Sie sind auf Seite 1von 30

The file is automatic updating DO NOT copy/insert/add lines or columns in the

file.
If a discipline requires more than the included number of rows the lead
engineer will request estimating to add the additional rows
Only GREY highlighted cells need to be filled in on the detail sheets
A NEW COPY OF THIS TEMPLATE IS TO BE USED FOR EACH NEW PROJECT - DO NOT USE A
PREVIOUS PROJECT FILE
EACH DISCIPLINE IN TURN FILLS IN THEIR OWN DATA IN A LOGICAL SEQUENCE

THE LEAD ENGINEER IS RESPONSIBLE FOR WALKING THE FILE BETWEEN DISCIPLINES AND
SUBMITTING THE COMPLETED FILE TO ENGINEERING AND DESIGN MANAGERS FOR REVIEW AND
QA/QC
THE LEAD ENGINEERING IS RESPONSIBLE FOR ENSURING THAT ALL COMMENTS FROM EM AND
DM ARE INCORPORATED PRIOR TO FINAL CHECKS BY EM, DM, AND PM
ONLY WHEN ALL CHECKS HAVE BEEN PERFORMED AND THE FILE IS CERTIFIED AS BEING VERIFIED
CORRECT AND FINAL WILL THE FILE BE TRANSMITTED TO THE ESTIMATOR

Each new project should be started on a clean copy of the


1 template
Open the template and save as a new project under the
2 project name in the correct project folder

Complete the IEP sheet first with project details then


3 proceed to the FEED and Detail sheets finally add any
assumptions
Fill in the relevant cells under the discipline section - only
4 grey highlighted cells are able to be changed, all other
cell are locked and cannot be selected
Ensure that each deliverable has a nominated engineer
5 applied from the drop down list - if a name is not in the
list request estimating to add the name
For each discipline the number of drawing prints to be
6 prepared/submitted by size must be included in the
relevant section of the template

