Sie sind auf Seite 1von 755

DETAILED GEOTECHNICAL

INVESTIGATION FOR
YANBU DISTRIBUTION HUB PROJECT
YANBU, K.S.A
------------------------------------------
Geotechnical File No.: 2015/104 Rev.1
------------------------------------------

D
BI
R
FO
ED

PREPARED FOR:

MUSTANG HDP
P. O. Box-3863
SU

AL-KHOBAR-31952
SAUDI ARABIA
IS

PREPARED BY:

AED EID AL OSAIMI ENGINEERING CONSULTING OFFICE


P.O. BOX # 1736, AL-KHOBAR 31952
KINGDOM OF SAUDI ARABIA

JUNE 2016
IS
SU
ED
FO
R
BI
D
Geotechnical File No. 2015/104, Rev.1

CONTENTS

Page #

EXECUTIVE SUMMARY 1

1. INTRODUCTION
1.1 General Project Description and Facilities 15
1.2 Purpose and Scope of Work 15

2. SITE CONDITIONS
2.1 Site Local Geology and General Description 17
2.2 Potential Geologic Hazards 18

D
2.3 Site Class & Liquefaction analysis 18
2.4 Site Topography and Surface Features 19

BI
3. SUBSURFACE CONDITIONS
3.1 Stratigraphy 24
3.2 Subsurface Material Properties and General Description 25

R
3.3 Groundwater Table Depths 25
FO
4. FIELD INVESTIGATIONS
4.1 Summary of Operations 27
4.2 Description of Sampling Procedures 27
4.2.1.a Standard Penetration Tests 27
4.2.1.b Undisturbed Samples 28
4.3 Logs of Borings 30
ED

4.4 Other in-situ tests 30


4.4.1 Seismic cross-hole Tests 30
4.4.2 Piezo cone Penetration Tests 32
4.4.3 Electrical Resistivity tests 33
SU

4.4.4 Seismic Refraction tests 34


4.4.5 Thermal Resistivity tests 35
4.4.6 Excavation of test pits and Collection of bulk samples 36
4.4.7 Photographs of field operations 36
IS

5. LABORATORY TESTS
5.1 Description of Tests 37
5.2 Presentation and Discussion of Test Results 38
5.3 Chemical Analysis of Soils & Water 40

6. FOUNDATION RECOMMENDATIONS
6.1 General 41
6.2 Geotechnical Evaluation 41
6.3 Shallow foundations 43
6.3.1 Criteria 43
6.3.2 Net Allowable Bearing Capacities 43
6.3.4 Spread footings 44
6.3.5 Increase in bearing capacity for short term loading & 51
Blasting

i
Geotechnical File No. 2015/104, Rev.1

6.3.6 Other settlement considerations 51


6.3.7 Foundation stability 52
6.4 Mat Foundations 52
6.5 Tank foundations 54
6.5.1 General 54
6.5.2 Settlement Analysis & recommendations 56
6.5.3 Soil Improvement by Replacement & filling 68
6.5.4 Hydro-Testing of Tank 70
6.6 Foundation for Vibrating equipments 71
6.6.1 Machines supported by Block foundations-General 71
6.6.2 Parameters from cross-hole tests 72
6.6.3 Spring constants & Damping in soils 73
7. CONSTRUCTION CONSIDERATIONS
7.1 Site Preparation 76

D
7.2 Excavation Considerations 76
7.3 Fill Considerations 77

BI
7.4 Drainage Provisions 80
7.5 Erosion Protection 81

R
7.6 Foundation Protection 82
7.7 Dewatering Aspects 83
FO
7.8 Pavement considerations 84
7.8.1 Sub-grade materials 84
7.8.2 Other aspects of pavements 85
ED

8. GENERAL COMMENTS AND LIMITATIONS 86

9. SELECTED REFERENCES 87
SU
IS

ii
Geotechnical File No. 2015/104, Rev.1

ILLUSTRATIONS

Figure.

D
Vicinity Map 1
Facility Plot plan 2

BI
Boreholes & other tests Location Plan 2a thru 2e
Generalized Subsoil profiles 3
Field SPT-N Tables 4 (a) thru 4(e)
SPT-N60 Tables

R 5 (a) thru 5(e)


FO
ED
SU
IS

iii
Geotechnical File No. 2015/104, Rev.1

APPENDIX-A
(Borehole Data)

Figure
Borehole Logs A-1 thru A-84

Symbols A-85

Unified Soil Classification (ASTM D-2487) A-86

Clark & Walker Carbonate Sediment Classification A-87

D
APPENDIX- B

BI
(Laboratory Test Data of Borehole Samples)

Figure
Summary of Laboratory Test Results on BH Samples B-1 thru B-31
Summary of Chemical Tests on Water Samples

R B-31(a)
FO
Gradation Charts B-32 thru B-116
Plasticity Charts B-117 thru B-142
Direct Shear Test Plots B-143 thru B-149
Unconfined Compression Test Plots of cohesive soils B-150 thru B-159
ED

Consolidation test plots B-160 thru B-167


SU

APPENDIX-C
(Settlement Analysis Computations)

Burland & Burbidge’s Analysis for Elastic settlement computation C-1 & C-1a
IS

Equation for NABC of Mat foundations C-2


Typical Settlement Computations for Spread foundations C-3 thru C-7
Typical calculations based on Shear Criteria for Spread C-8 thru C-11
Foundations
Typical NABC Computations for Mat foundations C-12 thru C-14
Input file of Settle 3D Software for Tank C-15 thru C-15(b)
Output file of Settle 3D Software for Tank C-16

iv
Geotechnical File No. 2015/104, Rev.1

APPENDIX – D
(Seismic Cross-hole Test Data)

Schematic Layout of Seismic Cross-hole Survey D-1


Borehole logs for Shot holes D-2 thru D-8
Summary of the laboratory test results of shot hole boreholes D-9 thru D-11
Test data, Plots of Velocities and Dynamic Soil Properties D-12 thru D-18(a)

D
BI
APPENDIX-E
(Piezo-cone Penetration Test Data)

Piezo-cone Penetration Tests Plots E-1 thru E-10

R
FO
APPENDIX-F
(Seismic Refraction Test Data)

Concept of Seismic Refraction soundings F-1


ED

Seismic velocity contour maps F-2 thru F-6


SU

APPENDIX-G
(Electrical Resistivity Test Data)

Wenner Field Array- Schematic Diagram G-1


IS

Electrical Resistivity and Electrode Spacing Plots G-2 thru G-21


Correlation Between Corrosivity & Soil Resistivity G-22

v
Geotechnical File No. 2015/104, Rev.1

APPENDIX-H
(Laboratory Test Data of Bulk Samples)

Test Pit Logs H-1 thru H-14

Summary of Laboratory Test Results H-15 thru 17

Classification of Soils as Per ASTM D-2487 H-18

Classification of Soils And Soil-Aggregate Mixtures For Highway H-19

D
Purposes as Per ASTM D-3282
Gradation Chart for Soils H-20 thru H-33

BI
Plasticity Chart H-34 thru H-36

Moisture Density Relationships H-37 thru H-50

CBR Test Plots


R H-51 thru H-64
FO
Approximate Correlation Of Soil Rating Based of CBR Values H-65

Field Density Tests Results H-66 thru H-79


ED

APPENDIX-I
(Field Thermal Resistivity Test Data)
SU

Field Thermal Resistivity Tests Data I-1


IS

APPENDIX-J
(Site classification & Liquefaction Analysis)

Site classification criteria as per ASCE 07-05 J-1

Typical site classification assessment J-2 & J-3

Liquefaction potential assessment J-4

vi
Geotechnical File No. 2015/104, Rev.1

APPENDIX-K
(Typical Charts and Equations)

Settlement from Adjacent Footings K-1

Limiting Angular Distortion K-2

Typical proposed Tank Foundation Details K-3

Six Modes of Vibrations for a Foundation K-4

D
Displacement Amplitude Limits K-5

Strain Modulus Relation For Sands K-6

BI
Block on Elastic Half-Space K-7

Concrete Exposure Type K-8 thru K-8(b)

R
FO
APPENDIX-L
(Calibration Certificates)

APPENDIX-M
ED

(Compliance statement)
SU
IS

vii
Geotechnical File No. 2015/104, Rev.1

GEOTECHNICAL INVESTIGATION
FOR
YANBU DISTRIBUTION HUB (YDH) PROJECT, YANBU
(Sub Contract No.: SC-5723-2118K, Rev.1)

EXECUTIVE SUMMARY

A. General

D
As stated in OEO’s Endorsement Letter, the dimensions, locations and loads of all

BI
proposed structures were not available when the Endorsement Letter was prepared.
As a result, OEO stated in the Endorsement letter that the SOW “may be” sufficient.
MHDP made the missing information available to OEO only a few days before
starting of the field

R
work. Furthermore, MHDP informed OEO the IFC
FO
st
drawings/documents will be issued to the LSTK contractors on May 31 , 2016.
Accordingly, it was not possible to drill additional boreholes due to time limitations.
However OEO has added extra five PCPTs at locations where suspected weak
zones were anticipated and the soil replacement was deepened in one tank in light of
ED

the results of the extra PCPT. OEO suggests that LSTK Contractor undertakes four
confirmatory boreholes during the LSTK Contractor detailed geotechnical study. This
statement is added to the report.
SU

A detailed geotechnical investigation was undertaken at the proposed project location


of the YANBU DISTRIBUTION HUB (YDH), Yanbu Area. The Yanbu Distribution Hub
(YDH) will aggregate refined product from the three (3) local refineries (SAMREF,
IS

YASREF, and Yanbu) and act as the origin pump station for at least two (2)
connecting pipelines, the Yanbu to Jeddah pipeline and the Yanbu to Central Region
pipeline. The project site is located at about 30 to 40 km from Yanbu towards
Jeddah. The Site vicinity map is included in Figure 1.

The geotechnical investigation comprised a total of eighty four (84) boreholes, {50
boreholes 20m & 34 boreholes 30m}, five (5) Piezocone Penetration Tests (PCPTs),
twenty (20) soil resistivity tests, five (5) In-situ thermal resistivity tests, seven (7)
Cross-hole seismic tests, five (5) shallow seismic refraction soundings and
Excavation of Test Pits at fourteen (14) locations including field density tests at 0.30

1
Geotechnical File No. 2015/104, Rev.1

m interval right from surface, Collection of Bulk samples for laboratory Testing from
each test pit locations. Plans showing boreholes and all other tests locations are
included in Figure 2a thru 2e. Facility Plot Plan for tank farm area & other units is
presented in Figure 2.

This report presents the findings of the geotechnical investigation, an assessment of


the geotechnical conditions and geotechnical recommendations for foundation
design. It should be noted that all recommendations in this revision of the report
should be considered preliminary until they are endorsed by Aramco Consulting
Services Department.

D
B. Stratigraphy & Ground Water

BI
The stratigraphy from 84 boreholes consists of primarily granular (sands & gravels)
soils within the depths of investigation. Fine grained soils (clays & silts) were

R
encountered in few boreholes mainly at deeper depths and in very few boreholes fine
grained soils were noticed at shallow depths. Presence of fine grained within in the
FO
shallow depths of boreholes is presented in Table 2.

Based on the corrected Standard Penetration Test (SPT) N60-values and correlations
ED

as presented in Table 3, the compactness of the granular soils has been observed to
vary from medium dense to very dense except for loose layers in borehole BH-82
and the consistency of fine-grained soils has been observed to be very stiff & hard in
SU

general. Loose granular soils were encountered within top 4.5m depth in borehole
BH-82. Stiff fine grained soils were encountered at a depth of 1.5m-3m in BH-5,
1.5m-2.25m in BH-17 & 18. Layer of medium stiff fine grained soils were noticed at a
IS

depth of 3m to 3.75m in BH-29.

Granular soils included well graded to poorly graded gravels with varied amounts of
silt, well graded to poorly graded gravels, silty clayey gravels, silty gravels, well
graded to poorly graded sands, well graded to poorly graded sands with varied
amounts of silt, silty sand, silty clayey sands, clayey sands, which are classified into
GW-GM, GP-GM, GW, GP, GC-GM, GM, SW, SP, SW-SM, SP-SM, SM, SC-SM and
SC groups as per ASTM D- 2487. Fine-grained soils included sandy silt, sandy silty
clay, sandy lean clay and sandy fat clay, which are classified into ML, CL-ML & CL
groups as per ASTM D-2487.

2
Geotechnical File No. 2015/104, Rev.1

Topography: Existing ground elevations within the boreholes (as presented in Table
1) varied between +2.48m & +5.84m indicating a difference in elevation of about
3.36m except for boreholes BH-82 & 83. These 2 boreholes are located in higher
elevation of +10.36m & 11.27m for BH-82 & BH-83, respectively. The elevations of
test locations are with relative to Saudi Aramco Vertical Datum (SAVD-78).

The GWT readings were recorded during the period of the field work in April-May
2016. The groundwater table was encountered at depths of 1.5m to 5m below
existing ground levels at the borehole locations BH-1 thru BH-81 & BH-84. Ground
water table was encountered at deeper depths of 9.5m & 10.4m in BH-82 & BH-83,
respectively, due to higher ground level at these boreholes. The variation in GWT

D
was consistent with the ground surface undulations in general. A possible fluctuation

BI
of about 1.0m can be anticipated due to seasonal and tidal variations. Nine (9) stand
pipe piezometers {in boreholes P01, P07, P13, P19, P25, P28, P34, P37 & P45}
were installed and ground water levels were monitored during our field work in April-
May, 2016.

R
FO
C. Recommendations

According to SOW, proposed Yanbu Distribution Hub project includes the mainly
ED

construction of 20 tanks, in which six (6) Gasoline tanks, three (3) Diesel tanks, one
(1) DPK tank, three (3) DPK/KEROSINE tanks, one (1) T&I Diesel/DPK tank, two (2)
Slop tanks, two (2) Fire water tanks, one (1) Utility water tank and one (1) Surge
SU

relief tank and other structural units with design details & sizes as provided by client
is presented in Tables 9, 9(a), 9(b), 9(c) & 10.
IS

According to the SOW, the proposed structures/facilities other than tanks will be
founded on shallow foundations of spread & mat foundations. Tanks are founded on
ground supported ring wall foundation. Accordingly, the Report presents analysis and
discussion on the Spread foundations (Section 6.3), Mat foundations (Section 6.4)
and Tank foundations (Section 6.5).

The analysis has been carried out for given tank diameters with design applied stress
of 150 kPa and foundation depth of 0.6m, 1.0m & 1.5m below FGL using the Settle
3D computer software, considering idealized soil profile of under each tank.
Accordingly, estimated settlements at center and at edge of tanks are presented in
Table 14. Settle 3D software considers very nominal time of 1 year for long term

3
Geotechnical File No. 2015/104, Rev.1

creep settlements. Therefore, estimated settlements by settle 3D shall be increased


25% to account for long term creep settlements over the period of 25 years in
accordance with SAES-A-113. Total estimated settlements at center and edge of
tanks are summarized in blow Table.

D
BI
R
FO
ED
SU
IS

4
Geotechnical File No. 2015/104, Rev.1

Estimated Settlements at Center and Edge of Tanks


S.NO. Type of structure BH Dia. of Design Depth of Total Estimated Immediate Long term Immediate Long term
covered Tank, m or Load, Foundation settlements (mm) Settlement settlement Settlement settlement
Foundation (kPa) from Final including long term (mm) (mm) (mm) (mm)

D
size Grade (m) settlement
@center @edge @center @edge

BI
1 Gasoline – D-0101 1,2,3 55 150 0.6 74 36 59 15 29 7
95 tank 1.0 73 35 58 15 28 7
1.5 70 34 56 14 27 7
D-0102 4,5,6 55 150 0.6 153 85 64.5 88.5 14.5 70.5

R
1.0 151 84 62.5 89 13 71
1.5 150 83 61 89 11.5 71.5
D-0103 7,8,9 55 150 0.6 76 38 61 15 30 8

FO
1.0 75 36 60 15 29 7
1.5 74 35 59 15 28 7
2 Gasoline – D-0201 10,11,12 55 150 0.6 60 30 48 12 24 6
91 tank 1.0 59 29 47 12 23 6
1.5 58 28 46 12 22 6
D-0202 13,14,15 55 ED
150 0.6
1.0
1.5
56
55
53
29
28
26
45
44
42
11
11
11
23
22
21
6
6
5
D-0203 16,17,18 55 150 0.6 259 150 48.5 210.5 30 120
1.0 257 149.5 46 211 30 119.5
SU
1.5 256.5 145 44 212.5 29 116
3 Diesel D-0301 19,20,21 65 150 0.6 78 39 62 16 31 8
tank 1.0 76 38 61 15 30 8
1.5 74 36 59 15 29 7
D-0302 22,23,24 65 150 0.6 64 33 51 13 26 7
IS

1.0 63 31 50 13 25 6
1.5 62 31 49.5 12.5 24.5 6.5
D-0303 25,26,27 65 150 0.6 68 34 54 14 27 7
1.0 65 33 52 13 26 7
1.5 64 32 51 13 25.5 6.5

5
Geotechnical File No. 2015/104, Rev.1

S.NO. Type of structure BH Dia. of Design Depth of Total Estimated Immediate Long term Immediate Long term
covered Tank, m or Load, Foundation settlements (mm) Settlement settlement Settlement settlement
Foundation (kPa) from Final including long term (mm) (mm) (mm) (mm)
size Grade (m) settlement
@center @edge @center @edge
4 DPK tank D-0401 37,38,39 67 150 0.6 81 40 65 16 32 8

D
1.0 79 39 63.5 15.5 31.5 7.5
1.5 78 39 62.5 15.5 31 8

BI
5 DPK/KER D-0402 34,35,36 55 150 27 7
OSINE 0.6 69 34 55 14
1.0 68 33 54 14 26 7
1.5 65 31 52 13 25 6

R
D-0403 31,32,33 55 150 0.6 70 34 56 14 27 6
1.0 69 33 55 14 26 7

FO
1.5 66 32 53 13 25.5 6.5
D-0404 28,29,30 55 150 0.6 139.5 73.5 93.5 46 36.5 37
1.0 138.5 72.5 92 46.5 35.5 37
1.5 137 72 90 47 35 37
6 T&I D-0502 40,41,42 77 150 0.6 80 40 64 16 32 8
Diesel/DP
K
ED 1.0
1.5
79
79
39
38
63.5
63
15.5
16
31
30.5
8
7.5

7 Slop tanks D-0601 43,44 38.5 150 29 7


0.6 73 36 58 15
SU

1.0 71 36 56.5 14.5 28.5 7.5


1.5 69 35 55 14 28 8
D-0602 45,46 38.5 150 0.6 60 30 48 12 24 6
1.0 58 29 46.5 11.5 23.5 5.5
IS

1.5 56 29 44.5 11.5 23 6


8 Fire water X40-D- 47,48,49 22.5 150 12 3
tanks 0701/0 0.6 30 15 24 6
702 1.0 29 14 23 6 11 3
1.5 26 13 21 5 10 3

6
Geotechnical File No. 2015/104, Rev.1

S.NO. Type of structure BH Dia. of Design Depth of Total Estimated Immediate Long term Immediate Long term
covered Tank, m or Load, Foundation settlements (mm) Settlement settlement Settlement settlement
Foundation (kPa) from Final including long term (mm) (mm) (mm) (mm)
size Grade (m) settlement
@center @edge @center @edge
9 Utility X40-D- 50 5.5 70 2 1

D
water tank 0703 0.6 5 3 4 1
1.0 4 3 3 1 2 1

BI
1.5 4 3 3 1 2 1
10 Surge X40-D- 51,52 20.5 100 7 2
0.6 18 9 14 4
relief tank 0801
6.5 1.5
1.0 16 8 12.5 3.5

R
6 2
1.5 15 8 12 3

FO
Si: Immediate Settlement, SL: Long term Settlement.

From above Table it is noted that, higher settlements about 140-260mm & edge settlements are concern for the tanks D-0102, D-0203
& D-0404 and these settlements are higher than allowable uniform settlement of 150 mm as per standard practice provided by client.
ED
For all other tank settlements are within the range of permissible uniform settlement of 150mm. Therefore, soil improvement by
excavation and replacement is recommended to a depth of 3m for Tanks D-0102 & D-0203, and to a depth of 6m for Tank D-0404 to
keep the anticipated settlements within the permissible limits. The soil improvement measures are detailed in Section 6.5.4. In addition
SU

to these measures, any other measures required by Saudi Aramco shall be followed in the ground improvement. Excavation
considerations and Dewatering measures shall be recommended in case of deep excavation for Tank D-0404. Excavation
considerations and Dewatering measures are detailed in Section 7.2 & 7.7.
IS

Note: In case that the facilities layout is modified, a new geotechnical campaign should be carried out by the LSTK contractor at the
new footprint of the facilities

7
Geotechnical File No. 2015/104, Rev.1

D
Post Improvement Settlements

BI
S.NO. Type of structure BH Dia. of Design Depth of Total Estimated Si SL Si SL
covered Tank, m or Load, Foundation settlements, mm (mm) (mm) (mm) (mm)
Foundation kPa from Final after 25% increase

R
size Grade (m) @ center @ edge @ center @ edge

1 Gasoline D-0102 4,5,6 55 150 0.6 76.5 37.5 61 15.5 30 7.5

FO
1.0 74 36.5 59 15 29 7.5
1.5 72.5 35 58 14.5 28 7
D-0203 16,17,18 55 150 0.6 68 28 54 14 22 6
1.0 67 27 53 14 21 6
1.5 64 25 51 13 20 5
D-0404 28,29,30 ED
55 150 0.6
1.0
1.5
91.5
89
87.5
44
43
42.5
73
71
70
18.5
18
17.5
35
34.5
34
9
8.5
8.5
SU
Si: Immediate Settlement, SL: Long term Settlement.
Note: In case that the facilities layout is modified, a new geotechnical campaign should be carried out by the LSTK contractor at the
new footprint of the facilities.
IS

8
Geotechnical File No. 2015/104, Rev.1

Specific spread foundation sizes (square, rectangular & strip) and depths of
foundation below FGL is provided by the Client are considered in the analysis. The
design details of the spread foundation are presented in Tables 9, 9a, 9b & 9C.

For spread foundations, analysis has been carried out considering both shear criteria
using equations presented in Figure 5 & settlement criteria based on Burland &
Burbridge method, as per SAES-A-113. The Net Allowable Bearing Capacity (NABC)
values are selected based on the least values estimated by the shear and the
settlement criteria, and are presented in the following tables.

D
Net Allowable Bearing Capacities (kN/m2)-Square Footings

BI
Structure Boreholes Footing Footing Size Recommended NABC
Covered Depth (m) (m x m) Square Footing (m x m)
below FGL
OME building 1.0 2.5 x 2.5 300
BH-55

R
1.5 2.5 x 2.5 300
Operation shelter 1.0 1.5 x 1.5 300
BH-58
FO
1.5 1.5 x 1.5 300
1.5 x 1.5 300
1.0
Security support 2.0 x 2.0 300
BH-59
building 1.5 x 1.5 300
1.5
2.0 x 2.0 300
Chemical 1.5 x 1.5 300
ED

1.0
shelter/x-ray 2.0 x 2.0 300
building & BH-60 1.5 x 1.5 300
Security support 1.5
2.0 x 2.0 300
building
SU

1.5 x 1.5 300


1.0
2.0 x 2.0 300
Mosque BH-55
1.5 x 1.5 300
1.5
2.0 x 2.0 300
IS

Sunshade for BH-59 3.5 x 3.5 300


2.0
gatehouse BH-60 3.5 x 3.5 300
Pump sheds *BH-62 thru 65 1.5 3.0 x 3.0 250
**1.0 3.0 x 3.0 180
Scraper trap BH-74, 75
**1.5 3.0 x 3.0 250
**Depth of foundation below EGL, *BH-62 & 64 critical boreholes for analysis.

Note: In case that actual design loads exceeding the allowable soil bearing
capacities, all geotechnical analyses should be revisited to ascertain that the
settlement criteria are satisfied due the new loads. In case that the facilities layout is
modified, a new geotechnical campaign should be carried out by the LSTK contractor
at the new footprint of the facilities.

9
Geotechnical File No. 2015/104, Rev.1

Net Allowable Bearing Capacity (kN/m2)-Square Footings

Structure Boreholes Footing Footing Recommended NABC


Covered Depth (m) Size Square Footing (m x m)
below FGL (m x m)
1.0 3.0 x 3.0 300
Pipe rack BH-68
1.5 3.0 x 3.0 300
PS-006-fire, 1.0 3.5 x 3.5 300
utility, drinking 1.5 3.5 x 3.5 300
BH-53
water pump
house
FSF building 1.0 1.5 x 1.5 300
BH-61
1.5 1.5 x 1.5 300
**1.0 2.0 x 2.0 300

D
Metering room 2.5 x 2.5 300
BH-76
marafiq **1.5 2.0 x 2.0 300
2.5 x 2.5 300

BI
Platform BH-77 & **1.0 1.5 x 1.5 300
foundation 78 **1.5 1.5 x 1.5 300
Platform BH-79 & **1.0 1.5 x 1.5 300

R
foundation 80 **1.5 1.5 x 1.5 300
BH-81, 83 1.0 1.5 x 1.5 225
Platform & 84 1.5 1.5 x 1.5 300
FO
foundation 1.0 1.5 x 1.5 150
BH-82
1.5 1.5 x 1.5 150
BH-81, 83 1.0 3.0 x 3.0 250
& 84 1.5 3.0 x 3.0 300
Pipe supports
1.0 3.0 x 3.0 90
ED

*BH-82
1.5 3.0 x 3.0 80
**Depth of foundation below EGL, *Borehole shifted about 14m from original
location duly approved by client.
SU

The recommended net allowable bearing capacities are low in specific borehole
location BH-82 due to presence of loose granular soils up to 4.5m. These bearing
capacities shall be verified by designer against design requirements. In the event,
IS

above bearing capacities at BH-82 do not meet the design requirements; we


recommend soil improvement (as per Section 6.5.4). Since borehole location is
shifted from original, designer shall ensure the presence of any structure at drilled
location.

Note: In case that actual design loads exceeding the allowable soil bearing
capacities, all geotechnical analyses should be revisited to ascertain that the
settlement criteria are satisfied due the new loads. In case that the facilities layout is
modified, a new geotechnical campaign should be carried out by the LSTK contractor
at the new footprint of the facilities.

10
Geotechnical File No. 2015/104, Rev.1

Net Allowable Bearing Capacity (kN/m2)-Rectangular Footings


Structure Boreholes Footing Footing Recommended Net
Covered Depth (m) Size Allowable Bearing
below (m x m) Capacity
FGL Rectangular footing
(m x m)
Pumps 3x5 300

D
1.0 3x6 300
*BH-62 to
4x8 250

BI
65
3x5 300
1.5 3x6 300
4x8 250
Skids 2.5 x 5 300

R
1.0
3x5 300
BH-67
2.5 x 5 300
1.5
FO
3x5 300
1.0 3.5 x 4 300
Pipe sleepers BH-77 & 78
1.5 3.5 x 4 300
BH-81, 83 & 1.0 3.5 x 4 250
Pipe sleepers
84 1.5 3.5 x 4 300
ED

1.0 3.5 x 4 80
Pipe sleepers **BH-82
1.5 3.5 x 4 70
1.0 3.5 x 4 300
Pipe sleepers BH-79, 80
1.5 3.5 x 4 300
Drinking water 1.0 4x4 300
SU

tank (vessel
BH-50
type) 1.5 4x4 300
X40-D-0704
*BH-62 & 64 critical boreholes for analysis. **Borehole shifted about 14m from
IS

original location duly approved by client.

Note: In case that actual design loads exceeding the allowable soil bearing
capacities, all geotechnical analyses should be revisited to ascertain that the
settlement criteria are satisfied due the new loads. In case that the facilities layout is
modified, a new geotechnical campaign should be carried out by the LSTK contractor
at the new footprint of the facilities.

11
Geotechnical File No. 2015/104, Rev.1

Net Allowable Bearing Capacity (kN/m2)-Strip Footings


Structure Boreholes Footing Width of Recommended Net
Covered Depth (m) footing Allowable Bearing
below (m) Capacity
FGL Strip footing (m)
Substation 2.0 200
buildings 2.5 200
0.6
3.0 250
4.0 300
BH-56
2.0 250
2.5 250

D
1.0
3.0 300
4.0 300

BI
2.0 200
2.5 200
0.6
3.0 250
4.0 300
BH-57

R
2.0 250
2.5 250
1.0
FO
3.0 300
4.0 300
Pipe sleepers BH-69 thru 1.0 2.5 250
main pipe way 71 1.5 2.5 300
ED

The analysis has been carried out for mat sizes given by client for different structures
as presented in Table 10 using the Equation 7 (Figure C-2), considering lower
subsoil profiles of applicable boreholes under each structure. Accordingly, Net
SU

Allowable Bearing Capacities (NABC) are presented in Table 10. Time factor of 1.5
for time period of 25 years is considered in recommending the Net allowable baring
capacity.
IS

Note: In case that actual design loads exceeding the allowable soil bearing
capacities, all geotechnical analyses should be revisited to ascertain that the
settlement criteria are satisfied due the new loads. In case that the facilities layout is
modified, a new geotechnical campaign should be carried out by the LSTK contractor
at the new footprint of the facilities.

12
Geotechnical File No. 2015/104, Rev.1

Net Allowable Bearing Capacity (kN/m2)-Mat Foundation


Structure Boreholes Footing Footing NABC (kPa) for
Covered Depth (m) Size Permissible Settlement of
below FGL (m x m) 50 mm
Mat foundation (m x m)
Skids 1.5 8.0 x 15.0 900
BH-67
2.0 8.0 x 15.0 950
Oily water lift station BH-72 7.4 7.0 x 11.5 800
Oily water lift station BH-73 7.4 7.0 x 11.5 700
Old tag x40x-1101 (new 0.6 8.0 x 15.0 700
tag-x40-u-0004), ows water BH-54 8.0 x 15.0
1.0 700
package
X-40-d-0901, drain vessel 5.0 x 12.0
BH-66 3.5 700

D
(HC)
Metering skid BH-85 1.0 5.0 x 11.0 Filed work not completed

BI
The recommended maximum NABC should not exceed 400 kPa to avoid possible
non-linear load-settlement response underneath the mat foundations leading to

R
higher settlements than those calculated by Equation 7. However, NABC with values
of higher than 400 kPa may be used for mat foundations, if required, provided that
FO
the load-displacement response of soil is further assessed by pressure meter testing
to determine the modulus of subgrade reaction of the soil.

Note: In case that actual design loads exceeding the allowable soil bearing
ED

capacities, all geotechnical analyses should be revisited to ascertain that the


settlement criteria are satisfied due the new loads. In case that the facilities layout is
modified, a new geotechnical campaign should be carried out by the LSTK contractor
SU

at the new footprint of the facilities.

The site is located within a zone of very light seismic activity. According to SAES-A-
IS

112, the Peak Ground Acceleration at the site is 0.04g, where g is the gravity
acceleration. The Seismic Site Class varies from C to D across the site. However,
an amplification factor of 1.6 (Site Seismic Class D) and Earthquake Magnitude of
5.5 were conservatively adopted in the liquefaction analysis. The analysis indicated
that liquefaction is unlikely for the loosest granular soil encountered at the site.

OEO has undertaken five extra PCPTs (PCPTs 6 thru 10), which were not included
in the original Scope of Work, to verify the vertical extent of the shallow clay layer at
some tank locations. The results of these extra PCPTs indicated tip cone resistance,
qc, of less than 5 MPa in the top 3.0m for the soundings of PCPT-6, 7 & 8 and 3m-6m

13
Geotechnical File No. 2015/104, Rev.1

for the sounding of PCPT-9 and gradually increases with depth up to the refusal
stress (35 MPa). The values of qc were greater than 5 MPa for soundings of PCPT-1
thru 5 in general.

The apparent soil resistivity values varied from 1.3-93.0 Ohm-meters. A correlation
between soil resistivity and corrosivity is presented in Figure G-22 for general
information. Following this figure, the corrosivity could vary from very severe to mild.

CBR tests conducted on bulk samples that indicated CBR value between 12 to 56 at
95% compaction and 21 to 71 at 100% compaction. The soil rating system for sub

D
grade, sub base or base for use in the design of light traffic pavements in terms of

BI
CBR values is reproduced in Figure H-69. Following this figure, the existing A-3, A-1-
b/A-2-4 soils could be categorized in general as ‘good to excellent’ sub-grade
materials to support pavements.

R
Thermal resistivity values ranged between 8.779 m. K/watt to 10.978 m. K/watt,
FO
which are generally in the range of values expected for dry sands to stiff cohesive
soils. However, we believe it may be necessary to re-conduct and re-evaluate the
results after site preparation works are complete.
ED

The chemical tests results are examined and compared with the exposure types as
per SAES Q-001 dated January 2016, reproduced in Figure K-8. As per the chemical
SU

test results and following Figures K-8 thru K-8(b), consider S2 Sulfate Exposure & C2
Chloride Exposure and Cement type shall be Type V, Uncoated and Type I +
Pozzolan or Slag with Epoxy Coated Rebars (ECR), respectively. Overall, Type I +
IS

Pozzolan or Slag with Epoxy Coated Rebars (ECR) is recommended. However,


concrete mix should be verified against exposure to sulfates attack.

D. Other Aspects

The report also includes soil design parameters and discussions regarding some of
the construction aspects including but not limited to site preparation, foundation
protection, dewatering, erosion protection etc. The Report concludes with the general
comments and limitations of the study and selected references. All field & laboratory
test data and typical analyses are presented in the Illustrations & Appendices as
stated in the report.

14
Geotechnical File No. 2015/104, Rev.1

1. INTRODUCTION

1.1 General Project Description

The objective of the YANBU DISTRIBUTION HUB PROJECT (YDH) (Saudi Aramco
BI-10-02399) project is to efficiently meet the kingdom’s refined product demands in
Makkah province. The Yanbu Distribution Hub (YDH) will aggregate refined product
from the three (3) local refineries (SAMREF, YASREF, and Yanbu) and act as the
origin pump station for at least two (2) connecting pipelines, the Yanbu to Jeddah

D
pipeline and the Yanbu to Central Region pipeline. A detailed geotechnical

BI
investigation was undertaken at the current project for the design of the proposed
facilities. Mustang Al Heijailan Dar PI (MUSTANG) has been appointed as design
consultant for this project.

R
FO
Ayed Eid Al Osaimi Engineering Office (OEO) was engaged by MUSTANG-HDP to
undertake geotechnical investigation for the proposed development. The
investigation was based on Subcontract No.: SC-5723-2118K, Rev. 1 dated 24
December 2015.
ED

1.2 Purpose and Scope of Work


SU

The purpose of the present geotechnical investigation is to:


• Determine the subsurface stratigraphy and groundwater conditions;
• Evaluate the geotechnical characteristics of the representative soil profiles;
IS

The specific scope includes:


• Drilling a total of eighty four (84) boreholes {fifty (50) boreholes to depths of
20 m & thirty four (34) boreholes to depths of 30 m}.
• Conducting five (5) Piezocone Penetration Tests (PCPTs) at specified
locations.
• Performing soil electrical resistivity tests at twenty (20) locations as given in
Table 1a.
• Conducting five (5) In-situ thermal resistivity Tests at specified as given in
Table 1a.

15
Geotechnical File No. 2015/104, Rev.1

• Performing seven (7) cross-hole seismic tests at given locations as per Table
1a.
• Conducting five (5) shallow refraction seismic soundings at the locations
given in Table 1a.
• Excavation of fourteen (14) tests pits at specified locations as given in Table
1a to 1.0 m depth, conducting Field Density tests at 0.30 m interval right from
surface and also collection of bulk sample from top 1.0 m for laboratory
testing of CBR.
• Physical & Chemical laboratory testing & analysis of borehole soil and water
samples.

D
• Preparation of this Interpretive Report on all field work and laboratory tests

BI
data; and provide geotechnical and foundation recommendations.

Plans showing boreholes and all other tests locations are included in Figure 2a thru

R
2e. Test locations for geotechnical investigation are included in Figure 2b. Facility
FO
Plot Plan for tank farm area & other units is presented in Figure 2.

The scope of work also includes but is not limited to executing an exploration
program, conducting field & laboratory testing and preparation of a geotechnical
ED

engineering report summarizing our findings & field / laboratory test data and
incorporating recommendations regarding site preparation, bearing capacity values
for the given foundation sizes, depths and settlements for design pressures under the
SU

tank foundations etc.

Borehole logs are presented in Appendix-A and laboratory tests data on borehole soil
IS

& water samples are presented in Appendix-B. Other field tests data are included in
Appendix-D thru Appendix-I.

16
Geotechnical File No. 2015/104, Rev.1

2. SITE CONDITIONS

2.1 Site Local Geology and General Description

The project site is located about 30 to 40 km from Yanbu towards Jeddah, in Western
province of the Kingdom of Saudi Arabia. The western coast plain of Kingdom of
Saudi Arabia along the Red Sea is low in elevation, and is covered, in many areas,
by salt bearing deposits. While rainfall is low, occasional high intensity rainstorms
create flash floods resulting in flooding and development of water courses (wadis). In
some locations, salt bearing soils are absent and instead there exists terraces of

D
coralline limestone overlooking the Red Sea. Further inland, localized deposits of

BI
argillaceous silts and gypsum outcrops can be found. West of the coastal plains,
offshore coral banks and reefal limestone can be found either outcropping or covered
with mostly carbonate sands. The coastal plains of Red Sea (Tihama) rise gently into

R
eastern plain, consisting of granular soils (sands, gravel, boulders and cobbles,
FO
overlaying tertiary limestone, shale, siltstone and sandstone) or crystalline rocks.

The Red Sea coastal zone can be divided into broadly defined zones each of which
is topographically distinct. Running parallel to the coast and few (about 10km) inland
ED

from the site is range of mountains that comprise the scarp of Arabian shield. The
rocks are pre-Cambrian and consist of a complex set of igneous and metamorphic
rocks. Material has eroded from these mountains to form the coastal plain, which
SU

consists of gravel, sand and silt as a network of interlinked alluvial fans and gravel
mounds. At many locations along the coastaline, these deposits extend from the
shoreline out to the coral reef, intermixing with the reef deposits. The formation of the
IS

coralline deposits can be related to changes in the sea level in geologically recent
times. Initially the sea level was considerably lower relative the land surface than at
present. Reefs were formed at this level and the thickness increased initially with the
reef growth and other processes associated with the changes in sea level.
Generalized geologic map of the Arabian Peninsula is shown in Figure 3.

17
Geotechnical File No. 2015/104, Rev.1

2.2 Potential Geologic Hazards

Seismic Parameters as per SAES A-112


Meteorological and Seismic Data for various locations in Kingdom of Saudi Arabia as
adopted by Saudi Aramco (vide their SAES-A-112, issue date July 2013) indicate the
following earthquake data assigned to Yanbu area within which the site is located.

Short Period Acceleration (Ss) in % g : 20.4


1-sec Period Acceleration (S1) in % g : 5.8

D
Peak Ground Acceleration (Sg) in % g : 4.0

BI
Site Class : varies C to D
Basic wind speed (km/hr) : 145
Prevailing Direction : W

R
Average Annual Temperature : 280 C.
Rainfall, Average Annual : 36 mm
FO
2.3 Liquefaction Analysis & Site Class
ED

The site is located within a zone of very light seismic activity. According to SAES-A-
112, the Peak Ground Acceleration at the site is 0.04g, where g is the gravity
acceleration. The earthquake-induced liquefaction triggering analysis published by
SU

Youd et al. (2001) was implemented to assess the liquefaction potential based on the
SPT blow counts (N). The N values were corrected for hammer energy, as automatic
hammers were used in the investigation and the adopted method is based on N60.
IS

The N values were also corrected for overburden stress effect and rod length
variation.

As per ASCE 07-05, the SPT-N values directly measured from field shall be used in
seismic site class assessment. However, SPT-N60 values (without overburden
correction) were adopted in seismic site class evaluation as automatic hammers
were used in the investigation. The Site Seismic Class assessment was carried out
for typical boreholes (presented in Figure J-2, J-3 & J-4, Appendix-J) and it varies
from Class C to Class D across the site. Class D, with a corresponding amplification
factor of 1.6 corresponding to Ss <= 0.25 (Table 3.4.2.3-1, AASHTO guide
specifications for LRFD Seismic Bridge Design) was assumed in the liquefaction. In

18
Geotechnical File No. 2015/104, Rev.1

addition, an Earthquake magnitude of 5.5 was assumed conservatively in the


analysis. The liquefaction analysis of the loosest granular soil encountered at the site
(Borehole BH-82) indicated that liquefaction is unlikely. The liquefaction analysis for
Borehole BH-82 is given in Figure J-5, Appendix J.

2.4 Site Topography and Surface Features

The UTM co-ordinates of the boreholes under the current investigation, MSL
elevations, depths of Groundwater below existing ground levels and MSL elevations
of Ground water table are given in Table 1. These coordinates are referenced to the

D
International 1924 Ellipsoid, Ain (Ayn) Al Abd 1970 Datum. MSL Elevations are

BI
referenced to SAVD 1978 Datum. These coordinates & elevations are also presented
in borehole logs Appendix A. Co-ordinates & elevations of bench marks used for
survey are presented in below Table 1.

R
Existing ground elevations within the boreholes (as presented in Table 1) varied
FO
between +2.48m & +5.84m indicating a difference in elevation of about 3.36m except
for boreholes BH-82 & 83. Theses 2 boreholes are located in higher elevation of
+10.36m & 11.27m for BH-82 & BH-83, respectively. The elevations of test locations
ED

are with relative to Saudi Aramco Vertical Datum (SAVD-78).


SU
IS

19
Geotechnical File No. 2015/104, Rev.1

Table 1
UTM Coordinates, Elevations of Boreholes & Ground Water Table
Depth Ain (Ayn) Al Abd 1970 Depth (m) MSL
MSL
(m) Datum of GWT Elevation
Elevation of
below below EGL of GWT
Northing EGL
Point EGL Easting
BH-01 30 2650110.93 430252.64 3.08 2.35 0.73
BH-02 20 2650128.80 430231.29 3.02 2.30 0.72
BH-03 20 2650093.10 430273.92 3.15 2.70 0.45
BH-04 30 2650027.90 430183.11 3.35 2.55 0.80
BH-05 20 2650045.76 430161.77 3.44 2.70 0.74
BH-06 20 2650010.07 430204.40 3.45 2.70 0.75
BH-07 30 2650234.10 430090.74 3.21 2.50 0.71

D
BH-08 20 2650251.96 430069.39 3.29 2.55 0.74
BH-09 20 2650216.27 430112.02 3.29 2.60 0.69

BI
BH-10 30 2649917.10 430090.35 4.19 3.45 0.74
BH-11 20 2649934.97 430069.00 4.24 3.50 0.74
BH-12 20 2649899.27 430111.63 4.46 3.65 0.81
BH-13 30 2649834.07 430020.83 4.13 3.50 0.63
BH-14
BH-15
20
20
2649851.93
2649816.23
429999.48
430042.11
R 3.93
4.12
3.15
3.45
0.78
0.67
FO
BH-16 30 2650137.99 430010.27 3.15 2.45 0.70
BH-17 20 2650155.85 429988.92 3.21 2.60 0.61
BH-18 20 2650120.16 430031.55 3.27 2.55 0.72
BH-19 30 2650591.85 429640.08 4.94 4.20 0.74
ED

BH-20 20 2650612.73 429615.13 5.00 4.35 0.65


BH-21 20 2650571.00 429664.97 4.83 4.05 0.78
BH-22 30 2650472.74 429540.35 5.27 4.50 0.77
BH-23 20 2650493.62 429515.40 5.25 4.55 0.70
SU

BH-24 20 2650451.86 429565.27 5.34 4.60 0.74


BH-25 30 2650353.63 429440.62 5.52 4.80 0.72
BH-26 20 2650374.51 429415.67 5.54 4.85 0.69
BH-27 20 2650332.78 429465.51 5.48 4.70 0.78
BH-28 30 2650425.79 429873.47 4.56 3.85 0.71
IS

BH-29 20 2650443.65 429852.12 4.83 4.10 0.73


BH-30 20 2650407.96 429894.75 4.46 3.70 0.76
BH-31 30 2650341.18 429802.63 4.50 3.80 0.70
BH-32 20 2650359.04 429781.28 4.57 3.85 0.72
BH-33 20 2650323.35 429823.91 4.50 3.80 0.70
BH-34 30 2650256.57 429731.79 4.62 3.90 0.72
BH-35 20 2650274.43 429710.44 4.41 3.80 0.61
BH-36 20 2650238.74 429753.07 4.31 3.65 0.66
BH-37 30 2650162.00 429652.60 4.38 3.70 0.68
BH-38 20 2650183.56 429626.78 4.44 3.70 0.74
BH-39 20 2650140.36 429678.38 4.09 3.35 0.74
BH-40 30 2650935.09 429618.55 4.71 3.95 0.76

20
Geotechnical File No. 2015/104, Rev.1

Depth Ain (Ayn) Al Abd 1970 Depth (m) MSL


MSL
(m) Datum of GWT Elevation
Elevation of
below below of GWT
Northing Easting EGL
Point EGL EGL
BH-41 20 2650960.01 429588.77 4.54 3.80 0.74
BH-42 20 2650910.14 429648.28 4.47 3.90 0.57
BH-43 30 2650060.70 429945.56 3.34 2.50 0.84
BH-44 20 2650045.70 429933.01 3.48 2.65 0.83
BH-45 30 2650003.19 429897.41 3.63 2.80 0.83
BH-46 20 2649988.19 429884.86 3.79 2.95 0.84
BH-47 30 2650820.89 429427.18 4.87 4.20 0.67
BH-48 20 2650811.76 429438.07 4.87 3.95 0.92
BH-49 30 2650802.60 429449.03 4.91 4.20 0.71

D
BH-50 30 2650837.67 429407.16 5.03 4.70 0.33
BH-51 30 2649710.02 430746.77 4.56 3.70 0.86

BI
BH-52 20 2649700.56 430738.83 4.60 3.80 0.80
BH-53 20 2650806.78 429378.80 5.18 4.40 0.78
BH-54 20 2649640.56 430686.65 4.33 3.50 0.83

R
BH-55 30 2650703.10 429434.27 5.32 4.60 0.72
BH-56 30 2649869.95 430845.99 3.05 2.20 0.85
FO
BH-57 20 2650390.05 430090.76 3.87 3.10 0.77
BH-58 20 2650203.99 429508.89 4.96 4.10 0.86
BH-59 20 2650687.23 429325.11 5.59 4.70 0.89
BH-60 20 2650755.27 429523.08 4.70 3.85 0.85
BH-61
ED

20 2650730.79 429243.03 5.84 5.00 0.84


BH-62 20 2650220.79 430305.64 3.15 2.40 0.75
BH-63 20 2649879.91 430700.66 4.12 3.40 0.72
BH-64 20 2650503.40 429966.16 5.30 4.50 0.80
SU

BH-65 20 2649934.52 430635.48 5.49 4.70 0.79


BH-66 20 2649937.30 429836.44 4.17 3.40 0.77
BH-67 20 2650025.88 430546.86 4.77 3.90 0.87
BH-68 30 2649998.94 429744.05 3.61 2.80 0.81
IS

BH-69 30 2649889.71 429650.70 5.03 4.10 0.93


BH-70 30 2649784.52 429562.63 3.28 2.40 0.88
BH-71 30 2649703.99 429495.20 4.54 3.60 0.94
BH-72 20 2650442.51 430033.67 4.22 3.40 0.82
BH-73 20 2650116.03 430423.61 4.11 3.30 0.81
BH-74 20 2649932.26 430938.87 2.48 1.50 0.98
BH-75 20 2649922.17 430930.43 2.54 1.70 0.84
BH-76 20 2649713.52 431029.53 2.84 2.00 0.84
BH-77 30 2649497.33 429367.39 4.23 4.10 0.13
BH-78 30 2649628.18 429474.63 4.32 3.60 0.72
BH-79 30 2650553.32 422282.87 3.92 2.80 1.12
BH-80 30 2650523.06 422271.67 4.01 3.40 0.61

21
Geotechnical File No. 2015/104, Rev.1

Depth Ain (Ayn) Al Abd 1970 Depth (m) MSL


MSL
(m) Datum of GWT Elevation
Elevation of
below below of GWT
Northing Easting EGL
Point EGL EGL
BH-81 20 2649886.53 422834.86 3.58 2.90 0.68
BH-82 20 2652441.80 425898.77 10.36 9.50 0.86
BH-83 30 2652473.53 425920.86 11.27 10.40 0.87
BH-84 20 2651355.36 427444.45 4.87 4.15 0.72
Bench marks used for Survey
PGM13
2650597.91 429312.78 6.46
8
YDH-3 2650561.45 429310.37 6.19
YDH-4 2651133.85 429631.76 4.99

D
BI
Table 1a
Coordinates & elevations of other tests locations

Ain (Ayn) Al Abd 1970 MSL

Point Northing
Datum

R Easting
Elevation of
EGL
FO
PCPT-01 2650675.36 429339.46 5.83
PCPT-02 2650794.44 429555.79 4.82
PCPT-03 2650337.12 430159.56 3.34
PCPT-04 2649804.21 430732.25 4.18
PCPT-05 2650709.54 429651.07 5.18
ED

SR-01 2650068.50 430218.98 3.25


SR-02 2649874.67 430056.69 4.16
SR-03 2650186.03 430050.49 3.16
SR-04 2650089.91 429970.02 3.48
SU

SR-05 2650032.14 429921.65 3.59


SR-06 2650382.59 429839.16 4.45
SR-07 2650297.97 429768.31 4.50
SR-08
IS

2650213.37 429697.48 3.95


SR-09 2650531.40 429591.34 5.08
SR-10 2650412.27 429491.59 5.65
SR-11 2650905.34 429593.64 4.71
SR-12 2650795.38 429457.66 4.70
SR-13 2649700.84 430757.73 4.62
SR-14 2650773.19 429359.15 5.46
SR-15 2649611.78 430662.62 4.21
SR-16 2650695.72 429443.25 5.33
SR-17 2649854.44 430867.72 2.98
SR-18 2650405.51 430103.69 4.10
SR-19 2650700.54 429309.70 5.74
SR-20 2649985.63 429819.22 3.77

22
Geotechnical File No. 2015/104, Rev.1

Ain (Ayn) Al Abd 1970 Datum MSL Elevation of


EGL
Point Northing Easting
TR-01 2650687.96 429383.16 5.69
TR-02 2649845.74 430846.57 3.09
TR-03 2650385.28 430115.06 3.98
TR-04 2649957.22 429781.15 3.77
TR-05 2650739.03 429509.53 4.70

SRS-01 2649514.21 430578.52 3.18


SRS-02 2649469.28 430540.90 3.60
SRS-03 2649424.35 430503.28 4.01

D
SRS-04 2649909.11 430959.17 2.19
SRS-05 2649884.57 430938.63 2.24

BI
TP-01 2651070.34 429644.40 4.45
TP-02 2650559.91 430310.50 3.20
TP-03 2650196.53 430744.51 3.06
TP-04 2649962.43 431024.12 2.04
TP-05
TP-06
2650887.77
2650383.18
R429444.27
430162.53
4.81
3.49
FO
TP-07 2650019.80 430596.54 4.58
TP-08 2649855.07 430793.29 3.42
TP-09 2650357.64 429284.40 5.85
TP-10 2650007.52 429702.58 3.94
TP-11 2649577.47 430216.22 3.51
ED

TP-12 2649338.46 430501.69 3.31


TP-13 2649920.50 430942.68 2.25
TP-14 2649936.10 430924.05 2.66
SU

PCPT~Piezocone penetration tests, SR~Soil electrical resistivity tests, TR~Thermal


resistivity tests, CHS~Cross-hole seismic tests, SRS~Shallow refraction seismic soundings
& TP~Test pits
IS

23
Geotechnical File No. 2015/104, Rev.1

3. SUBSURFACE CONDITIONS

3.1 Stratigraphy

The stratigraphy from 84 boreholes consists of primarily granular (sands & gravels)
soils within the depths of investigation. Fine grained soils (clays & silts) were
encountered in few boreholes mainly at deeper depths and in very few boreholes fine
grained soils were noticed at shallow depths. Presence of fine grained within in the
shallow depths of boreholes is presented in Table 2.

D
Table 2

BI
Presence of fine grained soils at shallow depths of Boreholes
Depth of occurrence of Boreholes
fine grained soils in Description
shallow boreholes

R
FO
From (m) To (m)
1.5 3.0 BH-1 very stiff to hard, sandy lean clay (CL)
1.5 3.75 BH-2 very stiff to hard, lean clay (CL)
1.5 3.0 BH-5 stiff, sandy lean clay (CL)
ED

1.5 3.0 BH-6 very stiff, sandy lean clay (CL)


3.0 4.5 BH-7 thru 9 very stiff to hard, sandy lean clay (CL)
0.0 3.0 BH-16 thru 17 stiff to very stiff, sandy lean clay (CL)
SU

1.5 2.25 BH-18 stiff, sandy lean clay (CL)

Based on the corrected Standard Penetration Test (SPT) N60-values and correlations
IS

as presented in Table 3, the compactness of the granular soils has been observed to
vary from medium dense to very dense except for loose layers in borehole BH-82
and the consistency of fine-grained soils has been observed to be very stiff & hard in
general. Loose granular soils were encountered within top 4.5m depth in borehole
BH-82. Stiff fine grained soils were encountered at a depth of 1.5m-3m in BH-5,
1.5m-2.25m in BH-17 & 18. Layer of medium stiff fine grained soils were noticed at a
depth of 3m to 3.75m in BH-29.

24
Geotechnical File No. 2015/104, Rev.1

Table 3
Correlation of SPT Values with Relative Density/Consistency
Soil state of Undrained Angle of Internal
“N” Values
Soil Types compactness/co Cohesion (cu Friction (Deg.)
(Blows/300mm)
nsistency - kPa)
Very Soft Less than 2 <10 -
Soft 2–4 10-20 -
Cohesive
Medium Stiff 5–8 20-35 -
Materials
Stiff 9 – 16 35-75 -
(Clays & Silts)
Very Stiff 17 – 32 75-125 -

D
Hard Greater than 32 125-150 -

BI
Very Loose 0–4 - 28
Granular
Loose 5 – 10 - 28-30
Materials
Medium Dense 11 – 30 - 30-36

R
(Sands &
Dense 31 – 50 - 33-38
Gravels)
FO
Very Dense Greater than 50 - 36-41

3.2 Subsurface Material Properties and General Description


ED

Granular soils included well graded to poorly graded gravels with varied amounts of
silt, well graded to poorly graded gravels, silty clayey gravels, silty gravels, well
SU

graded to poorly graded sands, well graded to poorly graded sands with varied
amounts of silt, silty sand, silty clayey sands, clayey sands, which are classified into
GW-GM, GP-GM, GW, GP, GC-GM, GM, SW, SP, SW-SM, SP-SM, SM, SC-SM and
IS

SC groups as per ASTM D- 2487. Fine-grained soils included sandy silt, sandy silty
clay, sandy lean clay and sandy fat clay, which are classified into ML, CL-ML & CL
groups as per ASTM D-2487.

3.3 Groundwater Table Depths

Stabilized groundwater table (GWT) levels were measured in the boreholes


presented in this report 24 hours or more after completion of borehole drilling. The
depth of groundwater table in each borehole is reported in borehole logs (Appendix
A), and also summarized in Table 1. The GWT readings were recorded during the
period of the field work in April-May 2016. The groundwater table was encountered at

25
Geotechnical File No. 2015/104, Rev.1

depths of 1.5m to 5m below existing ground levels at the borehole locations BH-1
thru BH-81 & BH-84. Ground water table was encountered at deeper depths of 9.5m
& 10.4m in BH-82 & BH-83, respectively, due to higher ground level at these
boreholes. The variation in GWT was consistent with the ground surface undulations
in general. A possible fluctuation of about 1.0m can be anticipated due to seasonal
and tidal variations. Nine (9) stand pipe piezometers {in boreholes P01, P07, P13,
P19, P25, P28, P34, P37 & P45} were installed and ground water levels were
monitored during our field work in April-May, 2016.

D
BI
R
FO
ED
SU
IS

26
Geotechnical File No. 2015/104, Rev.1

4. FIELD INVESTIGATIONS

4.1 Summary of Operations

Subsurface conditions at the YANBU DISTRIBUTION HUB project site were explored
through (i) drilling boreholes, (ii) conducting standard penetration tests and sampling
for laboratory testing and analysis, (iii) observing ground water levels, (iv) conducting
piezocone penetration tests, (v) performing seismic cross-hole tests, (vi) conducting
seismic refraction tests, (vii) conducting soil electrical resistivity tests, (viii)
Excavation of test pits, conducting field density test and collection of bulk samples for

D
laboratory CBR tests.

BI
Table 4
Summary of All Field Tests Performed
S.No. Field Test Performed in the Site

R
1 Boreholes/SPT
2 Seismic cross-hole tests
FO
3 Piezo-cone Penetration tests
4 Seismic refraction tests
5 Soil electrical resistivity tests
6 Excavation of Test pits and Collection of Bulk Samples
along with Field density tests at each 0.30m interval
7 Groundwater Measurement
ED

4.2 Description of Sampling Procedures


SU

4.2.1.a Standard Penetration Tests

For drilling and sampling, four-wheel drive (4WD) truck mounted straight rotary
IS

drilling rigs, Acker SIMCO type, Soil Max type, AD-II type and MP8 type owned and
operated by Osaimi Engineering Office (OEO) were used. Boreholes were advanced
using wash boring techniques whereby the borings were stabilized using a
continuous flow of drilling mud. The boreholes were drilled to specified depths of
20/30 m below the existing ground levels (EGL) across the study locations.

Hand excavations were carried out in few borehole locations up to 1.5m depth to
verify the presence of any underground utilities or cables prior to start drilling.
Standard penetration tests (SPTs) were conducted and representative soil samples
were retrieved at 0.15 m, every 0.75 m depth interval up to 4.5m and subsequently at

27
Geotechnical File No. 2015/104, Rev.1

1.5 m interval up to the final depth using test techniques in accordance with ASTM D-
1586. In this test, a split spoon sampler of 50.8 mm (2”) outside diameter & 38.1mm
(1.5”) inside diameter is driven into the soil with blows from a 63.5 kg. (140 lbs)
sliding weight (hammer) dropped freely through a distance of 760mm (30”).

4.2.1.b Undisturbed Samples

Both Plastic (PVC) sampling tubes with U100 Sampler & Shelby tube sampler were
used in collection of undisturbed samples from cohesive soil layers. Samples
recovered during the investigation were examined for field classification by our site

D
supervisor, properly labeled, packed and transported to OEO laboratory at Al-

BI
Khobar, for further testing and analysis.

The list of undisturbed samples collected from different depths of boreholes, which

R
are tested for consolidation/ UCS Tests are given below in Table 5.
FO
Table 5
List of undisturbed samples collected & Tested for Consolidation
BH DEPTH(m) Classification Soil Type
ED

1 3.0 CL Sandy lean Clay


7 6.5 SC Clayey sand
8 6 CL Lean clay
SU

9 5 CL Sandy lean Clay


51 15.5 CL Lean clay
57 3.75 CL Lean clay
57 6.5 CL Lean clay
IS

64 4.5 SC-SM Silty clayey sand


64 7.5 CL-ML Silty clay
64 10.5 CL-ML Silty clay
68 7.5 CL Lean clay
69 13.5 CL Lean clay
69 18 CL Lean clay
72 6.5 CL-ML Silty clay
78 22.5 CL-ML Silty clay

Detailed descriptions of the soils encountered at each borehole and the depths at
which samples were taken are presented on the borehole logs in Figures A-1 thru A-
84 of Appendix-A. The penetration resistance of cohesive samples was also
measured (N-value) for each sample, as shown on the boring logs. Blows required

28
Geotechnical File No. 2015/104, Rev.1

for the penetration of each 15cms (6”) are recorded in the field. N-value is the
number of blows required for the penetration of the last 30 cms (12”) out of 45 cms
(18”) of the sampler and is shown accordingly on the logs. When the sampler
penetration is less than 15 cms (6”) for 50 blows of the hammer, further blows are
stopped after recording the penetration.

In general, estimates of compactness of the granular soils and consistency of


cohesive soils presented on the borehole logs are based on the results of the
Standard Penetration Tests as presented in Table 3.

D
SPT-N values measured are summarized in Figures 4 (a) thru 4 (e), Illustrations.

BI
Further, above SPT-N values are to be corrected for energy ratio, borehole diameter,
rod length, sampling method etc. and N60 values are usually used in the analysis.

N60=(N.ηH.ηB.ηS.ηR)/60 …………………………………………. (1)


R
FO
Where N60 = Corrected Standard Penetration Number
N = Measured Penetration Number
ηH = Hammer efficiency {Calibration certificates are attached in Appendix-I}.
ED

ηB = correction for Borehole dia = 1.0 for borehole of 60-120 mm dia.


ηS = Sampler correction = 1.0 for Standard Sampler
ηR = Correction for rod length = varies from 0.75 to 1.0 based on Rod length. {ηR =
SU

0.75 for rod length of 0.0-4.0m, ηR = 0.85 for rod length of 4-6m, ηR = 0.95 for rod
length of 6-10m & ηR = 1 for rod length > 10m}
IS

A total of seven (7) drilling rings with Automatic hammers were used for this project.
Drilling rig and respective hammer efficiency are summarized in the following Table 6
(Calibration Certificate attached in Appendix-I).

29
Geotechnical File No. 2015/104, Rev.1

Table 6

Rig Type/Hammer Hammer Efficiency (%)


OEO H-690_SOIL MAX 89.4
OEO H-790_AD II 100.9
OEO H-807_SOIL MAX 90.4
OEO H-808_MP8 95.8
OEO H-811_SIMCO 108.8
OEO H-812_SIMCO 101.7
OEO H-814_SIMCO 94.6

D
BI
Corrected SPT values (SPT-N60) are estimated using the equation 1 & are
summarized in Figures 5 (a) thru 5 (e), Illustrations.

R
Symbols used on the borehole logs are presented in Figure A-85. All borehole soil
FO
samples are classified as per ASTM D-2487 as shown in Figure A-86. The Clark &
Walker carbonate sediment classification system is shown in Figure A-87.

4.3 Logs of Borings


ED

Borehole logs are presented in Figures A-1 thru A-84 of Appendix-A.


SU

4.4 Other in-situ tests

4.4.1 Seismic Cross-hole tests


IS

Seven (7) cross-hole tests were conducted in the study area at locations as shown in
Figure 2(a) and indicated in Table # 1(a). Typical schematic layout of the test is
shown in Figure D-1, Appendix-D. In the cross-hole test, the travel times of the
seismic waves are determined in the field. From the field data, Poisson’s ratio (µ),
dynamic shear modulus (G) and Young’s modulus (E) are computed. In cross-hole
test method, the time for compression waves (P) and shear waves (S) propagating
between adjacent boreholes is measured.

A suite of three (3) boreholes arranged in a co-linear array was employed. The two
(2) end holes drilled prior to the actual test were used to house three component

30
Geotechnical File No. 2015/104, Rev.1

down-hole geophones and thus served as receiver holes. The third boring, located
adjacent to the receiver holes, was used to generate seismic energy and is referred
to herein as the shot hole. Shot hole was drilled as the survey progressed and the
measurements were observed stopping at every 0.75m interval till the final depth of
10m. Tests were conducted up to 10m depth below existing grades at these
locations.

At each measurement depth, we impacted the drill string with a 63.5 Kg (140 lbs)
hammer. SPT Sampling was done at each measurement depth in Shot hole. Energy
transmitted down the drill rods to the bottom of the hole propagates through strata in

D
the form of P-waves and vertically polarized S-waves. The resulting ground motion

BI
was detected by the geophones situated at the same depth in the receiver holes. The
geophones were fixed in place against the PVC casing. The signals received by the
geophones were recorded using a multi-channel signal enhancement seismograph.

R
Borehole diameter was kept to a minimum consistent with source and receiver
FO
characteristics. PVC casing of 2 ½” diameter was employed and coupled to the soil
with low density cement-Bentonite grout thus providing better coupling and
transmission at the source and receivers. In performing the seismic cross-hole test,
ED

we had adopted a co-linear array of three boreholes allowing interval timings to be


measured as well as first arrivals. The detectors used for the cross-hole survey
consisted of two borehole picks of Geostuff, USA. The borehole pick unit comprised
SU

of submersible probe containing three (3) mutually perpendicular geophones. The


seismic information detected by these geophones is converted into electrical
impulses and transmitted to the seismograph via a long multi-conductor water-proof
IS

cable.

The P-wave and S-wave travel times for each cross-hole measurement were
determined from the display/print out. From this data, the difference in travel time (∆t)
from the shot hole to receiver holes was determined. The difference in travel path
(∆x) was divided by (∆t) to determine the interval velocity. Thus P-wave velocities
(Vp) and S-wave velocities (Vs) were determined for each test depth.

From these velocities, other dynamic soil parameters were computed using the
following relations:

31
Geotechnical File No. 2015/104, Rev.1

0.5(Vp / Vs )2 − 1
Poisson’s Ratio, µ = ……….……………………….(2)
(Vp / Vs )2 − 1

γ 2
Dynamic Shear Modulus, G= .Vs ……………………………… ..(3)
g
Young’s modulus, E = 2(1 + µ ).G ………………..……………………..(4)

Where, γ = Bulk unit weight; g = Acceleration due to gravity

Wave velocity and elastic modulii values for varying depths for the tests are
presented graphically in Figures D-12(a) thru D-18(a), Appendix-D. These figures

D
also include the stratigraphy details from shot borehole log.

BI
Dynamic elastic properties measured using seismic techniques are generally
considered valid for strains in the order of 10-6. Hence it may be prudent to correct

R
these values to yield the equivalent modulus at the strain levels anticipated in the
intended applications.
FO
4.4.2 Piezo-cone Penetration Tests (PCPT)

A total of ten (10) Static Piezo cone penetrometer soundings were carried out, in
ED

which 5 locations as specified in Figure 2a given by client and additional 5 locations


within 1.0m radius of boreholes BH-16, BH-17, BH-5, BH-29 & BH-64 as mentioned
in Table 1a as interest of OEO to understand better strength & stratigraphy. The tests
SU

were performed in accordance with ASTM D5778-95. The soundings were made by
hydraulically pushing 1000sq. mm end area, 60-degree apex angle cones into the
ground. The cone was advanced at a constant rate. The cone contains electrical load
IS

transducers for measuring the cone tip resistance and sleeve friction. Readings of
the cone tip resistance and sleeve friction resistance are obtained at constant
intervals. The data is transmitted continuously via an electric cable in the cone rods,
to a computer on the site. During the test, the data is displayed on the computer
screen. All the data is stored in the computer and later on sent to office for
processing and are plotted using processing software Coneplot.

The test results of cone penetration tests (cone tip resistance, local friction, pore-
water pressure and friction ratio versus depth) are presented as graphical plots in
Figures E-1 thru E-10, Appendix – E. The plots PCPT-01 thru 04 indicated refusal

32
Geotechnical File No. 2015/104, Rev.1

within the 3m depth & other plots at depths varying between 3.5 m & 7.0 m in
general. Accordingly, the tests were terminated at refusal depths. Friction ratio is
defined as the ratio of sleeve friction to cone tip resistance, expressed as
percentage. Cone tip resistance & friction ratio data is utilized to facilitate
interpretation of soil classification.

OEO has undertaken five extra PCPTs (PCPTs 6 thru 10), which were not included
in the original Scope of Work, to verify the vertical extent of the shallow clay layer at
some tank locations. The results of these extra PCPTs indicated tip cone resistance,
qc, of less than 5 MPa in the top 3.0m for the soundings of PCPT-6, 7 & 8 and 3m-6m

D
for the sounding of PCPT-9 and gradually increases with depth up to the refusal

BI
stress (35 MPa). The values of qc were greater than 5 MPa for soundings of PCPT-1
thru 5 in general.

R
4.4.3 Soil Electrical Resistivity Tests
FO
A total of Twenty (20) Soil Electrical resistivity tests were conducted at locations (SR
# 1 thru 20) as specified in Figure 2a and indicated in Table # 1 (a). The tests were
conducted using Wenner array method and in general in accordance with ASTM G
ED

57. The array consisted of four equally spaced electrodes set out in a collinear
arrangement. Electrical current is introduced into the ground through the outer
electrodes (designated C1 and C2) and the potentials arising from the resulting
SU

electrical field are measured across the inner electrodes (designated P1 and P2). A
schematic diagram is shown in Figure G-1, Appendix-G. Variation in resistivity with
depth is obtained by increasing the separation distance i.e. distances between the
IS

electrodes. This forces the current to flow deeper into the earth in order to complete
the circuit, thereby increasing the depth of penetration. The depth of penetration
approximately equals the electrode spacing.

At all test locations, the electrical resistivity measurements were taken along two
mutually perpendicular directions. The proposed electrode spacing was 0.5, 1.0, 1.5,
3, 5.0 and 7.0 m. When the readings obtained were negligibly small, the test was
terminated at that spacing. Otherwise the test was continued up to the maximum
electrode spacing. Results of the tests are presented in graphical form as a relation
between computed electrical resistivity and electrode spacing in Figures G-2 thru G-
21, Appendix- G. The field test data is also presented in tabular form in these figures.

33
Geotechnical File No. 2015/104, Rev.1

The apparent resistivity values varied from 1.3-93.0 Ohm-meters. A correlation


between soil resistivity and corrosivity is presented in Figure G-22 for general
information. Following this figure, the corrosivity could vary from very severe to mild.
In addition, the results shall be interpreted with respect to penetration depths and
mean values shall be taken for grounding design purposes. However, we believe it
may be necessary to re-conduct and re-evaluate the results after site preparation
works are complete. It should in general be noted that variation in resistivity values
do occur and are reported to depend on the soil type, soil constituents including salt
content, soil state, subsurface strata, near-surface irregularities, environmental

D
factors etc.

BI
4.4.4 Seismic Refraction Tests

R
A total of five (5) seismic refraction tests {SRS-01 thru 05} were carried out at the
specified location as given in Table 1a.
FO
Concept of Sounding
ED

The concept of seismic refraction sounding is shown in Figure F-1, Appendix-F.


Surface seismic refraction sounding was made using Italy make, M.A.E. 12-Channel
signal enhancement Seismograph. The signals transmitted to this instrument from
each geophone are individually amplified and then converted from analog to digital
SU

form and stored in memory. Repeated signals are algebraically summed, thus
enhancing the repeatable portion of signal while tending to cancel out random noise
thereby improving signal-to-noise ratio. GEOV/4,5 type geophones of M.A.E. make
IS

were used in the seismic refraction survey. These geophones are made smaller in
size & lighter in weight.

Hammer impacts on steel plate are used as source of seismic energy. The seismic
waves generated by hammer impact were detected by collinear array of geophones
placed at predetermined distances along a line from the shot point or impact point.
The geophone array was of 24 m spread with 12 geophones spaced at 2 m intervals.
With the time (T) of arrival and distance (X) between the receiver (geophone) and
energy source (shot point) known, seismic velocity through the medium is calculated.
The soundings were made in forward direction and reverse directions at each test

34
Geotechnical File No. 2015/104, Rev.1

location and Time vs Distance (T-X) plots for the tests have been established using
software Easy Refract of Geostru. seismic wave velocity contour maps are presented
in Figures F-2 thru F-6.

As per to SAES –A-114, Table 1, the excavation is rock type if the seismic velocity is
more than 1530 m/s. Accordingly, based on the seismic velocity contour maps
provided in Figures F-2 thru F-6, excavation can be considered as rock type where
the velocity is more than 1530 m/s. Further, below tables summarizes the layers,
seismic velocity of the each layer and excavation type.

D
Seismic
Excavation
SRT # Test depth Layers velocity Vp,

BI
type
(m/s)
0-5 700 Normal
1 @ surface
5-30 1925 Rock

0-6
R 750 Normal
FO
2 @ surface
6-30 1870 Rock

0-5 535 Normal


3 @ surface
5-30 1538 Rock
ED

0-5 860 Normal


4 @ surface
5-30 2016 Rock

0-5 740 Normal


SU

5 @ surface
5-30 2200 Rock

4.4.5 Thermal Resistivity Tests


IS

A total of Five (5) In-situ thermal resistivity tests were conducted using field thermal
needle method and in accordance with IEEE standard 442-1981. The tests were
performed in the locations (SRT # 1 thru 5) indicated in Table # 1(a) according to
SOW. Thermal resistivity tests results along with the temperature details are
presented in Figure I-1, Appendix-I. Thermal resistivity values ranged between 8.779
m. K/watt to 10.978 m. K/watt, which are generally in the range of values expected
for dry sands to stiff cohesive soils. However, we believe it may be necessary to re-
conduct and re-evaluate the results after site preparation works are complete.

35
Geotechnical File No. 2015/104, Rev.1

4.4.6 Excavation of Test pits and Collection of Bulk Samples

A total of fourteen (14) out of fifteen (15), test pits were excavated by using
mechanical excavator and performing field density tests at 0.30m interval right from
surface and bulk samples two at each location were collected from within the depths
of top 1.0 m at the respective existing grades. The samples were transported to OEO
laboratory, Al-Khobar for testing of compaction characteristics and CBR. Test pit logs
are shown in Figure H-1 thru H-14, Appendix-H.

4.4.7 Photographs of Field Operations & samples

D
BI
Photographs taken during the field operations, samples (soil, bulk samples) & tests
pits are presented in enclosed CD.

R
FO
ED
SU
IS

36
Geotechnical File No. 2015/104, Rev.1

5. LABORATORY TESTS

5.1 Description of Tests

The physical and chemical characteristics of selected and representative soil & water
samples from the boreholes presented in this report were tested adopting the latest
revisions of ASTM procedures. Some of the tests conducted are detailed below.

Particle size analysis of soils was done in accordance with ASTM D-422. Liquid and
plastic limits of finer soil samples were obtained as per ASTM D-4318. These tests

D
help in the classification of soil following ASTM D-2487. Natural moisture content of

BI
soils was determined adopting ASTM D-2216 procedures. Specific gravity tests were
conducted in accordance with ASTM D-854. Consolidation tests were performed on
selected samples in accordance with ASTM D-2435. Unconfined compression tests

R
on fine-grained clay soils were performed in accordance with ASTM D-2166. Direct
shear test on granular soils was conducted as per ASTM D-3080.
FO
On bulk samples from Test pits, Compaction tests were conducted in accordance
with ASTM D-1557. Laboratory CBR tests were carried out in accordance with ASTM
D-1883.
ED

Chemical tests were conducted on selected soil samples to determine pH, sulfates,
and chlorides using AASHTO test procedures. The tests were performed for
SU

carbonate content using ASTM D 4373 – 96. The ground water samples from the
selected boreholes were tested for pH, sulfates, chlorides and TDS using the
respective standards / test procedures.
IS

In addition to these laboratory tests, a visual classification of all materials obtained


during the drilling operations was carried out in the field / laboratory by our geologist /
geotechnical engineer.

37
Geotechnical File No. 2015/104, Rev.1

Summary of All the Laboratory Tests Performed


S.No. Laboratory Test Performed
1 Sieve Analysis, Classification & Moisture content
2 Atterberg Limits
3 Specific Gravity Tests
4 Unconfined Compression Test (Soil)
5 Sulphate, chloride, Carbonate & pH test (Soil)
6 Sulphate, chloride, TDS & pH test (Water)
7 Direct Shear Test
8 Consolidation Tests
9 Hydrometer Analysis

D
10 CBR Test on Bulk Samples

BI
5.2 Presentations and Discussion of Test Results

R
5.2.1 Borehole samples
FO
Summary of all laboratory test results on borehole soils & water samples are
presented in Figures B-1 thru B-31(a), Appendix-B. All borehole samples are
classified as per ASTM D-2487.
ED

Laboratory tests have indicated that the granular soils are classified into GW-GM,
GP-GM, GW, GP, GC-GM, GM, SW, SP, SW-SM, SP-SM, SM, SC-SM and SC
groups as per ASTM D-2487. Gradation charts are presented in Figures B-32 thru B-
SU

116. The percent fines in coarse grained soil varied between 1% & 49%.

Plasticity charts are included in Figures B-117 thru B-142. Fine-grained soils are
IS

classified into ML, CL-ML & CL groups as per ASTM D-2487. The liquid limits varied
between 23 & 45 and the plasticity indexes between 4 and 19. The natural moisture
contents varied from 0.7 & 34.9. Specific gravity test results of selected soil samples
indicated values of between 2.66 and 2.7. Direct shear test plots as presented in
Figures B-143 thru B-149 indicated the angle of internal friction to vary between 33 &
380. The stress-strain plots as illustrated in Figures B-150 thru B-159 revealed the
unconfined compressive strength of fine-grained soils in the range of 184 – 315
kN/m2.

38
Geotechnical File No. 2015/104, Rev.1

The consolidation tests results (Figures B-160 thru B-167) conducted on selected
samples from different depths & from the boreholes presented in this report revealed
that the fine-grained samples are primarily over-consolidated with medium to low
compressibility.

The initial void ratio varied between 0.46 and 0.88; the pre-consolidation pressures
ranged between 180-330 kPa. The compression index values varied from 0.10 - 0.28
& Re-compression index varied between 0.02 & 0.06.

5.2.2 Bulk Samples from Test Pits

D
BI
The Summary of laboratory test results on bulk samples are presented in Figure H-
15 thru H-17, Appendix-H. The bulk samples are classified as per ASTM D-2487,
Figure H-18. The soil classification chart for highway purposes as per ASTM D-3282

R
is given in Figure H-19. Gradation charts for bulk samples are given in Figures H-20
thru H-33. Plasticity charts for bulk samples are given Figures H-34 thru H-36.
FO
Laboratory tests have indicated that the bulk samples collected represented silty
sand, poorly graded sands with varied amounts of silt, silty clayey sand & silty clayey
gravel, which are classified into SM, SP-SM, SC-SM & GC-GM groups as per ASTM
ED

D-2487 and as A-2-4, A-1-B & A-3 types as per ASTM D-3282.

The moisture-density relationships for compaction characteristics of bulk samples are


SU

presented in Figures H-37 thru H-50. The maximum dry densities are found to be
2.063 g/cc & 2.287 g/cc and the optimum moisture contents found to be 4.2% &
10.1%. CBR test plots are given in Figures H-51 thru H-64, which indicated CBR
IS

values between 12 to 56 at 95% maximum dry density and 24 to 71 at 100%


maximum dry density. Figure H-65 shows the approximate correlation of soil ratings
based on CBR values for use in design of light traffic pavements. Following this
figure, the sub grade soils provide good to excellent support for the pavements. The
discussions on pavement considerations are included in Section 7.8. Field density
tests were conducted at 0.30 m interval right from surface and the results are
presented in Figure H- 66 thru H-79.

39
Geotechnical File No. 2015/104, Rev.1

5.4 Chemical Analysis of Soil and Water

Soil samples from selected boreholes presented in this report were tested for pH,
Sulfates, Chlorides & carbonates. Ground water samples from selected boreholes
were tested for pH, Sulfates, Chlorides & TDS. The Chemical analysis results of soil
samples are presented in summary sheets, Figures B-1 thru B-31 and water samples
are presented in Figure B-31(a). Based on the summary, the range of parameters is
included in Table 8.

Table 8

D
Chemical analysis of soil & water

BI
Soil Water

pH 7.4 - 7.6 7.3 - 7.6


Water Soluble Sulfates <0.002 – 0.619 (%) 634 - 2567 ppm
Water Soluble Chlorides

R
0.037 – 2.565 (%) 4254 - 20384 ppm
FO
Carbonate content 2 – 6 (%) -
TDS - 8380 - 39670 ppm

Based on the above chemical tests results and following the table given in SAES Q-
ED

001 dated January 2016 as reproduced in Figures K-8 thru K-8(b) , the exposure
type and cement type shall be assessed.
SU
IS

40
Geotechnical File No. 2015/104, Rev.1

6. FOUNDATION RECOMMENDATIONS

6.1 General

As stated in OEO’s Endorsement Letter, the dimensions, locations and loads of all
proposed structures were not available when the Endorsement Letter was prepared.
As a result, OEO stated in the Endorsement letter that the SOW “may be” sufficient.
MHDP made the missing information available to OEO only a few days before
starting of the field work. Furthermore, MHDP informed OEO the IFC
drawings/documents will be issued to the LSTK contractors on May 31st, 2016.

D
Accordingly, it was not possible to drill additional boreholes due to time limitations.

BI
However OEO has added extra five PCPTs at locations where suspected weak
zones were anticipated and the soil replacement was deepened in one tank in light of
the results of the extra PCPT. OEO suggests that LSTK Contractor undertakes four

R
confirmatory boreholes during the LSTK Contractor detailed geotechnical study. This
FO
statement is added to the report.

A geotechnical investigation was undertaken at the proposed project location of the


YANBU DISTRIBUTION HUB (YDH), Yanbu Area. The Yanbu Distribution Hub
(YDH) will aggregate refined product from the three (3) local refineries (SAMREF,
ED

YASREF, and Yanbu) and act as the origin pump station for at least two (2)
connecting pipelines, the Yanbu to Jeddah pipeline and the Yanbu to Central Region
pipeline.
SU

The project includes the mainly construction of 20 tanks, in which six (6) Gasoline
tanks, three (3) Diesel tanks, one (1) DPK tank, three (3) DPK/KEROSINE tanks, one
IS

(1) T&I Diesel/DPK tank, two (2) Slop tanks, two (2) Fire water tanks, one (1) Utility
water tank and one (1) Surge relief tank and other structural units with design details
& sizes as provided by client is presented in Tables 9, 9(a), 9(b), 9(c) & 10.

We understand form the SOW, proposed structures/facilities other than tanks,


founded on shallow foundations of spread & mat foundations. Tanks are founded on
ground supported ring wall foundation. Accordingly, the Report presents analysis and
discussion on the Spread foundations (Section 6.3), Mat foundations (Section 6.4)
and Tank foundations (Section 6.5).

41
Geotechnical File No. 2015/104, Rev.1

6.2 Geotechnical Site Evaluation

The stratigraphy from 84 boreholes consists of primarily granular (sands & gravels)
soils within the depths of investigation. Fine grained soils (clays & silts) were
encountered in few boreholes mainly at deeper depths and in very few boreholes fine
grained soils were noticed at shallow depths. Presence of fine grained within in the
shallow depths of boreholes is presented in Table 2.

Based on the corrected Standard Penetration Test (SPT) N60-values and correlations
as presented in Table 3, the compactness of the granular soils has been observed to

D
vary from medium dense to very dense except for loose layers in borehole BH-82

BI
and the consistency of fine-grained soils has been observed to be very stiff & hard in
general. Loose granular soils were encountered within top 4.5m depth in borehole
BH-82. Stiff fine grained soils were encountered at a depth of 1.5m-3m in BH-5,

R
1.5m-2.25m in BH-17 & 18. Layer of medium stiff fine grained soils were noticed at a
depth of 3m to 3.75m in BH-29.
FO
Existing ground elevations within the boreholes (as presented in Table 1) varied
between +2.48m & +5.84m indicating a difference in elevation of about 3.36m except
ED

for boreholes BH-82 & 83. Theses 2 boreholes are located in higher elevation of
+10.36m & 11.27m for BH-82 & BH-83, respectively. The elevations of test locations
are with relative to Saudi Aramco Vertical Datum (SAVD-78).
SU

The GWT readings were recorded during the period of the field work in April-May
2016. The groundwater table was encountered at depths of 1.5m to 5m below
IS

existing ground levels at the borehole locations BH-1 thru BH-81. Ground water table
was encountered at deeper depths of 9.5m & 10.4m in BH-82 & BH-83, respectively,
due to higher ground level at these boreholes. A possible fluctuation of about 1.0m
can be anticipated due to seasonal and tidal variations for design.

Based on the field and laboratory testing results (Atterberg limits, natural moisture
content and UCS), the fine-grained soils can be considered as inactive, non-swelling,
non-collapsible and primarily over-consolidated.

42
Geotechnical File No. 2015/104, Rev.1

6.3 Shallow Foundations

6.3.1 Criteria

A suitable foundation for any structure must satisfy the following two basic and
independent criteria with respect to the underlying foundation soils, as follows:

a) The foundation must have an adequate factor of safety against shear failure or
bearing capacity failure of sub soil.
b) Vertical movements of foundation due to compression of the soils beneath the

D
foundation must be within tolerable limits.

BI
6.3.2 Net Allowable Bearing Capacities

R
Generally, the bearing pressures are computed for both shear failure and maximum
permissible settlement criteria and the smaller value is considered as the Net
FO
Allowable Bearing Capacity (NABC) and adopted in the design of foundations.

A. Safe Pressure against Shear Failure


ED

Allowable bearing capacity of soils is mainly governed by the following factors:

i. Cohesion (c) and Angle of internal friction (φ) of the soil;


SU

ii. Width (B) and depth (D) of the footing;


iii. Density of the supporting strata; and
iv. Depth of groundwater table (GWT).
IS

The equations used to estimate the safe bearing capacity against shear failure are
given in equation 6. The values of c and φ in the above-mentioned equations are
estimated based on N60 within the influence zones underneath the foundations.

Settlement Analysis Approach:

Settlement of foundations on soils is usually expressed as the sum of immediate


(elastic) settlement, Si; primary consolidation settlement Sc; and secondary (creep)
consolidation settlements Ss.

43
Geotechnical File No. 2015/104, Rev.1

S = Si + Sc + Ss (5)

Where Si = Immediate (Elastic) Settlement {estimated for granular soils using


equations presented in Figures C-1 & C-1a of Appendix-C}.

The elastic settlements in granular soil layers are estimated using Burland &
Burbidge’s method. This equation considers the average SPT-N60 values and net
effective stress in soil layers. This method is detailed in Figures C-1 and C-1a,
Appendix-C. The settlement analysis using this method considers average SPT-N60
values within a depth of influence (related to footing size).Therefore, applicable

D
primarily for homogeneous granular soils only.

BI
In the analysis, it is reasonable to assume that very stiff to hard fine-grained soils are
negligible consolidation settlements and only soft to stiff fine grained soils would

R
contribute to consolidation. Consistency of fine grained soils met in the applicable
shallow foundations area in general observed to be hard. Therefore, the analysis
FO
considers that hard fine grained soils primarily undergo elastic settlements.

Since the fine-grained soils met are observed to be inorganic, we have ignored the
ED

effect of secondary consolidation due to inorganic nature of fine grained soils.


However, the settlement analysis based on Burland & Burbidge’s method considers a
factor (ft) for long-term (secondary) settlements in sands. In this analysis, we have
SU

considered an elapsed time of 25 years to account for creep in granular soils.

6.3.4 Spread footings


IS

Specific spread foundation sizes (square, rectangular & strip) and depths of
foundation below FGL is provided by the Client are considered in the analysis. The
design details of the spread foundation are presented in Tables 9, 9a, 9b & 9C.

Generally, the allowable bearing pressures are computed for both shear failure and
maximum permissible settlement criteria and usually the smaller of the two is used in
the design of foundations and is considered as the Net Allowable Bearing Capacity
(NABC) of the soil.

The analysis has been carried out assuming the following:

44
Geotechnical File No. 2015/104, Rev.1

(i) As per SOW provided by client, FGL for spread foundations is


considered 200 mm above the proposed FGL for nearest tanks and
where FGL is not available; EGL is considered in analysis. Therefore,
it is interpreted that existing levels would be raised to the finished
grade level with well compacted fill material. Accordingly, we
considered fill.
(ii) A minimum SPT-N value of 20 has been considered throughout the
thickness of fill.
(iii) Spread foundation widths & depth are assumed as per SOW.

D
(iv) Analysis has been carried out considering both shear criteria using

BI
equation 6 & settlement criteria based on Burland & Burbridge
method, as advised by Saudi Aramco and least selected Net allowable
bearing capacity values are presented in the following table.

R
(v) The bearing capacities associated with each structure was estimated
based on the applicable borehole profiles under each structure.
FO
Shear Considerations:
ED

ଵ ఊᇲ
‫ݍ‬஺(௡௘௧) = ி ቂ‫ݏ ݍ‬௤ ܰ௤ + ଶ
‫ݏ ܤ‬ఊ ܰఊ ቃ − ߛ ᇱ ‫ܦ‬ (6)

Where
SU

B = Width of foundation
D = Foundation embedment
ߛ ′ = Effective unit weight
IS

F = Factor of safety to be 3

 φ  B 
N q = tan 2 45 + .eπ . tan φ , N γ = 2.[ N q + 1]. tan φ , S q = 1 + . tan φ  ,
 2  L 
 B
Sγ = 1 − 0.4  , ∅_Based on Correlation ∅ (deg)= 27.1+0.3N60-0.00054[N60]2
 L
γ' = Effective unit weight_Based on Correlation

Spread sheets showing the settlement estimations for typical sizes & depth are
shown in Figures C-3 thru C-8 based on Burland & Burbidge method. Also, spread

45
Geotechnical File No. 2015/104, Rev.1

sheets showing shear estimation for typical spread footing dimensions and depths
are shown in Figures C-9 thru C-11 (Appendix C).

A permissible total settlement of 25 mm is usually allowed for spread footings.


However, the recommendations for the net allowable bearing capacities were made
taking into account of possible secondary & local compression effects, if any.

Accordingly, the NABC for spread footings based on applicable borehole profile each
structure are presented in Tables 9, 9(a), 9(b) & 9c.

D
BI
R
FO
ED
SU
IS

46
Geotechnical File No. 2015/104, Rev.1

Table 9
Net Allowable Bearing Capacities (kN/m2)-Square Footings
Structure Boreholes Footing Footing NABC (kPa) for Allowable Recommended
Covered Depth Size Permissible bearing capacity Net Allowable
(m) (m x m) Settlement of 25 based on shear Bearing Capacity

D
below mm Criteria
FGL Square Footing Square Footing Square Footing

BI
(m x m) (m x m) (m x m)
OME building 1.0 2.5 x 2.5 300 340 325
BH-55
1.5 2.5 x 2.5 300 800 300
Operation shelter 1.0 1.5 x 1.5 300 300 300

R
BH-58
1.5 1.5 x 1.5 300 500 300
1.5 x 1.5 300 600 300

FO
1.0
Security support 2.0 x 2.0 300 700 300
BH-59
building 1.5 x 1.5 300 1000 300
1.5
2.0 x 2.0 300 1000 300
Chemical 1.5 x 1.5 300 300 300
1.0
shelter/x-ray 2.0 x 2.0 300 325 300
building &
Security support
building
BH-60 ED
1.5
1.5 x 1.5
2.0 x 2.0
300
300
700
800
300
300

1.5 x 1.5 300 300 300


1.0
2.0 x 2.0 300 325 300
SU
Mosque BH-55
1.5 x 1.5 300 750 300
1.5
2.0 x 2.0 300 750 300
Sunshade for BH-59 3.5 x 3.5 300 1000 300
2.0
gatehouse BH-60 3.5 x 3.5 300 1000 300
IS

Pump sheds *BH-62 thru 65 1.5 3.0 x 3.0 250 450 250
**1.0 3.0 x 3.0 250 180 180
Scraper trap BH-74, 75
**1.5 3.0 x 3.0 300 250 250
**Depth of foundation below EGL, *BH-62 & 64 critical boreholes for analysis.

47
Geotechnical File No. 2015/104, Rev.1

Table 9a
Net Allowable Bearing Capacity (kN/m2)-Square Footings

Structure Borehol Footing Footing NABC (kPa) for Allowable bearing Recommended Net

D
es Depth (m) Size Permissible Settlement capacity based on Allowable Bearing
Covered below FGL (m x m) of 25 mm shear Criteria Capacity
Square Footing (m x m) Square Footing (m x m) Square Footing (m x m)

BI
1.0 3.0 x 3.0 300 350 300
Pipe rack BH-68
1.5 3.0 x 3.0 300 1000 300
PS-006-fire, utility, 1.0 3.5 x 3.5 300 350 300
drinking water BH-53 1.5 3.5 x 3.5 300 550 300

R
pump house
FSF building 1.0 1.5 x 1.5 300 400 300

FO
BH-61
1.5 1.5 x 1.5 300 1000 300
**1.0 2.0 x 2.0 300 300 300
Metering room 2.5 x 2.5 300 325 300
BH-76
marafiq **1.5 2.0 x 2.0 300 500 300
2.5 x 2.5 300 550 300
Platform
foundation
Platform
BH-77 &
78
BH-79 &
**1.0
**1.5
**1.0
ED1.5 x 1.5
1.5 x 1.5
1.5 x 1.5
300
300
300
300
1000
300
300
300
300
foundation 80 **1.5 1.5 x 1.5 300 450 300
1.0 1.5 x 1.5 300 225 225
SU
BH-81,
Platform 83 & 84 1.5 1.5 x 1.5 300 325 300
foundation 1.0 1.5 x 1.5 150 225 150
BH-82
1.5 1.5 x 1.5 150 300 150
BH-81, 1.0 3.0 x 3.0 250 300 250
IS

83 & 84 1.5 3.0 x 3.0 300 400 300


Pipe supports
1.0 3.0 x 3.0 90 300 90
*BH-82
1.5 3.0 x 3.0 80 300 80
**Depth of foundation below EGL, *Borehole shifted about 14m from original location.