7 If a new discipline section is required the Project engineer


will request estimating to insert it

Any Assumptions made during the completion of the file


8 should be recorded on the assumption sheet

Once completed, forward the file to the engineering and


9 design managers for checking

Following checks by the EM and DM the file should be


10 updated and returned for final checks by the EM, DM and
PM

Following the final checks the file will be sent to


11 estimating for finalisation

Once finalised the file will be returned to the Project


12 Manager for issue to the client
Project Title: Import of Hydrocarbons from Unilube to mix with HFO Date:
Project No. SPP 15/01
Revision: 0 Manhours Total Rate SARhr Total SAR
Discipline Category II Category III (Contract) Saudi Eastern Western Total Saudi Eastern Western Saudi Eastern Western Total
General Engineer Process Engineer 0.00 0.00 0.00 0.00 289.00 232.00 505.00 0.00 0.00 0.00 0.00
General Designer Process Designer 0.00 0.00 0.00 0.00 168.00 149.00 398.00 0.00 0.00 0.00 0.00
General Draughtsman MCIE Draughtsman 0.00 0.00 0.00 0.00 160.00 143.00 363.00 0.00 0.00 0.00 0.00
General CAD MCIE CAD 0.00 0.00 0.00 0.00 148.00 134.00 348.00 0.00 0.00 0.00 0.00
Process Engineer Process Engineer 0.00 0.00 0.00 0.00 289.00 232.00 505.00 0.00 0.00 0.00 0.00
Process Designer Process Designer 0.00 0.00 0.00 0.00 168.00 149.00 398.00 0.00 0.00 0.00 0.00
Process Draughtsman MCIE Draughtsman 0.00 0.00 0.00 0.00 160.00 143.00 363.00 0.00 0.00 0.00 0.00
Process CAD MCIE CAD 0.00 0.00 0.00 0.00 148.00 134.00 348.00 0.00 0.00 0.00 0.00
Mechanical Engineer MCIE Engineer 0.00 0.00 0.00 0.00 247.00 203.00 500.00 0.00 0.00 0.00 0.00
Mechanical Designer MCIE Designer 0.00 0.00 0.00 0.00 168.00 149.00 398.00 0.00 0.00 0.00 0.00
Mechanical Draughtsman MCIE Draughtsman 0.00 0.00 0.00 0.00 160.00 143.00 363.00 0.00 0.00 0.00 0.00
Mechanical CAD MCIE CAD 0.00 0.00 0.00 0.00 148.00 134.00 348.00 0.00 0.00 0.00 0.00
Instruments Engineer MCIE Engineer 0.00 0.00 0.00 0.00 247.00 203.00 500.00 0.00 0.00 0.00 0.00
Instruments Designer MCIE Designer 0.00 0.00 0.00 0.00 168.00 149.00 398.00 0.00 0.00 0.00 0.00
Instruments Draughtsman MCIE Draughtsman 0.00 0.00 0.00 0.00 160.00 143.00 363.00 0.00 0.00 0.00 0.00
Instruments CAD MCIE CAD 0.00 0.00 0.00 0.00 148.00 134.00 348.00 0.00 0.00 0.00 0.00
Communications Engineer MCIE Engineer 0.00 0.00 0.00 0.00 247.00 203.00 500.00 0.00 0.00 0.00 0.00
Communications Designer MCIE Designer 0.00 0.00 0.00 0.00 168.00 149.00 398.00 0.00 0.00 0.00 0.00
Communications Draughtsman MCIE Draughtsman 0.00 0.00 0.00 0.00 160.00 143.00 363.00 0.00 0.00 0.00 0.00
Communications CAD MCIE CAD 0.00 0.00 0.00 0.00 148.00 134.00 348.00 0.00 0.00 0.00 0.00
Piping Engineer MCIE Engineer 0.00 0.00 0.00 0.00 247.00 203.00 500.00 0.00 0.00 0.00 0.00
Piping Designer MCIE Designer 0.00 0.00 0.00 0.00 168.00 149.00 398.00 0.00 0.00 0.00 0.00
Piping Draughtsman MCIE Draughtsman 0.00 0.00 0.00 0.00 160.00 143.00 363.00 0.00 0.00 0.00 0.00
Piping CAD MCIE CAD 0.00 0.00 0.00 0.00 148.00 134.00 348.00 0.00 0.00 0.00 0.00
Electrical Engineer MCIE Engineer 0.00 0.00 0.00 0.00 247.00 203.00 500.00 0.00 0.00 0.00 0.00
Electrical Designer MCIE Designer 0.00 0.00 0.00 0.00 168.00 149.00 398.00 0.00 0.00 0.00 0.00
Electrical Draughtsman MCIE Draughtsman 0.00 0.00 0.00 0.00 160.00 143.00 363.00 0.00 0.00 0.00 0.00
Electrical CAD MCIE CAD 0.00 0.00 0.00 0.00 148.00 134.00 348.00 0.00 0.00 0.00 0.00
Civil Engineer MCIE Engineer 0.00 0.00 0.00 0.00 247.00 203.00 500.00 0.00 0.00 0.00 0.00
Civil Designer MCIE Designer 0.00 0.00 0.00 0.00 168.00 149.00 398.00 0.00 0.00 0.00 0.00
Civil Draughtsman MCIE Draughtsman 0.00 0.00 0.00 0.00 160.00 143.00 363.00 0.00 0.00 0.00 0.00
Civil CAD MCIE CAD 0.00 0.00 0.00 0.00 148.00 134.00 348.00 0.00 0.00 0.00 0.00
Architectural Engineer MCIE Engineer 0.00 0.00 0.00 0.00 247.00 203.00 500.00 0.00 0.00 0.00 0.00
Architectural Designer MCIE Designer 0.00 0.00 0.00 0.00 168.00 149.00 398.00 0.00 0.00 0.00 0.00
Architectural Draughtsman MCIE Draughtsman 0.00 0.00 0.00 0.00 160.00 143.00 363.00 0.00 0.00 0.00 0.00
Architectural CAD MCIE CAD 0.00 0.00 0.00 0.00 148.00 134.00 348.00 0.00 0.00 0.00 0.00
HVAC Engineer MCIE Engineer 0.00 0.00 0.00 0.00 247.00 203.00 500.00 0.00 0.00 0.00 0.00
HVAC Designer MCIE Designer 0.00 0.00 0.00 0.00 168.00 149.00 398.00 0.00 0.00 0.00 0.00
HVAC Draughtsman MCIE Draughtsman 0.00 0.00 0.00 0.00 160.00 143.00 363.00 0.00 0.00 0.00 0.00
HVAC CAD MCIE CAD 0.00 0.00 0.00 0.00 148.00 134.00 348.00 0.00 0.00 0.00 0.00
Plumbing Engineer MCIE Engineer 0.00 0.00 0.00 0.00 247.00 203.00 500.00 0.00 0.00 0.00 0.00
Plumbing Designer MCIE Designer 0.00 0.00 0.00 0.00 168.00 149.00 398.00 0.00 0.00 0.00 0.00
Plumbing Draughtsman MCIE Draughtsman 0.00 0.00 0.00 0.00 160.00 143.00 363.00 0.00 0.00 0.00 0.00
Plumbing CAD MCIE CAD 0.00 0.00 0.00 0.00 148.00 134.00 348.00 0.00 0.00 0.00 0.00
Fire Protection Engineer MCIE Engineer 0.00 0.00 0.00 0.00 247.00 203.00 500.00 0.00 0.00 0.00 0.00
Fire Protection Designer MCIE Designer 0.00 0.00 0.00 0.00 168.00 149.00 398.00 0.00 0.00 0.00 0.00
Fire Protection Draughtsman MCIE Draughtsman 0.00 0.00 0.00 0.00 160.00 143.00 363.00 0.00 0.00 0.00 0.00
Fire Protection CAD MCIE CAD 0.00 0.00 0.00 0.00 148.00 134.00 348.00 0.00 0.00 0.00 0.00
Materials Engineer MCIE Engineer 0.00 0.00 0.00 0.00 247.00 203.00 500.00 0.00 0.00 0.00 0.00
Materials Designer MCIE Designer 0.00 0.00 0.00 0.00 168.00 149.00 398.00 0.00 0.00 0.00 0.00
Materials Draughtsman MCIE Draughtsman 0.00 0.00 0.00 0.00 160.00 143.00 363.00 0.00 0.00 0.00 0.00
Materials CAD MCIE CAD 0.00 0.00 0.00 0.00 148.00 134.00 348.00 0.00 0.00 0.00 0.00
Subtotal Engineering A 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Indirects Project Manager Project Manager 0.00 0.00 0.00 0.00 464.00 353.00 692.00 0.00 0.00 0.00 0.00
Indirects Project Engineer Project Engineer 0.00 0.00 0.00 0.00 289.00 232.00 515.00 0.00 0.00 0.00 0.00
Indirects Planning Engineer Planning Engineer 0.00 0.00 0.00 0.00 259.00 211.00 424.00 0.00 0.00 0.00 0.00
Indirects Estimate Engineer Estimate Engineer 0.00 0.00 0.00 0.00 247.00 203.00 474.00 0.00 0.00 0.00 0.00
Subtotal Indirects B 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total C=A+B 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Scouting 0.00 0.00 0.00 60.00 Scouting 20,000.00


Drawing Print Outs 0.00

Grand Total Manhours 60.00 Grand Total (SAR) 20,000.00


SASREF GES Program
Engineering Exections Plan (EEP) Rev:
A) Project Information:
Project Title: SASREF P.O. N

SASREF Project Number: Quotation Request R


Project Leader: Jacobs-ZATE Ref:
D&E Consultant Assigned Leader:
B) Project Scope of Work - Summary:

C) Project Objectives:

D) Proposed Alternative Options (if any):

E) Lessons Learned Relevant to Project:

G) Design Standards & Reference Documents:

H) Design & Engineering Process:

I) Agreed Schedule Milestones & Progress Payments:

EEP Form (21 June 2015)


J) Critical Path Issues/Long Lead Items:

K) STANDARD REVIEWS:
URS
Internal Reviews
Design 30% 60% 90%

L) Special Review Requirments (Highlight Non-Standard Review Requirements):


HAZOP
HAZID/ Hazard & Risk
Hazardous Area Classification
HSE Desk Review/ Other

EEP Form (21 June 2015)


M) Proposed Contracting Strategy:

N) Special Construction Issues:


Shutdowns/TA
Tie-in type (flanged/ Hot tap)
Hot work (req'/restricted)

Underground Svcs (New/Existing)

Asbestos (known/not known)


HSE issues (Contamination, Matl
Disposal, Access etc)
Impact Assessment on Operations
& Maintenance
Spares (Commissioning & 2 Yr)
Training of SASREF Personnel
Other (Special Lifts, etc)
O) Other:

P) Special Tasks to be Performed ( e.g. Investigations, Site Visits, Brainstorming Sessions):

Q) Agreed List of Deliverables:

R) Target Estimate (See Breakdown, +/-10%):


Design & Engineering SR: 20,000.00 Man-Hours: 60.00
Total Project Cost SR:

S) Attachments:
Budget Breakdown
Deliverable list
Other
Title Initials Date
Prepared By: Lead Engr. / Project Engr.
Checked By: Engineering Manager
Approved By (Contractor): Project Manager
Status: Draft
Note: The rates included within the calculations have been checked for consistency with the approved contract rates

EEP Form (21 June 2015)


0 Date: 28-Jun-15

SASREF P.O. No:

Quotation Request Ref:


obs-ZATE Ref: SAF000XX
Location: SASREF, Al-Jubail

EEP Form (21 June 2015)


Final

EEP Form (21 June 2015)


EEP Form (21 June 2015)
SASREF GES Program
Design & Engineering Initiation Execution Plan (IEP) Rev: 0 Date: 27-Jun-15
Project Information:
Project Title: Import of Hydrocarbons from Unilube to mix with HFO Project No: SPP 15/01
SASREF Project Leader: Quotation Request Ref:
Jacobs-ZATE Ref: SAF000XX
D&E Consultant Assigned Leader: Location: SASREF, Al-Jubail
1. Project Purpose:

2. IEP Work Scope:

3. Fast Track Project: YES NO

4. IEP Schedule:
IEP (Meetings, Site Visits, Information gathering) -
Preparing IEP, Meetings, Information gathering, Clarification requests: Weeks
Front End Engineering Design: Weeks
Detail Design and Construction / Comissioning support: Weeks
Delivery of Engineering Engineering Execution Plan (EEP):

5. IEP Target Estimate (+/- 10%):


Scouting (IEP, EEP, URS): 60.00 20,000.00
FEED: 0.00 -
Detail Design: 0.00 -
Total: 60.00 20,000.00
6. Deliverables:

Engineering Execution Plan Other (Specify)

Title Initials Date


Prepared By: Lead Engr. / Project Engr.
Checked By: Engineering Manager
Approved By (Contractor): Project Manager
Status: Draft
Note: The rates included within the calculations have been checked for consistency with the approved contract rates

IEP Form (21 June 2015)


VARIATION NOTE

Client Name: SAUDI ARAMCO SHELL REFINERY Variation Note No:


Project Number: SPP 15/01 VN Revision No: Rev 0
Project Title: Import of Hydrocarbons from Unilube to mix with HFO VN Date: 25-Jun-2015

Title:
Design of Unilube Hydrocarbon Unloading Facility for unloading Kerosene range hydrocarbons.

Description of Variation (Use sheet 2 for additional information if required):


Original scope of SPP-15/01 was to install an unloading facility for Unilube Hydrocarbons. The fluid properties were provided by client and were used for developing the FEED Package.
However, per the new requiremenet, unilube unloading facility shall to be designed for unloading hydrocarbons ranging from Kerosene upto HVGO grade. Additional engineering effort is
required to complete the design for this. Additionally, Desk Safety Review was assumed as one day session, however, it was extended for two days.

Following are the major engineering effort needed to complete the design with new specification:

1- Resizing Pump for less dense fluid and higher vapor pressure.
2- Revision to Fire Protection system design due to introduction of low flash point fluids.
3- Pumps, Metering Skid, Isolation Valves datasheets update.
4- Revision to LEL and Toxic gas detection system provided in FEED for low flash point fluids.

On the civil point of view, the following are the major engineering effort needed to complete the design;
1. Foam skid foundation and calculations.
2. Pipe bridge, foundations and calculations.
3. Revision of grading and paving, drainage layout, shelter and its foundations, additional MTO, and scope of work.
Piping Scope:
1. Revised Plot Plan.
2. Revised Piping Plan.

3.Prepare Foam Skid Piping Plan


4. Prepare Construction/ Erection Drawing for Foam Skid .
5. Revised isometric Drawings.
6. Revised Hydrostatic
test diagram.

Justification for Variation / Reference Documents / Additional Information Attached:


Additional engineering effort based on the request. This was not estimated earlier in the SPP 15/01 estimation.

Disciplines Affected:
Process Yes Electrical Yes Project Controls Yes Doc. Control Yes Process
Mechanical Yes Instrumentation Yes Procurement No Construction No Work-hrs:
Piping Yes Communication No Subcontract No Others (see below) No Mechanical
Civil / Structural Yes Project Mngmnt Yes QA/QC Yes Work-hrs:
Work-hrs:
Pro Service Work-hours & Costs: Work-hours Costs (SAR) Electrical
Rough Order of Magnitude (ROM) Engineering 1,869 #N/A Work-hrs:
Proj Support/Others 262 SR. 112,215 Control Systems
Deliverables (112,215) SR. 20,310
Sub-contract (20,310) SR. - Control Systems
TOTAL COST: 2,131 #N/A Work-hrs:

Schedule Impact:
Work-hrs:
Work-hrs:
Work-hrs:
Variation Originated By: Client: Yes JZate: No Name of Originator: Tanveer Ahmed T
o
Variation Validated By: Project Controls: Date: 25-Jun-15 t
a
JacobsZate Approval: l
Submit for Client approval Proceed with work (original scope - not a variation)
On Hold - further information required Rejected - no further action required

Comments:

JacobsZate Project Engineer: Date:

JacobsZate Project Manager: Date:

Client Approval:
Please indicate below how you wish to proceed. If you authorise JacobsZate to proceed with the work and/or preparation of the Change
Order, then JacobsZate will be due all approved costs associated with the work, including the preparation of the Change Order.