48
Geotechnical File No. 2015/104, Rev.1

Table 9b
Net Allowable Bearing Capacity (kN/m2)-Rectangular Footings
Structure Boreholes Footing Footing NABC (kPa) for Allowable bearing Recommended Net

D
Covered Depth (m) Size Permissible capacity based on Allowable Bearing
below (m x m) Settlement of 25 mm shear Criteria Capacity

BI
FGL Rectangular footing Rectangular footing Rectangular footing
(m x m) (m x m) (m x m)
Pumps 1.0 3x5 300 325 300
3x6 300 300 300

R
*BH-62 to
4x8 250 300 250
65
1.5 3x5 300 400 300

FO
3x6 300 400 300
4x8 250 450 250
Skids 1.0 2.5 x 5 300 1000 300
3x5 300 1000 300
BH-67
1.5 2.5 x 5 350 1000 300

Pipe sleepers BH-77 & 78


1.0
1.5
ED 3x5
3.5 x 4
3.5 x 4
350
300
350
1000
350
1000
300
300
300
BH-81, 83 & 1.0 3.5 x 4 250 250 250
Pipe sleepers
84 1.5 3.5 x 4 300 350 300
SU

1.0 3.5 x 4 80 300 80


Pipe sleepers BH-82
1.5 3.5 x 4 70 300 70
1.0 3.5 x 4 350 350 300
Pipe sleepers BH-79, 80
1.5 3.5 x 4 300 700 300
IS

Drinking water 1.0 4x4 300 350 300


tank (vessel 1.5 4x4 300 600 300
BH-50
type)
X40-D-0704
*BH-62 & 64 critical boreholes for analysis.

49
Geotechnical File No. 2015/104, Rev.1

Table 9c
Net Allowable Bearing Capacity (kN/m2)-Strip Footings

D
Structure Boreholes Footing Width of NABC (kPa) for Allowable bearing Recommended Net
Covered Depth (m) footing Permissible capacity based on Allowable Bearing

BI
below (m) Settlement of 25 mm shear Criteria Capacity
FGL Strip footing (m) Strip footing (m) Strip footing (m)
Substation 0.6 2.0 350 200 200
Buildings 2.5 350 200 200

R
3.0 300 250 250
4.0 300 300 300
BH-56

FO
1.0 2.0 350 250 250
2.5 350 250 250
3.0 300 300 300
4.0 300 350 300
0.6 2.0 350 200 200
ED 2.5
3.0
4.0
350
300
250
200
250
300
200
250
300
BH-57
1.0 2.0 350 250 250
2.5 350 250 250
SU

3.0 300 300 300


4.0 250 350 300
Pipe sleepers BH-69 thru 1.0 2.5 300 250 250
main pipe way 71 1.5 2.5 350 350 350
IS

Note: In case that actual design loads exceeding the allowable soil bearing capacities, all geotechnical analyses should be revisited to
ascertain that the settlement criteria are satisfied due the new loads. In case that the facilities layout is modified, a new geotechnical
campaign should be carried out by the LSTK contractor at the new footprint of the facilities.

50
Geotechnical File No. 2015/104, Rev.1

The recommended net allowable bearing capacities are low in specific borehole
location BH-82 due to presence of loose granular soils up to 4.5m. These bearing
capacities shall be verified by designer against design requirements. In the event,
above bearing capacities at BH-82 do not meet the design requirements; we
recommend soil improvement (as per Section 6.5.4). Since borehole location is
shifted from original, designer shall ensure the presence of any structure at drilled
location.

6.3.5 Increase in Bearing Capacity for Short-Term Loading & Blast Loading

D
The use of a one-third stress increase for load combinations including earthquake

BI
loads may be used for foundation soil bearing capacities, if specially permitted by
registered geotechnical engineer. Also, as per NAVFAC DM_7.02, when part of the
live loads are temporary (earthquake, wind, snow etc.), use a factor of safety of 2.

R
The maximum increase over the safe loads to account for transient (wind,
earthquake & hydrostatic) loading shall be 33 to the order of even 50 percent. An
FO
increase in allowable bearing capacities may be expected due to blast load
conditions, if any. Appropriate factors for dynamic effects shall be considered as per
SAES M-009.
ED

6.3.6 Other Settlement Considerations


SU

The bearing capacities in Tables 9, 9a, 9b and 9c, and their associated settlements,
are considered total settlements for static conditions and for a single isolated footing
subjected to vertical concentric loads having no interference from adjacent
IS

foundations. However, in practice, footings might be constructed close enough that


may result in overlap of stress zones below the footings. When the center-to-center
spacing of footings is such that an overlap of the foundation stress zone takes place,
there will be increased foundation settlements due to interference. Settlements due
to the presence of footings within the close proximity of adjacent footings can be
estimated using Figure K-1 (Appendix K). It is observed from this figure, the
influence increases as the relative distance (dA/B) decreases.

It is often the differential settlement rather than the total settlement that is critical to a
structure. The differential settlements are expected to be about two-thirds of the total
settlements. Differential settlement is the relative movement of two parts of the

51
Geotechnical File No. 2015/104, Rev.1

structure. This results in angular distortion or relative rotations, which become critical
beyond certain limiting values. The limiting values differ, however, depending on the
function of the structure. Generally, an angular distortion of 1/500 is considered a
safe limit for buildings unless specified otherwise. Bjerrum (1963) presented the
limiting angular distortions and are shown in Figure K-2 (Appendix K).

6.3.7 Foundation Stability

Foundation stability shall be checked using service load combinations from Saudi
Aramco specifications and /or International Standards like SAES-M-001, SAES-M-

D
100, ASCE/SE17 and / or SEI/ASCE37 for any other probable and realistic

BI
combinations of loads. For higher resistance against sliding, other options such as
‘shear key’, anchoring could be considered. Foundation stability factors for blast
resistant buildings shall be in accordance with SAES-M-009.

6.4 Mat Foundations


R
FO
A footing greater than 5 m x 5 m or greater is generally considered as mat
foundation. A structure supported on a mat foundation can withstand greater
ED

settlements than one supported on spread footings as mat foundations tend to bridge
over heterogeneity of the soil and the average settlement does not approach the
extreme values of spread footings. Therefore, the allowable bearing pressure for mat
SU

foundation can be greater than that for footings.

For mat foundations on sand or gravel, Terzaghi & Peck suggest an increase in
IS

allowable pressure than those for footings. Thus, settlements of the order of 50mm
can be usually considered acceptable in case of mats. The recommendations are
made accordingly in this report.

The analysis has been carried out for mat sizes given by client for different structures
as presented in Table 10 using the Equation 7 (Figure C-2), considering lower
subsoil profiles of applicable boreholes under each structure. Accordingly, Net
Allowable Bearing Capacities (NABC) are presented in Table 9. Time factor of 1.5 for
time period of 25 years is considered in recommending the Net allowable baring
capacity.

52
Geotechnical File No. 2015/104, Rev.1

Settlement consideration:

For Mat foundation in granular soils, Net Allowable Bearing Capacity can be obtained
from the following equation with settlement (Se) limited to 50 mm.

ேలబ ஻ା଴.ଷ ଶ ௌ
‫ݍ‬஺(௡௘௧) = ଴.଴଼
ቂ஻
ቃ ‫ܨ‬ௗ ቂଶହ೐ ቃ (7)

Where Fd = 1+0.33(D/B), Se is the allowable settlement which can be taken as 50


mm.

D
Table 10
Net Allowable Bearing Capacity (kN/m2)-Mat Foundation

BI
Structure Boreholes Footing Footing NABC (kPa) for
Covered Depth (m) Size Permissible Settlement of
below FGL (m x m) 50 mm

R
Mat foundation (m x m)
Skids 1.5 8.0 x 15.0 900
BH-67
2.0 8.0 x 15.0 950
FO
Oily water lift station BH-72 7.4 7.0 x 11.5 800
Oily water lift station BH-73 7.4 7.0 x 11.5 700
Old tag x40x-1101 (new 0.6 8.0 x 15.0 700
tag-x40-u-0004), ows water BH-54 8.0 x 15.0 700
1.0
package
ED

X-40-d-0901, drain vessel 5.0 x 12.0 700


BH-66 3.5
(HC)
1.0 5.0 x 11.0 Filed work not completed
Metering skid BH-85
1.5 5.0 x 11.0
SU

Spread sheets showing NABC estimation of mat footing dimension and depths for
given sizes are shown in Figures C-12 thru C-14 (Appendix C), respectively.
IS

Note: In case that actual design loads exceeding the allowable soil bearing
capacities, all geotechnical analyses should be revisited to ascertain that the
settlement criteria are satisfied due the new loads. In case that the facilities layout is
modified, a new geotechnical campaign should be carried out by the LSTK contractor
at the new footprint of the facilities.

The recommended maximum NABC should not exceed 400 kPa to avoid possible
non-linear load-settlement response underneath the mat foundations leading to
higher settlements than those calculated by Equation 7. However, NABC with values
of higher than 400 kPa may be used for mat foundations, if required, provided that

53
Geotechnical File No. 2015/104, Rev.1

the load-displacement response of soil is further assessed by pressure meter testing


to determine the modulus of subgrade reaction of the soil.

6.5 Tank Foundations

6.5.1 General

The project includes the construction of six (6) Gasoline tanks, three (3) Diesel tanks,
one (1) DPK tank, three (3) DPK/KEROSINE tanks, one (1) T&I Diesel/DPK tank, two
(2) Slop tanks, two (2) Fire water tanks, one (1) Utility water tank and one (1) Surge

D
relief tank. The stratigraphy at these tanks are coming are explored boreholes by BH

BI
# 1 thru 52. The site of each large-diameter Tank is explored by 3 boreholes, out of
which the center borehole was drilled to 30 m depths and the peripheral boreholes
were drilled to 20 m depths. The layout of tanks and corresponding boreholes is

R
shown in Figure 2 & 2(a). All tanks are circular with diameters of 55m, 65m, 67m, 77,
38.5m, 22.5m, 20.5m & 5.5m and anticipated applied pressure at the formation levels
FO
of 150 kPa. Type of tanks and locations of the corresponding boreholes, as well as
the design details are provided by M/s. Mustang and presented in Table 11.
ED
SU
IS

54
Geotechnical File No. 2015/104, Rev.1

Table 11
Type of Tanks, Corresponding Boreholes & Design Details

S.NO Type of structure BHs Dia. of Tank (m) Design Bearing


covered or Foundation Capacity (kPa)
size
1 Gasoline – 95 D-0101 *1, 2, 3 55 150
tank
D-0102 *4, 5, 6 55 150

D
D-0103 *7, 8, 9 55 150

BI
2 Gasoline – 91 D-0201 *10, 11, 12 55 150
tank
D-0202 *13, 14,15 55 150

D-0203
R
*16, 17, 18 55 150
FO
3 Diesel tank D-0301 *19 ,20, 21 65 150

D-0302 *22, 23, 24 65 150

D-0303 *25, 26, 27 65 150


ED

4 DPK tank D-0401 *37, 38, 39 67 150

5 DPK/KEROSI D-0402 *34, 35, 36 55 150


SU

NE
D-0403 *31, 32, 33 55 150

D-0404 *28, 29, 30 55 150


IS

6 T&I D-0502 *40, 41, 42 77 150


Diesel/DPK
7 Slop tanks D-0601 *43, 44 38.5 150

D-0602 *45, 46 38.5 150

8 Fire water X40-D- *47, 48, *49 22.5 150


tanks 0701/0702
9 Utility water X40-D-0703 *50 5.5 70
tank
10 Surge relief X40-D-0801 *51, 52 20.5 100
tank
*Borehole drilled @ center of Tank & depth 30m.

55
Geotechnical File No. 2015/104, Rev.1

Typical proposed tank foundation is illustrated in Figure K-3. It comprises concrete


ring wall foundation, which is located around the periphery of the tank to distribute
the concentrated load of the tank shell and its attachments. It is recommended that
the ring wall should be proportioned in such a way that the bearing pressure under
the ring wall is approximately equal to that of soil beneath the tank at the same level.
This will help minimize the differential settlements between the centre of the tank and
its outer shell. Concrete ring wall foundations of 400 mm to 600 mm size (width) may
be considered. The settlement of the ring wall itself will be very nominal and the edge
settlements are primarily the soil settlements only. Edge stability against bearing
capacity failure is critical to the support of tank structures.

D
BI
Tank foundations shall also be designed and constructed as per provisions of the
latest version of API standards 650. As per this, the minimum reinforcement in any
ring-wall should be 0.002 times the cross-sectional area of the wall above grade. For

R
hot tanks, greater amount of steel may be required to withstand the thermal stresses.
FO
It is emphasized that the soil fill between the concrete ring walls be properly tested
and compacted. The material specifications shall be that of a select fill. The material
specifications and compaction requirements shall be in accordance with SAES A-
114.
ED

6.5.2 Settlement Analysis and Recommendations


SU

As per the data provided by Client (presented in Table 12), average existing grade
levels (NGL) under different tanks vary from +3.0m to +5.5m and Finished Grade
Levels (FGL) vary from +4.15m to +5.6m. Therefore, it is interpreted that existing
IS

levels would be raised to the respective finished grade levels with well compacted
structural fill material. Filling & cutting requirements based on NGL & FLG of each
tank is provided in Table 12.

In the analysis, we have considered loaded area of tank base as equivalent to


circular diameter and the embedment depth of tank base as 0.6m, 1.0m & 1.5m
below the FGL. Idealized soil profile from within the data of boreholes explored under
each tank is considered.

56
Geotechnical File No. 2015/104, Rev.1

Table 12
Average Natural ground levels (NGL) Finished graded levels (FGL) under each Tank
TAG
Number as Permanent Dia. Height NGL FGL Fill/Cut
TANK TYPE
per Plot TAG Number (m) (m) (m) (m) (m)
plan
Diesel DPK T & I
X40-D-0502 X40-D-0009 77 15 5 5.5 0.5 fill
Tank
Diesel Tank X40-D-0301 X40-D-0006A 65 15 5.25 5.5 0.25 fill
Diesel Tank X40-D-0302 X40-D-0006B 65 15 5.25 5.5 0.25 fill

D
Diesel Tank X40-D-0303 X40-D-0006C 65 15 5 5.5 0.5 fill
DPK X40-D-0401 X40-D-0017 67 15 4.5 5.5 1.0 fill

BI
DPK X40-D-0402 X40-D-0018A 55 15 4.5 5.5 1.0 fill
DPK X40-D-0403 X40-D-0018B 55 15 4.5 5.5 1.0 fill
DPK X40-D-0404 X40-D-0018C 55 15 4.5 5.5 1.0 fill
GASOLINE 95 X40-D-0101 X40-D-0016A

R 55 15 3 4.9 1.9 fill


FO
GASOLINE 95 X40-D-0102 X40-D-0016B 55 15 3.5 4.9 1.4 fill
GASOLINE 95 X40-D-0103 X40-D-0016C 55 15 3.25 4.9 1.65 fill
GASOLINE 91 X40-D-0201 X40-D-0002A 55 15 4 4.9 0.9 fill
GASOLINE 91 X40-D-0202 X40-D-0002B 55 15 4 4.9 0.9 fill
ED

GASOLINE 91 X40-D-0203 X40-D-0002C 55 15 3.25 4.9 1.65 fill


SLOP TANKS X40-D-0601 X40-D-0010A 38.5 15 3.25 4.9 1.65 fill
SLOP TANKS X40-D-0602 X40-D-0010B 38.5 15 3.5 4.9 1.4 fill
SU

SURGE RELIEF X40-D-0801 X40-D-0011 20.5 7.5 4.5 4.15 0.35 cut
FIRE WATER
X40-D-0701 X40-D-0028A 22.5 16 5 5.6 0.6 fill
TANK
FIRE WATER
X40-D-0702 X40-D-0028B 22.5 16 5 5.6 0.6 fill
IS

TANK
UTILITY WATER
X40-D-0703 X40-D-0014 5.5 6 5 5.6 0.6 fill
TANK

57
Geotechnical File No. 2015/104, Rev.1

Table 13
Idealized Soil Profile & Soil Design Parameters
3 E s (MPa) Consolidation
Depth (m) Layer SPT “N60” γ (kN/m ) Ф (Deg) Cu (kPa) µ
parameters

D
Gasoline – 95 Tank –BH-1, 2 & 3 (D-0101)
FGL-NGL Structural fill-2m 20 18 33 -- 0.325 20

BI
NGL-1.5 Medium dense SAND 20 18 33 -- 0.325 20
1.5-3.75 Very stiff to hard sandy lean CLAY 32 19 -- 110 0.45 12.5
3.75 – 6.0 Dense SAND with gravels 49 20 40 -- 0.375 49
6.0 - 30 Very dense SAND with gravels 85 20 40 -- 0.375 85
Gasoline – 95 Tank –BH-4, 5 & 6 (D-0102)

R
FGL-NGL Structural fill-1.5m 20 18 33 -- 0.325 20
NGL – 1.5 Medium dense SAND 23 18 33 -- 0.325 23

FO
Cc=0.2, Cr=0.05,
1.5 -3.0 Very stiff sandy lean CLAY 20 19 -- -- 0.45 8.4
e0 =1.05 & OCR=1
3.0-9.0 Dense SAND with gravels 48 19 40 -- 0.375 48
9.0 – 22.5 Very dense SAND with gravels 61 20 40 -- 0.375 61
22.5 – 30.0 Very dense SAND with gravels 85 20 40 -- 0.375 85
Gasoline – 95 Tank –BH-7, 8 & 9 (D-0103)
FGL-NGL
NGL – 3.75
3.75 -7.5
Structural fill-1.65m
Medium dense SAND
Hard sandy lean CLAY
ED 20
28
43
18
18
19
33
35
--
--
--
145
0.325
0.325
0.45
20
28
16
7.5 – 30.0 Very dense SAND 85 20 40 -- 0.375 85
SU
Gasoline – 91 Tank –BH-10, 11 & 12 (D-0201)
FGL-NGL Structural fill-0.9m 20 18 33 -- 0.325 20
NGL-4.5 Dense SAND 32 19 36 -- 0.375 32
4.5 – 22.5 Very dense SAND with gravels 76 20 40 -- 0.375 76
22.5 – 30.0 Very dense SAND with gravels 86 20 40 -- 0.375 86
IS

Gasoline – 91 Tank –BH-13, 14 & 15 (D-0202)


FGL-NGL Structural fill-0.9m 20 18 33 -- 0.325 20
NGL – 1.5 Medium dense SAND 21 18 33 -- 0.325 21
1.5 –9.0 Very dense SAND with gravels 74 20 40 -- 0.375 74
9.0 -16.5 Hard sandy lean CLAY 84 19 40 145 0.45 67
16.5 – 30.0 Very dense SAND with gravels 85 20 40 -- 0.375 85

58
Geotechnical File No. 2015/104, Rev.1

Table 13 (a)
Idealized Soil Profile & Soil Design Parameters

D
3 E s (MPa) Consolidation
Depth (m) Layer SPT “N60” γ (kN/m ) Ф (Deg) Cu (kPa) µ
parameters
Gasoline – 91 Tank –BH-16, 17 & 18 (D-0203)

BI
FGL-NGL Structural fill-1.65m 20 18 33 0.325 20
Cc=0.18, Cr=0.05,
NGL -3.0 Very stiff sandy lean CLAY 17 19 -- 0.45 7.4
e0 =0.95 & OCR=1
3.0 -4.5 Hard sandy lean CLAY 34 19 -- 125 0.45 13

R
4.5 – 18.0 Very dense SAND with gravels 76 20 40 -- 0.375 76
18.0-22.5 Hard sandy lean CLAY 100 20 145 0.45 76
22.5 - 30 Very dense SAND with gravels 86 20 40 -- 0.375 86

FO
Diesel Tank –BH-19, 20 & 21 (D-0301)
NGL – 3.0 Medium dense SAND 23 18 33 -- 0.325 23
3.0 – 4.5 Dense SAND with gravels 45 19 40 -- 0.375 45
4.5 -10.5 Very dense SAND with gravels 71 20 40 -- 0.375 70
10.5 – 15.0 Very dense SAND with gravels 85 20 40 -- 0.375 85
22.5 – 30.0

NGL – 1.0
Very dense SAND with gravels

Medium dense SAND


ED 68 20 40
Diesel Tank –BH-22, 23 & 24 (D-0302)
24 18 33
--

--
0.375

0.325
68

24
1.0 – 7.5 Dense SAND with gravels 49 19 40 -- 0.375 49
7.5 – 15.0 Very dense SAND with gravels 63 20 40 -- 0.375 63
SU
15.0 – 30.0 Very dense SAND 87 20 40 -- 0.375 87
Diesel Tank –BH-25, 26 & 27 (D-0303)
FGL-NGL Structural fill-0.5m 20 18 33 -- 0.325 20
NGL-0.75 Dense SAND 28 19 35 -- 0.375 28
0.75 – 2.25 Dense SAND 40 19 40 -- 0.375 40
IS

2.25 – 19.5 Very dense SAND with gravels 73 20 40 -- 0.375 73


19.5 – 30.0 Very dense SAND with gravels 85 20 40 -- 0.375 85

59
Geotechnical File No. 2015/104, Rev.1

Table 13 (b)
Idealized Soil Profile & Soil Design Parameters

D
E s (MPa) Consolidation
Depth (m) Layer SPT “N60” γ (kN/m3) Ф (Deg) Cu (kPa) µ
parameters
DPK/KEROSINE Tank –BH-28, 29 & 30 (D-0404)

BI
FGL-NGL Structural fill-1m 20 18 33 0.325 20
NGL – 3.0 Medium dense SAND 24 18 33 -- 0.325 24
Cc=0.2, Cr=0.06,
3.0 -3.75 Stiff sandy lean CLAY 9 19 -- -- 0.45 7.8
e0 =1 & OCR=1

R
3.75 – 6.0 Very stiff sandy lean CLAY 26 20 100 0.45 10
6.0-9.0 Medium dense SAND 23 18 33 -- 0.325 23

FO
6.0-9.0 Dense SAND with gravels 49 19 40 -- 0.375 49
9.0 - 30 Very dense SAND with gravels 70 20 40 -- 0.375 70
DPK/KEROSINE Tank –BH-31, 32 & 33 (D-0403)
FGL-NGL Structural fill-1m 20 18 33 -- 0.325 20
NGL – 3.75 Medium dense SAND 20 18 33 -- 0.325 20
3.0-7.5 Dense SAND with gravels 44 19 40 -- 0.375 44
7.5 – 13.5
13.5 – 16.5
16.5 – 25.5
Very dense SAND with gravels
Hard sandy silt
Very dense SAND with gravels
ED 62
63
84
20
20
20
40
--
40
--
--
--
0.375
0.45
0.375
62
50
84
25.5 – 27.0 Hard lean clay 75 20 -- -- 0.45 60
27.0 – 30.0 Very dense SAND with gravels 85 20 40 -- 0.375 85
SU
DPK/KEROSINE Tank –BH-34, 35 & 36 (D-0402)
FGL-NGL Structural fill-1m 20 18 33 0.325 20
NGL – 2.25 Medium dense SAND 19 18 32 -- 0.325 19
2.25-6.0 Dense SAND with gravels 36 19 37 -- 0.375 36
6.0 – 9.0 Very dense SAND with gravels 58 20 40 -- 0.375 58
IS

9.0 -15.0 Hard sandy lean CLAY 51 19 -- 145 0.45 41


15.0 – 21.0 Very dense SAND 76 20 40 -- 0.375 76
21.0 -28.5 Hard sandy lean CLAY 77 19 -- 145 0.45 61.5
28.5 – 30.0 Very dense SAND 90 20 40 -- 0.375 90

60
Geotechnical File No. 2015/104, Rev.1

Table 13 (c)

D
Idealized Soil Profile & Soil Design Parameters
3 E s (MPa) Consolidation
Depth (m) Layer SPT “N60” γ (kN/m ) Ф (Deg) Cu (kPa) µ

BI
parameters
DPK Tank –BH-37, 38 & 39 (D-0401)
FGL-NGL Structural fill-1m 20 18 33 -- 0.325 20
NGL-3.0 Dense SAND with gravels 40 19 38 -- 0.375 40

R
3.0 – 12.0 Very dense SAND with gravels 68 20 40 -- 0.375 68
12.0- 23 Dense SAND with gravels 41 20 38 -- 0.375 41
23.0 - 30 Very dense SAND with gravels 85 20 40 -- 0.375 85

FO
T & I Diesel/DPK Tank –BH-40, 41 & 42 (D-0502)
FGL-NGL Structural fill-0.5m 20 18 33 -- 0.325 20
NGL – 1.5 Dense SAND with gravels 40 19 38 -- 0.375 40
1.5 -6.0 Medium dense SAND 25 18 34 -- 0.325 25
6.0-10.5 Very dense SAND with gravels 57 19 40 -- 0.375 57
10.5 – 16.5 Very dense SAND with gravels 82 20 40 -- 0.375 82
16.5-22.5
22.5 – 30.0
Very dense SAND with gravels
Very dense SAND with gravels
ED 63
85
20
20
40
40
Slop Tank –BH-43 & 44 (D-0601)
--
--
0.375
0.375
63
85

FGL-NGL Structural fill-1.65m 20 18 33 -- 0.325 20


SU
NGL – 7.5 Dense SAND with gravels 36 19 37 -- 0.375 36
7.5 – 18.0 Very dense SAND with gravels 53 20 40 -- 0.375 53
18.0 -27.0 Hard sandy lean CLAY 47 19 -- 145 0.45 38
27 – 30.0 dense SAND 34 19 36 -- 0.375 34
Slop Tank –BH-45 & 46 (D-0602)
IS

FGL-NGL Structural fill-1.5m 20 18 33 -- 0.325 20


NGL-2.25 Dense SAND 37 19 37 -- 0.375 37
2.25 – 7.5 Dense SAND 42 19 38 -- 0.375 42
7.5 – 21.0 Very dense SAND with gravels 84 20 40 -- 0.375 84
21.0 – 30.0 dense SAND with gravels 42 20 38 -- 0.375 42

61
Geotechnical File No. 2015/104, Rev.1

Table 13 (d)
Idealized Soil Profile & Soil Design Parameters

D
E s (MPa) Consolidation
Depth (m) Layer SPT “N60” γ (kN/m3) Ф (Deg) Cu (kPa) µ
parameters
Fire water Tanks –BH-47 48 & 49 (D-0701/0702)

BI
FGL-NGL Structural fill-0.6m 20 18 33 -- 0.325 20
NGL – 1.5 Medium dense SAND 21 18 33 -- 0.325 21
1.5 –4.5 Dense SAND 46 19 39 -- 0.375 46
4.5 – 30.0 Very dense SAND with gravels 85 20 40 -- 0.375 85

R
Utility water Tank –BH-50 (D-0703)
FGL-NGL Structural fill-0.6m 20 18 33 -- 0.325 20

FO
NGL – 3.75 Dense SAND with gravels 45 19 39 -- 0.375 45
3.75 – 30.0 Very dense SAND with gravels 85 20 40 -- 0.375 85
Surge relief Tank –BH-51 & 52 (D-0801)
FGL – 1.5 Medium dense SAND 27 18 33 -- 0.325 27
1.5 – 7.5 Very dense SAND with gravels 58 20 40 -- 0.375 58
7.5 – 30.0 Very dense SAND with gravels 85 20 40 -- 0.375 85
ED
In above Tables, the following symbols are used:
• SPT ‘N60’: Average standard penetration test from Ideal profile
• UCS: The average unconfined compressive strength obtained from laboratory results of fine-grained soils
SU
• Es: Elastic modulus from correlations as per SAES-A-113 for granular & fine –grained soils. Higher Es for deeper depths of fine-grained
soils is assigned 800*N60
• γ : Bulk unit weight
• Ф: Angle of internal friction from correlations as per SAES-A-113 & from laboratory test results wherever available. It is restricted to 400
IS

for very dense granular soils.

62
Geotechnical File No. 2015/104, Rev.1

Settle 3D computer software was used to model the given tanks foundation system. The
analysis was progressed as follows:
(vi) A fill/Cut requirement as presented in Table 11 is considered for each
Tank. The fill material specification shall be that of a select fill. The
material specification and compaction requirements shall be in
accordance with SAES-A-114.
(vii) A minimum SPT-N value of 20 has been considered throughout the
thickness of structural fill.
(viii) An idealized soil profile was developed based on stratigraphy

D
encountered in boreholes within the tanks. The idealized stratigraphy

BI
and geotechnical parameters presented in Tables 13 thru 13 (d) were
considered in the analysis for respective tank.
(ix) Tank diameters & depths below FGL are considered in the analysis as

R
per SOW provided by client.
(x) It is reasonable to assume that consolidation settlements of very stiff
FO
to hard fine grained soils are negligible and therefore, the analysis
considers that very stiff to hard fine grained soils primarily undergo
elastic settlements.
ED

(xi) In the settlement analysis, stress influence zone is considered 1.25


times diameter of tank base under axi-symmetric conditions below the
depth of tank foundation in accordance with SAES-A-114.
SU

(xii) Depth beyond 30m, stratigraphy encountered at bottom of idealized


soil profile for applicable tank would continue up to influence depth for
settlement analysis.
IS

The analysis has been carried out for given tank diameters with design applied stress
of 150 kPa and foundation depth of 0.6m, 1.0m & 1.5m below FGL using the Settle
3D computer software, considering idealized soil profile of under each tank.
Accordingly, estimated settlements at center and at edge of tanks are presented in
Table 14. Settle 3D software considers very nominal time of 1 year for long term
creep settlements. Therefore, estimated settlements by settle 3D shall be increased
25% to account for long term creep settlements over the period of 25 years in
accordance with SAES-A-113. Total estimated settlements at center and edge of
tanks are summarized in Table 14.Typical Input & output files of settle 3D software
are presented in Figures C-15 thru 16.

63
Geotechnical File No. 2015/104, Rev.1

Table 14
Estimated Settlements of Tanks for Applied pressure of 150 kPa

D
S.N Type of structure BH Dia. of Desig Depth of Estimated Total Estimated Si SL Si SL
O. covered Tank, m n Foundati settlements, mm settlements (mm) (mm) (mm) (mm) (mm)
or Load, on from including long term

BI
Founda (kPa) Final settlement
tion Grade (m) @center @edge @center @edge @center @edge
size
1 Gasoline D-0101 1,2,3 55 150 0.6 59 29 74 36 59 15 29 7

R
– 95 1.0 58 28 73 35 58 15 28 7
tank 1.5 56 27 70 34 56 14 27 7
D-0102 4,5,6 55 150 0.6 122 68 153 85 64.5 88.5 *14.5 *70.5

FO
1.0 121 67 151 84 62.5 89 *13 *71
1.5 120 66 150 83 61 89 *11.5 *71.5
D-0103 7,8,9 55 150 0.6 61 30 76 38 61 15 30 8
1.0 60 29 75 36 60 15 29 7
1.5 59 28 74 35 59 15 28 7
2 Gasoline
– 91
tank
D-0201 10,11,12 55 ED
150 0.6
1.0
1.5
48
47
46
24
23
22
60
59
58
30
29
28
48
47
46
12
12
12
24
23
22
6
6
6
D-0202 13,14,15 55 150 0.6 45 23 56 29 45 11 23 6
1.0 44 22 55 28 44 11 22 6
SU

1.5 42 21 53 26 42 11 21 5
D-0203 16,17,18 55 150 0.6 207 120 259 150 48.5 210.5 *30 *120
1.0 206 119.5 257 149.5 46 211 *30 *119.5
1.5 205.5 116 256.5 145 44 212.5 *29 *116
3 Diesel D-0301 19,20,21 65 150 0.6 62 31 78 39 62 16 31 8
IS

tank 1.0 61 30 76 38 61 15 30 8
1.5 59 29 74 36 59 15 29 7
D-0302 22,23,24 65 150 0.6 51 26 64 33 51 13 26 7
1.0 50 25 63 31 50 13 25 6
1.5 49.5 24.5 62 31 49.5 12.5 24.5 6.5

64
Geotechnical File No. 2015/104, Rev.1

S.N Type of structure BH Dia. of Desig Depth of Estimated Total Estimated Si SL Si SL


O. covered Tank, m n Foundati settlements, mm settlements (mm) (mm) (mm) (mm) (mm)
or Load, on from including long term
Founda (kPa) Final settlement
tion Grade (m) @center @edge @center @edge @center @edge

D
size
D-0303 25,26,27 65 150 0.6 54 27 68 34 54 14 27 7
1.0 52 26 65 33 52 13 26 7

BI
1.5 51 25.5 64 32 51 13 25.5 6.5
4 DPK D-0401 37,38,39 67 150 0.6 65 32 81 40 65 16 32 8
tank 1.0 63.5 31.5 79 39 63.5 15.5 31.5 7.5
1.5 62.5 31 78 39 62.5 15.5 31 8

R
5 DPK/KE D-0402 34,35,36 55 150 0.6 55 27 69 34 55 14 27 7
ROSINE 1.0 54 26 68 33 54 14 26 7

FO
1.5 52 25 65 31 52 13 25 6
D-0403 31,32,33 55 150 0.6 56 27 70 34 56 14 27 7
1.0 55 26 69 33 55 14 26 7
1.5 53 25.5 66 32 53 13 25.5 6.5
D-0404 28,29,30 55 150 0.6 111.5 58.5 139.5 73.5 93.5 46 *36.5 *37

6 T&I D-0502 40,41,42 77


ED
150
1.0
1.5
0.6
110.5
109.5
64
58
57.5
32
138.5
137
80
72.5
72
40
92
90
64
46.5
47
16
*35.5
*35
32
*37
*37
8
Diesel/D 1.0 63.5 31 79 39 63.5 15.5 31 8
PK
SU
1.5 63 30.5 79 38 63 16 30.5 7.5
7 Slop D-0601 43,44 38.5 150 0.6 58 29 73 36 58 15 29 7
tanks 1.0 56.5 28.5 71 36 56.5 14.5 28.5 7.5
1.5 55 28 69 35 55 14 28 8
D-0602 45,46 38.5 150 0.6 48 24 60 30 48 12 24 6
IS

1.0 46.5 23.5 58 29 46.5 11.5 23.5 5.5


1.5 44.5 23 56 29 44.5 11.5 23 6
8 Fire X40-D- 47,48,49 22.5 150 0.6 24 12 30 15 24 6 12 3
water 0701/0
1.0 23 11 29 14 23 6 11 3
tanks 702
1.5 21 10 26 13 21 5 10 3

65
Geotechnical File No. 2015/104, Rev.1

S.N Type of structure BH Dia. of Desig Depth of Estimated Total Estimated Si SL Si SL


O. covered Tank, m n Foundati settlements, mm settlements (mm) (mm) (mm) (mm) (mm)
or Load, on from including long term
Founda (kPa) Final settlement
tion Grade (m) @center @edge @center @edge @center @edge

D
size
9 Utility X40-D- 50 5.5 70 0.6 4 2 5 3 4 1 2 1
water 0703

BI
1.0 3 2 4 3 3 1 2 1
tank
1.5 3 2 4 3 3 1 2 1
10 Surge X40-D- 51,52 20.5 100 0.6 14 7 18 9 14 4 7 2
relief 0801
1.0 12.5 6.5 16 8 12.5 3.5 6.5 1.5
tank

R
1.5 12 6 15 8 12 3 6 2

FO
Si: Immediate Settlement, SL: Long term Settlement.
* : Approximately calculated

ED
Note: In case that the facilities layout is modified, a new geotechnical campaign should be carried out by the LSTK contractor at the
new footprint of the facilities
SU
IS

66
Geotechnical File No. 2015/104, Rev.1

From the above table, it is noted that the estimated settlements for applied bearing
pressure of 150 kPa are in the range of 4-81mm for all the tanks except for tanks D-
0102, D-0203 & D-0404, which indicated higher settlements about 140-260mm at
center of tanks. These high settlements are due to the presence of fine-grained soils
with relatively low stiffness in comparison with that of the encountered cohesionless
soil. According to the boreholes findings, the depth of the fine-grained extends up to
3m at Tanks D-0102, D-0203 and 3m to 6m at Tank D-0404. Further investigation by
PCPT also indicted that fine-grade soil extends to a depth of about 6m with low tip
resistance of less than 5 MPa. The sounding of PCPT at Tank D-0404 is presented in
Figure E-9, Appendix-E (PCPT No. 9).

D
BI
Edge settlements are estimated about 3-40mm for applied bearing pressure of 150
kPa for all the tanks except for Tanks D-0102, D-0203 & D-0404, which indicated
higher edge settlements about 72-150mm. Besides, about one-third of the edge

R
settlements are expected to occur differentially along the perimeter of the tank due to
normal soil variations. Additional settlements also do take place due to the proximity
FO
of other adjacent tanks. The magnitude of these additional settlements (both at
center and edge) is a function of relative distance between the tanks. For current
settlement assessment long term/creep settlement for period of 25 years has been
ED

considered. However effect of adjacent foundation on settlement shall be considered


during detailed design by LSTK contractor and final settlement values shall be
reported including this consideration before proceeding with foundation design.
SU

Higher settlements about 140-260mm & edge settlements are concern for the tanks
D-0102, D-0203 & D-0404 and these settlements are higher than allowable uniform
IS

settlement of 150 mm as per standard practice provided by client. For all other tank
settlements are within the range of permissible uniform settlement of 150mm.
Therefore, soil improvement by excavation and replacement is recommended to a
depth of 3m for Tanks D-0102 & D-0203, and to a depth of 6m for Tank D-0404 to
keep the anticipated settlements within the permissible limits. The soil improvement
measures are detailed in Section 6.5.4. Excavation considerations and Dewatering
measures shall be recommended in case of deep excavation for Tank D-0404.
Excavation considerations and Dewatering measures are detailed in Section 7.2 &
7.7. In addition to these measures, are other measures required by Saudi Aramco
shall be followed in the ground improvement.

67
Geotechnical File No. 2015/104, Rev.1

Design limits of differential settlement are currently not available. When those
tolerance data are provided by Tank Vendor/Manufacturer, mitigation measures may
be required if the provided tolerance data are not satisfied. In this case, additional
soil improvement measures may be required, in post-award stage, to satisfy the
tolerance data.

6.5.3 Soil Improvement by Replacement & Filling

Significant settlements underneath the tanks D-0102, D-0203 and D-0404 due to the
presence of stiff fine-grained soils, as discussed above in Section 6.5.2. Therefore, it

D
is recommended to excavate the top 3m fine grained soils at Tanks D-0102 & D-0203

BI
and the top 6m at Tank D-0404, and replace them with well compacted select fill
material to keep the settlement within the permissible limits.

R
The material specifications shall be that of a select fill. The material specifications
and compaction requirements shall be in accordance with SAES A-114. The fill
FO
should be verified by SPT boreholes to prove that the blow counts equal to or
exceeding 20. Alternately, it can be verified with CPT soundings to prove a cone tip
resistance not less than 10 MPa. One borehole or CPT should be conducted every
ED

600 square meters

Soil improvement contractor shall ensure that the post improvement, settlements will
SU

be within the permissible settlements. Post–improvement, assuming an equivalent


SPT-N value of 20 in the improved soil layers, the settlements are expected to be
similar to those estimated for the other unit areas. Post improvement settlements are
IS

presented in below Table.

68
Geotechnical File No. 2015/104, Rev.1

Table 15
Post Improvement Settlements

D
S.NO. Type of structure BH Dia. of Design Depth of Estimated Total Estimated Si SL Si SL
covered Tank, m Load, Foundation settlements, mm settlements, mm (mm) (mm) (mm) (mm)

BI
or kPa from Final after 25% increase
Foundati Grade (m) @ center @ edge @ center @ edge @ center @ edge
on size
1 Gasoline D-0102 4,5,6 55 150 0.6 61 30 76.5 37.5 61 15.5 30 7.5

R
1.0 59 29 74 36.5 59 15 29 7.5
1.5 58 28 72.5 35 58 14.5 28 7

FO
D-0203 16,17,18 55 150 0.6 54 22 68 28 54 14 22 6
1.0 53 21 67 27 53 14 21 6
1.5 51 20 64 25 51 13 20 5
D-0404 28,29,30 55 150 0.6 73 35 91.5 44 73 18.5 35 9
1.0 71 34.5 89 43 71 18 34.5 8.5
1.5 70 34 87.5 42.5 70 17.5 34 8.5
ED
Si: Immediate Settlement, SL: Long term Settlement,
SU
Variations in the subsurface conditions may do generally exist, which leads to differential settlements. Fig.# 20 presents typical tolerable
differential settlement values for storage tanks and ring wall foundations in accordance with NAVFAC Design Manual.
IS

Further, it is recommended to undertake Hydro-testing of tanks prior to piping connections are made. With hydro-testing (as detailed in
Section 6.5.4), the majority of the settlements are expected to be induced immediately, prior to the actual operations.

69
Geotechnical File No. 2015/104, Rev.1

6.5.4. Hydro-testing of Tank

Hydro-testing of tanks is most important and highly beneficial. The main purpose of
hydro-testing of tanks is to induce the settlements in the substrata prior to the actual
loading and thus reduce the post-construction settlements under actual operational
loads. Based on our experience and literature, a few guidelines for hydro-testing are
outlined.

Prior to hydro-test, a level survey of points marked on shell base plate at 10m

D
spacing around the tank perimeter and at selected other points shall be conducted
for settlement observations. It is advisable that the Tank should be initially test

BI
loaded in several stages over a period of several days to weeks and the settlements
of the ring-walls and possibly of selected internal points should be carefully planned
and monitored over a longer period. However, the maximum duration/time for testing

R
may be restricted as per the project requirements and time constraints. The stages
FO
may be typically chosen as 0.25H, 0.5H, 0.75H & H, where H is the final/design
height of water. These are known as ‘hold points’. The rate of filling of ground tanks
in general shall not exceed 2m per day. Each hold point load shall be for 48 hrs of
‘hold period’. Immediately after each hold point is reached, shell levelness surveys
ED

shall be conducted at 4, 12, 24, 36 & 48 hrs intervals. If two successive surveys at 12
hrs intervals indicate that settlement has essentially ceased, filling to the next ‘hold
point’ can start. In general, it is suggested that the new loading should not be started
SU

until the average increase in settlement is limited to 2 mm/12 hrs, with no individual
marker settlement greater than 5 mm/12 hrs. In addition to the above settlement
criteria, we suggest that the hydro-test should immediately cease and tank emptied if:
IS

• Any distortion, buckling, cracks are observed,


• Any leakage of water to the foundation observed,
• Any danger to the integrity of tank foundation is perceived,
• The settlement exceeds the specific limits established by the tank
designer/engineer.

The level survey data should also be obtained during the tank unloading process.
One set of data should be obtained when the test load is at 0.5H. One additional set
of data should also be obtained when the test load is completely removed and the

70
Geotechnical File No. 2015/104, Rev.1

final data set should be obtained after about 24 hrs after the test load is completely
removed. It is once again emphasized that the above stages of test loading and
unloading, rate of filling, time/duration of testing etc. shall be done in accordance with
project requirements/ specifications, duly approved by standard procedures of Saudi
ARAMCO.

The above information should be taken as guidelines only and the actual stages of
test loading, unloading, holding period etc. shall be done in accordance with
approved standard procedures of Owner.

D
The LSTK contractor shall submit an official letter to SAUDI ARAMCO indicating
possible higher limits for edge settlements and stating that such an increase may

BI
result in additional stresses to be accommodated/compensated during tank piping
design.

6.6 Foundations for Vibrating Equipment

R
FO
6.6.1 Machines supported by Block foundations - General

Generally, machine foundations when acted upon by dynamic loads, may vibrate in
ED

any one or combination of the six modes of vibrations (degrees of freedom) as


illustrated in Figure K-4. These modes of vibrations include translational modes along
vertical and horizontal directions, rotational modes in the form of rocking (about
SU

longitudinal axis) or pitching (about lateral axis) or yawning (about vertical axis).

In the design of machine foundations, transient forces consisting of vertical, lateral


IS

and longitudinal forces equal to 25 percent (unless specified by the manufacturer) of


the machine weight shall be used.

The recommended NABCs for shallow footings are applicable for vertical, concentric
‘static’ loads only. For machine foundations, the bearing capacity values should be
reduced appropriately as per generally accepted industry practices (generally one-
half of the static values). Applicable specifications should be followed for the design
and construction of foundations supporting heavy machinery.

71
Geotechnical File No. 2015/104, Rev.1

Reference be made to applicable SAES Q-007 on ”Foundations and Supporting


Structures for Heavy Machines”. For design purposes, the allowable bearing
capacities for vibrating equipment foundations shall be limited as indicated below:

1. For high tuned foundations, the soil bearing pressure shall not exceed fifty
percent (50%) of the allowable bearing pressure permitted for static loads.
2. For low tuned foundations, the soil bearing capacities shall not exceed
seventy five percent (75%) of the allowable bearing pressure permitted for
static loads.

D
The long-term cyclic loadings imposed by the machines could, however, cause minor

BI
or some densification of the granular material beneath the foundations. Due to this
densification, differential settlements will be minimized. The design of the foundations
should restrain the dynamic response of the soil-structure system to within tolerable

R
and acceptable limits of displacements as per applicable project Specifications.
Richart, Hall and Woods (1970) provide guidance for tolerable displacement
FO
amplitudes for machine vibrations, as shown in FigureK-5. Same information is
reproduced in “Design of structures & foundations for vibrating machines” by Arya,
O’Neill & Pincus (1984).
ED

The maximum permissible increase over the safe loads on the foundations to
account for the transient dynamic loads also shall be 25 percent.
SU

6.6.2 Parameters from Cross-hole Tests


IS

For the design of foundations subjected to dynamic loads, seven (7) seismic cross-
hole tests (CHS # 01 thru CHS # 07) have been performed at locations as indicated
in Table # 1(a). The borehole logs for cross-holes tests at shot hole locations are
presented in Figures D-2 thru D-8. Summary of the laboratory test results of cross-
hole tests are presented in Figures D-9 thru D-11. Details of parameters computed
from the data of seismic tests are tabulated in Figures D-12 thru D-18, Appendix- D.
The data is also presented graphically in Figures D-12(a) thru D-18(a).

Based on the cross-hole test results, the following range of parameters are
recommended for preliminary design of machine foundations (extreme values are
ignored).

72
Geotechnical File No. 2015/104, Rev.1

Table 16
Dynamic Soil Parameters from Cross-hole Tests
Parameter/ µ G (MPa) E (MPa)
Reference
CHS-1 0.28 – 0.39 110 - 300 300 – 850
CHS-2 0.30 – 0.38 40 - 350 100 – 950
CHS-3 0.29 – 0.41 150 - 450 350 – 1300
CHS-4 0.25 – 0.41 80 - 450 200 – 1300
CHS-5 0.31 – 0.39 100 - 500 200 – 1400

D
CHS-6 0.28 – 0.38 60 - 500 175 - 1450

BI
CHS-7 0.24 - 0.39 60-450 150-850
µ: Poisson’s ratio; G: Dynamic shear modulus; E: Young’s modulus

R
These design parameters can also be used to calculate other dynamic parameters
FO
such as spring constants.

Shear wave velocities are sensitive due to low-strain measurements. Dynamic


elastic properties measured using the seismic techniques are generally valid for
ED

strains in the order of 10-6. Hence, it is important to correct these values to yield the
equivalent modulus at the strain levels anticipated in the intended applications.
Figure K-6 may be used for correcting the elastic modulii.
SU

6.6.3 Spring constants & Damping in Soils


IS

For a rigid block foundation resting on an elastic half-space, the spring constants and
damping aspects are related to mass ratio and mass moment of inertia. For design
purposes, the values of Equivalent spring constants and geometric damping ratios
with embedment effect as reproduced by Arya et al. (1984) are given in Tables 16 (a)
thru 16 (e).

73
Geotechnical File No. 2015/104, Rev.1

Table 16(a)
Equivalent Spring Constants for Rigid Footings
Motion Spring Constant
Circular Footing
Vertical kz = 4Gro. η z /1-µ
Horizontal kx = 32 (1-µ) Gro3 η x /(7-8µ)
Rocking k ψ = 8Gro³ ηψ /[3(1-µ)]
Torsional k θ = 16 (G ro³) /3
Rectangular Footing
Vertical Kz = [G/ (1- µ)] β z (bL)1/2η z

D
Horizontal Kx= 2(1+µ) G βx (bL)1/2 η x
Rocking k ψ = [G/ (1-µ)] β ψ bL2ηψ

BI
Note: For βv, β H and βR see Figure K-7
Where Equivalent Radius, ro for Rectangular footings = (bL/π)1/2 Translation

R
= (bL /3π)1/4 Rocking
3

= [bL (b2+L2)/6π]1/4 Torsion


FO
Table 16(b)
Embedment Coefficients for Spring Constants
ED

Motion Coefficient (η )
Vertical η z = 1 + 0.6(1 − µ )(h / r0 )
Horizontal η x = 1 + 0.55(2 − µ )(h / r0 )
SU

Rocking ηψ = 1 + 1.2( 2 − µ )(h / r0 ) + 0.22(2 − µ )( h / r0 ) 3


Torsional Not available
Where h = depth of embedment below grade
IS

Table 16(c)
Geometrical Damping Ratios

Motion Mass factor Damping Ratio


Vertical Bz= [(1-µ)/ 4].W/γro3 Dz = 0.425αz / (Bz )1/2
Horizontal Bx = [(7-8µ)/ 32(1-µ)].W/γ ro3 Dx = 0.288αx / (Bx)1/2
Rocking Bψ = [3(1-µ)/8].Iψ /γ ro5 Dψ = 0.15 αψ/ [(1+ηψBψ)(ηψBψ)1/2]
Torsion Bθ = Iθ/γ ro5 Dθ = 0.50/ (1+2Bθ)

74
Geotechnical File No. 2015/104, Rev.1

Table 16(d)
Embedment Coefficients on Damping Ratios

Motion Coefficient (η )
Vertical α z = 1 + 1.9(1 − µ )( h / r0 ) / η z
Horizontal α x = 1 + 1.9(2 − µ )(h / r0 ) / η x
Rocking αψ = [1 + 0.7(1 − µ )(h / r0 ) + 0.6(2 − µ )(h / r0 ) 3 ] / ηψ
Torsional Not available
Where h = depth of embedment below grade

D
Table 16(e)

BI
Values of ηψ for various values of Bψ

Bψ 5 3 3 1 0.8 0.5 0.2

R
ηψ 1.079 1.110 1.143 1.219 1.251 1.378 1.600
FO
The internal damping ratio value needs to be combined with the various damping
ratios for geometrical damping as shown in this reference. The soils parameters
provided in above tables can be used for design purposes.
ED
SU
IS

75
Geotechnical File No. 2015/104, Rev.1

7. CONSTRUCTION CONSIDERATIONS

7.1 SITE PREPARATION

A. General

It is noted that the existing ground elevations within the boreholes (as presented in
Table 1) varied between +2.48m & +5.84m indicating a difference in elevation of
about 3.36m except for boreholes BH-82 & BH-83. Theses 2 boreholes are located in
higher elevation of +10.36m & +11.27m for BH-82 & BH-83, respectively. According

D
to SOW, the final grade expected to vary about 0.5m to 2m within the tanks.

BI
Therefore, based on final grade levels, the site needs to be cut/raised, as a part of
site grading and development work. Based on the groundwater table elevation and
proposed footing depths, appropriate dewatering system may be adopted if

R
applicable to maintain the groundwater table well below the foundation depths.
FO
Therefore, the site preparation would involve cutting, backfilling and raising
operations in order to bring the various construction areas to the desired grades, and
dewatering as applicable. The construction aspects and work of site preparation shall
be done in accordance with applicable SAES A-114 Standards.
ED

7.2 EXCAVATION CONSIDERATIONS


Excavation Plan, including a Pre-Excavation checklist, as per the Saudi Aramco
SU

Construction Safety Manual and Safety Management Guide 06-002-2008 shall be


submitted prior to beginning of excavation. All excavation work, placement,
compaction, inspection shall be in accordance with SAES-A-114. All excavations,
IS

including shoring and sheeting materials and systems, shall meet the minimum
requirements established by the Construction Safety Manual and Safety
Management Guide 06-002-2008. All excavations to desired grades, for foundations
and utilities can be made using conventional earth moving machinery consisting of
scraper, dozer, trencher, backhoe etc. A clear space of at least 0.6m (2 ft.) is
recommended to be maintained on all sides of an excavation or trench. Sides of the
shallow excavations less than one (1.0) meter deep may be made to about 35
degrees to horizontal, without significant sloughing. Excavation slopes for depths of
1.0m to 1.2m may be cut to 1.5:1.0 (horizontal to vertical) or flatter above the
GWT. These slopes are generally stable and minor sloughing may be anticipated.

76
Geotechnical File No. 2015/104, Rev.1

Similar slope can also be adopted for the fill embankments up-to a height of 1.5 to
2.0 meters. When any excavation or trench reaches a depth of 1.2m (4 ft), shoring
shall be installed or the sides shall be sloped or benched. For every 1.2m depth of
excavation, benches may be required to ensure safe means of entry and exit for all
trenches. For excavations below GWT, appropriate dewatering system shall be
adopted for proper drainage and disposal of all water throughout excavation and
construction. For further deeper excavations, sheet piling, ground anchoring or a
combination of the two or any other method acceptable and approved by Saudi
Aramco shall be adopted. Therefore, proper excavation protection should be required
in the form of sheet piling, ground anchoring or any other method acceptable and

D
approved by Saudi Aramco should be adopted. In all cases, applicable earthwork

BI
specifications and construction safety procedures shall be adhered to Saudi
Aramco’s Construction Safety Manual and Safety Management Guide 06-002-2008.

R
7.3 Fill considerations
FO
A. Fill Material

SAES A-114 specifies that Fill materials are broadly of two types, ‘General Fill
material’ or ‘Select fill material’. ‘Select fill material’ shall be required within 0.6m of
ED

the bottom elevation of foundations, tanks, spread footings, slab on grade and
pavements when fill is required to achieve final grade. As per Commentary Note
6.3.1.1 “Foundations may be constructed directly on undisturbed soil. Excavation of
SU

undisturbed soil and replacement with Select Fill Material shall not be performed
except as noted in 6.2.3.2 or 7.2.2 of SAES-A-114”. Requirements for ‘fill material’ as
per SAES A-114 are as follows.
IS

1. General Fill Material – Fill material shall consist of gravel, sand and/or marl.
The maximum size of fill material shall be one-half the lift thickness or 75 mm
(3 inches), whichever is less. Fill material shall be free of frozen lumps,
organic matter, trash, chunks of high plastic clay of other unsatisfactory
material.

2. Select Fill Material - Soil shall be composed only of inorganic material,


carbonate-free and shall have 100% passing the 5 cm (2”) sieve and from 0
to 20 percent passing the No. 200 sieve. That portion of the material passing

77
Geotechnical File No. 2015/104, Rev.1

the No. 40 sieve shall have a maximum liquid limit of 35 and maximum
plasticity index of 12 as per ASTM D-4318.

B. Suitability aspects of on-site soils

The top soils (to depths of about 2 SPTs ~ 1.5 m) from majority of the boreholes
revealed predominantly poorly graded to well graded sands with silt/silty sand/clayey
sand/silty clayey gravel/silty gravel/poorly graded gravel with silt/ fine-grained
materials with percent material passing through No. 200 Sieve more than 20. In
addition, majority of the test pit samples also indicated fines percent more than 20.
However, some locations indicated poorly graded sands with silt/silty sand/silty gravel/

D
well graded to poorly graded gravels with silt/well graded to poorly graded sands with

BI
silt/ silty gravel with percent material passing through No. 200 Sieve less than 20.
Therefore, the suitability of the on-site soils to meet the specifications of fill material
criteria as per SAES A-114 may not be clearly commented. However, the on-site soils

R
are observed to be free from organic material & carbonates and comprise of granular
FO
soils intermixed with fines and/or fine-grained soils of low plasticity. Therefore, the
material from the excavations may be utilized as general fill material. To utilize as
Select fill material, the on-site/ borrowed material shall be tested/ re-tested and
approved by Saudi Aramco/ Owner Engineer. Besides, compaction requirements and
ED

adequate quality control shall be ensured.

Soil mixture free from organic matter, containing no rocks or lumps over 75 mm (3
SU

inches) or half-the lift thickness, whichever is less, may be considered as satisfactory


material for general fill. This is however subject to the approval of Aramco / M/S
MUSTANG/ Owner Engineer at site In addition, while utilizing this material as backfill,
IS

proper compaction requirements and adequate quality control shall be ensured.

C. Fill Placement and Compaction

Fill or backfill material shall be as per the suitability criteria mentioned above in
Section. Fill material shall be placed in lifts of about 200 mm - 300 mm in loose
depth for vibratory roller compaction; and not exceeding 100mm for hand-operated
compaction. If the fill material is predominantly fine-grained, shall be placed in lifts of
about 150 mm -200 mm in loose thickness.

78
Geotechnical File No. 2015/104, Rev.1

Other lift thicknesses may be approved by the Aramco Engineers based on field test
section using the intended compaction equipment. It is advisable to prepare a ‘trial
section’ in the field using the anticipated procedure/ equipment and check if the
assumptions made for the fill are achieved by performing appropriate testing.

Compaction shall begin only after the fill or backfill has been properly placed and the
material to be compacted is at the proper moisture content. Compaction shall be
performed with equipment compatible with soil type. Preferably, vibratory roller
compaction is recommended for granular fill materials and static sheep foot rollers /
pneumatic - tired rollers are preferred in compacting fine-grained fills.

D
BI
Fill or backfill placed beneath mat foundations shall be compacted to at least 90% of
the Maximum Modified Proctor Density as determined by ASTM D-1557. For
cohesionless free draining soils, 70% relative density as determined by ASTM D-

R
4253 and ASTM D-4254 shall be used. In general, it is recommended that the
moisture contents of the fill material shall be ± 2% of the optimum moisture at the
FO
time of compaction, to achieve desired degree of compaction. Where mechanical
mixing of soil and water is done, it shall be carried out in field sections as outlined in
Section 7.3 C and the degree of compaction be verified in field sections.
ED

In no case should compaction be allowed on slopes steeper than 1(V) to 5 (H) i.e.
20% slopes. A series of horizontal benches, steps or terraces, at least 1 compactor
SU

width, should be cut into existing and natural slopes prior to adding new
fill. Construction of new slopes shall be accomplished by compacting horizontal fill
layers at least 1 (one) roller width beyond the design edge of the slope and when
IS

trimming back to achieve the final slope dimensions.

When the backfill material cannot clearly be classified as cohesive or cohesion-less,


both relative density and Proctor density tests must be performed as stated
above. The backfill shall then be compacted to the greater density.

D. Field Control

Prior to compaction of any fill material, a field section using the intended compaction
equipment shall be performed to determine the proper lift thickness to achieve the
necessary density requirements.

79
Geotechnical File No. 2015/104, Rev.1

To verify that the specified degree of compaction has been achieved, in-place density
and moisture content of soils shall be determined as per ASTM D-1556 or D-2922 or
other acceptable methods. As per applicable SAES A-114 standards, the acceptance
testing of in-place density and moisture content (field density testing) on compacted
fill can be performed.

The number of tests shall be increased if a visual inspection determines that the
moisture content is not uniform or if the compacting effort is variable and not
considered sufficient to attain specified density. The Site Engineer may approve a

D
decrease in the number of tests once a compaction procedure has proven to meet

BI
compaction requirements.

7.4 DRAINAGE PROVISIONS

R
A well-planned drainage network should be designed for the site to take care of (i)
FO
rainfall; (ii) runoff water; (iii) sewage, etc.

The drainage system should be capable of disposing, safely, waters from all sources
without causing any adverse effect to structures and/or foundation soils. While
ED

preparing the site for the proposed construction, a suitable drainage network should
be planned so as to remove the rainwater and other sources of water effectively
away from the main structures. This should be continuously and effectively taken to a
SU

pre-planned zone so as to discharge into the designated outlets in the area.

In view of the influence of moisture variation on foundation soils, it is recommended


IS

that all precautions be taken to see the moisture of subsurface/foundation soils is not
unduly disturbed. This can be achieved by considering the following and/or other
appropriate methods:

a. Keeping all greenery at least 3m away from the building periphery;


b. Providing proper drainage for prompt and quick disposal of all run off or surface
waters and;
c. All areas surrounding structures be paved and graded away from the structure (i.e.
splash zones sloping away from the structure should be provided).

80
Geotechnical File No. 2015/104, Rev.1

For a positive protection, in our opinion, the splash zone should be covered with
asphalt cap. This will minimize the ingress of water into foundation soils. Any
gardening activity in the form of lawns, flowerbeds etc. should be accordingly
undertaken somewhat away (about 2m) from the proposed structures.

7.5 EROSION PROTECTION

On-site near-surface soils are generally susceptible to wind and water erosion. These
could be stabilized with Cement. The soil and cement should be well mixed,
moisture-conditioned to within 1 per cent of optimum moisture and compacted to at

D
least 95% of the maximum dry density. The optimum moisture content and maximum
dry density of the soil-cement mixture should be determined by the ASTM D-558 test

BI
method. Subject to the availability, marl might also be used in lieu of soil-cement
mixture. Mixing, moisture conditioning, and compaction should be completed in not

R
more than two hours. Traffic, except as required to maintain the surface of the soil-
cement in a damp condition, should not be permitted for at least 24 hours after final
FO
compaction.

The exposed sands could also be stabilized using a mixture of marl and on-site or
imported sands or base aggregate. The aggregate base (10cm-15cm thick) should
ED

be compacted to at least 95 percent of the maximum dry density based on the ASTM
D-1557 test procedures.
SU

For slope protection against erosion from wind, stabilization of surface soil with Type
V Portland Cement as per ASTM C 150 may be adopted. For slope protection
against erosion from water, slowing down of surface water is needed. To accomplish
IS

this, erosion control blankets, fiber rolls may be used. Erosion control blankets are
usually woven type from a chosen material, with lots of ridges and obstructions.
These materials are either synthetic or natural. Fiber rolls are also made of similar
material as used in erosion control blankets, but are rolled into large diameter logs.
Coir type logs/ Logs made of rice/wheat straw also may be used. These logs are
nailed into the slope to slow down the surface water. Tensar type geo-grids also may
be effective. The source/ availability of the appropriate material is essential in
selection of the technique, and it shall be duly approved by Saudi Aramco Engineer.

81
Geotechnical File No. 2015/104, Rev.1

7.6 FOUNDATION PROTECTION

7.6.1 Protection against Concrete Deterioration

Available literature on the performance of concrete structures in various parts of


Kingdom of Saudi Arabia points towards the need for appropriate durability
considerations in the concrete mix design. Design of concrete mixes etc. shall be
done by keeping in mind the aggressive environmental conditions in the region.

It should be noted that higher temperatures could accelerate chemical reactions,

D
which affect the durability of concrete. Also, extreme temperature fluctuation causes

BI
expansion and contraction in concrete elements.

Unsatisfactory aggregates also are a common cause of concrete deterioration. To

R
combat any possible unsatisfactory performance of aggregates, we recommend that
fine and coarse aggregates for concrete mix should be selected carefully.
FO
Once the aggregate proportions have been determined, the total chloride and sulfate
contents of the concrete materials should be checked to ensure that the limits as
ED

recommended by ACI/ASTM or other applicable Specifications are not exceeded.

Caution is advised regarding minimum cement content, maximum water-cement


SU

ratio, minimum concrete cover to be adopted and the penetrability of resulting


concrete. We also recommend that during construction, the concrete should be
properly consolidated to form a dense impermeable mass. Special attention should
IS

be given to proper curing. Inadequate curing can negate all the earlier care taken in
the mix design and concreting operations and it cannot be made good by later
treatments easily.

In temperate climates, a concrete mix is typically designed to meet three criteria and
their importance is usually identified thus:
Strength, Workability and Durability
It was rightly said that in the Gulf environment, the order of their significance should
be reversed to:
Durability, Workability and Strength

82
Geotechnical File No. 2015/104, Rev.1

All construction practices including selection of cement type etc. shall be in


accordance with applicable SAES.

Extreme care is, therefore, advised in the design and construction of foundations to
eliminate the possibility of concrete deterioration and/or corrosion of steel. All
concrete construction below ground level shall be appropriately “protected” in order
to safeguard from aggressive chemical attack from soil and/or groundwater. Details
for “protection of buildings against water from the ground” are given in CP 102 of BSI.
Appropriate coating shall be considered for reinforcement of steel. Consideration
should be given to the provision of an impervious membrane or to the use of special

D
cements/ additives to provide a concrete of adequate resistance to chemical attack.

BI
All construction practices shall be in accordance with applicable SAES. A plasticized
sheet vapor barrier, minimum 0.15 mm (6 mils) in thickness or a 50mm thick sub-slab

R
(lean concrete) shall be placed beneath concrete foundations as per SAES Q-001.
FO
7.6.2 Type of Exposure and Cement

Summary of the results of laboratory chemical analysis for sulfates and chlorides of
ED

selected soil and water samples tested is presented in Table 8. The chemical tests
results are examined and compared with the exposure types as per SAES Q-001
dated January 2016, reproduced in Figure K-8. As per the chemical test results and
SU

following Figures K-8 thru K-8(b), consider S2 Sulfate Exposure & C2 Chloride
Exposure and Cement type shall be Type V, Uncoated and Type I + Pozzolan or
Slag with Epoxy Coated Rebars (ECR), respectively. Overall, Type I + Pozzolan or
IS

Slag with Epoxy Coated Rebars (ECR) is recommended. However, concrete mix
should be verified against exposure to sulfates attack.

7.7 Dewatering Aspects

The GWT readings were recorded during the period of the field work in April-May
2016. The groundwater table was encountered at depths of 1.5m to 5m below
existing ground levels at the borehole locations of boreholes BH-1 thru BH-81 & BH-
84. Ground water table was encountered at deeper depths of 9.5m & 10.4m in BH-82
& BH-83, respectively, due to higher ground level at these boreholes. Based on final
grade levels, excavation levels, dewatering as required shall be carried out before

83
Geotechnical File No. 2015/104, Rev.1

the excavation. Besides, in order to maintain the ground water table at depths well
below the bottom of foundations, and during the site grading activities, to obtain a
stable bottom of the excavation, dewatering is required. Dewatering may be carried
out in advance of any excavation. It is suggested that dewatering, shall be performed
by carefully installed well point system or by any other measures applicable within
project technical specifications. The dewatering system should be designed by
experienced dewatering contractors having sufficient knowledge with local
experience.

Typical Dewatering using well-point system includes the following steps:

D
a. Excavate to near the anticipated ground water level.

BI
b. Install well points around the perimeter of the area to be excavated.
c. The well points could be jetted or drilled into position. The well points

R
should extend below the excavation to a depth of at least about 1.5 times
the excavation depth below the ground water level. The well points
FO
should be spaced about two meters center to center (other depth-spacing
criteria may be adopted to suit the field conditions).
d. Dewatering should be accomplished by pumping from the well
points. After dewatering, excavate the remaining soils to the desired
ED

grade. Supplemental well points may be necessary to lower ground water


levels below the bottom of the interior of the excavation.
SU

7.8 Pavement Considerations

7.8.1 Sub-grade Materials


IS

A total of fourteen (14) test pits were excavated by using mechanical excavator as
specified in Figure 2a. Bulk samples were collected from each layer of test pits within
the depths of top 1.0 m at the respective existing grades. Index tests, Proctor and
CBR tests were conducted on all the bulk samples. The summary of laboratory test
results on test pit samples are given in Figures in Appendix-H.

As observed from the summary of laboratory tests (Figures H-15 thru H-17), the
samples are classified as SM, SP-SM, SC-SM & GC-GM as per ASTM-2487 and A-
2-4, A-1-b & A-3 as per ASTM D-3282.

84
Geotechnical File No. 2015/104, Rev.1

From the summary, it is noted that out of 16 samples collected, about 3 samples (TP
# 2, 7 & 9) only indicated the fines passing through sieve No. # 200 less than 20. The
remaining samples indicated fines passing through sieve No. # 200 more than 20
percent. Therefore, the suitability of the on-site soils to meet the specifications of fill
material criteria as per SAES A-114 can not be clearly commented. In view of this,
verification tests are required after the site grading is complete. In general, it is
recommended that the moisture contents of the sub-grade soils be ± 2% of the
optimum moisture at the time of compaction. Accordingly, the existing sub-grade
soils if needed to be utilized should, therefore, be wetted to increase their moisture
contents in order to provide adequate and proper compaction. It is essential that the

D
sub-grade and sub-base be hard and non-yielding at the time of pavement

BI
construction.

It is known that CBR value for the material is an important parameter in the material

R
selection and design of flexible pavements. CBR tests conducted on bulk samples
that indicated CBR value between 12 to 56 at 95% compaction and 24 to 71 at 100%
FO
compaction. The soil rating system for sub grade, sub base or base for use in the
design of light traffic pavements in terms of CBR values is reproduced in Figure H-
65. Following this figure, the existing A-3, A-2-4 / A-1-b soils could be categorized in
ED

general as ‘good to excellent’ sub-grade materials to support pavements.

7.8.2 Other Aspects of Pavement


SU

A base course may be generally defined as a layer of granular material, which lies
immediately below the wearing surface of a flexible pavement. As this course lies
close to the pavement surface, it must possess high resistance to deformation in
IS

order to withstand high pressures imposed upon it.

All Asphalt concrete paving aspects shall be in accordance with SAES Q-006.

For “Asphalt Concrete Paving”, the entire sub grade shall be compacted to not less
than 95 percent of the maximum dry density per (ASTM D-1557, Method-D, or
AASHTO T-180 Method-D) or to not less than 70 percent of relative density
determined by ASTM D-4253 and D-4254, unless specified otherwise in the
Earthwork documents. The granular sub base material should be compacted to 95%
of the maximum modified dry density (ASTM D-1557). All compaction operations at

85
Geotechnical File No. 2015/104, Rev.1

the site shall preferably be done at moisture content close to optimum, and shall be
done in accordance with project specifications. Sub grade below paved areas and
roadways should be prepared as recommended in the site preparation section as per
SAES A-114 or Project specifications. Fill necessary to raise each site and bring the
pavement areas to the desired grades should also be as specified in SAES A-114.
On-site granular soil can be used as backfill if properly compacted and prepared as
discussed above and also meet the project specifications. It is recommended that all
pavement areas and drives be properly graded to promote effective drainage of
water and prevent ponding of surface water onto the pavement areas.

D
BI
R
FO
ED
SU
IS

86
Geotechnical File No. 2015/104, Rev.1

8. GENERAL COMMENTS AND LIMITATIONS

 This Detailed Engineering Report is for exclusive use of Mustang HDP for specific
application to the proposed YANBU DISTRIBUTION HUB Project.

 The soil data, test results and foundation recommendations submitted in this report
are based on subsurface conditions revealed through a total of eighty four (84)
Boreholes, Standard penetration tests & Collection of Samples for laboratory testing
on borehole samples, ten (10) PCPTs, seven (7) seismic cross-hole tests, five (5)
seismic refraction tests, twenty (20) soil electrical resistivity tests, Excavation of

D
fourteen (14) Test pits including field density tests and Collection of Bulk Samples as

BI
per the locations provided in SOW. No other warranty, expressed or implied, is
made.

R
 In the event that the design or location of the proposed structures/locations with
reference to current boreholes is changed, the recommendations contained in this
FO
report should be thoroughly reviewed and the conclusions of this report shall be re-
evaluated with specific application.

 It is a standard and good practice to probe for and remove all loose/soft
ED

zones/pockets at foundation level or immediately below and replace the same with
compacted fill (as per project specifications), prior to placement of foundations. It is
recommended that all construction operations dealing with excavations, earthwork
SU

and foundations be supervised by experienced personnel.

 Experienced engineer should observe the site preparation and foundation


IS

installations to check that the work is performed in accordance with the plans and
specifications. Field and laboratory tests should be performed to confirm that the
material quality, compaction and strength meet the project specifications.

 Extreme care is advised in the design & construction to eliminate the possibility of
concrete deterioration and/or corrosion of steel.

 Due care shall be exercised to ensure proper erosion protection measures are
implemented.

87
Geotechnical File No. 2015/104, Rev.1

9. SELECTED REFERENCES

1. Terzaghi, K & Peck, R.B (1967) Soil Mechanics in Engineering Practice.


John Wiley & Sons.
2. Winterkorn, H.F. & Fang, H (1975) Foundation Engineering Hand Book, Van
Nostrand Reinhold
3. Issa Oweis & John Bowman (1981) Geotechnical Considerations
for Construction in Saudi Arabia. ASCE,
GT3, March, Pp 319 – 338.

D
4. Hunt, Roy E. (1984) Geotechnical Engineering Investigation

BI
Manual, Von Hoffman Press, New York.

5. Tomlinson, M.J. (1986) Foundation Design and Construction. ELBS

R
and Pitman.
6. Rasheeduzzafar, F.H; Dakhil, A. S. Proposal for a Code of Practice to Ensure
FO
Al-Gahtani, S.S. Al-Saadoun, M.
Durability of Concrete Construction in the
Badar & K.Y. Meddallah. (1987)
Arabian Gulf Environment.
7. Bowles, J.E. (1988 & 1996) Foundation Analysis and
ED

Design. McGraw-Hill Publishing Co. Ltd.,


8. SAES A-104, A-112, A-113, M-009, SAUDI ARAMCO Engineering Standards
Q-001, Q-005, Q-007, Q-006
SU

9. Youd, T. L. et. “Liquefaction Resistance of Soils: Summary


al. Report from the 1996 NCEER and 1998
NCEER/NSF Workshops on Evaluation of
IS

Liquefaction Resistance of Soils”, Journal of


Geotechnical and Geoenvironmental
Engineering, ASCE, 127(10), 817-833.

88
IS
SU
ED
FO
R
BI
D
D
BI
R
FO
ED
SU
IS

Drawing Title : Client / Owner: Project Title :


Geotechnical Investigation for
FACILITY PLOT PLAN YANBU DISTRIBUTION HUB Project, Yanbu

(TANK FARM AREA) Geotechnical File No. 2015/104 Figure No. 2


D
BI
R
FO
ED
SU
IS

Drawing Title : Client / Owner: Project Title :


Geotechnical Investigation for
BOREHOLES AND OTHER YANBU DISTRIBUTION HUB Project, Yanbu

TESTS LOCATION PLAN Geotechnical File No. 2015/104 Figure No. 2(a)
D
BI
R
FO
ED
SU
IS

Drawing Title : Client / Owner: Project Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu
TESTS LOCATION SCHEDULE
Geotechnical File No. 2015/104 Figure No. 2(b)
D
BI
R
FO
ED
SU
IS

Drawing Title : Client / Owner: Project Title :


Geotechnical Investigation for
BOREHOLES AND OTHER YANBU DISTRIBUTION HUB Project, Yanbu

TESTS LOCATION PLAN Geotechnical File No. 2015/104 Figure No. 2(c)
D
BI
R
FO
ED
SU
IS

Drawing Title : Client / Owner: Project Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu
BOREHOLES LOCATION PLAN
Geotechnical File No. 2015/104 Figure No. 2(d)
D
BI
R
FO
ED
SU
IS

Drawing Title : Client / Owner: Project Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu
BOREHOLES LOCATION PLAN
Geotechnical File No. 2015/104 Figure No. 2(e)
Depth 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
0.15 21 20 17 27 30 16 33 35 25 24 24 28 28 18 18 18 20 9 31 19
0.75 24 13 19 17 20 23 32 35 28 32 33 26 19 20 22 11 17 11 17 15
1.5 27 21 33 22 10 20 30 36 24 38 42 29 53 49 58 13 12 12 40 21
2.25 43 33 30 41 14 21 18 36 29 43 52 19 57 61 58 13 15 13 48 18
3 50 26 34 50/11 45 46 33 18 20 44 47 28 91/24 66 50 U 28 24 37 56
3.75 49 50 42 76 32 36 34 32 17 44 49 20 50/10 75 46 31 26 22 43 41
4.5 56 46 36 38 29 53 31 37 43 53 54 49 50/10 81 59 50/12 48 88/25 56 51

D
6 64 56 73 43 33 62 52 U-1 42 50 58 51 50/13 95/27 65 48 39 71 45 58
7.5 61 53 60 42 32 58 44 50/10 65 46 44 55 83 50/13 69 62 53 63 56 52

BI
9 65 63 62 76 43 64 50/13 50/9 63 46 40 53 93/26 50/10 56 59 50 66 55 58
10.5 36 63 60 71 40 80 50/11 50/10 74 43 37 55 50/12 40 70 69 62 76 59 51
12 49 69 57 73 35 70 50/10 50/8 93/25 43 34 58 50/14 37 66 46 68 68 59 53

R
13.5 45 68 45 69 41 70 50/11 50/11 84 40 48 59 50/12 80 63 47 71 54 59 59
15 56 60 42 59 37 63 50/14 50/13 94/25 47 51 56 90/24 94/25 61 41 45 59 53 63

FO
16.5 48 65 50 63 29 43 50/12 50/14 95/26 47 55 53 50/12 94/25 72 46 47 71 49 57
18 56 54 79 78 28 64 50/8 50/11 85 46 50 70 50/10 50/9 50/7 77/27 92/25 76 32 61
19.5 56 67 79 71 34 69 50/11 50/10 50/13 53 42 68 50/14 50/12 50/5 50/13 88/28 50/13 40 45
21 53 67 83 59 37 74 87/24 50/12 50/12 50 48 56 50/12 50/8 50/11 82 50/4 50/12 48 44
22.5 57 60 82 54 50/13 70 53

ED
24 47 60 90/24 46 50/11 73 40
25.5 46 62 91 52 50/12 50/12 36
27 59 63 99/25 53 50/10 50/14 41
28.5 58 58 50/13 48 50/13 50/11 48
SU
30 61 65 50/10 52 50/14 50/13 49
CL-ML/CL/ML U: Undistrubed sample
GWT 2.35 2.3 2.7 2.55 2.7 2.7 2.5 2.55 2.6 3.45 3.5 3.65 3.5 3.15 3.45 2.45 2.6 2.55 4.2 4.35
IS

RIG # 808 808 814 808 812 814 690 690 690 812 812 812 690 690 814 790 790 790 690 790

SPT- N VALUES vs. DEPTH


Project Title: Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yambu
Client/Owner: MUSTANG-HDP / SAUDI ARAMCO

Geotechnical File No. 2015/104 Figure No. 4(a)


Depth 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
0.15 26 19 31 44 24 51 32 18 33 24 32 26 12 11 17 19 32 36 30 37
0.75 15 38 59 37 30 51 38 19 35 21 23 26 17 14 30 24 30 27 38 23
1.5 19 39 67 46 85/20 74/26 39 25 22 21 29 34 14 25 32 22 38 32 48 27
2.25 52 46 74 52 50/3 67 89/21 15 10 11 35 44 17 27 33 26 43 41 50 31
3 72 60 34 52 50/11 50/13 85/22 18 7 12 50 42 20 49 26 26 48 64 54 29
3.75 87 69 34 72 79 50/9 50/11 14 17 16 55 49 26 55 30 33 57 71 53 28

D
4.5 84 57 30 55 41 50/10 87/20 15 21 20 65 61 35 39 62 33 66 59 54 32
6 96/23 41 40 48 42 50/8 50/10 10 37 23 57 66 35 90/29 36 40 48 39 56 94/24

BI
7.5 67 34 51 49 52 87/22 60 20 52 31 64 60 43 52 36 42 85/27 51 47 91/26
9 75 42 73 65 68 50/12 60 32 50 37 67 66 60 52 38 27 88/25 70 53 94/25
10.5 60 43 71 73 39 65 87 29 53 36 62 29 60 33 45 30 91/23 55 59 83
12 94/24 52 37 51 45 67 65 27 52 41 68 44 45 32 51 37 63 57 24 91

R
13.5 50/8 59 37 57 42 60 58 29 47 35 65 35 54 83/20 48 38 30 56 25 92
15 50/14 64 63 72 51 50/10 52 32 51 39 62 44 54 50/9 42 51 55 55 26 50/10

FO
16.5 50/12 73 74 51 47 50/10 71 42 53 39 60 58 46 87/22 52 58 56 24 24 50/11
18 50/10 69 50/11 50 51 85/23 71 43 51 46 51 58 45 94/26 50 45 61 26 27 50/14
19.5 50/13 70 50/14 73 96/20 50/6 60 42 48 35 57 52 45 81 60 60 66 64 30 86
21 50/10 62 79 81 89/22 50/9 77/25 43 45 41 29 60 42 39 75/20 58 50 60 32 83

ED
22.5 76 78 33 58 50 63 90
24 50/13 77 40 58 51 83/25 93/26
25.5 96/27 56 47 47 50 60 50/9
27 50/14 72 33 53 55 51 50/9
SU
28.5 66 58 40 55 60 53 84
30 52 54 46 62 59 52 89/25
CL-ML/CL/ML U: Undistrubed sample
GWT 4.05 4.5 4.55 4.6 4.8 4.85 4.7 3.85 4.1 3.7 3.8 3.85 3.8 3.9 3.8 3.65 3.7 3.7 3.35 3.95
IS

RIG # 690 790 790 808 814 807 814 812 812 812 808 808 790 814 814 814 807 807 807 690

SPT- N VALUES vs. DEPTH


Project Title: Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yambu
Client/Owner: MUSTANG-HDP / SAUDI ARAMCO

Geotechnical File No. 2015/104 Figure No. 4(b)


Depth 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60
0.15 38 26 29 27 26 36 14 15 22 28 20 22 17 35 29 34 26 19 35 32
0.75 33 27 31 29 30 39 20 38 37 37 28 26 19 38 33 32 33 37 39 35
1.5 21 35 28 20 41 50/10 50/13 52 38 39 49 53 32 38 27 45 32 52 41 34
2.25 19 41 30 27 32 28 36 46 33 41 48 52 46 40 33 49 30 64 41 31
3 24 44 40 42 47 30 42 46 34 41 64 41 48 49 72 45 32 48 48 32
3.75 20 51 37 43 65 34 40 45 40 43 68 45 58 53 76 57 U-1 52 57 31
4.5 24 42 43 29 65 41 48 53 56 44 75 42 61 52 47 63 43 60 52 34

D
6 40 63 35 32 65 42 42 65 61 75 85 49 67 50 50 64 49 39 47 36
7.5 42 76 36 41 90/24 50/11 50/14 73 69 69 93/27 60 76 64 48 73 51 57 50 38

BI
9 42 54 42 42 69 85/24 50/12 66 63 68 89/22 90/22 78 53 87 50/9 49 58 50 39
10.5 55 48 46 33 63 57 76 79 61 67 50/10 85 67 57 48 50/10 55 61 55 42
12 55 50 50 31 61 59 66 65 71 59 50/11 84/20 70 61 46 50/9 57 61 43 39

R
13.5 57 53 50 31 55 61 62 61 59 62 50/10 95/18 69 50 49 50/10 46 60 36 39
15 51 51 51 38 50 88/26 54 52 57 78/28 30 50/12 59 56 51 50/13 53 60 34 40

FO
16.5 43 62 39 36 50 54 63 49 50/14 68 69 93/20 57 47 52 50/13 55 75 32 42
18 44 67 22 37 46 34 47 58 75 63 73 89/24 53 50 52 50/13 42 55 32 34
19.5 36 70 21 40 51 52 38 52 80 65 73 98/21 52 56 52 65 46 58 31 32
21 43 66 25 37 25 37 56 53 52 68 92/28 75 55 53 58 75 57 60 32 29
22.5 26 29 57 59 73 90/26 55 78

ED
24 25 31 67 55 66 94/25 55 84
25.5 23 27 67 63 75 95/26 58 90/25
27 22 27 70 70 74 50/12 55 52
28.5 22 24 64 60 78 50/13 54 60
SU
30 24 30 63 60 80 50/10 63 63
CL-ML/CL/ML U: Undistrubed sample
GWT 3.8 3.9 2.5 2.65 2.8 2.95 4.2 3.95 4.2 4.7 3.7 3.8 4.4 3.5 4.6 2.2 3.1 4.1 4.7 3.85
IS

RIG # 807 808 807 807 807 807 790 790 790 808 690 814 811 814 790 690 812 790 807 807

SPT- N VALUES vs. DEPTH


Project Title: Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yambu
Client/Owner: MUSTANG-HDP / SAUDI ARAMCO

Geotechnical File No. 2015/104 Figure No. 4(c)


Depth 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80
0.15 23 23 54 22 40 26 39 31 22 29 H 28 23 14 19 36 H H H H
0.75 41 19 54 21 40 37 50 32 30 33 H 34 26 13 19 31 H H H H
1.5 47 22 50 15 39 55 55 43 45 38 43 41 33 18 17 36 H 39 23 34
2.25 77 21 76 16 57 44 49 47 42 42 44 49 38 21 15 43 51 45 31 29
3 89 32 81/26 27 62 39 55 66 49 41 43 43 31 26 21 41 55 40 17 28
3.75 79 41 84/24 31 63 41 41 67 45 50 45 46 38 35 31 43 57 51 18 31
4.5 71 38 69 U-1 39 46 37 67 59 46 51 49 40 51 49 59 63 38 20 36

D
6 66 42 84/25 39 48 56 52 68 63 51 63 47 35 53 49 59 40 44 25 36
7.5 69 37 74 U-2 48 58 61 U-1 76 36 63 22 48 59 71 69 36 49 52 39

BI
9 63 41 80 24 52 76 69 21 22 42 59 35 38 75 72 88/27 48 47 47 47
10.5 66 45 59 U-3 57 48 74 29 22 36 52 57 41 93/19 98/19 88/26 50/13 71 62 52
12 76 47 63 40 61 53 68 43 22 34 45 53 42 85/24 50 95/28 50/13 66 74 58

R
13.5 59 48 71 50/4 62 53 60 56 U-1 30 70 55 43 85/26 54 50/13 64 76 77 51
15 68 45 80 50/11 63 53 57 45 21 40 71 60 41 91/22 91/22 50/13 65 87/29 66 61

FO
16.5 75 66 87/27 50/13 61 56 67 55 22 46 67 55 47 93/20 89/25 50/12 67 64 72 64
18 72 47 91/26 92/25 59 53 73 62 U-2 54 59 61 30 99/17 91/19 50/14 82/28 67 68 63
19.5 78 47 80 50/12 66 57 75 65 53 59 63 54 33 97/16 98/16 50/11 68 79 60 64
21 77 46 85 50/14 66 60 71 60 63 51 70 55 30 97/21 94/18 50/9 78 64 50/13 61
22.5 69 64 55 56 79 U 92/27 73

ED
24 65 61 57 58 73 53 84 54
25.5 64 79/27 61 61 57 57 50/12 63
27 55 50/10 40 55 67 63 50/14 77
28.5 48 83 40 60 70 58 78 70
SU
30 44 84/29 35 62 71 56 94/26 81
CL-ML/CL/ML U: Undistrubed sample
GWT 5 2.4 3.4 4.5 4.7 3.4 3.9 2.8 4.1 2.4 3.6 3.4 3.3 1.5 1.7 2 4.1 3.6 2.8 3.4
IS

RIG # 808 807 811 790 808 808 811 790 790 812 790 812 807 814 814 690 811 790 811 790

SPT- N VALUES vs. DEPTH


Project Title: Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yambu
Client/Owner: MUSTANG-HDP / SAUDI ARAMCO

Geotechnical File No. 2015/104 Figure No. 4(d)


Depth 81 82 83 84 85
0.15 H H H H
0.75 H H H H
1.5 39 8 64 H
2.25 38 11 59 12
3 42 4 60 39
3.75 45 5 65 36
4.5 53 12 60 42

D
6 55 23 61 47
7.5 54 33 56 50

BI
9 63 64/26 56 56
10.5 68 36 71 56
12 74 39 60 70

R
13.5 80 50 77 62
15 65 56 73 61

FO
16.5 73 72 61 53
18 90/28 64 66 50
19.5 93/25 68 64 60
21 50/14 62 62 61
22.5 50/12 66 79 47

ED
24 50/13 64 66 47
25.5 50/10 61 72 53
27 94/24 73 64 58
28.5 50/14 77 66 54
SU
30 50/9 72 71 59
CL-ML/CL/ML U: Undistrubed sample
GWT 2.9 9.5 10.4 4.15
IS

RIG # 690 790 807 814

SPT- N VALUES vs. DEPTH


Project Title: Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yambu
Client/Owner: MUSTANG-HDP / SAUDI ARAMCO

Geotechnical File No. 2015/104 Figure No. 4(e)


Depth 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
0.15 25 24 20 32 38 19 37 39 28 31 31 36 31 20 21 23 25 11 35 24
0.75 29 16 22 20 25 27 36 39 31 41 42 33 21 22 26 14 21 14 19 19
1.5 32 25 39 26 13 24 34 40 27 48 53 37 59 55 69 16 15 15 45 26
2.25 51 40 35 49 18 25 20 40 32 55 66 24 64 68 69 16 19 16 54 23
3 60 31 40 50/11 57 54 37 20 22 56 60 36 91/24 74 59 U 35 30 41 71
3.75 59 60 50 91 41 43 38 36 19 56 62 25 50/10 84 54 39 33 28 48 52
4.5 76 62 48 52 42 71 39 47 54 76 78 71 50/10 103 79 50/12 69 88/25 71 73

D
6 87 76 98 58 48 83 66 U-1 53 72 84 73 50/13 95/27 87 69 56 100 57 83
7.5 93 80 90 64 52 87 62 50/10 92 74 71 89 117 50/13 103 99 85 100 79 83

BI
9 99 96 93 115 69 96 50/13 50/9 89 74 64 85 93/26 50/10 84 94 80 100 78 93
10.5 57 101 95 113 68 126 50/11 50/10 110 73 63 93 50/12 60 110 100 100 100 88 86
12 78 110 90 117 59 110 50/10 50/8 93/25 73 58 98 50/14 55 104 77 100 100 88 89

R
13.5 72 109 71 110 69 110 50/11 50/11 125 68 81 100 50/12 119 99 79 100 91 88 99
15 89 96 66 94 63 99 50/14 50/13 94/25 80 86 95 90/24 94/25 96 69 76 99 79 100

FO
16.5 77 104 79 101 49 68 50/12 50/14 95/26 80 93 90 50/12 94/25 114 77 79 100 73 96
18 89 86 125 125 47 101 50/8 50/11 127 78 85 119 50/10 50/9 50/7 77/27 92/25 100 48 100
19.5 89 107 125 113 58 109 50/11 50/10 50/13 90 71 115 50/14 50/12 50/5 50/13 88/28 50/13 60 76
21 85 107 131 94 63 117 87/24 50/12 50/12 85 81 95 50/12 50/8 50/11 100 50/4 50/12 72 74
22.5 91 96 100 92 50/13 100 79

ED
24 75 96 90/24 78 50/11 100 60
25.5 73 99 100 88 50/12 50/12 54
27 94 101 99/25 90 50/10 50/14 61
28.5 93 93 50/13 81 50/13 50/11 72
SU
30 97 104 50/10 88 50/14 50/13 73
CL-ML/CL/ML U: Undistrubed sample
GWT 2.35 2.3 2.7 2.55 2.7 2.7 2.5 2.55 2.6 3.45 3.5 3.65 3.5 3.15 3.45 2.45 2.6 2.55 4.2 4.35
IS

RIG # 808 808 814 808 812 814 690 690 690 812 812 812 690 690 814 790 790 790 690 790

SPT- N60 VALUES vs. DEPTH FOR BOREHOLES

Project Title: Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yambu
Client/Owner: MUSTANG-HDP / SAUDI ARAMCO

Geotechnical File No. 2015/104 Figure No. 5(a)


Depth 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
0.15 29 24 39 53 28 58 38 23 42 31 38 31 15 13 20 22 36 41 34 41
0.75 17 48 74 44 35 58 45 24 44 27 28 31 21 17 35 28 34 31 43 26
1.5 21 49 85 55 85/20 74/26 46 32 28 27 35 41 18 30 38 26 43 36 54 30
2.25 58 58 93 62 50/3 76 89/21 19 13 14 42 53 21 32 39 31 49 46 57 35
3 80 76 43 62 50/11 50/13 85/22 23 9 15 60 50 25 58 31 31 54 72 61 32
3.75 97 87 43 86 93 50/9 50/11 18 22 20 66 59 33 65 35 39 64 80 60 31

D
4.5 106 81 43 75 55 50/10 87/20 22 30 29 88 83 50 52 83 44 85 76 69 41
6 96/23 59 57 65 56 50/8 50/10 14 53 33 77 90 50 90/29 48 54 61 50 72 94/24

BI
7.5 95 54 81 74 78 87/22 90 32 84 50 97 91 69 78 54 63 85/27 73 67 91/26
9 100 67 100 99 100 50/12 90 52 81 60 100 100 96 78 57 40 88/25 100 76 94/25
10.5 89 72 100 100 61 98 100 49 90 61 99 46 100 52 71 47 91/23 83 89 100
12 94/24 87 62 81 71 100 100 46 88 69 100 70 76 50 80 58 95 86 36 100

R
13.5 50/8 99 62 91 66 90 91 49 80 59 100 56 91 83/20 76 60 45 84 38 100
15 50/14 100 100 100 80 50/10 82 54 86 66 99 70 91 50/9 66 80 83 83 39 50/10

FO
16.5 50/12 100 100 81 74 50/10 100 71 90 66 96 93 77 87/22 82 91 84 36 36 50/11
18 50/10 100 50/11 80 80 85/23 100 73 86 78 81 93 76 94/26 79 71 92 39 41 50/14
19.5 50/13 100 50/14 100 96/20 50/6 95 71 81 59 91 83 76 100 95 95 99 96 45 100
21 50/10 100 100 100 89/22 50/9 77/25 73 76 69 46 96 71 61 75/20 91 75 90 48 100

ED
22.5 100 100 56 93 79 95 100
24 50/13 100 68 93 80 83/25 93/26
25.5 96/27 88 80 75 79 90 50/9
27 50/14 100 56 85 87 77 50/9
SU
28.5 100 91 68 88 95 80 100
30 87 85 78 99 93 78 89/25
CL-ML/CL/ML U: Undistrubed sample
GWT 3.8 3.85 3.8 3.9 3.8 3.65 3.7 3.7 3.35 3.95 3.85 3.8 3.9 3.8 3.65 3.7 3.7 3.35 3.95
IS

RIG # 808 808 790 814 814 814 807 807 807 690 808 790 814 814 814 807 807 807 690

SPT- N60 VALUES vs. DEPTH FOR BOREHOLES


Project Title: Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yambu
Client/Owner: MUSTANG-HDP / SAUDI ARAMCO

Geotechnical File No. 2015/104 Figure No. 5(b)


Depth 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60
0.15 43 31 33 31 29 41 18 19 28 34 22 26 23 41 37 38 33 24 40 36
0.75 37 32 35 33 34 44 25 48 47 44 31 31 26 45 42 36 42 47 44 40
1.5 24 42 32 23 46 50/10 50/13 66 48 47 55 63 44 45 34 50 41 66 46 38
2.25 21 49 34 31 36 32 45 58 42 49 54 61 63 47 42 55 38 81 46 35
3 27 53 45 47 53 34 53 58 43 49 72 48 65 58 91 50 41 61 54 36
3.75 23 61 42 49 73 38 50 57 50 51 76 53 79 63 96 64 U-1 66 64 35
4.5 31 57 55 37 83 53 69 76 80 60 95 56 94 70 67 80 62 86 67 44

D
6 51 86 45 41 83 54 60 93 87 102 108 66 103 67 71 81 71 56 60 46
7.5 60 115 52 59 90/24 50/11 50/14 117 110 105 93/27 90 131 96 77 103 82 91 72 54

BI
9 60 82 60 60 99 85/24 50/12 105 101 103 89/22 90/22 134 79 139 50/9 79 93 72 56
10.5 83 77 69 50 95 86 128 133 103 107 50/10 134 121 90 81 50/10 93 103 83 63
12 83 80 75 47 92 89 111 109 119 94 50/11 84/20 127 96 77 50/9 97 103 65 59

R
13.5 86 85 75 47 83 92 104 103 99 99 50/10 95/18 125 79 82 50/10 78 101 54 59
15 77 81 77 57 75 88/26 91 87 96 78/28 45 50/12 107 88 86 50/13 90 101 51 60

FO
16.5 65 99 59 54 75 81 106 82 50/14 109 103 93/20 103 74 87 50/13 93 126 48 63
18 66 107 33 56 69 51 79 98 126 101 109 89/24 96 79 87 50/13 71 92 48 51
19.5 54 112 32 60 77 78 64 87 135 104 109 98/21 94 88 87 97 78 98 47 48
21 65 105 38 56 38 56 94 89 87 109 92/28 118 100 84 98 112 97 101 48 44
22.5 39 44 96 99 117 90/26 92 116

ED
24 38 47 113 92 105 94/25 92 125
25.5 35 41 113 106 120 95/26 98 90/25
27 33 41 118 118 118 50/12 92 77
28.5 33 36 108 101 125 50/13 91 89
SU
30 36 45 106 101 128 50/10 106 94
CL-ML/CL/ML U: Undistrubed sample
GWT 3.9 2.5 2.65 2.8 2.95 4.2 3.95 4.2 4.7 3.7 3.8 4.4 3.5 4.6 2.2 3.1 4.1 4.7 3.85
IS

RIG # 808 807 807 807 807 790 790 790 808 690 814 811 814 790 690 812 790 807 807

SPT- N60 VALUES vs. DEPTH FOR BOREHOLES

Project Title: Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yambu
Client/Owner: MUSTANG-HDP / SAUDI ARAMCO

Geotechnical File No. 2015/104 Figure No. 5(c)


Depth 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80
0.15 28 28 73 28 48 31 53 39 28 37 E 36 26 17 22 40 E E E E
0.75 49 23 73 26 48 44 68 40 38 42 E 43 29 15 22 35 E E E E
1.5 56 26 68 19 47 66 75 54 57 48 54 52 37 21 20 40 E 49 31 43
2.25 92 25 103 20 68 53 67 59 53 53 55 62 43 25 18 48 69 57 42 37
3 107 38 81/26 34 74 47 75 83 62 52 54 55 35 31 25 46 75 50 23 35
3.75 95 49 84/24 39 75 49 56 85 57 64 57 58 43 41 37 48 78 64 24 39
4.5 96 52 106 U-1 53 62 57 96 84 66 73 71 51 68 66 75 97 54 31 51

D
6 90 57 84/25 56 65 76 80 97 90 73 90 68 45 71 66 75 62 63 39 51
7.5 105 56 127 U-2 73 88 105 U-1 121 58 101 35 69 88 106 98 62 78 90 62

BI
9 96 62 138 38 79 115 119 34 35 68 94 56 54 112 108 88/27 83 75 81 75
10.5 105 72 107 U-3 91 77 134 49 37 61 87 97 62 93/19 98/22 88/26 50/13 119 112 87
12 121 75 114 67 97 85 123 72 37 58 76 90 63 85/24 79 95/28 50/13 111 134 98

R
13.5 94 77 129 50/4 99 85 109 94 U-1 51 118 93 65 85/26 85 50/13 116 128 140 86
15 109 72 145 50/11 101 85 103 76 35 68 119 102 62 91/22 91/22 50/13 118 87/29 120 103

FO
16.5 120 105 87/27 50/13 97 89 121 92 37 78 113 93 71 93/20 89/25 50/12 121 108 131 108
18 115 75 91/26 92/25 94 85 132 104 U-2 92 99 103 45 99/17 91/19 50/14 82/28 113 123 106
19.5 125 75 145 50/12 105 91 136 109 89 100 106 92 50 97/16 98/16 50/11 123 133 109 108
21 123 73 154 50/14 105 96 129 101 106 86 118 93 45 97/21 94/18 50/9 141 108 50/13 103
22.5 116 108 93 94 143 U 92/27 123

ED
24 109 103 97 98 132 89 152 91
25.5 108 79/27 103 103 103 96 50/12 106
27 92 50/10 68 92 121 106 50/14 129
28.5 81 140 68 101 127 98 141 118
SU
30 74 84/29 59 104 129 94 94/26 136
CL-ML/CL/ML U: Undistrubed sample
GWT 2.4 3.4 4.5 4.7 3.4 3.9 2.8 4.1 2.4 3.6 3.4 3.3 1.5 1.7 2 4.1 3.6 2.8 3.4
IS

RIG # 807 811 790 808 808 811 790 790 812 790 812 807 814 814 690 811 790 811 790

SPT- N60 VALUES vs. DEPTH FOR BOREHOLES

Project Title: Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yambu
Client/Owner: MUSTANG-HDP / SAUDI ARAMCO

Geotechnical File No. 2015/104 Figure No. 5(d)


Depth 81 82 83 84 85
0.15 H H H H
0.75 H H H H
1.5 44 10 72 H
2.25 42 14 67 14
3 47 5 68 46
3.75 50 6 73 43
4.5 67 17 77 56

D
6 70 33 78 63
7.5 76 53 80 75

BI
9 89 64/26 80 84
10.5 101 61 107 88
12 110 66 90 110

R
13.5 119 84 116 98
15 97 94 110 96

FO
16.5 109 121 92 84
18 90/28 108 99 79
19.5 93/25 114 96 95
21 50/14 104 93 96
22.5 50/12 111 119 74

ED
24 50/13 108 99 74
25.5 50/10 103 108 84
27 94/24 123 96 91
28.5 50/14 129 99 85
SU
30 50/9 121 107 93

GWT 2.9 9.5 10.4 4.15


IS

RIG # 690 790 807 814

SPT- N60 VALUES vs. DEPTH FOR BOREHOLES

Project Title: Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yambu
Client/Owner: MUSTANG-HDP / SAUDI ARAMCO

Geotechnical File No. 2015/104 Figure No. 5(e)


IS
SU
ED
FO
R
BI
D
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,110.93 meter TYPE OF BORING: ROTARY WASH
EAST: 430,252.64 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-01
GROUND ELEVATION: 3.08 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 23-4-16
DEPTH OF GROUNDWATER TABLE: 2.35 meter RIG #: ACKER MP8 (OEO-808) DATE COMPLETED: 24-4-16
MEASURED AT: 0700 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abdullah
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 Medium dense, brown, silty sand with gravel. 0.3


SPT - 1 21
2 0.6
3 Ditto but dark brown without gravel. 0.9
SPT - 2 24

D
4 1.2
5 1.5
Very stiff, light grey, sandy lean clay.