Submit Change Order On Hold - further information required Rejected - take no further action
Comments:

Authorised Representative: Date:

file:///conversion/tmp/scratch/423279319.xlsx Page : 10/30


_x000D__x000D_ _x000D__x000D_ _x000D__x000D_
Project: SPP 15/01
Deliverables - Variation Notice

Deliverable Count
Existing to be Engineer Designer Draftsman CADD
No. Type Drawing Title New Document Cost Cost Cost Cost Total Hours
Revised hours hours hours hours
A0 A1 A2 A3 A4

1 - - - - -
2 - - - - -
3 - - - - -
4 - - - - -
5 - - - - -
6 - - - - -
7 - - - - -
8 - - - - -
9 - - - - -
10 - - - - -
11 - - - - -
12 - - - - -
13 General - - - - -
14 - - - - -
15 - - - - -
16 - - - - -
17 - - - - -
18 - - - - -
19 - - - - -
20 - - - - -
21 - - - - -
22 - - - - -
23 - - - - -
24 - - - - -
25 - - - - -
26 PEFS X 1.0 5.0 #N/A 5.0 #N/A - - 10.00
27 PFS X X 2.0 5.0 #N/A 5.0 #N/A - - 10.00
28 T-3.077.210 - Design Basis Document X 8.0 15.0 #N/A - - - 15.00
29 T-3.077.211 - Fire Water Design Basis Document X 10.0 20.0 #N/A - - - 20.00
30 T-3.077.212 - Control Narrative X 10.0 10.0 #N/A - - - 10.00
31 T-3.077.213 - Hydraulic Calculation Report X 10.0 10.0 #N/A - - - 10.00
T-3.077.215 - FW Hydraulic Report (Upstream of foam
32 X 10.0 10.0 #N/A - - - 10.00
skid)
33 Pump datasheet - Process Input X 4.0 2.0 #N/A - - - 2.00
34 Metering Skid datasheet - Process Input X 4.0 2.0 #N/A - - - 2.00
35 81-XE-450 TSO valve datasheet - Process Input X 2.0 2.0 #N/A - - - 2.00
36 81-RV-X2 RSV datasheet - Process Input X 2.0 2.0 #N/A - - - 2.00
37 Foam system MR - Process Input X 4.0 3.0 #N/A - - - 3.00
38 Process TBE- Foam system X 10.0 10.0 #N/A - - - 10.00
39 Site Visit ( 1 additional) 10.0 #N/A - - - 10.00
40 Scope Clarification 3.0 #N/A - - - 3.00
41 F&G Cause & Effect Diagram (Process input) 2.0 4.0 #N/A - - - 4.00
42 - - - - -
43 - - - - -
44 - - - - -
45 - - - - -
46 - - - - -
47 - - - - -
48 - - - - -
49 - - - - -
50 - - - - -
51 Technical Specification- Unilube system X 5.0 1,015.00 - - - 5.00
52 Data Sheet- Unilube unloading pumps X 5.0 1,015.00 - - - 5.00
53 Data Sheet- Unilube unloading skid X 5.0 1,015.00 - - - 5.00
54 Tank adequacy verification X 30.0 6,090.00 - - - 30.00
55 Technical Specification- Foam system X 30.0 6,090.00 - - - 30.00
56 MR- Foam system X 30.0 6,090.00 - - - 30.00
57 TBE- Foam system X 40.0 8,120.00 - - - 40.00
58 - - - - -
59 - - - - -
60 - - - - -
61 - - - - -
62 - - - - -
63 Mechanical - - - - -
64 - - - - -
65 - - - - -
66 - - - - -
67 - - - - -
68 - - - - -
69 - - - - -
70 - - - - -
71 - - - - -
72 - - - - -
73 - - - - -
74 - - - - -
75 - - - - -
76 Inst. Input to P&ID's X X 3.0 #N/A - - - 3.00
77 Inst. Input to Mech. Specification X 6.0 #N/A - - - 6.00
78 Inst. Input to Construction SOW X 5.0 #N/A - - - 5.00
79 Instrument Index Update X 5.0 6.0 #N/A - - - 6.00
80 IO List Update X 5.0 6.0 #N/A - - - 6.00
81 Inst. Data Sheet Update (TSO Valve) X 2.0 3.0 #N/A - - - 3.00
82 Inst. Data Sheet Update (RV) X 2.0 2.0 #N/A - - - 2.00
83 Inst. Data Sheet Update (Custody Trans. Flow Mtrs.) X 3.0 3.0 #N/A - - - 3.00
84 Vendor Package Review (Unilube+Foam) X 30.0 #N/A - - - 30.00
85 Cause & Effect Diagram X 2.0 80.0 #N/A - - - 80.00
86 F&G Layout X 1.0 20.0 #N/A 15.0 #N/A - - 35.00
87 Inst. Block Diagram Update X X 2.0 10.0 #N/A 10.0 #N/A - - 20.00
88 Instruments Inst. Main Cable Layout Update X 8.0 30.0 #N/A 50.0 #N/A - - 80.00
89 Instrument JB Interconnection drawing X 5.0 10.0 #N/A 15.0 #N/A - - 25.00
90 Instrument Marshalling wiring drawing X 4.0 5.0 #N/A 5.0 #N/A - - 10.00
91 Instrument Loop / Segment Diagram X 15.0 10.0 #N/A 15.0 #N/A - - 25.00
92 Inst. Cable & Conduit Schedule Update X 2.0 5.0 #N/A - - - 5.00
93 Logic Diagram X 10.0 50.0 #N/A 30.0 #N/A - - 80.00
94 Inst. MR Update (Instruments, Cables, Bulk) X 35.0 6.0 #N/A - - - 6.00
95 Bulk MTO Update X 5.0 5.0 #N/A 3.0 #N/A - - 8.00
96 Core Team Activity (Site Visit + Scouting) X 30.0 #N/A - - - 30.00
97 Client Technical & Design review X 10.0 #N/A - - - 10.00
98 - - - - -
99 - - - - -
100 - - - - -
101 - - - - -
102 - - - - -
103 - - - - -
104 - - - - -
105 - - - - -
106 - - - - -
107 - - - - -
108 - - - - -
109 - - - - -
110 - - - - -
111 - - - - -
112 - - - - -
113 Communications - - - - -
114 - - - - -
115 - - - - -
116 - - - - -
117 - - - - -
118 - - - - -
119 - - - - -
120 - - - - -
121 - - - - -
122 - - - - -
123 - - - - -
124 - - - - -
125 - - - - -
126 Plot Plan X 1.0 2.0 #N/A 5.0 #N/A - - 7.00
127 Piping Layout X 2.0 3.0 #N/A 10.0 #N/A - - 13.00
128 Piping Section & Details X 1.0 3.0 #N/A 10.0 #N/A - - 13.00
129 Isometric Drawing X 2.0 4.0 #N/A 6.0 #N/A - - 10.00

Attachment-1 11 of 30
_x000D__x000D_ _x000D__x000D_ _x000D__x000D_
Project: SPP 15/01
Deliverables - Variation Notice

Deliverable Count
Existing to be Engineer Designer Draftsman CADD
No. Type Drawing Title New Document Cost Cost Cost Cost Total Hours
Revised hours hours hours hours
A0 A1 A2 A3 A4

130 MTO X 2.0 2.0 #N/A 3.0 #N/A - - 5.00


131 SOW ( Piping Input ) X 2.0 5.0 #N/A - - - 5.00
132 P& ID input X 2.0 #N/A - - - 2.00
133 Site Visit X X 10.0 #N/A - - - 10.00
134 Hydrostatic Test Diagram X 1.0 3.0 #N/A 4.0 #N/A - - 7.00
135 MR's X 12.0 10.0 #N/A - - - 10.00
136 Client Technical & Design review 10.0 #N/A - - - 10.00
137 X - - - - -
138 Piping - - - - -
139 - - - - -
140 - - - - -
141 - - - - -
142 - - - - -
143 - - - - -
144 - - - - -
145 - - - - -
146 - - - - -
147 - - - - -
148 - - - - -
149 - - - - -
150 - - - - -
151 Over all cable routing plan X 1.0 4.0 988.00 10.0 1,680.00 - - 14.00
152 Component schedule / Terminal list X 4.0 8.0 1,976.00 15.0 2,520.00 - - 23.00
153 Area Classification X 1.0 3.0 741.00 5.0 840.00 - - 8.00
154 Power And Control Plan- S/S# 7 X 1.0 3.0 741.00 5.0 840.00 - - 8.00
155 Cable Sizing Calculation X 3.0 8.0 1,976.00 - - - 8.00
156 Panel Arrangement Layout X 3.0 6.0 1,482.00 15.0 2,520.00 - - 21.00
157 Trench / Duct Bank-Sections X 1.0 3.0 741.00 5.0 840.00 - - 8.00
158 Cable routing layout for Foam Skid X 1.0 5.0 1,235.00 15.0 2,520.00 - - 20.00
159 Lighting layout for Foam Skid X 1.0 5.0 1,235.00 10.0 1,680.00 - - 15.00
160 Grounding layout for Foam Skid X 1.0 5.0 1,235.00 10.0 1,680.00 - - 15.00
161 Load Calculation X 5.0 20.0 4,940.00 - - - 20.00
162 Cable Schedule X 1.0 4.0 988.00 - - - 4.00
163 Electrical Single Line Diagram for Foam Skid X 1.0 8.0 1,976.00 15.0 2,520.00 - - 23.00
164 Schedule for LV Switchboard X 1.0 8.0 1,976.00 15.0 2,520.00 - - 23.00
165 MTO X X 5.0 5.0 1,235.00 - - - 5.00
166 SOW X X 2.0 5.0 1,235.00 - - - 5.00
167 Site visit X 10.0 2,470.00 - - - 10.00
168 MR's X X 15.0 20.0 4,940.00 - - - 20.00
169 Client Technical & Design review X 10.0 2,470.00 - - - 10.00
170 - - - - -
171 - - - - -
172 - - - - -
173 - - - - -
174 - - - - -
175 - - - - -
176 Grading and Paving Layout X 6.0 #N/A 6.0 #N/A - - 12.00
177 Drainage Layout X 6.0 #N/A 6.0 #N/A - - 12.00
178 Shelter Foundation Layout X 10.0 #N/A 10.0 #N/A - - 20.00
179 Shelter Foundation Plan & Details X 10.0 #N/A 10.0 #N/A - - 20.00
180 Shelter Plan, Section & Elevation X 15.0 #N/A 25.0 #N/A - - 40.00
181 Calculation of Shelter X 40.0 #N/A - - - 40.00
182 Foam Skid Foundation Plan, Sections and Details X 10.0 #N/A 25.0 #N/A - - 35.00
183 Scope of Work X 15.0 #N/A - - - 15.00
184 Calculation (Foam Skid) X 25.0 #N/A - - - 25.00
185 - - - - -
186 - - - - -
187 MTO X 5.0 #N/A - - - 5.00
188 Civil DSR 10.0 #N/A - - - 10.00
189 Site Visit 10.0 #N/A - - - 10.00
190 - - - - -
191 - - - - -
192 - - - - -
193 - - - - -
194 - - - - -
195 - - - - -
196 - - - - -
197 - - - - -
198 - - - - -
199 - - - - -
200 - - - - -
201 - - - - -
202 - - - - -
203 - - - - -
204 - - - - -
205 - - - - -
206 - - - - -
207 - - - - -
208 - - - - -
209 - - - - -
210 - - - - -
211 - - - - -
212 - - - - -
213 Architectural - - - - -
214 - - - - -
215 - - - - -
216 - - - - -
217 - - - - -
218 - - - - -
219 - - - - -
220 - - - - -
221 - - - - -
222 - - - - -
223 - - - - -
224 - - - - -
225 - - - - -
226 - - - - -
227 - - - - -
228 - - - - -
229 - - - - -
230 - - - - -
231 - - - - -
232 - - - - -
233 - - - - -
234 - - - - -
235 - - - - -
236 - - - - -
237 - - - - -
238 HVAC - - - - -
239 - - - - -
240 - - - - -
241 - - - - -
242 - - - - -
243 - - - - -
244 - - - - -
245 - - - - -
246 - - - - -
247 - - - - -
248 - - - - -
249 - - - - -
250 - - - - -
251 - - - - -
252 - - - - -
253 - - - - -
254 - - - - -
255 - - - - -
256 - - - - -
257 - - - - -
258 - - - - -

Attachment-1 12 of 30

Plumbing
_x000D__x000D_ _x000D__x000D_ _x000D__x000D_
Project: SPP 15/01
Deliverables - Variation Notice

Deliverable Count
Existing to be Engineer Designer Draftsman CADD
No. Type Drawing Title New Document Cost Cost Cost Cost Total Hours
Revised hours hours hours hours
A0 A1 A2 A3 A4