BI
6 SPT - 3 27 34.9 62 1.8
CL
7 2.1
8 Ditto but hard, light brown. 2.4
SPT - 4 43 26.7 67
9 CL 2.7
10
11
12
U-1 13.3 42
SC
R
Brown, clayey sand.
3.0
3.4
3.7
FO
13 Dense, dark brown, well graded sand with silt & gravel. 4.0
SPT - 5 49 10.1 11
14 SW-SM 4.3
15 4.6
16 SPT - 6 >50
Ditto but very dense. 4.9
17 5.2
ED

18 5.5
19 5.8
20 6.1
SPT - 7 >50
Ditto. 6.4
21
SU

22 6.7
23 7.0
24 7.3
25 7.6
SPT - 8 >50
Ditto.
26 7.9
IS

27 8.2
28 8.5
29 8.8
30 9.1
SPT - 9 >50
Ditto.
31 9.4
32 9.8
33 10.1
34 10.4
35 10.7
SP-SM
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 3
FIGURE A-1
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,110.93 meter TYPE OF BORING: ROTARY WASH
EAST: 430,252.64 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-01
GROUND ELEVATION: 3.08 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 23-4-16
DEPTH OF GROUNDWATER TABLE: 2.35 meter RIG #: ACKER MP8 (OEO-808) DATE COMPLETED: 24-4-16
MEASURED AT: 0700 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abdullah
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 10 36 11.4 05 Dense, dark brown, poorly graded sand with silt & gravel.
36 11.0
37 11.3
SP-SM
38 11.6

D
39 11.9
40 Ditto. 12.2
SPT - 11 49

BI
41 12.5
42 12.8
43 13.1
44 13.4
45
46
47
SPT - 12 45
R
Ditto. 13.7
14.0
14.3
FO
48 14.6
49 14.9
50
SPT - 13 >50 9.1 06 Very dense, dark brown, poorly graded gravel with silt & 15.2
51 sand. 15.5
52 GP-GM 15.8
ED

53 16.2
54 16.5
55
SPT - 14 48
Ditto but dense. 16.8
56 17.1
SU

57 17.4
58 17.7
59 18.0
60 SPT - 15 >50
Ditto but very dense. 18.3
61 18.6
IS

62 18.9
63 19.2
64 19.5
65 SPT - 16 >50
Ditto. 19.8
66 20.1
67 20.4
68 20.7
69 21.0
70 SPT - 17 >50
Ditto. 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 3
FIGURE A-1
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,110.93 meter TYPE OF BORING: ROTARY WASH
EAST: 430,252.64 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-01
GROUND ELEVATION: 3.08 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 23-4-16
DEPTH OF GROUNDWATER TABLE: 2.35 meter RIG #: ACKER MP8 (OEO-808) DATE COMPLETED: 24-4-16
MEASURED AT: 0700 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abdullah
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

71 Very dense, dark brown, poorly graded gravel with silt & 21.6
72
sand. 21.9
73 22.3

D
74 22.6
75 SPT - 18 >50 Ditto. 22.9

BI
76 23.2
77 23.5
78 23.8
79 24.1
SPT - 19 04 Dense, brown, poorly graded gravel with sand.
80
81
82
47 8.7

GP
R 24.4
24.7
25.0
FO
83 25.3
84 25.6
SPT - 20 46
Ditto.
85 25.9
86 26.2
87 26.5
ED

88 26.8
89 27.1
SPT - 21 >50
Ditto but very dense.
90 27.4
91 27.7
SU

92 28.0
93 28.3
94 28.7
SPT - 22 >50
Ditto.
95 29.0
96 29.3
IS

97 29.6
98 29.9
99 30.2
SPT - 23 >50
Ditto.
100 30.5
101 END OF BORING @ 30.45 m. 30.8
102 31.1
103 31.4
104 31.7
105 32.0

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 3
FIGURE A-1
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,128.80 meter TYPE OF BORING: ROTARY WASH
EAST: 430,231.29 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-02
GROUND ELEVATION: 3.02 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 21-4-16
DEPTH OF GROUNDWATER TABLE: 2.30 meter RIG #: ACKER MP8 (OEO-808) DATE COMPLETED: 21-4-16
MEASURED AT: 0710 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abdullah
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 Medium dense, brown, silty sand with occasional gravel. 0.3


SPT - 1 20
2 0.6
3 Ditto. 0.9
SPT - 2 13 19.2 29

D
4 SM 1.2
5 1.5
Very stiff, light grey, lean clay with occasional gravel.

BI
6 SPT - 3 21 29.3 72 1.8
CL
7 2.1
8 Ditto but hard. 2.4
SPT - 4 33
9 2.7
10
11
12
SPT - 5 26 26.1 67
CL
R
Ditto but very stiff.
3.0
3.4
3.7
FO
13 Dense, brown, gravel with silty sand. 4.0
SPT - 6 50
14 4.3
15 4.6
16 SPT - 7 46
Dense, brown, silty sand with occasional gravel. 4.9
17 5.2
ED

18 5.5
19 5.8
20 6.1
SPT - 8 >50
Ditto but very dense. 6.4
21
SU

22 6.7
23 7.0
24 7.3
25 7.6
SPT - 9 >50 17.3 15 Ditto.
26 7.9
IS

27 8.2
SM 8.5
28
29 8.8
30 9.1
SPT - 10 >50
Ditto.
31 9.4
32 9.8
33 10.1
34 10.4
35 10.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-2
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,128.80 meter TYPE OF BORING: ROTARY WASH
EAST: 430,231.29 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-02
GROUND ELEVATION: 3.02 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 21-4-16
DEPTH OF GROUNDWATER TABLE: 2.30 meter RIG #: ACKER MP8 (OEO-808) DATE COMPLETED: 21-4-16
MEASURED AT: 0710 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abdullah
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 Very dense, brown, silty sand with occasional gravel.
36 11.0
37 11.3
38 11.6

D
39 11.9
40 Very dense, brown, poorly graded gravel with silt & sand. 12.2
SPT - 12 >50 6.5 11

BI
41 12.5
42 GP-GM 12.8
43 13.1
44 13.4
45
46
47
SPT - 13 >50
R
Ditto. 13.7
14.0
14.3
FO
48 14.6
49 14.9
50
SPT - 14 >50
Very dense, brown, silty sand with gravel. 15.2
51 15.5
52 15.8
ED

53 16.2
54 16.5
55
SPT - 15 >50
Ditto. 16.8
56 17.1
SU

57 17.4
58 17.7
59 18.0
60 SPT - 16 >50
Ditto. 18.3
61 18.6
IS

62 18.9
63 19.2
64 19.5
65 SPT - 17 >50
Ditto. 19.8
66 20.1
SPT - 18 >50
Ditto but with traces of clay. 20.4
67
68 END OF BORING @ 20.45 m. 20.7
69 21.0
70 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-2
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,093.10 meter TYPE OF BORING: ROTARY WASH
EAST: 430,273.92 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-03
GROUND ELEVATION: 3.15 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 21-4-16
DEPTH OF GROUNDWATER TABLE: 2.70 meter RIG #: SIMCO (OEO-814) DATE COMPLETED: 23-4-16
MEASURED AT: 0725 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 Medium dense, brown, silty sand with gravel. 0.3


SPT - 1 17
2 0.6
3 Ditto. 0.9
SPT - 2 19

D
4 1.2
5 1.5
Dense, brownish grey, clayey sand with gravel.

BI
6 SPT - 3 33 17.9 32 1.8
SC
7 2.1
8 Ditto but medium dense. 2.4
SPT - 4 30
9 2.7
10
11
12
SPT - 5 34
R
Ditto but dense.
3.0
3.4
3.7
FO
13 Dense, greyish brown, silty clayey sand with gravel. 4.0
SPT - 6 42 15.2 24
14 SC-SM 4.3
15 4.6
16 SPT - 7 36
Ditto but brown. 4.9
17 5.2
ED

18 5.5
19 5.8
20 6.1
SPT - 8 >50
Very dense, brown, silty gravel with sand. 6.4
21
SU

22 6.7
23 7.0
24 7.3
25 7.6
SPT - 9 >50 14.0 12 Very dense, brown, poorly graded sand with silt & gravel.
26 7.9
IS

27 8.2
SP-SM 8.5
28
29 8.8
30 9.1
SPT - 10 >50
Ditto.
31 9.4
32 9.8
33 10.1
34 10.4
35 10.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-3
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,093.10 meter TYPE OF BORING: ROTARY WASH
EAST: 430,273.92 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-03
GROUND ELEVATION: 3.15 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 21-4-16
DEPTH OF GROUNDWATER TABLE: 2.70 meter RIG #: SIMCO (OEO-814) DATE COMPLETED: 23-4-16
MEASURED AT: 0725 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 Very dense, brown, poorly graded sand with silt & gravel.
36 11.0
37 11.3
38 11.6

D
39 11.9
40 Very dense, brown, silty gravel with sand. 12.2
SPT - 12 >50 12.4 14

BI
41 12.5
42 GM 12.8
43 13.1
44 13.4
45
46
47
SPT - 13 45
R
Dense, brown, silty sand with gravel. 13.7
14.0
14.3
FO
48 14.6
49 14.9
50
SPT - 14 42
Ditto. 15.2
51 15.5
52 15.8
ED

53 16.2
54 16.5
55
SPT - 15 50
Ditto. 16.8
56 17.1
SU

57 17.4
58 17.7
59 18.0
60 SPT - 16 >50
Ditto but very dense. 18.3
61 18.6
IS

62 18.9
63 19.2
64 19.5
65 SPT - 17 >50
Ditto. 19.8
66 20.1
SPT - 18 >50
Ditto. 20.4
67
68 END OF BORING @ 20.45 m. 20.7
69 21.0
70 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-3
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,027.90 meter TYPE OF BORING: ROTARY WASH
EAST: 430,183.11 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-04
GROUND ELEVATION: 3.35 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 24-4-16
DEPTH OF GROUNDWATER TABLE: 2.55 meter RIG #: ACKER MP8 (OEO-808) DATE COMPLETED: 25-4-16
MEASURED AT: 0740 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 Medium dense, brown, silty sand with gravel. 0.3


SPT - 1 27
2 0.6
3 Medium dense, brown, silty clayey gravel with sand. 0.9
SPT - 2 17 14.1 42

D
4 GC-GM 1.2
5 1.5
Ditto.

BI
6 SPT - 3 22 1.8
7 2.1
8 Dense, light brown, silty sand with gravel. 2.4
SPT - 4 41 24.3 33
9 SM 2.7
10
11
12
SPT - 5 >50
R
Ditto but very dense.
3.0
3.4
3.7
FO
13 Very dense, brown, silty gravel with sand. 4.0
SPT - 6 >50
14 4.3
15 4.6
16 SPT - 7 38 11.5 13 Ditto but dense. 4.9
17 5.2
ED

18 GM 5.5
19 5.8
20 6.1
SPT - 8 43
Ditto. 6.4
21
SU

22 6.7
23 7.0
24 7.3
25 7.6
SPT - 9 42
Ditto.
26 7.9
IS

27 8.2
28 8.5
29 8.8
30 9.1
SPT - 10 >50
Ditto but very dense.
31 9.4
32 9.8
33 10.1
34 10.4
35 10.7
GM
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 3
FIGURE A-4
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,027.90 meter TYPE OF BORING: ROTARY WASH
EAST: 430,183.11 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-04
GROUND ELEVATION: 3.35 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 24-4-16
DEPTH OF GROUNDWATER TABLE: 2.55 meter RIG #: ACKER MP8 (OEO-808) DATE COMPLETED: 25-4-16
MEASURED AT: 0740 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 12.7 16 Very dense, brown, silty gravel with sand.
36 11.0
37 11.3
GM
38 11.6

D
39 11.9
40 Very dense, yellowish, silty sand with traces of clay. 12.2
SPT - 12 >50 30.6 32

BI
41 12.5
42 SM 12.8
43 13.1
44 13.4
45
46
47
SPT - 13 >50
R
Ditto. 13.7
14.0
14.3
FO
48 14.6
49 14.9
50
SPT - 14 >50 23.3 26 Very dense, brown, silty sand. 15.2
51 15.5
52 SM 15.8
ED

53 16.2
54 16.5
55
SPT - 15 >50
Ditto. 16.8
56 17.1
SU

57 17.4
58 17.7
59 18.0
60 SPT - 16 >50
Ditto. 18.3
61 18.6
IS

62 18.9
63 19.2
64 19.5
65 SPT - 17 >50
Ditto. 19.8
66 20.1
67 20.4
68 20.7
69 21.0
70 SPT - 18 >50 30.2 25 SM Ditto. 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 3
FIGURE A-4
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,027.90 meter TYPE OF BORING: ROTARY WASH
EAST: 430,183.11 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-04
GROUND ELEVATION: 3.35 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 24-4-16
DEPTH OF GROUNDWATER TABLE: 2.55 meter RIG #: ACKER MP8 (OEO-808) DATE COMPLETED: 25-4-16
MEASURED AT: 0740 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

71 Very dense, brown, silty sand. 21.6


72 21.9
SM
73 22.3

D
74 22.6
75 SPT - 19 >50 Ditto. 22.9

BI
76 23.2
77 23.5
78 23.8
79 24.1
SPT - 20 Very dense, brown, silty sand with gravel.
80
81
82
>50 R 24.4
24.7
25.0
FO
83 25.3
84 25.6
SPT - 21 >50
Ditto.
85 25.9
86 26.2
87 26.5
ED

88 26.8
89 27.1
SPT - 22 >50
Ditto but with gravel.
90 27.4
91 27.7
SU

92 28.0
93 28.3
94 28.7
SPT - 23 >50
Ditto.
95 29.0
96 29.3
IS

97 29.6
98 29.9
99 30.2
SPT - 24 >50
Ditto.
100 30.5
101 END OF BORING @ 30.45 m. 30.8
102 31.1
103 31.4
104 31.7
105 32.0

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 3
FIGURE A-4
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,045.76 meter TYPE OF BORING: ROTARY WASH
EAST: 430,161.77 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-05
GROUND ELEVATION: 3.44 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 23-4-16
DEPTH OF GROUNDWATER TABLE: 2.70 meter RIG #: SIMCO (OEO-812) DATE COMPLETED: 24-4-16
MEASURED AT: 0800 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 Medium dense, brown, silty sand with occasional gravel. 0.3


SPT - 1 30
2 0.6
3 Ditto. 0.9
SPT - 2 20

D
4 1.2
5 1.5
Stiff, brownish grey, sandy lean clay with crystals of

BI
6 SPT - 3 10 18.6 57 1.8
CL anhydrite.
7 2.1
8 Stiff, brown, sandy lean clay. 2.4
SPT - 4 14 14.1 69
9 CL 2.7
10
11
12
SPT - 5 45
R
Dense, light grey, silty clayey gravel with sand.
3.0
3.4
3.7
FO
13 Ditto but brownish grey. 4.0
SPT - 6 32 6.3 13
14 GC-GM 4.3
15 4.6
16 SPT - 7 29
Medium dense, brown, silty sand with gravel. 4.9
17 5.2
ED

18 5.5
19 5.8
20 6.1
SPT - 8 33 17.3 28 Dense, yellowish grey, clayey sand with occasional gravel. 6.4
21
SU

22 6.7
23
SC 7.0
24 7.3
25 7.6
SPT - 9 32
Dense, brown, gravel with silty sand.
26 7.9
IS

27 8.2
28 8.5
29 8.8
30 9.1
SPT - 10 43
Ditto.
31 9.4
32 9.8
33 10.1
34 10.4
35 10.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-5
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,045.76 meter TYPE OF BORING: ROTARY WASH
EAST: 430,161.77 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-05
GROUND ELEVATION: 3.44 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 23-4-16
DEPTH OF GROUNDWATER TABLE: 2.70 meter RIG #: SIMCO (OEO-812) DATE COMPLETED: 24-4-16
MEASURED AT: 0800 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 40 Dense, brown, gravel with silty sand.
36 11.0
37 11.3
38 11.6

D
39 11.9
40 Dense, brownish grey, clayey sand with gravel. 12.2
SPT - 12 35

BI
41 12.5
42 12.8
43 13.1
44 13.4
45
46
47
SPT - 13 41
R
Ditto. 13.7
14.0
14.3
FO
48 14.6
49 14.9
50
SPT - 14 37 14.3 20 Ditto. 15.2
51 15.5
52 SC 15.8
ED

53 16.2
54 16.5
55
SPT - 15 29
Ditto but medium dense. 16.8
56 17.1
SU

57 17.4
58 17.7
59 18.0
60 SPT - 16 28
Ditto. 18.3
61 18.6
IS

62 18.9
63 19.2
64 19.5
65 SPT - 17 34
Ditto but dense. 19.8
66 20.1
SPT - 18 37
Ditto. 20.4
67
68 END OF BORING @ 20.45 m. 20.7
69 21.0
70 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-5
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,010.07 meter TYPE OF BORING: ROTARY WASH
EAST: 430,204.40 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-06
GROUND ELEVATION: 3.45 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 24-4-16
DEPTH OF GROUNDWATER TABLE: 2.70 meter RIG #: SIMCO (OEO-814) DATE COMPLETED: 25-4-16
MEASURED AT: 0810 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 Medium dense, brown, silty sand with gravel. 0.3


SPT - 1 16
2 0.6
3 Ditto but without gravel. 0.9
SPT - 2 23 6.9 36

D
4 SM 1.2
5 1.5
Very stiff, brown, sandy lean clay with occasional gravel.

BI
6 SPT - 3 20 18.3 56 1.8
CL
7 2.1
8 Ditto. 2.4
SPT - 4 21
9 2.7
10
11
12
SPT - 5 46 19.1 33
SC
R
Dense, yellowish grey, clayey sand with gravel.
3.0
3.4
3.7
FO
13 Ditto. 4.0
SPT - 6 36
14 4.3
15 4.6
16 SPT - 7 >50 14.7 28 Ditto but very dense, brownish grey. 4.9
17 5.2
ED

18 SC 5.5
19 5.8
20 6.1
SPT - 8 >50 12.3 32 Very dense, brown, silty clayey sand with gravel. 6.4
21
SU

22 6.7
23
SC-SM 7.0
24 7.3
25 7.6
SPT - 9 >50
Ditto but greyish brown.
26 7.9
IS

27 8.2
28 8.5
29 8.8
30 9.1
SPT - 10 >50
Very dense, yellowish brown, silty sand with gravel.
31 9.4
32 9.8
33 10.1
34 10.4
35 10.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-6
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,010.07 meter TYPE OF BORING: ROTARY WASH
EAST: 430,204.40 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-06
GROUND ELEVATION: 3.45 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 24-4-16
DEPTH OF GROUNDWATER TABLE: 2.70 meter RIG #: SIMCO (OEO-814) DATE COMPLETED: 25-4-16
MEASURED AT: 0810 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 Very dense, brown, clayey silty sand with gravel.
36 11.0
37 11.3
38 11.6

D
39 11.9
40 Very dense, brown, silty sand with gravel & traces of clay. 12.2
SPT - 12 >50 27.8 26

BI
41 12.5
42 SM 12.8
43 13.1
44 13.4
45
46
47
SPT - 13 >50 33.3 36 R
Very dense, brown, silty sand with traces of clay. 13.7
14.0
14.3
FO
SM
48 14.6
49 14.9
50
SPT - 14 >50
Ditto but yellowish grey. 15.2
51 15.5
52 15.8
ED

53 16.2
54 16.5
55
SPT - 15 43
Ditto but dense. 16.8
56 17.1
SU

57 17.4
58 17.7
59 18.0
60 SPT - 16 >50
Ditto but very dense, greyish brown. 18.3
61 18.6
IS

62 18.9
63 19.2
64 19.5
65 SPT - 17 >50
Ditto. 19.8
66 20.1
SPT - 18 >50
Ditto. 20.4
67
68 END OF BORING @ 20.45 m. 20.7
69 21.0
70 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-6
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,234.10 meter TYPE OF BORING: ROTARY WASH
EAST: 430,090.74 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-07
GROUND ELEVATION: 3.21 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 21-4-16
DEPTH OF GROUNDWATER TABLE: 2.50 meter RIG #: ACKER SOILMAX (OEO-690) DATE COMPLETED: 23-4-16
MEASURED AT: 0825 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abdullah
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 Dense, brown, silty sand with occasional gravel. 0.3


SPT - 1 33
2 0.6
3 Ditto but dark brown. 0.9
SPT - 2 32 11.0 19

D
4 SM 1.2
5 1.5
Ditto but medium dense.

BI
6 SPT - 3 30 1.8
7 2.1
8 Ditto. 2.4
SPT - 4 18
9 2.7
10
11
12
SPT - 5 33 22.8 52
CL
R
Hard, dark brown, sandy lean clay.
3.0
3.4
3.7
FO
13 Ditto. 4.0
SPT - 6 34
14 4.3
15 4.6
16 SPT - 7 31 14.6 30 Dense, dark brown, silty sand with occasional gravel. 4.9
17 5.2
ED

18 SM 5.5
19 5.8
20 6.1
SPT - 8 >50
Very dense, dark brown, clayey sand. 6.4
21
SU

22 U-1 11.6 46 Ditto. 6.7


23 7.0
SC
24 7.3
25 7.6
SPT - 9 44 16.8 43 Ditto but dense, brown.
26 7.9
IS

27 8.2
SC 8.5
28
29 8.8
30 9.1
SPT - 10 >50 Ditto but very dense, light grey.
31 9.4
32 9.8
33 10.1
34 10.4
35 10.7
SC
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 3
FIGURE A-7
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,234.10 meter TYPE OF BORING: ROTARY WASH
EAST: 430,090.74 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-07
GROUND ELEVATION: 3.21 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 21-4-16
DEPTH OF GROUNDWATER TABLE: 2.50 meter RIG #: ACKER SOILMAX (OEO-690) DATE COMPLETED: 23-4-16
MEASURED AT: 0825 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abdullah
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 9.9 15 Very dense, light grey, clayey sand with gravel.
36 11.0
37 11.3
SC
38 11.6

D
39 11.9
40 SPT - 12 >50 Ditto. 12.2

BI
41 12.5
42 12.8
43 13.1
44 13.4
45
46
47
SPT - 13 >50 R
Ditto. 13.7
14.0
14.3
FO
48 14.6
49 14.9
50 SPT - 14 >50 Ditto. 15.2
51 15.5
52 15.8
ED

53 16.2
54 16.5
55 SPT - 15 >50 Ditto. 16.8
56 17.1
SU

57 17.4
58 17.7
59 18.0
60 SPT - 16 >50 13.3 13 Very dense, brown, silty gravel with sand. 18.3
61 18.6
IS

62 GM 18.9
63 19.2
64 19.5
65 SPT - 17 >50 Ditto. 19.8
66 20.1
67 20.4
68 20.7
69 21.0
70 SPT - 18 >50 14.6 31 SC Very dense, dark brown,clayey sand with occasional gravel. 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 3
FIGURE A-7
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,234.10 meter TYPE OF BORING: ROTARY WASH
EAST: 430,090.74 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-07
GROUND ELEVATION: 3.21 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 21-4-16
DEPTH OF GROUNDWATER TABLE: 2.50 meter RIG #: ACKER SOILMAX (OEO-690) DATE COMPLETED: 23-4-16
MEASURED AT: 0825 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abdullah
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

71 Very dense, dark brown,clayey sand with occasional gravel. 21.6


72 21.9
SC
73 22.3

D
74 22.6
75 SPT - 19 >50 Very dense, dark brown, silty sand. 22.9

BI
76 23.2
77 23.5
78 23.8
79 24.1
SPT - 20 >50 Ditto.
80
81
82
R 24.4
24.7
25.0
FO
83 25.3
84 25.6
SPT - 21 >50
Ditto but with occasional gravel.
85 25.9
86 26.2
87 26.5
ED

88 26.8
89 27.1
SPT - 22 >50 Ditto.
90 27.4
91 27.7
SU

92 28.0
93 28.3
94 >50 28.7
SPT - 23 Very dense, dark brown, clayey sand with occasional gravel.
95 29.0
96 29.3
IS

97 29.6
98 29.9
99 >50 30.2
SPT - 24 Ditto.
100 30.5
END OF BORING @ 30.10 m.
101 30.8
102 31.1
103 31.4
104 31.7
105 32.0

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 3
FIGURE A-7
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,251.96 meter TYPE OF BORING: ROTARY WASH
EAST: 430,069.39 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-08
GROUND ELEVATION: 3.29 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 20-4-16
DEPTH OF GROUNDWATER TABLE: 2.55 meter RIG #: ACKER SOILMAX (OEO-690) DATE COMPLETED: 21-4-16
MEASURED AT: 0835 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abdullah
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 Dense, brown, silty sand with occasional gravel. 0.3


SPT - 1 35
2 0.6
3 Ditto but dark brown. 0.9
SPT - 2 35

D
4 1.2
5 1.5
Ditto.

BI
6 SPT - 3 36 15.7 15 1.8
SM
7 2.1
8 Ditto. 2.4
SPT - 4 36
9 2.7
10
11
12
SPT - 5 18
R
Medium dense, brown, silty clayey sand.
3.0
3.4
3.7
FO
13 Very stiff, light grey, sandy lean clay. 4.0
SPT - 6 32 17.4 53
14 CL 4.3
15 4.6
16 SPT - 7 37
Ditto but hard. 4.9
17 5.2
ED

18 5.5
19 5.8
20 6.1
U-1 65
Light grey, lean clay with sand & occasional gravel. 6.4
21 16.5
SU

22 6.7
23
CL 7.0
24 7.3
25 7.6
SPT - 8 >50 Very dense, light grey, silty clayey sand with gravel.
26 7.9
IS

27 8.2
28 8.5
29 8.8
30 9.1
SPT - 9 >50 17.0 30 Ditto.
31 9.4
32 9.8
SC-SM
33 10.1
34 10.4
35 10.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-8
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,251.96 meter TYPE OF BORING: ROTARY WASH
EAST: 430,069.39 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-08
GROUND ELEVATION: 3.29 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 20-4-16
DEPTH OF GROUNDWATER TABLE: 2.55 meter RIG #: ACKER SOILMAX (OEO-690) DATE COMPLETED: 21-4-16
MEASURED AT: 0835 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abdullah
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 10 >50 Very dense, light grey, silty clayey sand with gravel.
36 11.0
37 11.3
38 11.6

D
39 11.9
40 SPT - 11 >50 Very dense, dark brown, silty sand with gravel. 12.2

BI
41 12.5
42 12.8
43 13.1
44 13.4
45
46
47
SPT - 12 >50 R
Ditto but light grey. 13.7
14.0
14.3
FO
48 14.6
49 14.9
50 SPT - 13 >50 14.6 11 Very dense, light grey, poorly graded sand with silt. 15.2
51 15.5
52 SP-SM 15.8
ED

53 16.2
54 16.5
55 SPT - 14 >50 Ditto. 16.8
56 17.1
SU

57 17.4
58 17.7
59 18.0
60 SPT - 15 >50 Ditto. 18.3
61 18.6
IS

62 18.9
63 19.2
64 19.5
65 SPT - 16 >50 Ditto. 19.8
66 20.1
SPT - 17 >50 Ditto.
67 20.4
END OF BORING @ 20.12 m.
68 20.7
69 21.0
70 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-8
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,216.27 meter TYPE OF BORING: ROTARY WASH
EAST: 430,112.02 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-09
GROUND ELEVATION: 3.29 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 23-4-16
DEPTH OF GROUNDWATER TABLE: 2.60 meter RIG #: ACKER SOILMAX (OEO-690) DATE COMPLETED: 24-4-16
MEASURED AT: 0850 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 Medium dense, brown, silty sand with gravel. 0.3


SPT - 1 25
2 0.6
3 Ditto. 0.9
SPT - 2 28

D
4 1.2
5 1.5
Ditto but greyish brown.

BI
6 SPT - 3 24 10.5 14 1.8
SM
7 2.1
8 Ditto. 2.4
SPT - 4 29
9 2.7
10
11
12
SPT - 5 20 14.8 29
SM
R
Medium dense, brown, silty sand.
3.0
3.4
3.7
FO
13 Very stiff, brown, sandy lean clay. 4.0
SPT - 6 17
14 4.3
15 4.6
SPT - 7 43 13.5 55 Ditto but hard. 4.9
16 CL
17 5.2
Ditto but brownish grey.
ED

U-1 15.5 65 5.5


18
CL
19 5.8
20 6.1
SPT - 8 42
Very dense, yellowish brown, gravel with sand. 6.4
21
SU

22 6.7
23 7.0
24 7.3
25 7.6
SPT - 9 >50 17.5 20 Very dense, yellowish grey, silty sand.
26 7.9
IS

27 8.2
SM 8.5
28
29 8.8
30 9.1
SPT - 10 >50
Ditto but greyish brown.
31 9.4
32 9.8
33 10.1
34 10.4
35 10.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-9
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,216.27 meter TYPE OF BORING: ROTARY WASH
EAST: 430,112.02 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-09
GROUND ELEVATION: 3.29 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 23-4-16
DEPTH OF GROUNDWATER TABLE: 2.60 meter RIG #: ACKER SOILMAX (OEO-690) DATE COMPLETED: 24-4-16
MEASURED AT: 0850 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 Very dense, greyish brown, silty sand with gravel.
36 11.0
37 11.3
38 11.6

D
39 11.9
40 Very dense, brown, gravel with silty sand. 12.2
SPT - 12 >50

BI
41 12.5
42 12.8
43 13.1
44 13.4
45
46
47
SPT - 13 >50 17.2 17 R
Very dense, brown, silty sand. 13.7
14.0
14.3
FO
SM
48 14.6
49 14.9
50 SPT - 14 >50 Ditto but with gravel. 15.2
51 15.5
52 15.8
ED

53 16.2
54 16.5
55 SPT - 15 >50 Ditto. 16.8
56 17.1
SU

57 17.4
58 17.7
59 18.0
60 SPT - 16 >50
Ditto. 18.3
61 18.6
IS

62 18.9
63 19.2
64 19.5
65 SPT - 17 >50 Ditto. 19.8
66 20.1
SPT - 18 >50 Ditto.
67 20.4
68 END OF BORING @ 20.45 m. 20.7
69 21.0
70 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-9
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,917.10 meter TYPE OF BORING: ROTARY WASH
EAST: 430,090.35 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-10
GROUND ELEVATION: 4.19 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 30-4-16
DEPTH OF GROUNDWATER TABLE: 4.10 meter RIG #: SIMCO (OEO-812) DATE COMPLETED: 30-4-16
MEASURED AT: 1048 HOURS ON: 22-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 Medium dense, brown, silty sand with gravel. 0.3


SPT - 1 24 1.2 17 SM
2 0.6
3 Ditto but dense. 0.9
SPT - 2 32

D
4 1.2
5 1.5
Dense, brown, silty gravel with sand.

BI
6 SPT - 3 38 10.8 16 1.8
GM
7 2.1
8 Ditto. 2.4
SPT - 4 43
9 2.7
10
11
12
SPT - 5 44
R
Ditto.
3.0
3.4
3.7
FO
13 Ditto. 4.0
SPT - 6 44
14 4.3
15 4.6
16 SPT - 7 >50 7.0 10 Very dense, brown, poorly graded gravel with silt & sand. 4.9
17 5.2
ED

18 GP-GM 5.5
19 5.8
20 6.1
SPT - 8 50
Ditto but dense. 6.4
21
SU

22 6.7
23 7.0
24 7.3
25 7.6
SPT - 9 46
Ditto.
26 7.9
IS

27 8.2
28 8.5
29 8.8
30 9.1
SPT - 10 46 8.5 15 Dense, brown, silty gravel with sand.
31 9.4
32 9.8
GM
33 10.1
34 10.4
35 10.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 3
FIGURE A-10
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,917.10 meter TYPE OF BORING: ROTARY WASH
EAST: 430,090.35 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-10
GROUND ELEVATION: 4.19 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 30-4-16
DEPTH OF GROUNDWATER TABLE: 4.10 meter RIG #: SIMCO (OEO-812) DATE COMPLETED: 30-4-16
MEASURED AT: 1048 HOURS ON: 22-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 43 Dense, brown, silty sand with gravel.
36 11.0
37 11.3
38 11.6

D
39 11.9
40 Ditto. 12.2
SPT - 12 43

BI
41 12.5
42 12.8
43 13.1
44 13.4
45
46
47
SPT - 13 40 11.0 25 R
Dense, brown, silty clayey sand with gravel. 13.7
14.0
14.3
FO
SC-SM
48 14.6
49 14.9
50
SPT - 14 47
Ditto. 15.2
51 15.5
52 15.8
ED

53 16.2
54 16.5
55
SPT - 15 47 11.3 17 Ditto but dark brown. 16.8
56 17.1
SU

57 SC-SM 17.4
58 17.7
59 18.0
60 SPT - 16 46
Dense, dark brown, silty sand with occasional gravel. 18.3
61 18.6
IS

62 18.9
63 19.2
64 19.5
65 SPT - 17 >50
Ditto but very dense. 19.8
66 20.1
67 20.4
68 20.7
69 21.0
70 SPT - 18 50
Ditto but dense. 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 3
FIGURE A-10
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,917.10 meter TYPE OF BORING: ROTARY WASH
EAST: 430,090.35 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-10
GROUND ELEVATION: 4.19 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 30-4-16
DEPTH OF GROUNDWATER TABLE: 4.10 meter RIG #: SIMCO (OEO-812) DATE COMPLETED: 30-4-16
MEASURED AT: 1048 HOURS ON: 22-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

71 Dense, dark brown, silty sand with occasional gravel. 21.6


72 21.9
73 22.3

D
74 22.6
75 SPT - 19 >50 Ditto but very dense. 22.9

BI
76 23.2
77 23.5
78 23.8
79 24.1
SPT - 20 Ditto but dense.
80
81
82
46 R 24.4
24.7
25.0
FO
83 25.3
84 25.6
SPT - 21 >50 17.2 46 Very dense, light brown, silty sand with gravel.
85 25.9
86 26.2
SM 26.5
87
ED

88 26.8
89 27.1
SPT - 22 >50
Ditto.
90 27.4
91 27.7
SU

92 28.0
93 28.3
94 28.7
SPT - 23 48
Ditto but dense.
95 29.0
96 29.3
IS

97 29.6
98 29.9
99 30.2
SPT - 24 >50
Ditto but very dense.
100 30.5
101 END OF BORING @ 30.45 m. 30.8
102 31.1
103 31.4
104 31.7
105 32.0

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 3
FIGURE A-10
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,934.97 meter TYPE OF BORING: ROTARY WASH
EAST: 430,069.00 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-11
GROUND ELEVATION: 4.24 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 24-4-16
DEPTH OF GROUNDWATER TABLE: 3.50 meter RIG #: SIMCO (OEO-812) DATE COMPLETED: 25-4-16
MEASURED AT: 0915 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 Medium dense, brown, silty sand with gravel. 0.3


SPT - 1 24
2 0.6
3 Ditto but dense. 0.9
SPT - 2 33

D
4 1.2
5 1.5
Ditto.

BI
6 SPT - 3 42 12.3 20 1.8
SM
7 2.1
8 Ditto but very dense. 2.4
SPT - 4 >50
9 2.7
10
11
12
SPT - 5 47 8.0 20
SM
R
Ditto but dense.
3.0
3.4
3.7
FO
13 Dense, yellowish grey, gravel with silty sand. 4.0
SPT - 6 49
14 4.3
15 4.6
16 SPT - 7 >50
Ditto but very dense. 4.9
17 5.2
ED

18 5.5
19 5.8
20 6.1
SPT - 8 >50
Ditto. 6.4
21
SU

22 6.7
23 7.0
24 7.3
25 7.6
SPT - 9 44 9.1 22 Dense, yellowish brown, silty sand with gravel.
26 7.9
IS

27 8.2
SM 8.5
28
29 8.8
30 9.1
SPT - 10 40
Ditto.
31 9.4
32 9.8
33 10.1
34 10.4
35 10.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-11
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,934.97 meter TYPE OF BORING: ROTARY WASH
EAST: 430,069.00 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-11
GROUND ELEVATION: 4.24 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 24-4-16
DEPTH OF GROUNDWATER TABLE: 3.50 meter RIG #: SIMCO (OEO-812) DATE COMPLETED: 25-4-16
MEASURED AT: 0915 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 37 Dense, yellowish brown, silty sand with gravel.
36 11.0
37 11.3
38 11.6

D
39 11.9
40 Dense, brown, silty clayey sand with gravel. 12.2
SPT - 12 34 20.7 27

BI
41 12.5
42 SC-SM 12.8
43 13.1
44 13.4
45
46
47
SPT - 13 48
R
Dense, brown, silty sand with gravel. 13.7
14.0
14.3
FO
48 14.6
49 14.9
50
SPT - 14 >50
Ditto but very dense. 15.2
51 15.5
52 15.8
ED

53 16.2
54 16.5
55
SPT - 15 >50
Ditto. 16.8
56 17.1
SU

57 17.4
58 17.7
59 18.0
60 SPT - 16 50
Ditto but dense. 18.3
61 18.6
IS

62 18.9
63 19.2
64 19.5
65 SPT - 17 42
Ditto. 19.8
66 20.1
SPT - 18 48
Ditto. 20.4
67
68 END OF BORING @ 20.45 m. 20.7
69 21.0
70 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-11
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,899.27 meter TYPE OF BORING: ROTARY WASH
EAST: 430,111.63 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-12
GROUND ELEVATION: 4.46 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 30-4-16
DEPTH OF GROUNDWATER TABLE: 3.65 meter RIG #: SIMCO (OEO-812) DATE COMPLETED: 30-4-16
MEASURED AT: 0925 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 Medium dense, brown, silty sand with gravel. 0.3


SPT - 1 28
2 0.6
3 Ditto. 0.9
SPT - 2 26 1.3 19

D
4 SM 1.2
5 1.5
Ditto.

BI
6 SPT - 3 29 1.8
7 2.1
8 Ditto. 2.4
SPT - 4 19 8.2 17
9 SM 2.7
10
11
12
SPT - 5 28
R
Ditto.
3.0
3.4
3.7
FO
13 Ditto. 4.0
SPT - 6 20
14 4.3
15 4.6
16 SPT - 7 49 6.0 12 Dense, brown, well graded gravel with silt & sand. 4.9
17 5.2
ED

18 GW-GM 5.5
19 5.8
20 6.1
SPT - 8 >50
Ditto but very dense. 6.4
21
SU

22 6.7
23 7.0
24 7.3
25 7.6
SPT - 9 >50
Ditto.
26 7.9
IS

27 8.2
28 8.5
29 8.8
30 9.1
SPT - 10 >50
Ditto.
31 9.4
32 9.8
33 10.1
34 10.4
35 10.7
SM
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-12
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,899.27 meter TYPE OF BORING: ROTARY WASH
EAST: 430,111.63 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-12
GROUND ELEVATION: 4.46 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 30-4-16
DEPTH OF GROUNDWATER TABLE: 3.65 meter RIG #: SIMCO (OEO-812) DATE COMPLETED: 30-4-16
MEASURED AT: 0925 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 10.1 16 Very dense, brown, silty sand with gravel.
36 11.0
37 11.3
SM
38 11.6

D
39 11.9
40 Ditto. 12.2
SPT - 12 >50

BI
41 12.5
42 12.8
43 13.1
44 13.4
45
46
47
SPT - 13 >50
R
Ditto. 13.7
14.0
14.3
FO
48 14.6
49 14.9
50
SPT - 14 >50 13.7 11 Very dense, brown, well graded gravel with silt & sand. 15.2
51 15.5
52 GW-GM 15.8
ED

53 16.2
54 16.5
55
SPT - 15 >50
Ditto. 16.8
56 17.1
SU

57 17.4
58 17.7
59 18.0
60 SPT - 16 >50
Ditto. 18.3
61 18.6
IS

62 18.9
63 19.2
64 19.5
65 SPT - 17 >50
Ditto. 19.8
66 20.1
SPT - 18 >50
Ditto. 20.4
67
68 END OF BORING @ 20.45 m. 20.7
69 21.0
70 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-12
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,834.07 meter TYPE OF BORING: ROTARY WASH
EAST: 430,020.83 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-13
GROUND ELEVATION: 4.13 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 26-4-16
DEPTH OF GROUNDWATER TABLE: 3.50 meter RIG #: ACKER SOILMAX (OEO-690) DATE COMPLETED: 27-4-16
MEASURED AT: 0935 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 Medium dense, brown, silty sand with gravel. 0.3


SPT - 1 28 0.7 16 SM
2 0.6
3 Ditto. 0.9
SPT - 2 19

D
4 1.2
5 1.5
Very dense, yellowish brown, silty gravel with sand.

BI
6 SPT - 3 >50 8.7 18 1.8
GM
7 2.1
8 Ditto. 2.4
SPT - 4 >50
9 2.7
10
11
12
SPT - 5 >50
R
Ditto.
3.0
3.4
3.7
FO
13 SPT - 6 >50 13.0 16 Ditto but greyish brown. 4.0
14 GM 4.3
15 4.6
16
SPT - 7 >50 Ditto. 4.9
17 5.2
ED

18 5.5
19 5.8
20 6.1
SPT - 8 >50 Ditto. 6.4
21
SU

22 6.7
23 7.0
24 7.3
25 7.6
SPT - 9 >50 13.5 39 Very dense, brown, silty clayey sand with gravel.
26 7.9
IS

27 8.2
SC-SM 8.5
28
29 8.8
30 9.1
SPT - 10 >50 Ditto.
31 9.4
32 9.8
33 10.1
34 10.4
35 >50 13.1 44 10.7
SC-SM
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 3
FIGURE A-13
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,834.07 meter TYPE OF BORING: ROTARY WASH
EAST: 430,020.83 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-13
GROUND ELEVATION: 4.13 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 26-4-16
DEPTH OF GROUNDWATER TABLE: 3.50 meter RIG #: ACKER SOILMAX (OEO-690) DATE COMPLETED: 27-4-16
MEASURED AT: 0935 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 Very dense, brown, silty clayey sand with occasional gravel.
36 11.0
37 11.3
SC-SM
38 11.6

D
39 11.9
40 SPT - 12 >50 Very dense, brown, well graded sand with silt & gravel. 12.2

BI
41 12.5
42 12.8
43 13.1
44 13.4
45
46
47
SPT - 13 >50 R
Ditto. 13.7
14.0
14.3
FO
48 14.6
49 14.9
50 SPT - 14 >50 20.2 08 Ditto. 15.2
51 15.5
52 SW-SM 15.8
ED

53 16.2
54 16.5
55 SPT - 15 >50 Ditto. 16.8
56 17.1
SU

57 17.4
58 17.7
59 18.0
60 SPT - 16 >50 Ditto. 18.3
61 18.6
IS

62 18.9
63 19.2
64 19.5
65 SPT - 17 >50 Ditto. 19.8
66 20.1
67 20.4
68 20.7
69 21.0
70 SPT - 18 >50 Ditto. 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 3
FIGURE A-13
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,834.07 meter TYPE OF BORING: ROTARY WASH
EAST: 430,020.83 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-13
GROUND ELEVATION: 4.13 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 26-4-16
DEPTH OF GROUNDWATER TABLE: 3.50 meter RIG #: ACKER SOILMAX (OEO-690) DATE COMPLETED: 27-4-16
MEASURED AT: 0935 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

71 Very dense, brown, well graded sand with silt & gravel. 21.6
72 21.9
73 22.3

D
74 22.6
SPT - 19 >50 Ditto.
75 22.9

BI
76 23.2
77 23.5
78 23.8
79 24.1
SPT - 20 >50 19.0 41 Very dense, brownish grey, silty clayey sand.
80
81
82
SC-SM
R 24.4
24.7
25.0
FO
83 25.3
84 25.6
SPT - 21 >50 20.0 41 Ditto but brown with occasional gravel.
85 25.9
86 26.2
SC-SM 26.5
87
ED

88 26.8
89 27.1
SPT - 22 >50 Ditto.
90 27.4
91 27.7
SU

92 28.0
93 28.3
94 28.7
SPT - 23 >50 Ditto.
95 29.0
96 29.3
IS

97 29.6
98 29.9
99 >50 30.2
SPT - 24 Ditto but brownish grey.
100 30.5
END OF BORING @ 30.14 m.
101 30.8
102 31.1
103 31.4
104 31.7
105 32.0

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 3
FIGURE A-13
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,851.93 meter TYPE OF BORING: ROTARY WASH
EAST: 429,999.48 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-14
GROUND ELEVATION: 3.93 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 24-4-16
DEPTH OF GROUNDWATER TABLE: 3.15 meter RIG #: ACKER SOILMAX (OEO-690) DATE COMPLETED: 25-4-16
MEASURED AT: 0950 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 Medium dense, brown, silty sand with gravel. 0.3


SPT - 1 18 3.3 22 SM
2 0.6
3 Ditto. 0.9
SPT - 2 20

D
4 1.2
5 1.5
Ditto but dense.

BI
6 SPT - 3 49 16.5 16 1.8
SM
7 2.1
8 Very dense, greyish brown, silty clayey sand with gravel. 2.4
SPT - 4 >50
9 2.7
10
11
12
SPT - 5 >50
R
Ditto.
3.0
3.4
3.7
FO
13 Ditto. 4.0
SPT - 6 >50 11.6 35
14 SC-SM 4.3
15 4.6
16 SPT - 7 >50
Very dense, greyish brown, well graded gravel with silt & 4.9
sand.
17 5.2
ED

18 5.5
19 5.8
20 6.1
SPT - 8 >50 Ditto. 6.4
21
SU

22 6.7
23 7.0
24 7.3
25 7.6
SPT - 9 >50 Ditto.
26 7.9
IS

27 8.2
28 8.5
29 8.8
30 9.1
SPT - 10 >50 9.7 08 Ditto.
31 9.4
32 9.8
GW-GM
33 10.1
34 10.4
35 10.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-14
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,851.93 meter TYPE OF BORING: ROTARY WASH
EAST: 429,999.48 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-14
GROUND ELEVATION: 3.93 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 24-4-16
DEPTH OF GROUNDWATER TABLE: 3.15 meter RIG #: ACKER SOILMAX (OEO-690) DATE COMPLETED: 25-4-16
MEASURED AT: 0950 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 40 Dense, brown, well graded gravel with silt & sand.
36 11.0
37 11.3
38 11.6

D
39 11.9
40 Dense, brown, clayey gravel with sand. 12.2
SPT - 12 37 17.5 41

BI
41 12.5
42 GC 12.8
43 13.1
44 13.4
45
46
47
SPT - 13 >50
R
Very dense, greyish brown, clayey silty sand with gravel. 13.7
14.0
14.3
FO
48 14.6
49 14.9
50 SPT - 14 >50 Very dense, brown, gravel with silty sand. 15.2
51 15.5
52 15.8
ED

53 16.2
54 16.5
55 SPT - 15 >50 9.5 18 Very dense, brown, silty sand with gravel. 16.8
56 17.1
SU

57 SM 17.4
58 17.7
59 18.0
60 SPT - 16 >50 Ditto. 18.3
61 18.6
IS

62 18.9
63 19.2
64 19.5
65 SPT - 17 >50 Ditto. 19.8
66 20.1
SPT - 18 >50 Ditto. 20.4
67
END OF BORING @ 20.23 m.
68 20.7
69 21.0
70 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-14
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,816.23 meter TYPE OF BORING: ROTARY WASH
EAST: 430,042.11 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-15
GROUND ELEVATION: 4.12 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 26-4-16
DEPTH OF GROUNDWATER TABLE: 3.45 meter RIG #: SIMCO (OEO-814) DATE COMPLETED: 27-4-16
MEASURED AT: 1000 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 Medium dense, brown, silty sand with occasional gravel. 0.3


SPT - 1 18
2 0.6
3 Ditto. 0.9
SPT - 2 22

D
4 1.2
5 1.5
Very dense, greyish brown, silty gravel with sand.

BI
6 SPT - 3 >50 14.2 22 1.8
GM
7 2.1
8 Ditto. 2.4
SPT - 4 >50
9 2.7
10
11
12
SPT - 5 50
R
Ditto but dense, brown.
3.0
3.4
3.7
FO
13 Ditto. 4.0
SPT - 6 46 15.7 15
14 GM 4.3
15 4.6
16 SPT - 7 >50
Ditto but very dense. 4.9
17 5.2
ED

18 5.5
19 5.8
20 6.1
SPT - 8 >50 13.6 11 Very dense, brown, poorly graded gravel with silt & sand. 6.4
21
SU

22 6.7
23
GP-GM 7.0
24 7.3
25 7.6
SPT - 9 >50 12.3 18 Very dense, brown, silty gravel with sand.
26 7.9
IS

27 8.2
GM 8.5
28
29 8.8
30 9.1
SPT - 10 >50
Hard, brown, sandy silty clay.
31 9.4
32 9.8
33 10.1
34 10.4
35 10.7
CL-ML
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-15
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,816.23 meter TYPE OF BORING: ROTARY WASH
EAST: 430,042.11 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-15
GROUND ELEVATION: 4.12 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 26-4-16
DEPTH OF GROUNDWATER TABLE: 3.45 meter RIG #: SIMCO (OEO-814) DATE COMPLETED: 27-4-16
MEASURED AT: 1000 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 21.0 53 Hard, brown, sandy silty clay.
36 11.0
37 11.3
CL-ML
38 11.6

D
39 11.9
40 Ditto. 12.2
SPT - 12 >50

BI
41 12.5
42 12.8
43 13.1
44 13.4
45
46
47
SPT - 13 >50 17.3 50 R
Hard, brown, sandy silt. 13.7
14.0
14.3
FO
ML
48 14.6
49 14.9
50
SPT - 14 >50
Ditto but yellowish. 15.2
51 15.5
52 15.8
ED

53 16.2
54 16.5
55
SPT - 15 >50 11.1 11 Very dense, brown, well graded gravel with silt & sand. 16.8
56 17.1
SU

57 GW-GM 17.4
58 17.7
59 18.0
60 SPT - 16 >50 Very dense, brown, silty sand with gravel. 18.3
61 18.6
IS

62 18.9
63 19.2
64 19.5
65 SPT - 17 >50 Very dense, brown, gravel with silty sand. 19.8
66 20.1
SPT - 18 >50 Ditto. 20.4
67
END OF BORING @ 20.26 m.
68 20.7
69 21.0
70 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-15
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,137.99 meter TYPE OF BORING: ROTARY WASH
EAST: 430,010.27 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-16
GROUND ELEVATION: 3.15 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 23-4-16
DEPTH OF GROUNDWATER TABLE: 2.45 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 24-4-16
MEASURED AT: 1010 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 Very stiff, brown, sandy lean clay. 0.3


SPT - 1 18
2 0.6
3 Ditto but stiff. 0.9
SPT - 2 11 25.1 55

D
4 CL 1.2
5 1.5
Ditto.

BI
6 SPT - 3 13 17.4 52 1.8
CL
7 2.1
8 Ditto. 2.4
SPT - 4 13 15.7 55
9 CL 2.7
10
11
12
U-1 14.3 48
SC-SM
R
Light grey, silty clayey sand.
3.0
3.4
3.7
FO
13 Dito but dense, greyish brown. 4.0
SPT - 5 31 15.9 48
14 SC-SM 4.3
15 4.6
16
SPT - 6 >50 12.8 17 Very dense, brown, silty sand with gravel. 4.9
17 5.2
ED

18 SM 5.5
19 5.8
20 6.1
SPT - 7 48
Ditto but dense. 6.4
21
SU

22 6.7
23 7.0
24 7.3
25 7.6
SPT - 8 >50
Ditto but very dense.
26 7.9
IS

27 8.2
28 8.5
29 8.8
30 9.1
SPT - 9 >50
Ditto.
31 9.4
32 9.8
33 10.1
34 10.4
35 10.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 3
FIGURE A-16
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,137.99 meter TYPE OF BORING: ROTARY WASH
EAST: 430,010.27 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-16
GROUND ELEVATION: 3.15 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 23-4-16
DEPTH OF GROUNDWATER TABLE: 2.45 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 24-4-16
MEASURED AT: 1010 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 10 >50 Very dense, brown, silty sand with gravel.
36 11.0
37 11.3
38 11.6

D
39 11.9
40 Dense, brown, silty sand with occasional gravel. 12.2
SPT - 11 46 15.0 19

BI
41 12.5
42 SM 12.8
43 13.1
44 13.4
45
46
47
SPT - 12 47
R
Ditto. 13.7
14.0
14.3
FO
48 14.6
49 14.9
50
SPT - 13 41
Ditto. 15.2
51 15.5
52 15.8
ED

53 16.2
54 16.5
55
SPT - 14 46
Ditto. 16.8
56 17.1
SU

57 17.4
58 17.7
59 18.0
60 SPT - 15 >50 Very dense, brown, poorly graded sand with silt & gravel. 18.3
61 18.6
IS

62 18.9
63 19.2
64 19.5
65 SPT - 16 >50 37.7 12 Ditto but brownish grey. 19.8
66 20.1
67 SP-SM 20.4
68 20.7
69 21.0
70 SPT - 17 >50 20.5 31 SM Very dense, brownish grey, silty sand with traces of clay. 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 3
FIGURE A-16
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,137.99 meter TYPE OF BORING: ROTARY WASH
EAST: 430,010.27 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-16
GROUND ELEVATION: 3.15 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 23-4-16
DEPTH OF GROUNDWATER TABLE: 2.45 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 24-4-16
MEASURED AT: 1010 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

71 Very dense, brownish grey, silty sand with traces of clay. 21.6
72 21.9
SM
73 22.3

D
74 22.6
75 SPT - 18 >50 Very dense, brown, silty sand with gravel. 22.9

BI
76 23.2
77 23.5
78 23.8
79 24.1
SPT - 19 Ditto.
80
81
82
>50 R 24.4
24.7
25.0
FO
83 25.3
84 25.6
SPT - 20 >50 Ditto but greyish brown.
85 25.9
86 26.2
87 26.5
ED

88 26.8
89 27.1
SPT - 21 >50 Ditto.
90 27.4
91 27.7
SU

92 28.0
93 28.3
94 28.7
SPT - 22 >50 Ditto.
95 29.0
96 29.3
IS

97 29.6
98 29.9
99 30.2
SPT - 23 >50 Ditto.
100 30.5
END OF BORING @ 30.28 m.
101 30.8
102 31.1
103 31.4
104 31.7
105 32.0

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 3
FIGURE A-16
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,155.85 meter TYPE OF BORING: ROTARY WASH
EAST: 429,988.92 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-17
GROUND ELEVATION: 3.21 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 21-4-16
DEPTH OF GROUNDWATER TABLE: 2.60 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 23-4-16
MEASURED AT: 1025 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 Medium dense, brown, silty sand with gravel. 0.3


SPT - 1 20
2 0.6
3 Very stiff, brown, lean clay with sand. 0.9
SPT - 2 17

D
4 1.2
5 1.5
Ditto but stiff.

BI
6 SPT - 3 12 23.4 79 1.8
CL
7 2.1
8 Stiff, brown, sandy lean clay. 2.4
SPT - 4 15 18.6 65
9 CL 2.7
10
11
12
SPT - 5 28 20.1 44
SC
R
Medium dense, yellowish brown, clayey sand with
occasional gravel.
3.0
3.4
3.7
FO
13 Medium dense, yellowish brown, silty clayey sand with 4.0
SPT - 6 26 19.2 42
14 SC-SM gravel. 4.3
15 4.6
16 SPT - 7 48 10.4 23 Dense, grey, silty clayey gravel with sand. 4.9
17 5.2
ED

18 GC-GM 5.5
19 5.8
20 6.1
SPT - 8 39
Ditto. 6.4
21
SU

22 6.7
23 7.0
24 7.3
25 7.6
SPT - 9 >50 6.7 08 Very dense, brown, poorly graded gravel with silt & sand.
26 7.9
IS

27 8.2
GP-GM 8.5
28
29 8.8
30 9.1
SPT - 10 50
Ditto but dense.
31 9.4
32 9.8
33 10.1
34 10.4
35 10.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-17
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,155.85 meter TYPE OF BORING: ROTARY WASH
EAST: 429,988.92 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-17
GROUND ELEVATION: 3.21 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 21-4-16
DEPTH OF GROUNDWATER TABLE: 2.60 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 23-4-16
MEASURED AT: 1025 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 Very dense, brown, poorly graded gravel with silt & sand.
36 11.0
37 11.3
38 11.6

D
39 11.9
40 Ditto but brownish grey. 12.2
SPT - 12 >50

BI
41 12.5
42 12.8
43 13.1
44 13.4
45
46
47
SPT - 13 >50
R
Ditto. 13.7
14.0
14.3
FO
48 14.6
49 14.9
50
SPT - 14 45 15.4 17 Dense, brown, silty sand with gravel. 15.2
51 15.5
52 SM 15.8
ED

53 16.2
54 16.5
55
SPT - 15 47
Ditto. 16.8
56 17.1
SU

57 17.4
58 17.7
59 18.0
60 SPT - 16 >50 27.7 53 Hard, light grey, sandy silt. 18.3
61 18.6
IS

62 ML 18.9
63 19.2
64 19.5
65 SPT - 17 >50 Ditto but light brown. 19.8
66 20.1
SPT - 18 >50 Ditto.
67 20.4
END OF BORING @ 20.19 m.
68 20.7
69 21.0
70 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-17
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,120.16 meter TYPE OF BORING: ROTARY WASH
EAST: 430,031.55 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-18
GROUND ELEVATION: 3.27 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 24-4-16
DEPTH OF GROUNDWATER TABLE: 2.55 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 25-4-16
MEASURED AT: 1035 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 Loose, brown, silty sand with occasional gravel. 0.3


SPT - 1 09
2 0.6
3 Ditto but medium dense. 0.9
SPT - 2 11

D
4 1.2
5 1.5
Stiff, brown, sandy lean clay with occasional gravel.

BI
6 SPT - 3 12 18.7 50 1.8
CL
7 2.1
8 Medium dense, brown, clayey sand with occasional gravel. 2.4
SPT - 4 13 14.2 43
9 SC 2.7
10
11
12
SPT - 5 24 12.1 20
GC-GM
R
Medium dense, light grey, silty clayey gravel with sand.
3.0
3.4
3.7
FO
13 Ditto. 4.0
SPT - 6 22
14 4.3
15 4.6
16 SPT - 7 >50 Ditto but very dense, yellowish brown. 4.9
17 5.2
ED

18 5.5
19 5.8
20 6.1
SPT - 8 >50
Ditto. 6.4
21
SU

22 6.7
23 7.0
24 7.3
25 7.6
SPT - 9 >50 16.0 24 Very dense, greyish brown, silty clayey sand with gravel.
26 7.9
IS

27 8.2
SC-SM 8.5
28
29 8.8
30 9.1
SPT - 10 >50
Ditto.
31 9.4
32 9.8
33 10.1
34 10.4
35 10.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-18
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,120.16 meter TYPE OF BORING: ROTARY WASH
EAST: 430,031.55 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-18
GROUND ELEVATION: 3.27 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 24-4-16
DEPTH OF GROUNDWATER TABLE: 2.55 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 25-4-16
MEASURED AT: 1035 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 Very dense, brown, gravel with clayey silty sand.
36 11.0
37 11.3
38 11.6

D
39 11.9
40 Ditto. 12.2
SPT - 12 >50

BI
41 12.5
42 12.8
43 13.1
44 13.4
45
46
47
SPT - 13 >50
R
Very dense, brown, poorly graded sand with silt & gravel. 13.7
14.0
14.3
FO
48 14.6
49 14.9
50
SPT - 14 >50
Ditto. 15.2
51 15.5
52 15.8
ED

53 16.2
54 16.5
55
SPT - 15 >50 26.6 51 Hard, brown, sandy silt. 16.8
56 17.1
SU

57 ML 17.4
58 17.7
59 18.0
60 SPT - 16 >50
Ditto. 18.3
61 18.6
IS

62 18.9
63 19.2
64 19.5
65 SPT - 17 >50 13.1 37 Very dense, greyish brown, silty sand with occasional gravel 19.8
SM
66
& traces of clay. 20.1
67
SPT - 18 >50 Ditto. 20.4
END OF BORING @ 20.27 m.
68 20.7
69 21.0
70 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-18
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,591.85 meter TYPE OF BORING: ROTARY WASH
EAST: 429,640.08 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-19
GROUND ELEVATION: 4.94 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 16-4-16
DEPTH OF GROUNDWATER TABLE: 4.20 meter RIG #: ACKER SOILMAX (OEO-690) DATE COMPLETED: 18-4-16
MEASURED AT: 1045 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 Dense, grey, silty sand. 0.3


SPT - 1 31 14.8 15 SM
2 0.6
3 Ditto but medium dense. 0.9
SPT - 2 17

D
4 1.2
5 1.5
Dense, grey, clayey sand with gravel.

BI
6 SPT - 3 40 21.4 31 1.8
SC
7 2.1
8 Dense, grey, gravel with silty clay. 2.4
SPT - 4 48
9 2.7
10
11
12
SPT - 5 37 16.8 32
SM
R
Dense, brown, silty clayey sand with occasional gravel.
3.0
3.4
3.7
FO
13 Ditto. 4.0
SPT - 6 43
14 4.3
15 4.6
16 SPT - 7 >50 14.0 24 Very dense, brown, silty clayey sand with gravel. 4.9
17 5.2
ED

18 SC-SM 5.5
19 5.8
20 6.1
SPT - 8 45
Ditto but dense. 6.4
21
SU

22 6.7
23 7.0
24 7.3
25 7.6
SPT - 9 >50
Ditto but very dense.
26 7.9
IS

27 8.2
28 8.5
29 8.8
30 9.1
SPT - 10 >50
Ditto.
31 9.4
32 9.8
33 10.1
34 10.4
35 10.7
SC
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 3
FIGURE A-19
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,591.85 meter TYPE OF BORING: ROTARY WASH
EAST: 429,640.08 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-19
GROUND ELEVATION: 4.94 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 16-4-16
DEPTH OF GROUNDWATER TABLE: 4.20 meter RIG #: ACKER SOILMAX (OEO-690) DATE COMPLETED: 18-4-16
MEASURED AT: 1045 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 16.9 18 Very dense, brown, clayey sand with gravel.
36 11.0
37 11.3
SC
38 11.6

D
39 11.9
40 Very dense, brown, silty sand with gravel. 12.2
SPT - 12 >50 15.6 13

BI
41 12.5
42 SM 12.8
43 13.1
44 13.4
45
46
47
SPT - 13 >50
R
Ditto. 13.7
14.0
14.3
FO
48 14.6
49 14.9
50
SPT - 14 >50 16.3 19 Very dense, brown, silty clayey sand with gravel. 15.2
51 15.5
52 SC-SM 15.8
ED

53 16.2
54 16.5
55
SPT - 15 49
Ditto but dense. 16.8
56 17.1
SU

57 17.4
58 17.7
59 18.0
60 SPT - 16 32 22.8 76 Very stiff, brown, lean clay with sand. 18.3
61 18.6
IS

62 CL 18.9
63 19.2
64 19.5
65 SPT - 17 40
Dense, brown, clayey sand with gravel. 19.8
66 20.1
67 20.4
68 20.7
69 21.0
70 SPT - 18 48 18.7 48 SC Ditto. 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 3
FIGURE A-19
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,591.85 meter TYPE OF BORING: ROTARY WASH
EAST: 429,640.08 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-19
GROUND ELEVATION: 4.94 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 16-4-16
DEPTH OF GROUNDWATER TABLE: 4.20 meter RIG #: ACKER SOILMAX (OEO-690) DATE COMPLETED: 18-4-16
MEASURED AT: 1045 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

71 Dense, brown, clayey sand with gravel. 21.6


72 21.9
SC
73 22.3

D
74 22.6
75 SPT - 19 >50 Ditto but very dense. 22.9

BI
76 23.2
77 23.5
78 23.8
79 24.1
SPT - 20 Ditto but dense & without gravel.
80
81
82
40 R 24.4
24.7
25.0
FO
83 25.3
84 25.6
SPT - 21 36
Ditto but with gravel.
85 25.9
86 26.2
87 26.5
ED

88 26.8
89 27.1
SPT - 22 41
Ditto.
90 27.4
91 27.7
SU

92 28.0
93 28.3
94 28.7
SPT - 23 48
Ditto.
95 29.0
96 29.3
IS

97 29.6
98 29.9
99 30.2
SPT - 24 49
Ditto.
100 30.5
101 END OF BORING @ 30.45 m. 30.8
102 31.1
103 31.4
104 31.7
105 32.0

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 3
FIGURE A-19
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,612.73 meter TYPE OF BORING: ROTARY WASH
EAST: 429,615.13 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-20
GROUND ELEVATION: 5.00 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 17-4-16
DEPTH OF GROUNDWATER TABLE: 4.35 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 18-4-16
MEASURED AT: 1055 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 Medium dense, brown, silty sand with gravel. 0.3


SPT - 1 19 3.0 27 SM
2 0.6
3 Ditto. 0.9
SPT - 2 15

D
4 1.2
5 1.5
Medium dense, brown, clayey sand.

BI
6 SPT - 3 21 1.0 47 1.8
SC
7 2.1
8 Ditto. 2.4
SPT - 4 18
9 2.7
10
11
12
SPT - 5 >50 17.5 47
SC
R
Very dense, yellowish brown, clayey sand with gravel.
3.0
3.4
3.7
FO
13 Ditto but dense. 4.0
SPT - 6 41
14 4.3
15 4.6
16 SPT - 7 >50 11.1 17 Ditto but very dense. 4.9
17 5.2
ED

18 SC 5.5
19 5.8
20 6.1
SPT - 8 >50
Ditto. 6.4
21
SU

22 6.7
23 7.0
24 7.3
25 7.6
SPT - 9 >50
Very dense, brown, poorly graded gravel with silt & sand.
26 7.9
IS

27 8.2
28 8.5
29 8.8
30 9.1
SPT - 10 >50
Ditto but brownish grey.
31 9.4
32 9.8
33 10.1
34 10.4
35 10.7
GP-GM
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-20
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,612.73 meter TYPE OF BORING: ROTARY WASH
EAST: 429,615.13 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-20
GROUND ELEVATION: 5.00 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 17-4-16
DEPTH OF GROUNDWATER TABLE: 4.35 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 18-4-16
MEASURED AT: 1055 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 11.7 09 Very dense, brownish grey, poorly graded gravel with silt &
36 11.0
37
sand. 11.3
GP-GM
38 11.6

D
39 11.9
40 Very dense, brown, clayey sand with gravel. 12.2
SPT - 12 >50 12.8 15

BI
41 12.5
42 SC 12.8
43 13.1
44 13.4
45
46
47
SPT - 13 >50
R
Very dense, brown, silty sand with gravel. 13.7
14.0
14.3
FO
48 14.6
49 14.9
50
SPT - 14 >50 17.4 20 Very dense, brown, silty clayey gravel with sand. 15.2
51 15.5
52 GC-GM 15.8
ED

53 16.2
54 16.5
55
SPT - 15 >50
Very dense, brownish grey, silty sand with occasional gravel. 16.8
56 17.1
SU

57 17.4
58 17.7
59 18.0
60 SPT - 16 >50
Very dense, brownish grey, silty sand with gravel. 18.3
61 18.6
IS

62 18.9
63 19.2
64 19.5
65 SPT - 17 45
Ditto but dense. 19.8
66 20.1
SPT - 18 44
Ditto. 20.4
67
68 END OF BORING @ 20.45 m. 20.7
69 21.0
70 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-20
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,571.00 meter TYPE OF BORING: ROTARY WASH
EAST: 429,664.97 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-21
GROUND ELEVATION: 4.83 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 14-4-16
DEPTH OF GROUNDWATER TABLE: 4.05 meter RIG #: ACKER SOILMAX (OEO-690) DATE COMPLETED: 16-4-16
MEASURED AT: 1105 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 Medium dense, brown, silty sand with gravel. 0.3


SPT - 1 26 6.5 31 SM
2 0.6
3 Medium dense, brown, silty clayey sand with occasional 0.9
SPT - 2 15

D
4 gravel. 1.2
5 1.5
Ditto.

BI
6 SPT - 3 19 16.2 26 1.8
SC-SM
7 2.1
8 Very dense, brown, well graded gravel with silt & sand. 2.4
SPT - 4 >50
9 2.7
10
11
12
SPT - 5 >50 12.6 06
GW-GM
R
Ditto.
3.0
3.4
3.7
FO
13 Ditto. 4.0
SPT - 6 >50
14 4.3
15 4.6
16 SPT - 7 >50
Ditto. 4.9
17 5.2
ED

18 5.5
19 5.8
20 6.1
SPT - 8 >50 16.6 08 Very dense, brown, poorly graded sand with silt & gravel. 6.4
21
SU

22 6.7
23
SP-SM 7.0
24 7.3
25 7.6
SPT - 9 >50
Ditto.
26 7.9
IS

27 8.2
28 8.5
29 8.8
30 9.1
SPT - 10 >50
Ditto.
31 9.4
32 9.8
33 10.1
34 10.4
35 10.7
GP
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-21
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,571.00 meter TYPE OF BORING: ROTARY WASH
EAST: 429,664.97 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-21
GROUND ELEVATION: 4.83 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 14-4-16
DEPTH OF GROUNDWATER TABLE: 4.05 meter RIG #: ACKER SOILMAX (OEO-690) DATE COMPLETED: 16-4-16
MEASURED AT: 1105 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 8.8 02 Very dense, brown, poorly graded gravel with sand.
36 11.0
37 11.3
GP
38 11.6

D
39 11.9
40 Ditto but grey. 12.2
SPT - 12 >50

BI
41 12.5
42 12.8
43 13.1
44 13.4
45
46
47
SPT - 13 >50 18.7 11 R
Very dense, brown, poorly graded sand with silt & gravel. 13.7
14.0
14.3
FO
SP-SM
48 14.6
49 14.9
50 SPT - 14 >50 Very dense, greyish brown, fine to coarse gravel with silty 15.2
51 sand. 15.5
52 15.8
ED

53 16.2
54 16.5
55 SPT - 15 >50 Ditto. 16.8
56 17.1
SU

57 17.4
58 17.7
59 18.0
60 SPT - 16 >50 Ditto. 18.3
61 18.6
IS

62 18.9
63 19.2
64 19.5
65 SPT - 17 >50 Ditto. 19.8
66 20.1
SPT - 18 >50 Ditto.
67 20.4
END OF BORING @ 20.13 m.
68 20.7
69 21.0
70 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-21
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,472.74 meter TYPE OF BORING: ROTARY WASH
EAST: 429,540.35 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-22
GROUND ELEVATION: 5.27 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 14-4-16
DEPTH OF GROUNDWATER TABLE: 4.50 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 17-4-16
MEASURED AT: 1120 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 Medium dense, brown, silty sand with occasional gravel. 0.3


SPT - 1 19 7.8 36 SM
2 0.6
3 Ditto but dense. 0.9
SPT - 2 38

D
4 1.2
5 1.5
Dense, brown, silty clayey sand with occasional gravel.

BI
6 SPT - 3 39 19.1 32 1.8
SC-SM
7 2.1
8 Ditto. 2.4
SPT - 4 46
9 2.7
10
11
12
SPT - 5 >50
R
Ditto but very dense.
3.0
3.4
3.7
FO
13 Ditto. 4.0
SPT - 6 >50
14 4.3
15 4.6
16 SPT - 7 >50 9.6 05 Very dense, brown, well graded gravel with silt & sand. 4.9
17 5.2
ED

18 GW-GM 5.5
19 5.8
20 6.1
SPT - 8 41
Ditto but dense. 6.4
21
SU

22 6.7
23 7.0
24 7.3
25 7.6
SPT - 9 34
Ditto.
26 7.9
IS

27 8.2
28 8.5
29 8.8
30 9.1
SPT - 10 42 9.5 10 Dense, greyish brown, poorly graded gravel with silt & sand.
31 9.4
32 9.8
GP-GM
33 10.1
34 10.4
35 10.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 3
FIGURE A-22
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,472.74 meter TYPE OF BORING: ROTARY WASH
EAST: 429,540.35 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-22
GROUND ELEVATION: 5.27 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 14-4-16
DEPTH OF GROUNDWATER TABLE: 4.50 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 17-4-16
MEASURED AT: 1120 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 43 Dense, brown, poorly graded gravel with silt & sand.
36 11.0
37 11.3
38 11.6

D
39 11.9
40 Ditto but very dense. 12.2
SPT - 12 >50 9.3 09

BI
41 12.5
42 GP-GM 12.8
43 13.1
44 13.4
45
46
47
SPT - 13 >50
R
Ditto. 13.7
14.0
14.3
FO
48 14.6
49 14.9
50
SPT - 14 >50
Ditto. 15.2
51 15.5
52 15.8
ED

53 16.2
54 16.5
55
SPT - 15 >50
Ditto. 16.8
56 17.1
SU

57 17.4
58 17.7
59 18.0
60 SPT - 16 >50 13.4 20 Very dense, brown, silty sand with gravel. 18.3
61 18.6
IS

62 SM 18.9
63 19.2
64 19.5
65 SPT - 17 >50
Ditto. 19.8
66 20.1
67 20.4
68 20.7
69 21.0
70 SPT - 18 >50
Ditto. 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 3
FIGURE A-22
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,472.74 meter TYPE OF BORING: ROTARY WASH
EAST: 429,540.35 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-22
GROUND ELEVATION: 5.27 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 14-4-16
DEPTH OF GROUNDWATER TABLE: 4.50 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 17-4-16
MEASURED AT: 1120 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

71 Very dense, brown, silty sand with gravel. 21.6


72 21.9
73 22.3

D
74 22.6
75 SPT - 19 >50 Very dense, brown, gravel with silty sand. 22.9

BI
76 23.2
77 23.5
78 23.8
79 24.1
SPT - 20 >50 Ditto.
80
81
82
R 24.4
24.7
25.0
FO
83 25.3
84 25.6
SPT - 21 >50 Ditto.
85 25.9
86 26.2
87 26.5
ED

88 26.8
89 27.1
SPT - 22 >50 12.9 16 Very dense, greyish brown, silty sand with gravel.
90 27.4
91 27.7
SM
SU

92 28.0
93 28.3
94 28.7
SPT - 23 >50
Ditto.
95 29.0
96 29.3
IS

97 29.6
98 29.9
99 30.2
SPT - 24 >50
Ditto.
100 30.5
101 END OF BORING @ 30.45 m. 30.8
102 31.1
103 31.4
104 31.7
105 32.0

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 3
FIGURE A-22
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,493.62 meter TYPE OF BORING: ROTARY WASH
EAST: 429,515.40 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-23
GROUND ELEVATION: 5.25 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 13-4-16
DEPTH OF GROUNDWATER TABLE: 4.55 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 14-4-16
MEASURED AT: 1130 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 Dense, brown, silty sand with gravel. 0.3


SPT - 1 31 2.7 24 SM
2 0.6
3 Ditto but very dense. 0.9
SPT - 2 >50

D
4 1.2
5 1.5
Very dense, brown, well graded gravel with silt & sand.

BI
6 SPT - 3 >50 9.2 09 1.8
GW-GM
7 2.1
8 Ditto. 2.4
SPT - 4 >50
9 2.7
10
11
12
SPT - 5 34
R
Ditto but dense.
3.0
3.4
3.7
FO
13 Ditto. 4.0
SPT - 6 34
14 4.3
15 4.6
16 SPT - 7 30 9.7 10 Ditto but medium dense. 4.9
17 5.2
ED

18 GW-GM 5.5
19 5.8
20 6.1
SPT - 8 40
Ditto but dense. 6.4
21
SU

22 6.7
23 7.0
24 7.3
25 7.6
SPT - 9 >50 9.5 06 Very dense, brown, poorly graded gravel with silt & sand.
26 7.9
IS

27 8.2
GP-GM 8.5
28
29 8.8
30 9.1
SPT - 10 >50
Ditto.
31 9.4
32 9.8
33 10.1
34 10.4
35 10.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-23
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,493.62 meter TYPE OF BORING: ROTARY WASH
EAST: 429,515.40 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-23
GROUND ELEVATION: 5.25 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 13-4-16
DEPTH OF GROUNDWATER TABLE: 4.55 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 14-4-16
MEASURED AT: 1130 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 Very dense, brown, poorly graded gravel with silt & sand.
36 11.0
37 11.3
38 11.6

D
39 11.9
40 Dense, greyish brown, silty clayey sand with gravel. 12.2
SPT - 12 37 20.3 27

BI
41 12.5
42 SC-SM 12.8
43 13.1
44 13.4
45
46
47
SPT - 13 37
R
Ditto. 13.7
14.0
14.3
FO
48 14.6
49 14.9
50
SPT - 14 >50
Ditto but very dense. 15.2
51 15.5
52 15.8
ED

53 16.2
54 16.5
55
SPT - 15 >50 15.1 15 Ditto but brown. 16.8
56 17.1
SU

57 SC-SM 17.4
58 17.7
59 18.0
60 SPT - 16 >50 Very dense, brown, silty sand with gravel. 18.3
61 18.6
IS

62 18.9
63 19.2
64 19.5
65 SPT - 17 >50 Ditto. 19.8
66 20.1
SPT - 18 >50
Ditto. 20.4
67
68 END OF BORING @ 20.45 m. 20.7
69 21.0
70 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-23
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,451.86 meter TYPE OF BORING: ROTARY WASH
EAST: 429,565.27 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-24
GROUND ELEVATION: 5.34 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 16-4-16
DEPTH OF GROUNDWATER TABLE: 4.60 meter RIG #: ACKER MP8 (OEO-808) DATE COMPLETED: 17-4-16
MEASURED AT: 1145 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 Dense, brown, silty sand with occasional gravel. 0.3


SPT - 1 44 3.6 25 SM
2 0.6
3 Ditto. 0.9
SPT - 2 37

D
4 1.2
5 1.5
Ditto.

BI
6 SPT - 3 46 1.8
7 2.1
8 Very dense, brown, silty sand with gravel & traces of clay. 2.4
SPT - 4 >50 16.0 26
9 SM 2.7
10
11
12
SPT - 5 >50
R
Ditto.
3.0
3.4
3.7
FO
13 Very dense, brown, silty sand with gravel. 4.0
SPT - 6 >50 17.3 13
14 SM 4.3
15 4.6
16 SPT - 7 >50
Ditto. 4.9
17 5.2
ED

18 5.5
19 5.8
20 6.1
SPT - 8 48 17.0 15 Ditto but dense. 6.4
21
SU

22 6.7
23
SM 7.0
24 7.3
25 7.6
SPT - 9 49
Ditto.
26 7.9
IS

27 8.2
28 8.5
29 8.8
30 9.1
SPT - 10 >50 12.3 12 Very dense, brown, well graded sand with silt & gravel.
31 9.4
32 9.8
SW-SM
33 10.1
34 10.4
35 10.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-24
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,451.86 meter TYPE OF BORING: ROTARY WASH
EAST: 429,565.27 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-24
GROUND ELEVATION: 5.34 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 16-4-16
DEPTH OF GROUNDWATER TABLE: 4.60 meter RIG #: ACKER MP8 (OEO-808) DATE COMPLETED: 17-4-16
MEASURED AT: 1145 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 Very dense, brown, gravel with silty sand.
36 11.0
37 11.3
38 11.6

D
39 11.9
40 Ditto but greyish brown. 12.2
SPT - 12 >50

BI
41 12.5
42 12.8
43 13.1
44 13.4
45
46
47
SPT - 13 >50
R
Ditto. 13.7
14.0
14.3
FO
48 14.6
49 14.9
50
SPT - 14 >50
Ditto. 15.2
51 15.5
52 15.8
ED

53 16.2
54 16.5
55
SPT - 15 >50 18.5 10 Very dense, grey, well graded sand with silt & gravel. 16.8
56 17.1
SU

57 SW-SM 17.4
58 17.7
59 18.0
60 SPT - 16 50
Ditto but dense. 18.3
61 18.6
IS

62 18.9
63 19.2
64 19.5
65 SPT - 17 >50
Ditto but very dense. 19.8
66 20.1
SPT - 18 >50
Ditto. 20.4
67
68 END OF BORING @ 20.45 m. 20.7
69 21.0
70 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-24
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,353.63 meter TYPE OF BORING: ROTARY WASH
EAST: 429,440.62 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-25
GROUND ELEVATION: 5.52 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 9-4-16
DEPTH OF GROUNDWATER TABLE: 4.80 meter RIG #: SIMCO (OEO-814) DATE COMPLETED: 11-4-16
MEASURED AT: 1200 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 Medium dense, brown, silty sand with gravel. 0.3


SPT - 1 24
2 0.6
3 Medium dense, brown, poorly graded sand with silt & 0.9
SPT - 2 30 15.5 05

D
4 SP-SM gravel. 1.2
5 1.5
SPT - 3 >50 Ditto but very dense.

BI
6 1.8
7 2.1
8 SPT - 4 >50 10.6 11 Very dense, brown, poorly graded gravel with silt & sand. 2.4
9 GP-GM 2.7
10
11
12
SPT - 5 >50
R
Ditto but with clay.
3.0
3.4
3.7
FO
13 Ditto. 4.0
SPT - 6 >50
14 4.3
15 4.6
16 SPT - 7 41
Ditto but dense. 4.9
17 5.2
ED

18 5.5
19 5.8
20 6.1
SPT - 8 42 11.6 10 Dense, brown, poorly graded sand with silt & gravel. 6.4
21
SU

22 6.7
23
SP-SM 7.0
24 7.3
25 7.6
SPT - 9 >50
Ditto but very dense, yellowish brown.
26 7.9
IS

27 8.2
28 8.5
29 8.8
30 9.1
SPT - 10 >50
Very dense, brown, silty gravel with sand.
31 9.4
32 9.8
33 10.1
34 10.4
35 10.7
SM
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 3
FIGURE A-25
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,353.63 meter TYPE OF BORING: ROTARY WASH
EAST: 429,440.62 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-25
GROUND ELEVATION: 5.52 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 9-4-16
DEPTH OF GROUNDWATER TABLE: 4.80 meter RIG #: SIMCO (OEO-814) DATE COMPLETED: 11-4-16
MEASURED AT: 1200 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 39 19.6 33 Dense, brown, silty sand with gravel.
36 11.0
37 11.3
SM
38 11.6

D
39 11.9
40 Ditto. 12.2
SPT - 12 45

BI
41 12.5
42 12.8
43 13.1
44 13.4
45
46
47
SPT - 13 42
R
Dense, brown, silty gravel with sand. 13.7
14.0
14.3
FO
48 14.6
49 14.9
50
SPT - 14 >50
Ditto but very dense with clay. 15.2
51 15.5
52 15.8
ED

53 16.2
54 16.5
55
SPT - 15 47 22.5 30 Dense, brown, silty sand with gravel & traces of clay. 16.8
56 17.1
SU

57 SM 17.4
58 17.7
59 18.0
60 SPT - 16 >50
Ditto. 18.3
61 18.6
IS

62 18.9
63 19.2
64 19.5
65 SPT - 17 >50 Very dense, brown, silty gravel with sand. 19.8
66 20.1
67 20.4
68 20.7
69 21.0
70 SPT - 18 >50 Ditto. 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 3
FIGURE A-25
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,353.63 meter TYPE OF BORING: ROTARY WASH
EAST: 429,440.62 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-25
GROUND ELEVATION: 5.52 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 9-4-16
DEPTH OF GROUNDWATER TABLE: 4.80 meter RIG #: SIMCO (OEO-814) DATE COMPLETED: 11-4-16
MEASURED AT: 1200 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

71 Very dense, brown, silty gravel with sand. 21.6


72 21.9
73 22.3

D
74 22.6
75 SPT - 19 >50 Ditto. 22.9

BI
76 23.2
77 23.5
78 23.8
79 24.1
SPT - 20 14 Very dense, brown, silty sand with gravel.
80
81
82
>50 13.9

SM
R 24.4
24.7
25.0
FO
83 25.3
84 25.6
SPT - 21 >50
Ditto.
85 25.9
86 26.2
87 26.5
ED

88 26.8
89 27.1
SPT - 22 >50
Ditto.
90 27.4
91 27.7
SU

92 28.0
93 28.3
94 28.7
SPT - 23 >50
Ditto.
95 29.0
96 29.3
IS

97 29.6
98 29.9
99 30.2
SPT - 24 >50
Ditto.
100 30.5
101 END OF BORING @ 30.45 m. 30.8
102 31.1
103 31.4
104 31.7
105 32.0

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 3
FIGURE A-25
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,374.51 meter TYPE OF BORING: ROTARY WASH
EAST: 429,415.67 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-26
GROUND ELEVATION: 5.54 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 9-4-16
DEPTH OF GROUNDWATER TABLE: 4.85 meter RIG #: ACKER SOILMAX (OEO-807) DATE COMPLETED: 10-4-16
MEASURED AT: 1210 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 Hard, brown, sandy clayey silt with occasional gravel. 0.3


SPT - 1 >50
2 0.6
3 Very dense, brown, silty sand. 0.9
SPT - 2 >50 8.0 13

D
4 SM 1.2
5 1.5
SPT - 3 14 Ditto.