259 - - - - -
260 - - - - -
261 - - - - -
262 - - - - -
263 Plumbing - - - - -
264 - - - - -
265 - - - - -
266 - - - - -
267 - - - - -
268 - - - - -
269 - - - - -
270 - - - - -
271 - - - - -
272 - - - - -
273 - - - - -
274 - - - - -
275 - - - - -
276 Design Basis - Foam System X 2.0 16.0 #N/A - - - 16.00
277 Scope of Work- Foam System X 2.0 16.0 #N/A - - - 16.00
278 Technical Specification- Foam system X 20.0 30.0 #N/A - - - 30.00
279 Technical Specification- Deluge Foam system X 20.0 30.0 #N/A - - - 30.00
280 General Notes X 1.0 15.0 #N/A 15.0 #N/A - - 30.00
281 Fire Protection Misl. Details X 2.0 30.0 #N/A 40.0 #N/A - - 70.00
282 Foam Generation System Schematic - Unloading area X 1.0 15.0 #N/A 20.0 #N/A - - 35.00
283 Fire protection Layout- Unloading Rack area X 1.0 15.0 #N/A 20.0 #N/A - - 35.00
284 Sectional Layouts X 1.0 10.0 #N/A 20.0 #N/A - - 30.00
285 Isometric Layouts X 1.0 10.0 #N/A 20.0 #N/A - - 30.00
286 Hydraulic Calculations X 20.0 30.0 #N/A 10.0 #N/A - - 40.00
287 Bulk MTO X 2.0 10.0 #N/A 10.0 #N/A - - 20.00
288 Fire Protection Site visits X 10.0 #N/A 10.0 #N/A - - 20.00
289 Client Technical & Design review meetings X 10.0 #N/A - - - 10.00
290 Hydrostatic Test Diagram X 1.0 10.0 #N/A 15.0 #N/A - - 25.00
291 Vendor Package Review (Foam) X 30.0 #N/A - - - 30.00
292 TBE- Foam system X 30.0 #N/A - - - 30.00
293 MR- Foam system X 30.0 #N/A - - - 30.00
294 - - - - -
295 - - - - -
296 - - - - -
297 - - - - -
298 - - - - -
299 - - - - -
300 - - - - -
301 - - - - -
302 - - - - -
303 - - - - -
304 - - - - -
305 - - - - -
306 - - - - -
307 - - - - -
308 - - - - -
309 - - - - -
310 - - - - -
311 - - - - -
312 - - - - -
313 Materials - - - - -
314 - - - - -
315 - - - - -
316 - - - - -
317 - - - - -
318 - - - - -
319 - - - - -
320 - - - - -
321 - - - - -
322 - - - - -
323 - - - - -
324 - - - - -
325 - - - - -
326 Sub-Totals 0 0 0 95 234 1,296.00 #N/A 573.00 #N/A 0.00 - 0.00 - 1,869.00
Indirect (Non-Engineering accounts)
327 Project Manager 2.0% 25,866.96 37.38
328 Project Engineer 4.0% 17,344.32 74.76
329 Planning Engineer 2.0% 15,849.12 37.38
330 Estimate Engineer 6.0% 53,154.36 112.14
331 Totals 112,214.76 2,130.66
A0 A1 A2 A3 A4
Drawings Detail Design, Two Submittal of Six Copies Only
1,140 2,808 6
Rate 16.00 11.50 6.00 5.50 5.00
Total - - - 6,270.00 14,040.00 20,310.00
Engineer Designer Draftsman CADD Indirect Drgs. Total
Total Sheet Value #N/A #N/A - - 112,214.76 20,310.00 #N/A

Attachment-1 13 of 30
_x000D__x000D_ _x000D__x000D_ _x000D__x000D_
Project: SPP 15/01
Deliverables - FEED Design Stage

Deliverable Count
Existing to be Engineer Designer Draftsman CADD
Type Drawing Title New Document Cost Cost Cost Cost Total Hours
Revised hours hours hours hours
A0 A1 A2 A3 A4

- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
General - - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
Process - - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
Mechanical - - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
Instruments - - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
Communications - - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -

Attachment-1 14 of 30
_x000D__x000D_ _x000D__x000D_ _x000D__x000D_
Project: SPP 15/01
Deliverables - FEED Design Stage

Deliverable Count
Existing to be Engineer Designer Draftsman CADD
Type Drawing Title New Document Cost Cost Cost Cost Total Hours
Revised hours hours hours hours
A0 A1 A2 A3 A4

- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
Piping - - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -

Attachment-1 15 of 30
_x000D__x000D_ _x000D__x000D_ _x000D__x000D_
Project: SPP 15/01
Deliverables - FEED Design Stage

Deliverable Count
Existing to be Engineer Designer Draftsman CADD
Type Drawing Title New Document Cost Cost Cost Cost Total Hours
Revised hours hours hours hours
A0 A1 A2 A3 A4

- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
Electrical - - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
Civil - - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
Architectural - - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
HVAC - - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
Plumbing - - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -

Attachment-1 16 of 30
_x000D__x000D_ _x000D__x000D_ _x000D__x000D_
Project: SPP 15/01
Deliverables - FEED Design Stage

Deliverable Count
Existing to be Engineer Designer Draftsman CADD
Type Drawing Title New Document Cost Cost Cost Cost Total Hours
Revised hours hours hours hours
A0 A1 A2 A3 A4

- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
Fire Protection - - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
Materials - - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
Sub-Totals 0 0 0 0 0 0.00 - 0.00 - 0.00 - 0.00 - 0.00
Indirect (Non-Engineering accounts)
Scouting (IEP, EEP, URS): Included here for information 20,000.00 60.00
Project Manager 2.0% - 0.00
Project Engineer 4.0% - 0.00
Planning Engineer 2.0% - 0.00
Estimate Engineer 6.0% - 0.00
Totals - -
A0 A1 A2 A3 A4
Drawings FEED, Two Submittal of Six Copies Only
0 0
Rate 16.00 11.50 6.00 5.50 5.00
Total 0.00 0.00 0.00 0.00 0.00 0.00
Engineer Designer Draftsman CADD Indirect Drgs. Total
Total Sheet Value - - - - - - -

Attachment-1 17 of 30
_x000D__x000D_ _x000D__x000D_ _x000D__x000D_
Project: SPP 15/01
Deliverables - FEED Design Stage

Deliverable Count
Existing to be Engineer Designer Draftsman CADD
No. Type Drawing Title New Document Cost Cost Cost Cost Total Hours
Revised hours hours hours hours
A0 A1 A2 A3 A4