BI
6 >50 13.8 1.8
SM
7 2.1
8 Ditto. 2.4
SPT - 4 >50
9 2.7
10
11
12
SPT - 5 >50
R
Ditto.
3.0
3.4
3.7
FO
13 SPT - 6 >50 Ditto. 4.0
14 4.3
15 4.6
16
SPT - 7 >50 12.3 12 Very dense, brown, poorly graded sand with silt & 4.9
occasional gravel.
17 5.2
ED

18 SP-SM 5.5
19 5.8
20 6.1
SPT - 8 >50 Ditto. 6.4
21
SU

22 6.7
23 7.0
24 7.3
25 7.6
SPT - 9 >50 Ditto.
26 7.9
IS

27 8.2
28 8.5
29 8.8
30 9.1
SPT - 10 >50 16.4 13 Very dense, brown, silty sand with gravel.
31 9.4
32 9.8
SM
33 10.1
34 10.4
35 10.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-26
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,374.51 meter TYPE OF BORING: ROTARY WASH
EAST: 429,415.67 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-26
GROUND ELEVATION: 5.54 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 9-4-16
DEPTH OF GROUNDWATER TABLE: 4.85 meter RIG #: ACKER SOILMAX (OEO-807) DATE COMPLETED: 10-4-16
MEASURED AT: 1210 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 Very dense, brown, silty gravel with sand.
36 11.0
37 11.3
38 11.6

D
39 11.9
40 Ditto. 12.2
SPT - 12 >50

BI
41 12.5
42 12.8
43 13.1
44 13.4
45
46
47
SPT - 13 >50 14.5 11 R
Very dense, brown, well graded sand with silt. 13.7
14.0
14.3
FO
SW-SM
48 14.6
49 14.9
50 SPT - 14 >50 Ditto. 15.2
51 15.5
52 15.8
ED

53 16.2
54 16.5
55 SPT - 15 >50 Ditto. 16.8
56 17.1
SU

57 17.4
58 17.7
59 18.0
60 SPT - 16 >50 Ditto. 18.3
61 18.6
IS

62 18.9
63 19.2
64 19.5
65 SPT - 17 >50 Ditto. 19.8
66 20.1
SPT - 18 >50 Ditto. 20.4
67
END OF BORING @ 20.24 m.
68 20.7
69 21.0
70 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-26
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,332.78 meter TYPE OF BORING: ROTARY WASH
EAST: 429,465.51 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-27
GROUND ELEVATION: 5.48 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 11-4-16
DEPTH OF GROUNDWATER TABLE: 4.70 meter RIG #: SIMCO (OEO-814) DATE COMPLETED: 14-4-16
MEASURED AT: 1225 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 Dense, brown, silty sand with occasional gravel. 0.3


SPT - 1 32
2 0.6
3 Ditto. 0.9
SPT - 2 38

D
4 1.2
5 1.5
Dense, brown, poorly graded gravel with silt & sand.

BI
6 SPT - 3 39 8.7 07 1.8
GP-GM
7 2.1
8 Ditto but very dense, grey. 2.4
SPT - 4 >50
9 2.7
10
11
12
SPT - 5 >50 12.0 10
GP-GM
R
Ditto but brown.
3.0
3.4
3.7
FO
13 SPT - 6 >50 Ditto. 4.0
14 4.3
15 4.6
16 SPT - 7 >50 Ditto. 4.9
17 5.2
ED

18 5.5
19 5.8
20 6.1
SPT - 8 >50 Ditto. 6.4
21
SU

22 6.7
23 7.0
24 7.3
25 7.6
SPT - 9 >50 10.8 19 Very dense, brown, silty sand with gravel.
26 7.9
IS

27 8.2
SM 8.5
28
29 8.8
30 9.1
SPT - 10 >50
Very dense, brown, clayey sand with gravel.
31 9.4
32 9.8
33 10.1
34 10.4
35 10.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-27
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,332.78 meter TYPE OF BORING: ROTARY WASH
EAST: 429,465.51 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-27
GROUND ELEVATION: 5.48 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 11-4-16
DEPTH OF GROUNDWATER TABLE: 4.70 meter RIG #: SIMCO (OEO-814) DATE COMPLETED: 14-4-16
MEASURED AT: 1225 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 Very dense, brown, silty sand with occasional gravel.
36 11.0
37 11.3
38 11.6

D
39 11.9
40 Very dense, brown, silty gravel with sand. 12.2
SPT - 12 >50 11.8 13

BI
41 12.5
42 GM 12.8
43 13.1
44 13.4
45
46
47
SPT - 13 >50
R
Very dense, brown, silty sand with gravel. 13.7
14.0
14.3
FO
48 14.6
49 14.9
50
SPT - 14 >50 14.7 16 Ditto. 15.2
51 15.5
52 SM 15.8
ED

53 16.2
54 16.5
55
SPT - 15 >50
Ditto. 16.8
56 17.1
SU

57 17.4
58 17.7
59 18.0
60 SPT - 16 >50
Ditto. 18.3
61 18.6
IS

62 18.9
63 19.2
64 19.5
65 SPT - 17 >50
Ditto. 19.8
66 20.1
SPT - 18 >50 Ditto. 20.4
67
68 END OF BORING @ 20.40 m. 20.7
69 21.0
70 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-27
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,425.79 meter TYPE OF BORING: ROTARY WASH
EAST: 429,873.47 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-28
GROUND ELEVATION: 4.56 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 20-4-16
DEPTH OF GROUNDWATER TABLE: 3.85 meter RIG #: SIMCO (OEO-812) DATE COMPLETED: 22-4-16
MEASURED AT: 1235 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 Medium dense, brown, silty sand with occasional gravel. 0.3


SPT - 1 18 6.3 27 SM
2 0.6
3 Ditto. 0.9
SPT - 2 19

D
4 1.2
5 1.5
Medium dense, brown, clayey sand with occasional gravel.

BI
6 SPT - 3 25 20.8 30 1.8
SC
7 2.1
8 Ditto. 2.4
SPT - 4 15
9 2.7
10
11
12
SPT - 5 18 18.7 23
SC
R
Ditto.
3.0
3.4
3.7
FO
13 Ditto. 4.0
SPT - 6 14
14 4.3
15 4.6
16 SPT - 7 15 19.6 23 Ditto. 4.9
17 5.2
ED

18 SC 5.5
19 5.8
20 6.1
SPT - 8 10 19.9 40 Loose, greyish brown, clayey sand. 6.4
21
SU

22 6.7
23
SC 7.0
24 7.3
25 7.6
SPT - 9 20
Medium dense, brown, silty clayey sand with gravel.
26 7.9
IS

27 8.2
28 8.5
29 8.8
30 9.1
SPT - 10 32 22.3 26 Ditto but dense.
31 9.4
32 9.8
SC-SM
33 10.1
34 10.4
35 10.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 3
FIGURE A-28
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,425.79 meter TYPE OF BORING: ROTARY WASH
EAST: 429,873.47 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-28
GROUND ELEVATION: 4.56 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 20-4-16
DEPTH OF GROUNDWATER TABLE: 3.85 meter RIG #: SIMCO (OEO-812) DATE COMPLETED: 22-4-16
MEASURED AT: 1235 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 29 Medium dense, grey, gravel.
36 11.0
37 11.3
38 11.6

D
39 11.9
40 Ditto. 12.2
SPT - 12 27

BI
41 12.5
42 12.8
43 13.1
44 13.4
45
46
47
SPT - 13 29
R
Medium dense, brownish grey, gravel with silty sand. 13.7
14.0
14.3
FO
48 14.6
49 14.9
50
SPT - 14 32
Ditto but dense. 15.2
51 15.5
52 15.8
ED

53 16.2
54 16.5
55
SPT - 15 42
Dense, brown, silty sand with gravel. 16.8
56 17.1
SU

57 17.4
58 17.7
59 18.0
60 SPT - 16 43
Dense, greyish brown, gravel with silty sand. 18.3
61 18.6
IS

62 18.9
63 19.2
64 19.5
65 SPT - 17 42
Dense, brown, silty sand with gravel. 19.8
66 20.1
67 20.4
68 20.7
69 21.0
70 SPT - 18 43 17.4 29 GC Dense, brown, clayey gravel with sand. 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 3
FIGURE A-28
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,425.79 meter TYPE OF BORING: ROTARY WASH
EAST: 429,873.47 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-28
GROUND ELEVATION: 4.56 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 20-4-16
DEPTH OF GROUNDWATER TABLE: 3.85 meter RIG #: SIMCO (OEO-812) DATE COMPLETED: 22-4-16
MEASURED AT: 1235 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

71 Dense, brown, clayey gravel with sand. 21.6


72 21.9
GC
73 22.3

D
74 22.6
75 SPT - 19 33 22.4 44 Ditto. 22.9

BI
76 23.2
77 GC 23.5
78 23.8
79 24.1
SPT - 20 Ditto.
80
81
82
40 R 24.4
24.7
25.0
FO
83 25.3
84 25.6
SPT - 21 47
Ditto.
85 25.9
86 26.2
87 26.5
ED

88 26.8
89 27.1
SPT - 22 33 26.3 42 Dense, brown, silty gravel with sand & traces of clay.
90 27.4
91 27.7
GM
SU

92 28.0
93 28.3
94 28.7
SPT - 23 40
Ditto.
95 29.0
96 29.3
IS

97 29.6
98 29.9
99 30.2
SPT - 24 46
Ditto.
100 30.5
101 END OF BORING @ 30.45 m. 30.8
102 31.1
103 31.4
104 31.7
105 32.0

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 3
FIGURE A-28
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,443.65 meter TYPE OF BORING: ROTARY WASH
EAST: 429,852.12 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-29
GROUND ELEVATION: 4.83 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 17-4-16
DEPTH OF GROUNDWATER TABLE: 4.10 meter RIG #: SIMCO (OEO-812) DATE COMPLETED: 18-4-16
MEASURED AT: 1245 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abdullah
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 Dense, brown, silty sand. 0.3


SPT - 1 33 9.9 23 SM
2 0.6
3 Ditto. 0.9
SPT - 2 35

D
4 1.2
5 1.5
Ditto but medium dense, dark brown.

BI
6 SPT - 3 22 12.7 21 1.8
SM
7 2.1
8 Loose, dark brown, silty clayey sand with gravel. 2.4
SPT - 4 10 14.9 35
9 SC-SM 2.7
10
11
12
SPT - 5 07 22.3 57
CL
R
Medium stiff, dark brown, sandy lean clay.
3.0
3.4
3.7
FO
13 Ditto but very stiff, light grey. 4.0
SPT - 6 17 24.1 59
14 CL 4.3
15 4.6
16 SPT - 7 21 26.3 60 Ditto but with occasional gravel. 4.9
17 5.2
ED

18 CL 5.5
19 5.8
20 6.1
SPT - 8 37 24.2 35 Dense, brown, clayey sand with gravel. 6.4
21
SU

22 6.7
23
SC 7.0
24 7.3
25 7.6
SPT - 9 >50 17.0 41 Very dense, light grey, silty clayey sand with gravel.
26 7.9
IS

27 8.2
SC-SM 8.5
28
29 8.8
30 9.1
SPT - 10 50
Dense, dark brown, clayey gravel.
31 9.4
32 9.8
33 10.1
34 10.4
35 10.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-29
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,443.65 meter TYPE OF BORING: ROTARY WASH
EAST: 429,852.12 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-29
GROUND ELEVATION: 4.83 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 17-4-16
DEPTH OF GROUNDWATER TABLE: 4.10 meter RIG #: SIMCO (OEO-812) DATE COMPLETED: 18-4-16
MEASURED AT: 1245 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abdullah
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 Very dense, dark brown, clayey gravel.
36 11.0
37 11.3
38 11.6

D
39 11.9
40 Ditto but with sand. 12.2
SPT - 12 >50

BI
41 12.5
42 12.8
43 13.1
44 13.4
45
46
47
SPT - 13 47
R
Dense, dark brown, clayey sand with gravel. 13.7
14.0
14.3
FO
48 14.6
49 14.9
50
SPT - 14 >50
Ditto but very dense. 15.2
51 15.5
52 15.8
ED

53 16.2
54 16.5
55 SPT - 15 >50
Very dense, dark brown, sandy clayey gravel. 16.8
56 17.1
SU

57 17.4
58 17.7
59 18.0
60 SPT - 16 >50
Ditto. 18.3
61 18.6
IS

62 18.9
63 19.2
64 19.5
65 SPT - 17 48
Ditto but dense. 19.8
66 20.1
SPT - 18 45
Ditto. 20.4
67
68 END OF BORING @ 20.45 m. 20.7
69 21.0
70 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-29
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,407.96 meter TYPE OF BORING: ROTARY WASH
EAST: 429,894.75 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-30
GROUND ELEVATION: 4.46 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 21-4-16
DEPTH OF GROUNDWATER TABLE: 3.70 meter RIG #: SIMCO (OEO-812) DATE COMPLETED: 23-4-16
MEASURED AT: 1255 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 Medium dense, brown, silty sand. 0.3


SPT - 1 24 3.8 34 SM
2 0.6
3 Ditto. 0.9
SPT - 2 21

D
4 1.2
5 1.5
Ditto.

BI
6 SPT - 3 21 20.5 34 1.8
SM
7 2.1
8 Ditto. 2.4
SPT - 4 11
9 2.7
10
11
12
SPT - 5 12 16.1 40
SC
R
Medium dense, grey, clayey sand.
3.0
3.4
3.7
FO
13 Medium dense, light grey, silty clayey sand. 4.0
SPT - 6 16 15.2 42
14 SC-SM 4.3
15 4.6
16 SPT - 7 20
Ditto. 4.9
17 5.2
ED

18 5.5
19 5.8
20 6.1
SPT - 8 23 20.2 22 Medium dense, light grey, silty sand with gravel. 6.4
21
SU

22 6.7
23
SC-SM 7.0
24 7.3
25 7.6
SPT - 9 31
Ditto but dense, light brown.
26 7.9
IS

27 8.2
28 8.5
29 8.8
30 9.1
SPT - 10 37
Ditto.
31 9.4
32 9.8
33 10.1
34 10.4
35 10.7
GW-GM
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-30
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,407.96 meter TYPE OF BORING: ROTARY WASH
EAST: 429,894.75 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-30
GROUND ELEVATION: 4.46 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 21-4-16
DEPTH OF GROUNDWATER TABLE: 3.70 meter RIG #: SIMCO (OEO-812) DATE COMPLETED: 23-4-16
MEASURED AT: 1255 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 36 9.5 10 Dense, brown, well graded gravel with silt & sand.
36 11.0
37 11.3
GW-GM
38 11.6

D
39 11.9
40 Ditto. 12.2
SPT - 12 41

BI
41 12.5
42 12.8
43 13.1
44 13.4
45
46
47
SPT - 13 35
R
Ditto. 13.7
14.0
14.3
FO
48 14.6
49 14.9
50
SPT - 14 39
Ditto. 15.2
51 15.5
52 15.8
ED

53 16.2
54 16.5
55
SPT - 15 39 12.4 26 Dense, greyish brown, clayey sand with gravel. 16.8
56 17.1
SU

57 SC 17.4
58 17.7
59 18.0
60 SPT - 16 46
Ditto but light grey. 18.3
61 18.6
IS

62 18.9
63 19.2
64 19.5
65 SPT - 17 35
Ditto but greyish brown. 19.8
66 20.1
SPT - 18 41
Ditto. 20.4
67
68 END OF BORING @ 20.45 m. 20.7
69 21.0
70 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-30
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,341.18 meter TYPE OF BORING: ROTARY WASH
EAST: 429,802.63 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-31
GROUND ELEVATION: 4.50 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 19-4-16
DEPTH OF GROUNDWATER TABLE: 3.80 meter RIG #: ACKER MP8 (OEO-808) DATE COMPLETED: 20-4-16
MEASURED AT: 1305 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abdullah
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 Very stiff, brown, gravelly silt with sand. 0.3


SPT - 1 32
2 0.6
3 Medium dense, dark brown, poorly graded sand with silt. 0.9
SPT - 2 23

D
4 1.2
5 1.5
Ditto.

BI
6 SPT - 3 29 9.2 09 1.8
SP-SM
7 2.1
8 Ditto but dense. 2.4
SPT - 4 35
9 2.7
10
11
12
SPT - 5 50
R
Ditto but light grey.
3.0
3.4
3.7
FO
13 Very dense, light grey, clayey sand with gravel. 4.0
SPT - 6 >50
14 4.3
15 4.6
16 SPT - 7 >50 12.9 29 Ditto. 4.9
17 5.2
ED

18 SC 5.5
19 5.8
20 6.1
SPT - 8 >50
Ditto. 6.4
21
SU

22 6.7
23 7.0
24 7.3
25 7.6
SPT - 9 >50
Very dense, brown, silty gravel with sand.
26 7.9
IS

27 8.2
28 8.5
29 8.8
30 9.1
SPT - 10 >50 12.6 14 Ditto.
31 9.4
32 9.8
GM
33 10.1
34 10.4
35 10.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 3
FIGURE A-31
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,341.18 meter TYPE OF BORING: ROTARY WASH
EAST: 429,802.63 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-31
GROUND ELEVATION: 4.50 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 19-4-16
DEPTH OF GROUNDWATER TABLE: 3.80 meter RIG #: ACKER MP8 (OEO-808) DATE COMPLETED: 20-4-16
MEASURED AT: 1305 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abdullah
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 Very dense, dark brown, silty sand with gravel.
36 11.0
37 11.3
38 11.6

D
39 11.9
40 Hard, light grey, lean clay with sand. 12.2
SPT - 12 >50 26.8 74

BI
41 12.5
42 CL 12.8
43 13.1
44 13.4
45
46
47
SPT - 13 >50
R
Ditto. 13.7
14.0
14.3
FO
48 14.6
49 14.9
50
SPT - 14 >50
Very dense, dark brown, silty sand with gravel. 15.2
51 15.5
52 15.8
ED

53 16.2
54 16.5
55
SPT - 15 >50
Ditto. 16.8
56 17.1
SU

57 17.4
58 17.7
59 18.0
60 SPT - 16 >50
Ditto. 18.3
61 18.6
IS

62 18.9
63 19.2
64 19.5
65 SPT - 17 >50
Ditto. 19.8
66 20.1
67 20.4
68 20.7
69 21.0
70 SPT - 18 29
Medium dense, dark brown, poorly graded sand with gravel. 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 3
FIGURE A-31
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,341.18 meter TYPE OF BORING: ROTARY WASH
EAST: 429,802.63 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-31
GROUND ELEVATION: 4.50 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 19-4-16
DEPTH OF GROUNDWATER TABLE: 3.80 meter RIG #: ACKER MP8 (OEO-808) DATE COMPLETED: 20-4-16
MEASURED AT: 1305 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abdullah
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

71 Medium dense, dark brown, poorly graded sand with gravel. 21.6
72 21.9
73 22.3

D
74 22.6
75 SPT - 19 >50 Ditto but very dense. 22.9

BI
76 23.2
77 23.5
78 23.8
79 24.1
SPT - 20 Very dense, dark brown, silty sand.
80
81
82
>50 R 24.4
24.7
25.0
FO
83 25.3
84 25.6
SPT - 21 47 29.1 86 Hard, brown, lean clay with sand.
85 25.9
86 26.2
CL 26.5
87
ED

88 26.8
89 27.1
SPT - 22 >50
Very dense, brown, silty clayey sand with gravel.
90 27.4
91 27.7
SU

92 28.0
93 28.3
94 28.7
SPT - 23 >50 16.9 29 Ditto.
95 29.0
96 29.3
IS

SC-SM
97 29.6
98 29.9
99 30.2
SPT - 24 >50
Ditto.
100 30.5
101 END OF BORING @ 30.45 m. 30.8
102 31.1
103 31.4
104 31.7
105 32.0

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 3
FIGURE A-31
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,359.04 meter TYPE OF BORING: ROTARY WASH
EAST: 429,781.28 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-32
GROUND ELEVATION: 4.57 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 17-4-16
DEPTH OF GROUNDWATER TABLE: 3.85 meter RIG #: ACKER MP8 (OEO-808) DATE COMPLETED: 18-4-16
MEASURED AT: 1315 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abdullah
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 Medium dense, light brown, silty sand with occasional 0.3


2
SPT - 1 26 2.1 24 SM gravel. 0.6
3 Medium dense, dark brown, silty sand with gravel. 0.9
SPT - 2 26

D
4 1.2
5 1.5
Ditto but dense.

BI
6 SPT - 3 34 9.0 14 1.8
SM
7 2.1
8 Ditto. 2.4
SPT - 4 44
9 2.7
10
11
12
SPT - 5 42
R
Dense, light grey, clayey sand with gravel.
3.0
3.4
3.7
FO
13 Ditto. 4.0
SPT - 6 49 12.4 31
14 SC 4.3
15 4.6
16 SPT - 7 >50
Very dense, light grey, clayey gravel. 4.9
17 5.2
ED

18 5.5
19 5.8
20 6.1
SPT - 8 >50 12.1 31 Very dense, light grey, clayey sand with gravel. 6.4
21
SU

22 6.7
23
SC 7.0
24 7.3
25 7.6
SPT - 9 >50
Very dense, light grey, gravel with clayey sand.
26 7.9
IS

27 8.2
28 8.5
29 8.8
30 9.1
SPT - 10 >50
Ditto.
31 9.4
32 9.8
33 10.1
34 10.4
35 10.7
SC
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-32
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,359.04 meter TYPE OF BORING: ROTARY WASH
EAST: 429,781.28 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-32
GROUND ELEVATION: 4.57 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 17-4-16
DEPTH OF GROUNDWATER TABLE: 3.85 meter RIG #: ACKER MP8 (OEO-808) DATE COMPLETED: 18-4-16
MEASURED AT: 1315 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abdullah
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 29 19.2 44 Medium dense, light grey, clayey sand.
36 11.0
37 11.3
SC
38 11.6

D
39 11.9
40 Ditto but dense. 12.2
SPT - 12 44

BI
41 12.5
42 12.8
43 13.1
44 13.4
45
46
47
SPT - 13 35 27.8 66 R
Hard, light grey, sandy lean clay. 13.7
14.0
14.3
FO
CL
48 14.6
49 14.9
50
SPT - 14 44
Ditto. 15.2
51 15.5
52 15.8
ED

53 16.2
54 16.5
55
SPT - 15 >50
Very dense, dark brown, silty sand with gravel. 16.8
56 17.1
SU

57 17.4
58 17.7
59 18.0
60 SPT - 16 >50
Ditto. 18.3
61 18.6
IS

62 18.9
63 19.2
64 19.5
65 SPT - 17 >50
Ditto. 19.8
66 20.1
SPT - 18 >50
Ditto. 20.4
67
68 END OF BORING @ 20.45 m. 20.7
69 21.0
70 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-32
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,323.35 meter TYPE OF BORING: ROTARY WASH
EAST: 429,823.91 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-33
GROUND ELEVATION: 4.50 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 21-4-16
DEPTH OF GROUNDWATER TABLE: 3.80 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 22-4-16
MEASURED AT: 1325 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 Medium dense, brown, silty sand with gravel. 0.3


SPT - 1 12 1.7 22 SM
2 0.6
3 Ditto. 0.9
SPT - 2 17

D
4 1.2
5 1.5
Ditto.

BI
6 SPT - 3 14 14.5 23 1.8
SM
7 2.1
8 Ditto but greyish brown. 2.4
SPT - 4 17
9 2.7
10
11
12
SPT - 5 20
R
Medium dense, brown, clayey silty sand with gravel.
3.0
3.4
3.7
FO
13 Medium dense, greyish brown, well graded gravel with silt 4.0
SPT - 6 26 7.6 12
14 GW-GM & sand. 4.3
15 4.6
16 SPT - 7 35
Ditto but dense, brown. 4.9
17 5.2
ED

18 5.5
19 5.8
20 6.1
SPT - 8 35 8.7 12 Ditto but greyish brown. 6.4
21
SU

22 6.7
23
GW-GM 7.0
24 7.3
25 7.6
SPT - 9 43
Ditto.
26 7.9
IS

27 8.2
28 8.5
29 8.8
30 9.1
SPT - 10 >50
Very dense, yellowish brown, clayey silty sand with
31 occasional gravel. 9.4
32 9.8
33 10.1
34 10.4
35 10.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-33
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,323.35 meter TYPE OF BORING: ROTARY WASH
EAST: 429,823.91 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-33
GROUND ELEVATION: 4.50 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 21-4-16
DEPTH OF GROUNDWATER TABLE: 3.80 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 22-4-16
MEASURED AT: 1325 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 Very dense, brown, poorly graded gravel with silt & sand.
36 11.0
37 11.3
38 11.6

D
39 11.9
40 Ditto but dense. 12.2
SPT - 12 45 11.2 12

BI
41 12.5
42 GP-GM 12.8
43 13.1
44 13.4
45
46
47
SPT - 13 >50
R
Ditto but very dense. 13.7
14.0
14.3
FO
48 14.6
49 14.9
50
SPT - 14 >50 11.1 07 Very dense, brown, poorly graded sand with silt & gravel. 15.2
51 15.5
52 SP-SM 15.8
ED

53 16.2
54 16.5
55
SPT - 15 46
Ditto but dense. 16.8
56 17.1
SU

57 17.4
58 17.7
59 18.0
60 SPT - 16 45
Ditto. 18.3
61 18.6
IS

62 18.9
63 19.2
64 19.5
65 SPT - 17 45
Ditto. 19.8
66 20.1
SPT - 18 42
Ditto. 20.4
67
68 END OF BORING @ 20.45 m. 20.7
69 21.0
70 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-33
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,256.57 meter TYPE OF BORING: ROTARY WASH
EAST: 429,731.79 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-34
GROUND ELEVATION: 4.62 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 18-4-16
DEPTH OF GROUNDWATER TABLE: 3.90 meter RIG #: SIMCO (OEO-814) DATE COMPLETED: 20-4-16
MEASURED AT: 1335 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 Medium dense, brown, silty sand with occasional gravel. 0.3


SPT - 1 11 8.5 32 SM
2 0.6
3 Ditto. 0.9
SPT - 2 14

D
4 1.2
5 1.5
Medium dense, greyish brown, poorly graded sand with silt

BI
6 SPT - 3 25 13.7 07 1.8
SP-SM & gravel.
7 2.1
8 Ditto. 2.4
SPT - 4 27
9 2.7
10
11
12
SPT - 5 49 16.7 24
GC-GM
R
Dense, brownish grey, silty clayey gravel with sand.
3.0
3.4
3.7
FO
13 Ditto but very dense, yellowish brown. 4.0
SPT - 6 >50
14 4.3
15 4.6
16 SPT - 7 39 9.8 38 Dense, greyish brown, silty clayey sand with gravel. 4.9
17 5.2
ED

18 SC-SM 5.5
19 5.8
20 6.1
SPT - 8 >50 Ditto but very dense. 6.4
21
SU

22 6.7
23 7.0
24 7.3
25 7.6
SPT - 9 >50 22.1 33 Ditto.
26 7.9
IS

27 8.2
SC-SM 8.5
28
29 8.8
30 9.1
SPT - 10 >50
Ditto.
31 9.4
32 9.8
33 10.1
34 10.4
35 10.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 3
FIGURE A-34
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,256.57 meter TYPE OF BORING: ROTARY WASH
EAST: 429,731.79 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-34
GROUND ELEVATION: 4.62 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 18-4-16
DEPTH OF GROUNDWATER TABLE: 3.90 meter RIG #: SIMCO (OEO-814) DATE COMPLETED: 20-4-16
MEASURED AT: 1335 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 33 Dense, brown, silty sand with occasional gravel.
36 11.0
37 11.3
38 11.6

D
39 11.9
40 Ditto. 12.2
SPT - 12 32

BI
41 12.5
42 12.8
43 13.1
44 13.4
45
46
47
SPT - 13 >50 9.0 07 R
Very dense, brownish grey, poorly graded gravel with silt &
sand.
13.7
14.0
14.3
FO
GP-GM
48 14.6
49 14.9
50 SPT - 14 >50 Ditto. 15.2
51 15.5
52 15.8
ED

53 16.2
54 16.5
55 SPT - 15 >50 10.5 10 Ditto but greyish brown. 16.8
56 17.1
SU

57 GP-GM 17.4
58 17.7
59 18.0
60 SPT - 16 >50 Ditto. 18.3
61 18.6
IS

62 18.9
63 19.2
64 19.5
65 SPT - 17 >50 16.4 19 Very dense, brown, silty clayey sand with gravel. 19.8
66 20.1
67 SC-SM 20.4
68 20.7
69 21.0
70 SPT - 18 39 13.5 57 CL Hard, brown, sandy lean clay. 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 3
FIGURE A-34
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,256.57 meter TYPE OF BORING: ROTARY WASH
EAST: 429,731.79 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-34
GROUND ELEVATION: 4.62 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 18-4-16
DEPTH OF GROUNDWATER TABLE: 3.90 meter RIG #: SIMCO (OEO-814) DATE COMPLETED: 20-4-16
MEASURED AT: 1335 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

71 Hard, brown, sandy lean clay. 21.6


72 21.9
CL
73 22.3

D
74 22.6
75 SPT - 19 50 Ditto. 22.9

BI
76 23.2
77 23.5
78 23.8
79 24.1
SPT - 20 Ditto.
80
81
82
>50 R 24.4
24.7
25.0
FO
83 25.3
84 25.6
SPT - 21 50
Ditto.
85 25.9
86 26.2
87 26.5
ED

88 26.8
89 27.1
SPT - 22 >50
Ditto.
90 27.4
91 27.7
SU

92 28.0
93 28.3
94 28.7
SPT - 23 >50 25.5 48 Very dense, yellowish brown, silty sand with traces of clay.
95 29.0
96 29.3
IS

SM
97 29.6
98 29.9
99 30.2
SPT - 24 >50
Ditto.
100 30.5
101 END OF BORING @ 30.45 m. 30.8
102 31.1
103 31.4
104 31.7
105 32.0

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 3
FIGURE A-34
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,274.43 meter TYPE OF BORING: ROTARY WASH
EAST: 429,710.44 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-35
GROUND ELEVATION: 4.41 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 14-4-16
DEPTH OF GROUNDWATER TABLE: 3.80 meter RIG #: SIMCO (OEO-814) DATE COMPLETED: 17-4-16
MEASURED AT: 1345 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 Medium dense, brown, silty sand with gravel. 0.3


SPT - 1 17 4.6 21 SM
2 0.6
3 Ditto. 0.9
SPT - 2 30

D
4 1.2
5 1.5
Dense, brown, silty gravel with sand.

BI
6 SPT - 3 32 14.0 14 1.8
GM
7 2.1
8 Dense, brown, silty clayey sand with gravel. 2.4
SPT - 4 33 14.9 19
9 SC-SM 2.7
10
11
12
SPT - 5 26 15.3 20
SC-SM
R
Ditto but medium dense.
3.0
3.4
3.7
FO
13 Ditto. 4.0
SPT - 6 30
14 4.3
15 4.6
16 SPT - 7 >50
Ditto but very dense. 4.9
17 5.2
ED

18 5.5
19 5.8
20 6.1
SPT - 8 36
Ditto but dense. 6.4
21
SU

22 6.7
23 7.0
24 7.3
25 7.6
SPT - 9 36 16.1 31 Dense, light grey, clayey sand.
26 7.9
IS

27 8.2
SC 8.5
28
29 8.8
30 9.1
SPT - 10 38
Ditto.
31 9.4
32 9.8
33 10.1
34 10.4
35 10.7
SC
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-35
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,274.43 meter TYPE OF BORING: ROTARY WASH
EAST: 429,710.44 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-35
GROUND ELEVATION: 4.41 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 14-4-16
DEPTH OF GROUNDWATER TABLE: 3.80 meter RIG #: SIMCO (OEO-814) DATE COMPLETED: 17-4-16
MEASURED AT: 1345 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 45 15.8 26 Dense, light grey, clayey sand with occasional gravel.
36 11.0
37 11.3
SC
38 11.6

D
39 11.9
40 Ditto but very dense. 12.2
SPT - 12 >50

BI
41 12.5
42 12.8
43 13.1
44 13.4
45
46
47
SPT - 13 48
R
Ditto but dense, greyish brown. 13.7
14.0
14.3
FO
48 14.6
49 14.9
50
SPT - 14 42 17.4 28 Ditto. 15.2
51 15.5
52 SC 15.8
ED

53 16.2
54 16.5
55
SPT - 15 >50
Ditto but very dense. 16.8
56 17.1
SU

57 17.4
58 17.7
59 18.0
60 SPT - 16 50
Ditto but dense. 18.3
61 18.6
IS

62 18.9
63 19.2
64 19.5
65 SPT - 17 >50
Ditto but very dense. 19.8
66 20.1
SPT - 18 >50 Ditto. 20.4
67
68 END OF BORING @ 20.35 m. 20.7
69 21.0
70 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-35
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,238.74 meter TYPE OF BORING: ROTARY WASH
EAST: 429,753.07 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-36
GROUND ELEVATION: 4.31 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 23-4-16
DEPTH OF GROUNDWATER TABLE: 3.65 meter RIG #: SIMCO (OEO-814) DATE COMPLETED: 24-4-16
MEASURED AT: 1355 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 Medium dense, brown, silty sand. 0.3


SPT - 1 19 4.0 17 SM
2 0.6
3 Ditto. 0.9
SPT - 2 24

D
4 1.2
5 1.5
Medium dense, greyish brown, well graded sand with silt &

BI
6 SPT - 3 22 13.9 09 1.8
SW-SM gravel.
7 2.1
8 Ditto. 2.4
SPT - 4 26
9 2.7
10
11
12
SPT - 5 26
R
Ditto.
3.0
3.4
3.7
FO
13 Dense, brown, poorly graded gravel with silt & sand. 4.0
SPT - 6 33 9.0 10
14 GP-GM 4.3
15 4.6
16 SPT - 7 33
Ditto. 4.9
17 5.2
ED

18 5.5
19 5.8
20 6.1
SPT - 8 40
Ditto. 6.4
21
SU

22 6.7
23 7.0
24 7.3
25 7.6
SPT - 9 42
Ditto.
26 7.9
IS

27 8.2
28 8.5
29 8.8
30 9.1
SPT - 10 27 21.7 59 Very stiff, brownish grey, sandy lean clay.
31 9.4
32 9.8
CL
33 10.1
34 10.4
35 10.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-36
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,238.74 meter TYPE OF BORING: ROTARY WASH
EAST: 429,753.07 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-36
GROUND ELEVATION: 4.31 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 23-4-16
DEPTH OF GROUNDWATER TABLE: 3.65 meter RIG #: SIMCO (OEO-814) DATE COMPLETED: 24-4-16
MEASURED AT: 1355 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 30 Very stiff, brownish grey, sandy lean clay.
36 11.0
37 11.3
38 11.6

D
39 11.9
40 Ditto but hard. 12.2
SPT - 12 37 20.9 65

BI
41 12.5
42 CL 12.8
43 13.1
44 13.4
45
46
47
SPT - 13 38
R
Ditto. 13.7
14.0
14.3
FO
48 14.6
49 14.9
50
SPT - 14 >50
Very dense, brownish grey, silty sand with gravel. 15.2
51 15.5
52 15.8
ED

53 16.2
54 16.5
55
SPT - 15 >50
Ditto but brown. 16.8
56 17.1
SU

57 17.4
58 17.7
59 18.0
60 SPT - 16 45
Ditto but dense. 18.3
61 18.6
IS

62 18.9
63 19.2
64 19.5
65 SPT - 17 >50
Ditto but very dense. 19.8
66 20.1
SPT - 18 >50
Ditto. 20.4
67
68 END OF BORING @ 20.45 m. 20.7
69 21.0
70 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-36
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,162.00 meter TYPE OF BORING: ROTARY WASH
EAST: 429,652.60 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-37
GROUND ELEVATION: 4.38 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 12-4-16
DEPTH OF GROUNDWATER TABLE: 3.70 meter RIG #: ACKER SOILMAX (OEO-807) DATE COMPLETED: 14-4-16
MEASURED AT: 1405 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 Dense, brown, silty gravel with sand. 0.3


SPT - 1 32
2 0.6
3 Ditto but medium dense. 0.9
SPT - 2 30

D
4 1.2
5 1.5
Ditto but dense.

BI
6 SPT - 3 38 8.3 15 1.8
GM
7 2.1
8 Dense, brown, silty sand with gravel & traces of clay. 2.4
SPT - 4 43
9 2.7
10
11
12
SPT - 5 48 13.4 27
SM
R
Ditto.
3.0
3.4
3.7
FO
13 Ditto but very dense. 4.0
SPT - 6 >50
14 4.3
15 4.6
16 SPT - 7 >50
Ditto. 4.9
17 5.2
ED

18 5.5
19 5.8
20 6.1
SPT - 8 48
Ditto but dense. 6.4
21
SU

22 6.7
23 7.0
24 7.3
25 7.6
SPT - 9 >50 9.1 08 Very dense, brown, poorly graded gravel with silt & sand.
26 7.9
IS

27 8.2
GP-GM 8.5
28
29 8.8
30 9.1
SPT - 10 >50 Ditto.
31 9.4
32 9.8
33 10.1
34 10.4
35 10.7
SM
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 3
FIGURE A-37
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,162.00 meter TYPE OF BORING: ROTARY WASH
EAST: 429,652.60 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-37
GROUND ELEVATION: 4.38 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 12-4-16
DEPTH OF GROUNDWATER TABLE: 3.70 meter RIG #: ACKER SOILMAX (OEO-807) DATE COMPLETED: 14-4-16
MEASURED AT: 1405 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 14.1 13 Very dense, brown, silty sand with gravel.
36 11.0
37 11.3
SM
38 11.6

D
39 11.9
40 Ditto. 12.2
SPT - 12 >50

BI
41 12.5
42 12.8
43 13.1
44 13.4
45
46
47
SPT - 13 30
R
Ditto but medium dense. 13.7
14.0
14.3
FO
48 14.6
49 14.9
50
SPT - 14 >50 8.8 09 Very dense, brown, well graded gravel with silt & sand. 15.2
51 15.5
52 GW-GM 15.8
ED

53 16.2
54 16.5
55
SPT - 15 >50
Ditto. 16.8
56 17.1
SU

57 17.4
58 17.7
59 18.0
60 SPT - 16 >50 11.0 12 Very dense, brown, well graded sand with silt & gravel. 18.3
61 18.6
IS

62 SW-SM 18.9
63 19.2
64 19.5
65 SPT - 17 >50
Ditto. 19.8
66 20.1
67 20.4
68 20.7
69 21.0
70 SPT - 18 >50
Dense, brown, silty gravel with sand. 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 3
FIGURE A-37
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,162.00 meter TYPE OF BORING: ROTARY WASH
EAST: 429,652.60 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-37
GROUND ELEVATION: 4.38 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 12-4-16
DEPTH OF GROUNDWATER TABLE: 3.70 meter RIG #: ACKER SOILMAX (OEO-807) DATE COMPLETED: 14-4-16
MEASURED AT: 1405 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

71 Dense, brown, silty gravel with sand. 21.6


72 21.9
73 22.3

D
74 22.6
75 SPT - 19 >50 14.7 16 Ditto. 22.9

BI
76 23.2
77 GM 23.5
78 23.8
79 24.1
SPT - 20 >50 Ditto.
80
81
82
R 24.4
24.7
25.0
FO
83 25.3
84 25.6
SPT - 21 >50
Ditto.
85 25.9
86 26.2
87 26.5
ED

88 26.8
89 27.1
SPT - 22 >50
Ditto.
90 27.4
91 27.7
SU

92 28.0
93 28.3
94 28.7
SPT - 23 >50
Very dense, brown, silty sand with gravel.
95 29.0
96 29.3
IS

97 29.6
98 29.9
99 30.2
SPT - 24 >50
Ditto.
100 30.5
101 END OF BORING @ 30.45 m. 30.8
102 31.1
103 31.4
104 31.7
105 32.0

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 3
FIGURE A-37
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,183.56 meter TYPE OF BORING: ROTARY WASH
EAST: 429,626.78 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-38
GROUND ELEVATION: 4.44 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 11-4-16
DEPTH OF GROUNDWATER TABLE: 3.70 meter RIG #: ACKER SOILMAX (OEO-807) DATE COMPLETED: 12-4-16
MEASURED AT: 1410 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 Hard, brown, clayey sandy silt with gravel. 0.3


SPT - 1 36
2 0.6
3 Ditto but very stiff. 0.9
SPT - 2 27

D
4 1.2
5 1.5
Dense, brown, silty sand with gravel.

BI
6 SPT - 3 32 10.7 19 1.8
SM
7 2.1
8 Dense, brown, silty clayey sand with gravel. 2.4
SPT - 4 41 13.6 29
9 SC-SM 2.7
10
11
12
SPT - 5 >50
R
Very dense, greyish brown, well graded gravel with silt &
sand.
3.0
3.4
3.7
FO
13 Ditto. 4.0
SPT - 6 >50
14 4.3
15 4.6
16 SPT - 7 >50 10.7 09 Ditto. 4.9
17 5.2
ED

18 GW-GM 5.5
19 5.8
20 6.1
SPT - 8 39
Ditto but dense. 6.4
21
SU

22 6.7
23 7.0
24 7.3
25 7.6
SPT - 9 >50
Ditto but very dense.
26 7.9
IS

27 8.2
28 8.5
29 8.8
30 9.1
SPT - 10 >50
Ditto.
31 9.4
32 9.8
33 10.1
34 10.4
35 10.7
GW-GM
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-38
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,183.56 meter TYPE OF BORING: ROTARY WASH
EAST: 429,626.78 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-38
GROUND ELEVATION: 4.44 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 11-4-16
DEPTH OF GROUNDWATER TABLE: 3.70 meter RIG #: ACKER SOILMAX (OEO-807) DATE COMPLETED: 12-4-16
MEASURED AT: 1410 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 9.5 07 Very dense, greyish brown, well graded gravel with silt &
36 11.0
37
sand. 11.3
GW-GM
38 11.6

D
39 11.9
40 Ditto. 12.2
SPT - 12 >50

BI
41 12.5
42 12.8
43 13.1
44 13.4
45
46
47
SPT - 13 >50
R
Ditto. 13.7
14.0
14.3
FO
48 14.6
49 14.9
50
SPT - 14 >50
Ditto. 15.2
51 15.5
52 15.8
ED

53 16.2
54 16.5
55
SPT - 15 24 23.9 10 Medium dense, brown, well graded sand with silt. 16.8
56 17.1
SU

57 SW-SM 17.4
58 17.7
59 18.0
60 SPT - 16 26
Ditto. 18.3
61 18.6
IS

62 18.9
63 19.2
64 19.5
65 SPT - 17 >50
Very dense, greyish brown, silty gravel with sand. 19.8
66 20.1
SPT - 18 >50
Ditto. 20.4
67
68 END OF BORING @ 20.45 m. 20.7
69 21.0
70 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-38
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,140.36 meter TYPE OF BORING: ROTARY WASH
EAST: 429,678.38 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-39
GROUND ELEVATION: 4.09 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 14-4-16
DEPTH OF GROUNDWATER TABLE: 3.35 meter RIG #: ACKER SOILMAX (OEO-807) DATE COMPLETED: 16-4-16
MEASURED AT: 1415 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 Medium dense, brown, silty sand with gravel. 0.3


SPT - 1 30
2 0.6
3 Ditto but dense. 0.9
SPT - 2 38

D
4 1.2
5 1.5
Ditto.

BI
6 SPT - 3 48 9.7 15 1.8
SM
7 2.1
8 Dense, brown, silty gravel with sand. 2.4
SPT - 4 50
9 2.7
10
11
12
SPT - 5 >50 12.6 19
GM
R
Ditto but very dense, light grey.
3.0
3.4
3.7
FO
13 Ditto. 4.0
SPT - 6 >50
14 4.3
15 4.6
16 SPT - 7 >50
Ditto. 4.9
17 5.2
ED

18 5.5
19 5.8
20 6.1
SPT - 8 >50 15.7 32 Very dense, brown, clayey sand with gravel. 6.4
21
SU

22 6.7
23
SC 7.0
24 7.3
25 7.6
SPT - 9 47
Ditto but dense.
26 7.9
IS

27 8.2
28 8.5
29 8.8
30 9.1
SPT - 10 >50 21.2 35 Very dense, light grey, silty clayey sand with gravel.
31 9.4
32 9.8
SC-SM
33 10.1
34 10.4
35 10.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-39
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,140.36 meter TYPE OF BORING: ROTARY WASH
EAST: 429,678.38 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-39
GROUND ELEVATION: 4.09 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 14-4-16
DEPTH OF GROUNDWATER TABLE: 3.35 meter RIG #: ACKER SOILMAX (OEO-807) DATE COMPLETED: 16-4-16
MEASURED AT: 1415 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 Very dense, light grey, silty clayey sand with gravel.
36 11.0
37 11.3
38 11.6

D
39 11.9
40 Medium dense, brown, silty sand. 12.2
SPT - 12 24

BI
41 12.5
42 12.8
43 13.1
44 13.4
45
46
47
SPT - 13 25 21.7 17 R
Ditto. 13.7
14.0
14.3
FO
SM
48 14.6
49 14.9
50
SPT - 14 26
Ditto. 15.2
51 15.5
52 15.8
ED

53 16.2
54 16.5
55
SPT - 15 24
Ditto but with occasional gravel. 16.8
56 17.1
SU

57 17.4
58 17.7
59 18.0
60 SPT - 16 27
Ditto. 18.3
61 18.6
IS

62 18.9
63 19.2
64 19.5
65 SPT - 17 30
Ditto. 19.8
66 20.1
SPT - 18 32
Ditto but dense. 20.4
67
68 END OF BORING @ 20.45 m. 20.7
69 21.0
70 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-39
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,935.09 meter TYPE OF BORING: ROTARY WASH
EAST: 429,618.55 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-40
GROUND ELEVATION: 4.71 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 18-4-16
DEPTH OF GROUNDWATER TABLE: 3.95 meter RIG #: ACKER SOILMAX (OEO-690) DATE COMPLETED: 21-4-16
MEASURED AT: 1425 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 Dense, brown, silty sand. 0.3


SPT - 1 37 3.0 34 SM
2 0.6
3 Ditto but medium dense. 0.9
SPT - 2 23

D
4 1.2
5 1.5
Medium dense, brown, clayey sand with occasional gravel.

BI
6 SPT - 3 27 17.3 35 1.8
SC
7 2.1
8 Dense, grey, silty sand with occasional gravel. 2.4
SPT - 4 31
9 2.7
10
11
12
SPT - 5 29
R
Ditto but medium dense.
3.0
3.4
3.7
FO
13 Ditto. 4.0
SPT - 6 28
14 4.3
15 4.6
16 SPT - 7 32
Ditto but dense. 4.9
17 5.2
ED

18 5.5
19 5.8
20 6.1
SPT - 8 >50 8.5 15 Very dense, brown, silty clayey gravel with sand. 6.4
21
SU

22 6.7
23
GC-GM 7.0
24 7.3
25 7.6
SPT - 9 >50 Very dense, grey, silty sand with gravel.
26 7.9
IS

27 8.2
28 8.5
29 8.8
30 9.1
SPT - 10 >50 Ditto.
31 9.4
32 9.8
33 10.1
34 10.4
35 10.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 3
FIGURE A-40
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,935.09 meter TYPE OF BORING: ROTARY WASH
EAST: 429,618.55 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-40
GROUND ELEVATION: 4.71 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 18-4-16
DEPTH OF GROUNDWATER TABLE: 3.95 meter RIG #: ACKER SOILMAX (OEO-690) DATE COMPLETED: 21-4-16
MEASURED AT: 1425 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 Very dense, greyish brown, silty sand with gravel.
36 11.0
37 11.3
38 11.6

D
39 11.9
40 Ditto. 12.2
SPT - 12 >50

BI
41 12.5
42 12.8
43 13.1
44 13.4
45
46
47
SPT - 13 >50 11.3 29 R
Very dense, brownish grey, silty sand with gravel. 13.7
14.0
14.3
FO
SM
48 14.6
49 14.9
50 SPT - 14 >50 Ditto. 15.2
51 15.5
52 15.8
ED

53 16.2
54 16.5
55 SPT - 15 >50 Ditto but brown. 16.8
56 17.1
SU

57 17.4
58 17.7
59 18.0
60 SPT - 16 >50 Ditto. 18.3
61 18.6
IS

62 18.9
63 19.2
64 19.5
65 SPT - 17 >50 32.8 66 Hard, greyish brown, sandy silt. 19.8
66 20.1
67 ML 20.4
68 20.7
69 21.0
70 SPT - 18 >50
Ditto. 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 3
FIGURE A-40
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,935.09 meter TYPE OF BORING: ROTARY WASH
EAST: 429,618.55 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-40
GROUND ELEVATION: 4.71 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 18-4-16
DEPTH OF GROUNDWATER TABLE: 3.95 meter RIG #: ACKER SOILMAX (OEO-690) DATE COMPLETED: 21-4-16
MEASURED AT: 1425 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

71 Hard, greyish brown, sandy silt. 21.6


72 21.9
73 22.3

D
74 22.6
75 SPT - 19 >50 Ditto. 22.9

BI
76 23.2
77 23.5
78 23.8
79 24.1
SPT - 20 >50 Ditto.
80
81
82
R 24.4
24.7
25.0
FO
83 25.3
84 25.6
SPT - 21 >50 Very dense, brown, clayey silty sand with occasional gravel.
85 25.9
86 26.2
87 26.5
ED

88 26.8
89 27.1
SPT - 22 >50 Ditto but without gravel.
90 27.4
91 27.7
SU

92 28.0
93 28.3
94 28.7
SPT - 23 >50 34.0 97 Hard, brown, silt.
95 29.0
96 29.3
IS

CL-ML
97 29.6
98 29.9
99 30.2
SPT - 24 >50 Ditto.
100 30.5
101
END OF BORING @ 30.40 m. 30.8
102 31.1
103 31.4
104 31.7
105 32.0

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 3
FIGURE A-40
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,960.01 meter TYPE OF BORING: ROTARY WASH
EAST: 429,588.77 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-41
GROUND ELEVATION: 4.54 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 17-4-16
DEPTH OF GROUNDWATER TABLE: 3.80 meter RIG #: ACKER SOILMAX (OEO-807) DATE COMPLETED: 18-4-16
MEASURED AT: 1435 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 Dense, brown, silty sand with occasional gravel. 0.3


SPT - 1 38
2 0.6
3 Dense, brown, silty clayey sand. 0.9
SPT - 2 33 16.5 33

D
4 SC-SM 1.2
5 1.5
Medium dense, brownish grey, poorly graded sand with silt.

BI
6 SPT - 3 21 1.8
7 2.1
8 Ditto. 2.4
SPT - 4 19 19.5 12
9 SP-SM 2.7
10
11
12
SPT - 5 24
R
Ditto.
3.0
3.4
3.7
FO
13 Ditto. 4.0
SPT - 6 20
14 4.3
15 4.6
16 SPT - 7 24
Ditto. 4.9
17 5.2
ED

18 5.5
19 5.8
20 6.1
SPT - 8 40 12.3 17 Dense, brown, silty clayey gravel with sand. 6.4
21
SU

22 6.7
23
GC-GM 7.0
24 7.3
25 7.6
SPT - 9 42
Ditto.
26 7.9
IS

27 8.2
28 8.5
29 8.8
30 9.1
SPT - 10 42 13.8 20 Ditto.
31 9.4
32 9.8
GC-GM
33 10.1
34 10.4
35 10.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-41
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,960.01 meter TYPE OF BORING: ROTARY WASH
EAST: 429,588.77 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-41
GROUND ELEVATION: 4.54 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 17-4-16
DEPTH OF GROUNDWATER TABLE: 3.80 meter RIG #: ACKER SOILMAX (OEO-807) DATE COMPLETED: 18-4-16
MEASURED AT: 1435 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 Very dense, greyish brown, silty clayey gravel with sand.
36 11.0
37 11.3
38 11.6

D
39 11.9
40 Very dense, greyish brown, silty sand with gravel. 12.2
SPT - 12 >50

BI
41 12.5
42 12.8
43 13.1
44 13.4
45
46
47
SPT - 13 >50
R
Ditto. 13.7
14.0
14.3
FO
48 14.6
49 14.9
50
SPT - 14 >50 11.1 20 Very dense, brown, silty clayey sand with gravel. 15.2
51 15.5
52 SC-SM 15.8
ED

53 16.2
54 16.5
55
SPT - 15 43
Ditto but dense. 16.8
56 17.1
SU

57 17.4
58 17.7
59 18.0
60 SPT - 16 44
Ditto. 18.3
61 18.6
IS

62 18.9
63 19.2
64 19.5
65 SPT - 17 36
Dense, brown, silty sand with occasional gravel. 19.8
66 20.1
SPT - 18 43
Ditto. 20.4
67
68 END OF BORING @ 20.45 m. 20.7
69 21.0
70 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-41
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,910.14 meter TYPE OF BORING: ROTARY WASH
EAST: 429,648.28 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-42
GROUND ELEVATION: 4.47 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 17-4-16
DEPTH OF GROUNDWATER TABLE: 3.90 meter RIG #: ACKER MP8 (OEO-808) DATE COMPLETED: 18-4-16
MEASURED AT: 1450 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 Medium dense, brown, silty sand. 0.3


SPT - 1 26 3.8 28 SM
2 0.6
3 Ditto but greyish brown. 0.9
SPT - 2 27

D
4 1.2
5 1.5
Ditto but dense.

BI
6 SPT - 3 35 14.4 13 1.8
SM
7 2.1
8 Ditto. 2.4
SPT - 4 41
9 2.7
10
11
12
SPT - 5 44
R
Ditto.
3.0
3.4
3.7
FO
13 Very dense, greyish brown, gravel with silty sand. 4.0
SPT - 6 >50
14 4.3
15 4.6
16 SPT - 7 42 17.8 15 Dense, brown, silty sand with occasional gravel. 4.9
17 5.2
ED

18 SM 5.5
19 5.8
20 6.1
SPT - 8 >50
Ditto but very dense. 6.4
21
SU

22 6.7
23 7.0
24 7.3
25 7.6
SPT - 9 >50 12.9 18 Very dense, brown, silty gravel with sand.
26 7.9
IS

27 8.2
GM 8.5
28
29 8.8
30 9.1
SPT - 10 >50
Ditto but brownish grey.
31 9.4
32 9.8
33 10.1
34 10.4
35 10.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-42
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,910.14 meter TYPE OF BORING: ROTARY WASH
EAST: 429,648.28 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-42
GROUND ELEVATION: 4.47 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 17-4-16
DEPTH OF GROUNDWATER TABLE: 3.90 meter RIG #: ACKER MP8 (OEO-808) DATE COMPLETED: 18-4-16
MEASURED AT: 1450 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 48 Very dense, brownish grey, silty gravel with sand.
36 11.0
37 11.3
38 11.6

D
39 11.9
40 Dense, brown, poorly graded sand with silt & gravel. 12.2
SPT - 12 50 15.7 08

BI
41 12.5
42 SP-SM 12.8
43 13.1
44 13.4
45
46
47
SPT - 13 >50
R
Ditto but very dense. 13.7
14.0
14.3
FO
48 14.6
49 14.9
50
SPT - 14 >50 12.1 08 Ditto. 15.2
51 15.5
52 SP-SM 15.8
ED

53 16.2
54 16.5
55
SPT - 15 >50
Ditto. 16.8
56 17.1
SU

57 17.4
58 17.7
59 18.0
60 SPT - 16 >50
Ditto. 18.3
61 18.6
IS

62 18.9
63 19.2
64 19.5
65 SPT - 17 >50
Ditto. 19.8
66 20.1
SPT - 18 >50
Ditto. 20.4
67
68 END OF BORING @ 20.45 m. 20.7
69 21.0
70 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-42
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,060.70 meter TYPE OF BORING: ROTARY WASH
EAST: 429,945.56 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-43
GROUND ELEVATION: 3.34 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 23-4-16
DEPTH OF GROUNDWATER TABLE: 2.50 meter RIG #: ACKER SOILMAX (OEO-807) DATE COMPLETED: 26-4-16
MEASURED AT: 1455 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 Medium dense, brown, silty sand with gravel. 0.3


SPT - 1 29
2 0.6
3 Ditto but dense. 0.9
SPT - 2 31

D
4 1.2
5 1.5
Medium dense, brown, silty clayey sand with occasional

BI
6 SPT - 3 28 16.5 40 1.8
SC-SM gravel.
7 2.1
8 Ditto. 2.4
SPT - 4 30
9 2.7
10
11
12
SPT - 5 40 9.6 11
SP-SM
R
Dense, brown, poorly graded sand with silt & gravel.
3.0
3.4
3.7
FO
13 Ditto. 4.0
SPT - 6 37
14 4.3
15 4.6
16 SPT - 7 43
Ditto. 4.9
17 5.2
ED

18 5.5
19 5.8
20 6.1
SPT - 8 35
Ditto. 6.4
21
SU

22 6.7
23 7.0
24 7.3
25 7.6
SPT - 9 36 10.3 14 Dense, brown, silty sand with gravel.
26 7.9
IS

27 8.2
SM 8.5
28
29 8.8
30 9.1
SPT - 10 42
Ditto.
31 9.4
32 9.8
33 10.1
34 10.4
35 10.7
SM
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 3
FIGURE A-43
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,060.70 meter TYPE OF BORING: ROTARY WASH
EAST: 429,945.56 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-43
GROUND ELEVATION: 3.34 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 23-4-16
DEPTH OF GROUNDWATER TABLE: 2.50 meter RIG #: ACKER SOILMAX (OEO-807) DATE COMPLETED: 26-4-16
MEASURED AT: 1455 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 46 11.1 19 Dense, brown, silty sand with occasional gravel.
36 11.0
37 11.3
SM
38 11.6

D
39 11.9
40 Ditto. 12.2
SPT - 12 50

BI
41 12.5
42 12.8
43 13.1
44 13.4
45
46
47
SPT - 13 50
R
Ditto. 13.7
14.0
14.3
FO
48 14.6
49 14.9
50
SPT - 14 >50 19.4 35 Very dense, brown, silty clayey sand with gravel. 15.2
51 15.5
52 SC-SM 15.8
ED

53 16.2
54 16.5
55
SPT - 15 39
Ditto but dense. 16.8
56 17.1
SU

57 17.4
58 17.7
59 18.0
60 SPT - 16 22
Ditto but medium dense. 18.3
61 18.6
IS

62 18.9
63 19.2
64 19.5
65 SPT - 17 21
Ditto. 19.8
66 20.1
67 20.4
68 20.7
69 21.0
70 SPT - 18 25
Ditto. 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 3
FIGURE A-43
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,060.70 meter TYPE OF BORING: ROTARY WASH
EAST: 429,945.56 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-43
GROUND ELEVATION: 3.34 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 23-4-16
DEPTH OF GROUNDWATER TABLE: 2.50 meter RIG #: ACKER SOILMAX (OEO-807) DATE COMPLETED: 26-4-16
MEASURED AT: 1455 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

71 Medium dense, brown, silty clayey sand with gravel. 21.6


72 21.9
73 22.3

D
74 22.6
75 SPT - 19 26 28.7 63 Very stiff, brown, sandy silt. 22.9

BI
76 23.2
77 ML 23.5
78 23.8
79 24.1
SPT - 20 Ditto.
80
81
82
25 R 24.4
24.7
25.0
FO
83 25.3
84 25.6
SPT - 21 23
Ditto.
85 25.9
86 26.2
87 26.5
ED

88 26.8
89 27.1
SPT - 22 22
Medium dense, brown, silty sand with occasional gravel.
90 27.4
91 27.7
SU

92 28.0
93 28.3
94 28.7
SPT - 23 22
Ditto.
95 29.0
96 29.3
IS

97 29.6
98 29.9
99 30.2
SPT - 24 24
Ditto.
100 30.5
101 END OF BORING @ 30.45 m. 30.8
102 31.1
103 31.4
104 31.7
105 32.0

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 3
FIGURE A-43
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,045.70 meter TYPE OF BORING: ROTARY WASH
EAST: 429,933.01 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-44
GROUND ELEVATION: 3.48 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 21-4-16
DEPTH OF GROUNDWATER TABLE: 2.65 meter RIG #: ACKER SOILMAX (OEO-807) DATE COMPLETED: 23-4-16
MEASURED AT: 1510 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abdullah
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 Medium dense, brown, silty sand with occasional gravel. 0.3


SPT - 1 27
2 0.6
3 Medium dense, dark brown, clayey sand. 0.9
SPT - 2 29 13.1 42

D
4 SC 1.2
5 1.5
Ditto but grey.

BI
6 SPT - 3 20 18.1 49 1.8
SC
7 2.1
8 Ditto. 2.4
SPT - 4 27
9 2.7
10
11
12
SPT - 5 42
R
Ditto but dense.
3.0
3.4
3.7
FO
13 Dense, dark brown, silty sand. 4.0
SPT - 6 43 15.2 20
14 SM 4.3
15 4.6
16 SPT - 7 29
Ditto but medium dense. 4.9
17 5.2
ED

18 5.5
19 5.8
20 6.1
SPT - 8 32
Ditto but dense. 6.4
21
SU

22 6.7
23 7.0
24 7.3
25 7.6
SPT - 9 41 8.9 16 Ditto.
26 7.9
IS

27 8.2
SM 8.5
28
29 8.8
30 9.1
SPT - 10 42
Dense, dark brown, clayey sand.
31 9.4
32 9.8
33 10.1
34 10.4
35 10.7
SC
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-44
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,045.70 meter TYPE OF BORING: ROTARY WASH
EAST: 429,933.01 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-44
GROUND ELEVATION: 3.48 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 21-4-16
DEPTH OF GROUNDWATER TABLE: 2.65 meter RIG #: ACKER SOILMAX (OEO-807) DATE COMPLETED: 23-4-16
MEASURED AT: 1510 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abdullah
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 33 19.7 38 Dense, light grey, clayey sand.
36 11.0
37 11.3
SC
38 11.6

D
39 11.9
40 Ditto. 12.2
SPT - 12 31

BI
41 12.5
42 12.8
43 13.1
44 13.4
45
46
47
SPT - 13 31 26.2 46 R
Ditto. 13.7
14.0
14.3
FO
SC
48 14.6
49 14.9
50
SPT - 14 38
Ditto. 15.2
51 15.5
52 15.8
ED

53 16.2
54 16.5
55
SPT - 15 36
Ditto. 16.8
56 17.1
SU

57 17.4
58 17.7
59 18.0
60 SPT - 16 37
Hard, light grey, sandy lean clay. 18.3
61 18.6
IS

62 18.9
63 19.2
64 19.5
65 SPT - 17 40 29.2 58 Ditto. 19.8
CL
66 20.1
SPT - 18 37
Ditto. 20.4
67
68 END OF BORING @ 20.45 m. 20.7
69 21.0
70 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-44
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,003.19 meter TYPE OF BORING: ROTARY WASH
EAST: 429,897.41 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-45
GROUND ELEVATION: 3.63 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 20-4-16
DEPTH OF GROUNDWATER TABLE: 2.80 meter RIG #: ACKER SOILMAX (OEO-807) DATE COMPLETED: 21-4-16
MEASURED AT: 1520 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abdullah
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 Medium dense, brown, silty sand with gravel. 0.3


SPT - 1 26
2 0.6
3 Ditto but dark brown. 0.9
SPT - 2 30

D
4 1.2
5 1.5
Ditto but dense.

BI
6 SPT - 3 41 10.8 25 1.8
SM
7 2.1
8 Ditto. 2.4
SPT - 4 32
9 2.7
10
11
12
SPT - 5 47 8.2 21
SM
R
Ditto.
3.0
3.4
3.7
FO
13 Ditto but very dense. 4.0
SPT - 6 >50
14 4.3
15 4.6
16 SPT - 7 >50
Ditto. 4.9
17 5.2
ED

18 5.5
19 5.8
20 6.1
SPT - 8 >50 9.2 14 Very dense, dark brown, silty sand with gravel. 6.4
21
SU

22 6.7
23
SM 7.0
24 7.3
25 7.6
SPT - 9 >50 Ditto.
26 7.9
IS

27 8.2
28 8.5
29 8.8
30 9.1
SPT - 10 >50
Ditto.
31 9.4
32 9.8
33 10.1
34 10.4
35 10.7
SP-SM
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 3
FIGURE A-45
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,003.19 meter TYPE OF BORING: ROTARY WASH
EAST: 429,897.41 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-45
GROUND ELEVATION: 3.63 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 20-4-16
DEPTH OF GROUNDWATER TABLE: 2.80 meter RIG #: ACKER SOILMAX (OEO-807) DATE COMPLETED: 21-4-16
MEASURED AT: 1520 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abdullah
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 8.2 10 Very dense, dark brown, poorly graded sand with silt &
36 11.0
37
gravel. 11.3
SP-SM
38 11.6

D
39 11.9
40 Ditto. 12.2
SPT - 12 >50

BI
41 12.5
42 12.8
43 13.1
44 13.4
45
46
47
SPT - 13 >50
R
Very dense, light grey, clayey sand with gravel. 13.7
14.0
14.3
FO
48 14.6
49 14.9
50
SPT - 14 50 16.0 23 Ditto but dense. 15.2
51 15.5
52 SC 15.8
ED

53 16.2
54 16.5
55
SPT - 15 50
Ditto. 16.8
56 17.1
SU

57 17.4
58 17.7
59 18.0
60 SPT - 16 46
Ditto. 18.3
61 18.6
IS

62 18.9
63 19.2
64 19.5
65 SPT - 17 >50 13.1 18 Very dense, dark brown, silty sand with gravel. 19.8
66 20.1
67 SM 20.4
68 20.7
69 21.0
70 SPT - 18 25
Ditto but medium dense. 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 3
FIGURE A-45
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,003.19 meter TYPE OF BORING: ROTARY WASH
EAST: 429,897.41 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-45
GROUND ELEVATION: 3.63 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 20-4-16
DEPTH OF GROUNDWATER TABLE: 2.80 meter RIG #: ACKER SOILMAX (OEO-807) DATE COMPLETED: 21-4-16
MEASURED AT: 1520 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abdullah
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

71 Medium dense, dark brown, silty sand. 21.6


72 21.9
73 22.3

D
74 22.6
75 SPT - 19 29 Ditto. 22.9

BI
76 23.2
77 23.5
78 23.8
79 24.1
SPT - 20 Ditto but dense.
80
81
82
31 R 24.4
24.7
25.0
FO
83 25.3
84 25.6
SPT - 21 27 16.5 19 Ditto but medium dense.
85 25.9
86 26.2
SM 26.5
87
ED

88 26.8
89 27.1
SPT - 22 27
Ditto.
90 27.4
91 27.7
SU

92 28.0
93 28.3
94 28.7
SPT - 23 24
Ditto.
95 29.0
96 29.3
IS

97 29.6
98 29.9
99 30.2
SPT - 24 30
Ditto.
100 30.5
101 END OF BORING @ 30.45 m. 30.8
102 31.1
103 31.4
104 31.7
105 32.0

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 3
FIGURE A-45
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,988.19 meter TYPE OF BORING: ROTARY WASH
EAST: 429,884.86 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-46
GROUND ELEVATION: 3.79 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 17-4-16
DEPTH OF GROUNDWATER TABLE: 2.95 meter RIG #: ACKER SOILMAX (OEO-807) DATE COMPLETED: 18-4-16
MEASURED AT: 1530 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abdullah
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 Dense, dark brown, silty sand with gravel. 0.3


SPT - 1 36 6.0 18 SM
2 0.6
3 Ditto. 0.9
SPT - 2 39

D
4 1.2
5 1.5
SPT - 3 >50 8.5 15 Ditto but very dense.

BI
6 1.8
SM
7 2.1
8 Medium dense, light grey, clayey gravel with sand. 2.4
SPT - 4 28
9 2.7
10
11
12
SPT - 5 30 10.7 17
GC
R
Ditto.
3.0
3.4
3.7
FO
13 Dense, light grey, poorly graded gravel with silt & sand. 4.0
SPT - 6 34
14 4.3
15 4.6
16 SPT - 7 41 7.8 09 Ditto. 4.9
17 5.2
ED

18 GP-GM 5.5
19 5.8
20 6.1
SPT - 8 42 12.9 22 Dense, brown, clayey sand with gravel. 6.4
21
SU

22 6.7
23
SC 7.0
24 7.3
25 7.6
SPT - 9 >50 Ditto but very dense.
26 7.9
IS

27 8.2
28 8.5
29 8.8
30 9.1
SPT - 10 >50 Ditto.
31 9.4
32 9.8
33 10.1
34 10.4
35 10.7
SC
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-46
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,988.19 meter TYPE OF BORING: ROTARY WASH
EAST: 429,884.86 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-46
GROUND ELEVATION: 3.79 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 17-4-16
DEPTH OF GROUNDWATER TABLE: 2.95 meter RIG #: ACKER SOILMAX (OEO-807) DATE COMPLETED: 18-4-16
MEASURED AT: 1530 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abdullah
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 12.6 21 Very dense, brown, clayey sand with gravel.
36 11.0
37 11.3
SC
38 11.6

D
39 11.9
40 Ditto. 12.2
SPT - 12 >50

BI
41 12.5
42 12.8
43 13.1
44 13.4
45
46
47
SPT - 13 >50
R
Ditto. 13.7
14.0
14.3
FO
48 14.6
49 14.9
50
SPT - 14 >50 13.2 28 Very dense, brown, clayey gravel with sand. 15.2
51 15.5
52 GC 15.8
ED

53 16.2
54 16.5
55
SPT - 15 >50 14.6 38 Very dense, brown, clayey sand with gravel. 16.8
56 17.1
SU

57 SC 17.4
58 17.7
59 18.0
60 SPT - 16 34
Dense, dark brown, silty sand with occasional gravel. 18.3
61 18.6
IS

62 18.9
63 19.2
64 19.5
65 SPT - 17 >50
Ditto but very dense. 19.8
66 20.1
SPT - 18 37
Ditto but dense. 20.4
67
68 END OF BORING @ 20.45 m. 20.7
69 21.0
70 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-46
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,820.89 meter TYPE OF BORING: ROTARY WASH
EAST: 429,427.18 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-47
GROUND ELEVATION: 4.87 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 23-4-16
DEPTH OF GROUNDWATER TABLE: 4.20 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 26-4-16
MEASURED AT: 1545 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 Medium dense, brown, silty sand with gravel. 0.3


SPT - 1 14 3.4 31 SM
2 0.6
3 Ditto. 0.9
SPT - 2 20

D
4 1.2
5 1.5
SPT - 3 >50 7.2 09 Very dense, brown, poorly graded gravel with silt & sand.

BI
6 1.8
GP-GM
7 2.1
8 Ditto but dense. 2.4
SPT - 4 36
9 2.7
10
11
12
SPT - 5 42
R
Ditto.
3.0
3.4
3.7
FO
13 Dense, brown, poorly graded gravel with sand. 4.0
SPT - 6 40 4.4 04
14 GP 4.3
15 4.6
16 SPT - 7 48
Ditto. 4.9
17 5.2
ED

18 5.5
19 5.8
20 6.1
SPT - 8 42
Ditto. 6.4
21
SU

22 6.7
23 7.0
24 7.3
25 7.6
SPT - 9 >50 Ditto but very dense, greyish brown.
26 7.9
IS

27 8.2
28 8.5
29 8.8
30 9.1
SPT - 10 >50 9.2 07 Very dense, brown, well graded gravel with silt & sand.
31 9.4
32 9.8
GW-GM
33 10.1
34 10.4
35 10.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 3
FIGURE A-47
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,820.89 meter TYPE OF BORING: ROTARY WASH
EAST: 429,427.18 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-47
GROUND ELEVATION: 4.87 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 23-4-16
DEPTH OF GROUNDWATER TABLE: 4.20 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 26-4-16
MEASURED AT: 1545 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 Very dense, brown, silty sand with gravel.
36 11.0
37 11.3
38 11.6

D
39 11.9
40 Ditto. 12.2
SPT - 12 >50

BI
41 12.5
42 12.8
43 13.1
44 13.4
45
46
47
SPT - 13 >50
R
Ditto. 13.7
14.0
14.3
FO
48 14.6
49 14.9
50
SPT - 14 >50
Ditto. 15.2
51 15.5
52 15.8
ED

53 16.2
54 16.5
55
SPT - 15 >50 13.8 21 Ditto. 16.8
56 17.1
SU

57 SM 17.4
58 17.7
59 18.0
60 SPT - 16 47
Ditto but dense. 18.3
61 18.6
IS

62 18.9
63 19.2
64 19.5
65 SPT - 17 38
Ditto. 19.8
66 20.1
67 20.4
68 20.7
69 21.0
70 SPT - 18 >50 19.0 37 SC-SM Very dense, brown, silty clayey sand. 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 3
FIGURE A-47
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,820.89 meter TYPE OF BORING: ROTARY WASH
EAST: 429,427.18 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-47
GROUND ELEVATION: 4.87 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 23-4-16
DEPTH OF GROUNDWATER TABLE: 4.20 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 26-4-16
MEASURED AT: 1545 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

71 Very dense, brown, silty clayey sand. 21.6


72 21.9
SC-SM
73 22.3

D
74 22.6
75 SPT - 19 >50 Ditto. 22.9

BI
76 23.2
77 23.5
78 23.8
79 24.1
SPT - 20 Ditto.
80
81
82
>50 R 24.4
24.7
25.0
FO
83 25.3
84 25.6
SPT - 21 >50
Ditto.
85 25.9
86 26.2
87 26.5
ED

88 26.8
89 27.1
SPT - 22 >50
Ditto.
90 27.4
91 27.7
SU

92 28.0
93 28.3
94 28.7
SPT - 23 >50
Ditto but greyish brown.
95 29.0
96 29.3
IS

97 29.6
98 29.9
99 30.2
SPT - 24 >50
Ditto.
100 30.5
101 END OF BORING @ 30.45 m. 30.8
102 31.1
103 31.4
104 31.7
105 32.0

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 3
FIGURE A-47
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,811.76 meter TYPE OF BORING: ROTARY WASH
EAST: 429,438.07 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-48
GROUND ELEVATION: 4.87 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 27-4-16
DEPTH OF GROUNDWATER TABLE: 3.95 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 28-4-16
MEASURED AT: 1555 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 Medium dense, brown, silty sand with occasional gravel. 0.3


SPT - 1 15 2.7 37 SM
2 0.6
3 Dense, brown, gravel with sandy clayey silt. 0.9
SPT - 2 38

D
4 1.2
5 1.5
Very dense, brown, silty sand with gravel.

BI
6 SPT - 3 >50 16.7 26 1.8
SM
7 2.1
8 Ditto but dense. 2.4
SPT - 4 46
9 2.7
10
11
12
SPT - 5 46
R
Ditto.
3.0
3.4
3.7
FO
13 Ditto. 4.0
SPT - 6 45
14 4.3
15 4.6
16 SPT - 7 >50 11.3 15 Very dense, brown, silty gravel with sand. 4.9
17 5.2
ED

18 GM 5.5
19 5.8
20 6.1
SPT - 8 >50
Ditto. 6.4
21
SU

22 6.7
23 7.0
24 7.3
25 7.6
SPT - 9 >50 7.2 10 Very dense, brown, poorly graded gravel with silt & sand.
26 7.9
IS

27 8.2
GP-GM 8.5
28
29 8.8
30 9.1
SPT - 10 >50
Ditto.
31 9.4
32 9.8
33 10.1
34 10.4
35 10.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-48
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,811.76 meter TYPE OF BORING: ROTARY WASH
EAST: 429,438.07 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-48
GROUND ELEVATION: 4.87 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 27-4-16
DEPTH OF GROUNDWATER TABLE: 3.95 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 28-4-16
MEASURED AT: 1555 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 Very dense, brown, poorly graded gravel with silt & sand.
36 11.0
37 11.3
38 11.6

D
39 11.9
40 Ditto. 12.2
SPT - 12 >50

BI
41 12.5
42 12.8
43 13.1
44 13.4
45
46
47
SPT - 13 >50
R
Ditto. 13.7
14.0
14.3
FO
48 14.6
49 14.9
50
SPT - 14 >50 19.1 20 Very dense, yellowish brown, silty sand. 15.2
51 15.5
52 SM 15.8
ED

53 16.2
54 16.5
55
SPT - 15 49
Ditto but dense. 16.8
56 17.1
SU

57 17.4
58 17.7
59 18.0
60 SPT - 16 >50
Ditto but very dense. 18.3
61 18.6
IS

62 18.9
63 19.2
64 19.5
65 SPT - 17 >50
Ditto but yellowish brown. 19.8
66 20.1
SPT - 18 >50
Ditto. 20.4
67
68 END OF BORING @ 20.45 m. 20.7
69 21.0
70 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-48
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,802.60 meter TYPE OF BORING: ROTARY WASH
EAST: 429,449.03 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-49
GROUND ELEVATION: 4.91 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 25-4-16
DEPTH OF GROUNDWATER TABLE: 4.20 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 26-4-16
MEASURED AT: 1610 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 Medium dense, brown, silty sand with gravel. 0.3


SPT - 1 22 6.9 33 SM
2 0.6
3 Ditto but dense. 0.9
SPT - 2 37

D
4 1.2
5 1.5
Ditto.

BI
6 SPT - 3 38 11.9 22 1.8
SM
7 2.1
8 Ditto. 2.4
SPT - 4 33
9 2.7
10
11
12
SPT - 5 34
R
Ditto.
3.0
3.4
3.7
FO
13 Dense, greyish brown, silty gravel with sand. 4.0
SPT - 6 40 10.3 20
14 GM 4.3
15 4.6
16 SPT - 7 >50
Very dense, brown, poorly graded gravel with silt & sand. 4.9
17 5.2
ED

18 5.5
19 5.8
20 6.1
SPT - 8 >50 9.0 07 Ditto. 6.4
21
SU

22 6.7
23
GP-GM 7.0
24 7.3
25 7.6
SPT - 9 >50
Ditto.
26 7.9
IS

27 8.2
28 8.5
29 8.8
30 9.1
SPT - 10 >50
Ditto.
31 9.4
32 9.8
33 10.1
34 10.4
35 10.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 3
FIGURE A-49
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,802.60 meter TYPE OF BORING: ROTARY WASH
EAST: 429,449.03 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-49
GROUND ELEVATION: 4.91 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 25-4-16
DEPTH OF GROUNDWATER TABLE: 4.20 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 26-4-16
MEASURED AT: 1610 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 Very dense, brown, poorly graded gravel with silt & sand.
36 11.0
37 11.3
38 11.6

D
39 11.9
40 Very dense, brown, silty sand. 12.2
SPT - 12 >50

BI
41 12.5
42 12.8
43 13.1
44 13.4
45
46
47
SPT - 13 >50 29.7 17 R
Ditto. 13.7
14.0
14.3
FO
SM
48 14.6
49 14.9
50
SPT - 14 >50
Ditto but yellowish grey. 15.2
51 15.5
52 15.8
ED

53 16.2
54 16.5
55 SPT - 15 >50 Ditto. 16.8
56 17.1
SU

57 17.4
58 17.7
59 18.0
60 SPT - 16 >50
Ditto but yellowish. 18.3
61 18.6
IS

62 18.9
63 19.2
64 19.5
65 SPT - 17 >50 23.2 72 Hard, brown, lean clay with sand. 19.8
66 20.1
67 CL 20.4
68 20.7
69 21.0
70 SPT - 18 >50
Very dense, grey, silty sand with occasional gravel. 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 3
FIGURE A-49
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,802.60 meter TYPE OF BORING: ROTARY WASH
EAST: 429,449.03 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-49
GROUND ELEVATION: 4.91 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 25-4-16
DEPTH OF GROUNDWATER TABLE: 4.20 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 26-4-16
MEASURED AT: 1610 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

71 Very dense, grey, silty sand with occasional gravel. 21.6


72 21.9
73 22.3

D
74 22.6
75 SPT - 19 >50 Ditto. 22.9

BI
76 23.2
77 23.5
78 23.8
79 24.1
SPT - 20 Ditto.
80
81
82
>50 R 24.4
24.7
25.0
FO
83 25.3
84 25.6
SPT - 21 >50 22.0 21 Very dense, grey, silty sand.
85 25.9
86 26.2
SM 26.5
87
ED

88 26.8
89 27.1
SPT - 22 >50
Ditto but yellowish brown.
90 27.4
91 27.7
SU

92 28.0
93 28.3
94 28.7
SPT - 23 >50
Ditto.
95 29.0
96 29.3
IS

97 29.6
98 29.9
99 30.2
SPT - 24 >50
Ditto but with occasional gravel.
100 30.5
101 END OF BORING @ 30.45 m. 30.8
102 31.1
103 31.4
104 31.7
105 32.0

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 3
FIGURE A-49
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,837.67 meter TYPE OF BORING: ROTARY WASH
EAST: 429,407.16 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-50
GROUND ELEVATION: 5.03 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 26-4-16
DEPTH OF GROUNDWATER TABLE: 4.70 meter RIG #: ACKER MP8 (OEO-808) DATE COMPLETED: 27-4-16
MEASURED AT: 1625 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 Medium dense, brown, silty sand with gravel. 0.3


SPT - 1 28
2 0.6
3 Ditto but dense. 0.9
SPT - 2 37 9.7 20

D
4 SM 1.2
5 1.5
Ditto.

BI
6 SPT - 3 39 1.8
7 2.1
8 Dense, greyish brown, poorly graded sand with silt & gravel. 2.4
SPT - 4 41 14.7 11
9 SP-SM 2.7
10
11
12
SPT - 5 41
R
Ditto.
3.0
3.4
3.7
FO
13 Ditto. 4.0
SPT - 6 43
14 4.3
15 4.6
16 SPT - 7 44
Ditto. 4.9
17 5.2
ED

18 5.5
19 5.8
20 6.1
SPT - 8 >50 4.4 06 Very dense, greyish brown, well graded gravel with silt. 6.4
21
SU

22 6.7
23
GW-GM 7.0
24 7.3
25 7.6
SPT - 9 >50
Ditto.
26 7.9
IS

27 8.2
28 8.5
29 8.8
30 9.1
SPT - 10 >50
Ditto.
31 9.4
32 9.8
33 10.1
34 10.4
35 10.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 3
FIGURE A-50
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,837.67 meter TYPE OF BORING: ROTARY WASH
EAST: 429,407.16 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-50
GROUND ELEVATION: 5.03 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 26-4-16
DEPTH OF GROUNDWATER TABLE: 4.70 meter RIG #: ACKER MP8 (OEO-808) DATE COMPLETED: 27-4-16
MEASURED AT: 1625 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 Very dense, greyish brown, well graded gravel with silt.
36 11.0
37 11.3
38 11.6

D
39 11.9
40 Ditto. 12.2
SPT - 12 >50

BI
41 12.5
42 12.8
43 13.1
44 13.4
45
46
47
SPT - 13 >50 24.0 32 R
Very dense, brown, silty clayey sand with gravel. 13.7
14.0
14.3
FO
SC-SM
48 14.6
49 14.9
50
SPT - 14 >50 25.1 60 Hard, brown, sandy silty clay. 15.2
51 15.5
52 CL-ML 15.8
ED

53 16.2
54 16.5
55
SPT - 15 >50
Ditto. 16.8
56 17.1
SU

57 17.4
58 17.7
59 18.0
60 SPT - 16 >50
Very dense, brown, silty gravel with sand. 18.3
61 18.6
IS

62 18.9
63 19.2
64 19.5
65 SPT - 17 >50
Ditto. 19.8
66 20.1
67 20.4
68 20.7
69 21.0
70 SPT - 18 >50 14.3 25 GM Ditto. 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 3
FIGURE A-50
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,837.67 meter TYPE OF BORING: ROTARY WASH
EAST: 429,407.16 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-50
GROUND ELEVATION: 5.03 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 26-4-16
DEPTH OF GROUNDWATER TABLE: 4.70 meter RIG #: ACKER MP8 (OEO-808) DATE COMPLETED: 27-4-16
MEASURED AT: 1625 HOURS ON: 30-4-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

71 Very dense, brown, silty gravel with sand. 21.6


72 21.9
GM
73 22.3

D
74 22.6
75 SPT - 19 >50 Ditto. 22.9

BI
76 23.2
77 23.5
78 23.8
79 24.1
SPT - 20 20 Ditto.
80
81
82
>50 11.5

GM
R 24.4
24.7
25.0
FO
83 25.3
84 25.6
SPT - 21 >50
Very dense, brown, silty sand with gravel.
85 25.9
86 26.2
87 26.5
ED

88 26.8
89 27.1
SPT - 22 >50
Ditto.
90 27.4
91 27.7
SU

92 28.0
93 28.3
94 28.7
SPT - 23 >50
Ditto.
95 29.0
96 29.3
IS

97 29.6
98 29.9
99 30.2
SPT - 24 >50
Ditto.
100 30.5
101 END OF BORING @ 30.45 m. 30.8
102 31.1
103 31.4
104 31.7
105 32.0

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 3
FIGURE A-50
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,710.02 meter TYPE OF BORING: ROTARY WASH
EAST: 430,746.77 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-51
GROUND ELEVATION: 4.56 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 30-4-16
DEPTH OF GROUNDWATER TABLE: 3.70 meter RIG #: ACKER SOILMAX (OEO-690) DATE COMPLETED: 30-4-16
MEASURED AT: 0630 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 Medium dense, brown, silty sand. 0.3


SPT - 1 20
2 0.6
3 Ditto. 0.9
SPT - 2 28 11.0 29

D
4 SM 1.2
5 1.5
Ditto but dense.

BI
6 SPT - 3 49 1.8
7 2.1
8 Ditto but with gravel. 2.4
SPT - 4 48 11.3 26
9 SM 2.7
10
11
12
SPT - 5 >50 15.2 30
SC
R
Dense, brown, clayey sand with gravel.
3.0
3.4
3.7
FO
13 Ditto but very dense. 4.0
SPT - 6 >50
14 4.3
15 4.6
16 SPT - 7 >50
Very dense, brown, silty sand with gravel. 4.9
17 5.2
ED

18 5.5
19 5.8
20 6.1
SPT - 8 >50
Ditto. 6.4
21
SU

22 6.7
23 7.0
24 7.3
25 7.6
SPT - 9 >50 8.5 14 Ditto.
26 7.9
IS

27 8.2
SM 8.5
28
29 8.8
30 9.1
SPT - 10 >50 Ditto but dark grey.
31 9.4
32 9.8
33 10.1
34 10.4
35 10.7
SC
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 3
FIGURE A-51
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,710.02 meter TYPE OF BORING: ROTARY WASH
EAST: 430,746.77 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-51
GROUND ELEVATION: 4.56 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 30-4-16
DEPTH OF GROUNDWATER TABLE: 3.70 meter RIG #: ACKER SOILMAX (OEO-690) DATE COMPLETED: 30-4-16
MEASURED AT: 0630 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 32.7 31 Very dense, brown, clayey sand with gravel.
36 11.0
37 11.3
SC
38 11.6

D
39 11.9
40 SPT - 12 >50 Ditto. 12.2

BI
41 12.5
42 12.8
43 13.1
44 13.4
45
46
47
SPT - 13 >50 R
Hard, greyish brown, lean clay. 13.7
14.0
14.3
FO
48 14.6
49 14.9
50
SPT - 14 30
Ditto but very stiff. 15.2
51 15.5
52 U-1 26.2 97 Ditto. 15.8
ED

53 CL 16.2
54 16.5
55
SPT - 15 >50
Very dense, greyish brown, silty sand. 16.8
56 17.1
SU

57 17.4
58 17.7
59 18.0
60 SPT - 16 >50
Ditto. 18.3
61 18.6
IS

62 18.9
63 19.2
64 19.5
65 SPT - 17 >50
Ditto. 19.8
66 20.1
67 20.4
68 20.7
69 21.0
70 SPT - 18 >50 Ditto. 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 3
FIGURE A-51
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,710.02 meter TYPE OF BORING: ROTARY WASH
EAST: 430,746.77 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-51
GROUND ELEVATION: 4.56 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 30-4-16
DEPTH OF GROUNDWATER TABLE: 3.70 meter RIG #: ACKER SOILMAX (OEO-690) DATE COMPLETED: 30-4-16
MEASURED AT: 0630 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

71 Very dense, greyish brown, silty sand. 21.6


72 21.9
73 22.3

D
74 22.6
75 SPT - 19 >50 24.8 22 Ditto. 22.9

BI
76 23.2
77 SM 23.5
78 23.8
79 24.1
SPT - 20 >50 Ditto.
80
81
82
R 24.4
24.7
25.0
FO
83 25.3
84 25.6
SPT - 21 >50 Ditto.
85 25.9
86 26.2
87 26.5
ED

88 26.8
89 27.1
SPT - 22 >50 18.4 34 Ditto.
90 27.4
91 27.7
SM
SU

92 28.0
93 28.3
94 28.7
SPT - 23 >50 Ditto.
95 29.0
96 29.3
IS

97 29.6
98 29.9
99 30.2
SPT - 24 >50 Ditto.
100 30.5
END OF BORING @ 30.25 m.
101 30.8
102 31.1
103 31.4
104 31.7
105 32.0

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 3
FIGURE A-51
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,700.56 meter TYPE OF BORING: ROTARY WASH
EAST: 430,738.83 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-52
GROUND ELEVATION: 4.60 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 1-5-16
DEPTH OF GROUNDWATER TABLE: 3.80 meter RIG #: SIMCO (OEO-814) DATE COMPLETED: 1-5-16
MEASURED AT: 0645 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 Medium dense, brown, silty sand with gravel. 0.3


SPT - 1 22
2 0.6
3 Ditto. 0.9
SPT - 2 26

D
4 1.2
5 1.5
Very dense, brown, clayey sand with gravel.

BI
6 SPT - 3 >50 12.8 27 1.8
SC
7 2.1
8 Ditto. 2.4
SPT - 4 >50
9 2.7
10
11
12
SPT - 5 41 13.9 38
SC
R
Dense, brown, clayey sand.
3.0
3.4
3.7
FO
13 Ditto. 4.0
SPT - 6 45
14 4.3
15 4.6
16 SPT - 7 42
Dense, brown, silty clayey gravel with sand. 4.9
17 5.2
ED

18 5.5
19 5.8
20 6.1
SPT - 8 49 10.2 16 Ditto. 6.4
21
SU

22 6.7
23
GC-GM 7.0
24 7.3
25 7.6
SPT - 9 >50
Ditto but very dense.
26 7.9
IS

27 8.2
28 8.5
29 8.8
30 9.1
SPT - 10 >50 Ditto.
31 9.4
32 9.8
33 10.1
34 10.4
35 10.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-52
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,700.56 meter TYPE OF BORING: ROTARY WASH
EAST: 430,738.83 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-52
GROUND ELEVATION: 4.60 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 1-5-16
DEPTH OF GROUNDWATER TABLE: 3.80 meter RIG #: SIMCO (OEO-814) DATE COMPLETED: 1-5-16
MEASURED AT: 0645 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 Very dense, brown, silty clayey gravel with sand.
36 11.0
37 11.3
38 11.6

D
39 11.9
40 SPT - 12 >50 Ditto. 12.2

BI
41 12.5
42 12.8
43 13.1
44 13.4
45
46
47
SPT - 13 >50 17.1 15 R
Very dense, brown, silty sand with gravel. 13.7
14.0
14.3
FO
SM
48 14.6
49 14.9
50 SPT - 14 >50 Ditto. 15.2
51 15.5
52 15.8
ED

53 16.2
54 16.5
55 SPT - 15 >50 17.6 38 Very dense, brown, clayey sand with occasional gravel. 16.8
56 17.1
SU

57 SC 17.4
58 17.7
59 18.0
60 SPT - 16 >50 Ditto. 18.3
61 18.6
IS

62 18.9
63 19.2
64 19.5
65 SPT - 17 >50 16.7 33 Very dense, brown, silty sand with occasional gravel. 19.8
SM
66 20.1
SPT - 18 >50
Ditto. 20.4
67
68 END OF BORING @ 20.45 m. 20.7
69 21.0
70 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-52
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,806.78 meter TYPE OF BORING: ROTARY WASH
EAST: 429,378.80 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-53
GROUND ELEVATION: 5.18 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 8-5-16
DEPTH OF GROUNDWATER TABLE: 4.40 meter RIG #: SIMCO (OEO-811) DATE COMPLETED: 9-5-16
MEASURED AT: 0655 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 Medium dense, brown, silty sand with gravel. 0.3


SPT - 1 17
2 0.6
3 Medium dense, brown, silty gravel with sand. 0.9
SPT - 2 19 11.3 16

D
4 GM 1.2
5 1.5
Ditto but dense.