1 - - - - -
2 - - - - -
3 - - - - -
4 - - - - -
5 - - - - -
6 - - - - -
7 - - - - -
8 - - - - -
9 - - - - -
10 - - - - -
11 - - - - -
12 - - - - -
13 General - - - - -
14 - - - - -
15 - - - - -
16 - - - - -
17 - - - - -
18 - - - - -
19 - - - - -
20 - - - - -
21 - - - - -
22 - - - - -
23 - - - - -
24 - - - - -
25 - - - - -
26 - - - - -
27 - - - - -
28 - - - - -
29 - - - - -
30 - - - - -
31 - - - - -
32 - - - - -
33 - - - - -
34 - - - - -
35 - - - - -
36 - - - - -
37 - - - - -
38 Process - - - - -
39 - - - - -
40 - - - - -
41 - - - - -
42 - - - - -
43 - - - - -
44 - - - - -
45 - - - - -
46 - - - - -
47 - - - - -
48 - - - - -
49 - - - - -
50 - - - - -
51 - - - - -
52 - - - - -
53 - - - - -
54 - - - - -
55 - - - - -
56 - - - - -
57 - - - - -
58 - - - - -
59 - - - - -
60 - - - - -
61 - - - - -
62 - - - - -
63 Mechanical - - - - -
64 - - - - -
65 - - - - -
66 - - - - -
67 - - - - -
68 - - - - -
69 - - - - -
70 - - - - -
71 - - - - -
72 - - - - -
73 - - - - -
74 - - - - -
75 - - - - -
76 - - - - -
77 - - - - -
78 - - - - -
79 - - - - -
80 - - - - -
81 - - - - -
82 - - - - -
83 - - - - -
84 - - - - -
85 - - - - -
86 - - - - -
87 - - - - -
88 Instruments - - - - -
89 - - - - -
90 - - - - -
91 - - - - -
92 - - - - -
93 - - - - -
94 - - - - -
95 - - - - -
96 - - - - -
97 - - - - -
98 - - - - -
99 - - - - -
100 - - - - -
101 - - - - -
102 - - - - -
103 - - - - -
104 - - - - -
105 - - - - -
106 - - - - -
107 - - - - -
108 - - - - -
109 - - - - -
110 - - - - -
111 - - - - -
112 - - - - -
113 Communications - - - - -
114 - - - - -
115 - - - - -
116 - - - - -
117 - - - - -
118 - - - - -
119 - - - - -
120 - - - - -
121 - - - - -
122 - - - - -
123 - - - - -
124 - - - - -
125 - - - - -
126 - - - - -
127 - - - - -
128 - - - - -
129 - - - - -

Attachment-1 18 of 30
_x000D__x000D_ _x000D__x000D_ _x000D__x000D_
Project: SPP 15/01
Deliverables - FEED Design Stage

Deliverable Count
Existing to be Engineer Designer Draftsman CADD
No. Type Drawing Title New Document Cost Cost Cost Cost Total Hours
Revised hours hours hours hours
A0 A1 A2 A3 A4

130 - - - - -
131 - - - - -
132 - - - - -
133 - - - - -
134 - - - - -
135 - - - - -
136 - - - - -
137 - - - - -
138 Piping - - - - -
139 - - - - -
140 - - - - -
141 - - - - -
142 - - - - -
143 - - - - -
144 - - - - -
145 - - - - -
146 - - - - -
147 - - - - -
148 - - - - -
149 - - - - -
150 - - - - -
151 - - - - -
152 - - - - -
153 - - - - -
154 - - - - -
155 - - - - -
156 - - - - -
157 - - - - -
158 - - - - -
159 - - - - -
160 - - - - -
161 - - - - -
162 - - - - -
163 Electrical - - - - -
164 - - - - -
165 - - - - -
166 - - - - -
167 - - - - -
168 - - - - -
169 - - - - -
170 - - - - -
171 - - - - -
172 - - - - -
173 - - - - -
174 - - - - -
175 - - - - -
176 - - - - -
177 - - - - -
178 - - - - -
179 - - - - -
180 - - - - -
181 - - - - -
182 - - - - -
183 - - - - -
184 - - - - -
185 - - - - -
186 - - - - -
187 - - - - -
188 Civil - - - - -
189 - - - - -
190 - - - - -
191 - - - - -
192 - - - - -
193 - - - - -
194 - - - - -
195 - - - - -
196 - - - - -
197 - - - - -
198 - - - - -
199 - - - - -
200 - - - - -
201 - - - - -
202 - - - - -
203 - - - - -
204 - - - - -
205 - - - - -
206 - - - - -
207 - - - - -
208 - - - - -
209 - - - - -
210 - - - - -
211 - - - - -
212 - - - - -
213 Architectural - - - - -
214 - - - - -
215 - - - - -
216 - - - - -
217 - - - - -
218 - - - - -
219 - - - - -
220 - - - - -
221 - - - - -
222 - - - - -
223 - - - - -
224 - - - - -
225 - - - - -
226 - - - - -
227 - - - - -
228 - - - - -
229 - - - - -
230 - - - - -
231 - - - - -
232 - - - - -
233 - - - - -
234 - - - - -
235 - - - - -
236 - - - - -
237 - - - - -
238 HVAC - - - - -
239 - - - - -
240 - - - - -
241 - - - - -
242 - - - - -
243 - - - - -
244 - - - - -
245 - - - - -
246 - - - - -
247 - - - - -
248 - - - - -
249 - - - - -
250 - - - - -
251 - - - - -
252 - - - - -
253 - - - - -
254 - - - - -
255 - - - - -
256 - - - - -
257 - - - - -
258 - - - - -

Attachment-1 19 of 30

Plumbing
_x000D__x000D_ _x000D__x000D_ _x000D__x000D_
Project: SPP 15/01
Deliverables - FEED Design Stage

Deliverable Count
Existing to be Engineer Designer Draftsman CADD
No. Type Drawing Title New Document Cost Cost Cost Cost Total Hours
Revised hours hours hours hours
A0 A1 A2 A3 A4

259 - - - - -
260 - - - - -
261 - - - - -
262 - - - - -
263 Plumbing - - - - -
264 - - - - -
265 - - - - -
266 - - - - -
267 - - - - -
268 - - - - -
269 - - - - -
270 - - - - -
271 - - - - -
272 - - - - -
273 - - - - -
274 - - - - -
275 - - - - -
276 - - - - -
277 - - - - -
278 - - - - -
279 - - - - -
280 - - - - -
281 - - - - -
282 - - - - -
283 - - - - -
284 - - - - -
285 - - - - -
286 - - - - -
287 - - - - -
288 Fire Protection - - - - -
289 - - - - -
290 - - - - -
291 - - - - -
292 - - - - -
293 - - - - -
294 - - - - -
295 - - - - -
296 - - - - -
297 - - - - -
298 - - - - -
299 - - - - -
300 - - - - -
301 - - - - -
302 - - - - -
303 - - - - -
304 - - - - -
305 - - - - -
306 - - - - -
307 - - - - -
308 - - - - -
309 - - - - -
310 - - - - -
311 - - - - -
312 - - - - -
313 Materials - - - - -
314 - - - - -
315 - - - - -
316 - - - - -
317 - - - - -
318 - - - - -
319 - - - - -
320 - - - - -
321 - - - - -
322 - - - - -
323 - - - - -
324 - - - - -
325 - - - - -
326 Sub-Totals 0 0 0 0 0 0.00 - 0.00 - 0.00 - 0.00 - 0.00
Indirect (Non-Engineering accounts)
327 Project Manager 2.0% - 0.00
328 Project Engineer 4.0% - 0.00
329 Planning Engineer 2.0% - 0.00
330 Estimate Engineer 6.0% - 0.00
331 Totals - -
A0 A1 A2 A3 A4
Drawings Detail Design, Two Submittal of Six Copies Only
0 0 6
Rate 16.00 11.50 6.00 5.50 5.00
Total - - - - - -
Engineer Designer Draftsman CADD Indirect Drgs. Total
Total Sheet Value - - - - - - -