BI
6 SPT - 3 32 1.8
7 2.1
8 Ditto. 2.4
SPT - 4 46 11.0 14
9 GM 2.7
10
11
12
SPT - 5 48
R
Ditto.
3.0
3.4
3.7
FO
13 Ditto but very dense. 4.0
SPT - 6 >50
14 4.3
15 4.6
16 SPT - 7 >50
Ditto. 4.9
17 5.2
ED

18 5.5
19 5.8
20 6.1
SPT - 8 >50 8.3 06 Very dense, brown, well graded gravel with silt & sand. 6.4
21
SU

22 6.7
23
GW-GM 7.0
24 7.3
25 7.6
SPT - 9 >50
Ditto.
26 7.9
IS

27 8.2
28 8.5
29 8.8
30 9.1
SPT - 10 >50
Ditto.
31 9.4
32 9.8
33 10.1
34 10.4
35 10.7
GW
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-53
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,806.78 meter TYPE OF BORING: ROTARY WASH
EAST: 429,378.80 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-53
GROUND ELEVATION: 5.18 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 8-5-16
DEPTH OF GROUNDWATER TABLE: 4.40 meter RIG #: SIMCO (OEO-811) DATE COMPLETED: 9-5-16
MEASURED AT: 0655 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 13.9 04 Very dense, brown, well graded gravel with sand.
36 11.0
37 11.3
GW
38 11.6

D
39 11.9
40 Ditto. 12.2
SPT - 12 >50

BI
41 12.5
42 12.8
43 13.1
44 13.4
45
46
47
SPT - 13 >50 23.7 21 R
Very dense, brown, silty sand. 13.7
14.0
14.3
FO
SM
48 14.6
49 14.9
50
SPT - 14 >50
Ditto. 15.2
51 15.5
52 15.8
ED

53 16.2
54 16.5
55
SPT - 15 >50
Ditto. 16.8
56 17.1
SU

57 17.4
58 17.7
59 18.0
60 SPT - 16 >50 18.8 43 Very dense, brown, silty clayey sand with occasional gravel. 18.3
61 18.6
IS

62 SC-SM 18.9
63 19.2
64 19.5
65 SPT - 17 >50
Ditto. 19.8
66 20.1
SPT - 18 >50
Ditto. 20.4
67
68 END OF BORING @ 20.45 m. 20.7
69 21.0
70 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-53
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,640.56 meter TYPE OF BORING: ROTARY WASH
EAST: 430,686.65 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-54
GROUND ELEVATION: 4.33 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 1-5-16
DEPTH OF GROUNDWATER TABLE: 3.50 meter RIG #: SIMCO (OEO-814) DATE COMPLETED: 1-5-16
MEASURED AT: 0710 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 Dense, brown, silty sand with gravel. 0.3


SPT - 1 35
2 0.6
3 Ditto. 0.9
SPT - 2 38

D
4 1.2
5 1.5
Ditto.

BI
6 SPT - 3 38 9.4 30 1.8
SM
7 2.1
8 Ditto. 2.4
SPT - 4 40
9 2.7
10
11
12
SPT - 5 49 10.3 15
GC-GM
R
Dense, brown, silty clayey gravel with sand.
3.0
3.4
3.7
FO
13 Ditto but very dense. 4.0
SPT - 6 >50
14 4.3
15 4.6
16 SPT - 7 >50
Ditto. 4.9
17 5.2
ED

18 5.5
19 5.8
20 6.1
SPT - 8 50 11.6 17 Ditto but dense. 6.4
21
SU

22 6.7
23
GC-GM 7.0
24 7.3
25 7.6
SPT - 9 >50
Ditto but very dense.
26 7.9
IS

27 8.2
28 8.5
29 8.8
30 9.1
SPT - 10 >50 23.1 37 Very dense, brown, clayey sand with gravel.
31 9.4
32 9.8
SC
33 10.1
34 10.4
35 10.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-54
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,640.56 meter TYPE OF BORING: ROTARY WASH
EAST: 430,686.65 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-54
GROUND ELEVATION: 4.33 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 1-5-16
DEPTH OF GROUNDWATER TABLE: 3.50 meter RIG #: SIMCO (OEO-814) DATE COMPLETED: 1-5-16
MEASURED AT: 0710 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 Very dense, brown, clayey sand with gravel.
36 11.0
37 11.3
38 11.6

D
39 11.9
40 Ditto. 12.2
SPT - 12 >50

BI
41 12.5
42 12.8
43 13.1
44 13.4
45
46
47
SPT - 13 50 14.0 21 R
Dense, brown, silty sand with gravel. 13.7
14.0
14.3
FO
SM
48 14.6
49 14.9
50
SPT - 14 >50 20.2 18 Ditto but very dense without gravel. 15.2
51 15.5
52 SM 15.8
ED

53 16.2
54 16.5
55
SPT - 15 47
Ditto but dense. 16.8
56 17.1
SU

57 17.4
58 17.7
59 18.0
60 SPT - 16 50
Ditto. 18.3
61 18.6
IS

62 18.9
63 19.2
64 19.5
65 SPT - 17 >50
Ditto but very dense. 19.8
66 20.1
SPT - 18 >50
Ditto. 20.4
67
68 END OF BORING @ 20.45 m. 20.7
69 21.0
70 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-54
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,703.10 meter TYPE OF BORING: ROTARY WASH
EAST: 429,434.27 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-55
GROUND ELEVATION: 5.32 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 2-5-16
DEPTH OF GROUNDWATER TABLE: 4.60 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 2-5-16
MEASURED AT: 0725 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 Medium dense, brown, silty sand. 0.3


SPT - 1 29 4.6 24 SM
2 0.6
3 Ditto but dense. 0.9
SPT - 2 33

D
4 1.2
5 1.5
Ditto but medium dense with occasional gravel.

BI
6 SPT - 3 27 16.9 28 1.8
SM
7 2.1
8 Ditto but dense. 2.4
SPT - 4 33
9 2.7
10
11
12
SPT - 5 >50 8.3 16
GM
R
Very dense, brown, silty gravel with sand.
3.0
3.4
3.7
FO
13 Ditto. 4.0
SPT - 6 >50
14 4.3
15 4.6
16 SPT - 7 47
Ditto but dense. 4.9
17 5.2
ED

18 5.5
19 5.8
20 6.1
SPT - 8 50 10.3 11 Dense, brown, poorly graded gravel with silt & sand. 6.4
21
SU

22 6.7
23
GP-GM 7.0
24 7.3
25 7.6
SPT - 9 48
Ditto.
26 7.9
IS

27 8.2
28 8.5
29 8.8
30 9.1
SPT - 10 >50 14.7 05 Very dense, brown, well graded gravel with silt & sand.
31 9.4
32 9.8
33 10.1
34 10.4
35 10.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 3
FIGURE A-55
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,703.10 meter TYPE OF BORING: ROTARY WASH
EAST: 429,434.27 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-55
GROUND ELEVATION: 5.32 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 2-5-16
DEPTH OF GROUNDWATER TABLE: 4.60 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 2-5-16
MEASURED AT: 0725 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 48 Dense, brown, well graded gravel with silt & sand.
36 11.0
37 11.3
38 11.6

D
39 11.9
40 Ditto. 12.2
SPT - 12 46

BI
41 12.5
42 12.8
43 13.1
44 13.4
45
46
47
SPT - 13 49
R
Ditto. 13.7
14.0
14.3
FO
48 14.6
49 14.9
50
SPT - 14 >50 11.9 16 Very dense, brown, silty sand with gravel. 15.2
51 15.5
52 SM 15.8
ED

53 16.2
54 16.5
55
SPT - 15 >50
Ditto. 16.8
56 17.1
SU

57 17.4
58 17.7
59 18.0
60 SPT - 16 >50
Ditto. 18.3
61 18.6
IS

62 18.9
63 19.2
64 19.5
65 SPT - 17 >50 11.1 11 Very dense, brown, well graded sand with silt & gravel. 19.8
66 20.1
67 SW-SM 20.4
68 20.7
69 21.0
70 SPT - 18 >50
Ditto. 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 3
FIGURE A-55
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,703.10 meter TYPE OF BORING: ROTARY WASH
EAST: 429,434.27 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-55
GROUND ELEVATION: 5.32 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 2-5-16
DEPTH OF GROUNDWATER TABLE: 4.60 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 2-5-16
MEASURED AT: 0725 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

71 Very dense, brown, well graded sand with silt & gravel. 21.6
72 21.9
73 22.3

D
74 22.6
75 SPT - 19 >50 11.7 08 Ditto. 22.9

BI
76 23.2
77 SW-SM 23.5
78 23.8
79 24.1
SPT - 20 Ditto.
80
81
82
>50 R 24.4
24.7
25.0
FO
83 25.3
84 25.6
SPT - 21 >50 12.5 09 Very dense, brown, well graded sand with silt & gravel.
85 25.9
86 26.2
SW-SM 26.5
87
ED

88 26.8
89 27.1
SPT - 22 >50
Ditto.
90 27.4
91 27.7
SU

92 28.0
93 28.3
94 28.7
SPT - 23 >50
Ditto.
95 29.0
96 29.3
IS

97 29.6
98 29.9
99 30.2
SPT - 24 >50
Ditto.
100 30.5
101 END OF BORING @ 30.45 m. 30.8
102 31.1
103 31.4
104 31.7
105 32.0

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 3
FIGURE A-55
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,869.95 meter TYPE OF BORING: ROTARY WASH
EAST: 430,845.99 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-56
GROUND ELEVATION: 3.05 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 30-4-16
DEPTH OF GROUNDWATER TABLE: 2.20 meter RIG #: ACKER SOILMAX (OEO-690) DATE COMPLETED: 1-5-16
MEASURED AT: 0735 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 Dense, brown, silty sand with occasional gravel. 0.3


SPT - 1 34
2 0.6
3 Ditto but greyish brown. 0.9
SPT - 2 32

D
4 1.2
5 1.5
Very dense, greyish brown, silty gravel with sand.

BI
6 SPT - 3 45 6.4 18 1.8
GM
7 2.1
8 Ditto. 2.4
SPT - 4 49
9 2.7
10
11
12
SPT - 5 45 10.3 27
GM
R
Ditto.
3.0
3.4
3.7
FO
13 Very dense, brown, silty sand with gravel. 4.0
SPT - 6 >50
14 4.3
15 4.6
16 SPT - 7 >50 9.9 14 Ditto. 4.9
17 5.2
ED

18 SM 5.5
19 5.8
20 6.1
SPT - 8 >50
Ditto. 6.4
21
SU

22 6.7
23 7.0
24 7.3
25 7.6
SPT - 9 >50
Ditto but grey.
26 7.9
IS

27 8.2
28 8.5
29 8.8
30 9.1
SPT - 10 >50 12.8 21 Ditto but greyish brown.
31 9.4
32 9.8
SM
33 10.1
34 10.4
35 10.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 3
FIGURE A-56
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,869.95 meter TYPE OF BORING: ROTARY WASH
EAST: 430,845.99 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-56
GROUND ELEVATION: 3.05 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 30-4-16
DEPTH OF GROUNDWATER TABLE: 2.20 meter RIG #: ACKER SOILMAX (OEO-690) DATE COMPLETED: 1-5-16
MEASURED AT: 0735 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 Very dense, greyish brown, poorly graded gravel with silt &
36 11.0
37
sand. 11.3
38 11.6

D
39 11.9
40 SPT - 12 >50 Ditto. 12.2

BI
41 12.5
42 12.8
43 13.1
44 13.4
45
46
47
SPT - 13 >50 R
Ditto. 13.7
14.0
14.3
FO
48 14.6
49 14.9
50 SPT - 14 >50 13.3 09 Ditto but brown. 15.2
51 15.5
52 GP-GM 15.8
ED

53 16.2
54 16.5
55 SPT - 15 >50 Ditto. 16.8
56 17.1
SU

57 17.4
58 17.7
59 18.0
60 SPT - 16 >50 Ditto. 18.3
61 18.6
IS

62 18.9
63 19.2
64 19.5
65 SPT - 17 >50 21.0 48 Very dense, brown, silty sand with traces of clay. 19.8
66 20.1
67 SM 20.4
68 20.7
69 21.0
70 SPT - 18 >50
Ditto. 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 3
FIGURE A-56
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,869.95 meter TYPE OF BORING: ROTARY WASH
EAST: 430,845.99 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-56
GROUND ELEVATION: 3.05 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 30-4-16
DEPTH OF GROUNDWATER TABLE: 2.20 meter RIG #: ACKER SOILMAX (OEO-690) DATE COMPLETED: 1-5-16
MEASURED AT: 0735 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

71 Very dense, brown, silty sand with clay. 21.6


72 21.9
73 22.3

D
74 22.6
75 SPT - 19 >50 18.9 44 Very dense, brown, silty clayey sand. 22.9

BI
76 23.2
77 SC-SM 23.5
78 23.8
79 24.1
SPT - 20 Ditto.
80
81
82
>50 R 24.4
24.7
25.0
FO
83 25.3
84 25.6
SPT - 21 >50 Ditto.
85 25.9
86 26.2
87 26.5
ED

88 26.8
89 27.1
SPT - 22 >50
Very dense, light grey, silty sand.
90 27.4
91 27.7
SU

92 28.0
93 28.3
94 28.7
SPT - 23 >50
Ditto.
95 29.0
96 29.3
IS

97 29.6
98 29.9
99 30.2
SPT - 24 >50
Ditto.
100 30.5
101 END OF BORING @ 30.45 m. 30.8
102 31.1
103 31.4
104 31.7
105 32.0

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 3
FIGURE A-56
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,390.05 meter TYPE OF BORING: ROTARY WASH
EAST: 430,090.76 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-57
GROUND ELEVATION: 3.87 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 30-4-16
DEPTH OF GROUNDWATER TABLE: 3.10 meter RIG #: SIMCO (OEO-812) DATE COMPLETED: 30-4-16
MEASURED AT: 0750 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 Medium dense, brown, silty sand with occasional gravel. 0.3


SPT - 1 26
2 0.6
3 Ditto but dense. 0.9
SPT - 2 33 2.6 39

D
4 SM 1.2
5 1.5
Dense, grey, well graded sand with gravel.

BI
6 SPT - 3 32 1.8
7 2.1
8 Ditto but medium dense. 2.4
SPT - 4 30 7.0 01
9 SW 2.7
10
11
12
SPT - 5 32
R
Very stiff, brown, lean clay with sand.
3.0
3.4
3.7
FO
13 Ditto. 4.0
U-1 22.2 83
14 CL 4.3
15 4.6
16 SPT - 6 43
Ditto but hard. 4.9
17 5.2
ED

18 5.5
19 5.8
20 6.1
SPT - 7 49
Hard, brown, lean clay with sand. 6.4
21
SU

22 Ditto. 6.7
U-2 18.1 75
23 7.0
CL
24 7.3
25 7.6
SPT - 8 >50
Ditto.
26 7.9
IS

27 8.2
28 8.5
29 8.8
30 9.1
SPT - 9 49
Ditto.
31 9.4
32 9.8
33 10.1
34 10.4
35 10.7
SC-SM
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-57
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,390.05 meter TYPE OF BORING: ROTARY WASH
EAST: 430,090.76 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-57
GROUND ELEVATION: 3.87 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 30-4-16
DEPTH OF GROUNDWATER TABLE: 3.10 meter RIG #: SIMCO (OEO-812) DATE COMPLETED: 30-4-16
MEASURED AT: 0750 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 10 >50 14.1 34 Very dense, brown, silty clayey sand with occasional gravel.
36 11.0
37 11.3
SC-SM
38 11.6

D
39 11.9
40 Ditto. 12.2
SPT - 11 >50

BI
41 12.5
42 12.8
43 13.1
44 13.4
45
46
47
SPT - 12 46
R
Ditto but dense. 13.7
14.0
14.3
FO
48 14.6
49 14.9
50
SPT - 13 >50 11.8 20 Very dense, brown, silty sand with gravel. 15.2
51 15.5
52 SM 15.8
ED

53 16.2
54 16.5
55
SPT - 14 >50
Ditto. 16.8
56 17.1
SU

57 17.4
58 17.7
59 18.0
60 SPT - 15 42
Dense, greyish brown, gravel with silty sand. 18.3
61 18.6
IS

62 18.9
63 19.2
64 19.5
65 SPT - 16 46
Ditto. 19.8
66 20.1
SPT - 17 >50
Ditto but very dense. 20.4
67
68 END OF BORING @ 20.45 m. 20.7
69 21.0
70 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-57
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,203.99 meter TYPE OF BORING: ROTARY WASH
EAST: 429,508.89 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-58
GROUND ELEVATION: 4.96 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 3-5-16
DEPTH OF GROUNDWATER TABLE: 4.10 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 3-5-16
MEASURED AT: 0800 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 Medium dense, brown, silty sand with occasional gravel. 0.3


SPT - 1 19 2.3 23 SM
2 0.6
3 Dense, brown, silty sand with gravel. 0.9
SPT - 2 37 13.4 13

D
4 SM 1.2
5 1.5
Ditto but very dense.

BI
6 SPT - 3 >50 10.6 20 1.8
SM
7 2.1
8 Ditto. 2.4
SPT - 4 >50
9 2.7
10
11
12
SPT - 5 48 12.5 16
SM
R
Ditto but dense.
3.0
3.4
3.7
FO
13 Ditto but very dense. 4.0
SPT - 6 >50
14 4.3
15 4.6
16 SPT - 7 >50
Ditto. 4.9
17 5.2
ED

18 5.5
19 5.8
20 6.1
SPT - 8 39
Ditto but dense. 6.4
21
SU

22 6.7
23 7.0
24 7.3
25 7.6
SPT - 9 >50 11.5 08 Very dense, brown, poorly graded gravel with silt & sand.
26 7.9
IS

27 8.2
GP-GM 8.5
28
29 8.8
30 9.1
SPT - 10 >50
Ditto.
31 9.4
32 9.8
33 10.1
34 10.4
35 10.7
GP-GM
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-58
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,203.99 meter TYPE OF BORING: ROTARY WASH
EAST: 429,508.89 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-58
GROUND ELEVATION: 4.96 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 3-5-16
DEPTH OF GROUNDWATER TABLE: 4.10 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 3-5-16
MEASURED AT: 0800 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 13.2 11 Very dense, brown, poorly graded gravel with silt & sand.
36 11.0
37 11.3
GP-GM
38 11.6

D
39 11.9
40 Ditto. 12.2
SPT - 12 >50 8.7 06

BI
41 12.5
42 GP-GM 12.8
43 13.1
44 13.4
45
46
47
SPT - 13 >50
R
Ditto. 13.7
14.0
14.3
FO
48 14.6
49 14.9
50
SPT - 14 >50
Ditto. 15.2
51 15.5
52 15.8
ED

53 16.2
54 16.5
55
SPT - 15 >50 11.2 08 Ditto. 16.8
56 17.1
SU

57 GP-GM 17.4
58 17.7
59 18.0
60 SPT - 16 >50 16.3 39 Very dense, greyish brown, silty clayey sand with occasional 18.3
61 gravel. 18.6
IS

62 SC-SM 18.9
63 19.2
64 19.5
65 SPT - 17 >50
Ditto. 19.8
66 20.1
SPT - 18 >50
Ditto. 20.4
67
68 END OF BORING @ 20.45 m. 20.7
69 21.0
70 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-58
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,687.23 meter TYPE OF BORING: ROTARY WASH
EAST: 429,325.11 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-59
GROUND ELEVATION: 5.59 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 30-4-16
DEPTH OF GROUNDWATER TABLE: 4.70 meter RIG #: ACKER SOILMAX (OEO-807) DATE COMPLETED: 30-4-16
MEASURED AT: 0815 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 Dense, brown, silty sand with gravel & traces of clay. 0.3
SPT - 1 35
2 0.6
3 Ditto. 0.9
SPT - 2 39

D
4 1.2
5 1.5
Dense, brown, silty gravel with sand.

BI
6 SPT - 3 41 6.9 15 1.8
GM
7 2.1
8 Ditto. 2.4
SPT - 4 41
9 2.7
10
11
12
SPT - 5 48
R
Ditto.
3.0
3.4
3.7
FO
13 Ditto but very dense. 4.0
SPT - 6 >50 5.1 16
14 GM 4.3
15 4.6
16 SPT - 7 >50
Ditto. 4.9
17 5.2
ED

18 5.5
19 5.8
20 6.1
SPT - 8 47
Dense, dark brown, silty gravel with sand. 6.4
21
SU

22 6.7
23 7.0
24 7.3
25 7.6
SPT - 9 50 8.5 18 Ditto.
26 7.9
IS

27 8.2
GM 8.5
28
29 8.8
30 9.1
SPT - 10 50
Ditto.
31 9.4
32 9.8
33 10.1
34 10.4
35 10.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-59
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,687.23 meter TYPE OF BORING: ROTARY WASH
EAST: 429,325.11 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-59
GROUND ELEVATION: 5.59 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 30-4-16
DEPTH OF GROUNDWATER TABLE: 4.70 meter RIG #: ACKER SOILMAX (OEO-807) DATE COMPLETED: 30-4-16
MEASURED AT: 0815 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 Very dense, dark brown, silty gravel with sand.
36 11.0
37 11.3
38 11.6

D
39 11.9
40 Ditto but dense. 12.2
SPT - 12 43

BI
41 12.5
42 12.8
43 13.1
44 13.4
45
46
47
SPT - 13 36 15.0 31 R
Ditto. 13.7
14.0
14.3
FO
GM
48 14.6
49 14.9
50
SPT - 14 34
Dense, brown, clayey sand with gravel. 15.2
51 15.5
52 15.8
ED

53 16.2
54 16.5
55
SPT - 15 32 22.5 49 Ditto. 16.8
56 17.1
SU

57 SC 17.4
58 17.7
59 18.0
60 SPT - 16 32 21.6 41 Dense, brown, silty sand. 18.3
61 18.6
IS

62 SM 18.9
63 19.2
64 19.5
65 SPT - 17 31
Ditto. 19.8
66 20.1
SPT - 18 32
Ditto. 20.4
67
68 END OF BORING @ 20.45 m. 20.7
69 21.0
70 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-59
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,755.27 meter TYPE OF BORING: ROTARY WASH
EAST: 429,523.08 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-60
GROUND ELEVATION: 4.70 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 30-4-16
DEPTH OF GROUNDWATER TABLE: 3.85 meter RIG #: ACKER SOILMAX (OEO-807) DATE COMPLETED: 30-4-16
MEASURED AT: 0830 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 Dense, brown, silty sand. 0.3


SPT - 1 32 3.6 26 SM
2 0.6
3 Ditto. 0.9
SPT - 2 35

D
4 1.2
5 1.5
Ditto.

BI
6 SPT - 3 34 1.8
7 2.1
8 Ditto. 2.4
SPT - 4 31
9 2.7
10
11
12
SPT - 5 32 16.2 27
SC-SM
R
Dense, brown, silty clayey sand with occasional gravel.
3.0
3.4
3.7
FO
13 Ditto. 4.0
SPT - 6 31
14 4.3
15 4.6
16 SPT - 7 34
Ditto. 4.9
17 5.2
ED

18 5.5
19 5.8
20 6.1
SPT - 8 36 14.2 25 Dense, brown, silty sand with occasional gravel. 6.4
21
SU

22 6.7
23
SM 7.0
24 7.3
25 7.6
SPT - 9 38 10.2 20 Ditto.
26 7.9
IS

27 8.2
SM 8.5
28
29 8.8
30 9.1
SPT - 10 39
Ditto.
31 9.4
32 9.8
33 10.1
34 10.4
35 10.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-60
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,755.27 meter TYPE OF BORING: ROTARY WASH
EAST: 429,523.08 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-60
GROUND ELEVATION: 4.70 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 30-4-16
DEPTH OF GROUNDWATER TABLE: 3.85 meter RIG #: ACKER SOILMAX (OEO-807) DATE COMPLETED: 30-4-16
MEASURED AT: 0830 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 42 Dense, brown, silty sand with occasional gravel.
36 11.0
37 11.3
38 11.6

D
39 11.9
40 Dense, brown, silty clayey sand with occasional gravel. 12.2
SPT - 12 39 11.7 26

BI
41 12.5
42 SC-SM 12.8
43 13.1
44 13.4
45
46
47
SPT - 13 39
R
Ditto. 13.7
14.0
14.3
FO
48 14.6
49 14.9
50
SPT - 14 40
Ditto. 15.2
51 15.5
52 15.8
ED

53 16.2
54 16.5
55
SPT - 15 42 15.2 33 Dense, brown, silty clayey sand. 16.8
56 17.1
SU

57 SC-SM 17.4
58 17.7
59 18.0
60 SPT - 16 34
Ditto. 18.3
61 18.6
IS

62 18.9
63 19.2
64 19.5
65 SPT - 17 32
Ditto. 19.8
66 20.1
SPT - 18 29
Ditto but medium dense. 20.4
67
68 END OF BORING @ 20.45 m. 20.7
69 21.0
70 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-60
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,730.79 meter TYPE OF BORING: ROTARY WASH
EAST: 429,243.03 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-61
GROUND ELEVATION: 5.84 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 30-4-16
DEPTH OF GROUNDWATER TABLE: 5.00 meter RIG #: ACKER MP8 (OEO-808) DATE COMPLETED: 30-4-16
MEASURED AT: 0845 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 Medium dense, brown, silty sand with gravel. 0.3


SPT - 1 23
2 0.6
3 Dense, brown, silty gravel with sand. 0.9
SPT - 2 41 11.4 15

D
4 GM 1.2
5 1.5
Ditto.

BI
6 SPT - 3 47 1.8
7 2.1
8 Ditto but very dense. 2.4
SPT - 4 >50
9 2.7
10
11
12
SPT - 5 >50 4.2 10
GP-GM
R
Very dense, brown, poorly graded gravel with silt & sand.
3.0
3.4
3.7
FO
13 Ditto. 4.0
SPT - 6 >50
14 4.3
15 4.6
16 SPT - 7 >50
Ditto but grey. 4.9
17 5.2
ED

18 5.5
19 5.8
20 6.1
SPT - 8 >50
Ditto. 6.4
21
SU

22 6.7
23 7.0
24 7.3
25 7.6
SPT - 9 >50 11.5 07 Very dense, brown, well graded sand with silt & gravel.
26 7.9
IS

27 8.2
SW-SM 8.5
28
29 8.8
30 9.1
SPT - 10 >50
Ditto.
31 9.4
32 9.8
33 10.1
34 10.4
35 10.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-61
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,730.79 meter TYPE OF BORING: ROTARY WASH
EAST: 429,243.03 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-61
GROUND ELEVATION: 5.84 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 30-4-16
DEPTH OF GROUNDWATER TABLE: 5.00 meter RIG #: ACKER MP8 (OEO-808) DATE COMPLETED: 30-4-16
MEASURED AT: 0845 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 Very dense, brown, well graded sand with silt & gravel.
36 11.0
37 11.3
38 11.6

D
39 11.9
40 Very dense, brown, silty sand with gravel. 12.2
SPT - 12 >50 15.2 20

BI
41 12.5
42 SM 12.8
43 13.1
44 13.4
45
46
47
SPT - 13 >50
R
Ditto. 13.7
14.0
14.3
FO
48 14.6
49 14.9
50
SPT - 14 >50
Ditto. 15.2
51 15.5
52 15.8
ED

53 16.2
54 16.5
55
SPT - 15 >50
Ditto. 16.8
56 17.1
SU

57 17.4
58 17.7
59 18.0
60 SPT - 16 >50 8.5 08 Very dense, brown, well graded sand with silt & gravel. 18.3
61 18.6
IS

62 SW-SM 18.9
63 19.2
64 19.5
65 SPT - 17 >50
Ditto. 19.8
66 20.1
SPT - 18 >50
Ditto. 20.4
67
68 END OF BORING @ 20.45 m. 20.7
69 21.0
70 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-61
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,220.79 meter TYPE OF BORING: ROTARY WASH
EAST: 430,305.64 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-62
GROUND ELEVATION: 3.15 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 1-5-16
DEPTH OF GROUNDWATER TABLE: 2.40 meter RIG #: ACKER SOILMAX (OEO-807) DATE COMPLETED: 1-5-16
MEASURED AT: 0900 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 Mediumm dense, brown, silty sand. 0.3


SPT - 1 23
2 0.6
3 Ditto. 0.9
SPT - 2 19 7.8 22

D
4 SM 1.2
5 1.5
Ditto.

BI
6 SPT - 3 22 1.8
7 2.1
8 Ditto. 2.4
SPT - 4 21
9 2.7
10
11
12
SPT - 5 32
R
Dense, yellowish brown, silty clayey gravel with sand.
3.0
3.4
3.7
FO
13 Ditto but greyish brown. 4.0
SPT - 6 41 9.6 15
14 GC-GM 4.3
15 4.6
16 SPT - 7 38
Ditto. 4.9
17 5.2
ED

18 5.5
19 5.8
20 6.1
SPT - 8 42
Ditto. 6.4
21
SU

22 6.7
23 7.0
24 7.3
25 7.6
SPT - 9 37 8.0 16 Dense, brown, silty sand with gravel.
26 7.9
IS

27 8.2
SM 8.5
28
29 8.8
30 9.1
SPT - 10 41
Ditto.
31 9.4
32 9.8
33 10.1
34 10.4
35 10.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-62
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,220.79 meter TYPE OF BORING: ROTARY WASH
EAST: 430,305.64 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-62
GROUND ELEVATION: 3.15 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 1-5-16
DEPTH OF GROUNDWATER TABLE: 2.40 meter RIG #: ACKER SOILMAX (OEO-807) DATE COMPLETED: 1-5-16
MEASURED AT: 0900 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 45 Dense, brown, silty sand with gravel.
36 11.0
37 11.3
38 11.6

D
39 11.9
40 Ditto. 12.2
SPT - 12 47 7.3 15

BI
41 12.5
42 SM 12.8
43 13.1
44 13.4
45
46
47
SPT - 13 48
R
Ditto. 13.7
14.0
14.3
FO
48 14.6
49 14.9
50
SPT - 14 45
Ditto. 15.2
51 15.5
52 15.8
ED

53 16.2
54 16.5
55
SPT - 15 >50 6.4 21 Very dense, brown, silty sand with gravel. 16.8
56 17.1
SU

57 SM 17.4
58 17.7
59 18.0
60 SPT - 16 47
Ditto but dense. 18.3
61 18.6
IS

62 18.9
63 19.2
64 19.5
65 SPT - 17 47
Ditto. 19.8
66 20.1
SPT - 18 46
Ditto. 20.4
67
68 END OF BORING @ 20.45 m. 20.7
69 21.0
70 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-62
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,879.91 meter TYPE OF BORING: ROTARY WASH
EAST: 430,700.66 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-63
GROUND ELEVATION: 4.12 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 1-5-16
DEPTH OF GROUNDWATER TABLE: 3.40 meter RIG #: SIMCO (OEO-811) DATE COMPLETED: 2-5-16
MEASURED AT: 0915 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 Very dense, brown, silty sand with gravel. 0.3


SPT - 1 >50
2 0.6
3 Ditto. 0.9
SPT - 2 >50 13.4 20

D
4 SM 1.2
5 1.5
Ditto.

BI
6 SPT - 3 >50 1.8
7 2.1
8 Ditto. 2.4
SPT - 4 >50 15.9 20
9 SM 2.7
10
11
12
SPT - 5 >50
R
Ditto.
3.0
3.4
3.7
FO
13 Ditto. 4.0
SPT - 6 >50
14 4.3
15 4.6
16 SPT - 7 >50
Ditto. 4.9
17 5.2
ED

18 5.5
19 5.8
20 6.1
SPT - 8 >50 18.2 21 Very dense, greyish brown, silty clayey sand with gravel. 6.4
21
SU

22 6.7
23
SC-SM 7.0
24 7.3
25 7.6
SPT - 9 >50
Ditto.
26 7.9
IS

27 8.2
28 8.5
29 8.8
30 9.1
SPT - 10 >50
Very dense, brown, gravel with clayey silty sand.
31 9.4
32 9.8
33 10.1
34 10.4
35 10.7
SM
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-63
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,879.91 meter TYPE OF BORING: ROTARY WASH
EAST: 430,700.66 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-63
GROUND ELEVATION: 4.12 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 1-5-16
DEPTH OF GROUNDWATER TABLE: 3.40 meter RIG #: SIMCO (OEO-811) DATE COMPLETED: 2-5-16
MEASURED AT: 0915 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 10.5 13 Very dense, greyish brown, silty sand with occasional gravel.
36 11.0
37 11.3
SM
38 11.6

D
39 11.9
40 Very dense, brown, silty sand with gravel. 12.2
SPT - 12 >50 15.5 19

BI
41 12.5
42 SM 12.8
43 13.1
44 13.4
45
46
47
SPT - 13 >50
R
Ditto. 13.7
14.0
14.3
FO
48 14.6
49 14.9
50
SPT - 14 >50
Ditto. 15.2
51 15.5
52 15.8
ED

53 16.2
54 16.5
55 SPT - 15 >50 11.8 18 Very dense, brown, silty sand with occasional gravel. 16.8
56 17.1
SU

57 SM 17.4
58 17.7
59 18.0
60 SPT - 16 >50 Ditto. 18.3
61 18.6
IS

62 18.9
63 19.2
64 19.5
65 SPT - 17 >50
Ditto. 19.8
66 20.1
SPT - 18 >50
Ditto. 20.4
67
68 END OF BORING @ 20.45 m. 20.7
69 21.0
70 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-63
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,503.40 meter TYPE OF BORING: ROTARY WASH
EAST: 429,966.16 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-64
GROUND ELEVATION: 5.30 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 1-5-16
DEPTH OF GROUNDWATER TABLE: 4.50 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 1-5-16
MEASURED AT: 0925 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 Medium dense, brown, silty sand with gravel. 0.3


SPT - 1 22
2 0.6
3 Medium dense, brown, clayey sand with occasional gravel. 0.9
SPT - 2 21 13.7 33

D
4 SC 1.2
5 1.5
Medium dense, brown, silty sand with gravel.

BI
6 SPT - 3 15 1.8
7 2.1
8 Ditto. 2.4
SPT - 4 16 9.5 13
9 SM 2.7
10
11
12
SPT - 5 27
R
Ditto.
3.0
3.4
3.7
FO
13 Very stiff, brown, sandy lean clay. 4.0
SPT - 6 31 12.3 52
14 CL 4.3
15 4.6
U-1 47
Brown, silty clayey sand. 4.9
16 14.4
17 5.2
ED

18 SC-SM 5.5
19 5.8
20 6.1
SPT - 7 39
Hard, brown, silty clay with sand. 6.4
21
SU

22 6.7
23 7.0
24 7.3
25 7.6
U-2 77 Ditto.
26 16.7 7.9
IS

27 8.2
CL-ML 8.5
28
29 8.8
30 9.1
SPT - 8 24
Medium dense, brown, clayey sand.
31 9.4
32 9.8
33 10.1
34 10.4
35 10.7
SC
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-64
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,503.40 meter TYPE OF BORING: ROTARY WASH
EAST: 429,966.16 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-64
GROUND ELEVATION: 5.30 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 1-5-16
DEPTH OF GROUNDWATER TABLE: 4.50 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 1-5-16
MEASURED AT: 0925 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
U-3 14.3 48 Brown, clayey sand. 11.0
36
37 11.3
SC
38 11.6

D
39 11.9
40 Dense, brown, silty sand with gravel. 12.2
SPT - 9 40

BI
41 12.5
42 12.8
43 13.1
44 13.4
>50 11.2 17
45
46
47
SPT - 10 R
Ditto but very dense. 13.7
14.0
14.3
FO
SM
48 14.6
49 14.9
50 SPT - 11 >50 Ditto. 15.2
51 15.5
52 15.8
ED

53 16.2
54 16.5
55 SPT - 12 >50 Very dense, brown, well graded gravel with silt & sand. 16.8
56 17.1
SU

57 17.4
58 17.7
59 18.0
60 SPT - 13 >50 8.6 12 Ditto. 18.3
61 18.6
IS

62 GW-GM 18.9
63 19.2
64 19.5
65 SPT - 14 >50 Ditto. 19.8
66 20.1
SPT - 15 >50 Ditto. 20.4
67
END OF BORING @ 20.29 m.
68 20.7
69 21.0
70 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-64
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,934.52 meter TYPE OF BORING: ROTARY WASH
EAST: 430,635.48 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-65
GROUND ELEVATION: 5.49 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 3-5-16
DEPTH OF GROUNDWATER TABLE: 4.70 meter RIG #: ACKER MP8 (OEO-808) DATE COMPLETED: 3-5-16
MEASURED AT: 0940 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 Dense, brown, silty sand with gravel. 0.3


SPT - 1 40
2 0.6
3 Ditto. 0.9
SPT - 2 40 21.2 24

D
4 SM 1.2
5 1.5
Dense, brown, silty gravel with sand.

BI
6 SPT - 3 39 13.4 18 1.8
GM
7 2.1
8 Ditto but very dense. 2.4
SPT - 4 >50
9 2.7
10
11
12
SPT - 5 >50 12.0 21
SM
R
Very dense, brown, silty sand with gravel.
3.0
3.4
3.7
FO
13 Ditto. 4.0
SPT - 6 >50
14 4.3
15 4.6
16 SPT - 7 39 12.4 10 Dense, brown, poorly graded gravel with silt & sand. 4.9
17 5.2
ED

18 GP-GM 5.5
19 5.8
20 6.1
SPT - 8 48
Ditto. 6.4
21
SU

22 6.7
23 7.0
24 7.3
25 7.6
SPT - 9 48
Ditto.
26 7.9
IS

27 8.2
28 8.5
29 8.8
30 9.1
SPT - 10 >50 16.6 40 Very dense, brown, clayey sand with gravel.
31 9.4
32 9.8
SC
33 10.1
34 10.4
35 10.7
SC-SM
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-65
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,934.52 meter TYPE OF BORING: ROTARY WASH
EAST: 430,635.48 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-65
GROUND ELEVATION: 5.49 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 3-5-16
DEPTH OF GROUNDWATER TABLE: 4.70 meter RIG #: ACKER MP8 (OEO-808) DATE COMPLETED: 3-5-16
MEASURED AT: 0940 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 24.7 34 Very dense, brown, silty clayey sand with gravel.
36 11.0
37 11.3
SC-SM
38 11.6

D
39 11.9
40 Ditto. 12.2
SPT - 12 >50

BI
41 12.5
42 12.8
43 13.1
44 13.4
45
46
47
SPT - 13 >50 19.0 91
R
Hard, dark brown, silty clay. 13.7
14.0
14.3
FO
CL-ML
48 14.6
49 14.9
50
SPT - 14 >50 Ditto. 15.2
51 15.5
52 15.8
ED

53 16.2
54 16.5
55
SPT - 15 >50 23.0 90 Hard, dark brown, silty clay. 16.8
56 17.1
SU

57 CL-ML 17.4
58 17.7
59 18.0
60 SPT - 16 >50 Ditto. 18.3
61 18.6
IS

62 18.9
63 19.2
64 19.5
65 SPT - 17 >50 Ditto. 19.8
66 20.1
SPT - 18 >50 Ditto. 20.4
67
68 END OF BORING @ 20.45 m. 20.7
69 21.0
70 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-65
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,937.30 meter TYPE OF BORING: ROTARY WASH
EAST: 429,836.44 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-66
GROUND ELEVATION: 4.17 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 3-5-16
DEPTH OF GROUNDWATER TABLE: 3.40 meter RIG #: ACKER MP8 (OEO-808) DATE COMPLETED: 3-5-16
MEASURED AT: 1000 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 Medium dense, brown, silty sand with gravel. 0.3


SPT - 1 26
2 0.6
3 Ditto but dense. 0.9
SPT - 2 37 15.6 25

D
4 SM 1.2
5 1.5
Ditto but very dense.

BI
6 SPT - 3 >50 1.8
7 2.1
8 Dense, dark grey, silty gravel with sand. 2.4
SPT - 4 44 5.4 13
9 GM 2.7
10
11
12
SPT - 5 39
R
Ditto.
3.0
3.4
3.7
FO
13 Ditto. 4.0
SPT - 6 41
14 4.3
15 4.6
16 SPT - 7 46
Ditto. 4.9
17 5.2
ED

18 5.5
19 5.8
20 6.1
SPT - 8 >50
Ditto but very dense. 6.4
21
SU

22 6.7
23 7.0
24 7.3
25 7.6
SPT - 9 >50 8.1 13 Ditto.
26 7.9
IS

27 8.2
GM 8.5
28
29 8.8
30 9.1
SPT - 10 >50
Ditto.
31 9.4
32 9.8
33 10.1
34 10.4
35 10.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-66
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,937.30 meter TYPE OF BORING: ROTARY WASH
EAST: 429,836.44 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-66
GROUND ELEVATION: 4.17 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 3-5-16
DEPTH OF GROUNDWATER TABLE: 3.40 meter RIG #: ACKER MP8 (OEO-808) DATE COMPLETED: 3-5-16
MEASURED AT: 1000 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 48 Dense, dark grey, silty gravel with sand.
36 11.0
37 11.3
38 11.6

D
39 11.9
40 Ditto but very dense. 12.2
SPT - 12 >50

BI
41 12.5
42 12.8
43 13.1
44 13.4
45
46
47
SPT - 13 >50 4.5 08 R
Very dense, grey, poorly graded gravel with silt & sand. 13.7
14.0
14.3
FO
GP-GM
48 14.6
49 14.9
50
SPT - 14 >50
Ditto. 15.2
51 15.5
52 15.8
ED

53 16.2
54 16.5
55
SPT - 15 >50
Ditto. 16.8
56 17.1
SU

57 17.4
58 17.7
59 18.0
60 SPT - 16 >50
Ditto. 18.3
61 18.6
IS

62 18.9
63 19.2
64 19.5
65 SPT - 17 >50
Ditto. 19.8
66 20.1
SPT - 18 >50
Ditto. 20.4
67
68 END OF BORING @ 20.45 m. 20.7
69 21.0
70 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-66
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,025.88 meter TYPE OF BORING: ROTARY WASH
EAST: 430,546.86 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-67
GROUND ELEVATION: 4.77 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 3-5-16
DEPTH OF GROUNDWATER TABLE: 3.90 meter RIG #: SIMCO (OEO-811) DATE COMPLETED: 3-5-16
MEASURED AT: 1010 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 Dense, brown, silty sand with gravel. 0.3


SPT - 1 39
2 0.6
3 Dense, brown, silty gravel with sand. 0.9
SPT - 2 50 8.1 17

D
4 GM 1.2
5 1.5
Very dense, brown, silty sand with gravel.

BI
6 SPT - 3 >50 10.6 29 1.8
SM
7 2.1
8 Ditto but dense. 2.4
SPT - 4 49
9 2.7
10
11
12
SPT - 5 >50
R
Ditto but very dense.
3.0
3.4
3.7
FO
13 Ditto but dense. 4.0
SPT - 6 41 9.1 19
14 SM 4.3
15 4.6
16 SPT - 7 37
Ditto but with traces of clay. 4.9
17 5.2
ED

18 5.5
19 5.8
20 6.1
SPT - 8 >50 13.2 19 Very dense, brown, silty clayey sand with gravel. 6.4
21
SU

22 6.7
23
SC-SM 7.0
24 7.3
25 7.6
SPT - 9 >50
Very dense, brown, silty sand with gravel.
26 7.9
IS

27 8.2
28 8.5
29 8.8
30 9.1
SPT - 10 >50 7.0 18 Ditto.
31 9.4
32 9.8
SM
33 10.1
34 10.4
35 10.7
SC
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-67
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,025.88 meter TYPE OF BORING: ROTARY WASH
EAST: 430,546.86 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-67
GROUND ELEVATION: 4.77 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 3-5-16
DEPTH OF GROUNDWATER TABLE: 3.90 meter RIG #: SIMCO (OEO-811) DATE COMPLETED: 3-5-16
MEASURED AT: 1010 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 9.5 22 Very dense, brown, clayey sand with gravel.
36 11.0
37 11.3
SC
38 11.6

D
39 11.9
40 Ditto. 12.2
SPT - 12 >50

BI
41 12.5
42 12.8
43 13.1
44 13.4
45
46
47
SPT - 13 >50 11.7 27 R
Very dense, brown, silty sand with gravel. 13.7
14.0
14.3
FO
SM
48 14.6
49 14.9
50
SPT - 14 >50
Ditto. 15.2
51 15.5
52 15.8
ED

53 16.2
54 16.5
55
SPT - 15 >50 11.2 35 Very dense, dark brown, silty sand. 16.8
56 17.1
SU

57 SM 17.4
58 17.7
59 18.0
60 SPT - 16 >50
Ditto. 18.3
61 18.6
IS

62 18.9
63 19.2
64 19.5
65 SPT - 17 >50
Ditto. 19.8
66 20.1
SPT - 18 >50
Ditto. 20.4
67
68 END OF BORING @ 20.45 m. 20.7
69 21.0
70 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-67
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,998.94 meter TYPE OF BORING: ROTARY WASH
EAST: 429,744.05 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-68
GROUND ELEVATION: 3.61 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 3-5-16
DEPTH OF GROUNDWATER TABLE: 2.80 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 3-5-16
MEASURED AT: 1025 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 Dense, brown, silty sand with gravel. 0.3


SPT - 1 31
2 0.6
3 Ditto. 0.9
SPT - 2 32 14.4 17

D
4 SM 1.2
5 1.5
Dense, light brown, silty sand with gravel & traces of clay.

BI
6 SPT - 3 43 14.8 29 1.8
SM
7 2.1
8 Dense, brown, silty clayey sand with gravel. 2.4
SPT - 4 47 12.7 24
9 SC-SM 2.7
10
11
12
SPT - 5 >50
R
Ditto but very dense.
3.0
3.4
3.7
FO
13 Very dense, brown, poorly graded gravel with silt & sand. 4.0
SPT - 6 >50 6.7 07
14 GP-GM 4.3
15 4.6
16 SPT - 7 >50 9.6 11 Very dense, brown, well graded gravel with silt & sand. 4.9
17 5.2
ED

18 GW-GM 5.5
19 5.8
20 6.1
SPT - 8 >50
Ditto. 6.4
21
SU

22 6.7
23 7.0
24 7.3
25 7.6
U-1 27.4 97 Brown, lean clay.
26 7.9
IS

27 8.2
CL 8.5
28
29 8.8
30 9.1
SPT - 9 21
Ditto but very stiff, greyish brown.
31 9.4
32 9.8
33 10.1
34 10.4
35 10.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 3
FIGURE A-68
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,998.94 meter TYPE OF BORING: ROTARY WASH
EAST: 429,744.05 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-68
GROUND ELEVATION: 3.61 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 3-5-16
DEPTH OF GROUNDWATER TABLE: 2.80 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 3-5-16
MEASURED AT: 1025 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 10 29 Hard, greyish brown, lean clay.
36 11.0
37 11.3
38 11.6

D
39 11.9
40 Dense, brown, silty sand with gravel. 12.2
SPT - 11 43

BI
41 12.5
42 12.8
43 13.1
44 13.4
45
46
47
SPT - 12 >50 11.4 09 R
Very dense, brown, well graded gravel with silt & sand. 13.7
14.0
14.3
FO
GW-GM
48 14.6
49 14.9
50
SPT - 13 45
Ditto but dense. 15.2
51 15.5
52 15.8
ED

53 16.2
54 16.5
55
SPT - 14 >50 10.9 09 Ditto but very dense. 16.8
56 17.1
SU

57 GW-GM 17.4
58 17.7
59 18.0
60 SPT - 15 >50
Ditto. 18.3
61 18.6
IS

62 18.9
63 19.2
64 19.5
65 SPT - 16 >50
Ditto. 19.8
66 20.1
67 20.4
68 20.7
69 21.0
70 SPT - 17 >50
Ditto. 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 3
FIGURE A-68
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,998.94 meter TYPE OF BORING: ROTARY WASH
EAST: 429,744.05 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-68
GROUND ELEVATION: 3.61 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 3-5-16
DEPTH OF GROUNDWATER TABLE: 2.80 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 3-5-16
MEASURED AT: 1025 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

71 Very dense, brown, well graded gravel with silt & sand. 21.6
72 21.9
73 22.3

D
74 22.6
75 SPT - 18 >50 11.9 17 Very dense, brown, silty sand with gravel. 22.9

BI
76 23.2
77 SM 23.5
78 23.8
79 24.1
SPT - 19 Ditto.
80
81
82
>50 R 24.4
24.7
25.0
FO
83 25.3
84 25.6
SPT - 20 >50
Ditto.
85 25.9
86 26.2
87 26.5
ED

88 26.8
89 27.1
SPT - 21 >50
Ditto.
90 27.4
91 27.7
SU

92 28.0
93 28.3
94 28.7
SPT - 22 48 21.2 60 Hard, light brown, sandy silty clay.
95 29.0
96 29.3
IS

CL-ML
97 29.6
98 29.9
99 30.2
SPT - 23 44
Ditto.
100 30.5
101 END OF BORING @ 30.45 m. 30.8
102 31.1
103 31.4
104 31.7
105 32.0

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 3
FIGURE A-68
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,889.71 meter TYPE OF BORING: ROTARY WASH
EAST: 429,650.70 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-69
GROUND ELEVATION: 5.03 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 5-5-16
DEPTH OF GROUNDWATER TABLE: 4.10 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 6-5-16
MEASURED AT: 1035 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 Medium dense, brown, silty sand with gravel. 0.3


SPT - 1 22
2 0.6
3 Medium dense, brown, silty gravel with sand & traces of 0.9
SPT - 2 30 10.4 21

D
4 GM clay. 1.2
5 1.5
Ditto but dense.

BI
6 SPT - 3 45 1.8
7 2.1
8 Ditto. 2.4
SPT - 4 42
9 2.7
10
11
12
SPT - 5 49
R
Ditto.
3.0
3.4
3.7
FO
13 Dense, brown, silty sand with gravel & traces of clay. 4.0
SPT - 6 45 14.2 27
14 SM 4.3
15 4.6
16 SPT - 7 >50
Ditto but very dense. 4.9
17 5.2
ED

18 5.5
19 5.8
20 6.1
SPT - 8 >50 16.1 24 Very dense, brown, silty clayey sand with gravel. 6.4
21
SU

22 6.7
23
SC-SM 7.0
24 7.3
25 7.6
SPT - 9 >50
Very dense, grey, silty sand with gravel.
26 7.9
IS

27 8.2
28 8.5
29 8.8
30 9.1
SPT - 10 22 15.7 15 Ditto but medium dense, without gravel.
31 9.4
32 9.8
SM
33 10.1
34 10.4
35 10.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 3
FIGURE A-69
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,889.71 meter TYPE OF BORING: ROTARY WASH
EAST: 429,650.70 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-69
GROUND ELEVATION: 5.03 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 5-5-16
DEPTH OF GROUNDWATER TABLE: 4.10 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 6-5-16
MEASURED AT: 1035 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 22 Medium dense, brown, silty sand.
36 11.0
37 11.3
38 11.6

D
39 11.9
40 Very stiff, brown, lean clay. 12.2
SPT - 12 22

BI
41 12.5
42 12.8
43 13.1
44 13.4
45
46
47
U-1 30.5 97 R
Ditto. 13.7
14.0
14.3
FO
CL
48 14.6
49 14.9
50
SPT - 13 21
Very stiff, brown, lean clay with sand. 15.2
51 15.5
52 15.8
ED

53 16.2
54 16.5
55
SPT - 14 22
Ditto. 16.8
56 17.1
SU

57 17.4
58 17.7
59 18.0
60 U-2 22.7 76 Ditto. 18.3
61 18.6
IS

62 CL 18.9
63 19.2
64 19.5
65 SPT - 15 >50
Very dense, brown, silty sand with gravel. 19.8
66 20.1
67 20.4
68 20.7
69 21.0
70 SPT - 16 >50
Very dense, brown, gravel with silty sand. 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 3
FIGURE A-69
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,889.71 meter TYPE OF BORING: ROTARY WASH
EAST: 429,650.70 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-69
GROUND ELEVATION: 5.03 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 5-5-16
DEPTH OF GROUNDWATER TABLE: 4.10 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 6-5-16
MEASURED AT: 1035 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

71 Very dense, brown, gravel with silty sand. 21.6


72 21.9
73 22.3

D
74 22.6
75 SPT - 17 >50 11.4 18 Very dense, brown, silty sand with gravel. 22.9

BI
76 23.2
77 SM 23.5
78 23.8
79 24.1
SPT - 18 Ditto.
80
81
82
>50 R 24.4
24.7
25.0
FO
83 25.3
84 25.6
SPT - 19 >50 11.3 19 Very dense, brown, silty gravel with sand.
85 25.9
86 26.2
GM 26.5
87
ED

88 26.8
89 27.1
SPT - 20 >50 Ditto.
90 27.4
91 27.7
SU

92 28.0
93 28.3
94 28.7
SPT - 21 >50
Ditto.
95 29.0
96 29.3
IS

97 29.6
98 29.9
99 30.2
SPT - 22 >50 Hard, brown, sandy silt with gravel.
100 30.5
101 END OF BORING @ 30.44 m. 30.8
102 31.1
103 31.4
104 31.7
105 32.0

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 3
FIGURE A-69
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,784.52 meter TYPE OF BORING: ROTARY WASH
EAST: 429,562.63 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-70
GROUND ELEVATION: 3.28 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 3-5-16
DEPTH OF GROUNDWATER TABLE: 2.40 meter RIG #: SIMCO (OEO-812) DATE COMPLETED: 3-5-16
MEASURED AT: 1045 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 Medium dense, brown, silty sand with gravel. 0.3


SPT - 1 29
2 0.6
3 Dense, brown, silty gravel with sand. 0.9
SPT - 2 33 2.5 19

D
4 GM 1.2
5 1.5
Ditto.

BI
6 SPT - 3 38 1.8
7 2.1
8 Dense, light brown, silty clayey sand with occasional gravel. 2.4
SPT - 4 42 12.2 35
9 SC-SM 2.7
10
11
12
SPT - 5 41
R
Ditto but off white.
3.0
3.4
3.7
FO
13 Dense, brown, silty sand with occasional gravel. 4.0
SPT - 6 50 8.3 38
14 SM 4.3
15 4.6
16 SPT - 7 46
Ditto. 4.9
17 5.2
ED

18 5.5
19 5.8
20 6.1
SPT - 8 >50
Ditto but very dense. 6.4
21
SU

22 6.7
23 7.0
24 7.3
25 7.6
SPT - 9 36 13.0 32 Dense, brown, clayey sand with gravel.
26 7.9
IS

27 8.2
SC 8.5
28
29 8.8
30 9.1
SPT - 10 42
Ditto.
31 9.4
32 9.8
33 10.1
34 10.4
35 10.7
SM
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 3
FIGURE A-70
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,784.52 meter TYPE OF BORING: ROTARY WASH
EAST: 429,562.63 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-70
GROUND ELEVATION: 3.28 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 3-5-16
DEPTH OF GROUNDWATER TABLE: 2.40 meter RIG #: SIMCO (OEO-812) DATE COMPLETED: 3-5-16
MEASURED AT: 1045 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 36 12.8 18 Dense, brown, silty sand with occasional gravel.
36 11.0
37 11.3
SM
38 11.6

D
39 11.9
40 Ditto. 12.2
SPT - 12 34

BI
41 12.5
42 12.8
43 13.1
44 13.4
45
46
47
SPT - 13 30
R
Ditto but medium dense. 13.7
14.0
14.3
FO
48 14.6
49 14.9
50
SPT - 14 40
Ditto but dense. 15.2
51 15.5
52 15.8
ED

53 16.2
54 16.5
55
SPT - 15 46
Ditto. 16.8
56 17.1
SU

57 17.4
58 17.7
59 18.0
60 SPT - 16 >50 9.3 11 Very dense, grey, well graded sand with silt & gravel. 18.3
61 18.6
IS

62 SW-SM 18.9
63 19.2
64 19.5
65 SPT - 17 >50
Ditto. 19.8
66 20.1
67 20.4
68 20.7
69 21.0
70 SPT - 18 >50 9.5 09 SW-SM Ditto. 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 3
FIGURE A-70
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,784.52 meter TYPE OF BORING: ROTARY WASH
EAST: 429,562.63 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-70
GROUND ELEVATION: 3.28 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 3-5-16
DEPTH OF GROUNDWATER TABLE: 2.40 meter RIG #: SIMCO (OEO-812) DATE COMPLETED: 3-5-16
MEASURED AT: 1045 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

71 Very dense, grey, well graded sand with silt & gravel. 21.6
72 21.9
SW-SM
73 22.3

D
74 22.6
75 SPT - 19 >50 Ditto. 22.9

BI
76 23.2
77 23.5
78 23.8
79 24.1
SPT - 20 Ditto.
80
81
82
>50 R 24.4
24.7
25.0
FO
83 25.3
84 25.6
SPT - 21 >50 13.0 15 Very dense, brown, silty sand with gravel.
85 25.9
86 26.2
SM 26.5
87
ED

88 26.8
89 27.1
SPT - 22 40
Ditto but dense.
90 27.4
91 27.7
SU

92 28.0
93 28.3
94 28.7
SPT - 23 40
Ditto.
95 29.0
96 29.3
IS

97 29.6
98 29.9
99 30.2
SPT - 24 35
Ditto.
100 30.5
101 END OF BORING @ 30.45 m. 30.8
102 31.1
103 31.4
104 31.7
105 32.0

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 3
FIGURE A-70
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,703.99 meter TYPE OF BORING: ROTARY WASH
EAST: 429,495.20 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-71
GROUND ELEVATION: 4.54 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 4-5-16
DEPTH OF GROUNDWATER TABLE: 3.60 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 5-5-16
MEASURED AT: 1100 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 0.3
2
Brown, well graded sand with silt & occasional gravel. 0.6
(Hand excavation)
3 H-1 4.6 11 0.9

D
4 1.2
5 1.5
Dense, brown, silty clayey gravel with sand.

BI
6 SPT - 1 43 8.8 16 1.8
GC-GM
7 2.1
8 Ditto. 2.4
SPT - 2 44
9 2.7
10
11
12
SPT - 3 43
R
Ditto.
3.0
3.4
3.7
FO
13 Ditto. 4.0
SPT - 4 45
14 4.3
15 4.6
16 SPT - 5 >50 12.4 19 Ditto but very dense. 4.9
17 5.2
ED

18 GC-GM 5.5
19 5.8
20 6.1
SPT - 6 >50 12.9 22 Ditto but brown to grey. 6.4
21
SU

22 6.7
23
GC-GM 7.0
24 7.3
25 7.6
SPT - 7 >50
Ditto.
26 7.9
IS

27 8.2
28 8.5
29 8.8
30 9.1
SPT - 8 >50
Very dense, brown, clayey sand with gravel.
31 9.4
32 9.8
33 10.1
34 10.4
35 10.7
GC-GM
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 3
FIGURE A-71
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,703.99 meter TYPE OF BORING: ROTARY WASH
EAST: 429,495.20 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-71
GROUND ELEVATION: 4.54 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 4-5-16
DEPTH OF GROUNDWATER TABLE: 3.60 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 5-5-16
MEASURED AT: 1100 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 9 >50 19.2 26 Very dense, light brown, silty clayey gravel with sand.
36 11.0
37 11.3
GC-GM
38 11.6

D
39 11.9
40 Ditto. 12.2
SPT - 10 >50

BI
41 12.5
42 12.8
43 13.1
44 13.4
45
46
47
SPT - 11 >50 15.0 25 R
Very dense, greyish brown, clayey sand with gravel. 13.7
14.0
14.3
FO
SC
48 14.6
49 14.9
50
SPT - 12 >50
Ditto. 15.2
51 15.5
52 15.8
ED

53 16.2
54 16.5
55
SPT - 13 >50 10.8 16 Very dense, greyish brown, silty clayey gravel with sand. 16.8
56 17.1
SU

57 GC-GM 17.4
58 17.7
59 18.0
60 SPT - 14 >50
Ditto. 18.3
61 18.6
IS

62 18.9
63 19.2
64 19.5
65 SPT - 15 >50
Ditto. 19.8
66 20.1
67 20.4
68 20.7
69 21.0
70 SPT - 16 >50 15.2 27 SC-SM Very dense, brown, silty clayey sand with gravel. 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 3
FIGURE A-71
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,703.99 meter TYPE OF BORING: ROTARY WASH
EAST: 429,495.20 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-71
GROUND ELEVATION: 4.54 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 4-5-16
DEPTH OF GROUNDWATER TABLE: 3.60 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 5-5-16
MEASURED AT: 1100 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

71 Very dense, brown, silty clayey sand with gravel. 21.6


72 21.9
SC-SM
73 22.3

D
74 22.6
75 SPT - 17 >50 Ditto. 22.9

BI
76 23.2
77 23.5
78 23.8
79 24.1
SPT - 18 49 Very dense, greyish brown, clayey sand.
80
81
82
>50 22.8

SC
R 24.4
24.7
25.0
FO
83 25.3
84 25.6
SPT - 19 >50
Ditto.
85 25.9
86 26.2
87 26.5
ED

88 26.8
89 27.1
SPT - 20 >50 26.8 62 Hard, brown, sandy silty clay.
90 27.4
91 27.7
CL-ML
SU

92 28.0
93 28.3
94 28.7
SPT - 21 >50
Ditto.
95 29.0
96 29.3
IS

97 29.6
98 29.9
99 30.2
SPT - 22 >50
Ditto but greyish brown.
100 30.5
101 END OF BORING @ 30.45 m. 30.8
102 31.1
103 31.4
104 31.7
105 32.0

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 3
FIGURE A-71
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,442.51 meter TYPE OF BORING: ROTARY WASH
EAST: 430,033.67 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-72
GROUND ELEVATION: 4.22 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 3-5-16
DEPTH OF GROUNDWATER TABLE: 3.40 meter RIG #: SIMCO (OEO-812) DATE COMPLETED: 3-5-16
MEASURED AT: 1110 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 Medium dense, brown, silty sand. 0.3


SPT - 1 28 1.4 21 SM
2 0.6
3 Ditto but dense. 0.9
SPT - 2 34

D
4 1.2
5 1.5
Dense, dark brown, silty clayey sand with occasional gravel.

BI
6 SPT - 3 31 16.5 33 1.8
SC-SM
7 2.1
8 Ditto. 2.4
SPT - 4 49
9 2.7
10
11
12
SPT - 5 43 12.0 58
CL-ML
R
Hard, dark brown, sandy silty clay.
3.0
3.4
3.7
FO
13 Ditto. 4.0
SPT - 6 46
14 4.3
15 4.6
16 SPT - 7 49 Ditto. 4.9
17 5.2
ED

18 5.5
19 5.8
20 6.1
SPT - 8 47 Ditto. 6.4
21
SU

22 Ditto. 6.7
U-1 15.8 50
23 7.0
CL-ML
24 7.3
25 7.6
SPT - 9 22 Medium dense, brown, silty clayey sand.
26 7.9
IS

27 8.2
28 8.5
29 8.8
30 9.1
SPT - 10 35 16.6 48 Ditto but dense.
31 9.4
32 9.8
SC-SM
33 10.1
34 10.4
35 10.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-72
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,442.51 meter TYPE OF BORING: ROTARY WASH
EAST: 430,033.67 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-72
GROUND ELEVATION: 4.22 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 3-5-16
DEPTH OF GROUNDWATER TABLE: 3.40 meter RIG #: SIMCO (OEO-812) DATE COMPLETED: 3-5-16
MEASURED AT: 1110 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 Very dense, brown, silty clayey sand.
36 11.0
37 11.3
38 11.6

D
39 11.9
40 Very dense, brown, clayey sand with occasional gravel. 12.2
SPT - 12 >50 15.8 46

BI
41 12.5
42 SC 12.8
43 13.1
44 13.4
45
46
47
SPT - 13 >50
R
Ditto. 13.7
14.0
14.3
FO
48 14.6
49 14.9
50
SPT - 14 >50 12.5 34 Very dense, brown, clayey gravel with sand. 15.2
51 15.5
52 GC 15.8
ED

53 16.2
54 16.5
55
SPT - 15 >50
Ditto. 16.8
56 17.1
SU

57 17.4
58 17.7
59 18.0
60 SPT - 16 >50 12.9 39 Very dense, brown, silty clayey sand with occasional gravel. 18.3
61 18.6
IS

62 SC-SM 18.9
63 19.2
64 19.5
65 SPT - 17 >50
Ditto. 19.8
66 20.1
SPT - 18 >50
Ditto. 20.4
67
68 END OF BORING @ 20.45 m. 20.7
69 21.0
70 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-72
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,116.03 meter TYPE OF BORING: ROTARY WASH
EAST: 430,423.61 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-73
GROUND ELEVATION: 4.11 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 2-5-16
DEPTH OF GROUNDWATER TABLE: 3.30 meter RIG #: ACKER SOILMAX (OEO-807) DATE COMPLETED: 3-5-16
MEASURED AT: 1125 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 Medium dense, brown, silty sand with occasional gravel. 0.3


SPT - 1 23
2 0.6
3 Ditto. 0.9
SPT - 2 26 7.3 27

D
4 SM 1.2
5 1.5
Ditto but dense.

BI
6 SPT - 3 33 1.8
7 2.1
8 Ditto. 2.4
SPT - 4 38
9 2.7
10
11
12
SPT - 5 31
R
Ditto.
3.0
3.4
3.7
FO
13 Dense, brown, silty sand with gravel. 4.0
SPT - 6 38 8.4 13
14 SM 4.3
15 4.6
16 SPT - 7 40
Ditto. 4.9
17 5.2
ED

18 5.5
19 5.8
20 6.1
SPT - 8 35
Ditto. 6.4
21
SU

22 6.7
23 7.0
24 7.3
25 7.6
SPT - 9 48 6.3 21 Ditto.
26 7.9
IS

27 8.2
SM 8.5
28
29 8.8
30 9.1
SPT - 10 38
Ditto.
31 9.4
32 9.8
33 10.1
34 10.4
35 10.7
SM
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-73
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,116.03 meter TYPE OF BORING: ROTARY WASH
EAST: 430,423.61 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-73
GROUND ELEVATION: 4.11 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 2-5-16
DEPTH OF GROUNDWATER TABLE: 3.30 meter RIG #: ACKER SOILMAX (OEO-807) DATE COMPLETED: 3-5-16
MEASURED AT: 1125 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 41 5.3 22 Dense, brown, silty sand with gravel.
36 11.0
37 11.3
SM
38 11.6

D
39 11.9
40 Ditto. 12.2
SPT - 12 42

BI
41 12.5
42 12.8
43 13.1
44 13.4
45
46
47
SPT - 13 43
R
Ditto. 13.7
14.0
14.3
FO
48 14.6
49 14.9
50
SPT - 14 41 7.0 22 Ditto. 15.2
51 15.5
52 SM 15.8
ED

53 16.2
54 16.5
55
SPT - 15 47
Ditto. 16.8
56 17.1
SU

57 17.4
58 17.7
59 18.0
60 SPT - 16 30 14.2 26 Medium dense, yellowish brown, silty sand with gravel & 18.3
61 traces of clay. 18.6
IS

62 SM 18.9
63 19.2
64 19.5
65 SPT - 17 33
Ditto but dense. 19.8
66 20.1
SPT - 18 30
Ditto but medium dense. 20.4
67
68 END OF BORING @ 20.45 m. 20.7
69 21.0
70 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-73
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,932.26 meter TYPE OF BORING: ROTARY WASH
EAST: 430,938.87 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-74
GROUND ELEVATION: 2.48 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 3-5-16
DEPTH OF GROUNDWATER TABLE: 1.50 meter RIG #: SIMCO (OEO-814) DATE COMPLETED: 3-5-16
MEASURED AT: 1145 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 Medium dense, brown, silty sand. 0.3


SPT - 1 14
2 0.6
3 Ditto but dark brown. 0.9
SPT - 2 13 11.4 22

D
4 SM 1.2
5 1.5
Medium dense, greyish brown, silty clayey sand with gravel.

BI
6 SPT - 3 18 15.5 38 1.8
SC-SM
7 2.1
8 Ditto. 2.4
SPT - 4 21
9 2.7
10
11
12
SPT - 5 26
R
Ditto.
3.0
3.4
3.7
FO
13 Dense, greyish brown, silty clayey sand. 4.0
SPT - 6 35 16.8 47
14 SC-SM 4.3
15 4.6
16 SPT - 7 >50
Ditto but very dense. 4.9
17 5.2
ED

18 5.5
19 5.8
20 6.1
SPT - 8 >50 8.8 21 Very dense, brown, silty gravel with sand. 6.4
21
SU

22 6.7
23
GM 7.0
24 7.3
25 7.6
SPT - 9 >50
Ditto.
26 7.9
IS

27 8.2
28 8.5
29 8.8
30 9.1
SPT - 10 >50
Ditto.
31 9.4
32 9.8
33 10.1
34 10.4
35 10.7
SC
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-74
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,932.26 meter TYPE OF BORING: ROTARY WASH
EAST: 430,938.87 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-74
GROUND ELEVATION: 2.48 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 3-5-16
DEPTH OF GROUNDWATER TABLE: 1.50 meter RIG #: SIMCO (OEO-814) DATE COMPLETED: 3-5-16
MEASURED AT: 1145 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 11.8 29 Very dense, brown, clayey sand with gravel.
36 11.0
37 11.3
SC
38 11.6

D
39 11.9
40 Ditto. 12.2
SPT - 12 >50

BI
41 12.5
42 12.8
43 13.1
44 13.4
45
46
47
SPT - 13 >50 12.7 20 R
Very dense, brown, silty sand with gravel. 13.7
14.0
14.3
FO
SM
48 14.6
49 14.9
50 SPT - 14 >50 Ditto. 15.2
51 15.5
52 15.8
ED

53 16.2
54 16.5
55 SPT - 15 >50 14.6 28 Very dense, light brown, silty clayey sand with occasional 16.8
56 gravel. 17.1
SU

57 SC-SM 17.4
58 17.7
59 18.0
60 SPT - 16 >50 Ditto. 18.3
61 18.6
IS

62 18.9
63 19.2
64 19.5
65 SPT - 17 >50 Ditto. 19.8
66 20.1
SPT - 18 >50 Ditto. 20.4
67
68 END OF BORING @ 20.36 m. 20.7
69 21.0
70 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-74
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,922.17 meter TYPE OF BORING: ROTARY WASH
EAST: 430,930.43 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-75
GROUND ELEVATION: 2.54 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 1-5-16
DEPTH OF GROUNDWATER TABLE: 1.70 meter RIG #: SIMCO (OEO-814) DATE COMPLETED: 2-5-16
MEASURED AT: 1200 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 Medium dense, brown, silty sand with gravel. 0.3


SPT - 1 19
2 0.6
3 Ditto. 0.9
SPT - 2 19

D
4 1.2
5 1.5
Medium dense, brown, silty clayey sand.

BI
6 SPT - 3 17 14.4 47 1.8
SC-SM
7 2.1
8 Ditto. 2.4
SPT - 4 15
9 2.7
10
11
12
SPT - 5 21 10.7 26
SC-SM
R
Medium dense, brown, silty clayey sand with gravel.
3.0
3.4
3.7
FO
13 Ditto but dense. 4.0
SPT - 6 31
14 4.3
15 4.6
16 SPT - 7 49
Dense, brown, silty clayey gravel with sand. 4.9
17 5.2
ED

18 5.5
19 5.8
20 6.1
SPT - 8 49 11.0 20 Ditto. 6.4
21
SU

22 6.7
23
GC-GM 7.0
24 7.3
25 7.6
SPT - 9 >50
Ditto but very dense.
26 7.9
IS

27 8.2
28 8.5
29 8.8
30 9.1
SPT - 10 >50 11.6 27 Very dense, brown, silty sand with gravel.
31 9.4
32 9.8
SM
33 10.1
34 10.4
35 10.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-75
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,922.17 meter TYPE OF BORING: ROTARY WASH
EAST: 430,930.43 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-75
GROUND ELEVATION: 2.54 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 1-5-16
DEPTH OF GROUNDWATER TABLE: 1.70 meter RIG #: SIMCO (OEO-814) DATE COMPLETED: 2-5-16
MEASURED AT: 1200 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 Very dense, brown, silty sand with gravel.
36 11.0
37 11.3
38 11.6

D
39 11.9
40 Dense, brown, well graded gravel with silt & sand. 12.2
SPT - 12 50 5.6 10

BI
41 12.5
42 GW-GM 12.8
43 13.1
44 13.4
45
46
47
SPT - 13 >50
R
Ditto but very dense. 13.7
14.0
14.3
FO
48 14.6
49 14.9
50 SPT - 14 >50 Ditto. 15.2
51 15.5
52 15.8
ED

53 16.2
54 16.5
55 SPT - 15 >50 Ditto. 16.8
56 17.1
SU

57 17.4
58 17.7
59 18.0
60 SPT - 16 >50 Ditto. 18.3
61 18.6
IS

62 18.9
63 19.2
64 19.5
65 SPT - 17 >50 Ditto. 19.8
66 20.1
SPT - 18 >50 Ditto. 20.4
67
68
END OF BORING @ 20.33 m. 20.7
69 21.0
70 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-75
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,713.52 meter TYPE OF BORING: ROTARY WASH
EAST: 431,029.53 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-76
GROUND ELEVATION: 2.84 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 3-5-16
DEPTH OF GROUNDWATER TABLE: 2.00 meter RIG #: ACKER SOILMAX (OEO-690) DATE COMPLETED: 4-5-16
MEASURED AT: 1210 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 Dense, brown, silty clayey sand with gravel. 0.3


SPT - 1 36
2 0.6
3 Ditto. 0.9
SPT - 2 31 14.2 15

D
4 SM 1.2
5 1.5
Dense, greyish brown, silty sand with gravel & traces of

BI
6 SPT - 3 36 13.2 25 1.8
SM clay.
7 2.1
8 Ditto. 2.4
SPT - 4 43
9 2.7
10
11
12
SPT - 5 41 15.3 25
SM
R
Ditto.
3.0
3.4
3.7
FO
13 Ditto. 4.0
SPT - 6 43
14 4.3
15 4.6
16 SPT - 7 >50
Very dense, brown, silty gravel with sand. 4.9
17 5.2
ED

18 5.5
19 5.8
20 6.1
SPT - 8 >50 12.0 15 Ditto but greyish brown. 6.4
21
SU

22 6.7
23
GM 7.0
24 7.3
25 7.6
SPT - 9 >50
Ditto but brown.
26 7.9
IS

27 8.2
28 8.5
29 8.8
30 9.1
SPT - 10 >50 Ditto.
31 9.4
32 9.8
33 10.1
34 10.4
35 10.7
GP-GM
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 2
FIGURE A-76
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,713.52 meter TYPE OF BORING: ROTARY WASH
EAST: 431,029.53 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-76
GROUND ELEVATION: 2.84 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 3-5-16
DEPTH OF GROUNDWATER TABLE: 2.00 meter RIG #: ACKER SOILMAX (OEO-690) DATE COMPLETED: 4-5-16
MEASURED AT: 1210 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 11 >50 12.7 08 Very dense, brown, poorly graded gravel with silt & sand.
36 11.0
37 11.3
GP-GM
38 11.6

D
39 11.9
40 Ditto. 12.2
SPT - 12 >50

BI
41 12.5
42 12.8
43 13.1
44 13.4
45
46
47
SPT - 13 >50 R
Ditto. 13.7
14.0
14.3
FO
48 14.6
49 14.9
50 SPT - 14 >50 17.3 14 Very dense, brown, silty sand with occasional gravel. 15.2
51 15.5
52 SM 15.8
ED

53 16.2
54 16.5
55 SPT - 15 >50 Ditto. 16.8
56 17.1
SU

57 17.4
58 17.7
59 18.0
60 SPT - 16 >50 Ditto. 18.3
61 18.6
IS

62 18.9
63 19.2
64 19.5
65 SPT - 17 >50 Very dense, greyish brown, gravel with silty sand. 19.8
66 20.1
SPT - 18 >50 Ditto but grey. 20.4
67
END OF BORING @ 20.24 m.
68 20.7
69 21.0
70 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 2
FIGURE A-76
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,497.33 meter TYPE OF BORING: ROTARY WASH
EAST: 429,367.39 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-77
GROUND ELEVATION: 4.23 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 18-5-16
DEPTH OF GROUNDWATER TABLE: 4.10 meter RIG #: SIMCO (OEO-811) DATE COMPLETED: 19-5-16
MEASURED AT: 1118 HOURS ON: 22-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Usman
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 0.3
2
Brown, silty gravel with sand. (Hand excavation, 0.6
0.00-2.00 m. depth)
3 0.9
H-1 6.5 17 GM

D
4 1.2
5 1.5

BI
6 1.8
7 2.1
8 Very dense, light brown, silty clayey sand with gravel. 2.4
SPT - 1 >50 12.5 35
9 SC-SM 2.7
10
11
12
SPT - 2 >50
R
Very dense, brown, poorly graded gravel with silt & sand.
3.0
3.4
3.7
FO
13 Ditto. 4.0
SPT - 3 >50
14 4.3
15 4.6
16 SPT - 4 >50 6.3 09 Ditto. 4.9
17 5.2
ED

18 GP-GM 5.5
19 5.8
20 6.1
SPT - 5 40 9.7 20 Dense, brown, silty clayey gravel with sand. 6.4
21
SU

22 6.7
23
GC-GM 7.0
24 7.3
25 7.6
SPT - 6 36
Ditto.
26 7.9
IS

27 8.2
28 8.5
29 8.8
30 9.1
SPT - 7 48 13.3 27 Dense, yellowish brown, silty gravel with sand.
31 9.4
32 9.8
GM
33 10.1
34 10.4
35 10.7
>50
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 3
FIGURE A-77
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,497.33 meter TYPE OF BORING: ROTARY WASH
EAST: 429,367.39 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-77
GROUND ELEVATION: 4.23 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 18-5-16
DEPTH OF GROUNDWATER TABLE: 4.10 meter RIG #: SIMCO (OEO-811) DATE COMPLETED: 19-5-16
MEASURED AT: 1118 HOURS ON: 22-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Usman
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 8 Very dense, dark grey, silty gravel with sand.
36 11.0
37 11.3
38 11.6

D
39 11.9
40 SPT - 9 >50 Very dense, brown, silty sand with gravel & traces of clay. 12.2

BI
41 12.5
42 12.8
43 13.1
44 13.4
45
46
47
SPT - 10 >50 13.5 22 R
Ditto but brown to dark grey. 13.7
14.0
14.3
FO
SM
48 14.6
49 14.9
50
SPT - 11 >50 10.0 31 Very dense, brown, silty sand with gravel. 15.2
51 15.5
52 SM 15.8
ED

53 16.2
54 16.5
55
SPT - 12 >50
Very dense, brown, silty gravel with sand. 16.8
56 17.1
SU

57 17.4
58 17.7
59 18.0
60 SPT - 13 >50 Ditto. 18.3
61 18.6
IS

62 18.9
63 19.2
64 19.5
65 SPT - 14 >50 12.1 13 Ditto. 19.8
66 20.1
67 GM 20.4
68 20.7
69 21.0
70 SPT - 15 >50
Very dense, brown, silty sand with gravel & traces of clay. 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 3
FIGURE A-77
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,497.33 meter TYPE OF BORING: ROTARY WASH
EAST: 429,367.39 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-77
GROUND ELEVATION: 4.23 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 18-5-16
DEPTH OF GROUNDWATER TABLE: 4.10 meter RIG #: SIMCO (OEO-811) DATE COMPLETED: 19-5-16
MEASURED AT: 1118 HOURS ON: 22-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Usman
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

71 Very dense, brown, silty sand with gravel & traces of clay. 21.6
72 21.9
73 22.3

D
74 22.6
75 SPT - 16 >50 14.5 20 Ditto. 22.9

BI
76 23.2
77 SM 23.5
78 23.8
79 24.1
SPT - 17 Very dense, light brown to brown, silty clayey gravel with
80
81
82
>50 R
sand.
24.4
24.7
25.0
FO
83 25.3
84 25.6
SPT - 18 >50 15.9 22 Ditto.
85 25.9
86 26.2
GC-GM 26.5
87
ED

88 26.8
89 27.1
SPT - 19 >50
Ditto.
90 27.4
91 27.7
SU

92 28.0
93 28.3
94 28.7
SPT - 20 >50
Ditto.
95 29.0
96 29.3
IS

97 29.6
98 29.9
99 30.2
SPT - 21 >50
Ditto.
100 30.5
101 END OF BORING @ 30.45 m. 30.8
102 31.1
103 31.4
104 31.7
105 32.0

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 3
FIGURE A-77
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,628.18 meter TYPE OF BORING: ROTARY WASH
EAST: 429,474.63 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-78
GROUND ELEVATION: 4.32 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 8-5-16
DEPTH OF GROUNDWATER TABLE: 3.60 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 9-5-16
MEASURED AT: 1220 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 0.3
2
Brown, silty sand with occasional gravel. (Hand excavation, 0.6
0.00-1.50 m. depth)
3 H-1 4.0 14 SM 0.9

D
4 1.2
5 1.5
Dense, brown, silty gravel with sand.

BI
6 SPT - 1 39 10.7 18 1.8
GM
7 2.1
8 Ditto. 2.4
SPT - 2 45
9 2.7
10
11
12
SPT - 3 40 10.4 17
GC-GM
R
Dense, light brown, silty clayey gravel with sand.
3.0
3.4
3.7
FO
13 Very dense, light brown, silty gravel with sand. 4.0
SPT - 4 >50 13.2 22
14 GM 4.3
15 4.6
16 SPT - 5 38 21.3 45 Dense, yellowish brown, silty clayey sand with gravel. 4.9
17 5.2
ED

18 SC-SM 5.5
19 5.8
20 6.1
SPT - 6 44
Ditto. 6.4
21
SU

22 6.7
23 7.0
24 7.3
25 7.6
SPT - 7 49 21.4 39 Ditto but brown.
26 7.9
IS

27 8.2
SC-SM 8.5
28
29 8.8
30 9.1
SPT - 8 47
Ditto.
31 9.4
32 9.8
33 10.1
34 10.4
35 10.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 3
FIGURE A-78
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,628.18 meter TYPE OF BORING: ROTARY WASH
EAST: 429,474.63 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-78
GROUND ELEVATION: 4.32 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 8-5-16
DEPTH OF GROUNDWATER TABLE: 3.60 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 9-5-16
MEASURED AT: 1220 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 9 >50 Very dense, yellowish brown, silty clayey sand with gravel.
36 11.0
37 11.3
38 11.6

D
39 11.9
40 Very dense, brown, silty gravel with sand. 12.2
SPT - 10 >50 11.6 19

BI
41 12.5
42 GM 12.8
43 13.1
44 13.4
45
46
47
SPT - 11 >50
R
Ditto. 13.7
14.0
14.3
FO
48 14.6
49 14.9
50
SPT - 12 >50 10.2 16 Very dense, brown, silty clayey gravel with sand. 15.2
51 15.5
52 GC-GM 15.8
ED

53 16.2
54 16.5
55
SPT - 13 >50
Ditto. 16.8
56 17.1
SU

57 17.4
58 17.7
59 18.0
60 SPT - 14 >50 8.1 13 Very dense, brown, silty gravel with sand. 18.3
61 18.6
IS

62 GM 18.9
63 19.2
64 19.5
65 SPT - 15 >50
Very dense, brown, silty sand with gravel. 19.8
66 20.1
67 20.4
68 20.7
69 21.0
70 SPT - 16 >50
Ditto. 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 3
FIGURE A-78
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,628.18 meter TYPE OF BORING: ROTARY WASH
EAST: 429,474.63 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-78
GROUND ELEVATION: 4.32 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 8-5-16
DEPTH OF GROUNDWATER TABLE: 3.60 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 9-5-16
MEASURED AT: 1220 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

71 Very dense, brown, silty sand with clay & gravel. 21.6
72 21.9
73 22.3

D
74 22.6
75 U-1 22.3 79 Brown, silty clay with sand. 22.9

BI
76 23.2
77 CL-ML 23.5
78 23.8
79 24.1
SPT - 17 Ditto but hard.
80
81
82
>50 R 24.4
24.7
25.0
FO
83 25.3
84 25.6
SPT - 18 >50 26.2 80 Hard, brown, lean clay with sand.
85 25.9
86 26.2
CL 26.5
87
ED

88 26.8
89 27.1
SPT - 19 >50
Ditto.
90 27.4
91 27.7
SU

92 28.0
93 28.3
94 28.7
SPT - 20 >50
Ditto.
95 29.0
96 29.3
IS

97 29.6
98 29.9
99 30.2
SPT - 21 >50
Ditto.
100 30.5
101 END OF BORING @ 30.45 m. 30.8
102 31.1
103 31.4
104 31.7
105 32.0

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 3
FIGURE A-78
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,553.32 meter TYPE OF BORING: ROTARY WASH
EAST: 422,282.87 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-79
GROUND ELEVATION: 3.92 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 16-5-16
DEPTH OF GROUNDWATER TABLE: 2.80 meter RIG #: SIMCO (OEO-811) DATE COMPLETED: 17-5-16
MEASURED AT: 1510 HOURS ON: 21-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Usman
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 0.3
2
Brown, silty gravel with sand. (Hand excavation, 0.6
0.00-1.50 m. depth)
3 H-1 7.7 14 GM 0.9

D
4 1.2
5 1.5
Medium dense, greyish brown, well graded sand with silt &

BI
6 SPT - 1 23 13.4 10 1.8
SW-SM gravel.
7 2.1
8 Ditto but dense. 2.4
SPT - 2 31
9 2.7
10
11
12
SPT - 3 17 23.0 26
GM
R
Medium dense, off white, silty gravel size coral fragments
with sand.
3.0
3.4
3.7
FO
13 Ditto. 4.0
SPT - 4 18
14 4.3
15 4.6
16 SPT - 5 20
Ditto. 4.9
17 5.2
ED

18 5.5
19 5.8
20 6.1
SPT - 6 25 11.9 13 Medium dense, brown, silty gravel with sand. 6.4
21
SU

22 6.7
23
GM 7.0
24 7.3
25 7.6
SPT - 7 >50 13.5 07 Very dense, brown to dark grey, poorly graded gravel with
26 7.9
silt & sand.
IS

27 8.2
GP-GM 8.5
28
29 8.8
30 9.1
SPT - 8 47
Ditto but dense.
31 9.4
32 9.8
33 10.1
34 10.4
35 10.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 3
FIGURE A-79
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,553.32 meter TYPE OF BORING: ROTARY WASH
EAST: 422,282.87 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-79
GROUND ELEVATION: 3.92 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 16-5-16
DEPTH OF GROUNDWATER TABLE: 2.80 meter RIG #: SIMCO (OEO-811) DATE COMPLETED: 17-5-16
MEASURED AT: 1510 HOURS ON: 21-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Usman
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 9 >50 Very dense, brown to dark grey, silty gravel with sand.
36 11.0
37 11.3
38 11.6

D
39 11.9
40 Ditto. 12.2
SPT - 10 >50

BI
41 12.5
42 12.8
43 13.1
44 13.4
45
46
47
SPT - 11 >50 11.1 13 R
Ditto. 13.7
14.0
14.3
FO
GM
48 14.6
49 14.9
50
SPT - 12 >50
Ditto. 15.2
51 15.5
52 15.8
ED

53 16.2
54 16.5
55
SPT - 13 >50
Ditto. 16.8
56 17.1
SU

57 17.4
58 17.7
59 18.0
60 SPT - 14 >50 8.9 14 Very dense, brown to dark grey, silty clayey gravel with 18.3
61 sand. 18.6
IS

62 GC-GM 18.9
63 19.2
64 19.5
65 SPT - 15 >50 11.8 20 Ditto but brown. 19.8
66 20.1
67 GC-GM 20.4
68 20.7
69 21.0
70 SPT - 16 >50 Very dense, brown, silty gravel with sand. 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 3
FIGURE A-79
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,553.32 meter TYPE OF BORING: ROTARY WASH
EAST: 422,282.87 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-79
GROUND ELEVATION: 3.92 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 16-5-16
DEPTH OF GROUNDWATER TABLE: 2.80 meter RIG #: SIMCO (OEO-811) DATE COMPLETED: 17-5-16
MEASURED AT: 1510 HOURS ON: 21-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Usman
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

71 Very dense, brown, silty gravel with sand. 21.6


72 21.9
73 22.3

D
74 22.6
75 SPT - 17 >50 Ditto. 22.9

BI
76 23.2
77 23.5
78 23.8
79 24.1
SPT - 18 18 Ditto.
80
81
82
>50 13.2

GM
R 24.4
24.7
25.0
FO
83 25.3
84 25.6
SPT - 19 >50 Very dense, greyish brown, poorly graded gravel with silt &
85 25.9
sand.
86 26.2
87 26.5
ED

88 26.8
89 11 27.1
SPT - 20 >50 11.5 Ditto.
90 27.4
91 27.7
GP-GM
SU

92 28.0
93 28.3
94 28.7
SPT - 21 >50
Ditto.
95 29.0
96 29.3
IS

97 29.6
98 29.9
99 30.2
SPT - 22 >50 Ditto but grey.
100 30.5
101
END OF BORING @ 30.41 m. 30.8
102 31.1
103 31.4
104 31.7
105 32.0

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 3
FIGURE A-79
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,523.06 meter TYPE OF BORING: ROTARY WASH
EAST: 422,271.67 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-80
GROUND ELEVATION: 4.01 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 8-5-16
DEPTH OF GROUNDWATER TABLE: 3.40 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 9-5-16
MEASURED AT: 1255 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 0.3
2
Brown, silty gravel with sand. (Hand excavation, 0.6
0.00-1.50 m. depth)
3 H-1 1.3 16 GM 0.9

D
4 1.2
5 1.5
Dense, brown, silty sand with gravel.

BI
6 SPT - 1 34 13.0 19 1.8
SM
7 2.1
8 Ditto but medium dense. 2.4
SPT - 2 29
9 2.7
10
11
12
SPT - 3 28
R
Ditto.
3.0
3.4
3.7
FO
13 Ditto but dense, whitish brown. 4.0
SPT - 4 31
14 4.3
15 4.6
16 SPT - 5 36 17.6 29 Dense, whitish, silty clayey gravel with sand. 4.9
17 5.2
ED

18 GC-GM 5.5
19 5.8
20 6.1
SPT - 6 36
Ditto. 6.4
21
SU

22 6.7
23 7.0
24 7.3
25 7.6
SPT - 7 39
Ditto but brown.
26 7.9
IS

27 8.2
28 8.5
29 8.8
30 9.1
SPT - 8 47 5.3 06 Dense, brown, poorly graded gravel with silt & sand.
31 9.4
32 9.8
GP-GM
33 10.1
34 10.4
35 10.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 3
FIGURE A-80
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,523.06 meter TYPE OF BORING: ROTARY WASH
EAST: 422,271.67 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-80
GROUND ELEVATION: 4.01 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 8-5-16
DEPTH OF GROUNDWATER TABLE: 3.40 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 9-5-16
MEASURED AT: 1255 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 9 >50 Very dense, brown, poorly graded gravel with silt & sand.
36 11.0
37 11.3
38 11.6

D
39 11.9
40 Very dense, brown, silty sand with gravel. 12.2
SPT - 10 >50 11.7 15

BI
41 12.5
42 SM 12.8
43 13.1
44 13.4
45
46
47
SPT - 11 >50
R
Ditto. 13.7
14.0
14.3
FO
48 14.6
49 14.9
50
SPT - 12 >50
Ditto. 15.2
51 15.5
52 15.8
ED

53 16.2
54 16.5
55
SPT - 13 >50 11.9 11 Very dense, brown, well graded sand with silt & gravel. 16.8
56 17.1
SU

57 SW-SM 17.4
58 17.7
59 18.0
60 SPT - 14 >50
Ditto. 18.3
61 18.6
IS

62 18.9
63 19.2
64 19.5
65 SPT - 15 >50
Ditto. 19.8
66 20.1
67 20.4
68 20.7
69 21.0
70 SPT - 16 >50 7.7 05 GP-GM Very dense, brown, poorly graded gravel with silt & sand. 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 3
FIGURE A-80
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,523.06 meter TYPE OF BORING: ROTARY WASH
EAST: 422,271.67 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-80
GROUND ELEVATION: 4.01 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 8-5-16
DEPTH OF GROUNDWATER TABLE: 3.40 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 9-5-16
MEASURED AT: 1255 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

71 Very dense, brown, poorly graded gravel with silt & sand. 21.6
72 21.9
GP-GM
73 22.3

D
74 22.6
75 SPT - 17 >50 Ditto. 22.9

BI
76 23.2
77 23.5
78 23.8
79 24.1
SPT - 18 Ditto.
80
81
82
>50 R 24.4
24.7
25.0
FO
83 25.3
84 25.6
SPT - 19 >50 11.9 08 Ditto.
85 25.9
86 26.2
GP-GM 26.5
87
ED

88 26.8
89 27.1
SPT - 20 >50 14.0 21 Very dense, brown to grey, silty clayey gravel with sand.
90 27.4
91 27.7
GC-GM
SU

92 28.0
93 28.3
94 28.7
SPT - 21 >50
Ditto.
95 29.0
96 29.3
IS

97 29.6
98 29.9
99 30.2
SPT - 22 >50
Ditto.
100 30.5
101 END OF BORING @ 30.45 m. 30.8
102 31.1
103 31.4
104 31.7
105 32.0

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 3
FIGURE A-80
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,886.53 meter TYPE OF BORING: ROTARY WASH
EAST: 422,834.86 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-81
GROUND ELEVATION: 3.58 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 4-5-16
DEPTH OF GROUNDWATER TABLE: 2.90 meter RIG #: ACKER SOILMAX (OEO-690) DATE COMPLETED: 5-5-16
MEASURED AT: 1235 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 0.3
2
Brown, silty sand with gravel. (Hand excavation, 0.6
0.00-1.50 m. depth)
3 H-1 8.3 21 SM 0.9

D
4 1.2
5 1.5
Dense, greyish white, silty sand with gravel.