Attachment-1 20 of 30
General - Assumptions used to prepare Engineering man-hour estimate:
Sr.No Description
1
2

Process - Assumptions used to prepare Process Engineering man-hour estimate:


Sr.No Description
1
2

Civil - Assumptions used to prepare Civil Engineering man-hour estimate:


Sr.No Description
It is assumed that the shelter size will be affected to accommodate the new foam fire fighting system.
1
2 It is assumed that pipe bridge will not be affected by this VN.

3 It is assumed that existing road layout and plot plan will remain same except addition of foam skid.
4 It is assumed that foam skid is a static equipment with no dynamic calculation required.

5 It is assumed that foam skid loads and reactions for foundation design will be provided by vendor
6 It is assumed that geotechnical report will be provided by client.
It is assumed that underground and above ground drawings are available and no radar mapping or underground
7 utility survey is required.
8 It is assumed that no instrument, electrical and piping support is required.
9 Fabrication drawings will not be provided
10 Construction site support not considered.
11 Fire water piping support and hydrant support other than shelter not considered.
Mechanical - Assumptions used to prepare Mechanical Engineering man-hour estimate:
Sr.No Description
Technical Specification and data sheet of T-8142 are excluded. Will be confirmed after adequacy check.
1
2

Piping - Assumptions used to prepare Piping Engineering man-hour estimate:


Sr.No Description
1 No DSR Meeting
2

Electrical - Assumptions used to prepare Electrical Engineering man-hour estimate:


Sr.No Description
1
2

Instruments - Assumptions used to prepare Instrumentation Engineering man-hour estimate:


Sr.No Description
1 Controller's and Control Panels for Unilube & Foam Skid are considered to be located in the FAR.
2 Addition of two new C&E considered
3 Logic Diagram 10 sheets considered.
Communications - Assumptions used to prepare Communications Engineering man-hour estimate:
Sr.No Description
1
2

Architectural - Assumptions used to prepare Architechural Engineering man-hour estimate:


Sr.No Description
1
2

HVAC - Assumptions used to prepare HVAC Engineering man-hour estimate:


Sr.No Description
1
2

Plumbing - Assumptions used to prepare Plumbing Engineering man-hour estimate:


Sr.No Description
1
2

Fire Protection - Assumptions used to prepare Fire-Protection Engineering man-hour estimate:


Sr.No Description
1
2

Materials - Assumptions used to prepare Materials Engineering man-hour estimate:


Sr.No Description
1
2

OTHER - Assumptions used to prepare Engineering man-hour estimate:


Sr.No Description
1
2

Assumptions used to prepare Electrical Engineering man-hour estimate:


Sr.No Description
1
2
Remarks
DESIGN ENGINEERING - WORK FLOW CYCLE

Project
Name % OVERALL

Start of FEED

FEED Design - Issued for Client Review 20%


Complete

SASREF Review

Comment
Resolution &
Incorporation

Start of Detailed
Design

Detail Design Issued for Detailed Design Review 70%


Complete for
Review

SASREF Review

Comment
Resolution &
Incorporation

Detail Design Issued for Construction 100%


Complete
DESIGN ENGINEERING - WORK FLOW CYCLE

Detail Design Issued for Construction 100%


Complete

NOTES:
1. More than one review may be required at FEED and/or Detailed Design Stage. This shall be
agreed and finalized during EEP Review.
OVERALL ENGINEERING CYCLE (FEED + DETAIL DESIGN)
DESIGN ENGINEERING - WORK FLOW CYCLE
Insert Here, If Available
Insert Here, If Available
Status Nationality Note:- The rates included within the calculations for the
Saudi IEP totals have been checked against the approved
Draft Western contract rates
Final Eastern
Engineer Nationality/Rate Engineer Nationality/Rate
Discipline S W E Discipline S W E
General G 289 505 232 Proj Mgr PM 464 692 353
Process P 289 505 232 Proj Eng'r. PE 289 515 232
Mechanical M 247 500 203
Instr I 247 500 203
Comms CO 247 500 203
Piping PI 247 500 203
Electrical E 247 500 203 Planning Eng'r PLA 259 424 211
Civil C 247 500 203 Estimate Eng'r EE 247 474 203
Architec A 247 500 203
HVAC H 247 500 203
Plumbing PL 247 500 203
Fire Protection F 247 500 203
Materials MA 247 500 203
Designer Nationality/Rate
Discipline S W E
General G 168 398 149
Process P 168 398 149
Mechanical M 168 398 149
Instr I 168 398 149
Comms CO 168 398 149
Piping PI 168 398 149
Electrical E 168 398 149
Civil C 168 398 149
Architec A 168 398 149
HVAC H 168 398 149
Plumbing PL 168 398 149
Fire Protection F 168 398 149
Materials MA 168 398 149
Design Draftsman Nationality/Rate
Discipline S W E
General G 160 363 143
Process P 160 363 143
Mechanical M 160 363 143
Instr I 160 363 143
Comms CO 160 363 143
Piping PI 160 363 143
Electrical E 160 363 143
Civil C 160 363 143
Architec A 160 363 143
HVAC H 160 363 143
Plumbing PL 160 363 143
Fire Protection F 160 363 143
Materials MA 160 363 143
CADD Nationality/Rate
Discipline S W E
General G 148 348 134
Process P 148 348 134
Mechanical M 148 348 134
Instr I 148 348 134
Comms CO 148 348 134
Piping PI 148 348 134
Electrical E 148 348 134
Civil C 148 348 134
Architec A 148 348 134
HVAC H 148 348 134
Plumbing PL 148 348 134
Fire Protection F 148 348 134
Materials MA 148 348 134