BI
6 SPT - 1 39 1.8
7 2.1
8 Dense, greyish brown, poorly graded gravel with sand. 2.4
SPT - 2 38 8.6 02
9 GP 2.7
10
11
12
SPT - 3 42
R
Ditto.
3.0
3.4
3.7
FO
13 Ditto. 4.0
SPT - 4 45
14 4.3
15 4.6
16 SPT - 5 >50
Ditto but very dense. 4.9
17 5.2
ED

18 5.5
19 5.8
20 6.1
SPT - 6 >50 21.7 13 Very dense, light brown, silty gravel with sand. 6.4
21
SU

22 6.7
23
GM 7.0
24 7.3
25 7.6
SPT - 7 >50
Ditto but off white.
26 7.9
IS

27 8.2
28 8.5
29 8.8
30 9.1
SPT - 8 >50 13.7 07 Very dense, brownish grey, well graded gravel with silt &
31 sand. 9.4
32 9.8
GW-GM
33 10.1
34 10.4
35 10.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 3
FIGURE A-81
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,886.53 meter TYPE OF BORING: ROTARY WASH
EAST: 422,834.86 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-81
GROUND ELEVATION: 3.58 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 4-5-16
DEPTH OF GROUNDWATER TABLE: 2.90 meter RIG #: ACKER SOILMAX (OEO-690) DATE COMPLETED: 5-5-16
MEASURED AT: 1235 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 9 >50 Very dense, brownish grey, well graded gravel with silt &
36 11.0
37
sand. 11.3
38 11.6

D
39 11.9
40 Ditto. 12.2
SPT - 10 >50

BI
41 12.5
42 12.8
43 13.1
44 13.4
45
46
47
SPT - 11 >50
R
Ditto. 13.7
14.0
14.3
FO
48 14.6
49 14.9
50
SPT - 12 >50 25.8 64 Hard, brown, sandy silt. 15.2
51 15.5
52 ML 15.8
ED

53 16.2
54 16.5
55
SPT - 13 >50 22.6 37 Very dense, brown, silty sand with occasional gravel & 16.8
56 traces of clay. 17.1
SU

57 SM 17.4
58 17.7
59 18.0
60 SPT - 14 >50 Very dense, brown, gravel with silty sand. 18.3
61 18.6
IS

62 18.9
63 19.2
64 19.5
65 SPT - 15 >50 Ditto but brownish grey. 19.8
66 20.1
67 20.4
68 20.7
69 21.0
70 SPT - 16 >50 17.2 06 SW-SM 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 3
FIGURE A-81
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,886.53 meter TYPE OF BORING: ROTARY WASH
EAST: 422,834.86 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-81
GROUND ELEVATION: 3.58 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 4-5-16
DEPTH OF GROUNDWATER TABLE: 2.90 meter RIG #: ACKER SOILMAX (OEO-690) DATE COMPLETED: 5-5-16
MEASURED AT: 1235 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

71 Very dense, brownish grey, well graded sand with silt & 21.6
72
gravel. 21.9
SW-SM
73 22.3

D
74 22.6
75
SPT - 17 >50 Ditto. 22.9

BI
76 23.2
77 23.5
78 23.8
79 24.1
SPT - 18 >50 9.9 06 Ditto but greyish brown.
80
81
82
SW-SM
R 24.4
24.7
25.0
FO
83 25.3
84 25.6
SPT - 19 >50 Ditto.
85 25.9
86 26.2
87 26.5
ED

88 26.8
89 27.1
SPT - 20 >50 Ditto.
90 27.4
91 27.7
SU

92 28.0
93 28.3
94 28.7
SPT - 21 >50 Ditto.
95 29.0
96 29.3
IS

97 29.6
98 29.9
99 >50 30.2
SPT - 22 Ditto.
100 30.5
END OF BORING @ 30.09 m.
101 30.8
102 31.1
103 31.4
104 31.7
105 32.0

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 3
FIGURE A-81
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,652,441.80 meter TYPE OF BORING: ROTARY WASH
EAST: 425,898.77 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-82
GROUND ELEVATION: 10.36 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 7-5-16
DEPTH OF GROUNDWATER TABLE: 9.50 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 8-5-16
MEASURED AT: 1315 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 0.3
2
Brown, silty sand with gravel. (Hand excavation, 0.6
0.00-1.50 m. depth)
3 H-1 1.8 14 SM 0.9

D
4 1.2
5 1.5
Loose, brown, poorly graded gravel with silt & sand.

BI
6 SPT - 1 08 1.8
7 2.1
8 Ditto but medium dense. 2.4
SPT - 2 11 1.8 08
9 GP-GM 2.7
10
11
12
SPT - 3 04
R
Ditto but very loose.
3.0
3.4
3.7
FO
13 Loose, brown, silty sand with gravel. 4.0
SPT - 4 05 9.3 15
14 SM 4.3
15 4.6
16 SPT - 5 12 2.8 05 Medium dense, brown, poorly graded gravel with silt & 4.9
sand.
17 5.2
ED

18 GP-GM 5.5
19 5.8
20 6.1
SPT - 6 23 10.1 05 Medium dense, brown, well graded gravel with silt & sand. 6.4
21
SU

22 6.7
23
GW-GM 7.0
24 7.3
25 7.6
SPT - 7 33
Ditto but dense.
26 7.9
IS

27 8.2
28 8.5
29 8.8
30 9.1
SPT - 8 >50 Ditto but very dense, grey.
31 9.4
32 9.8
33 10.1
34 10.4
35 10.7
SW
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 3
FIGURE A-82
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,652,441.80 meter TYPE OF BORING: ROTARY WASH
EAST: 425,898.77 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-82
GROUND ELEVATION: 10.36 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 7-5-16
DEPTH OF GROUNDWATER TABLE: 9.50 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 8-5-16
MEASURED AT: 1315 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 9 36 5.4 03 Dense, brown to grey, well graded sand with gravel.
36 11.0
37 11.3
SW
38 11.6

D
39 11.9
40 Ditto. 12.2
SPT - 10 39

BI
41 12.5
42 12.8
43 13.1
44 13.4
45
46
47
SPT - 11 50
R
Ditto. 13.7
14.0
14.3
FO
48 14.6
49 14.9
50
SPT - 12 >50
Ditto but very dense. 15.2
51 15.5
52 15.8
ED

53 16.2
54 16.5
55
SPT - 13 >50 4.8 19 Very dense, brown, silty sand with occasional gravel. 16.8
56 17.1
SU

57 SM 17.4
58 17.7
59 18.0
60 SPT - 14 >50
Very dense, brown, silty gravel with sand. 18.3
61 18.6
IS

62 18.9
63 19.2
64 19.5
65 SPT - 15 >50 14.2 33 Ditto. 19.8
66 20.1
67 GM 20.4
68 20.7
69 21.0
70 SPT - 16 >50
Ditto. 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 3
FIGURE A-82
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,652,441.80 meter TYPE OF BORING: ROTARY WASH
EAST: 425,898.77 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-82
GROUND ELEVATION: 10.36 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 7-5-16
DEPTH OF GROUNDWATER TABLE: 9.50 meter RIG #: ACKER AD-II (OEO-790) DATE COMPLETED: 8-5-16
MEASURED AT: 1315 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

71 Very dense, brown, silty gravel with sand. 21.6


72 21.9
73 22.3

D
74 22.6
75 SPT - 17 >50 Ditto. 22.9

BI
76 23.2
77 23.5
78 23.8
79 24.1
SPT - 18 20 Very dense, brown, silty sand with occasional gravel.
80
81
82
>50 21.4

SM
R 24.4
24.7
25.0
FO
83 25.3
84 25.6
SPT - 19 >50
Ditto.
85 25.9
86 26.2
87 26.5
ED

88 26.8
89 27.1
SPT - 20 >50 29.7 84 Hard, brown, lean clay with occasional gravel.
90 27.4
91 27.7
CL
SU

92 28.0
93 28.3
94 28.7
SPT - 21 >50
Ditto.
95 29.0
96 29.3
IS

97 29.6
98 29.9
99 30.2
SPT - 22 >50
Ditto.
100 30.5
101 END OF BORING @ 30.45 m. 30.8
102 31.1
103 31.4
104 31.7
105 32.0

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 3
FIGURE A-82
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,652,473.53 meter TYPE OF BORING: ROTARY WASH
EAST: 425,920.86 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-83
GROUND ELEVATION: 11.27 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 4-5-16
DEPTH OF GROUNDWATER TABLE: 10.40 meter RIG #: ACKER SOILMAX (OEO-807) DATE COMPLETED: 5-5-16
MEASURED AT: 1325 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 0.3
2
Brown, poorly graded sand with silt & occasional gravel. 0.6
(Hand excavation, 0.00-1.50 m. depth)
3 H-1 5.3 11 SP-SM 0.9

D
4 1.2
5 1.5
Very dense, brown, silty sand with occasional gravel.

BI
6 SPT - 1 >50 9.0 15 1.8
SM
7 2.1
8 Ditto. 2.4
SPT - 2 >50
9 2.7
10
11
12
SPT - 3 >50
R
Ditto.
3.0
3.4
3.7
FO
13 Ditto. 4.0
SPT - 4 >50
14 4.3
15 4.6
16 SPT - 5 >50 4.7 06 Very dense, brown, well graded gravel with silt & sand. 4.9
17 5.2
ED

18 GW-GM 5.5
19 5.8
20 6.1
SPT - 6 >50
Ditto. 6.4
21
SU

22 6.7
23 7.0
24 7.3
25 7.6
SPT - 7 >50
Ditto.
26 7.9
IS

27 8.2
28 8.5
29 8.8
30 9.1
SPT - 8 >50 6.0 12 Very dense, brown, poorly graded sand with silt & gravel.
31 9.4
32 9.8
SP-SM
33 10.1
34 10.4
35 10.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 3
FIGURE A-83
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,652,473.53 meter TYPE OF BORING: ROTARY WASH
EAST: 425,920.86 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-83
GROUND ELEVATION: 11.27 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 4-5-16
DEPTH OF GROUNDWATER TABLE: 10.40 meter RIG #: ACKER SOILMAX (OEO-807) DATE COMPLETED: 5-5-16
MEASURED AT: 1325 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 9 >50 Very dense, brown, poorly graded sand with silt & gravel.
36 11.0
37 11.3
38 11.6

D
39 11.9
40 Ditto. 12.2
SPT - 10 >50 9.8 11

BI
41 12.5
42 SP-SM 12.8
43 13.1
44 13.4
45
46
47
SPT - 11 >50
R
Ditto. 13.7
14.0
14.3
FO
48 14.6
49 14.9
50
SPT - 12 >50
Ditto. 15.2
51 15.5
52 15.8
ED

53 16.2
54 16.5
55
SPT - 13 >50 7.3 06 Very dense, brown, poorly graded gravel with silt & sand. 16.8
56 17.1
SU

57 GP-GM 17.4
58 17.7
59 18.0
60 SPT - 14 >50
Ditto. 18.3
61 18.6
IS

62 18.9
63 19.2
64 19.5
65 SPT - 15 >50
Ditto. 19.8
66 20.1
67 20.4
68 20.7
69 21.0
70 SPT - 16 >50 9.7 12 SP-SM Very dense, brown, poorly graded sand with silt & gravel. 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 3
FIGURE A-83
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,652,473.53 meter TYPE OF BORING: ROTARY WASH
EAST: 425,920.86 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-83
GROUND ELEVATION: 11.27 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 4-5-16
DEPTH OF GROUNDWATER TABLE: 10.40 meter RIG #: ACKER SOILMAX (OEO-807) DATE COMPLETED: 5-5-16
MEASURED AT: 1325 HOURS ON: 9-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

71 Very dense, brown, poorly graded sand with silt & gravel. 21.6
72 21.9
SP-SM
73 22.3

D
74 22.6
75 SPT - 17 >50 Ditto. 22.9

BI
76 23.2
77 23.5
78 23.8
79 24.1
SPT - 18 Ditto.
80
81
82
>50 R 24.4
24.7
25.0
FO
83 25.3
84 25.6
SPT - 19 >50 11.0 13 Very dense, brown, silty sand with gravel.
85 25.9
86 26.2
SM 26.5
87
ED

88 26.8
89 27.1
SPT - 20 >50
Ditto.
90 27.4
91 27.7
SU

92 28.0
93 28.3
94 28.7
SPT - 21 >50
Ditto.
95 29.0
96 29.3
IS

97 29.6
98 29.9
99 30.2
SPT - 22 >50
Ditto.
100 30.5
101 END OF BORING @ 30.45 m. 30.8
102 31.1
103 31.4
104 31.7
105 32.0

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 3
FIGURE A-83
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,651,355.36 meter TYPE OF BORING: ROTARY WASH
EAST: 427,444.45 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-84
GROUND ELEVATION: 4.87 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 12-5-16
DEPTH OF GROUNDWATER TABLE: 4.15 meter RIG #: SIMCO (OEO-814) DATE COMPLETED: 12-5-16
MEASURED AT: 1015 HOURS ON: 13-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 0.3
2
Brown, poorly graded sand with silt & occasional gravel. 0.6
(Hand excavation, 0.00-2.00 m. depth)
3 0.9
H-1 3.6 11 SP-SM

D
4 1.2
5 1.5

BI
6 1.8
7 2.1
8 Medium dense, brownish grey, silty sand with gravel. 2.4
SPT - 1 12 11.7 20
9 SM 2.7
10
11
12
SPT - 2 39
R
Ditto but dense.
3.0
3.4
3.7
FO
13 Ditto. 4.0
SPT - 3 36
14 4.3
15 4.6
16 SPT - 4 42 15.1 12 Dense, grey, well graded sand with silt & gravel. 4.9
17 5.2
ED

18 SW-SM 5.5
19 5.8
20 6.1
SPT - 5 47
Ditto. 6.4
21
SU

22 6.7
23 7.0
24 7.3
25 7.6
SPT - 6 50 12.0 07 Dense, grey, poorly graded gravel with silt & sand.
26 7.9
IS

27 8.2
GP-GM 8.5
28
29 8.8
30 9.1
SPT - 7 >50
Ditto but very dense.
31 9.4
32 9.8
33 10.1
34 10.4
35 10.7
GP-GM
L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 3
FIGURE A-84
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,651,355.36 meter TYPE OF BORING: ROTARY WASH
EAST: 427,444.45 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-84
GROUND ELEVATION: 4.87 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 12-5-16
DEPTH OF GROUNDWATER TABLE: 4.15 meter RIG #: SIMCO (OEO-814) DATE COMPLETED: 12-5-16
MEASURED AT: 1015 HOURS ON: 13-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches
SPT - 8 >50 7.2 05 Very dense, grey, poorly graded gravel with silt & sand.
36 11.0
37 11.3
GP-GM
38 11.6

D
39 11.9
40 Ditto. 12.2
SPT - 9 >50 11.6 06

BI
41 12.5
42 GP-GM 12.8
43 13.1
44 13.4
45
46
47
SPT - 10 >50
R
Ditto. 13.7
14.0
14.3
FO
48 14.6
49 14.9
50
SPT - 11 >50
Ditto. 15.2
51 15.5
52 15.8
ED

53 16.2
54 16.5
55
SPT - 12 >50 15.8 07 Very dense, grey, poorly graded sand with silt & gravel. 16.8
56 17.1
SU

57 SP-SM 17.4
58 17.7
59 18.0
60 SPT - 13 50
Ditto but dense. 18.3
61 18.6
IS

62 18.9
63 19.2
64 19.5
65 SPT - 14 >50
Ditto but very dense. 19.8
66 20.1
67 20.4
68 20.7
69 21.0
70 SPT - 15 >50 9.7 06 GP-GM Very dense, grey, poorly graded gravel with silt & sand. 21.3

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 2 OF 3
FIGURE A-84
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,651,355.36 meter TYPE OF BORING: ROTARY WASH
EAST: 427,444.45 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 BH-84
GROUND ELEVATION: 4.87 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 12-5-16
DEPTH OF GROUNDWATER TABLE: 4.15 meter RIG #: SIMCO (OEO-814) DATE COMPLETED: 12-5-16
MEASURED AT: 1015 HOURS ON: 13-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

71 Very dense, grey, poorly graded gravel with silt & sand. 21.6
72 21.9
GP-GM
73 22.3

D
74 22.6
75 SPT - 16 47 Hard, light brown, lean clay with gravel. 22.9

BI
76 23.2
77 23.5
78 23.8
79 24.1
SPT - 17 72 Ditto.
80
81
82
47 32.3

CL
R 24.4
24.7
25.0
FO
83 25.3
84 25.6
SPT - 18 >50
Ditto.
85 25.9
86 26.2
87 26.5
ED

88 26.8
89 27.1
SPT - 19 >50
Hard, light brown, lean clay with gravel.
90 27.4
91 27.7
SU

92 28.0
93 28.3
94 28.7
SPT - 20 >50 27.9 64 Ditto.
95 29.0
96 29.3
IS

CL
97 29.6
98 29.9
99 30.2
SPT - 21 >50
Ditto.
100 30.5
101 END OF BORING @ 30.45 m. 30.8
102 31.1
103 31.4
104 31.7
105 32.0

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 3 OF 3
FIGURE A-84
Boulder & Cobbles Well Graded Gravel with Silt

Poorly Graded Sand Well Graded Sand

Silty Sand Well Graded Gravel

Clayey Gravel Silty Gravel

Poorly Graded Gravel Limestone / Calcarenite

Poorly Graded Gravel with Silt SILTSTONE

D
BI
Fat Clay TOP SOIL

Lean Clay R SANDSTONE


FO
Clayey Sand CHALK

Silty Clay Basalt, Syenite / Igneous Rock


ED

Silt Marl / Chert


SU

Elastic Silt Gypsum, Rock Salt, etc.


IS

Silty Clayey Sand CORAL

Poorly Graded Sand with Silt Well Graded Sand with Silt

DRAWN NOT TO SCALE


Project Title : Drawing Title :
Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu

Client / Owner : SYMBOLS

Geotechnical File No. 2015/104 Figure No. A - 85


Soil Classification
Criteria for Assigning Group Symbols and Group Names Using Laboratory TestsA Group
Group NameB
Symbol
COARSE - GRAINED SOILS Gravels Clean Gravels Cu ≥ 4 and 1 ≤ Cc ≤ 3E GW Well - graded gravelF
More than 50 % retained More than 50 % of coarse Less than 5 % fines C
Cu < 4 and/or 1 > Cc > 3 E
GP Poorly graded gravelF
on No. 200 sieve fraction retained on No. 4 sieve Gravels with fines Fines classify as ML or MH GM Silty gravelF, G, H
More than 12 % fines C
Fines classify as CL or CH GC Clayey gravelF, G, H
E
Sands Clean Sands Cu ≥ 6 and 1 ≤ Cc ≤ 3 SW Well - graded sandI

D
50 % or more of coarse Less than 5 % fines D
Cu < 6 and/or 1 > Cc > 3 E
SP Poorly graded sandI
fraction passes No. 4 sieve Sands with fines Fines classify as ML or MH SM Silty sandG, H, I
More than 12 % fines D
Fines classify as CL or CH SC Clayey sandG, H, I

BI
FINE - GRAINED SOILS Silts and Clays Inorganic PI > 7 and plots on or above "A" line J CL Lean clayK, L, M
50 % or more passes Liquid limit less than 50 PI < 4 or plots below "A" lineJ ML SiltK, L, M
the No. 200 sieve Organic Liquid limit - oven dried Organic clayK, L, M, N
< 0.75 OL
Organic siltK, L, M, O

R
Liquid limit - not dried
Silts and Clays Inorganic PI plots on or above "A" line CH Fat clayK, L, M
Liquid limit 50 or more PI plots below "A" line MH Elastic siltK, L, M

FO
Organic Liquid limit - oven dried Organic clayK, L, M, P
< 0.75 OH
Liquid limit - not dried Organic siltK, L, M, Q
HIGHLY ORGANIC SOILS Primarily organic matter, dark in color, and organic odor PT Peat
A
Based on the material passing the 3-in. (75-mm) sieve E ( D30 )2 M
If soil contains ≥ 30 % plus No. 200,
B
Cu = D60/D10 Cc =
If field sample contained cobbles or boulders, or both D10 X D60 predominantly gravel, add "gravelly" to group name.

ED
F N
add "with cobbles or boulders, or both" to group name If soil contains ≥ 15 % sand, add "with sand" to group name PI ≥ 4 and plots on or above "A" line.
C G O
Gravels with 5 to 12 % fines require dual symbols: If fines classify as CL-ML, use dual symbol PI < 4 or plots below "A" line.
P
GW - GM well - graded gravel with silt GC - GM or SC - SM PI plots on or above "A" line.
H Q
GW - GC well - graded gravel with clay If fines are organic, add "with organic fines" to group name PI plots below "A" line.
SU
I
GP - GM poorly graded gravel with silt If soil contains ≥ 15 % gravel, add "with gravel" to group name
J
GP - GC poorly graded gravel with clay If Atterberg limits plot in hatched area, soil is a
D
Sands with 5 to 12 % fines require dual symbols: CL - ML, silty clay.
K
SW - SM well - graded sand with silt If soil contains 15 to 29 % plus No. 200, add "with sand"
SW - SC well - graded sand with clay or "with gravel," whichever is predominant.
IS

L
SP - SM poorly graded sand with silt If soil contains ≥ 30 % plus No. 200, predominantly sand,
SP - SC poorly graded sand with clay add "sandy" to group name.

Drawing Title : Project Title :


Geotechnical Investigation for Geotechnical File No. 2015/104 Figure No. A - 86
YANBU DISTRIBUTION HUB Project, Yanbu
CLASSIFICATION OF SOILS FOR
ENGINEERING PURPOSES (ASTM D-2487) Client / Owner :
ADDITIONAL DESCRIPTIVE TERMS BASED ON ORIGIN OF CONSTITUENT PARTICLES TERMS RELATED TO CARBONATE CLASSIFICATION:

COMPRESSIVE
APPROXIMATE
UNCONFINED
INDURATION
DEGREE OF

STRENGTH
BIOCLASTIC OOLITE SHELL CORAL ALGAL PISOLITES
NOT DISCERNIBLE
(Organic) (Inorganic) (Organic) (Organic) (Organic) (Inorganic) Algal : Composed of the remains of calcareous
INCREASING GRAIN SIZE OF PARTICULATE DEPOSITS secreting algae.

0.002 mm. 0.075 mm. 4.75 mm. 75 mm. Authigenic : Formed in place by chemical or
biochemical action.
Carbonate Carbonate Carbonate Bioclastic : Consisting of fragmental remains of organism.
( <30 to >300 kPa )

TOTAL CARBONATE CONTENT % ( Constituent particles plus matrix )


Very soft to hard

CLAY SILT ( 1 ) SAND (1) Coral : Calcareous skeleton of corator group of corals.
Non Indurated

D
Mixed Carbonate and Non Detrital : Derived of pre - existing rock fragments.
50 %
Carbonate GRAVEL ( 2 ) Oolitic : Made up of ooliths ( 0.25 to 2 mm. spherical
Calcareous Calcareous Calcareous particles, usually carbonate ).

BI
CLAY ( 3 ) SILT (1) SAND (1) Pisolitic : Made up of pisolith ( 2 to 10 mm. round particles
usually carbonate ).
12 %
Shell : The generally hard rigid covering of an animal
CLAY SILT Silica SAND GRAVEL
commonly calcareous.

R
Siliceous : Containing abundant quartz or silica, generally
CALCILUTITE CALCISILTITE CALCARENITE CALCIRUDITE
( 0.3 to 12.5 Mpa )
moderately weak

cryptocrystalline.
50 %
Indutated

FO
Hard to
slightly

Calcareous Calcareous Calcareous


Calcareous CONGLOMERATE
CLAYSTONE SILTSTONE SANDSTONE Notes :
(1) Non - carbonate constituents are likely to be siliceous
12 %
apart from local concentrations of minerals
CLAYSTONE SILTSTONE SANDSTONE CONGLOMERATE or BRECCIA
such as feldspar & mixed heavy minerals.
(2) In description, the rough proportions of carbonate

ED
Fine - grained
Fine - grained Detrital and non - carbonate constituents should be quoted
clayey Conglomeritic LIMESTONE ( 2 )
( 12.5 to 100 Mpa )

LIMESTONE LIMESTONE & detail of both the particle minerals & matrix
strong to strong

LIMESTONE
Moderately

minerals should be included.


Moderately
Indurated

50 %
(3) Calcareous is suggested as a general term to indicate
Calcareous Calcareous Calcareous the presence of unidentified carbonates. When mineral
Calcareous CONGLOMERATE
SU
CLAYSTONE SILTSTONE SANDSTONE identification is possible, calcareous referring to
calcite or alternative adjective such as dolomitic,
12 %
oragonitic, sideritic, etc. should be use.
CLAYSTONE SILTSTONE SANDSTONE CONGLOMERATE or BRECCIA
IS

Drawing Title : Project Title :


Geotechnical Investigation for
Geotechnical File No. 2015/104 Figure No. A - 87
YANBU DISTRIBUTION HUB Project, Yanbu
CLARK & WALKER CARBONATE SEDIMENT
CLASSIFICATION SYSTEM Client / Owner :
IS
SU
ED
FO
R
BI
D
SUMMARY OF LABORATORY TEST RESULTS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu

NATURAL PHYSICAL PROPERTIES GEOTECHNICAL PROPERTIES CHEMICAL ANALYSIS

D
Moisture Dry Unit Specific Atterberg Limits Direct Unconfined Point Load Compaction
Sieve Analysis
BH Sample Content Weight Gravity U.S.C. Shear Test Compressive Max. Dry Optimum
2- 1- 2- 2+
Depth % Passing LL PI GROUP c Ø Strength Unit Wt. Moisture pH SO4 Cl CO3 Mg Remarks

BI
(M.D.D.) Content
3 2
m % kN/m #4 # 40 # 200 % % Kg/cm2 Deg N/mm kN g/cc % % % % %
BH - 01 1.50 34.9 94 77 62 42 19 CL 7.5 0.619 0.588 2

R
2.25 26.7 98 83 67 40 17 CL
3.00 13.3 2.67 97 74 42 29 09 SC 0.235 U-1

FO
3.75 10.1 64 22 11 NP SW-SM
10.50 11.4 55 19 05 NP SP-SM
15.00 9.1 41 18 06 NP GP-GM
24.00 8.7 31 11 04 NP GP

BH - 02 0.75
1.50
19.2
29.3 2.68
91
89
67
86
29
72
ED38
NP

15
SM
CL
SU
3.00 26.1 93 80 67 39 18 CL
7.50 17.3 89 30 15 NP SM
12.00 6.5 34 17 11 NP GP-GM
IS

BH - 03 1.50 17.9 86 54 32 29 09 SC 7.6 0.594 0.385 6


3.75 15.2 69 41 24 26 06 SC-SM
7.50 14.0 80 29 12 NP SP-SM -- 35
12.00 12.4 48 28 14 NP GM

Site Location: YANBU DISTRIBUTION HUB, Yanbu - Saudi Arabia Geotechnical File No. 2015/104 Figure No. B-1
OEO - GF - 02, Rev. 00
NP - Non Plastic
SUMMARY OF LABORATORY TEST RESULTS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu

NATURAL PHYSICAL PROPERTIES GEOTECHNICAL PROPERTIES CHEMICAL ANALYSIS

D
Moisture Dry Unit Specific Atterberg Limits Direct Unconfined Point Load Compaction
Sieve Analysis
BH Sample Content Weight Gravity U.S.C. Shear Test Compressive Max. Dry Optimum
2- 1- 2- 2+
Depth % Passing LL PI GROUP c Ø Strength Unit Wt. Moisture pH SO4 Cl CO3 Mg Remarks

BI
(M.D.D.) Content
3 2
m % kN/m #4 # 40 # 200 % % Kg/cm2 Deg N/mm kN g/cc % % % % %
BH - 04 0.75 14.1 64 52 42 26 05 GC-GM 7.6 0.606 0.788 2
NP

R
2.25 24.3 82 48 33 SM
4.50 11.5 50 23 13 NP GM

FO
10.50 12.7 57 30 16 NP GM
12.00 30.6 2.68 100 97 32 32 04 SM
15.00 23.3 96 86 26 NP SM
21.00 30.2 100 99 25 NP SM

BH - 05 1.50
2.25
3.75
18.6
14.1
6.3
2.68 99
100
32
84
94
20
57
69
13
ED32
34
26
12
12
06
CL
CL
GC-GM
SU
6.00 17.3 88 50 28 28 08 SC
15.00 14.3 83 41 20 30 09 SC

NP
IS

BH - 06 0.75 6.9 97 77 36 SM
1.50 18.3 89 77 56 34 12 CL
3.00 19.1 80 46 33 28 08 SC
4.50 14.7 64 45 28 32 12 SC
6.00 12.3 76 50 32 26 05 SC-SM
12.00 27.8 2.67 85 82 26 30 03 SM
13.50 33.3 98 88 36 36 05 SM

Site Location: YANBU DISTRIBUTION HUB, Yanbu - Saudi Arabia Geotechnical File No. 2015/104 Figure No. B-2
OEO - GF - 02, Rev. 00
NP - Non Plastic
SUMMARY OF LABORATORY TEST RESULTS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu

NATURAL PHYSICAL PROPERTIES GEOTECHNICAL PROPERTIES CHEMICAL ANALYSIS

D
Moisture Dry Unit Specific Atterberg Limits Direct Unconfined Point Load Compaction
Sieve Analysis
BH Sample Content Weight Gravity U.S.C. Shear Test Compressive Max. Dry Optimum
2- 1- 2- 2+
Depth % Passing LL PI GROUP c Ø Strength Unit Wt. Moisture pH SO4 Cl CO3 Mg Remarks

BI
(M.D.D.) Content
3 2
m % kN/m #4 # 40 # 200 % % Kg/cm2 Deg N/mm kN g/cc % % % % %
BH - 07 0.75 11.0 98 54 19 NP SM

R
3.00 22.8 97 80 52 36 14 CL
4.50 14.6 93 68 30 NP SM

FO
6.50 11.6 2.67 97 78 46 32 12 SC 0.310 U-1
7.50 16.8 97 77 43 30 10 SC
10.50 9.9 59 27 15 28 08 SC
18.00 13.3 42 27 13 NP GM

ED
21.00 14.6 93 60 31 29 09 SC

BH - 08 1.50 15.7 90 68 15 NP SM
3.75 17.4 2.67 100 85 53 34 12 CL
SU
6.00 16.5 2.7 89 76 65 40 17 CL 0.271 U-1
9.00 17.0 73 40 30 26 06 SC-SM
15.00 14.6 96 21 11 NP SP-SM
IS

BH - 09 1.50 10.5 2.68 61 37 14 NP SM


3.00 14.8 100 88 29 NP SM
4.50 13.5 98 85 55 34 14 CL
5.00 15.5 2.68 100 89 65 38 15 CL 0.298 U-1
7.50 17.5 98 61 20 NP SM
13.50 17.2 100 65 17 NP SM

Site Location: YANBU DISTRIBUTION HUB, Yanbu - Saudi Arabia Geotechnical File No. 2015/104 Figure No. B-3
OEO - GF - 02, Rev. 00
NP - Non Plastic
SUMMARY OF LABORATORY TEST RESULTS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu

NATURAL PHYSICAL PROPERTIES GEOTECHNICAL PROPERTIES CHEMICAL ANALYSIS

D
Moisture Dry Unit Specific Atterberg Limits Direct Unconfined Point Load Compaction
Sieve Analysis
BH Sample Content Weight Gravity U.S.C. Shear Test Compressive Max. Dry Optimum
2- 1- 2- 2+
Depth % Passing LL PI GROUP c Ø Strength Unit Wt. Moisture pH SO4 Cl CO3 Mg Remarks

BI
(M.D.D.) Content
3 2
m % kN/m #4 # 40 # 200 % % Kg/cm2 Deg N/mm kN g/cc % % % % %
BH - 10 0.15 1.2 73 32 17 NP SM

R
1.50 10.8 2.67 54 26 16 NP GM
4.50 7.0 46 19 10 NP GP-GM

FO
9.00 8.5 47 23 15 NP GM
13.50 11.0 2.68 85 49 25 26 06 SC-SM
16.50 11.3 71 32 17 26 05 SC-SM
25.50 17.2 80 63 46 NP SM

BH - 11 1.50
3.00
12.3
8.0
77
75
42
47
20
20
ED NP
NP
SM
SM
SU
7.50 9.1 72 52 22 NP SM
12.00 20.7 71 47 27 26 06 SC-SM
IS

BH - 12 0.75 1.3 79 53 19 NP SM 7.5 0.094 1.595 2


2.25 8.2 60 29 17 NP SM
4.50 6.0 45 21 12 NP GW-GM
10.50 10.1 66 29 16 NP SM
15.00 13.7 55 25 11 NP GW-GM

Site Location: YANBU DISTRIBUTION HUB, Yanbu - Saudi Arabia Geotechnical File No. 2015/104 Figure No. B-4
OEO - GF - 02, Rev. 00
NP - Non Plastic
SUMMARY OF LABORATORY TEST RESULTS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu

NATURAL PHYSICAL PROPERTIES GEOTECHNICAL PROPERTIES CHEMICAL ANALYSIS

D
Moisture Dry Unit Specific Atterberg Limits Direct Unconfined Point Load Compaction
Sieve Analysis
BH Sample Content Weight Gravity U.S.C. Shear Test Compressive Max. Dry Optimum
2- 1- 2- 2+
Depth % Passing LL PI GROUP c Ø Strength Unit Wt. Moisture pH SO4 Cl CO3 Mg Remarks

BI
(M.D.D.) Content
3 2
m % kN/m #4 # 40 # 200 % % Kg/cm2 Deg N/mm kN g/cc % % % % %
BH - 13 0.15 0.7 83 41 16 NP SM
1.50 8.7 46 28 18 NP GM

R
3.75 13.0 46 25 16 NP GM
7.50 13.5 2.67 77 70 39 27 07 SC-SM

FO
10.50 13.1 89 78 44 26 05 SC-SM
15.00 20.2 74 12 08 NP SW-SM
24.00 19.0 95 88 41 26 06 SC-SM
25.50 20.0 92 79 41 26 07 SC-SM

BH - 14 0.15
1.50
3.75
3.3
16.5
11.6
84
77
86
53
26
53
22
16
35
ED24
NP
NP
05
SM
SM
SC-SM
7.5 0.606 0.374 6
SU
9.00 9.7 41 15 08 NP GW-GM
12.00 17.5 62 49 41 29 09 GC
16.50 9.5 72 36 18 NP SM
IS

BH - 15 1.50 14.2 2.68 54 34 22 NP GM


3.75 15.7 44 27 15 NP GM
6.00 13.6 46 18 11 NP GP-GM
7.50 12.3 50 29 18 NP GM
10.50 21.0 98 85 53 26 06 CL-ML
13.50 17.3 100 94 50 28 04 ML
16.50 11.1 45 21 11 NP GW-GM

Site Location: YANBU DISTRIBUTION HUB, Yanbu - Saudi Arabia Geotechnical File No. 2015/104 Figure No. B-5
OEO - GF - 02, Rev. 00
NP - Non Plastic
SUMMARY OF LABORATORY TEST RESULTS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu

NATURAL PHYSICAL PROPERTIES GEOTECHNICAL PROPERTIES CHEMICAL ANALYSIS

D
Moisture Dry Unit Specific Atterberg Limits Direct Unconfined Point Load Compaction
Sieve Analysis
BH Sample Content Weight Gravity U.S.C. Shear Test Compressive Max. Dry Optimum
2- 1- 2- 2+
Depth % Passing LL PI GROUP c Ø Strength Unit Wt. Moisture pH SO4 Cl CO3 Mg Remarks

BI
(M.D.D.) Content
3 2
m % kN/m #4 # 40 # 200 % % Kg/cm2 Deg N/mm kN g/cc % % % % %
BH - 16 0.75 25.1 98 81 55 34 13 CL

R
1.50 17.4 96 73 52 30 09 CL
2.25 15.7 98 79 55 29 09 CL

FO
3.00 14.3 2.67 99 84 48 27 07 SC-SM U-1
3.75 15.9 98 80 48 27 07 SC-SM
4.50 12.8 65 31 17 NP SM
12.00 15.0 89 40 19 NP SM
19.50
21.00
37.7
20.5
82
95
65
71
12
31
ED28
NP

03
SP-SM
SM
SU
BH - 17 1.50 23.4 100 93 79 29 10 CL
2.25 18.6 95 79 65 29 09 CL
3.00 20.1 89 69 44 30 09 SC
IS

3.75 19.2 80 61 42 27 07 SC-SM


4.50 10.4 49 36 23 27 07 GC-GM
7.50 6.7 26 15 08 NP GP-GM
15.00 15.4 72 35 17 NP SM
18.00 27.7 2.67 95 85 53 39 08 ML

Site Location: YANBU DISTRIBUTION HUB, Yanbu - Saudi Arabia Geotechnical File No. 2015/104 Figure No. B-6
OEO - GF - 02, Rev. 00
NP - Non Plastic
SUMMARY OF LABORATORY TEST RESULTS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu

NATURAL PHYSICAL PROPERTIES GEOTECHNICAL PROPERTIES CHEMICAL ANALYSIS

D
Moisture Dry Unit Specific Atterberg Limits Direct Unconfined Point Load Compaction
Sieve Analysis
BH Sample Content Weight Gravity U.S.C. Shear Test Compressive Max. Dry Optimum
2- 1- 2- 2+
Depth % Passing LL PI GROUP c Ø Strength Unit Wt. Moisture pH SO4 Cl CO3 Mg Remarks

BI
(M.D.D.) Content
3 2
m % kN/m #4 # 40 # 200 % % Kg/cm2 Deg N/mm kN g/cc % % % % %
BH - 18 1.50 18.7 93 69 50 34 12 CL

R
2.25 14.2 89 71 43 29 08 SC
3.00 12.1 48 36 20 26 05 GC-GM

FO
7.50 16.0 77 40 24 26 07 SC-SM
16.50 26.6 2.67 100 86 51 35 05 ML
19.50 13.1 91 69 37 29 04 SM

BH - 19 0.15
1.50
3.00
14.8
21.4
16.8
2.67
2.67
100
85
90
62
52
52
15
31
32
ED31
25
NP

10
06
SM
SC
SC-SM
SU
4.50 14.0 75 40 24 27 07 SC-SM
10.50 16.9 71 32 18 29 09 SC
12.00 15.6 62 22 13 NP SM
IS

15.00 16.3 82 45 19 25 06 SC-SM


18.00 22.8 98 97 76 34 12 CL
21.00 18.7 85 73 48 34 12 SC

Site Location: YANBU DISTRIBUTION HUB, Yanbu - Saudi Arabia Geotechnical File No. 2015/104 Figure No. B-7
OEO - GF - 02, Rev. 00
NP - Non Plastic
SUMMARY OF LABORATORY TEST RESULTS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu

NATURAL PHYSICAL PROPERTIES GEOTECHNICAL PROPERTIES CHEMICAL ANALYSIS


Moisture Dry Unit Specific Atterberg Limits Direct Unconfined Point Load Compaction

D
Sieve Analysis
BH Sample Content Weight Gravity U.S.C. Shear Test Compressive Max. Dry Optimum
2- 1- 2- 2+
Depth % Passing LL PI GROUP c Ø Strength Unit Wt. Moisture pH SO4 Cl CO3 Mg Remarks

BI
(M.D.D.) Content
3 2
m % kN/m #4 # 40 # 200 % % Kg/cm2 Deg N/mm kN g/cc % % % % %
BH - 20 0.15 3.0 79 50 27 NP SM
1.50 18.0 2.67 100 72 47 36 14 SC 7.5 0.058 0.532 4

R
3.00 17.5 79 65 47 32 12 SC
4.50 11.1 59 30 17 28 08 SC

FO
10.50 11.7 54 22 09 NP GP-GM
12.00 12.8 67 35 15 30 10 SC
15.00 17.4 2.66 55 34 20 26 06 GC-GM

ED
BH - 21 0.15 6.5 81 51 31 NP SM
1.50 16.2 93 52 26 26 05 SC-SM
3.00 12.6 41 09 06 NP GW-GM
NP
SU
6.00 16.6 69 15 08 SP-SM
10.50 8.8 30 11 02 NP GP
13.50 18.7 76 20 11 NP SP-SM
IS

BH - 22 0.15 7.8 88 54 36 NP SM
1.50 19.1 89 53 32 26 07 SC-SM
4.50 9.6 31 11 05 NP GW-GM
9.00 9.5 54 21 09 NP GP-GM
12.00 9.3 34 17 10 NP GP-GM
18.00 13.4 66 41 20 NP SM
27.00 12.9 59 32 16 NP SM

Site Location: YANBU DISTRIBUTION HUB, Yanbu - Saudi Arabia Geotechnical File No. 2015/104 Figure No. B-8
OEO - GF - 02, Rev. 00
NP - Non Plastic
SUMMARY OF LABORATORY TEST RESULTS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu

NATURAL PHYSICAL PROPERTIES GEOTECHNICAL PROPERTIES CHEMICAL ANALYSIS

D
Moisture Dry Unit Specific Atterberg Limits Direct Unconfined Point Load Compaction
Sieve Analysis
BH Sample Content Weight Gravity U.S.C. Shear Test Compressive Max. Dry Optimum
2- 1- 2- 2+
Depth % Passing LL PI GROUP c Ø Strength Unit Wt. Moisture pH SO4 Cl CO3 Mg Remarks

BI
(M.D.D.) Content
3 2 2
m % kN/m #4 # 40 # 200 % % Kg/cm Deg N/mm kN g/cc % % % % %
BH - 23 0.15 2.7 100 62 24 NP SM

R
1.50 9.2 2.67 41 21 09 NP GW-GM
4.50 9.7 53 22 10 NP GW-GM

FO
7.50 9.5 38 13 06 NP GP-GM
12.00 20.3 83 47 27 25 04 SC-SM
16.50 15.1 59 26 15 26 05 SC-SM

ED
BH - 24 0.15 3.6 92 47 25 NP SM
2.25 16.0 65 40 26 26 03 SM
3.75 17.3 63 21 13 NP SM
SU
6.00 17.0 71 35 15 NP SM
9.00 12.3 65 23 12 NP SW-SM
16.50 18.5 79 15 10 NP SW-SM
IS

BH - 25 0.75 15.5 91 12 05 NP SW-SM


2.25 10.6 46 21 11 NP GP-GM
6.00 11.6 60 36 10 NP SP-SM
10.50 19.6 77 48 33 NP SM
16.50 22.5 69 43 30 26 03 SM
24.00 13.9 57 33 14 NP SM

Site Location: YANBU DISTRIBUTION HUB, Yanbu - Saudi Arabia Geotechnical File No. 2015/104 Figure No. B-9
OEO - GF - 02, Rev. 00
NP - Non Plastic
SUMMARY OF LABORATORY TEST RESULTS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu

NATURAL PHYSICAL PROPERTIES GEOTECHNICAL PROPERTIES CHEMICAL ANALYSIS

D
Moisture Dry Unit Specific Atterberg Limits Direct Unconfined Point Load Compaction
Sieve Analysis
BH Sample Content Weight Gravity U.S.C. Shear Test Compressive Max. Dry Optimum
2- 1- 2- 2+
Depth % Passing LL PI GROUP c Ø Strength Unit Wt. Moisture pH SO4 Cl CO3 Mg Remarks

BI
(M.D.D.) Content
3 2
m % kN/m #4 # 40 # 200 % % Kg/cm2 Deg N/mm kN g/cc % % % % %
BH - 26 0.75 8.0 97 46 13 NP SM
NP

R
1.50 13.8 95 41 14 SM 7.5 0.031 0.454 2
4.50 12.3 92 39 12 NP SP-SM

FO
9.00 16.4 68 29 13 NP SM
13.50 14.5 100 26 11 NP SW-SM

BH - 27 1.50 8.7 2.67 28 15 07 NP GP-GM


NP

ED
3.00 12.0 38 18 10 GP-GM
7.50 10.8 65 32 19 NP SM
12.00 11.8 54 25 13 NP GM
15.00 14.7 82 36 16 NP SM
SU
BH - 28 0.15 6.3 89 53 27 NP SM
1.50 20.8 93 58 30 28 08 SC
IS

3.00 18.7 89 52 23 30 10 SC
4.50 19.6 90 52 23 29 09 SC
6.00 19.9 99 91 40 31 10 SC
9.00 22.3 85 51 26 26 07 SC-SM
21.00 17.4 61 44 29 28 09 GC
22.50 22.4 63 54 44 36 14 GC
27.00 26.3 2.67 65 58 42 39 08 GM

Site Location: YANBU DISTRIBUTION HUB, Yanbu - Saudi Arabia Geotechnical File No. 2015/104 Figure No. B - 10
OEO - GF - 02, Rev. 00
NP - Non Plastic
SUMMARY OF LABORATORY TEST RESULTS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu

NATURAL PHYSICAL PROPERTIES GEOTECHNICAL PROPERTIES CHEMICAL ANALYSIS

D
Moisture Dry Unit Specific Atterberg Limits Direct Unconfined Point Load Compaction
Sieve Analysis
BH Sample Content Weight Gravity U.S.C. Shear Test Compressive Max. Dry Optimum
2- 1- 2- 2+
Depth % Passing LL PI GROUP c Ø Strength Unit Wt. Moisture pH SO4 Cl CO3 Mg Remarks

BI
(M.D.D.) Content
3 2
m % kN/m #4 # 40 # 200 % % Kg/cm2 Deg N/mm kN g/cc % % % % %
BH - 29 0.15 9.9 95 59 23 NP SM
1.50 12.7 100 64 21 NP SM -- 33

R
2.25 14.9 76 52 35 26 07 SC-SM
3.00 22.3 97 80 57 34 12 CL

FO
3.75 24.1 98 86 59 36 14 CL
4.50 26.3 92 78 60 38 15 CL
6.00 24.2 85 54 35 29 09 SC
7.50 17.0 83 57 41 26 07 SC-SM

BH - 30 0.15
1.50
3.00
3.8
20.5
16.1
2.67
96
94
100
66
58
93
34
34
40
ED27
28
NP
03
09
SM
SM
SC
SU
3.75 15.2 100 91 42 26 06 SC-SM
6.00 20.2 69 44 22 25 06 SC-SM
10.50 9.5 43 20 10 NP GW-GM
16.50 12.4 65 52 26 29 09 SC
IS

BH - 31 1.50 9.2 99 49 09 NP SP-SM 7.6 0.399 0.314 4


4.50 12.9 81 48 29 29 09 SC
9.00 12.6 55 26 14 NP GM
12.00 26.8 2.68 99 88 74 32 12 CL
25.50 29.1 100 98 86 38 15 CL
28.50 16.9 75 65 29 25 04 SC-SM

Site Location: YANBU DISTRIBUTION HUB, Yanbu - Saudi Arabia Geotechnical File No. 2015/104 Figure No. B - 11
OEO - GF - 02, Rev. 00
NP - Non Plastic
SUMMARY OF LABORATORY TEST RESULTS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu

NATURAL PHYSICAL PROPERTIES GEOTECHNICAL PROPERTIES CHEMICAL ANALYSIS

D
Moisture Dry Unit Specific Atterberg Limits Direct Unconfined Point Load Compaction
Sieve Analysis
BH Sample Content Weight Gravity U.S.C. Shear Test Compressive Max. Dry Optimum
2- 1- 2- 2+
Depth % Passing LL PI GROUP c Ø Strength Unit Wt. Moisture pH SO4 Cl CO3 Mg Remarks

BI
(M.D.D.) Content
3 2
m % kN/m #4 # 40 # 200 % % Kg/cm2 Deg N/mm kN g/cc % % % % %
BH - 32 0.15 2.1 93 54 24 NP SM
1.50 9.0 74 46 14 NP SM

R
3.75 12.4 81 50 31 28 09 SC
6.00 12.1 77 44 31 31 10 SC

FO
10.50 19.2 100 82 44 32 12 SC
13.50 27.8 2.69 100 93 66 38 15 CL

BH - 33 0.15 1.7 78 41 22 NP SM
1.50 14.5 75 43 23 NP SM
3.75
6.00
12.00
15.00
7.6
8.7
11.2
11.1
36
36
48
59
22
20
21
20
12
12
12
07
ED NP
NP
NP
NP
GW-GM
GW-GM
GP-GM
SP-SM
SU
BH - 34 0.15 8.5 93 61 32 NP SM
1.50 13.7 83 25 07 NP SP-SM 7.5 0.536 0.170 4
3.00 16.7 56 35 24 27 07 GC-GM
IS

4.50 9.8 80 62 38 26 06 SC-SM


7.50 22.1 78 52 33 26 07 SC-SM
13.50 9.0 30 14 07 NP GP-GM
16.50 10.5 36 19 10 NP GP-GM
19.50 16.4 62 32 19 26 05 SC-SM
21.00 13.5 99 84 57 34 12 CL
28.50 25.5 2.67 99 86 48 34 07 SM

Site Location: YANBU DISTRIBUTION HUB, Yanbu - Saudi Arabia Geotechnical File No. 2015/104 Figure No. B - 12
OEO - GF - 02, Rev. 00
NP - Non Plastic
SUMMARY OF LABORATORY TEST RESULTS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu

NATURAL PHYSICAL PROPERTIES GEOTECHNICAL PROPERTIES CHEMICAL ANALYSIS

D
Moisture Dry Unit Specific Atterberg Limits Direct Unconfined Point Load Compaction
Sieve Analysis
BH Sample Content Weight Gravity U.S.C. Shear Test Compressive Max. Dry Optimum
2- 1- 2- 2+
Depth % Passing LL PI GROUP c Ø Strength Unit Wt. Moisture pH SO4 Cl CO3 Mg Remarks

BI
(M.D.D.) Content
3 2
m % kN/m #4 # 40 # 200 % % Kg/cm2 Deg N/mm kN g/cc % % % % %
BH - 35 0.15 4.6 78 43 21 NP SM
NP

R
1.50 14.0 51 24 14 GM 7.6 0.418 0.356 4
2.25 14.9 68 37 19 26 07 SC-SM

FO
3.00 15.3 76 42 20 26 04 SC-SM
7.50 16.1 99 59 31 28 08 SC
10.50 15.8 91 49 26 32 12 SC
15.00 17.4 93 52 28 29 09 SC

BH - 36 0.15
1.50
3.75
4.0
13.9
9.0
95
84
47
59
34
32
17
09
10
ED NP
NP
NP
SM
SW-SM
GP-GM
7.5 0.317 0.214 4
SU
9.00 21.7 100 88 59 36 14 CL
12.00 20.9 100 91 65 38 15 CL

NP
IS

BH - 37 1.50 8.3 56 34 15 GM
3.00 13.4 68 42 27 27 03 SM
7.50 9.1 35 16 08 NP GP-GM
10.50 14.1 62 31 13 NP SM
15.00 8.8 43 20 09 NP GW-GM
18.00 11.0 68 35 12 NP SW-SM
22.50 14.7 56 33 16 NP GM

Site Location: YANBU DISTRIBUTION HUB, Yanbu - Saudi Arabia Geotechnical File No. 2015/104 Figure No. B - 13
OEO - GF - 02, Rev. 00
NP - Non Plastic
SUMMARY OF LABORATORY TEST RESULTS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu

NATURAL PHYSICAL PROPERTIES GEOTECHNICAL PROPERTIES CHEMICAL ANALYSIS

D
Moisture Dry Unit Specific Atterberg Limits Direct Unconfined Point Load Compaction
Sieve Analysis
BH Sample Content Weight Gravity U.S.C. Shear Test Compressive Max. Dry Optimum
2- 1- 2- 2+
Depth % Passing LL PI GROUP c Ø Strength Unit Wt. Moisture pH SO4 Cl CO3 Mg Remarks

BI
(M.D.D.) Content
3 2 2
m % kN/m #4 # 40 # 200 % % Kg/cm Deg N/mm kN g/cc % % % % %
BH - 38 1.50 10.7 63 40 19 NP SM

R
2.25 13.6 85 49 29 26 04 SC-SM
4.50 10.7 43 20 09 NP GW-GM

FO
10.50 9.5 46 17 07 NP GW-GM
16.50 23.9 98 44 10 NP SW-SM

BH - 39 1.50 9.7 74 45 15 NP SM -- 34

ED
3.00 12.6 52 30 19 NP GM
6.00 15.7 78 49 32 31 10 SC
9.00 21.2 76 50 35 27 07 SC-SM
SU
13.50 21.7 100 82 17 NP SM

BH - 40 0.15 3.0 96 65 34 NP SM
1.50 17.3 2.67 94 62 35 29 09 SC
IS

6.00 8.5 47 27 15 26 06 GC-GM


13.50 11.3 78 58 29 NP SM
19.50 32.8 2.67 100 92 66 42 10 ML
28.50 34.0 2.68 100 100 97 45 12 ML

Site Location: YANBU DISTRIBUTION HUB, Yanbu - Saudi Arabia Geotechnical File No. 2015/104 Figure No. B - 14
OEO - GF - 02, Rev. 00
NP - Non Plastic
SUMMARY OF LABORATORY TEST RESULTS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu

NATURAL PHYSICAL PROPERTIES GEOTECHNICAL PROPERTIES CHEMICAL ANALYSIS

D
Moisture Dry Unit Specific Atterberg Limits Direct Unconfined Point Load Compaction
Sieve Analysis
BH Sample Content Weight Gravity U.S.C. Shear Test Compressive Max. Dry Optimum
2- 1- 2- 2+
Depth % Passing LL PI GROUP c Ø Strength Unit Wt. Moisture pH SO4 Cl CO3 Mg Remarks

BI
(M.D.D.) Content
3 2 2
m % kN/m #4 # 40 # 200 % % Kg/cm Deg N/mm kN g/cc % % % % %
BH - 41 0.75 16.5 2.67 98 67 33 27 07 SC-SM

R
2.25 19.5 100 61 12 NP SP-SM -- 34
6.00 12.3 55 31 17 27 07 GC-GM

FO
9.00 13.8 57 37 20 26 06 GC-GM
15.00 11.1 73 48 20 25 04 SC-SM

BH - 42 0.15 3.8 97 61 28 NP SM

ED
1.50 14.4 95 49 13 NP SM 7.4 <0.002 0.372 2
4.50 17.8 93 29 15 NP SM
7.50 12.9 55 28 18 NP GM
SU
12.00 15.7 59 32 08 NP SP-SM
15.00 12.1 58 30 08 NP SP-SM

BH - 43 1.50 16.5 87 71 40 25 06 SC-SM


IS

3.00 9.6 55 30 11 NP SP-SM


7.50 10.3 73 35 14 NP SM
10.50 11.1 88 44 19 NP SM
15.00 19.4 67 43 35 26 05 SC-SM
22.50 28.7 96 93 63 32 05 ML

Site Location: YANBU DISTRIBUTION HUB, Yanbu - Saudi Arabia Geotechnical File No. 2015/104 Figure No. B - 15
OEO - GF - 02, Rev. 00
NP - Non Plastic
SUMMARY OF LABORATORY TEST RESULTS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu

NATURAL PHYSICAL PROPERTIES GEOTECHNICAL PROPERTIES CHEMICAL ANALYSIS

D
Moisture Dry Unit Specific Atterberg Limits Direct Unconfined Point Load Compaction
Sieve Analysis
BH Sample Content Weight Gravity U.S.C. Shear Test Compressive Max. Dry Optimum
2- 1- 2- 2+
Depth % Passing LL PI GROUP c Ø Strength Unit Wt. Moisture pH SO4 Cl CO3 Mg Remarks

BI
(M.D.D.) Content
3 2
m % kN/m #4 # 40 # 200 % % Kg/cm2 Deg N/mm kN g/cc % % % % %
BH - 44 0.75 13.1 100 86 42 29 09 SC
1.50 18.1 99 81 49 32 12 SC

R
3.75 15.2 95 57 20 NP SM
7.50 8.9 100 54 16 NP SM

FO
10.50 19.7 98 90 38 31 10 SC
13.50 26.2 100 87 46 34 12 SC
19.50 29.2 100 91 58 36 15 CL

BH - 45 1.50 10.8 86 69 25 NP SM 7.6 0.158 2.565 2


3.00
6.00
10.50
15.00
8.2
9.2
8.2
16.0
84
74
55
74
62
40
30
44
21
14
10
23
ED29
NP
NP
NP
09
SM
SM
SP-SM
SC
SU
19.50 13.1 74 37 18 NP SM
25.50 16.5 100 74 19 NP SM

BH - 46 0.15 6.0 80 42 18 NP SM
IS

1.50 8.5 58 33 15 NP SM
3.00 10.7 54 28 17 28 08 GC
4.50 7.8 25 13 09 NP GP-GM
6.00 12.9 73 39 22 29 10 SC
10.50 12.6 61 33 21 28 09 SC
15.00 13.2 46 41 28 30 09 GC
16.50 14.6 70 56 38 32 12 SC

Site Location: YANBU DISTRIBUTION HUB, Yanbu - Saudi Arabia Geotechnical File No. 2015/104 Figure No. B - 16
OEO - GF - 02, Rev. 00
NP - Non Plastic
SUMMARY OF LABORATORY TEST RESULTS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu

NATURAL PHYSICAL PROPERTIES GEOTECHNICAL PROPERTIES CHEMICAL ANALYSIS

D
Moisture Dry Unit Specific Atterberg Limits Direct Unconfined Point Load Compaction
Sieve Analysis
BH Sample Content Weight Gravity U.S.C. Shear Test Compressive Max. Dry Optimum
2- 1- 2- 2+
Depth % Passing LL PI GROUP c Ø Strength Unit Wt. Moisture pH SO4 Cl CO3 Mg Remarks

BI
(M.D.D.) Content
3 2 2
m % kN/m #4 # 40 # 200 % % Kg/cm Deg N/mm kN g/cc % % % % %
BH - 47 0.15 3.4 86 52 31 NP SM

R
1.50 7.2 36 17 09 NP GP-GM
3.75 4.4 35 09 04 NP GP

FO
9.00 9.2 45 11 07 NP GW-GM
16.50 13.8 82 54 21 NP SM
21.00 19.0 100 72 37 25 04 SC-SM

ED
BH - 48 0.15 2.7 90 56 37 NP SM
1.50 16.7 2.68 76 42 26 NP SM
4.50 11.3 54 27 15 NP GM
SU
7.50 7.2 39 21 10 NP GP-GM
15.00 19.1 100 77 20 NP SM

BH - 49 0.15 6.9 79 53 33 NP SM
IS

1.50 11.9 63 35 22 NP SM
3.75 10.3 57 31 20 NP GM
6.00 9.0 31 11 07 NP GP-GM
13.50 29.7 94 86 17 NP SM
19.50 23.2 100 97 72 36 14 CL
25.50 22.0 99 90 21 NP SM

Site Location: YANBU DISTRIBUTION HUB, Yanbu - Saudi Arabia Geotechnical File No. 2015/104 Figure No. B - 17
OEO - GF - 02, Rev. 00
NP - Non Plastic
SUMMARY OF LABORATORY TEST RESULTS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu

NATURAL PHYSICAL PROPERTIES GEOTECHNICAL PROPERTIES CHEMICAL ANALYSIS

D
Moisture Dry Unit Specific Atterberg Limits Direct Unconfined Point Load Compaction
Sieve Analysis
BH Sample Content Weight Gravity U.S.C. Shear Test Compressive Max. Dry Optimum
2- 1- 2- 2+
Depth % Passing LL PI GROUP c Ø Strength Unit Wt. Moisture pH SO4 Cl CO3 Mg Remarks

BI
(M.D.D.) Content
3 2
m % kN/m #4 # 40 # 200 % % Kg/cm2 Deg N/mm kN g/cc % % % % %
BH - 50 0.75 9.7 61 34 20 NP SM 7.6 0.521 0.867 6
2.25 14.7 58 20 11 NP SP-SM

R
6.00 4.4 10 07 06 NP GW-GM
13.50 24.0 71 55 32 26 05 SC-SM

FO
15.00 25.1 95 88 60 27 07 CL-ML
21.00 14.3 55 37 25 NP GM
24.00 11.5 53 31 20 NP GM

ED
BH - 51 0.75 11.0 98 68 29 NP SM
2.25 11.3 65 39 26 NP SM
3.00 15.2 73 46 30 28 08 SC
7.50 8.5 57 30 14 NP SM
SU
10.50 32.7 76 55 31 38 15 SC
15.50 26.2 2.68 100 100 97 42 19 CL 0.185 U-1
22.50 24.8 100 98 22 NP SM
27.00 18.4 100 87 34 NP SM
IS

BH - 52 1.50 12.8 73 46 27 29 09 SC
3.00 13.9 98 62 38 30 09 SC
6.00 10.2 42 29 16 27 07 GC-GM
13.50 17.1 72 60 15 NP SM
16.50 17.6 93 71 38 32 12 SC
19.50 16.7 91 67 33 NP SM

Site Location: YANBU DISTRIBUTION HUB, Yanbu - Saudi Arabia Geotechnical File No. 2015/104 Figure No. B - 18
OEO - GF - 02, Rev. 00
NP - Non Plastic
SUMMARY OF LABORATORY TEST RESULTS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu

NATURAL PHYSICAL PROPERTIES GEOTECHNICAL PROPERTIES CHEMICAL ANALYSIS

D
Moisture Dry Unit Specific Atterberg Limits Direct Unconfined Point Load Compaction
Sieve Analysis
BH Sample Content Weight Gravity U.S.C. Shear Test Compressive Max. Dry Optimum
2- 1- 2- 2+
Depth % Passing LL PI GROUP c Ø Strength Unit Wt. Moisture pH SO4 Cl CO3 Mg Remarks

BI
(M.D.D.) Content
3 2
m % kN/m #4 # 40 # 200 % % Kg/cm2 Deg N/mm kN g/cc % % % % %
BH - 53 0.75 11.3 55 28 16 NP GM
2.25 11.0 51 24 14 NP GM

R
6.00 8.3 40 15 06 NP GW-GM
10.50 13.9 40 08 04 NP GW

FO
13.50 23.7 96 78 21 NP SM
18.00 18.8 88 71 43 26 06 SC-SM

BH - 54 1.50 9.4 84 51 30 NP SM

ED
3.00 10.3 50 26 15 26 05 GC-GM
6.00 11.6 58 30 17 26 06 GC-GM
9.00 23.1 2.67 79 63 37 30 09 SC
13.50 14.0 73 68 21 NP SM
SU
15.00 20.2 100 100 18 NP SM

BH - 55 0.15 4.6 97 51 24 NP SM
1.50 16.9 90 51 28 NP SM
IS

3.00 8.3 54 28 16 NP GM
6.00 10.3 40 20 11 NP GP-GM
9.00 14.7 36 10 05 NP GW-GM
15.00 11.9 64 28 16 NP SM
19.50 11.1 62 21 11 NP SW-SM
22.50 11.7 55 17 08 NP SW-SM
25.50 12.5 58 17 09 NP SW-SM

Site Location: YANBU DISTRIBUTION HUB, Yanbu - Saudi Arabia Geotechnical File No. 2015/104 Figure No. B - 19
OEO - GF - 02, Rev. 00
NP - Non Plastic
SUMMARY OF LABORATORY TEST RESULTS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu

NATURAL PHYSICAL PROPERTIES GEOTECHNICAL PROPERTIES CHEMICAL ANALYSIS

D
Moisture Dry Unit Specific Atterberg Limits Direct Unconfined Point Load Compaction
Sieve Analysis
BH Sample Content Weight Gravity U.S.C. Shear Test Compressive Max. Dry Optimum
2- 1- 2- 2+
Depth % Passing LL PI GROUP c Ø Strength Unit Wt. Moisture pH SO4 Cl CO3 Mg Remarks

BI
(M.D.D.) Content
3 2
m % kN/m #4 # 40 # 200 % % Kg/cm2 Deg N/mm kN g/cc % % % % %
BH - 56 1.50 6.4 2.67 46 28 18 NP GM
3.00 10.3 61 38 27 26 03 GM

R
4.50 9.9 59 29 14 NP SM
9.00 12.8 77 46 21 NP SM

FO
15.00 13.3 50 17 09 NP GP-GM
19.50 21.0 2.67 96 88 48 34 07 SM
22.50 18.9 94 87 44 27 05 SC-SM

BH - 57 0.75 2.6 87 66 39 NP SM 7.6 0.354 0.978 4


2.25
3.75
6.50
10.50
7.0
22.2
18.1
14.1
2.67
2.68
57
100
100
89
11
95
91
48
01
83
75
34
ED41
39
26
NP
18
17
06
SW
CL
CL
SC-SM
-- 33
0.272
0.246
U-1
U-2
SU
15.00 11.8 85 34 20 NP SM

BH - 58 0.15 2.3 93 52 23 NP SM
0.75 13.4 59 23 13 NP SM
IS

1.50 10.6 64 36 20 NP SM
3.00 12.5 65 30 16 NP SM
7.50 11.5 42 18 08 NP GP-GM
10.50 13.2 47 22 11 NP GP-GM
12.00 8.7 24 12 06 NP GP-GM
16.50 11.2 35 17 08 NP GP-GM
18.00 16.3 2.67 90 74 39 26 06 SC-SM

Site Location: YANBU DISTRIBUTION HUB, Yanbu - Saudi Arabia Geotechnical File No. 2015/104 Figure No. B - 20
OEO - GF - 02, Rev. 00
NP - Non Plastic
SUMMARY OF LABORATORY TEST RESULTS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu

NATURAL PHYSICAL PROPERTIES GEOTECHNICAL PROPERTIES CHEMICAL ANALYSIS

D
Moisture Dry Unit Specific Atterberg Limits Direct Unconfined Point Load Compaction
Sieve Analysis
BH Sample Content Weight Gravity U.S.C. Shear Test Compressive Max. Dry Optimum
2- 1- 2- 2+
Depth % Passing LL PI GROUP c Ø Strength Unit Wt. Moisture pH SO4 Cl CO3 Mg Remarks

BI
(M.D.D.) Content
3 2 2
m % kN/m #4 # 40 # 200 % % Kg/cm Deg N/mm kN g/cc % % % % %
BH - 59 1.50 6.9 44 27 15 NP GM

R
3.75 5.1 46 33 16 NP GM
7.50 8.5 54 33 18 NP GM

FO
13.50 15.0 55 39 31 NP GM
16.50 22.5 82 64 49 36 14 SC
18.00 21.6 97 68 41 NP SM

ED
BH - 60 0.15 3.6 97 70 26 NP SM
3.00 16.2 91 44 27 27 05 SC-SM
6.00 14.2 93 47 25 NP SM
SU
7.50 10.2 90 45 20 NP SM
12.00 11.7 90 49 26 26 05 SC-SM
16.50 15.2 96 61 33 26 06 SC-SM
IS

BH - 61 0.75 11.4 55 30 15 NP GM
3.00 4.2 35 19 10 NP GP-GM
7.50 11.5 59 15 07 NP SW-SM
12.00 15.2 79 43 20 NP SM
18.00 8.5 54 23 08 NP SW-SM

Site Location: YANBU DISTRIBUTION HUB, Yanbu - Saudi Arabia Geotechnical File No. 2015/104 Figure No. B - 21
OEO - GF - 02, Rev. 00
NP - Non Plastic
SUMMARY OF LABORATORY TEST RESULTS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu

NATURAL PHYSICAL PROPERTIES GEOTECHNICAL PROPERTIES CHEMICAL ANALYSIS

D
Moisture Dry Unit Specific Atterberg Limits Direct Unconfined Point Load Compaction
Sieve Analysis
BH Sample Content Weight Gravity U.S.C. Shear Test Compressive Max. Dry Optimum
2- 1- 2- 2+
Depth % Passing LL PI GROUP c Ø Strength Unit Wt. Moisture pH SO4 Cl CO3 Mg Remarks

BI
(M.D.D.) Content
3 2
m % kN/m #4 # 40 # 200 % % Kg/cm2 Deg N/mm kN g/cc % % % % %
BH - 62 0.75 7.8 99 65 22 NP SM

R
3.75 9.6 43 25 15 24 04 GC-GM
7.50 8.0 68 39 16 NP SM

FO
12.00 7.3 62 39 15 NP SM
16.50 6.4 70 46 21 NP SM

BH - 63 0.75 13.4 82 34 20 NP SM 7.6 0.262 0.914 4


NP

ED
2.25 15.9 77 34 20 SM
6.00 18.2 74 35 21 25 04 SC-SM
10.50 10.5 87 36 13 NP SM
12.00 15.5 71 33 19 NP SM
SU
16.50 11.8 88 39 18 NP SM

BH - 64 0.75 13.7 2.67 90 55 33 29 09 SC


NP
IS

2.25 9.5 77 29 13 SM
3.75 12.3 95 75 52 34 12 CL
4.50 14.4 2.67 100 85 47 27 07 SC-SM 0.259 U-1
7.50 16.7 2.67 100 90 77 26 06 CL-ML U-2
10.50 14.3 2.68 100 85 48 28 08 SC 0.250 U-3
13.50 11.2 69 32 17 NP SM
18.00 8.6 47 22 12 NP GW-GM

Site Location: YANBU DISTRIBUTION HUB, Yanbu - Saudi Arabia Geotechnical File No. 2015/104 Figure No. B - 22
OEO - GF - 02, Rev. 00
NP - Non Plastic
SUMMARY OF LABORATORY TEST RESULTS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu

NATURAL PHYSICAL PROPERTIES GEOTECHNICAL PROPERTIES CHEMICAL ANALYSIS


Moisture Dry Unit Specific Atterberg Limits Direct Unconfined Point Load Compaction

D
Sieve Analysis
BH Sample Content Weight Gravity U.S.C. Shear Test Compressive Max. Dry Optimum
Depth % Passing LL PI GROUP c Ø Strength Unit Wt. Moisture pH SO4
2-
Cl1- CO3
2-
Mg2+ Remarks

BI
(M.D.D.) Content
3 2
m % kN/m #4 # 40 # 200 % % Kg/cm2 Deg N/mm kN g/cc % % % % %
BH - 65 0.75 21.2 77 37 24 NP SM
1.50 13.4 50 28 18 NP GM

R
3.00 12.0 73 40 21 NP SM
4.50 12.4 36 16 10 NP GP-GM

FO
9.00 16.6 76 52 40 30 09 SC
10.50 24.7 2.68 78 70 34 26 04 SC-SM
13.50 19.0 2.68 100 98 91 23 07 CL-ML
16.50 23.0 2.68 100 97 90 26 05 CL-ML

BH - 66 0.75
2.25
15.6
5.4
66
48
43
24
25
13 ED NP
NP
NP
SM
GM
SU
7.50 8.1 50 23 13 GM
13.50 4.5 37 12 08 NP GP-GM

BH - 67 0.75 8.1 41 24 17 NP GM
IS

1.50 10.6 73 43 29 NP SM 7.6 0.581 0.851 4


3.75 9.1 60 36 19 NP SM
6.00 13.2 68 36 19 26 06 SC-SM
9.00 7.0 67 41 18 NP SM
10.50 9.5 81 48 22 28 08 SC
13.50 11.7 83 49 27 NP SM
16.50 11.2 94 59 35 NP SM

Site Location: YANBU DISTRIBUTION HUB, Yanbu - Saudi Arabia Geotechnical File No. 2015/104 Figure No. B - 23
OEO - GF - 02, Rev. 00
NP - Non Plastic
SUMMARY OF LABORATORY TEST RESULTS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu

NATURAL PHYSICAL PROPERTIES GEOTECHNICAL PROPERTIES CHEMICAL ANALYSIS

D
Moisture Dry Unit Specific Atterberg Limits Direct Unconfined Point Load Compaction
Sieve Analysis
BH Sample Content Weight Gravity U.S.C. Shear Test Compressive Max. Dry Optimum
2- 1- 2- 2+
Depth % Passing LL PI GROUP c Ø Strength Unit Wt. Moisture pH SO4 Cl CO3 Mg Remarks

BI
(M.D.D.) Content
3 2 2
m % kN/m #4 # 40 # 200 % % Kg/cm Deg N/mm kN g/cc % % % % %
BH - 68 0.75 14.4 84 44 17 NP SM

R
1.50 14.8 74 44 29 27 03 SM
2.25 12.7 62 37 24 24 06 SC-SM

FO
3.75 6.7 26 14 07 NP GP-GM
4.50 9.6 43 21 11 NP GW-GM
7.50 27.4 2.68 100 99 97 38 15 CL U-1
13.50 11.4 46 18 09 NP GW-GM

ED
16.50 10.9 47 18 09 NP GW-GM
22.50 11.9 72 34 17 NP SM
28.50 21.2 2.67 99 87 60 27 07 CL-ML
SU
BH - 69 0.75 10.4 2.67 49 31 21 27 03 GM
3.75 14.2 2.67 67 41 27 28 03 SM 7.6 0.672 0.680 6
6.00 16.1 76 42 24 26 05 SC-SM
IS

9.00 15.7 100 70 15 NP SM -- 38


13.50 30.5 2.68 100 98 97 39 17 CL U-1
18.00 22.7 2.67 100 96 76 34 12 CL 0.315 U-1
22.50 11.4 63 33 18 NP SM
25.50 11.3 49 28 19 NP GM

Site Location: YANBU DISTRIBUTION HUB, Yanbu - Saudi Arabia Geotechnical File No. 2015/104 Figure No. B - 24
OEO - GF - 02, Rev. 00
NP - Non Plastic
SUMMARY OF LABORATORY TEST RESULTS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu

NATURAL PHYSICAL PROPERTIES GEOTECHNICAL PROPERTIES CHEMICAL ANALYSIS

D
Moisture Dry Unit Specific Atterberg Limits Direct Unconfined Point Load Compaction
Sieve Analysis
BH Sample Content Weight Gravity U.S.C. Shear Test Compressive Max. Dry Optimum
2- 1- 2- 2+
Depth % Passing LL PI GROUP c Ø Strength Unit Wt. Moisture pH SO4 Cl CO3 Mg Remarks

BI
(M.D.D.) Content
3 2 2
m % kN/m #4 # 40 # 200 % % Kg/cm Deg N/mm kN g/cc % % % % %
BH - 70 0.75 2.5 58 39 19 NP GM

R
2.25 12.2 90 53 35 27 07 SC-SM
3.75 8.3 89 58 38 NP SM

FO
7.50 13.0 71 48 32 28 08 SC
10.50 12.8 88 31 18 NP SM
18.00 9.3 70 27 11 NP SW-SM
21.00 9.5 68 21 09 NP SW-SM

ED
25.50 13.0 84 29 15 NP SM

BH - 71 0.00-1.50 4.6 87 50 11 NP SW-SM


SU
1.50 8.8 43 25 16 26 06 GC-GM
4.50 12.4 53 32 19 25 05 GC-GM
6.00 12.9 2.67 59 37 22 26 06 GC-GM
10.50 19.2 2.67 59 39 26 27 07 GC-GM
IS

13.50 15.0 68 41 25 28 08 SC
16.50 10.8 48 31 16 26 07 GC-GM
21.00 15.2 2.67 71 43 27 26 06 SC-SM
24.00 22.8 97 67 49 34 12 SC
27.00 26.8 2.67 100 79 62 27 07 CL-ML

Site Location: YANBU DISTRIBUTION HUB, Yanbu - Saudi Arabia Geotechnical File No. 2015/104 Figure No. B - 25
OEO - GF - 02, Rev. 00
NP - Non Plastic
SUMMARY OF LABORATORY TEST RESULTS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu

NATURAL PHYSICAL PROPERTIES GEOTECHNICAL PROPERTIES CHEMICAL ANALYSIS

D
Moisture Dry Unit Specific Atterberg Limits Direct Unconfined Point Load Compaction
Sieve Analysis
BH Sample Content Weight Gravity U.S.C. Shear Test Compressive Max. Dry Optimum
2- 1- 2- 2+
Depth % Passing LL PI GROUP c Ø Strength Unit Wt. Moisture pH SO4 Cl CO3 Mg Remarks

BI
(M.D.D.) Content
3 2
m % kN/m #4 # 40 # 200 % % Kg/cm2 Deg N/mm kN g/cc % % % % %
BH - 72 0.15 1.4 97 55 21 NP SM
1.50 16.5 89 57 33 24 06 SC-SM 7.5 0.255 0.383 4

R
3.00 12.0 100 86 58 27 07 CL-ML
6.50 15.8 2.68 97 92 50 26 06 CL-ML 0.187 U-1

FO
9.00 16.6 2.67 99 91 48 26 04 SC-SM
12.00 15.8 93 67 46 29 09 SC
15.00 12.5 65 44 34 30 10 GC
18.00 12.9 91 51 39 26 07 SC-SM

BH - 73 0.75
3.75
7.50
7.3
8.4
6.3
89
73
62
60
33
43
27
13
21
ED NP
NP
NP
SM
SM
SM
SU
10.50 5.3 61 46 22 NP SM
15.00 7.0 68 45 22 NP SM
18.00 14.2 2.67 84 53 26 28 03 SM
IS

BH - 74 0.75 11.4 98 66 22 NP SM 7.4 0.053 0.037 2


1.50 15.5 2.67 77 60 38 25 06 SC-SM
3.75 16.8 2.67 100 77 47 25 07 SC-SM
6.00 8.8 56 35 21 NP GM
10.50 11.8 77 50 29 28 09 SC
13.50 12.7 70 45 20 NP SM
16.50 14.6 92 59 28 26 06 SC-SM

Site Location: YANBU DISTRIBUTION HUB, Yanbu - Saudi Arabia Geotechnical File No. 2015/104 Figure No. B - 26
OEO - GF - 02, Rev. 00
NP - Non Plastic
SUMMARY OF LABORATORY TEST RESULTS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu

NATURAL PHYSICAL PROPERTIES GEOTECHNICAL PROPERTIES CHEMICAL ANALYSIS

D
Moisture Dry Unit Specific Atterberg Limits Direct Unconfined Point Load Compaction
Sieve Analysis
BH Sample Content Weight Gravity U.S.C. Shear Test Compressive Max. Dry Optimum
2- 1- 2- 2+
Depth % Passing LL PI GROUP c Ø Strength Unit Wt. Moisture pH SO4 Cl CO3 Mg Remarks

BI
(M.D.D.) Content
3 2
m % kN/m #4 # 40 # 200 % % Kg/cm2 Deg N/mm kN g/cc % % % % %
BH - 75 1.50 14.4 98 76 47 26 05 SC-SM
3.00 10.7 67 43 26 27 05 SC-SM

R
6.00 11.0 58 36 20 24 06 GC-GM
9.00 11.6 85 57 27 NP SM

FO
12.00 5.6 39 24 10 NP GW-GM

BH - 76 0.75 14.2 2.66 86 74 15 27 07 SC-SM


1.50 13.2 2.67 67 42 25 29 04 SM 7.5 0.275 0.383 4

ED
3.00 15.3 79 44 25 28 04 SM
6.00 12.0 2.66 51 30 15 NP GM
10.50 12.7 42 14 08 NP GP-GM
15.00 17.3 93 48 14 NP SM
SU
BH - 77 0.00-2.00 6.5 56 33 17 NP GM 7.6 0.909 1.318 4
2.25 12.5 86 52 35 24 04 SC-SM
4.50 6.3 25 15 09 NP GP-GM
IS

6.00 9.7 56 35 20 24 04 GC-GM


9.00 13.3 57 46 27 NP GM
13.50 13.5 66 38 22 26 03 SM
15.00 10.0 74 49 31 20 03 SM
19.50 12.1 39 22 13 NP GM
22.50 14.5 63 33 20 27 03 SM
25.50 15.9 56 37 22 26 04 GC-GM

Site Location: YANBU DISTRIBUTION HUB, Yanbu - Saudi Arabia Geotechnical File No. 2015/104 Figure No. B - 27
OEO - GF - 02, Rev. 00
NP - Non Plastic
SUMMARY OF LABORATORY TEST RESULTS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu

NATURAL PHYSICAL PROPERTIES GEOTECHNICAL PROPERTIES CHEMICAL ANALYSIS


Moisture Dry Unit Specific Atterberg Limits Direct Unconfined Point Load Compaction

D
Sieve Analysis
BH Sample Content Weight Gravity U.S.C. Shear Test Compressive Max. Dry Optimum
Depth % Passing LL PI GROUP c Ø Strength Unit Wt. Moisture pH SO4
2-
Cl1- CO3
2-
Mg2+ Remarks

BI
(M.D.D.) Content
3 2
m % kN/m #4 # 40 # 200 % % Kg/cm2 Deg N/mm kN g/cc % % % % %
BH - 78 0.00-1.50 4 88 55 14 NP SM
1.50 10.7 45 27 18 NP GM 7.5 0.496 0.425 6

R
3.00 10.4 47 26 17 24 04 GC-GM
3.75 13.2 58 34 22 26 03 GM

FO
4.50 21.3 2.68 81 62 45 26 07 SC-SM
7.50 21.4 2.68 80 57 39 26 05 SC-SM
12.00 11.6 56 32 19 27 03 GM
15.00 10.2 2.67 43 26 16 23 04 GC-GM

ED
18.00 8.1 48 25 13 NP GM
22.50 22.3 2.67 100 99 79 27 07 CL-ML 0.288 U-1
25.50 26.2 2.68 99 93 80 34 12 CL
SU
BH - 79 0.00-1.50 7.7 46 27 14 NP GM
1.50 13.4 80 38 10 NP SW-SM
3.00 23.0 58 36 26 27 03 GM
IS

6.00 11.9 41 22 13 NP GM
7.50 13.5 31 14 07 NP GP-GM
13.50 11.1 47 21 13 NP GM
18.00 8.9 41 23 14 21 04 GC-GM
19.50 11.8 59 33 20 22 04 GC-GM
24.00 13.2 55 30 18 NP GM
27.00 11.5 43 24 11 NP GP-GM

Site Location: YANBU DISTRIBUTION HUB Project, Yanbu - Saudi Arabia Geotechnical File No. 2015/104 Figure No. B - 28
OEO - GF - 02, Rev. 00
NP - Non Plastic
SUMMARY OF LABORATORY TEST RESULTS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu

NATURAL PHYSICAL PROPERTIES GEOTECHNICAL PROPERTIES CHEMICAL ANALYSIS

D
Moisture Dry Unit Specific Atterberg Limits Direct Unconfined Point Load Compaction
Sieve Analysis
BH Sample Content Weight Gravity U.S.C. Shear Test Compressive Max. Dry Optimum
2- 1- 2- 2+
Depth % Passing LL PI GROUP c Ø Strength Unit Wt. Moisture pH SO4 Cl CO3 Mg Remarks

BI
(M.D.D.) Content
3 2 2
m % kN/m #4 # 40 # 200 % % Kg/cm Deg N/mm kN g/cc % % % % %
BH - 80 0.00-1.50 1.3 50 33 16 NP GM

R
1.50 13.0 2.67 77 47 19 NP SM
4.50 17.6 43 39 29 26 06 GC-GM

FO
9.00 5.3 18 11 06 NP GP-GM
12.00 11.7 64 37 15 NP SM
16.50 11.9 57 24 11 NP SW-SM
21.00 7.7 18 09 05 NP GP-GM

ED
25.50 11.9 37 17 08 NP GP-GM
27.00 14.0 50 32 21 25 06 GC-GM
SU
BH - 81 0.00-1.50 8.3 62 37 21 NP SM
2.25 8.6 41 19 02 NP GP
6.00 21.7 52 28 13 NP GM
9.00 13.7 48 15 07 NP GW-GM
IS

15.00 25.8 2.68 100 83 64 37 07 ML


16.50 22.6 2.68 87 52 37 29 04 SM
21.00 17.2 59 10 06 NP SW-SM
24.00 9.9 54 11 06 NP SW-SM

Site Location: YANBU DISTRIBUTION HUB Project, Yanbu - Saudi Arabia Geotechnical File No. 2015/104 Figure No. B - 29
OEO - GF - 02, Rev. 00
NP - Non Plastic
SUMMARY OF LABORATORY TEST RESULTS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu

NATURAL PHYSICAL PROPERTIES GEOTECHNICAL PROPERTIES CHEMICAL ANALYSIS

D
Moisture Dry Unit Specific Atterberg Limits Direct Unconfined Point Load Compaction
Sieve Analysis
BH Sample Content Weight Gravity U.S.C. Shear Test Compressive Max. Dry Optimum
2- 1- 2- 2+
Depth % Passing LL PI GROUP c Ø Strength Unit Wt. Moisture pH SO4 Cl CO3 Mg Remarks

BI
(M.D.D.) Content
3 2
m % kN/m #4 # 40 # 200 % % Kg/cm2 Deg N/mm kN g/cc % % % % %
BH - 82 0.00-1.50 1.8 76 47 14 NP SM
NP

R
2.25 1.8 53 32 08 GP-GM
3.75 9.3 65 41 15 NP SM

FO
4.50 2.8 25 16 05 NP GP-GM
6.00 10.1 51 18 05 NP GW-GM
10.50 5.4 53 09 03 NP SW
16.50 4.8 87 60 19 NP SM
NP

ED
19.50 14.2 55 39 33 GM
24.00 21.4 92 72 20 NP SM
27.00 29.7 2.69 90 90 84 38 15 CL
SU
BH - 83 0.00-1.50 5.3 88 51 11 NP SP-SM
1.50 9.0 86 44 15 NP SM
4.50 4.7 40 20 06 NP GW-GM
NP
IS

9.00 6.0 57 35 12 SP-SM


12.00 9.8 72 37 11 NP SP-SM
16.50 7.3 46 24 06 NP GP-GM
21.00 9.7 70 37 12 NP SP-SM
25.50 11.0 81 41 13 NP SM

Site Location: YANBU DISTRIBUTION HUB Project, Yanbu - Saudi Arabia Geotechnical File No. 2015/104 Figure No. B - 30
OEO - GF - 02, Rev. 00
NP - Non Plastic
SUMMARY OF LABORATORY TEST RESULTS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu

NATURAL PHYSICAL PROPERTIES GEOTECHNICAL PROPERTIES CHEMICAL ANALYSIS

D
Moisture Dry Unit Specific Atterberg Limits Direct Unconfined Point Load Compaction
Sieve Analysis
BH Sample Content Weight Gravity U.S.C. Shear Test Compressive Max. Dry Optimum
2- 1- 2- 2+
Depth % Passing LL PI GROUP c Ø Strength Unit Wt. Moisture pH SO4 Cl CO3 Mg Remarks

BI
(M.D.D.) Content
3 2
m % kN/m #4 # 40 # 200 % % Kg/cm2 Deg N/mm kN g/cc % % % % %
BH - 84 0.00-2.00 3.6 88 47 11 NP SP-SM
NP

R
2.25 11.7 99 69 20 SM -- 38 7.4 0.285 0.037 2
4.50 15.1 86 62 12 NP SW-SM

FO
7.50 12.0 53 27 07 NP GP-GM
10.50 7.2 41 17 05 NP GP-GM
12.00 11.6 49 22 06 NP GP-GM
16.50 15.8 85 34 07 NP SP-SM
NP

ED
21.00 9.7 44 26 06 GP-GM
24.00 32.3 2.68 81 78 72 38 15 CL
28.50 27.9 2.68 71 69 64 36 14 CL
SU
IS

Site Location: YANBU DISTRIBUTION HUB Project, Yanbu - Saudi Arabia Geotechnical File No. 2015/104 Figure No. B - 31
OEO - GF - 02, Rev. 00
NP - Non Plastic
TESTED PARAMETERS
Borehole # Cl- REMARKS
SO4 TDS
pH
(ppm) (ppm) (ppm)

BH - 01 7.5 2347 17548 34400

BH - 07 7.4 1690 9572 18460

BH - 13 7.6 2460 19143 37530

BH - 19 7.6 2532 20384 38830

D
BH - 25 7.4 1421 7976 15780

BI
BH - 28 7.3 768 6204 11350

BH - 34 7.3 634 R 4254 8380


FO
BH - 37 7.6 2567 20384 39670

BH - 45 7.4 1879 9394 18860


ED
SU
IS

Project Title : Drawing Title :

Geotechnical Investigation for


YANBU DISTRIBUTION HUB Project, Yanbu
SUMMARY OF CHEMICAL TEST OF
Client / Owner : WATER SAMPLES

Geotechnical File No. 2015/104 Figure No. B - 31(a)


GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 01 1.50 94.40 76.72 61.64 42 19 CL

BH - 01 2.25 97.97 83.11 66.89 40 17 CL


IS

BH - 01 3.00 97.32 74.12 41.61 29 09 SC

BH - 01 3.75 64.44 22.37 10.52 N P SW-SM

Borehole No. BH - 01 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abdullah


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 32
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20 R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 01 10.50 55.27 18.80 5.13 N P SP-SM

BH - 01 15.00 40.91 18.18 6.36 N P GP-GM


IS

BH - 01 24.00 31.19 11.07 4.23 N P GP

Borehole No. BH - 01 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abdullah


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 32(a)
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER

3" 2" 11/2" 1" 3/4" 3/8" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 02 0.75 90.76 66.61 29.31 N P SM

BH - 02 1.50 98.87 86.48 71.83 38 15 CL


IS

BH - 02 3.00 92.94 79.76 67.06 39 18 CL

BH - 02 7.50 88.63 29.68 14.95 N P SM

BH - 02 12.00 34.06 17.39 10.87 N P GP-GM

Borehole No. BH - 02 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abdullah


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 33
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER

3" 2" 11/2" 1" 3/4" 3/8" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 03 1.50 86.35 54.07 31.76 29 09 SC

BH - 03 3.75 69.25 41.39 23.78 26 06 SC-SM


IS

BH - 03 7.50 80.23 29.36 12.21 N P SP-SM

BH - 03 12.00 48.07 27.90 13.85 N P GM

Borehole No. BH - 03 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : April 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 34
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 04 0.75 63.59 51.63 41.85 26 05 GC-GM

BH - 04 2.25 81.79 48.40 32.88 N P SM


IS

BH - 04 4.50 49.85 22.96 12.69 N P GM

BH - 04 10.50 57.42 29.58 16.48 N P GM

Borehole No. BH - 04 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : April 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 35
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20 R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 04 12.00 100.00 96.84 31.74 32 04 SM

BH - 04 15.00 96.48 86.43 25.63 N P SM


IS

BH - 04 21.00 100.00 98.69 24.59 N P SM

Borehole No. BH - 04 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : April 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 35(a)
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20 R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 05 1.50 98.62 84.14 57.24 32 12 CL

BH - 05 2.25 100.00 93.88 68.71 34 12 CL


IS

BH - 05 3.75 32.47 19.93 12.92 26 06 GC-GM

BH - 05 6.00 88.18 50.00 28.18 28 08 SC

BH - 05 15.00 83.08 41.43 20.17 30 09 SC

Borehole No. BH - 05 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : April 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 36
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER

3" 2" 11/2" 1" 3/4" 3/8" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 06 0.75 96.77 77.42 35.94 N P SM

BH - 06 1.50 88.79 76.99 56.34 34 12 CL


IS

BH - 06 3.00 80.40 46.23 33.17 28 08 SC

BH - 06 4.50 64.04 45.32 27.59 32 12 SC

Borehole No. BH - 06 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 37
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20 R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 06 6.00 75.91 49.52 31.93 26 05 SC-SM

BH - 06 12.00 85.36 81.58 25.83 30 03 SM


IS

BH - 06 13.50 97.50 88.33 35.83 36 05 SM

Borehole No. BH - 06 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 37(a)
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 07 0.75 97.48 54.23 18.92 N P SM

BH - 07 3.00 97.10 80.08 51.87 36 14 CL


IS

BH - 07 4.50 92.80 68.22 29.66 N P SM

BH - 07 6.50 96.52 77.51 46.29 32 12 SC

Borehole No. BH - 07 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abdullah


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 38
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 07 7.50 97.38 77.43 43.31 30 10 SC

BH - 07 10.50 59.05 27.24 15.31 28 08 SC


IS

BH - 07 18.00 42.18 27.01 12.80 N P GM

BH - 07 21.00 92.83 59.50 31.46 29 09 SC

Borehole No. BH - 07 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abdullah


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 38(a)
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20 R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 08 1.50 89.81 68.30 15.47 N P SM

BH - 08 3.75 100.00 84.85 53.03 34 12 CL


IS

BH - 08 6.00 88.59 76.41 64.93 40 17 CL

BH - 08 9.00 73.20 39.54 29.74 26 06 SC-SM

BH - 08 15.00 95.82 20.56 10.68 N P SP-SM

Borehole No. BH - 08 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abdullah


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 39
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 09 1.50 60.88 37.07 13.95 N P SM

BH - 09 3.00 100.00 87.85 28.74 N P SM


IS

BH - 09 4.50 98.00 84.50 54.50 34 14 CL

BH - 09 5.00 100.00 88.95 64.89 38 15 CL

BH - 09 7.50 98.32 60.94 19.53 N P SM

BH - 09 13.50 100.00 64.81 17.17 N P SM

Borehole No. BH - 09 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 40
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 10 0.15 73.23 32.26 17.42 N P SM

BH - 10 1.50 54.05 25.90 16.07 N P GM


IS

BH - 10 4.50 46.41 18.66 9.73 N P GP-GM

BH - 10 9.00 47.14 22.57 14.57 N P GM

Borehole No. BH - 10 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Wajahat


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 41
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20 R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 10 13.50 85.35 49.12 24.71 26 06 SC-SM

BH - 10 16.50 71.23 32.15 17.23 26 06 SC-SM


IS

BH - 10 25.50 80.00 62.50 46.25 N P SM

Borehole No. BH - 10 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Wajahat


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 41(a)
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 11 1.50 76.78 42.08 20.22 N P SM

BH - 11 3.00 74.56 47.34 20.41 N P SM


IS

BH - 11 7.50 72.00 52.32 22.04 N P SM

BH - 11 12.00 71.38 46.90 27.24 26 06 SC-SM

Borehole No. BH - 11 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 42
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 12 0.75 79.26 52.53 19.35 N P SM

BH - 12 2.25 60.43 29.14 16.87 N P SM


IS

BH - 12 4.50 45.39 20.61 12.26 N P GW-GM

BH - 12 10.50 65.88 29.23 15.96 N P SM

BH - 12 15.00 54.45 24.67 10.95 N P GW-GM

Borehole No. BH - 12 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Wajahat


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 43
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20 R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 13 0.15 82.55 41.01 15.53 N P SM

BH - 13 1.50 45.90 27.87 18.40 N P GM


IS

BH - 13 3.75 45.80 25.47 15.99 N P GM

BH - 13 7.50 76.95 69.91 38.77 27 07 SC-SM

Borehole No. BH - 13 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 44
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20 R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 13 10.50 89.18 78.36 44.40 26 05 SC-SM

BH - 13 15.00 73.79 12.10 7.66 N P SW-SM


IS

BH - 13 24.00 95.00 88.00 41.00 26 06 SC-SM

BH - 13 25.50 92.00 78.67 41.33 26 07 SC-SM

Borehole No. BH - 13 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 44(a)
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 14 0.15 83.78 52.73 22.24 N P SM

BH - 14 1.50 77.36 25.98 16.11 N P SM


IS

BH - 14 3.75 85.71 53.06 35.37 24 05 SC-SM

BH - 14 9.00 41.44 14.58 8.33 N P GW-GM

BH - 14 12.00 61.98 49.43 41.44 29 09 GC

BH - 14 16.50 72.04 35.86 18.42 N P SM

Borehole No. BH - 14 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 45
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER

3" 2" 11/2" 1" 3/4" 3/8" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 15 1.50 54.08 33.48 22.32 N P GM

BH - 15 3.75 43.61 27.44 16.17 N P GM


IS

BH - 15 6.00 46.08 18.07 11.14 N P GP-GM

BH - 15 7.50 50.18 28.52 18.41 N P GM

Borehole No. BH - 15 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 46
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20 R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 15 10.50 98.20 85.03 53.29 26 06 CL-ML

BH - 15 13.50 100.00 93.53 50.36 28 04 ML


IS

BH - 15 16.50 45.01 21.11 11.23 N P GW-GM

Borehole No. BH - 15 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 46(a)
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 16 0.75 98.33 80.50 55.43 34 13 CL

BH - 16 1.50 95.93 72.67 52.33 30 09 CL


IS

BH - 16 2.25 97.46 79.19 54.82 29 09 CL

BH - 16 3.00 98.99 84.37 48.27 27 07 SC-SM

BH - 16 3.75 97.55 79.59 47.76 27 07 SC-SM

Borehole No. BH - 16 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : April 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 47
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 16 4.50 64.68 30.64 16.60 N P SM

BH - 16 12.00 88.66 39.68 19.43 N P SM


IS

BH - 16 19.50 82.46 64.91 12.28 N P SP-SM

BH - 16 21.00 94.88 71.43 31.34 28 03 SM

Borehole No. BH - 16 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : April 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 47(a)
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER

3" 2" 11/2" 1" 3/4" 3/8" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 17 1.50 100.00 92.93 78.80 29 10 CL

BH - 17 2.25 94.68 79.16 64.52 29 09 CL


IS

BH - 17 3.00 89.35 68.64 44.38 30 09 SC

BH - 17 3.75 80.14 60.98 42.16 27 07 SC-SM

Borehole No. BH - 17 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : April 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 48
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20 R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 17 4.50 48.53 36.16 23.13 27 07 GC-GM

BH - 17 7.50 26.03 14.68 8.02 N P GP-GM


IS

BH - 17 15.00 71.68 34.77 17.20 N P SM

BH - 17 18.00 95.39 85.04 52.81 39 08 ML

Borehole No. BH - 17 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : April 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 48(a)
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20 R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 18 1.50 93.17 69.02 50.34 34 12 CL

BH - 18 2.25 88.56 71.12 42.78 29 08 SC


IS

BH - 18 3.00 47.98 36.36 19.70 26 05 GC-GM

BH - 18 7.50 77.00 40.00 24.00 26 07 SC-SM

BH - 18 16.50 100.00 85.83 50.74 35 05 ML

BH - 18 19.50 90.98 68.85 36.89 29 04 SM

Borehole No. BH - 18 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : April 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 49
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER

3" 2" 11/2" 1" 3/4" 3/8" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 19 0.15 100.00 61.81 14.58 N P SM

BH - 19 1.50 84.72 51.53 31.44 31 10 SC


IS

BH - 19 3.00 90.48 51.91 32.33 25 06 SC-SM

BH - 19 4.50 75.11 40.17 24.02 27 07 SC-SM

BH - 19 10.50 70.81 31.89 17.84 29 09 SC

Borehole No. BH - 19 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : April 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 50
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20 R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 19 12.00 62.08 22.32 12.84 N P SM

BH - 19 15.00 81.98 45.35 18.60 25 06 SC-SM


IS

BH - 19 18.00 98.28 96.55 75.86 34 12 CL

BH - 19 21.00 85.48 72.83 48.01 34 12 SC

Borehole No. BH - 19 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : April 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 50(a)
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 20 0.15 78.63 50.25 26.71 N P SM

BH - 20 1.50 100.00 71.54 46.82 36 14 SC


IS

BH - 20 3.00 79.06 64.96 46.58 32 12 SC

BH - 20 4.50 58.96 30.29 17.26 28 08 SC

Borehole No. BH - 20 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : April 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 51
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20 R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 20 10.50 54.41 22.39 8.55 N P GP-GM

BH - 20 12.00 67.08 35.14 14.50 30 10 SC


IS

BH - 20 15.00 54.76 34.31 20.18 26 06 GC-GM

Borehole No. BH - 20 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : April 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 51(a)
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20 R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 21 0.15 81.22 51.43 31.02 N P SM

BH - 21 1.50 92.54 52.19 26.32 26 05 SC-SM


IS

BH - 21 3.00 41.03 9.41 5.86 N P GW-GM

BH - 21 6.00 69.17 14.62 8.30 N P SP-SM

BH - 21 10.50 29.52 10.82 1.82 N P GP

BH - 21 13.50 76.30 19.93 11.31 N P SP-SM

Borehole No. BH - 21 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : April 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 52
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER

3" 2" 11/2" 1" 3/4" 3/8" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 22 0.15 88.17 54.16 36.41 N P SM

BH - 22 1.50 88.82 52.63 32.24 26 07 SC-SM


IS

BH - 22 4.50 31.05 10.74 5.47 N P GW-GM

BH - 22 9.00 53.79 21.33 9.72 N P GP-GM

Borehole No. BH - 22 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : April 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 53
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20 R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 22 12.00 34.43 16.60 8.92 N P GP-GM

BH - 22 18.00 66.30 40.72 19.81 N P SM


IS

BH - 22 27.00 59.02 31.97 15.98 N P SM

Borehole No. BH - 22 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : April 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 53(a)
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 23 0.15 100.00 62.39 23.89 N P SM

BH - 23 1.50 41.25 20.63 9.06 N P GW-GM


IS

BH - 23 4.50 53.28 21.64 10.23 N P SW-SM

BH - 23 7.50 37.96 13.38 6.02 N P GP-GM

BH - 23 12.00 83.27 47.01 27.09 25 04 SC-SM

BH - 23 16.50 58.72 25.53 15.32 26 05 SC-SM

Borehole No. BH - 23 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : April 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 54
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 24 0.15 91.70 47.29 24.91 N P SM

BH - 24 2.25 65.20 40.00 26.00 26 03 SM


IS

BH - 24 3.75 62.92 21.28 13.37 N P SM

BH - 24 6.00 70.75 35.38 15.32 N P SM

BH - 24 9.00 64.79 23.24 11.97 N P SW-SM

BH - 24 16.50 79.17 14.81 10.19 N P SW-SM

Borehole No. BH - 24 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : April 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 55
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 25 0.75 90.61 11.74 5.16 N P SW-SM

BH - 25 2.25 45.80 21.44 10.81 N P GP-GM


IS

BH - 25 6.00 60.11 35.73 9.97 N P SP-SM

BH - 25 10.50 77.21 48.15 32.76 N P SM

BH - 25 16.50 68.63 43.14 29.90 26 03 SM

BH - 25 24.00 57.25 33.13 13.89 N P SM

Borehole No. BH - 25 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : April 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 56
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20 R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 26 0.75 96.57 46.29 13.14 N P SM

BH - 26 1.50 94.76 41.43 14.29 N P SM


IS

BH - 26 4.50 91.96 38.87 12.06 N P SP-SM

BH - 26 9.00 68.44 28.89 13.33 N P SM

BH - 26 13.50 100.00 26.27 10.59 N P SW-SM

Borehole No. BH - 26 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : April 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 57
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20 R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 27 1.50 27.61 14.51 7.02 N P GP-GM

BH - 27 3.00 38.27 17.57 9.59 N P GP-GM


IS

BH - 27 7.50 64.82 31.54 18.54 N P SM

BH - 27 12.00 54.04 25.31 12.72 N P GM

BH - 27 15.00 81.50 35.57 16.43 N P SM

Borehole No. BH - 27 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : April 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 58
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20 R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 28 0.15 88.89 52.96 27.41 N P SM

BH - 28 1.50 93.44 57.92 30.05 28 08 SC


IS

BH - 28 3.00 88.89 52.27 23.48 30 10 SC

BH - 28 4.50 90.04 52.03 22.88 29 09 SC

BH - 28 6.00 99.00 90.55 39.80 31 10 SC

Borehole No. BH - 28 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : April 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 59
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20 R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 28 9.00 85.03 51.13 25.99 26 07 SC-SM

BH - 28 21.00 61.27 44.37 28.64 28 09 GC


IS

BH - 28 22.50 63.02 53.65 44.27 36 14 GC

BH - 28 27.00 65.45 57.87 42.36 39 08 GM

Borehole No. BH - 28 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : April 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 59(a)
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 29 0.15 94.69 59.39 23.34 N P SM

BH - 29 1.50 100.00 64.32 20.75 N P SM


IS

BH - 29 2.25 76.45 52.07 34.71 26 07 SC-SM

BH - 29 3.00 96.57 80.00 56.57 34 12 CL

Borehole No. BH - 29 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abdullah


Hub Project, Yanbu Dated Tested : April 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 60
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 29 3.75 97.99 86.43 58.79 36 14 CL

BH - 29 4.50 91.89 78.38 60.23 38 15 CL


IS

BH - 29 6.00 84.54 54.12 35.05 29 09 SC

BH - 29 7.50 82.97 57.21 40.61 26 07 SC-SM

Borehole No. BH - 29 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : April 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 60(a)
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 30 0.15 95.73 66.35 34.12 N P SM

BH - 30 1.50 94.36 57.69 33.85 27 03 SM


IS

BH - 30 3.00 100.00 93.01 39.86 28 09 SC

BH - 30 3.75 100.00 91.23 41.52 26 06 SC-SM

Borehole No. BH - 30 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : April 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 61
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20 R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 30 6.00 69.44 43.82 22.25 25 06 SC-SM

BH - 30 10.50 42.91 20.23 9.64 N P GW-GM


IS

BH - 30 16.50 64.68 52.32 25.83 29 09 SC

Borehole No. BH - 30 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : April 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 61(a)
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 31 1.50 98.97 49.40 9.40 N P SP-SM

BH - 31 4.50 80.60 48.28 28.88 29 09 SC


IS

BH - 31 9.00 54.53 25.69 13.86 N P GM

BH - 31 12.00 99.09 88.24 74.05 32 12 CL

BH - 31 25.50 100.00 97.77 86.03 38 15 CL

BH - 31 28.50 74.73 64.52 28.76 25 04 SC-SM

Borehole No. BH - 31 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abdullah


Hub Project, Yanbu Dated Tested : April 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 62
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 32 0.15 92.52 53.85 24.32 N P SM

BH - 32 1.50 74.31 46.03 14.00 N P SM


IS

BH - 32 3.75 80.97 50.00 31.42 28 09 SC

BH - 32 6.00 77.06 44.06 31.19 31 10 SC

BH - 32 10.50 100.00 81.87 44.00 32 12 SC

BH - 32 13.50 100.00 93.19 65.93 38 15 CL

Borehole No. BH - 32 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abdullah


Hub Project, Yanbu Dated Tested : April 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 63
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 33 0.15 78.45 40.59 21.55 N P SM

BH - 33 1.50 75.19 43.13 22.90 N P SM


IS

BH - 33 3.75 35.93 21.59 11.50 N P GW-GM

BH - 33 6.00 36.23 20.45 11.54 N P GW-GM

BH - 33 12.00 48.39 21.33 11.70 N P GP-GM

BH - 33 15.00 58.92 20.09 7.45 N P SP-SM

Borehole No. BH - 33 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : April 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 64
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER

3" 2" 11/2" 1" 3/4" 3/8" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 34 0.15 92.95 61.20 31.57 N P SM

BH - 34 1.50 82.55 24.53 7.08 N P SP-SM


IS

BH - 34 3.00 55.88 34.97 24.18 27 07 GC-GM

BH - 34 4.50 79.95 62.21 37.53 26 06 SC-SM

BH - 34 7.50 77.95 51.71 32.81 26 07 SC-SM

Borehole No. BH - 34 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : April 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 65
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER

3" 2" 11/2" 1" 3/4" 3/8" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 34 13.50 29.82 14.23 6.82 N P GP-GM

BH - 34 16.50 36.01 18.88 9.79 N P GP-GM


IS

BH - 34 19.50 62.43 32.29 18.98 26 05 SC-SM

BH - 34 21.00 98.78 83.49 56.57 34 12 CL

BH - 34 28.50 99.35 86.35 47.81 34 07 SM

Borehole No. BH - 34 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : April 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 65(a)
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 35 0.15 78.15 43.05 20.53 N P SM

BH - 35 1.50 50.68 23.53 14.48 N P GM


IS

BH - 35 2.25 67.73 37.29 19.33 26 07 SC-SM

BH - 35 3.00 76.33 41.53 20.19 26 04 SC-SM

Borehole No. BH - 35 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : April 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 66
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20 R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 35 7.50 98.50 58.72 30.96 28 08 SC

BH - 35 10.50 90.48 49.10 25.78 32 12 SC


IS

BH - 35 15.00 93.06 52.28 27.98 29 09 SC

Borehole No. BH - 35 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : April 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 66(a)
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 36 0.15 94.67 59.33 16.67 N P SM

BH - 36 1.50 83.54 34.18 9.28 N P SW-SM


IS

BH - 36 3.75 46.90 32.10 9.64 N P GP-GM

BH - 36 9.00 100.00 87.50 59.24 36 14 CL

BH - 36 12.00 100.00 90.96 64.97 38 15 CL

Borehole No. BH - 36 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : April 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 67
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 37 1.50 56.35 33.73 15.08 N P GM

BH - 37 3.00 67.69 42.06 27.02 27 03 SM


IS

BH - 37 7.50 34.52 16.27 7.94 N P GP-GM

BH - 37 10.50 62.30 31.41 13.09 N P SM

Borehole No. BH - 37 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : April 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 68
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20 R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 37 15.00 42.82 20.40 9.32 N P GW-GM

BH - 37 18.00 68.12 35.10 12.33 N P SW-SM


IS

BH - 37 22.50 56.33 33.33 16.33 N P GM

Borehole No. BH - 37 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : April 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 68(a)
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 38 1.50 63.20 40.37 19.25 N P SM

BH - 38 2.25 84.52 48.68 29.53 26 04 SC-SM


IS

BH - 38 4.50 43.05 20.40 9.19 N P GW-GM

BH - 38 10.50 46.43 16.74 7.13 N P GW-GM

BH - 38 16.50 98.17 44.04 10.09 N P SW-SM

Borehole No. BH - 38 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : April 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 69
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 39 1.50 73.87 45.05 15.32 N P SM

BH - 39 3.00 52.09 30.16 18.61 N P GM


IS

BH - 39 6.00 78.11 48.68 32.45 31 10 SC

BH - 39 9.00 75.51 50.00 35.20 27 07 SC-SM

BH - 39 13.50 100.00 82.00 17.42 N P SM

Borehole No. BH - 39 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : April 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 70
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 40 0.15 95.58 64.95 34.02 N P SM

BH - 40 1.50 93.53 61.73 34.77 29 09 SC


IS

BH - 40 6.00 46.69 26.66 14.87 26 06 GC-GM

BH - 40 13.50 78.41 58.34 28.90 N P SM

BH - 40 19.50 100.00 92.35 65.77 42 10 ML

BH - 40 28.50 100.00 100.00 97.19 45 12 ML

Borehole No. BH - 40 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : April 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 71
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 41 0.75 97.96 66.67 32.65 27 07 SC-SM

BH - 41 2.25 100.00 60.50 11.50 N P SP-SM


IS

BH - 41 6.00 55.00 30.67 16.67 27 07 GC-GM

BH - 41 9.00 56.52 36.57 20.20 26 06 GC-GM

BH - 41 15.00 73.43 47.83 20.29 25 04 SC-SM

Borehole No. BH - 41 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : April 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 72
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 42 0.15 96.61 60.59 27.97 N P SM

BH - 42 1.50 94.48 49.17 12.71 N P SM


IS

BH - 42 4.50 92.59 28.89 14.57 N P SM

BH - 42 7.50 55.09 28.48 17.67 N P GM

BH - 42 12.00 59.36 22.28 8.02 N P SP-SM

BH - 42 15.00 58.17 29.91 8.26 N P SP-SM

Borehole No. BH - 42 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : April 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 73
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 43 1.50 86.72 70.54 39.83 25 06 SC-SM

BH - 43 3.00 54.91 29.48 11.37 N P SP-SM


IS

BH - 43 7.50 72.54 35.41 13.88 N P SM

BH - 43 10.50 87.76 44.22 18.82 N P SM

BH - 43 15.00 67.17 42.55 35.21 26 05 SC-SM

BH - 43 22.50 95.80 93.01 62.94 32 05 ML

Borehole No. BH - 43 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : April 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 74
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER

3" 2" 11/2" 1" 3/4" 3/8" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 44 0.75 100.00 85.83 42.26 29 09 SC

BH - 44 1.50 98.80 80.72 49.40 32 12 SC


IS

BH - 44 3.75 94.85 57.22 20.10 N P SM

BH - 44 7.50 100.00 53.80 15.82 N P SM

Borehole No. BH - 44 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abdullah


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 75
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20 R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 44 10.50 98.26 90.14 37.97 31 10 SC

BH - 44 13.50 100.00 87.16 46.17 34 12 SC


IS

BH - 44 19.50 100.00 90.61 58.12 36 15 CL

Borehole No. BH - 44 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abdullah


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 75(a)
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER

3" 2" 11/2" 1" 3/4" 3/8" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 45 1.50 85.99 69.19 24.65 N P SM

BH - 45 3.00 83.59 61.56 20.52 N P SM


IS

BH - 45 6.00 74.30 39.79 14.08 N P SM

BH - 45 10.50 54.53 30.19 10.06 N P SP-SM

Borehole No. BH - 45 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abdullah


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 76
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20 R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 45 15.00 74.41 44.39 23.22 29 09 SC

BH - 45 19.50 74.22 36.93 18.47 N P SM


IS

BH - 45 25.50 100.00 74.44 18.52 N P SM

Borehole No. BH - 45 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abdullah


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 76(a)
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 46 0.15 80.09 42.13 18.06 N P SM

BH - 46 1.50 57.63 33.05 15.44 N P SM


IS

BH - 46 3.00 53.50 27.80 17.40 28 08 GC

BH - 46 4.50 24.70 12.96 9.19 N P GP-GM

Borehole No. BH - 46 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abdullah


Hub Project, Yanbu Dated Tested : April 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 77
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 46 6.00 73.46 38.83 22.33 29 10 SC

BH - 46 10.50 61.01 33.24 21.23 28 09 SC


IS

BH - 46 15.00 46.47 41.35 27.52 30 09 GC

BH - 46 16.50 69.79 55.64 38.43 32 12 SC

Borehole No. BH - 46 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abdullah


Hub Project, Yanbu Dated Tested : April 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 77(a)
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 47 0.15 85.57 51.89 31.27 N P SM

BH - 47 1.50 36.22 16.54 9.45 N P GP-GM


IS

BH - 47 3.75 35.22 8.74 4.37 N P GP

BH - 47 9.00 44.91 11.33 7.03 N P GW-GM

BH - 47 16.50 81.78 53.78 20.89 N P SM

BH - 47 21.00 100.00 72.11 37.09 25 04 SC-SM

Borehole No. BH - 47 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 78
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 48 0.15 90.20 55.74 36.82 N P SM

BH - 48 1.50 76.15 42.26 25.94 N P SM


IS

BH - 48 4.50 53.74 26.79 14.81 N P GM

BH - 48 6.00 39.25 20.94 10.40 N P GP-GM

BH - 48 15.00 100.00 76.53 20.33 N P SM

Borehole No. BH - 48 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 79
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER

3" 2" 11/2" 1" 3/4" 3/8" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 49 0.15 78.99 52.52 32.95 N P SM

BH - 49 1.50 62.61 34.78 22.32 N P SM


IS

BH - 49 3.75 57.17 31.34 19.84 N P GM

BH - 49 6.00 31.38 11.14 6.74 N P GP-GM

Borehole No. BH - 49 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 80
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20 R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 49 13.50 94.32 86.46 16.59 N P SM

BH - 49 19.50 100.00 96.78 71.70 36 14 CL


IS

BH - 49 25.50 98.92 90.32 20.97 N P SM

Borehole No. BH - 49 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 80(a)
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER

3" 2" 11/2" 1" 3/4" 3/8" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 50 0.75 61.27 34.34 20.42 N P SM

BH - 50 2.25 57.45 19.93 10.89 N P SP-SM


IS

BH - 50 6.00 10.27 7.36 5.90 N P GW-GM

BH - 50 13.50 70.93 55.04 32.17 26 05 SC-SM

Borehole No. BH - 50 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 81
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20 R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 50 15.00 95.07 88.18 60.10 27 07 CL-ML

BH - 50 21.00 54.65 37.47 25.06 N P GM


IS

BH - 50 24.00 52.55 31.26 20.18 N P GM

Borehole No. BH - 50 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 81(a)
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER

3" 2" 11/2" 1" 3/4" 3/8" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 51 0.75 97.79 68.21 28.92 N P SM

BH - 51 2.25 65.37 38.53 25.54 N P SM


IS

BH - 51 3.00 73.14 45.87 29.75 28 08 SC

BH - 51 7.50 56.98 29.46 13.95 N P SM

Borehole No. BH - 51 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Wajahat


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 82
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 51 10.50 76.10 54.58 31.47 38 15 SC

BH - 51 15.50 100.00 100.00 96.78 42 19 CL


IS

BH - 51 22.50 100.00 97.84 21.83 N P SM

BH - 51 27.00 100.00 87.03 34.05 N P SM

Borehole No. BH - 51 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Wajahat


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 82(a)
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 52 1.50 73.26 45.99 27.27 29 09 SC

BH - 52 3.00 97.77 62.01 37.99 30 09 SC


IS

BH - 52 6.00 42.40 28.91 16.27 27 07 GC-GM

BH - 52 13.50 72.38 60.00 15.24 N P SM

BH - 52 16.50 93.39 70.80 38.29 32 12 SC

BH - 52 19.50 90.64 67.00 33.00 N P SM

Borehole No. BH - 52 Date Sampled : May 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Wajahat


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 83
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 53 0.75 54.85 28.16 16.08 N P GM

BH - 53 2.25 50.78 23.78 13.74 N P GM


IS

BH - 53 6.00 39.90 14.79 6.20 N P GW-GM

BH - 53 10.50 40.08 8.33 4.37 N P GW

BH - 53 13.50 96.40 77.70 20.86 N P SM

BH - 53 18.00 87.61 70.80 43.36 26 06 SC-SM

Borehole No. BH - 53 Date Sampled : May 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Wajahat


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 84
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 54 1.50 83.66 50.69 30.19 N P SM

BH - 54 3.00 50.00 26.25 15.31 26 05 GC-GM


IS

BH - 54 6.00 58.18 29.82 16.73 26 06 GC-GM

BH - 54 9.00 78.56 62.84 37.12 30 09 SC

BH - 54 13.50 72.68 68.12 20.68 N P SM

BH - 54 15.00 100.00 100.00 18.13 N P SM

Borehole No. BH - 54 Date Sampled : May 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Wajahat


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 85
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER

3" 2" 11/2" 1" 3/4" 3/8" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 55 0.15 96.67 51.07 24.47 N P SM

BH - 55 1.50 90.30 51.04 28.41 N P SM


IS

BH - 55 3.00 53.67 28.25 15.54 N P GM

BH - 55 6.00 40.02 19.95 11.42 N P GP-GM

BH - 55 9.00 35.94 10.42 4.69 N P GW-GM

Borehole No. BH - 55 Date Sampled : May 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Wajahat


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 86
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 55 15.00 63.79 27.93 15.52 N P SM

BH - 55 19.50 62.27 20.91 11.36 N P SW-SM


IS

BH - 55 22.50 55.24 17.02 7.69 N P SW-SM

BH - 55 25.50 58.17 17.23 8.98 N P SW-SM

Borehole No. BH - 55 Date Sampled : May 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Wajahat


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 86(a)
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 56 1.50 45.80 28.13 17.53 N P GM

BH - 56 3.00 60.67 38.40 26.53 26 03 GM


IS

BH - 56 4.50 58.63 28.46 13.53 N P SM

BH - 56 9.00 77.11 46.42 20.50 N P SM

Borehole No. BH - 56 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 87
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20 R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 56 15.00 49.74 17.44 8.72 N P GP-GM

BH - 56 19.50 96.44 87.61 47.77 37 07 SM


IS

BH - 56 22.50 93.53 87.07 44.11 27 05 SC-SM

Borehole No. BH - 56 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 87(a)
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 57 0.75 87.34 66.11 38.92 N P SM

BH - 57 2.25 56.80 11.04 1.44 N P SW


IS

BH - 57 3.75 100.00 95.06 82.61 41 18 CL

BH - 57 6.50 100.00 91.05 74.58 39 17 CL

BH - 57 10.50 88.51 47.97 34.46 26 06 SC-SM

BH - 57 15.00 84.54 33.55 19.74 N P SM

Borehole No. BH - 57 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 88
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 58 0.15 92.82 51.79 22.56 N P SM

BH - 58 0.75 59.47 23.30 12.88 N P SM


IS

BH - 58 1.50 63.89 36.25 19.89 N P SM

BH - 58 3.00 64.58 29.59 16.20 N P SM

BH - 58 7.50 41.55 18.24 8.45 N P GP-GM

Borehole No. BH - 58 Date Sampled : May 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Wajahat


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 89
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20 R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 58 10.50 47.01 21.86 10.78 N P GP-GM

BH - 58 12.00 23.98 12.45 6.42 N P GP-GM


IS

BH - 58 16.50 34.61 17.05 8.14 N P GP-GM

BH - 58 18.00 90.38 74.00 38.84 26 06 SC-SM

Borehole No. BH - 58 Date Sampled : May 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Wajahat


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 89(a)
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 59 1.50 43.79 27.45 14.71 N P GM

BH - 59 3.75 45.86 33.00 16.19 N P GM


IS

BH - 59 7.50 53.88 33.33 18.05 N P GM

BH - 59 18.50 54.58 38.70 30.54 N P GM

BH - 59 16.50 81.98 64.41 49.10 36 14 SC

BH - 59 18.00 97.36 67.81 40.90 N P SM

Borehole No. BH - 59 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Wajahat


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 90
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 60 0.15 96.83 70.14 26.24 N P SM

BH - 60 3.00 91.41 44.44 26.77 27 05 SC-SM


IS

BH - 60 6.00 92.89 46.70 24.87 N P SM

BH - 60 7.50 89.71 45.23 20.42 N P SM

BH - 60 12.00 89.50 49.11 25.44 26 05 SC-SM

BH - 60 16.50 95.98 61.16 33.48 26 06 SC-SM

Borehole No. BH - 60 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 91
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER

3" 2" 11/2" 1" 3/4" 3/8" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 61 0.75 55.49 29.62 15.49 N P GM

BH - 61 3.00 34.74 18.99 9.99 N P GP-GM


IS

BH - 61 7.50 58.50 14.77 6.54 N P SW-SM

BH - 61 12.00 78.93 42.86 20.06 N P SM

BH - 61 18.00 53.75 22.92 8.32 N P SW-SM

Borehole No. BH - 61 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Wajahat


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 92
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 62 0.75 98.81 65.41 21.67 N P SM

BH - 62 3.75 42.71 25.32 14.58 24 04 GC-GM


IS

BH - 62 7.50 67.58 38.74 16.35 N P SM

BH - 62 12.00 62.41 38.62 14.98 N P SM

BH - 62 16.50 69.78 45.53 20.87 N P SM

Borehole No. BH - 62 Date Sampled : May 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 93
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 63 0.75 81.87 33.92 19.88 N P SM

BH - 63 2.25 76.87 33.79 19.73 N P SM


IS

BH - 63 6.00 73.88 35.05 20.96 25 04 SC-SM

BH - 63 10.50 86.91 35.64 12.73 N P SM

BH - 63 12.00 70.69 33.01 18.84 N P SM

BH - 63 16.50 88.11 39.08 17.68 N P SM

Borehole No. BH - 63 Date Sampled : May 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 94
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20 R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 64 0.75 89.42 55.03 32.80 29 09 SC

BH - 64 2.25 76.53 28.93 13.06 N P SM


IS

BH - 64 3.75 94.69 75.46 52.24 34 12 CL

BH - 64 4.50 100.00 84.79 47.00 27 07 SC-SM

Borehole No. BH - 64 Date Sampled : May 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Wajahat


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 95
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20 R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 64 7.50 100.00 89.93 77.07 26 06 CL-ML

BH - 64 10.50 100.00 84.52 48.00 28 08 SC


IS

BH - 64 13.50 68.42 31.82 16.75 N P SM

BH - 64 18.00 46.90 22.11 11.98 N P GW-GM

Borehole No. BH - 64 Date Sampled : May 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Wajahat


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 95(a)
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20 R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 65 0.75 77.20 36.79 24.35 N P SM

BH - 65 1.50 49.50 28.26 17.84 N P GM


IS

BH - 65 3.00 72.59 39.47 20.61 N P SM

BH - 65 4.50 35.98 15.90 10.04 N P GP-GM

Borehole No. BH - 65 Date Sampled : May 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Wajahat


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 96
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20 R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 65 9.00 75.98 51.50 39.95 30 09 SC

BH - 65 10.50 78.17 70.16 33.53 26 04 SC-SM


IS

BH - 65 13.50 100.00 98.17 91.05 23 07 CL-ML

BH - 65 16.50 99.69 96.63 90.17 26 05 CL-ML

Borehole No. BH - 65 Date Sampled : May 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Wajahat


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 96(a)
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20 R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 66 0.75 65.55 43.06 25.13 N P SM

BH - 66 2.25 47.80 23.77 12.92 N P GM


IS

BH - 66 7.50 49.91 23.32 12.61 N P GM

BH - 66 13.50 36.58 12.06 8.17 N P GP-GM

Borehole No. BH - 66 Date Sampled : May 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 97
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20 R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 67 0.75 41.12 24.37 17.01 N P GM

BH - 67 1.50 73.04 43.17 29.33 N P SM


IS

BH - 67 3.75 59.49 36.20 18.99 N P SM

BH - 67 6.00 67.82 36.05 19.35 26 06 SC-SM

Borehole No. BH - 67 Date Sampled : May 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 98
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20 R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 67 9.00 67.00 40.54 18.07 N P SM

BH - 67 10.50 81.07 48.15 21.81 28 08 SC


IS

BH - 67 13.50 83.29 49.88 27.76 N P SM

BH - 67 16.50 93.85 58.46 34.62 N P SM

Borehole No. BH - 67 Date Sampled : May 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 98(a)
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 68 0.75 83.68 43.93 16.74 N P SM

BH - 68 1.50 73.58 44.04 28.50 27 03 SM


IS

BH - 68 2.25 61.82 37.09 23.82 24 06 SC

BH - 68 3.75 25.91 13.82 7.49 N P GP-GM

BH - 68 4.50 43.38 20.73 10.56 N P GW-GM

Borehole No. BH - 68 Date Sampled : May 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Wajahat


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 99
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 68 7.50 100.00 99.39 96.97 38 15 CL

BH - 68 13.50 45.99 18.35 8.65 N P GW-GM


IS

BH - 68 16.50 46.90 18.11 9.18 N P GW-GM

BH - 68 22.50 72.46 34.25 16.70 N P SM

BH - 68 28.50 99.47 87.49 59.67 27 07 CL-ML

Borehole No. BH - 68 Date Sampled : May 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Wajahat


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 99(a)
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20 R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 69 0.75 48.92 30.57 20.75 27 03 GM

BH - 69 3.75 66.66 40.89 26.72 27 03 SM


IS

BH - 69 6.00 75.94 42.16 24.06 26 05 SC-SM

BH - 69 9.00 100.00 70.49 15.34 N P SM

Borehole No. BH - 69 Date Sampled : May 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 100
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20 R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 69 13.50 100.00 98.38 96.77 39 17 CL

BH - 69 18.00 100.00 96.37 75.80 34 12 CL


IS

BH - 69 22.50 63.05 32.56 17.57 N P SM

BH - 69 25.50 48.70 27.88 18.59 N P GM

Borehole No. BH - 69 Date Sampled : May 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 100(a)
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20 R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 70 0.75 57.82 38.91 18.55 N P GM

BH - 70 2.25 89.54 53.38 35.08 27 07 SC-SM


IS

BH - 70 3.75 88.85 58.46 38.08 N P SM

BH - 70 7.50 70.57 48.13 31.67 28 08 SC

Borehole No. BH - 70 Date Sampled : May 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Wajahat


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 101
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20 R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 70 10.50 88.43 31.08 18.07 N P SM

BH - 70 18.00 70.04 27.43 10.55 N P SW-SM


IS

BH - 70 21.00 67.82 21.45 9.15 N P SW-SM

BH - 70 25.50 84.45 29.41 14.71 N P SM

Borehole No. BH - 70 Date Sampled : May 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Wajahat


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 101(a)
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 71 0.00-1.50 87.04 50.46 11.11 N P SW-SM

BH - 71 1.50 43.40 25.16 16.04 26 06 GC-GM


IS

BH - 71 4.50 53.40 31.62 18.91 25 05 GC-GM

BH - 71 6.00 58.79 37.19 22.27 26 06 GC-GM

BH - 71 10.50 58.97 38.78 25.70 27 07 GC-GM

Borehole No. BH - 71 Date Sampled : May 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Wajahat


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 102
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 71 13.50 68.14 41.00 25.37 28 08 SC

BH - 71 16.50 47.78 31.03 15.76 26 07 GC-GM


IS

BH - 71 21.00 70.51 43.05 26.68 26 06 SC-SM

BH - 71 24.00 96.88 67.41 48.66 34 12 SC

BH - 71 27.00 100.00 78.56 61.94 27 07 CL-ML

Borehole No. BH - 71 Date Sampled : May 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Wajahat


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 102(a)
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER

3" 2" 11/2" 1" 3/4" 3/8" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 72 0.15 97.19 55.04 20.84 N P SM

BH - 72 1.50 88.76 57.12 32.96 24 06 SC-SM


IS

BH - 72 3.00 100.00 86.49 58.35 27 07 CL-ML

BH - 72 6.50 96.97 91.61 49.88 26 06 CL-ML

Borehole No. BH - 72 Date Sampled : May 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Wajahat


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 103
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER

3" 2" 11/2" 1" 3/4" 3/8" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 72 9.00 99.04 91.38 48.28 26 04 SC-SM

BH - 72 12.00 93.02 66.98 45.58 29 09 SC


IS

BH - 72 15.00 64.71 43.73 34.02 30 10 GC

BH - 72 18.00 90.55 51.27 38.55 26 07 SC-SM

Borehole No. BH - 72 Date Sampled : May 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Wajahat


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 103(a)
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 73 0.75 88.96 59.82 27.30 N P SM

BH - 73 3.75 73.15 33.07 13.43 N P SM


IS

BH - 73 7.50 62.05 43.02 20.65 N P SM

BH - 73 10.50 60.91 44.37 21.83 N P SM

BH - 73 15.00 67.55 45.36 21.52 N P SM

BH - 73 18.00 84.36 53.13 26.21 28 03 SM

Borehole No. BH - 73 Date Sampled : May 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 104
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20 R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 74 0.75 97.46 66.10 22.46 N P SM

BH - 74 1.50 77.30 59.52 37.61 25 06 SC-SM


IS

BH - 74 3.75 100.00 76.84 47.01 26 07 SC-SM

BH - 74 6.00 55.60 35.38 21.30 N P GM

Borehole No. BH - 74 Date Sampled : May 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Wajahat


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 105
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20 R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 74 10.50 77.22 49.81 28.96 28 09 SC

BH - 74 13.50 70.16 45.40 20.00 N P SM


IS

BH - 74 16.50 91.67 58.75 28.33 26 06 SC-SM

Borehole No. BH - 74 Date Sampled : May 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Wajahat


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 105(a)
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 75 1.50 98.12 75.55 46.71 26 05 SC-SM

BH - 75 3.00 67.07 42.93 25.85 27 05 SC-SM


IS

BH - 75 6.00 57.86 35.71 20.00 24 06 GC-GM

BH - 75 9.00 84.56 56.69 26.55 N P SM

BH - 75 12.00 39.28 24.29 10.06 N P GW-GM

Borehole No. BH - 75 Date Sampled : May 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 106
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 76 0.75 85.77 73.91 43.90 27 07 SC-SM

BH - 76 1.50 67.34 42.49 25.07 29 04 SM


IS

BH - 76 3.00 78.69 44.10 24.53 28 04 SM

BH - 76 6.00 51.00 29.93 14.96 N P GM

BH - 76 10.50 41.86 14.04 8.32 N P GP-GM

BH - 76 15.50 92.92 47.86 13.97 N P SM

Borehole No. BH - 76 Date Sampled : May 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 107
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER

3" 2" 11/2" 1" 3/4" 3/8" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 77 0.00-2.00 55.63 32.75 17.21 N P GM

BH - 77 2.25 86.19 51.94 34.68 24 04 SC-SM


IS

BH - 77 4.50 25.23 15.46 8.99 N P GP-GM

BH - 77 6.00 56.19 35.05 19.59 24 04 GC-GM

BH - 77 9.00 57.27 45.86 26.70 N P GM

Borehole No. BH - 77 Date Sampled : May 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Usman


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 108
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER

3" 2" 11/2" 1" 3/4" 3/8" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 77 13.50 66.48 38.07 22.40 26 03 SM

BH - 77 15.00 74.32 48.65 31.35 20 03 SM


IS

BH - 77 19.50 38.88 21.63 12.56 N P GM

BH - 77 22.50 63.37 33.33 20.15 27 03 SM

BH - 77 25.50 55.78 36.65 22.31 26 04 GC-GM

Borehole No. BH - 77 Date Sampled : May 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Usman


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 108(a)
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 78 0.00-1.50 87.69 55.16 13.85 N P SM

BH - 78 1.50 44.82 27.36 18.04 N P GM


IS

BH - 78 3.00 46.60 26.21 16.99 24 04 GC-GM

BH - 78 3.75 57.84 33.78 22.16 26 03 GM

BH - 78 4.50 81.42 61.55 44.66 26 07 SC-SM

BH - 78 7.50 80.12 56.90 38.94 26 05 SC-SM

Borehole No. BH - 78 Date Sampled : May 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Wajahat


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 109
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 78 12.00 56.39 31.63 19.06 N P GM

BH - 78 15.00 42.62 25.60 16.40 23 04 GC-GM


IS

BH - 78 18.00 48.01 25.27 13.00 N P GM

BH - 78 22.50 100.00 98.59 79.44 27 07 CL-ML

BH - 78 25.50 98.97 93.13 80.31 34 12 CL

Borehole No. BH - 78 Date Sampled : May 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Wajahat


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 109(a)
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20 R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 79 0.00-1.50 46.32 26.84 13.97 N P GM

BH - 79 1.50 80.04 38.32 9.80 N P SW-SM


IS

BH - 79 3.00 58.16 35.56 25.52 27 03 GM

BH - 79 6.00 40.71 22.35 12.83 N P GM

BH - 79 7.50 31.06 14.17 6.81 N P GP-GM

Borehole No. BH - 79 Date Sampled : May 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Usman


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 110
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20 R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 79 13.50 46.86 21.45 13.20 N P GM

BH - 79 18.00 41.26 22.61 14.45 21 04 GC-GM


IS

BH - 79 19.50 59.39 32.83 19.54 22 04 GC-GM

BH - 79 24.00 54.89 30.45 18.05 N P GM

BH - 79 27.00 42.92 23.89 11.28 N P GP-GM

Borehole No. BH - 79 Date Sampled : May 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Usman


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 110(a)
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 80 0.00-1.50 50.21 32.98 15.97 N P GM

BH - 80 1.50 77.16 46.60 19.44 N P SM


IS

BH - 80 4.50 59.73 38.77 29.45 26 06 GC-GM

BH - 80 9.00 18.23 10.72 6.30 N P GP-GM

BH - 80 12.00 63.95 36.79 14.81 N P SM

Borehole No. BH - 80 Date Sampled : May 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Wajahat


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 111
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER

3" 2" 11/2" 1" 3/4" 3/8" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 80 16.50 57.45 23.58 11.38 N P SW-SM

BH - 80 21.00 17.85 8.62 4.62 N P GP-GM


IS

BH - 80 25.50 37.26 16.52 8.32 N P GP-GM

BH - 80 27.00 50.00 32.02 21.35 25 06 GC-GM

Borehole No. BH - 80 Date Sampled : May 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Wajahat


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 111(a)
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER

3" 2" 11/2" 1" 3/4" 3/8" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 81 0.00-1.50 61.62 36.57 20.81 N P SM

BH - 81 2.25 40.49 19.33 1.53 N P GP


IS

BH - 81 6.00 52.23 27.81 12.95 N P GM

BH - 81 9.00 48.24 15.22 7.48 N P GW-GM

Borehole No. BH - 81 Date Sampled : May 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 112
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER

3" 2" 11/2" 1" 3/4" 3/8" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) 07
SU

BH - 81 15.00 100.00 83.40 63.68 37 07 ML

BH - 81 16.50 87.20 51.65 36.97 29 04 SM


IS

BH - 81 21.00 58.61 10.25 6.38 N P SW-SM

BH - 81 24.00 53.61 10.56 5.83 N P SW-SM

Borehole No. BH - 81 Date Sampled : May 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 112(a)
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 82 0.00-1.50 76.02 46.89 14.11 N P SM

BH - 82 2.25 53.19 32.44 8.44 N P GP-GM


IS

BH - 82 3.75 64.73 41.43 15.47 N P SM

BH - 82 4.50 25.44 16.07 4.50 N P GP-GM

BH - 82 6.00 51.46 18.45 5.34 N P GP-GM

Borehole No. BH - 82 Date Sampled : May 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Wajahat


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 113
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 82 10.50 52.69 9.06 3.38 N P SW

BH - 82 16.50 86.52 59.57 19.15 N P SM


IS

BH - 82 19.50 55.23 38.91 33.05 N P GM

BH - 82 24.00 91.96 72.32 19.64 N P SM

BH - 82 27.00 90.46 89.50 84.31 38 15 CL

Borehole No. BH - 82 Date Sampled : May 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Wajahat


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 113(a)
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20 R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 83 0.00-1.50 88.13 51.25 10.63 N P SP-SM

BH - 83 1.50 86.13 43.55 14.84 N P SM


IS

BH - 83 4.50 39.71 19.71 5.88 N P GW-GM

BH - 83 9.00 56.56 34.85 11.67 N P SP-SM

Borehole No. BH - 83 Date Sampled : May 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 114
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20 R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 83 12.00 71.97 36.93 10.95 N P SP-SM

BH - 83 16.50 46.12 23.67 6.31 N P GP-GM


IS

BH - 83 21.00 70.10 37.09 12.23 N P SP-SM

BH - 83 25.50 81.26 41.34 13.24 N P SM

Borehole No. BH - 83 Date Sampled : May 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 114(a)
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER


1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 84 0.00-1.50 88.49 46.83 11.11 N P SP-SM

BH - 84 2.25 99.16 68.55 19.50 N P SM


IS

BH - 84 4.50 85.94 61.46 12.24 N P SW-SM

BH - 84 7.50 52.55 26.64 7.30 N P GP-GM

BH - 84 10.50 40.62 16.62 4.71 N P GP-GM

Borehole No. BH - 84 Date Sampled : May 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Wajahat


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 115
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER

1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001

Grain Size in Millimeters


ED

Borehole Depth % Passing Atterberg Limit


Symbol U.S.C. Group
No. (m) #4 # 40 # 200 LL (%) PI (%)
SU

BH - 84 12.00 48.51 22.34 5.74 N P GP-GM

BH - 84 16.50 84.83 34.33 7.19 N P SP-SM


IS

BH - 84 21.00 44.34 26.24 6.33 N P GP-GM

BH - 84 24.00 80.62 78.34 71.77 38 15 CL

BH - 84 28.50 70.82 68.92 63.97 36 14 CL

Borehole No. BH - 84 Date Sampled : May 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Wajahat


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : Ernie

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. B - 116
OEO - GF - 03, Rev. 00
CLASSIFICATION OF SOILS FOR ENGINEERING PURPOSES
( ASTM D - 2487 )

60
For classification of fine-grained
soils and fine-grained fraction of
coarse-grained soils
50
Equation of "A" Line
PLASTICITY INDEX ( PI ), %

Horizontal at PI = 4 to LL = 25.5,
then PI = 0.73 (LL - 20)
40
Equation of "U" Line
Vertical at LL = 16 to PI = 7,
then PI = 0.90 (LL - 8)
30

D
20

BI
10
7
4
4
0
0 10 20 30 40 50
R 60
LIQUID LIMIT ( LL ), %
70 80 90 100 110
FO
16

Unified Soil Classification


Borehole # Depth (m) Symbols LL (%) PI (%) Minus # 200 Sieve, (%)
( ASTM D - 2487 )
ED

BH - 01 1.50 42 19 62 CL

2.25 40 17 67 CL

3.75 29 9 42 SC
SU

BH - 02 1.50 38 15 72 CL

3.00 39 18 67 CL
IS

BH - 03 1.50 29 9 32 SC

3.75 26 6 24 SC-SM

BH - 04 0.75 26 5 42 GC-GM

12.00 + 32 4 32 SM

Project Title : Drawing Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu
PLASTICITY CHART
Client / Owner :

Geotechnical File No. 2015/104 Figure No. B - 117

OEO - GF - 04, Rev. 00


CLASSIFICATION OF SOILS FOR ENGINEERING PURPOSES
( ASTM D - 2487 )

60
For classification of fine-grained
soils and fine-grained fraction of
coarse-grained soils
50
Equation of "A" Line
PLASTICITY INDEX ( PI ), %

Horizontal at PI = 4 to LL = 25.5,
then PI = 0.73 (LL - 20)
40
Equation of "U" Line
Vertical at LL = 16 to PI = 7,
then PI = 0.90 (LL - 8)
30

D
20

BI
10
7
4
4

0
0 10 20 30 40 50
R 60 70 80 90 100 110
FO
16 LIQUID LIMIT ( LL ), %

Unified Soil Classification


Borehole # Depth (m) Symbols LL (%) PI (%) Minus # 200 Sieve, (%)
ED

( ASTM D - 2487 )

BH - 05 1.50 32 12 57 CL

2.25 34 12 69 CL

3.75 26 6 13 GC-GM
SU

6.00 28 8 28 SC

15.00 30 9 20 SC
IS

BH - 06 1.50 34 12 56 CL

3.00 28 8 33 SC

4.50 32 12 28 SC

6.00 + 26 5 32 SC-SM

12.00 x 30 3 26 SM

13.50 -- 36 5 36 SM

Project Title : Drawing Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu
PLASTICITY CHART
Client / Owner :

Geotechnical File N o. 2015/104 Figure No. B - 118

OEO - GF - 04, Rev. 00


CLASSIFICATION OF SOILS FOR ENGINEERING PURPOSES
( ASTM D - 2487 )

60
For classification of fine-grained
soils and fine-grained fraction of
coarse-grained soils
50
Equation of "A" Line
PLASTICITY INDEX ( PI ), %

Horizontal at PI = 4 to LL = 25.5,
then PI = 0.73 (LL - 20)
40
Equation of "U" Line
Vertical at LL = 16 to PI = 7,
then PI = 0.90 (LL - 8)
30

D
20

BI
10
7
4
4

0
0 10 20 30 40 50
R 60 70 80 90 100 110
FO
16 LIQUID LIMIT ( LL ), %

Unified Soil Classification


Borehole # Depth (m) Symbols LL (%) PI (%) Minus # 200 Sieve, (%)
ED

( ASTM D - 2487 )

BH - 07 3.00 36 14 52 CL

6.50 32 12 46 SC

7.50 30 10 43 SC
SU

10.50 28 8 15 SC

21.00 29 9 31 SC
IS

BH - 08 3.75 34 12 53 CL

6.00 40 17 65 CL

9.00 26 6 30 SC-SM

BH - 09 4.50 + 34 14 55 CL

5.00 x 38 15 65 CL

Project Title : Drawing Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu
PLASTICITY CHART
Client / Owner :

Geotechnical File N o. 2015/104 Figure No. B - 119

OEO - GF - 04, Rev. 00


CLASSIFICATION OF SOILS FOR ENGINEERING PURPOSES
( ASTM D - 2487 )

60
For classification of fine-grained
soils and fine-grained fraction of
coarse-grained soils
50
Equation of "A" Line
PLASTICITY INDEX ( PI ), %

Horizontal at PI = 4 to LL = 25.5,
then PI = 0.73 (LL - 20)
40
Equation of "U" Line
Vertical at LL = 16 to PI = 7,
then PI = 0.90 (LL - 8)
30

D
20

BI
10
7
4
4

0
0 10 20 30 40 50
R 60 70 80 90 100 110
FO
16 LIQUID LIMIT ( LL ), %

Unified Soil Classification


Borehole # Depth (m) Symbols LL (%) PI (%) Minus # 200 Sieve, (%)
ED

( ASTM D - 2487 )

BH - 10 13.50 26 6 25 SC-SM

16.50 26 5 17 SC-SM
SU

BH - 11 12.00 26 6 27 SC-SM

BH - 13 7.50 27 7 39 SC-SM
IS

10.50 26 5 44 SC-SM

24.00 26 6 41 SC-SM

25.50 26 7 41 SC-SM

BH - 14 3.75 24 5 35 SC-SM

12.00 + 29 9 41 GC

Project Title : Drawing Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu
PLASTICITY CHART
Client / Owner :

Geotechnical File N o. 2015/104 Figure No. B - 120

OEO - GF - 04, Rev. 00


CLASSIFICATION OF SOILS FOR ENGINEERING PURPOSES
( ASTM D - 2487 )

60
For classification of fine-grained
soils and fine-grained fraction of
coarse-grained soils
50
Equation of "A" Line
PLASTICITY INDEX ( PI ), %

Horizontal at PI = 4 to LL = 25.5,
then PI = 0.73 (LL - 20)
40
Equation of "U" Line
Vertical at LL = 16 to PI = 7,
then PI = 0.90 (LL - 8)
30

D
20

BI
10
7
4
4

0
0 10 20 30 40 50
R 60 70 80 90 100 110
FO
16 LIQUID LIMIT ( LL ), %

Unified Soil Classification


Borehole # Depth (m) Symbols LL (%) PI (%) Minus # 200 Sieve, (%)
ED

( ASTM D - 2487 )

BH - 15 10.50 26 6 53 CL-ML

13.50 28 4 50 ML
SU

BH - 16 0.75 34 13 55 CL

1.50 30 9 52 CL

2.25 29 9 55 CL
IS

3.00 27 7 48 SC-SM

3.75 27 7 48 SC-SM

21.00 28 3 31 SM

BH - 17 1.50 + 29 10 79 CL

2.25 x 29 9 65 CL

Project Title : Drawing Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu
PLASTICITY CHART
Client / Owner :

Geotechnical File N o. 2015/104 Figure No. B - 121

OEO - GF - 04, Rev. 00


CLASSIFICATION OF SOILS FOR ENGINEERING PURPOSES
( ASTM D - 2487 )

60
For classification of fine-grained
soils and fine-grained fraction of
coarse-grained soils
50
Equation of "A" Line
PLASTICITY INDEX ( PI ), %

Horizontal at PI = 4 to LL = 25.5,
then PI = 0.73 (LL - 20)
40
Equation of "U" Line
Vertical at LL = 16 to PI = 7,
then PI = 0.90 (LL - 8)
30

D
20

BI
10
7
4
4
0
0 10 20 30 40 50
R 60
LIQUID LIMIT ( LL ), %
70 80 90 100 110
FO
16

Unified Soil Classification


Borehole # Depth (m) Symbols LL (%) PI (%) Minus # 200 Sieve, (%)
( ASTM D - 2487 )
ED

BH - 17 3.00 30 9 44 SC

3.75 27 7 42 SC-SM

4.50 27 7 23 GC-GM
SU

18.00 39 8 53 ML

BH - 18 1.50 34 12 50 CL
IS

2.25 29 8 43 SC

3.00 26 5 20 GC-GM

7.50 26 7 24 SC-SM

16.50 + 35 5 51 ML

19.50 x 29 4 37 SM

Project Title : Drawing Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu
PLASTICITY CHART
Client / Owner :

Geotechnical File No. 2015/104 Figure No. B - 122

OEO - GF - 04, Rev. 00


CLASSIFICATION OF SOILS FOR ENGINEERING PURPOSES
( ASTM D - 2487 )

60
For classification of fine-grained
soils and fine-grained fraction of
coarse-grained soils
50
Equation of "A" Line
PLASTICITY INDEX ( PI ), %

Horizontal at PI = 4 to LL = 25.5,
then PI = 0.73 (LL - 20)
40
Equation of "U" Line
Vertical at LL = 16 to PI = 7,
then PI = 0.90 (LL - 8)
30

D
20

BI
10
7
4
4

0
0 10 20 30 40 50
R 60 70 80 90 100 110
FO
16 LIQUID LIMIT ( LL ), %

Unified Soil Classification


Borehole # Depth (m) Symbols LL (%) PI (%) Minus # 200 Sieve, (%)
ED

( ASTM D - 2487 )

BH - 19 1.50 31 10 31 SC

3.00 25 6 32 SC-SM

4.50 27 7 24 SC-SM
SU

10.50 29 9 18 SC

15.00 25 6 19 SC-SM

18.00 34 12 76 CL
IS

21.00 34 12 48 SC

BH - 20 1.50 36 14 47 SC

3.00 + 32 12 47 SC

4.50 x 28 8 17 SC

12.00 -- 30 10 15 SC

Project Title : Drawing Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu
PLASTICITY CHART
Client / Owner :

Geotechnical File N o. 2015/104 Figure No. B - 123

OEO - GF - 04, Rev. 00


CLASSIFICATION OF SOILS FOR ENGINEERING PURPOSES
( ASTM D - 2487 )

60
For classification of fine-grained
soils and fine-grained fraction of
coarse-grained soils
50
Equation of "A" Line
PLASTICITY INDEX ( PI ), %

Horizontal at PI = 4 to LL = 25.5,
then PI = 0.73 (LL - 20)
40
Equation of "U" Line
Vertical at LL = 16 to PI = 7,
then PI = 0.90 (LL - 8)
30

D
20

BI
10
7
4
4

0
0 10 20 30 40 50
R 60 70 80 90 100 110
FO
16 LIQUID LIMIT ( LL ), %

Unified Soil Classification


Borehole # Depth (m) Symbols LL (%) PI (%) Minus # 200 Sieve, (%)
ED

( ASTM D - 2487 )

BH - 20 15.00 26 6 20 GC-GM

BH - 21 1.50 26 5 26 SC-SM
SU

BH - 22 1.50 26 7 32 SC-SM
IS

BH - 23 12.00 25 4 27 SC-SM

16.50 26 5 15 SC-SM

BH - 24 2.25 26 3 26 SM

BH - 25 16.50 26 3 30 SM

Project Title : Drawing Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu
PLASTICITY CHART
Client / Owner :

Geotechnical File N o. 2015/104 Figure No. B - 124

OEO - GF - 04, Rev. 00


CLASSIFICATION OF SOILS FOR ENGINEERING PURPOSES
( ASTM D - 2487 )

60
For classification of fine-grained
soils and fine-grained fraction of
coarse-grained soils
50
Equation of "A" Line
PLASTICITY INDEX ( PI ), %

Horizontal at PI = 4 to LL = 25.5,
then PI = 0.73 (LL - 20)
40
Equation of "U" Line
Vertical at LL = 16 to PI = 7,
then PI = 0.90 (LL - 8)
30

D
20

BI
10
7
4
4

0
0 10 20 30 40 50
R 60 70 80 90 100 110
FO
16 LIQUID LIMIT ( LL ), %

Unified Soil Classification


Borehole # Depth (m) Symbols LL (%) PI (%) Minus # 200 Sieve, (%)
ED

( ASTM D - 2487 )

BH - 28 1.50 28 8 30 SC

3.00 30 10 23 SC

4.50 29 9 23 SC
SU

6.00 31 10 40 SC

9.00 26 7 26 SC-SM

21.00 28 9 29 GC
IS

22.50 36 14 44 GC

27.00 39 8 42 GM

BH - 29 2.25 + 26 7 35 SC-SCM

3.00 x 34 12 57 CL

3.75 -- 36 14 59 CL

Project Title : Drawing Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu
PLASTICITY CHART
Client / Owner :

Geotechnical File N o. 2015/104 Figure No. B - 125

OEO - GF - 04, Rev. 00


CLASSIFICATION OF SOILS FOR ENGINEERING PURPOSES
( ASTM D - 2487 )

60
For classification of fine-grained
soils and fine-grained fraction of
coarse-grained soils
50
Equation of "A" Line
PLASTICITY INDEX ( PI ), %

Horizontal at PI = 4 to LL = 25.5,
then PI = 0.73 (LL - 20)
40
Equation of "U" Line
Vertical at LL = 16 to PI = 7,
then PI = 0.90 (LL - 8)
30

D
20

BI
10
7
4
4

0
0 10 20 30 40 50
R 60 70 80 90 100 110
FO
16 LIQUID LIMIT ( LL ), %

Unified Soil Classification


Borehole # Depth (m) Symbols LL (%) PI (%) Minus # 200 Sieve, (%)
ED

( ASTM D - 2487 )

BH - 29 4.50 38 15 60 CL

6.00 29 9 35 SC

7.50 26 7 41 SC-SM
SU

BH - 30 1.50 27 3 34 SM

3.00 28 9 40 SC
IS

3.75 26 6 42 SC-SM

6.00 25 6 22 SC-SM

16.50 29 9 26 SC

BH - 31 4.50 + 29 9 29 SC

12.00 x 32 12 74 CL

Project Title : Drawing Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu
PLASTICITY CHART
Client / Owner :

Geotechnical File N o. 2015/104 Figure No. B - 126

OEO - GF - 04, Rev. 00


CLASSIFICATION OF SOILS FOR ENGINEERING PURPOSES
( ASTM D - 2487 )

60
For classification of fine-grained
soils and fine-grained fraction of
coarse-grained soils
50
Equation of "A" Line
PLASTICITY INDEX ( PI ), %

Horizontal at PI = 4 to LL = 25.5,
then PI = 0.73 (LL - 20)
40
Equation of "U" Line
Vertical at LL = 16 to PI = 7,
then PI = 0.90 (LL - 8)
30

D
20

BI
10
7
4
4
0
0 10 20 30 40 50
R 60
LIQUID LIMIT ( LL ), %
70 80 90 100 110
FO
16

Unified Soil Classification


Borehole # Depth (m) Symbols LL (%) PI (%) Minus # 200 Sieve, (%)
( ASTM D - 2487 )
ED

BH - 31 25.50 38 15 86 CL

28.50 25 4 29 SC-SM
SU

BH - 32 3.75 28 9 31 SC

6.00 31 10 31 SC

10.50 32 12 44 SC
IS

13.50 38 15 66 CL

BH - 34 3.00 27 7 24 GC-GM

4.50 26 6 38 SC-SM

7.50 + 26 7 33 SC-SM

19.50 x 26 5 19 SC-SM

Project Title : Drawing Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu
PLASTICITY CHART
Client / Owner :

Geotechnical File No. 2015/104 Figure No. B - 127

OEO - GF - 04, Rev. 00


CLASSIFICATION OF SOILS FOR ENGINEERING PURPOSES
( ASTM D - 2487 )

60
For classification of fine-grained
soils and fine-grained fraction of
coarse-grained soils
50
Equation of "A" Line
PLASTICITY INDEX ( PI ), %

Horizontal at PI = 4 to LL = 25.5,
then PI = 0.73 (LL - 20)
40
Equation of "U" Line
Vertical at LL = 16 to PI = 7,
then PI = 0.90 (LL - 8)
30

D
20

BI
10
7
4
4

0
0 10 20 30 40 50
R 60 70 80 90 100 110
FO
16 LIQUID LIMIT ( LL ), %

Unified Soil Classification


Borehole # Depth (m) Symbols LL (%) PI (%) Minus # 200 Sieve, (%)
ED

( ASTM D - 2487 )

BH - 34 21.00 34 12 57 CL

28.50 34 7 48 SM
SU

BH - 35 2.25 26 7 19 SC-SM

3.00 26 4 20 SC-SM

7.50 28 8 31 SC
IS

10.50 32 12 26 SC

15.00 29 9 28 SC

BH - 36 9.00 36 14 59 CL

12.00 + 38 15 65 CL

Project Title : Drawing Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu
PLASTICITY CHART
Client / Owner :

Geotechnical File N o. 2015/104 Figure No. B - 128

OEO - GF - 04, Rev. 00


CLASSIFICATION OF SOILS FOR ENGINEERING PURPOSES
( ASTM D - 2487 )

60
For classification of fine-grained
soils and fine-grained fraction of
coarse-grained soils
50
Equation of "A" Line
PLASTICITY INDEX ( PI ), %

Horizontal at PI = 4 to LL = 25.5,
then PI = 0.73 (LL - 20)
40
Equation of "U" Line
Vertical at LL = 16 to PI = 7,
then PI = 0.90 (LL - 8)
30

D
20

BI
10
7
4
4

0
0 10 20 30 40 50
R 60 70 80 90 100 110
FO
16 LIQUID LIMIT ( LL ), %

Unified Soil Classification


Borehole # Depth (m) Symbols LL (%) PI (%) Minus # 200 Sieve, (%)
ED

( ASTM D - 2487 )

BH - 37 3.00 27 3 27 SM

BH - 38 2.25 26 4 29 SC-SM
SU

BH - 39 6.00 31 10 32 SC

9.00 27 7 35 SC-SM
IS

BH - 40 1.50 29 9 35 SC

6.00 26 6 15 GC-GM

19.50 42 10 66 ML

28.50 45 12 97 ML

Project Title : Drawing Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu
PLASTICITY CHART
Client / Owner :

Geotechnical File N o. 2015/104 Figure No. B - 129

OEO - GF - 04, Rev. 00


CLASSIFICATION OF SOILS FOR ENGINEERING PURPOSES
( ASTM D - 2487 )

60
For classification of fine-grained
soils and fine-grained fraction of
coarse-grained soils
50
Equation of "A" Line
PLASTICITY INDEX ( PI ), %

Horizontal at PI = 4 to LL = 25.5,
then PI = 0.73 (LL - 20)
40
Equation of "U" Line
Vertical at LL = 16 to PI = 7,
then PI = 0.90 (LL - 8)
30

D
20

BI
10
7
4
4

0
0 10 20 30 40 50
R 60 70 80 90 100 110
FO
16 LIQUID LIMIT ( LL ), %

Unified Soil Classification


Borehole # Depth (m) Symbols LL (%) PI (%) Minus # 200 Sieve, (%)
ED

( ASTM D - 2487 )

BH - 41 0.75 27 7 33 SC-SM

6.00 27 7 17 GC-GM

9.00 26 6 20 GC-GM
SU

15.00 25 4 20 SC-SM

BH - 43 1.50 25 6 40 SC-SM
IS

15.00 26 5 35 SC-SM

22.50 32 5 63 ML

BH - 44 0.75 29 9 42 SC

1.50 + 32 12 49 SC

10.50 x 31 10 38 SC

Project Title : Drawing Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu
PLASTICITY CHART
Client / Owner :

Geotechnical File N o. 2015/104 Figure No. B - 130

OEO - GF - 04, Rev. 00


CLASSIFICATION OF SOILS FOR ENGINEERING PURPOSES
( ASTM D - 2487 )

60
For classification of fine-grained
soils and fine-grained fraction of
coarse-grained soils
50
Equation of "A" Line
PLASTICITY INDEX ( PI ), %

Horizontal at PI = 4 to LL = 25.5,
then PI = 0.73 (LL - 20)
40
Equation of "U" Line
Vertical at LL = 16 to PI = 7,
then PI = 0.90 (LL - 8)
30

D
20

BI
10
7
4
4

0
0 10 20 30 40 50
R 60 70 80 90 100 110
FO
16 LIQUID LIMIT ( LL ), %

Unified Soil Classification


Borehole # Depth (m) Symbols LL (%) PI (%) Minus # 200 Sieve, (%)
ED

( ASTM D - 2487 )

BH - 44 13.50 34 12 46 SC

19.50 36 15 58 CL
SU

BH - 45 15.00 29 9 23 SC

BH - 46 3.00 28 8 17 GC
IS

6.00 29 10 22 SC

10.50 28 9 21 SC

15.00 30 9 28 GC

16.50 32 12 38 SC

BH - 47 21.00 x 25 4 37 SC-SM

Project Title : Drawing Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu
PLASTICITY CHART
Client / Owner :

Geotechnical File N o. 2015/104 Figure No. B - 131

OEO - GF - 04, Rev. 00


CLASSIFICATION OF SOILS FOR ENGINEERING PURPOSES
( ASTM D - 2487 )

60
For classification of fine-grained
soils and fine-grained fraction of
coarse-grained soils
50
Equation of "A" Line
PLASTICITY INDEX ( PI ), %

Horizontal at PI = 4 to LL = 25.5,
then PI = 0.73 (LL - 20)
40
Equation of "U" Line
Vertical at LL = 16 to PI = 7,
then PI = 0.90 (LL - 8)
30

D
20

BI
10
7
4
4
0
0 10 20 30 40 50
R 60
LIQUID LIMIT ( LL ), %
70 80 90 100 110
FO
16

Unified Soil Classification


Borehole # Depth (m) Symbols LL (%) PI (%) Minus # 200 Sieve, (%)
( ASTM D - 2487 )
ED

BH - 49 19.50 36 14 72 CL

BH - 50 13.50 26 5 32 SC-SM
SU

15.00 27 7 60 CL-ML

BH - 51 3.00 28 8 30 SC
IS

10.50 38 15 31 SC

15.50 42 19 97 CL

BH - 52 1.50 29 9 27 SC

3.00 30 9 38 SC

6.00 x 27 7 16 GC-GM

Project Title : Drawing Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu
PLASTICITY CHART
Client / Owner :

Geotechnical File No. 2015/104 Figure No. B - 132

OEO - GF - 04, Rev. 00


CLASSIFICATION OF SOILS FOR ENGINEERING PURPOSES
( ASTM D - 2487 )

60
For classification of fine-grained
soils and fine-grained fraction of
coarse-grained soils
50
Equation of "A" Line
PLASTICITY INDEX ( PI ), %

Horizontal at PI = 4 to LL = 25.5,
then PI = 0.73 (LL - 20)
40
Equation of "U" Line
Vertical at LL = 16 to PI = 7,
then PI = 0.90 (LL - 8)
30

D
20

BI
10
7
4
4

0
0 10 20 30 40 50
R 60 70 80 90 100 110
FO
16 LIQUID LIMIT ( LL ), %

Unified Soil Classification


Borehole # Depth (m) Symbols LL (%) PI (%) Minus # 200 Sieve, (%)
ED

( ASTM D - 2487 )

BH - 52 16.50 32 12 38 SC

BH - 53 18.00 26 6 42 SC-SM
SU

BH - 54 3.00 26 5 15 GC-GM

6.00 26 6 17 GC-GM
IS

9.00 30 9 37 SC

BH - 56 3.00 26 3 27 GM

19.50 34 7 48 SM

22.50 27 5 44 SC-SM

Project Title : Drawing Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu
PLASTICITY CHART
Client / Owner :

Geotechnical File N o. 2015/104 Figure No. B - 133

OEO - GF - 04, Rev. 00


CLASSIFICATION OF SOILS FOR ENGINEERING PURPOSES
( ASTM D - 2487 )

60
For classification of fine-grained
soils and fine-grained fraction of
coarse-grained soils
50
Equation of "A" Line
PLASTICITY INDEX ( PI ), %

Horizontal at PI = 4 to LL = 25.5,
then PI = 0.73 (LL - 20)
40
Equation of "U" Line
Vertical at LL = 16 to PI = 7,
then PI = 0.90 (LL - 8)
30

D
20

BI
10
7
4
4

0
0 10 20 30 40 50
R 60 70 80 90 100 110
FO
16 LIQUID LIMIT ( LL ), %

Unified Soil Classification


Borehole # Depth (m) Symbols LL (%) PI (%) Minus # 200 Sieve, (%)
ED

( ASTM D - 2487 )

BH - 57 3.75 41 18 83 CL

6.50 39 17 75 CL

10.50 26 6 34 SC-SM
SU

BH - 58 18.00 26 6 39 SC-SM
IS

BH - 59 16.50 36 14 49 SC

BH - 60 3.00 27 5 27 SC-SM

12.00 26 5 26 SC-SM

16.50 26 6 33 SC-SM

Project Title : Drawing Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu
PLASTICITY CHART
Client / Owner :

Geotechnical File N o. 2015/104 Figure No. B - 134

OEO - GF - 04, Rev. 00


CLASSIFICATION OF SOILS FOR ENGINEERING PURPOSES
( ASTM D - 2487 )

60
For classification of fine-grained
soils and fine-grained fraction of
coarse-grained soils
50
Equation of "A" Line
PLASTICITY INDEX ( PI ), %

Horizontal at PI = 4 to LL = 25.5,
then PI = 0.73 (LL - 20)
40
Equation of "U" Line
Vertical at LL = 16 to PI = 7,
then PI = 0.90 (LL - 8)
30

D
20

BI
10
7
4
4

0
0 10 20 30 40 50
R 60 70 80 90 100 110
FO
16 LIQUID LIMIT ( LL ), %

Unified Soil Classification


Borehole # Depth (m) Symbols LL (%) PI (%) Minus # 200 Sieve, (%)
ED

( ASTM D - 2487 )

BH - 62 3.75 24 4 15 GC-GM

BH - 63 6.00 25 4 21 SC-SM
SU

BH - 64 0.75 29 9 33 SC

3.75 34 12 52 CL
IS

4.50 27 7 47 SC-SM

7.50 26 6 77 CL-ML

10.50 28 8 48 SC

BH - 65 9.00 30 9 40 SC

10.50 + 26 4 34 SC-SM

Project Title : Drawing Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu
PLASTICITY CHART
Client / Owner :

Geotechnical File N o. 2015/104 Figure No. B - 135

OEO - GF - 04, Rev. 00


CLASSIFICATION OF SOILS FOR ENGINEERING PURPOSES
( ASTM D - 2487 )

60
For classification of fine-grained
soils and fine-grained fraction of
coarse-grained soils
50
Equation of "A" Line
PLASTICITY INDEX ( PI ), %

Horizontal at PI = 4 to LL = 25.5,
then PI = 0.73 (LL - 20)
40
Equation of "U" Line
Vertical at LL = 16 to PI = 7,
then PI = 0.90 (LL - 8)
30

D
20

BI
10
7
4
4

0
0 10 20 30 40 50
R 60 70 80 90 100 110
FO
16 LIQUID LIMIT ( LL ), %

Unified Soil Classification


Borehole # Depth (m) Symbols LL (%) PI (%) Minus # 200 Sieve, (%)
ED

( ASTM D - 2487 )

BH - 65 13.50 23 7 91 CL-ML

16.50 26 5 90 CL-ML
SU

BH - 67 6.00 26 6 19 SC-SM

10.50 28 8 22 SC
IS

BH - 68 1.50 27 3 29 SM

2.25 27 6 24 SC-SM

7.50 38 15 97 CL

28.50 27 7 60 CL-ML

BH - 69 0.75 + 27 3 21 GM

Project Title : Drawing Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu
PLASTICITY CHART
Client / Owner :

Geotechnical File N o. 2015/104 Figure No. B - 136

OEO - GF - 04, Rev. 00


CLASSIFICATION OF SOILS FOR ENGINEERING PURPOSES
( ASTM D - 2487 )

60
For classification of fine-grained
soils and fine-grained fraction of
coarse-grained soils
50
Equation of "A" Line
PLASTICITY INDEX ( PI ), %

Horizontal at PI = 4 to LL = 25.5,
then PI = 0.73 (LL - 20)
40
Equation of "U" Line
Vertical at LL = 16 to PI = 7,
then PI = 0.90 (LL - 8)
30

D
20

BI
10
7
4
4
0
0 10 20 30 40 50
R 60
LIQUID LIMIT ( LL ), %
70 80 90 100 110
FO
16

Unified Soil Classification


Borehole # Depth (m) Symbols LL (%) PI (%) Minus # 200 Sieve, (%)
( ASTM D - 2487 )
ED

BH - 69 3.75 28 3 27 SM

6.00 26 5 24 SC-SM

13.50 39 17 97 CL
SU

18.00 34 12 76 CL

BH - 70 2.25 27 7 35 SC-SM
IS

7.50 28 8 32 SC

BH - 71 1.50 26 6 16 GC-GM

4.50 25 5 19 GC-GM

6.00 + 26 6 22 GC-GM

10.50 x 27 7 26 GC-GM

Project Title : Drawing Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu
PLASTICITY CHART
Client / Owner :

Geotechnical File No. 2015/104 Figure No. B - 137

OEO - GF - 04, Rev. 00


CLASSIFICATION OF SOILS FOR ENGINEERING PURPOSES
( ASTM D - 2487 )

60
For classification of fine-grained
soils and fine-grained fraction of
coarse-grained soils
50
Equation of "A" Line
PLASTICITY INDEX ( PI ), %

Horizontal at PI = 4 to LL = 25.5,
then PI = 0.73 (LL - 20)
40
Equation of "U" Line
Vertical at LL = 16 to PI = 7,
then PI = 0.90 (LL - 8)
30

D
20

BI
10
7
4
4

0
0 10 20 30 40 50
R 60 70 80 90 100 110
FO
16 LIQUID LIMIT ( LL ), %

Unified Soil Classification


Borehole # Depth (m) Symbols LL (%) PI (%) Minus # 200 Sieve, (%)
ED

( ASTM D - 2487 )

BH - 71 13.50 28 8 25 SC

16.50 26 7 16 GC-GM

21.00 26 6 27 SC-SM
SU

24.00 34 12 49 SC

27.00 27 7 62 CL-ML
IS

BH - 72 1.50 24 6 33 SC-SM

3.00 27 7 58 CL-ML

6.50 26 6 50 CL-ML

9.00 + 26 4 48 SC-SM

12.00 x 29 9 46 SC

15.00 -- 30 10 34 GC

Project Title : Drawing Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu
PLASTICITY CHART
Client / Owner :

Geotechnical File N o. 2015/104 Figure No. B - 138

OEO - GF - 04, Rev. 00


CLASSIFICATION OF SOILS FOR ENGINEERING PURPOSES
( ASTM D - 2487 )

60
For classification of fine-grained
soils and fine-grained fraction of
coarse-grained soils
50
Equation of "A" Line
PLASTICITY INDEX ( PI ), %

Horizontal at PI = 4 to LL = 25.5,
then PI = 0.73 (LL - 20)
40
Equation of "U" Line
Vertical at LL = 16 to PI = 7,
then PI = 0.90 (LL - 8)
30

D
20

BI
10
7
4
4

0
0 10 20 30 40 50
R 60 70 80 90 100 110
FO
16 LIQUID LIMIT ( LL ), %

Unified Soil Classification


Borehole # Depth (m) Symbols LL (%) PI (%) Minus # 200 Sieve, (%)
ED

( ASTM D - 2487 )

BH - 72 18.00 26 7 39 SC-SM

BH - 73 18.00 28 3 26 SM
SU

BH - 74 1.50 25 6 38 SC-SM

3.75 26 7 47 SC-SM
IS

10.50 28 9 29 SC

16.50 26 6 28 SC-SM

BH - 75 1.50 26 5 47 SC-SM

3.00 27 5 26 SC-SM

6.00 + 24 6 20 GC-GM

Project Title : Drawing Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu
PLASTICITY CHART
Client / Owner :

Geotechnical File N o. 2015/104 Figure No. B - 139

OEO - GF - 04, Rev. 00


CLASSIFICATION OF SOILS FOR ENGINEERING PURPOSES
( ASTM D - 2487 )

60
For classification of fine-grained
soils and fine-grained fraction of
coarse-grained soils
50
Equation of "A" Line
PLASTICITY INDEX ( PI ), %

Horizontal at PI = 4 to LL = 25.5,
then PI = 0.73 (LL - 20)
40
Equation of "U" Line
Vertical at LL = 16 to PI = 7,
then PI = 0.90 (LL - 8)
30

D
20

BI
10
7
4
4

0
0 10 20 30 40 50
R 60 70 80 90 100 110
FO
16 LIQUID LIMIT ( LL ), %

Unified Soil Classification


Borehole # Depth (m) Symbols LL (%) PI (%) Minus # 200 Sieve, (%)
ED

( ASTM D - 2487 )

BH - 76 0.75 27 7 15 SC-SM

1.50 29 4 25 SM

3.00 28 4 25 SM
SU

BH - 77 2.25 24 4 35 SC-SM

6.00 24 4 20 GC-GM
IS

13.50 26 3 22 SM

15.00 20 3 31 SM

22.50 27 3 20 SM

25.50 + 26 4 22 GC-GM

BH - 78 3.00 x 24 4 17 GC-GM

Project Title : Drawing Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu
PLASTICITY CHART
Client / Owner :

Geotechnical File N o. 2015/104 Figure No. B - 140

OEO - GF - 04, Rev. 00


CLASSIFICATION OF SOILS FOR ENGINEERING PURPOSES
( ASTM D - 2487 )

60
For classification of fine-grained
soils and fine-grained fraction of
coarse-grained soils
50
Equation of "A" Line
PLASTICITY INDEX ( PI ), %

Horizontal at PI = 4 to LL = 25.5,
then PI = 0.73 (LL - 20)
40
Equation of "U" Line
Vertical at LL = 16 to PI = 7,
then PI = 0.90 (LL - 8)
30

D
20

BI
10
7
4
4

0
0 10 20 30 40 50
R 60 70 80 90 100 110
FO
16 LIQUID LIMIT ( LL ), %

Unified Soil Classification


Borehole # Depth (m) Symbols LL (%) PI (%) Minus # 200 Sieve, (%)
ED

( ASTM D - 2487 )

BH - 78 3.75 26 3 22 GM

4.50 26 7 45 SC-SM

7.50 26 5 39 SC-SM
SU

12.00 27 3 19 GM

15.00 23 4 16 GC-GM

22.50 27 7 79 CL-ML
IS

25.50 34 12 80 CL

BH - 79 3.00 27 3 26 GM

18.00 + 21 4 14 GC-GM

19.50 x 22 4 20 GC-GM

Project Title : Drawing Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu
PLASTICITY CHART
Client / Owner :

Geotechnical File N o. 2015/104 Figure No. B - 141

OEO - GF - 04, Rev. 00


CLASSIFICATION OF SOILS FOR ENGINEERING PURPOSES
( ASTM D - 2487 )

60
For classification of fine-grained
soils and fine-grained fraction of
coarse-grained soils
50
Equation of "A" Line
PLASTICITY INDEX ( PI ), %

Horizontal at PI = 4 to LL = 25.5,
then PI = 0.73 (LL - 20)
40
Equation of "U" Line
Vertical at LL = 16 to PI = 7,
then PI = 0.90 (LL - 8)
30

D
20

BI
10
7
4
4
0
0 10 20 30 40 50
R 60
LIQUID LIMIT ( LL ), %
70 80 90 100 110
FO
16

Unified Soil Classification


Borehole # Depth (m) Symbols LL (%) PI (%) Minus # 200 Sieve, (%)
( ASTM D - 2487 )
ED

BH - 80 4.50 26 6 29 GC-GM

27.00 25 6 21 GC-GM
SU

BH - 81 15.00 37 7 64 ML

16.50 29 4 67 SM
IS

BH - 82 27.00 38 15 84 CL

BH - 84 24.00 38 15 72 CL

28.50 36 14 64 CL

Project Title : Drawing Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu
PLASTICITY CHART
Client / Owner :

Geotechnical File No. 2015/104 Figure No. B - 142

OEO - GF - 04, Rev. 00


Sample No. : BH - 03 Date : May 2016
Location : Yanbu Distribution Hub, Yanbu Sampled By : Abbas
Depth : 7.50 m. Tested By : Wryner
Description : Brown, poorly graded sand with silt

2.0

1.5
SHEAR STRESS, Kg/cm2

D
1.0
φ = 35o

BI
0.5
R
FO
ED

0.0
0.0 0.5 1.0 1.5 2.0 2.5 3.0

NORMAL STRESS, Kg/cm2


SU

Dry Density : 1.870 g/cc


Moisture Content : 15.6 %
Angle of Internal Friction 35 Degree
IS

:
Cohesion : -- Kg/cm 2

Remarks :
Test Conducted on Reconstituted SPT Samples
Note :
Test was Conducted in Accordance with ASTM D - 3080

Project Title : Drawing Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu
DIRECT SHEAR
Client / Owner:
TEST PLOT

Geotechnical File No. 2015/104 Figure No. B - 143

OEO - GF - 05, Rev. 00


Sample No. : BH - 29 Date : May 2016
Location : Yanbu Distribution Hub, Yanbu Sampled By : Abdullah
Depth : 1.50 m. Tested By : Wryner
Description : Dark brown, silty sand

2.0

1.5
SHEAR STRESS, Kg/cm2

D
1.0
φ = 33o

BI
0.5
R
FO
ED

0.0
0.0 0.5 1.0 1.5 2.0 2.5 3.0
2
NORMAL STRESS, Kg/cm
SU

Dry Density : 1.649 g/cc


Moisture Content : 16.6 %
IS

Angle of Internal Friction : 33 Degree


Cohesion : -- Kg/cm 2

Remarks :
Test Conducted on Reconstituted SPT Samples
Note :
Test was Conducted in Accordance with ASTM D - 3080

Project Title : Drawing Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu
DIRECT SHEAR
Client / Owner:
TEST PLOT

Geotechnical File No. 2015/104 Figure No. B - 144

OEO - GF - 05, Rev. 00


Sample No. : BH - 39 Date : May 2016
Location : Yanbu Distribution Hub, Yanbu Sampled By : Abbas
Depth : 1.50 m. Tested By : Wryner
Description : Brown, silty sand

2.0

1.5
SHEAR STRESS, Kg/cm2

D
1.0
φ = 34o

BI
0.5
R
FO
ED

0.0
0.0 0.5 1.0 1.5 2.0 2.5 3.0

NORMAL STRESS, Kg/cm2


SU

Dry Density : 1.765 g/cc


Moisture Content : 13.4 %
IS

Angle of Internal Friction : 34 Degree


Cohesion : -- Kg/cm 2

Remarks :
Test Conducted on Reconstituted SPT Samples
Note :
Test was Conducted in Accordance with ASTM D - 3080

Project Title : Drawing Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu
DIRECT SHEAR
Client / Owner:
TEST PLOT

Geotechnical File No. 2015/104 Figure No. B - 145

OEO - GF - 05, Rev. 00


Sample No. : BH - 41 Date : May 2016
Location : Yanbu Distribution Hub, Yanbu Sampled By : Abbas
Depth : 2.25 m. Tested By : Wryner
Description : Brownish grey, poorly graded sand with silt

2.0

1.5
SHEAR STRESS, Kg/cm2

D
1.0
φ = 34o

BI
0.5
R
FO
ED

0.0
0.0 0.5 1.0 1.5 2.0 2.5 3.0

NORMAL STRESS, Kg/cm2


SU

Dry Density : 1.574 g/cc


Moisture Content : 20.7 %
IS

Angle of Internal Friction : 34 Degree


Cohesion : -- Kg/cm 2

Remarks :
Test Conducted on Reconstituted SPT Samples
Note :
Test was Conducted in Accordance with ASTM D - 3080

Project Title : Drawing Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu
DIRECT SHEAR
Client / Owner:
TEST PLOT

Geotechnical File No. 2015/104 Figure No. B - 146

OEO - GF - 05, Rev. 00


Sample No. : BH - 57 Date : May 2016
Location : Yanbu Distribution Hub, Yanbu Sampled By : Abbas
Depth : 2.25 m. Tested By : Wryner
Description : Grey, well graded sand

2.0

1.5
SHEAR STRESS, Kg/cm2

D
1.0
φ = 33o

BI
0.5
R
FO
ED

0.0
0.0 0.5 1.0 1.5 2.0 2.5 3.0
2
NORMAL STRESS, Kg/cm
SU

Dry Density : 1.624 g/cc


Moisture Content : 18.4 %
Angle of Internal Friction 33 Degree
IS

:
Cohesion : -- Kg/cm 2

Remarks :
Test Conducted on Reconstituted SPT Samples
Note :
Test was Conducted in Accordance with ASTM D - 3080

Project Title : Drawing Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu
DIRECT SHEAR
Client / Owner:
TEST PLOT

Geotechnical File No. 2015/104 Figure No. B - 147

OEO - GF - 05, Rev. 00


Sample No. : BH - 69 Date : May 2016
Location : Yanbu Distribution Hub, Yanbu Sampled By : Abbas
Depth : 9.00 m. Tested By : Wryner
Description : Grey, silty sand

2.0

1.5
2
SHEAR STRESS, Kg/cm

D
1.0
φ = 38o

BI
0.5
R
FO
ED

0.0
0.0 0.5 1.0 1.5 2.0 2.5 3.0
2
NORMAL STRESS, Kg/cm
SU

Dry Density : 1.605 g/cc


Moisture Content : 16.2 %
IS

Angle of Internal Friction : 38 Degree


Cohesion : -- Kg/cm 2

Remarks :
Test Conducted on Reconstituted SPT Samples
Note :
Test was Conducted in Accordance with ASTM D - 3080

Project Title : Drawing Title :

Geotechnical Investigation for


YANBU DISTRIBUTION HUB Project, Yanbu
DIRECT SHEAR
Client / Owner:
TEST PLOT

Geotechnical File No. 2015/104 Figure No. B - 148

OEO - GF - 05, Rev. 00


Sample No. : BH - 84 Date : May 2016
Location : Yanbu Distribution Hub, Yanbu Sampled By : Wajahat
Depth : 2.25 m. Tested By : Wryner
Description : Brownish grey, silty sand

2.0

1.5
SHEAR STRESS, Kg/cm2

D
1.0
φ = 38o

BI
0.5
R
FO
ED

0.0
0.0 0.5 1.0 1.5 2.0 2.5 3.0

NORMAL STRESS, Kg/cm2


SU

Dry Density : 1.622 g/cc


Moisture Content : 14.3 %
IS

Angle of Internal Friction : 38 Degree


Cohesion : -- Kg/cm 2

Remarks :
Test Conducted on Reconstituted SPT Samples
Note :
Test was Conducted in Accordance with ASTM D - 3080

Project Title : Drawing Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu
DIRECT SHEAR
Client / Owner:
TEST PLOT

Geotechnical File No. 2015/104 Figure No. B - 149

OEO - GF - 05, Rev. 00


Sample No. : BH - 01 Date : May 2016
Location : Yanbu Distribution Hub, Yanbu Sampled By : Abbas
Depth : 3.00 m. Tested By : Engr. Jamal

240
234.74

220

200

180

160

D
S T R E S S, kN/m2

140

BI
120

100 R
FO
80

60
ED

40

20
SU

0
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00
STRAIN, %
IS

Dry Density, g/cc : 1.871


Moisture Content, % : 13.6
Unconfined Compressive Strength, qu : 234.7 kN/m2
0.235 MPa

Project Title : Drawing Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu
UNCONFINED
Owner / Client : COMPRESSION TEST PLOT

Geotechnical File No. 2015/104 Figure No. B - 150


Sample No. : BH - 07 Date : May 2016
Location : Yanbu Distribution Hub, Yanbu Sampled By : Abbas
Depth : 6.50 m. Tested By : Engr. Jamal

320
309.59
300

280

260

240

220

200

D
S T R E S S, kN/m2

180

BI
160

140

120
R
FO
100

80
ED

60

40
SU

20

0
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
STRAIN, %
IS

Dry Density, g/cc : 2.088


Moisture Content, % : 12.1
Unconfined Compressive Strength, qu : 309.6 kN/m2
0.310 MPa

Project Title : Drawing Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu
UNCONFINED
Owner / Client : COMPRESSION TEST PLOT

Geotechnical File No. 2015/104 Figure No. B - 151


Sample No. : BH - 08 Date : May 2016
Location : Yanbu Distribution Hub, Yanbu Sampled By : Abbas
Depth : 6.00 m. Tested By : Engr. Jamal

280
271.34
260

240

220

200

180

D
S T R E S S, kN/m2

160

BI
140

120 R
FO
100

80

60
ED

40
SU

20

0
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
STRAIN, %
IS

Dry Density, g/cc : 1.858


Moisture Content, % : 17.0
Unconfined Compressive Strength, qu : 271.3 kN/m2
0.271 MPa

Project Title : Drawing Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu
UNCONFINED
Owner / Client : COMPRESSION TEST PLOT

Geotechnical File No. 2015/104 Figure No. B - 152


Sample No. : BH - 09 Date : May 2016
Location : Yanbu Distribution Hub, Yanbu Sampled By : Abbas
Depth : 5.00 m. Tested By : Engr. Jamal

320

300 298.47

280

260

240

220

200

D
S T R E S S, kN/m2

180

BI
160

140

120
R
FO
100

80
ED

60

40
SU

20

0
0.00 2.00 4.00 6.00 8.00 10.00 12.00
STRAIN, %
IS

Dry Density, g/cc : 2.096


Moisture Content, % : 14.4
Unconfined Compressive Strength, qu : 298.5 kN/m2
0.298 MPa

Project Title : Drawing Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu
UNCONFINED
Owner / Client : COMPRESSION TEST PLOT

Geotechnical File No. 2015/104 Figure No. B - 153


Sample No. : BH - 51 Date : May, 2016
Location : Yanbu Distribution Hub, Yanbu Sampled By : Abbas
Depth : 15.50 m. Tested By : Engr. Jamal

200

184.83
180

160

140
2

D
120
S T R E S S, kN/m

BI
100

80 R
FO
60

40
ED

20
SU

0
0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50

STRAIN, %
IS

Dry Density, g/cc : 1.600


Moisture Content, % : 27.0
Unconfined Compressive Strength, qu : 184.8 kN/m2
0.185 MPa

Project Title : Drawing Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu
UNCONFINED
Owner / Client : COMPRESSION TEST PLOT

Geotechnical File No. 2015/104 Figure No. B - 154


Sample No. : BH - 57 Date : May, 2016
Location : Yanbu Distribution Hub, Yanbu Sampled By : Abbas
Depth : 3.75 m. Tested By : Engr. Jamal

280
272.13
260

240

220

200

180

D
S T R E S S, kN/m2

160

BI
140

120

100
R
FO
80

60
ED

40

20
SU

0
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00
STRAIN, %
IS

Dry Density, g/cc : 1.758


Moisture Content, % : 21.0
Unconfined Compressive Strength, qu : 272.1 kN/m2
0.272 MPa

Project Title : Drawing Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu
UNCONFINED
Owner / Client : COMPRESSION TEST PLOT

Geotechnical File No. 2015/104 Figure No. B - 155


Sample No. : BH - 57 Date : May, 2016
Location : Yanbu Distribution Hub, Yanbu Sampled By : Abbas
Depth : 6.50 m. Tested By : Engr. Jamal

260

246.00
240

220

200

180

160

D
2
S T R E S S, kN/m

BI
140

120

100
R
FO
80

60
ED

40

20
SU

0
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 11.00 12.00 13.00
STRAIN, %
IS

Dry Density, g/cc : 1.880


Moisture Content, % : 18.5
Unconfined Compressive Strength, qu : 246.0 kN/m2
0.246 MPa

Project Title : Drawing Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu
UNCONFINED
Owner / Client : COMPRESSION TEST PLOT

Geotechnical File No. 2015/104 Figure No. B - 155(a)


Sample No. : BH - 64 Date : May 2016
Location : Yanbu Distribution Hub, Yanbu Sampled By : Abbas
Depth : 4.50 m. Tested By : Engr. Jamal

280

260 259.13

240

220

200

180

D
S T R E S S, kN/m2

160

BI
140

120

100
R
FO
80

60
ED

40

20
SU

0
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00
STRAIN, %
IS

Dry Density, g/cc : 1.997


Moisture Content, % : 14.4
Unconfined Compressive Strength, qu : 259.1 kN/m2
0.259 MPa

Project Title : Drawing Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu
UNCONFINED
Owner / Client : COMPRESSION TEST PLOT

Geotechnical File No. 2015/104 Figure No. B - 156


Sample No. : BH - 64 Date : May 2016
Location : Yanbu Distribution Hub, Yanbu Sampled By : Abbas
Depth : 10.50 m. Tested By : Engr. Jamal

260
249.86
240

220

200

180

160

D
S T R E S S, kN/m2

BI
140

120

100
R
FO
80

60
ED

40

20
SU

0
0.00 2.00 4.00 6.00 8.00 10.00
STRAIN, %
IS

Dry Density, g/cc : 2.011


Moisture Content, % : 14.1
Unconfined Compressive Strength, qu : 249.9 kN/m2
0.250 MPa

Project Title : Drawing Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu
UNCONFINED
Owner / Client : COMPRESSION TEST PLOT

Geotechnical File No. 2015/104 Figure No. B - 156(a)


Sample No. : BH - 69 Date : May 2016
Location : Yanbu Distribution Hub, Yanbu Sampled By : Abbas
Depth : 18.00 m. Tested By : Engr. Jamal

340

320
314.88
300

280

260

240

220

D
S T R E S S, kN/m2

200

BI
180

160

140 R
FO
120

100

80
ED

60

40
SU

20

0
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
STRAIN, %
IS

Dry Density, g/cc : 1.930


Moisture Content, % : 17.8
Unconfined Compressive Strength, qu : 314.9 kN/m2
0.315 MPa

Project Title : Drawing Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu
UNCONFINED
Owner / Client : COMPRESSION TEST PLOT

Geotechnical File No. 2015/104 Figure No. B - 157


Sample No. : BH - 72 Date : May 2016
Location : Yanbu Distribution Hub, Yanbu Sampled By : Abbas
Depth : 6.50 m. Tested By : Engr. Jamal

200

186.53
180

160

140

D
S T R E S S, kN/m2

120

BI
100

80
R
FO
60
ED

40

20
SU

0
0.00 2.00 4.00 6.00 8.00 10.00 12.00
STRAIN, %
IS

Dry Density, g/cc : 1.942


Moisture Content, % : 16.3
Unconfined Compressive Strength, qu : 186.5 kN/m2
0.187 MPa

Project Title : Drawing Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu
UNCONFINED
Owner / Client : COMPRESSION TEST PLOT

Geotechnical File No. 2015/104 Figure No. B - 158


Sample No. : BH - 78 Date : May 2016
Location : Yanbu Distribution Hub, Yanbu Sampled By : Abbas
Depth : 22.50 m. Tested By : Engr. Jamal

300

287.80
280

260

240

220

200

D
S T R E S S, kN/m2

180

BI
160

140

120
R
FO
100

80
ED

60

40
SU

20

0
0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50
STRAIN, %
IS

Dry Density, g/cc : 1.977


Moisture Content, % : 10.6
Unconfined Compressive Strength, qu : 287.8 kN/m2
0.288 MPa

Project Title : Drawing Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu
UNCONFINED
Owner / Client : COMPRESSION TEST PLOT

Geotechnical File No. 2015/104 Figure No. B - 159


Sample No. : BH - 08 Date : May 2016
Location : Yanbu Distribution Hub, Yanbu Sampled by : Abbas
Depth : 6.00 m. Tested by : Engr. Jamal
Description : Light grey, lean clay with with sand & occasional gravel

Bulk Density , g/cc : 2.029 Specific Gravity, Gs : 2.678


Natural Moisture Content, % : 22.1 Initial Void Ratio : 0.61
Dry Density , g/cc : 1.662 Degree of Saturation, % : 96.7

0.65 0.0808
8 Kg.

0.0789

0.0772
0.60

D
0.0752

BI
0.0739
0.55
VOID RATIO - e

0 0 0.0482 0 0 0.0718

R
0.0825
FO
0.50
ED

0.45
SU
IS

0.40
0.1 1 10
APPLIED STRESS [P], Kg/cm2

PRECONSOLIDATION PRESSURE, Kg/cm2 = 2.90

Project Title : Drawing Title :

Geotechnical Investigation for


YANBU DISTRIBUTION HUB Project, Yanbu
CONSOLIDATION
Owner / Client :
TEST PLOT

Geotechnical File No. 2015/104 Figure No. B - 160


Sample No. : BH - 09 Date : May 2016
Location : Yanbu Distribution Hub, Yanbu Sampled by : Abbas
Depth : 5.00 m. Tested by : Engr. Jamal
Description : Brownish grey, sandy lean clay

Bulk Density , g/cc : 1.898 Specific Gravity, Gs : 2.678


Natural Moisture Content, % : 31.4 Initial Void Ratio : 0.85
Dry Density , g/cc : 1.444 Degree of Saturation, % : 98.4

0.85 0.0808
8 Kg.

0.0789

0.80
0.0772

D
0.0752
0.75

BI
0.0739
VOID RATIO - e

R
0.70
0 0 0.0482 0 0 0.0718 0.0825
FO
0.65
ED

0.60
SU

0.55
IS

0.50
0.1 1 10
APPLIED STRESS [P], Kg/cm2

PRECONSOLIDATION PRESSURE, Kg/cm2 = 3.30

Project Title : Drawing Title :

Geotechnical Investigation for


YANBU DISTRIBUTION HUB Project, Yanbu
CONSOLIDATION
Owner / Client :
TEST PLOT

Geotechnical File No. 2015/104 Figure No. B - 161


Sample No. : BH - 51 Date : May 2016
Location : Yanbu Distribution Hub, Yanbu Sampled by : Abbas
Depth : 15.50 m. Tested by : Engr. Jamal
Description : Greyish brown, lean clay

Bulk Density , g/cc : 1.842 Specific Gravity, Gs : 2.678


Natural Moisture Content, % : 29.2 Initial Void Ratio : 0.88
Dry Density , g/cc : 1.425 Degree of Saturation, % : 89.1

0.90 0.0808
8 Kg.

0.0789
0.88

0.0772

D
0.86
0.0752

BI
0.84
0.0739
VOID RATIO - e

0.82
0 0 0.0482 0 0 0.0718

R
0.0825
FO
0.80
ED

0.78
SU

0.76
IS

0.74
0.1 1 10
APPLIED STRESS [P], Kg/cm2

PRECONSOLIDATION PRESSURE, Kg/cm2 = 2.20

Project Title : Drawing Title :

Geotechnical Investigation for


YANBU DISTRIBUTION HUB Project, Yanbu
CONSOLIDATION
Owner / Client :
TEST PLOT

Geotechnical File No. 2015/104 Figure No. B - 162


Sample No. : BH - 57 Date : May 2016
Location : Yanbu Distribution Hub, Yanbu Sampled by : Abbas
Depth : 3.75 m. Tested by : Engr. Jamal
Description : Brown, lean clay with sand

Bulk Density , g/cc : 1.928 Specific Gravity, Gs : 2.674


Natural Moisture Content, % : 29.7 Initial Void Ratio : 0.80
Dry Density , g/cc : 1.487 Degree of Saturation, % : 99.3

0.65 0.0808
8 Kg.

0.0789

0.0772
0.60

D
0.0752

BI
0.0739
0.55
VOID RATIO - e

R
0 0 0.0482 0 0 0.0718 0.0825
FO
0.50
ED

0.45
SU
IS

0.40
0.1 1 10
APPLIED STRESS [P], Kg/cm2

PRECONSOLIDATION PRESSURE, Kg/cm2 = 1.80

Project Title : Drawing Title :

Geotechnical Investigation for


YANBU DISTRIBUTION HUB Project, Yanbu
CONSOLIDATION
Owner / Client :
TEST PLOT

Geotechnical File No. 2015/104 Figure No. B - 163


Sample No. : BH - 57 Date : May 2016
Location : Yanbu Distribution Hub, Yanbu Sampled by : Abbas
Depth : 6.50 m. Tested by : Engr. Jamal
Description : Brown, lean clay with sand

Bulk Density , g/cc : 1.944 Specific Gravity, Gs : 2.678


Natural Moisture Content, % : 21.1 Initial Void Ratio : 0.67
Dry Density , g/cc : 1.605 Degree of Saturation, % : 84.7

0.60 0.0808
8 Kg.

0.0789
0.55

0.0772

D
0.50

0.0752

BI
0.45
0.0739
VOID RATIO - e

R
0.40 0 0 0.0482 0 0 0.0718 0.0825
FO
0.35

0.30
ED

0.25
SU

0.20
IS

0.15
0.1 1 10
APPLIED STRESS [P], Kg/cm2

PRECONSOLIDATION PRESSURE, Kg/cm2 = 2.40

Project Title : Drawing Title :

Geotechnical Investigation for


YANBU DISTRIBUTION HUB Project, Yanbu
CONSOLIDATION
Owner / Client :
TEST PLOT

Geotechnical File No. 2015/104 Figure No. B - 163(a)


Sample No. : BH - 64 Date : May 2016
Location : Yanbu Distribution Hub, Yanbu Sampled by : Abbas
Depth : 4.50 m. Tested by : Engr. Jamal
Description : Brown, silty clayey sand

Bulk Density , g/cc : 2.071 Specific Gravity, Gs : 2.671


Natural Moisture Content, % : 14.9 Initial Void Ratio : 0.48
Dry Density , g/cc : 1.802 Degree of Saturation, % : 82.7

0.55

0.50

D
BI
0.45
VOID RATIO - e

0.40
R
FO
0.35
ED

0.30
SU
IS

0.25
0.10 1.00 10.00
APPLIED STRESS [P], Kg/cm2

PRECONSOLIDATION PRESSURE, Kg/cm2 = 2.01

Project Title : Drawing Title :

Geotechnical Investigation for


YANBU DISTRIBUTION HUB Project, Yanbu
CONSOLIDATION
Owner / Client :
TEST PLOT

Geotechnical File No. 2015/104 Figure No. B - 164


Sample No. : BH - 64 Date : May 2016
Location : Yanbu Distribution Hub, Yanbu Sampled by : Abbas
Depth : 7.50 m. Tested by : Engr. Jamal
Description : Brown, silty clay with sand

Bulk Density , g/cc : 2.138 Specific Gravity, Gs : 2.670


Natural Moisture Content, % : 16.7 Initial Void Ratio : 0.46
Dry Density , g/cc : 1.831 Degree of Saturation, % : 97.6

0.50

0.46

D
BI
0.42
VOID RATIO - e

R
FO
0.38
ED

0.34
SU
IS

0.30
0.1 1 10
APPLIED STRESS [P], Kg/cm2

PRECONSOLIDATION PRESSURE, Kg/cm2 = 2.10

Project Title : Drawing Title :

Geotechnical Investigation for


YANBU DISTRIBUTION HUB Project, Yanbu
CONSOLIDATION
Owner / Client :
TEST PLOT

Geotechnical File No. 2015/104 Figure No. B - 164(a)


Sample No. : BH - 68 Date : May 2016
Location : Yanbu Distribution Hub, Yanbu Sampled by : Wajahat
Depth : 7.50 m. Tested by : Engr. Jamal
Description : Brown, lean clay

Bulk Density , g/cc : 1.896 Specific Gravity, Gs : 2.671


Natural Moisture Content, % : 27.4 Initial Void Ratio : 0.86
Dry Density , g/cc : 1.488 Degree of Saturation, % : 99.5

0.80 0.0808
8 Kg.

0.0789
0.75

0.0772
0.70

D
0.0752

BI
0.65

0.0739
0.60
VOID RATIO - e

R
0 0 0.0482 0 0 0.0718 0.0825
0.55
FO
0.50
ED

0.45

0.40
SU

0.35
IS

0.30
0.1 1 10
APPLIED STRESS [P], Kg/cm2

PRECONSOLIDATION PRESSURE, Kg/cm2 = 3.05

Project Title : Drawing Title :

Geotechnical Investigation for


YANBU DISTRIBUTION HUB Project, Yanbu
CONSOLIDATION
Owner / Client :
TEST PLOT

Geotechnical File No. 2015/104 Figure No. B - 165


Sample No. : BH - 69 Date : May 2016
Location : Yanbu Distribution Hub, Yanbu Sampled by : Abbas
Depth : 13.50 m. Tested by : Engr. Jamal
Description : Brown, lean clay

Bulk Density , g/cc : 1.948 Specific Gravity, Gs : 2.676


Natural Moisture Content, % : 30.5 Initial Void Ratio : 0.74
Dry Density , g/cc : 1.493 Degree of Saturation, % : 95.9

0.80 0.0808
8 Kg.

0.0789
0.75

0.0772
0.70

D
0.0752

BI
0.65

0.0739
0.60
VOID RATIO - e

R
0 0 0.0482 0 0 0.0718 0.0825
0.55
FO
0.50
ED

0.45

0.40
SU

0.35
IS

0.30
0.1 1 10
APPLIED STRESS [P], Kg/cm2

PRECONSOLIDATION PRESSURE, Kg/cm2 = 3.05

Project Title : Drawing Title :

Geotechnical Investigation for


YANBU DISTRIBUTION HUB Project, Yanbu
CONSOLIDATION
Owner / Client :
TEST PLOT

Geotechnical File No. 2015/104 Figure No. B - 166


Sample No. : BH - 72 Date : May 2016
Location : Yanbu Distribution Hub, Yanbu Sampled by : Wajahat
Depth : 6.50 m. Tested by : Engr. Jamal
Description : Dark brown, sandy silty clay

Bulk Density , g/cc : 2.133 Specific Gravity, Gs : 2.673


Natural Moisture Content, % : 15.8 Initial Void Ratio : 0.47
Dry Density , g/cc : 1.842 Degree of Saturation, % : 97.7

0.35 0.0808
8 Kg.

0.0789

0.30
0.0772

D
0.0752

BI
0.25
0.0739
VOID RATIO - e

R
0 0 0.0482 0 0 0.0718 0.0825
0.20
FO
0.15
ED
SU

0.10
IS

0.05
0.1 1 10
APPLIED STRESS [P], Kg/cm2

PRECONSOLIDATION PRESSURE, Kg/cm2 = 2.05

Project Title : Drawing Title :

Geotechnical Investigation for


YANBU DISTRIBUTION HUB Project, Yanbu
CONSOLIDATION
Owner / Client :
TEST PLOT

Geotechnical File No. 2015/104 Figure No. B - 167


IS
SU
ED
FO
R
BI
D
IS
SU
ED
FO
R
BI
D
IS
SU
ED
FO
R
BI
D
IS
SU
ED
FO
R
BI
D
SPREAD FOUNDATION, OME building (BH-55)
Depth (m) Layer 1 Layer 2
From To SPT-N60 B= 2.5 B= 2.5 ηH 60
0 1 L= 2.5 L= 2.5 ηB 1.0
1 1.5 20 D= 1 D= 1 ηS 1.0
1.5 2.25 37 Zi = 2.06 Zi = 2.06 ηR 1.0
2.25 3 42 q= 150 q= 150 N60 1.0

D
3 3.75 34 q'= 150 q'= 150
3.75 4.5 42 q'= 300 300
4.5 5.25 67 WT= 4 WT= 4

BI
5.25 6 67 GAMA= 18 GAMA= 18
6 6.75 71 Gama'= 8.2 8.2
6.75 7.5 71 Hs 10 10
7.5 8.25 77 N 60 33 Nspt 39
8.25 9 77 Nearest Tank FGL : + 5.6

R
9 9.75 39 Propsed FGL: +5.8
9.75 10.5 27 EGL: +5.3

FO
10.5 11.25 fs 1 fs 1 Filling : 0.5m
11.25 12 H1 0.5 H2 3.0 0 20
12 12.75 0.65 0.15 37
12.75 13.5 1.25 0.75 42
13.5 14.25 fh 1 fh 1 2 1.5 34
14.25 15 R 0.2 R 0.2 2.75 2.25 42
15 15.75 R3 0.3 R3 0.3 3.5 3 91
15.75
16.5
17.25
16.5
17.25
18
t
ft
Ic
ED 25
1.5
0.0128
t
ft
Ic
5
1.3
0.0171
4.25
5
6.5
3.75
4.5
6
96
67
71
18 18.75 S1 10.82 S2 13.1 8 7.5 77
18.75 19.5 9.5 9 139
SU
19.5 20.25 Total Elastic Settlement S (mm) = 10.82 11 10.5 81
20.25 21
21 21.75
21.75 22.5 GWT below FGL : 5.1
22.5 23.25 Design GWT: 4
IS

23.25 24
24 24.75
24.75 25.5
25.5 26.25
26.25 27
27
27.75 27.75
Drawing Title: Project Title:
Geotechnical Investigation for Yanbu Distribution Hub Project, Geotechnical File No. 2015/104 Fighure No. C - 3
Yanbu, K.S.A
BURLAND & BURBIDGE'S METHOD
TYPICAL SETTLEMENT ANALYSIS Client / Owner:
SPREAD FOUNDATION, Operation Shelter (BH-58)
Depth (m) Layer 2
From To SPT-N60 B= 1.5 B= 1.5 ηH 60
0 1 L= 1.5 L= 1.5 ηB 1.0
1 1.5 20 D= 1 D= 1 ηS 1.0
1.5 2.25 24 Zi = 1.40 Zi = 1.40 ηR 1.0
2.25 3 47 q= 150 q= 150 N60 1.0

D
3 3.75 66 q'= 150 q'= 150
3.75 4.5 81 q'= 300 300
4.5 5.25 61 WT= 3.8 WT= 3.8

BI
5.25 6 GAMA= 18 GAMA= 18
6 6.75 Gama'= 8.2 8.2
6.75 7.5 Hs 10 10
7.5 8.25 N 60 30 Nspt 55
8.25 9 Nearest Tank FGL : + 5.5

R
9 9.75 55 Propsed FGL: +5.7
9.75 10.5 35 EGL: +4.96

FO
10.5 11.25 fs 1 fs 1 Filling : 0.7m
11.25 12 H1 0.5 H2 3.0 0 20
12 12.75 0.85 0.15 24
12.75 13.5 1.45 0.75 47
13.5 14.25 fh 1 fh 1 2.2 1.5 66
14.25 15 R 0.2 R 0.2 2.95 2.25 81
15 15.75 R3 0.3 R3 0.3 3.7 3 61
15.75
16.5
17.25
16.5
17.25
18
t
ft
Ic
ED 25
1.5
0.0144
t
ft
Ic
5
1.3
0.0119
4.45
5.2
6.7
3.75
4.5
6
66
86
56
18 18.75 S1 8.51 S2 6.4 8.2 7.5 91
18.75 19.5 9.7 9 93
SU
19.5 20.25 Total Elastic Settlement S (mm) = 8.51 11.2 10.5
20.25 21
21 21.75
21.75 22.5 GWT below FGL : 4.8
22.5 23.25 Design GWT: 3.8
IS

23.25 24
24 24.75
24.75 25.5
25.5 26.25
26.25 27
27
27.75 27.75
Drawing Title: Project Title:
Geotechnical Investigation for Yanbu Geotechnical File No. 2015/104 Fighure No. C - 4
BURLAND & BURBIDGE'S METHOD Distribution Hub Project, Yanbu, K.S.A
TYPICAL SETTLEMENT ANALYSIS Client / Owner:
SPREAD FOUNDATION, Security support building (BH-59)
Depth (m) Layer 1 Layer 2
From To SPT-N60 B= 3.5 B= 3.5 ηH 60
0 2 L= 3.5 L= 3.5 ηB 1.0
2 2.25 44 D= 2 D= 2 ηS 1.0
2.25 3 46 Zi = 2.65 Zi = 2.65 ηR 1.0
3 3.75 46 q= 150 q= 150 N60 1.0

D
3.75 4.5 46 q'= 150 q'= 150
4.5 5.25 54 q'= 300 300
5.25 6 64 WT= 4 WT= 4

BI
6 6.75 GAMA= 18 GAMA= 18
6.75 7.5 Gama'= 8.2 8.2
7.5 8.25 Hs 10 10
8.25 9 N 60 46 Nspt 48
9 9.75 Nearest Tank FGL : + 5.6

R
9.75 10.5 48 Propsed FGL: +5.8
10.5 11.25 32 EGL: +5.6

FO
11.25 12 fs 1 fs 1 Filling : 0.2m
12 12.75 H1 0.25 H2 3.0 0
12.75 13.5 0.15 0.15 40
13.5 14.25 0.75 0.75 44
14.25 15 fh 1 fh 1 1.5 1.5 46
15 15.75 R 0.2 R 0.2 2.25 2.25 46
15.75 16.5 R3 0.3 R3 0.3 3 3 54
16.5
17.25
18
17.25
18
18.75
t
ft
Ic
ED 25
1.5
0.0082
t
ft
Ic
5
1.3
0.0137
3.75
4.5
6
3.75
4.5
6
64
67
60
18.75 19.5 S1 8.73 S2 13.3 7.5 7.5 72
19.5 20.25 9 9 72
SU
20.25 21 Total Elastic Settlement S (mm) = 8.73 10.5 10.5
21 21.75
21.75 22.5
22.5 23.25 GWT below FGL : 4.9
23.25 24 Design GWT: 4
IS

24 24.75
24.75 25.5
25.5 26.25
26.25 27
27 27.75
27.75
28.5 28.5
Drawing Title: Project Title:
Geotechnical Investigation for Yanbu Distribution Hub Project, Geotechnical File No. 2015/104 Fighure No. C - 5
Yanbu, K.S.A
BURLAND & BURBIDGE'S METHOD
TYPICAL SETTLEMENT ANALYSIS Client / Owner:
SPREAD FOUNDATION, Platform foundation (BH-77 & 78)
Depth (m) Layer 1 Layer 2
From To SPT-N60 B= 3.5 B= 3.5 ηH 60
0 1 L= 4 L= 4 ηB 1.0
1 1.5 20 D= 1 D= 1 ηS 1.0
1.5 2.25 49 Zi = 2.65 Zi = 2.65 ηR 1.0
2.25 3 57 q= 150 q= 150 N60 1.0

D
3 3.75 50 q'= 150 q'= 150
3.75 4.5 64 q'= 300 300
4.5 5.25 54 WT= 2.6 WT= 2.6

BI
5.25 6 63 GAMA= 18 GAMA= 18
6 6.75 Gama'= 8.2 8.2
6.75 7.5 Hs 10 10
7.5 8.25 N 60 44 Nspt 55
8.25 9

R
9 9.75 55
9.75 10.5 35 EGL: +4.2

FO
10.5 11.25 fs 1.05193951 fs 1.05193951
11.25 12 H1 0.5 H2 3.0
12 12.75 0.15 20
12.75 13.5 0.75 20
13.5 14.25 fh 1 fh 1 1.5 49
14.25 15 R 0.2 R 0.2 2.25 57
15 15.75 R3 0.3 R3 0.3 3 50
15.75
16.5
17.25
16.5
17.25
18
t
ft
Ic
ED 25
1.5
0.0085
t
ft
Ic
5
1.3
0.0118
3.75
4.5
6
64
54
63
18 18.75 S1 9.60 S2 12.0 7.5
18.75 19.5 9
SU
19.5 20.25 Total Elastic Settlement S (mm) = 9.60 10.5
20.25 21
21 21.75
21.75 22.5 GWT below EGL : 3.6
22.5 23.25 Design GWT: 2.6
IS

23.25 24
24 24.75
24.75 25.5
25.5 26.25
26.25 27
27
27.75 27.75
Drawing Title: Project Title:
Geotechnical Investigation for Yanbu Distribution Hub Project, Geotechnical File No. 2015/104 Fighure No. C - 6
Yanbu, K.S.A
BURLAND & BURBIDGE'S METHOD
TYPICAL SETTLEMENT ANALYSIS Client / Owner:
STRIP FOUNDATION, Pumps (BH-56)
Depth (m) Layer 1 Layer 2
From To SPT-N60 B= 4 B= 4 ηH 60
0 0.6 L= 40 L= 40 ηB 1.0
0.6 1.5 20 D= 0.6 D= 0.6 ηS 1.0
1.5 2.25 38 Zi = 2.93 Zi = 2.93 ηR 1.0
2.25 3 50 q= 150 q= 150 N60 1.0

D
3 3.75 50 q'= 150 q'= 150
3.75 4.5 q'= 300 300
4.5 5.25 WT= 1.2 WT= 1.2

BI
5.25 6 GAMA= 18 GAMA= 18
6 6.75 Gama'= 8.2 8.2
6.75 7.5 Hs 10 10
7.5 8.25 N 60 40 Nspt 46
8.25 9

R
9 9.75 46
9.75 10.5 31 EGL: +3.05

FO
10.5 11.25 fs 1.48720999 fs 1.48720999
11.25 12 H1 0.9 H2 3.0 0
12 12.75 0.15 38
12.75 13.5 0.75 36
13.5 14.25 fh 1 fh 1 1.5 50
14.25 15 R 0.2 R 0.2 2.25 55
15 15.75 R3 0.3 R3 0.3 3 50
15.75
16.5
17.25
16.5
17.25
18
t
ft
Ic
ED 25
1.5
0.0099
t
ft
Ic
5
1.3
0.0143
3.75
4.5
6
64

18 18.75 S1 17.39 S2 22.7 7.5


18.75 19.5 9
SU
19.5 20.25 Total Elastic Settlement S (mm) = 17.39 10.5
20.25 21
21 21.75
21.75 22.5 GWT below EGL : 2.2
22.5 23.25 Design GWT: 1.2
IS

23.25 24
24 24.75
24.75 25.5
25.5 26.25
26.25 27
27
27.75 27.75
Drawing Title: Project Title:
Geotechnical Investigation for Yanbu Distribution Hub Project Geotechnical File No. 2015/105 Fighure No. C - 7
Yanbu, K.S.A
BURLAND & BURBIDGE'S METHOD
TYPICAL SETTLEMENT ANALYSIS Client / Owner:
SHEAR CONSIDERATION_USING EQUATIONS PRESENTED IN EQUATION 6 OF REPORT-BH55

D
LOWER SPT-N60-BH-55

BI
Footing Type B(m) L(m) D (m) Ø (deg) Ø (radians) Ƴ (Kn/m3) N60 Nq NƳ Sq SƳ Ƴ' (Kn/m3) qA(net) - kPa

Spread 2.5 2.5 1 33 0.57 19 20 26 34.6 1.65 0.6 9.19 341.43

R
FO
Mat
50 50 34.53 0.60 26
1 18 31 44.6 1.69 0.6 1.0066 662.17

From Settlement Considerations


ED
Net Allowable
SU
Footing Type B(m) L(m) D (m) N60 ES Bearing Capacity
(kPa)
Figure e
Schmert Burland &
mann's Burbridge
IS

Method Method
Spread 2 2 1 20 20000 210 320
FIGURE C-8
Mat 10 10 1 20 26000 120 210
SHEAR CONSIDERATION_USING EQUATION 6 PRESENTED IN REPORT-BH58

D
LOWER SPT-N60-BH 58

BI
Footing Type B(m) L(m) D (m) Ø (deg) Ø (radians) Ƴ (Kn/m3) N60 Nq NƳ Sq SƳ Ƴ' (Kn/m3) qA(net) - kPa

Spread 1.5 1.5 1 33 0.57 19 20 26 34.6 1.65 0.6 9.19 309.66

R
FO
Mat
50 50 34.53 0.60 26
1 18 31 44.6 1.69 0.6 1.0066 662.17

From Settlement Considerations


ED
Net Allowable
SU
Footing Type B(m) L(m) D (m) N60 ES Bearing Capacity
(kPa)
Figure e
Schmert Burland &
mann's Burbridge
IS

Method Method
Spread 2 2 1 20 20000 210 320
FIGURE C-9
Mat 10 10 1 20 26000 120 210
SHEAR CONSIDERATION_USING EQUATION 6 PRESENTED IN REPORT-BH56

D
LOWER RANGE OF SPT-N60

BI
Footing Type B(m) L(m) D (m) Ø (deg) Ø (radians) Ƴ (Kn/m3) N60 Nq NƳ Sq SƳ Ƴ' (Kn/m3) qA(net) - kPa

Spread 4 40 0.6 33 0.57 19 20 26 34.6 1.06 0.96 9.19 303.62

R
FO
Mat
50 50 34.53 0.60 26
1 18 31 44.6 1.69 0.6 1.0066 662.17

From Settlement Considerations


ED
Net Allowable
SU
Footing Type B(m) L(m) D (m) N60 ES Bearing Capacity
(kPa)
Figure e
Schmert Burland &
mann's Burbridge
IS

Method Method
Spread 2 2 1 20 20000 210 320
FIGURE C-10
Mat 10 10 1 20 26000 120 210
SHEAR CONSIDERATION_USING EQUATIONS PRESENTED IN FIGURE 5 OF ILUSTRATIONS-BH77 & 78

D
LOWER RANGE OF SPT-N60

BI
Footing Type B(m) L(m) D (m) Ø (deg) Ø (radians) Ƴ (Kn/m3) N60 Nq NƳ Sq SƳ Ƴ' (Kn/m3) qA(net) - kPa

Spread 3.5 4 1 41 0.71 19 49 69 119.4 1.75 0.65 9.19 1171.92

R
FO
Mat
50 50 34.53 0.60 26
1 18 31 44.6 1.69 0.6 1.0066 662.17

From Settlement Considerations


ED
Net Allowable
SU
Footing Type B(m) L(m) D (m) N60 ES Bearing Capacity
(kPa)
Figure e
Schmert Burland &
mann's Burbridge
IS

Method Method
Spread 2 2 1 20 49000 210 320
FIGURE C-11
Mat 10 10 1 20 26000 120 210
NET ALLOWABLE BEARING CAPACITY OF MAT FOUNDATION FOR SETTLMENT OF 50 MM_USING EQUATION PRESENTED IN FIGURE C-2 OF APPENDIX-C
STRUCTURE : SKIDS (BH-67)

D
Footing Type B(m) L(m) D (m) Ø (deg) Ø (radians) Ƴ (Kn/m3) N60 Nq NƳ Sq SƳ Fd qA(net) - kPa qA(net) - kPa
Reco.

BI
Mat 8 15 40.75 0.71 50
1.5 18 71 124.6 1.46 0.78667 1.061875 1428.76 952.5074

R
Nearest Tank : FGL 4.9

FO
PFGL 5.1
EGL: 4.8
Filling : 0.3

GWT below FGL: 4.2


dgwt: 3.2
ED
SU
IS

Figure C-12
NET ALLOWABLE BEARING CAPACITY OF MAT FOUNDATION FOR SETTLMENT OF 50 MM_USING EQUATION PRESENTED IN FIGURE C-2 OF APPENDIX-C
STRUCTURE : OWS WATER PACKAGE (BH-54)
Footing Type B(m) L(m) D (m) Ø (deg) Ø (radians) Ƴ (Kn/m3) N60 Nq NƳ Sq SƳ Fd qA(net) - kPa qA(net) - kPa

D
Reco.

BI
Mat 8 15 38.24 1.00 40
0.6 18 1549 4826.8 1.83 0.78667 1.02475 1103.05 735.3649

R
FO
EGL: 4.3

GWT below FGL: 3.5


dgwt: 2.5
ED
SU
IS

Figure C-13
NET ALLOWABLE BEARING CAPACITY OF MAT FOUNDATION FOR SETTLMENT OF 50 MM_USING EQUATION PRESENTED IN FIGURE C-2 OF APPENDIX-C
STRUCTURE : OILY WATER LIFT STATION (BH-72)
Footing Type B(m) L(m) D (m) Ø (deg) Ø (radians) Ƴ (Kn/m3) N60 Nq NƳ Sq SƳ Fd qA(net) - kPa qA(net) - kPa

D
Reco.

BI
Mat 7 11.5 36.94 0.64 35
7.4 19 43 65.5 1.46 0.75652 1.348857 1283.58 855.7214

R
Nearest Tank : FGL 5.5
PFGL 5.7

FO
EGL: 4.2
Filling : 1.5

GWT below FGL: 4.9


dgwt: 3.9
ED
SU
IS

Figure C-14
SETTLE3D 3.017

: Page 1 of 3

Settle3D Analysis Information


Project Settings
Document Name D-0103
Date Created 5/3/2016, 11:48:56 AM
Stress Computation Method Westergaard
Calculate settlement with mean stress
Use average properties to calculate layered stresses

Stage Settings

Stage # Name
1 Stage 1

D
BI
Results
Time taken to compute: 0 seconds

Stage: Stage 1

R
FO
Data Type Minimum Maximum
Total Settlement [mm] 0 58.0943
Consolidation Settlement [mm] 0 0
Immediate Settlement [mm] 0 58.0943
Loading Stress [kPa] 0 150
ED

Effective Stress [kPa] 0 893.311


Mean Stress [kPa] 0 108.416
Total Stress [kPa] 0 1566.77
Total Strain 0 0.00465106
Pore Water Pressure [kPa] 0 673.457
SU

Degree of Consolidation [%] 0 0


Pre-consolidation Stress [kPa] 1.35 892.959
Over-consolidation Ratio 1 1
Void Ratio 0 0
IS

Hydroconsolidation Settlement [mm] 0 0


Undrained Shear Strength 0 172.759

Loads
1. Circular Load

Radius 27.5 m
Center (10, 20)
Load Type Flexible
Area of Load 2363.79 m2
Load 150 kPa
Depth 1.5 m
Installation Stage Stage 1
Figure 15

D-0103.s3z 5/3/2016, 11:48:56 AM


SETTLE3D 3.017

: Page 2 of 3

Empirical Results

Load 1
Modified Schmertmann Yes
Consider Time Dependent Settlement No

Schmertmann Method Thickness [m] Es [kPa] Unit Weight [kN/m 3] Sat. Unit Weight [kN/m 3 ]
Layer 1 3 23000 18 19.61
Layer 2 1.5 45000 19 20.59
Layer 3 6 70000 20.59 22.06
Layer 4 4.5 85000 20.59 22.06
Layer 5 15 65000 20.59 22.06
Layer 6 52 70000 20.59 22.06

Settlement Results

D
Schmertmann [mm]
Stage 1 46.7528

BI
Soil Layers

Layer # Type Thickness [m] Depth [m]


1
2
Engineering Fill
Medium dense SAND
1.65
3.75 1.65
0

R
FO
3 Hard Clay 3.75 5.4
4 Very Dense SAND 61 9.15
ED
SU

Soil Properties
IS

Property Engineering Fill Medium dense SAND Hard Clay Very Dense SAND
Color ___ ___ ___ ___
Unit Weight [kN/m3 ] 18 18 19 20
Saturated Unit Weight [kN/m3 ] 19.61 19.61 21.57 22.06
Poisson's Ratio 0.325 0.325 0.45 0.375
Immediate Settlement Enabled Enabled Enabled Enabled
E [kPa] 20000 28000 15990 85000
Eur [kPa] 20000 28000 15990 85000
Undrained Su A [kN/m2] 0 0 0 0
Undrained Su S 0.2 0.2 0.2 0.2
Undrained Su m 0.8 0.8 0.8 0.8
Piezo Line ID 1 1 1 1

Figure 15a
Groundwater

D-0103.s3z 5/3/2016, 11:48:56 AM


SETTLE3D 3.017

: Page 3 of 3

Groundwater method Piezometric Lines


Water Unit Weight 9.81 kN/m3
Generating excess pore pressure above water table

Piezometric Line Entities


ID Depth (m)
1 1.5 m

Query Lines
Line # Start Location End Location Horizontal Divisions Vertical Divisions
1 10, 20 37.5, 20 20 Auto: 55

D
BI
R
FO
ED
SU
IS

Figure 15b

D-0103.s3z 5/3/2016, 11:48:56 AM


Total Settlement (mm)
0.0
5.9
100

11.8
17.7
23.6
29.5
35.4
41.3
47.2
53.1

D
59.0
max (stage): 58.1 mm
max (all): 58.1 mm

BI
50

R
58.09

27.98

FO
Schmertmann: 46.75 mm
0

ED
SU
-50

IS

-50 0 50
Project

Analysis Description

Drawn By Company

Date File Name


SETTLE3D 3.017
5/3/2016, 11:48:56 AM D-0103.s3z Figure 16
IS
SU
ED
FO
R
BI
D
TRIGGER
HAMMER WT. PICKUP UNIT

HYDRAULIC
PUMP

D
BI
R
BOREHOLE BOREHOLE

FO
DETECTOR UNIT
( Geophones )

ENERGY SOURCE
ED
SU
SHOT HOLE RECEIVER HOLE - 1 RECEIVER HOLE - 2
IS

Drawing Title : Project Title :


Geotechnical Investigation for Geotechnical File No. 2015/104 Figure No. D - 1
YANBU DISTRIBUTION HUB Project, Yanbu
SCHEMATIC LAYOUT OF
Client / Owner :
SEISMIC CROSSHOLE SURVEY
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,240.59 meter TYPE OF BORING: ROTARY WASH
EAST: 430,310.14 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 CHS-01
GROUND ELEVATION: 3.04 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 4-5-16
DEPTH OF GROUNDWATER TABLE: 2.60 meter RIG #: SIMCO (OEO-811) DATE COMPLETED: 4-5-16
MEASURED AT: 1007 HOURS ON: 25-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 Medium dense, brown, silty sand with gravel. 0.3


SPT - 1 17
2 0.6
3 Medium dense, brown, silty gravel with sand. 0.9
SPT - 2 21 10.7 17

D
4 GM 1.2
5 1.5
Ditto.

BI
6 SPT - 3 25 1.8
7 2.1
8 Dense, brown, silty clayey sand with gravel. 2.4
SPT - 4 39 14.1 22
9 SC-SM 2.7
10
11
12
SPT - 5 45 11.5 20
SM
R
Dense, brown, silty sand with gravel.
3.0
3.4
3.7
FO
13 Ditto. 4.0
SPT - 6 46
14 4.3
15 4.6
16 SPT - 7 50
Ditto. 4.9
17 5.2
ED

18
SPT - 8 >50 9.3 16 Ditto but very dense. 5.5
19 SM 5.8
20 6.1
SPT - 9 48 10.1 14 Ditto but dense. 6.4
21
SM
SU

22 6.7
23
SPT - 10 49
Ditto. 7.0
24 7.3
25 7.6
SPT - 11 47
Ditto.
26 7.9
IS

27 8.2
28 SPT - 12 >50 11.3 14 Ditto but very dense. 8.5
29 SM 8.8
30 9.1
SPT - 13 >50
Ditto.
31 9.4
32 9.8
33 SPT - 14 45
Ditto but dense. 10.1
34 10.4
END OF BORING @ 10.20 m.
35 10.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 1
FIGURE D-2
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,868.56 meter TYPE OF BORING: ROTARY WASH
EAST: 430,716.00 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 CHS-02
GROUND ELEVATION: 4.00 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 8-5-16
DEPTH OF GROUNDWATER TABLE: 3.40 meter RIG #: SIMCO (OEO-811) DATE COMPLETED: 8-5-16
MEASURED AT: 1015 HOURS ON: 25-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 Medium dense, brown, silty sand with gravel & traces of 0.3
2
SPT - 1 29 clay. 0.6
3 Ditto but dense. 0.9
SPT - 2 48 8.9 27

D
4 SM 1.2
5 1.5
Ditto but very dense.

BI
6 SPT - 3 >50 9.6 23 1.8
SM
7 2.1
8 Ditto. 2.4
SPT - 4 >50
9 2.7
10
11
12
SPT - 5 >50
R
Ditto.
3.0
3.4
3.7
FO
13 Ditto. 4.0
SPT - 6 >50 8.2 22
14 SM 4.3
15 4.6
16 SPT - 7 >50
Ditto. 4.9
17 5.2
ED

18
SPT - 8 >50 9.3 17 Very dense, brownish grey, silty sand with gravel. 5.5
19 SM 5.8
20 6.1
SPT - 9 >50
Ditto. 6.4
21
SU

22 6.7
23
SPT - 10 >50
Ditto. 7.0
24 7.3
25 7.6
SPT - 11 41 1.7 26 Dense, brown, silty clayey sand.
26 7.9
IS

SC-SM
27 8.2
28 SPT - 12 50
Ditto. 8.5
29 8.8
30 9.1
SPT - 13 >50 7.2 17 Very dense, brown, silty sand with gravel.
31 9.4
SM
32 9.8
33 SPT - 14 >50
Ditto. 10.1
34 10.4
END OF BORING @ 10.20 m.
35 10.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 1
FIGURE D-3
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,510.53 meter TYPE OF BORING: ROTARY WASH
EAST: 429,958.13 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 CHS-03
GROUND ELEVATION: 5.50 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 9-5-16
DEPTH OF GROUNDWATER TABLE: 4.90 meter RIG #: SIMCO (OEO-814) DATE COMPLETED: 9-5-16
MEASURED AT: 1030 HOURS ON: 25-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Abbas
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 Medium dense, brown, silty sand with gravel. 0.3


SPT - 1 14
2 0.6
3 Ditto. 0.9
SPT - 2 18 9.6 19

D
4 GM 1.2
5 1.5
Medium dense, brown, poorly graded sand with silt &

BI
6 SPT - 3 16 6.2 07 1.8
SP-SM occasional gravel.
7 2.1
8 Ditto. 2.4
SPT - 4 16
9 2.7
10
11
12
SPT - 5 18 10.8 08
SW-SM
R
Medium dense, brown, well graded sand with silt & gravel.
3.0
3.4
3.7
FO
13 Ditto. 4.0
SPT - 6 25
14 4.3
15 4.6
16 SPT - 7 28
Ditto. 4.9
17 5.2
ED

18
SPT - 8 17 18.0 38 Medium dense, brown, silty clayey sand with occasional 5.5
19 SC-SM gravel. 5.8
20 6.1
U-1 Ditto. 6.4
21
SU

22 6.7
23 SPT - 9 25 14.2 57 Very stiff, grey, lean clay with sand & gavel. 7.0
24 CL 7.3
25 7.6
SPT - 10 41
Dense, grey, silty sand with occasional gravel.
26 7.9
IS

27 8.2
28 U-2 22.5 76 Grey, silty clay with sand. 8.5
29 CL-ML 8.8
30 9.1
U-3 22.8 81 Ditto.
31 9.4
CL-ML
32 9.8
33 SPT - 11 30
Medium dense, brownish grey, silty sand. 10.1
34 10.4
END OF BORING @ 10.20 m.
35 10.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 1
FIGURE D-4
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,947.61 meter TYPE OF BORING: ROTARY WASH
EAST: 430,621.64 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 CHS-04
GROUND ELEVATION: 5.44 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 8-5-16
DEPTH OF GROUNDWATER TABLE: 4.84 meter RIG #: SIMCO (OEO-811) DATE COMPLETED: 8-5-16
MEASURED AT: 1040 HOURS ON: 25-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 Dense, light brown, silty sand with gravel. 0.3


SPT - 1 28
2 0.6
3 Ditto but very dense, brown. 0.9
SPT - 2 >50 4.2 20

D
4 SM 1.2
5 1.5
Ditto but dense.

BI
6 SPT - 3 40 12.8 15 1.8
SM
7 2.1
8 Ditto but very dense. 2.4
SPT - 4 >50 1.6 14
9 SM 2.7
10
11
12
SPT - 5 >50 4.3 18
GM
R
Very dense, brown, silty gravel with sand.
3.0
3.4
3.7
FO
13 Ditto. 4.0
SPT - 6 >50
14 4.3
15 4.6
16 SPT - 7 >50
Ditto. 4.9
17 5.2
ED

18
SPT - 8 >50
Ditto. 5.5
19 5.8
20 6.1
SPT - 9 >50 10.5 22 Very dense, brown, silty clayey gravel with sand. 6.4
21
GC-GM
SU

22 6.7
23 SPT - 10 >50 Ditto. 7.0
24 7.3
25 7.6
SPT - 11 50
Ditto but dense.
26 7.9
IS

27 8.2
28 SPT - 12 >50
Ditto but very dense. 8.5
29 8.8
30 9.1
SPT - 13 >50 14.1 21 Ditto.
31 9.4
GC-GM
32 9.8
33 SPT - 14 >50
Ditto. 10.1
34 10.4
END OF BORING @ 10.20 m.
35 10.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 1
FIGURE D-5
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,737.92 meter TYPE OF BORING: ROTARY WASH
EAST: 430,722.72 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 CHS-05
GROUND ELEVATION: 4.57 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 10-5-16
DEPTH OF GROUNDWATER TABLE: 3.97 meter RIG #: ACKER MP8 (OEO-808) DATE COMPLETED: 10-5-16
MEASURED AT: 1055 HOURS ON: 25-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 Dense, brown, silty sand with gravel. 0.3


SPT - 1 46
2 0.6
3 Ditto but very dense. 0.9
SPT - 2 >50 7.4 20

D
4 SM 1.2
5 1.5
Ditto.

BI
6 SPT - 3 >50 17.5 15 1.8
SM
7 2.1
8 Ditto. 2.4
SPT - 4 >50
9 2.7
10
11
12
SPT - 5 >50
R
Ditto.
3.0
3.4
3.7
FO
13 Very dense, brown, poorly graded sand with silt & gravel. 4.0
SPT - 6 >50 10.7 10
14 SP-SM 4.3
15 4.6
16 SPT - 7 >50
Ditto. 4.9
17 5.2
ED

18
SPT - 8 >50 10.2 07 Very dense, brown, well graded gravel with silt & sand. 5.5
19 GW-GM 5.8
20 6.1
SPT - 9 >50
Ditto. 6.4
21
SU

22 6.7
23
SPT - 10 >50 12.0 10 Very dense, brown to grey, poorly graded sand with silt & 7.0
24 SP-SM gravel. 7.3
25 7.6
SPT - 11 >50
Ditto.
26 7.9
IS

27 8.2
28 SPT - 12 >50
Ditto. 8.5
29 8.8
30 9.1
SPT - 13 >50 Ditto.
31 9.4
32 9.8
33 SPT - 14 >50 9.0 10 GW-GM Very dense, brown, well graded gravel with silt & sand. 10.1
34 END OF BORING @ 10.11 m. 10.4
35 10.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 1
FIGURE D-6
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,650,796.78 meter TYPE OF BORING: ROTARY WASH
EAST: 429,371.86 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 CHS-06
GROUND ELEVATION: 5.27 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 12-5-16
DEPTH OF GROUNDWATER TABLE: 4.67 meter RIG #: ACKER MP8 (OEO-808) DATE COMPLETED: 12-5-16
MEASURED AT: 1110 HOURS ON: 25-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 Medium dense, brown, silty sand with gravel & traces of 0.3
2
SPT - 1 13 clay. 0.6
3 Ditto. 0.9
SPT - 2 28 15.6 24

D
4 SM 1.2
5 1.5
Ditto.

BI
6 SPT - 3 30 1.8
7 2.1
8 Dense, brown, silty clayey sand with gravel. 2.4
SPT - 4 38 13.4 17
9 SC-SM 2.7
10
11
12
SPT - 5 38
R
Ditto.
3.0
3.4
3.7
FO
13 Dense, brown, poorly graded gravel with silt & sand. 4.0
SPT - 6 47 5.1 11
14 GP-GM 4.3
15 4.6
16 SPT - 7 46 11.9 31 Dense, brown, silty gravel with sand. 4.9
GM
17 5.2
ED

18
SPT - 8 46
Dense, brown, poorly graded gravel with sand. 5.5
19 5.8
20 6.1
SPT - 9 >50 8.1 04 Ditto but very dense. 6.4
21
GP
SU

22 6.7
23 SPT - 10 >50 Ditto. 7.0
24 7.3
25 7.6
SPT - 11 >50 17.1 34 Very dense, brown, silty clayey sand with gravel.
26 7.9
IS

SC-SM
27 8.2
28 SPT - 12 >50
Ditto. 8.5
29 8.8
30 9.1
SPT - 13 >50 13.0 29 Very dense, brown, silty clayey gravel with sand.
31 9.4
GC-GM
32 9.8
33 SPT - 14 >50
Ditto. 10.1
34 10.4
END OF BORING @ 10.20 m.
35 10.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 1
FIGURE D-7
SAUDI ARAMCO BORING LOG
GEOTECHNICAL & CIVIL TESTING UNIT
PROJECT NAME: Geotehcnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu FILE NO: Geotechnical File No. 2015/104
LOCATION: Yanbu Distribution Hub, Yanbu - Saudi Arabia FIELD INVESTIGATION: OSAIMI ENGINEERING OFFICE
COORDINATES: NORTH: 2,649,930.50 meter TYPE OF BORING: ROTARY WASH
EAST: 429,824.54 meter DIA. OF BORING: 100 mm. CORE SIZE: NW BORING NO: 2015_104 CHS-07
GROUND ELEVATION: 4.07 meter DIA. OF UNDISTURBED SAMPLE: 64 mm. DATE COMMENCED: 11-5-16
DEPTH OF GROUNDWATER TABLE: 3.47 meter RIG #: ACKER MP8 (OEO-808) DATE COMPLETED: 11-5-16
MEASURED AT: 1130 HOURS ON: 25-5-16 HAMMER WT & DROP: 63.5 kg. / 760 mm. DRILLING SUPERVISOR: Wajahat
Sample Sample
Depth Moisture CaCO3 Passing Soil Classi- Depth
(feet)
Type & Blows per
Content % % 200 % Symbol fication
DESCRIPTION (meters)
Number 12 inches

1 Medium dense, brown, silty sand with occasional gravel. 0.3


SPT - 1 15
2 0.6
3 Ditto. 0.9
SPT - 2 29 7.5 20

D
4 SM 1.2
5 1.5
Dense, brown, poorly graded sand with silt & gravel.

BI
6 SPT - 3 40 4.1 11 1.8
SP-SM
7 2.1
8 Ditto. 2.4
SPT - 4 47
9 2.7
10
11
12
SPT - 5 49 7.9 07
GW-GM
R
Dense, grey, well graded gravel with silt & sand.
3.0
3.4
3.7
FO
13 Ditto but very dense, greyish brown. 4.0
SPT - 6 >50 5.2 09
14 GW-GM 4.3
15 4.6
16 SPT - 7 >50
Ditto. 4.9
17 5.2
ED

18
SPT - 8 >50 12.4 02 Very dense, grey, well graded gravel with sand. 5.5
19 GW 5.8
20 6.1
SPT - 9 >50
Ditto. 6.4
21
SU

22 6.7
23
SPT - 10 >50 17.3 02 Ditto. 7.0
24 GW 7.3
25 7.6
SPT - 11 >50
Ditto.
26 7.9
IS

27 8.2
28 SPT - 12 >50 7.5 07 Very dense, brown, poorly graded gravel with silt & sand. 8.5
29 GP-GM 8.8
30 9.1
SPT - 13 >50
Ditto.
31 9.4
32 9.8
33 SPT - 14 >50
Ditto. 10.1
34 10.4
END OF BORING @ 10.20 m.
35 10.7

L E G E N D:
SPT-1 : STANDARD PENETRATION TEST & NUMBER TCR : TOTAL CORE RECOVERY
H-1 : HAND SAMPLE & NUMBER SCR : SOLID CORE RECOVERY
R-1 : ROCK CORE RUN & NUMBER PWR : PARTIALLY WEATHERED ROCK
RQD : ROCK QUALITY DESIGNATION ROCK : UNWEATHERED ROCK
: WATER TABLE SHEET 1 OF 1
FIGURE D-8
SUMMARY OF LABORATORY TEST RESULTS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu

NATURAL PHYSICAL PROPERTIES GEOTECHNICAL PROPERTIES CHEMICAL ANALYSIS

D
Moisture Dry Unit Specific Atterberg Limits Direct Unconfined Point Load Compaction
Sieve Analysis
BH Sample Content Weight Gravity U.S.C. Shear Test Compressive Max. Dry Optimum
2- 1- 2- 2+
Depth % Passing LL PI GROUP c Ø Strength Unit Wt. Moisture pH SO4 Cl CO3 Mg Remarks

BI
(M.D.D.) Content
3 2
m % kN/m #4 # 40 # 200 % % Kg/cm2 Deg N/mm kN g/cc % % % % %
CHS-01 0.75 10.7 43 24 17 NP GM

R
2.25 14.1 2.66 85 35 22 24 04 SC-SM
3.00 11.5 81 32 20 NP SM

FO
5.25 9.3 62 31 16 NP SM
6.00 10.1 78 27 14 NP SM
8.25 11.3 74 26 14 NP SM

ED
CHS-02 0.75 8.9 2.66 74 49 27 26 03 SM
1.50 9.6 2.66 70 40 23 26 03 SM
3.75 8.2 2.66 63 38 22 28 04 SM
5.25 9.3 67 38 17 NP SM
SU
7.50 1.7 100 92 26 26 06 SC-SM
9.00 7.2 62 33 17 NP SM

NP
IS

CHS-03 0.75 9.6 53 33 19 GM


1.50 6.2 91 27 07 NP SP-SM
3.00 10.8 85 28 08 NP SW-SM
5.25 18.0 89 81 38 26 06 SC-SM
6.75 14.2 80 70 57 32 12 CL
8.25 22.5 2.67 100 90 76 26 07 CL-ML U-1
9.00 22.8 2.67 99 95 81 27 07 CL-ML U-2

Site Location: YANBU DISTRIBUTION HUB Project, Yanbu - Saudi Arabia Geotechnical File No. 2015/104 Figure No. D-9
OEO - GF - 02, Rev. 00
NP - Non Plastic
SUMMARY OF LABORATORY TEST RESULTS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu

NATURAL PHYSICAL PROPERTIES GEOTECHNICAL PROPERTIES CHEMICAL ANALYSIS

D
Moisture Dry Unit Specific Atterberg Limits Direct Unconfined Point Load Compaction
Sieve Analysis
BH Sample Content Weight Gravity U.S.C. Shear Test Compressive Max. Dry Optimum
2- 1- 2- 2+
Depth % Passing LL PI GROUP c Ø Strength Unit Wt. Moisture pH SO4 Cl CO3 Mg Remarks

BI
(M.D.D.) Content
3 2
m % kN/m #4 # 40 # 200 % % Kg/cm2 Deg N/mm kN g/cc % % % % %
CHS-04 0.75 4.2 73 50 20 NP SM
NP

R
1.50 12.8 69 31 15 SM
2.25 1.6 69 29 14 NP SM

FO
3.00 4.3 58 33 18 NP GM
6.00 10.5 46 28 22 22 04 GC-GM
9.00 14.1 2.67 55 27 21 25 06 GC-GM

NP

ED
CHS-05 0.75 7.4 72 43 20 SM
1.50 17.5 83 32 15 NP SM
3.75 10.7 67 28 10 NP SP-SM
5.25 10.2 35 15 07 NP GW-GM
SU
6.75 12.0 73 16 10 NP SP-SM
9.75 9.0 41 26 10 NP GW-GM
IS

CHS-06 0.75 15.6 89 52 24 26 03 SM


2.25 13.4 67 46 17 25 04 SC-SM
3.75 5.1 37 20 11 NP GP-GM
4.50 11.9 62 49 31 NP GM
6.00 8.1 22 08 04 NP GP
7.50 17.1 73 48 34 27 07 SC-SM
9.00 13.0 59 40 29 26 06 GC-GM

Site Location: YANBU DISTRIBUTION HUB Project, Yanbu - Saudi Arabia Geotechnical File No. 2015/104 Figure No. D - 10
OEO - GF - 02, Rev. 00
NP - Non Plastic
SUMMARY OF LABORATORY TEST RESULTS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu

NATURAL PHYSICAL PROPERTIES GEOTECHNICAL PROPERTIES CHEMICAL ANALYSIS

D
Moisture Dry Unit Specific Atterberg Limits Direct Unconfined Point Load Compaction
Sieve Analysis
BH Sample Content Weight Gravity U.S.C. Shear Test Compressive Max. Dry Optimum
2- 1- 2- 2+
Depth % Passing LL PI GROUP c Ø Strength Unit Wt. Moisture pH SO4 Cl CO3 Mg Remarks

BI
(M.D.D.) Content
3 2
m % kN/m #4 # 40 # 200 % % Kg/cm2 Deg N/mm kN g/cc % % % % %
CHS-07 0.75 7.5 88 49 20 NP SM
NP

R
1.50 4.1 65 39 11 SP-SM
3.00 7.9 35 16 07 NP GW-GM

FO
3.75 5.2 36 21 09 NP GW-GM
5.25 12.4 34 07 02 NP GW
6.75 17.3 34 08 02 NP GW
8.25 7.5 47 16 07 NP GP-GM

ED
SU
IS

Site Location: YANBU DISTRIBUTION HUB Project, Yanbu - Saudi Arabia Geotechnical File No. 2015/104 Figure No. D - 11
OEO - GF - 02, Rev. 00
NP - Non Plastic
CROSS HOLE TEST RESULTS (CHS-01) - SOIL DESIGN PARAMETERS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu

Depth t-Comp t-Comp t-Shear t-Shear Distance vp vs (vp/vs)2 µ γt G E

D
m (ms) (s) (ms) (s) x (m) tcomp/x (m/s) tshear/x (m/s) (kN/m3) (MPa) (MPa)

0.75 5.8 0.0058 11.8 0.0118 3 517.24 254.24 4.14 0.34 18 119 318

BI
1.50 4.3 0.0043 7.95 0.00795 3 697.67 377.36 3.42 0.29 18 261 676

R
2.25 4.1 0.0041 9.4 0.0094 3 731.71 319.15 5.26 0.38 19 197 545

FO
3.00 4.8 0.0048 10.8 0.0108 3 625.00 277.78 5.06 0.38 19 149 412

3.75 6.1 0.0061 11.8 0.0118 6 983.61 508.47 3.74 0.32 19 501 1320

4.50 4.2 0.0042 9.6 0.0096 3 714.29 312.50 5.22 0.38 19 189 523

5.25

6.00
3.4

5.1
0.0034

0.0051
7.5

9.2
0.0075

0.0092 ED
3

3
882.35

588.24
400.00

326.09
4.87

3.25
0.37

0.28
20

19
326

206
894

526
SU
6.75 4.8 0.0048 10.6 0.0106 3 625.00 283.02 4.88 0.37 19 155 425

7.50 4.3 0.0043 9.6 0.0096 3 697.67 312.50 4.98 0.37 19 189 520
IS

8.25 4 0.004 8 0.008 3 750.00 375.00 4.00 0.33 20 287 765

9.00 3.5 0.0035 8.2 0.0082 3 857.14 365.85 5.49 0.39 20 273 758

9.75 3.6 0.0036 8.2 0.0082 3 833.33 365.85 5.19 0.38 19 259 716

Client/Owner: M/s. MUSTANG-HDP / SAUDI ARAMCO Geotechnical File No. 2015/104 Figure No. D - 12
PLOTS OF VELOCITY AND DYNAMIC SOIL PROPERTIES
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu
SOIL SYMBOL

Blows/ 300mm
Classification

Unit Weight,
SPT Values

Poisson's
SHEAR WAVE VELOCITY, m/sec.
Depth in
Meters

Ratios
kN/m3
DYNAMIC SHEAR DYNAMIC YOUNG'S
USC

S - Wave Velocity, Vs

D
P - Wave Velocity, Vp
MODULUS, G, MPa MODULUS, E, MPa

BI
0 400 800 1200 0 200 400 600 0 500 1000 1500
0.00
0

R
GM 21 18 0.34 1.00

25 18 0.29

FO
2.00
2
SC-SM 39 19 0.38

3.00
SM 45 19 0.38

46 19 0.32 4.00
4

SM
50

>50
19

20
0.38

0.37
5.00

6.00
ED
SU
6 SM 48 19 0.28

49 19 0.37 7.00

47 19 0.37
IS

8 8.00
SM >50 20 0.33

>50 20 0.39 9.00

45 19 0.38
10 10.00

Legend : vp vs

Client/Owner: M/s. MUSTANG-HDP / SAUDI ARAMCO Geotechnical File No. 2015/104 Figure No. D - 12(a)
OEO - GF - 12, Rev. 00
CROSS HOLE TEST RESULTS (CHS-02) - SOIL DESIGN PARAMETERS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu

Depth t-Comp t-Comp t-Shear t-Shear Distance vp vs (vp/vs)2 µ γt G E

D
m (ms) (s) (ms) (s) x (m) tcomp/x (m/s) tshear/x (m/s) (kN/m3) (MPa) (MPa)

0.75 11.1 0.0111 21 0.021 3 270.27 142.86 3.58 0.31 19 40 103

BI
1.50 7 0.007 14 0.014 3 428.57 214.29 4.00 0.33 20 94 250

R
2.25 5 0.005 9.4 0.0094 3 600.00 319.15 3.53 0.30 20 208 541

FO
3.00 4 0.004 7.6 0.0076 3 750.00 394.74 3.61 0.31 20 318 831

3.75 7 0.007 15.5 0.0155 6 857.14 387.10 4.90 0.37 20 305 838

4.50 3.4 0.0034 7.23 0.00723 3 882.35 414.94 4.52 0.36 20 351 953

5.25

6.00
4.3

6.9
0.0043

0.0069
9.6

14.5
0.0096

0.0145 ED
3

6
697.67

869.57
312.50

413.79
4.98

4.42
0.37

0.35
20

20
199

349
547

945
SU
6.75 3.8 0.0038 8.2 0.0082 3 789.47 365.85 4.66 0.36 20 273 744

7.50 4.3 0.0043 8.7 0.0087 3 697.67 344.83 4.09 0.34 19 230 616
IS

8.25 3.6 0.0036 8.2 0.0082 3 833.33 365.85 5.19 0.38 19 259 716

9.00 4 0.004 8.25 0.00825 3 750.00 363.64 4.25 0.35 20 270 726

9.75 5.8 0.0058 13 0.013 6 1034.48 461.54 5.02 0.38 20 434 1195

Client/Owner: M/s. MUSTANG-HDP / SAUDI ARAMCO Geotechnical File No. 2015/104 Figure No. D - 13
PLOTS OF VELOCITY AND DYNAMIC SOIL PROPERTIES
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu
SOIL SYMBOL

Blows/ 300mm
Classification

Unit Weight,
SPT Values

Poisson's
SHEAR WAVE VELOCITY, m/sec.
Depth in
Meters

Ratios
kN/m3
DYNAMIC SHEAR DYNAMIC YOUNG'S
USC

S - Wave Velocity, Vs

D
P - Wave Velocity, Vp
MODULUS, G, MPa MODULUS, E, MPa

BI
0 400 800 1200 0 200 400 600 0 500 1000 1500
0.00
0

SM

R
48 19 0.31 1.00

SM >50 20 0.33

FO
2.00
2
>50 20 0.30

3.00
>50 20 0.31

SM >50 20 0.37
4 4.00

SM
>50

>50
20

20
0.36

0.37
5.00

ED `
SU
6 >50 20 0.35 6.00

>50 20 0.36
7.00

SC-SM 41 19 0.34
IS

8 8.00
50 19 0.38

SM >50 20 0.35 9.00

>50 20 0.38
10 10.00

Legend : vp vs

Client/Owner: M/s. MUSTANG-HDP / SAUDI ARAMCO Geotechnical File No. 2015/104 Figure No. D - 13(a)
OEO - GF - 12, Rev. 00
CROSS HOLE TEST RESULTS (CHS-03) - SOIL DESIGN PARAMETERS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu

Depth t-Comp t-Comp t-Shear t-Shear Distance vp vs (vp/vs)2 µ γt G E

D
m (ms) (s) (ms) (s) x (m) tcomp/x (m/s) tshear/x (m/s) (kN/m3) (MPa) (MPa)

0.75 5.5 0.0055 10.4 0.0104 3 545.45 288.46 3.58 0.31 18 153 399

BI
1.50 4.8 0.0048 8.9 0.0089 3 625.00 337.08 3.44 0.29 18 208 540

R
2.25 4.7 0.0047 10 0.01 3 638.30 300.00 4.53 0.36 18 165 449

FO
3.00 5.1 0.0051 9.6 0.0096 3 588.24 312.50 3.54 0.30 18 179 467

3.75 4.8 0.0048 10.4 0.0104 3 625.00 288.46 4.69 0.36 18 153 417

4.50 4.3 0.0043 10.1 0.0101 3 697.67 297.03 5.52 0.39 18 162 450

5.25

6.00
4.1

3.8
0.0041

0.0038
9.6

8.9
0.0096

0.0089 ED
3

3
731.71

789.47
312.50

337.08
5.48

5.49
0.39

0.39
18

18
179

208
498

579
SU
6.75 4.8 0.0048 12 0.012 6 1250.00 500.00 6.25 0.40 19 484 1360

7.50 8 0.008 16 0.016 6 750.00 375.00 4.00 0.33 19 272 726


IS

8.25 4.8 0.0048 12.25 0.01225 6 1250.00 489.80 6.51 0.41 19 465 1310

9.00 6 0.006 12.8 0.0128 6 1000.00 468.75 4.55 0.36 19 426 1157

9.75 2.9 0.0029 7 0.007 3 1034.48 428.57 5.83 0.40 18 337 941

Client/Owner: M/s. MUSTANG-HDP / SAUDI ARAMCO Geotechnical File No. 2015/104 Figure No. D - 14
PLOTS OF VELOCITY AND DYNAMIC SOIL PROPERTIES
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu
SOIL SYMBOL

Blows/ 300mm
Classification

Unit Weight,
SPT Values

Poisson's
SHEAR WAVE VELOCITY, m/sec.
Depth in
Meters

Ratios
kN/m3
DYNAMIC SHEAR DYNAMIC YOUNG'S
USC

S - Wave Velocity, Vs

D
P - Wave Velocity, Vp
MODULUS, G, MPa MODULUS, E, MPa

BI
0 500 1000 1500 0 200 400 600 0 500 1000 1500
0.00
0

R
GM 18 18 0.31 1.00

SP-SM 16 18 0.29

FO
2.00
2
16 18 0.36

3.00
SW-SM 18 18 0.30

25 18 0.36 4.00
4

SC-SM
28

17
18

18
0.39

0.39
5.00

ED
SU
6 31 18 0.39 6.00

CL 25 19 0.40
7.00

41 19 0.33
IS

8 8.00
CL-ML U-2 19 0.41

CL-ML U-3 19 0.36 9.00

30 18 0.40
10 10.00

Legend : vp vs

Client/Owner: M/s. MUSTANG-HDP / SAUDI ARAMCO Geotechnical File No. 2015/104 Figure No. D - 14(a)
OEO - GF - 12, Rev. 00
CROSS HOLE TEST RESULTS (CHS-04) - SOIL DESIGN PARAMETERS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu

Depth t-Comp t-Comp t-Shear t-Shear Distance vp vs (vp/vs)2 µ γt G E

D
m (ms) (s) (ms) (s) x (m) tcomp/x (m/s) tshear/x (m/s) (kN/m3) (MPa) (MPa)

0.75 4.34 0.00434 8.68 0.00868 3 691.24 345.62 4.00 0.33 20 244 649

BI
1.50 5.8 0.0058 10.1 0.0101 3 517.24 297.03 3.03 0.25 19 171 429

R
2.25 6.5 0.0065 14.5 0.0145 3 461.54 206.90 4.98 0.37 20 87 240

FO
3.00 10.8 0.0108 20.5 0.0205 6 555.56 292.68 3.60 0.31 20 175 457

3.75 7.5 0.0075 16.1 0.0161 6 800.00 372.67 4.61 0.36 20 283 771

4.50 5.8 0.0058 10.8 0.0108 3 517.24 277.78 3.47 0.30 20 157 408

5.25

6.00
7

6.5
0.007

0.0065
12.8

12.1
0.0128

0.0121 ED
3

3
428.57

461.54
234.38

247.93
3.34

3.47
0.29

0.30
20

20
112

125
288

325
SU
6.75 6.3 0.0063 12.3 0.0123 6 952.38 487.80 3.81 0.32 20 485 1283

7.50 5.5 0.0055 12.3 0.0123 6 1090.91 487.80 5.00 0.38 20 485 1334
IS

8.25 4.8 0.0048 12.25 0.01225 6 1250.00 489.80 6.51 0.41 20 489 1379

9.00 3.4 0.0034 7.5 0.0075 3 882.35 400.00 4.87 0.37 20 326 894

9.75 4.1 0.0041 8.9 0.0089 3 731.71 337.08 4.71 0.37 20 232 633

Client/Owner: M/s. MUSTANG-HDP / SAUDI ARAMCO Geotechnical File No. 2015/104 Figure No. D - 15
PLOTS OF VELOCITY AND DYNAMIC SOIL PROPERTIES
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu
SOIL SYMBOL

Blows/ 300mm
Classification

Unit Weight,
SPT Values

Poisson's
SHEAR WAVE VELOCITY, m/sec.
Depth in
Meters

Ratios
kN/m3
DYNAMIC SHEAR DYNAMIC YOUNG'S
USC

S - Wave Velocity, Vs

D
P - Wave Velocity, Vp
MODULUS, G, MPa MODULUS, E, MPa

BI
0 500 1000 1500 0 200 400 600 0 500 1000 1500
0.00
0

R
SM >50 20 0.33 1.00

SM 40 19 0.25

FO
2.00
2
SM >50 20 0.37

3.00
GM >50 20 0.31

>50 20 0.36 4.00


4
>50

>50
20

20
0.30

0.29
5.00

ED
SU
6 GC-GM >50 20 0.30 6.00

>50 20 0.32
7.00

>50 20 0.38
IS

8 8.00
>50 20 0.41

GC-GM >50 20 0.37 9.00

>50 20 0.37
10 10.00

Legend : vp vs

Client/Owner: M/s. MUSTANG-HDP / SAUDI ARAMCO Geotechnical File No. 2015/104 Figure No. D - 15(a)
OEO - GF - 12, Rev. 00
CROSS HOLE TEST RESULTS (CHS-05) - SOIL DESIGN PARAMETERS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu

Depth t-Comp t-Comp t-Shear t-Shear Distance vp vs (vp/vs)2 µ γt G E

D
m (ms) (s) (ms) (s) x (m) tcomp/x (m/s) tshear/x (m/s) (kN/m3) (MPa) (MPa)

0.75 7.1 0.0071 13.5 0.0135 3 422.54 222.22 3.62 0.31 20 101 264

BI
1.50 3.6 0.0036 7.5 0.0075 3 833.33 400.00 4.34 0.35 20 326 881

R
2.25 5.3 0.0053 10.6 0.0106 3 566.04 283.02 4.00 0.33 20 163 435

FO
3.00 7 0.007 13.7 0.0137 6 857.14 437.96 3.83 0.32 20 391 1035

3.75 5.6 0.0056 12.3 0.0123 6 1071.43 487.80 4.82 0.37 20 485 1329

4.50 4.1 0.0041 9.2 0.0092 3 731.71 326.09 5.04 0.38 20 217 597

5.25

6.00
3.9

4
0.0039

0.004
8.6

8.8
0.0086

0.0088 ED
3

3
769.23

750.00
348.84

340.91
4.86

4.84
0.37

0.37
20

20
248

237
680

649
SU
6.75 4.7 0.0047 9.4 0.0094 3 638.30 319.15 4.00 0.33 20 208 554

7.50 3.9 0.0039 9 0.009 3 769.23 333.33 5.33 0.38 20 227 627
IS

8.25 2.5 0.0025 6 0.006 3 1200.00 500.00 5.76 0.39 20 510 1422

9.00 3.6 0.0036 8.5 0.0085 3 833.33 352.94 5.57 0.39 20 254 706

9.75 2.5 0.0025 5.9 0.0059 3 1200.00 508.47 5.57 0.39 20 527 1466

Client/Owner: M/s. MUSTANG-HDP / SAUDI ARAMCO Geotechnical File No. 2015/104 Figure No. D - 16
PLOTS OF VELOCITY AND DYNAMIC SOIL PROPERTIES
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu
SOIL SYMBOL

Blows/ 300mm
Classification

Unit Weight,
SPT Values

Poisson's
SHEAR WAVE VELOCITY, m/sec.
Depth in
Meters

Ratios
kN/m3
DYNAMIC SHEAR DYNAMIC YOUNG'S
USC

S - Wave Velocity, Vs

D
P - Wave Velocity, Vp
MODULUS, G, MPa MODULUS, E, MPa

BI
0 500 1000 1500 0 200 400 600 0 500 1000 1500
0.00
0

SM

R
>50 20 0.31 1.00

SM >50 20 0.35

FO
2.00
2
>50 20 0.33

3.00
>50 20 0.32

SP-SM >50 20 0.37 4.00


4

GW-GM
>50

>50
20

20
0.38

0.37
5.00

ED
SU
6 >50 20 0.37 6.00

SP-SM >50 20 0.33


7.00

>50 20 0.38
IS

8 8.00
>50 20 0.39

>50 20 0.39 9.00

GW-GM >50 20 0.39


10 10.00

Legend : vp vs

Client/Owner: M/s. MUSTANG-HDP / SAUDI ARAMCO Geotechnical File No. 2015/104 Figure No. D - 16(a)
OEO - GF - 12, Rev. 00
CROSS HOLE TEST RESULTS (CHS-06) - SOIL DESIGN PARAMETERS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu

Depth t-Comp t-Comp t-Shear t-Shear Distance vp vs (vp/vs)2 µ γt G E

D
m (ms) (s) (ms) (s) x (m) tcomp/x (m/s) tshear/x (m/s) (kN/m3) (MPa) (MPa)

0.75 7.9 0.0079 16.4 0.0164 3 379.75 182.93 4.31 0.35 19 65 175

BI
1.50 7 0.007 14.5 0.0145 3 428.57 206.90 4.29 0.35 19 83 224

R
2.25 9.6 0.0096 17.4 0.0174 6 625.00 344.83 3.29 0.28 19 230 590

FO
3.00 9.8 0.0098 21 0.021 6 612.24 285.71 4.59 0.36 19 158 430

3.75 8 0.008 16.4 0.0164 6 750.00 365.85 4.20 0.34 19 259 697

4.50 5.1 0.0051 11.5 0.0115 6 1176.47 521.74 5.08 0.38 19 527 1453

5.25

6.00
8.9

3.1
0.0089

0.0031
17.6

7
0.0176

0.007 ED
6

3
674.16

967.74
340.91

428.57
3.91

5.10
0.33

0.38
19

20
225

374
598

1032
SU
6.75 2.6 0.0026 5.8 0.0058 3 1153.85 517.24 4.98 0.37 20 545 1499

7.50 4.6 0.0046 9 0.009 3 652.17 333.33 3.83 0.32 20 227 599
IS

8.25 2.9 0.0029 5.7 0.0057 3 1034.48 526.32 3.86 0.33 20 565 1497

9.00 3.1 0.0031 6.1 0.0061 3 967.74 491.80 3.87 0.33 20 493 1308

9.75 3.1 0.0031 6 0.006 3 967.74 500.00 3.75 0.32 20 510 1343

Client/Owner: M/s. MUSTANG-HDP / SAUDI ARAMCO Geotechnical File No. 2015/104 Figure No. D - 17
PLOTS OF VELOCITY AND DYNAMIC SOIL PROPERTIES
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu
SOIL SYMBOL

Blows/ 300mm
Classification

Unit Weight,
SPT Values

Poisson's
SHEAR WAVE VELOCITY, m/sec.
Depth in
Meters

Ratios
kN/m3
DYNAMIC SHEAR DYNAMIC YOUNG'S
USC

S - Wave Velocity, Vs

D
P - Wave Velocity, Vp
MODULUS, G, MPa MODULUS, E, MPa

BI
0 400 800 1200 0 200 400 600 0 500 1000 1500
0.00
0

R
SM 28 19 0.35 1.00

30 19 0.35

FO
2.00
2
SC-SM 38 19 0.28

3.00
38 19 0.36

GP-GM 47 19 0.34 4.00


4

ED
GM 46 19 0.38
5.00
46 19 0.33
SU
6 GP >50 20 0.38 6.00

>50 20 0.37
7.00

SC-SM >50 20 0.32


IS

8 8.00
>50 20 0.33

GC-GM >50 20 0.33 9.00

>50 20 0.32
10 10.00

Legend : vp vs

Client/Owner: M/s. MUSTANG-HDP / SAUDI ARAMCO Geotechnical File No. 2015/104 Figure No. D - 17(a)
OEO - GF - 12, Rev. 00
CROSS HOLE TEST RESULTS (CHS-07) - SOIL DESIGN PARAMETERS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu

Depth t-Comp t-Comp t-Shear t-Shear Distance vp vs (vp/vs)2 µ γt G E

D
m (ms) (s) (ms) (s) x (m) tcomp/x (m/s) tshear/x (m/s) (kN/m3) (MPa) (MPa)

0.75 9.6 0.0096 16.4 0.0164 3 312.50 182.93 2.92 0.24 20 68 169

BI
1.50 11.5 0.0115 17.4 0.0174 6 521.74 344.83 2.29 0.11 20 242 539

R
2.25 10 0.01 17.1 0.0171 3 300.00 175.44 2.92 0.24 20 63 156

FO
3.00 10.6 0.0106 20.5 0.0205 6 566.04 292.68 3.74 0.32 20 175 460

3.75 9.2 0.0092 17.4 0.0174 6 652.17 344.83 3.58 0.31 19 230 602

4.50 10 0.01 18.1 0.0181 6 600.00 331.49 3.28 0.28 17 190 488

5.25

6.00
9.4

5.3
0.0094

0.0053
17.1

10.85
0.0171

0.01085 ED
6

3
638.30

566.04
350.88

276.50
3.31

4.19
0.28

0.34
17

19
213

148
548

398
SU
6.75 3.6 0.0036 7.5 0.0075 3 833.33 400.00 4.34 0.35 20 326 881

7.50 8.2 0.0082 17.6 0.0176 6 731.71 340.91 4.61 0.36 20 237 645
IS

8.25 5.3 0.0053 12.5 0.0125 6 1132.08 480.00 5.56 0.39 20 470 1306

9.00 4.6 0.0046 8.7 0.0087 3 652.17 344.83 3.58 0.31 20 242 633

9.75 4.1 0.0041 9.3 0.0093 3 731.71 322.58 5.15 0.38 20 212 585

Client/Owner: M/s. MUSTANG-HDP / SAUDI ARAMCO Geotechnical File No. 2015/104 Figure No. D - 18
PLOTS OF VELOCITY AND DYNAMIC SOIL PROPERTIES
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu
SOIL SYMBOL

Blows/ 300mm
Classification

Unit Weight,
SPT Values

Poisson's
SHEAR WAVE VELOCITY, m/sec.
Depth in
Meters

Ratios
kN/m3
DYNAMIC SHEAR DYNAMIC YOUNG'S
USC

S - Wave Velocity, Vs

D
P - Wave Velocity, Vp
MODULUS, G, MPa MODULUS, E, MPa

BI
0 400 800 1200 0 200 400 600 0 500 1000 1500
0.00
0

R
SM 29 20 0.24 1.00

SP-SM 40 20 0.11

FO
2.00
2
47 20 0.24

3.00
GW-GM 49 20 0.32

>50 19 0.31 4.00


4 GW-GM

GW
>50

>50
17

17
0.28

0.28
5.00

ED
SU
6 >50 19 0.34 6.00

GW >50 20 0.35
7.00

>50 20 0.36
IS

8 8.00
GP-GM >50 20 0.39

>50 20 0.31 9.00

>50 20 0.38
10 10.00

Legend : vp vs

Client/Owner: M/s. MUSTANG-HDP / SAUDI ARAMCO Geotechnical File No. 2015/104 Figure No. D - 18(a)
OEO - GF - 12, Rev. 00
IS
SU
ED
FO
R
BI
D
PROJECT: Distribution Hub CLIENT: Mustang TEST DATE: Sun 22-May-2016
TEST ID: mMustang-PCPT-01 CLIENT REP: START TIME: 08:42:40
LOCATION: Yanbu OPERATOR: Usman Ghani WEATHER: CLEAR

Tip Sleeve Pore Pressure Friction Ratio Soil Behavior Type*


N/mm^2 kN/m^2 kN/m^2 Fs/Qc (%) Zone: UBC-1983
0 35 0 700 -30 30 0 8 0 12
0

D
BI
R
1

FO
Depth
(m)

ED
2
SU
IS

1 sensitive fine grained 4 silty clay to clay 7 silty sand to sandy silt 10 gravelly sand to sand
2 organic material 5 clayey silt to silty clay 8 sand to silty sand 11 very stiff fine grained (*)
3 clay 6 sandy silt to clayey silt 9 sand 12 sand to clayey sand (*)
*SBT/SPT CORRELATION: UBC-1983

Figure E-1
PROJECT: Distribution Hub CLIENT: Mustang TEST DATE: Sun 22-May-2016
TEST ID: mMustang-PCPT-02 CLIENT REP: START TIME: 09:33:49
LOCATION: Yanbu OPERATOR: Usman Ghani WEATHER: CLEAR

Tip Sleeve Pore Pressure Friction Ratio Soil Behavior Type*


N/mm^2 kN/m^2 kN/m^2 Fs/Qc (%) Zone: UBC-1983
0 40 0 400 -30 40 0 6 0 12
0

D
BI
R
1

FO
Depth
(m)

ED
2
SU
IS

1 sensitive fine grained 4 silty clay to clay 7 silty sand to sandy silt 10 gravelly sand to sand
2 organic material 5 clayey silt to silty clay 8 sand to silty sand 11 very stiff fine grained (*)
3 clay 6 sandy silt to clayey silt 9 sand 12 sand to clayey sand (*)
*SBT/SPT CORRELATION: UBC-1983

Figure E-2
PROJECT: Distribution Hub CLIENT: Mustang TEST DATE: Sat 21-May-2016
TEST ID: mMustang-PCPT-03 CLIENT REP: START TIME: 10:07:55
LOCATION: Yanbu OPERATOR: Usman Ghani WEATHER: CLEAR

Tip Sleeve Pore Pressure Friction Ratio Soil Behavior Type*


N/mm^2 kN/m^2 kN/m^2 Fs/Qc (%) Zone: UBC-1983
0 35 0 160 -10 10 0 1 0 12
0

D
BI
R
FO
Depth
(m)

ED
SU
IS

1 sensitive fine grained 4 silty clay to clay 7 silty sand to sandy silt 10 gravelly sand to sand
2 organic material 5 clayey silt to silty clay 8 sand to silty sand 11 very stiff fine grained (*)
3 clay 6 sandy silt to clayey silt 9 sand 12 sand to clayey sand (*)
*SBT/SPT CORRELATION: UBC-1983

Figure E-3
PROJECT: Distribution Hub CLIENT: Mustang TEST DATE: Sun 22-May-2016
TEST ID: Mustang-PCPT-04 CLIENT REP: START TIME: 15:05:31
LOCATION: Yanbu OPERATOR: Usman Ghani WEATHER: CLEAR

Tip Sleeve Pore Pressure Friction Ratio Soil Behavior Type*


N/mm^2 kN/m^2 kN/m^2 Fs/Qc (%) Zone: UBC-1983
0 40 0 600 -30 30 0 5 0 12
0

D
BI
R
FO
Depth
1
(m)

ED
SU
IS

1 sensitive fine grained 4 silty clay to clay 7 silty sand to sandy silt 10 gravelly sand to sand
2 organic material 5 clayey silt to silty clay 8 sand to silty sand 11 very stiff fine grained (*)
3 clay 6 sandy silt to clayey silt 9 sand 12 sand to clayey sand (*)
*SBT/SPT CORRELATION: UBC-1983

Figure E-4
PROJECT: Distribution Hub CLIENT: Mustang TEST DATE: Sun 22-May-2016
TEST ID: Mustang-PCPT-05 CLIENT REP: START TIME: 14:29:57
LOCATION: Yanbu OPERATOR: Usman Ghani WEATHER: CLEAR

Tip Sleeve Pore Pressure Friction Ratio Soil Behavior Type*


N/mm^2 kN/m^2 kN/m^2 Fs/Qc (%) Zone: UBC-1983
0 40 0 400 -80 60 0 8 0 12
0

D
BI
1

R
2

FO
Depth
3
(m)

ED
4
SU

5
IS

1 sensitive fine grained 4 silty clay to clay 7 silty sand to sandy silt 10 gravelly sand to sand
2 organic material 5 clayey silt to silty clay 8 sand to silty sand 11 very stiff fine grained (*)
3 clay 6 sandy silt to clayey silt 9 sand 12 sand to clayey sand (*)
*SBT/SPT CORRELATION: UBC-1983

Figure E-5
PROJECT: Distribution Hub CLIENT: Mustang TEST DATE: Sat 21-May-2016
Test ID: PCPT-06 Near BH-16 CLIENT REP: START TIME: 14:53:57
LOCATION: Yanbu OPERATOR: Usman Ghani WEATHER: CLEAR

Tip Sleeve Pore Pressure Friction Ratio Soil Behavior Type*


N/mm^2 kN/m^2 kN/m^2 Fs/Qc (%) Zone: UBC-1983
0 40 0 450 -100 350 0 7 0 12
0

D
BI
1

R
FO
Depth
2
(m)

ED
SU

3
IS

1 sensitive fine grained 4 silty clay to clay 7 silty sand to sandy silt 10 gravelly sand to sand
2 organic material 5 clayey silt to silty clay 8 sand to silty sand 11 very stiff fine grained (*)
3 clay 6 sandy silt to clayey silt 9 sand 12 sand to clayey sand (*)
*SBT/SPT CORRELATION: UBC-1983

Figure E-6
PROJECT: Distribution Hub CLIENT: Mustang TEST DATE: Mon 23-May-2016
TEST ID: PCPT-07 Near BH-17 CLIENT REP: START TIME: 09:21:01
LOCATION: Yanbu OPERATOR: Usman Ghani WEATHER: CLEAR

Tip Sleeve Pore Pressure Friction Ratio Soil Behavior Type*


N/mm^2 kN/m^2 kN/m^2 Fs/Qc (%) Zone: UBC-1983
0 30 0 600 -70 30 0 10 0 12
0

D
BI
1

R
FO
2

Depth
(m)

3
ED
SU

4
IS

1 sensitive fine grained 4 silty clay to clay 7 silty sand to sandy silt 10 gravelly sand to sand
2 organic material 5 clayey silt to silty clay 8 sand to silty sand 11 very stiff fine grained (*)
3 clay 6 sandy silt to clayey silt 9 sand 12 sand to clayey sand (*)
*SBT/SPT CORRELATION: UBC-1983

Figure E-7
PROJECT: Distribution Hub CLIENT: Mustang TEST DATE: Sat 21-May-2016
TEST ID: PCPT-08 Near BH-5 CLIENT REP: START TIME: 15:17:03
LOCATION: Yanbu OPERATOR: Usman Ghani WEATHER: CLEAR

Tip Sleeve Pore Pressure Friction Ratio Soil Behavior Type*


N/mm^2 kN/m^2 kN/m^2 Fs/Qc (%) Zone: UBC-1983
0 45 0 800 -70 10 0 6 0 12
0

D
BI
R
1

FO
Depth
(m)

ED
2
SU
IS

1 sensitive fine grained 4 silty clay to clay 7 silty sand to sandy silt 10 gravelly sand to sand
2 organic material 5 clayey silt to silty clay 8 sand to silty sand 11 very stiff fine grained (*)
3 clay 6 sandy silt to clayey silt 9 sand 12 sand to clayey sand (*)
*SBT/SPT CORRELATION: UBC-1983

Figure E-8
PROJECT: Distribution Hub CLIENT: Mustang TEST DATE: Sat 21-May-2016
TEST ID: PCPT-09 Near BH-29 CLIENT REP: START TIME: 09:04:07
LOCATION: Yanbu OPERATOR: Usman Ghani WEATHER: CLEAR

Tip Sleeve Pore Pressure Friction Ratio Soil Behavior Type*


N/mm^2 kN/m^2 kN/m^2 Fs/Qc (%) Zone: UBC-1983
0 50 0 500 -70 20 0 6 0 12
0

D
BI
1

R
2

FO
3

Depth
(m)

4 ED
5
SU

6
IS

1 sensitive fine grained 4 silty clay to clay 7 silty sand to sandy silt 10 gravelly sand to sand
2 organic material 5 clayey silt to silty clay 8 sand to silty sand 11 very stiff fine grained (*)
3 clay 6 sandy silt to clayey silt 9 sand 12 sand to clayey sand (*)
*SBT/SPT CORRELATION: UBC-1983

Figure E-9
PROJECT: Distribution Hub CLIENT: Mustang TEST DATE: Sun 22-May-2016
TEST ID: PCPT-10 Near BH-64 CLIENT REP: START TIME: 16:02:22
LOCATION: Yanbu OPERATOR: Usman Ghani WEATHER: CLEAR

Tip Sleeve Pore Pressure Friction Ratio Soil Behavior Type*


N/mm^2 kN/m^2 kN/m^2 Fs/Qc (%) Zone: UBC-1983
0 25 0 700 -200 1400 0 5 0 12
0

D
1

BI
2

R
3

FO
4
Depth
(m)
5
ED
6
SU

7
IS

1 sensitive fine grained 4 silty clay to clay 7 silty sand to sandy silt 10 gravelly sand to sand
2 organic material 5 clayey silt to silty clay 8 sand to silty sand 11 very stiff fine grained (*)
3 clay 6 sandy silt to clayey silt 9 sand 12 sand to clayey sand (*)
*SBT/SPT CORRELATION: UBC-1983

Figure E-10
IS
SU
ED
FO
R
BI
D
IS
SU
ED
FO
R
BI
D
Test No: SRT-01

D
BI
R
FO
ED
SU
IS

Figure F-2
Test No: SRT-02

D
BI
R
FO
ED
SU
IS

Figure F-3
Test No: SRT-03

D
BI
R
FO
ED
SU
IS

Figure F-4
Test No: SRT-04

D
BI
R
FO
ED
SU
IS

Figure F-5
Test No: SRT-05

D
BI
R
FO
ED
SU
IS

Figure F-6
IS
SU
ED
FO
R
BI
D
RHOMETER
C1 V1 V2 C2

C1 P1 P2 C2
ELECTRODES

b EARTH EARTH

D
a a a

BI
In the Wenner Array the apparent resistivity,
R ρa is given by :
FO
4π . a . R.
ρa = 2a a
1 +
ED

a 2 + 4b 2 a2 + b2

Where :
R = Resistance ( V / I )
SU

a = Electrode Separation
b = Depth of Electrode into the Earth

When a ≥ 10b this equation simplifies to


IS

ρa = 2 π . a . R ohm - m when a is in meters.

Data obtained at each location is given in the form of plots of apparent resistivity
ρ a values for various electrode spacing.

Source: IEEE81

Project Title : Drawing Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu
WENNER FIELD ARRAY
Client / Owner :
SCHEMATIC DIAGRAM

Geotechnical File No. 2015/104 Figure No. G - 1


Test No. : SR - 01 Date : 06 May 2016
Location : Yanbu Distribution Hub, Yanbu Start Time : 0600 Hour
Weather : Sunny Tested By : Abbas
Method : Wenner's 4 - Pin Northing : 2650068.50
Instrument : MEGGER DET 5/4D Easting : 430218.98
Depth of Electrode : 10.0 cm. Elevation : 3.25 m.

Terrain Condition :

Plain area, surface covered with silty sand with gravels & cobbles.

OBSERVATIONS
Spacing of
Electrodes
LINE - 1 LINE - 2 LINE - 1 LINE - 2
Average Apparent Resistivity
REMARKS / NOTES
(a) Reading Multiplier Reading Multiplier
in Meters in Ohms constant in Ohms constant in Ohm - meters

0.5 3.76 1 4.25 1 11.8 13.4

1.0 2.43 1 3.67 1 15.3 23.1

D
2.0 1.72 1 1.92 1 21.6 24.1 Line - 1 : EAST to WEST

BI
3.0 0.94 1 1.02 1 17.7 19.2 Line - 2 : NORTH to SOUTH

5.0 0.53 1 0.49 1 16.7 15.4

7.0 0.24 1 0.18 1


R 10.6 7.9
FO
Legend : LINE - 1 LINE - 2

30.0
APPARENT RESISTIVITY in Ohm-metres

27.0
ED

24.0

21.0
SU

18.0

15.0

12.0
IS

9.0

6.0

3.0

0.0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0
ELECTRODE SPACING in Meters

Project Title : Drawing Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu
EARTH RESISTIVITY &
Client / Owner :
ELECTRODE SPACING PLOT

Geotechnical File No. 2015/104 Figure No. G - 2


Test No. : SR - 02 Date : 06 May 2016
Location : Yanbu Distribution Hub, Yanbu Start Time : 0630 Hour
Weather : Sunny Tested By : Abbas
Method : Wenner's 4 - Pin Northing : 2649874.67
Instrument : MEGGER DET 5/4D Easting : 430056.69
Depth of Electrode : 10.0 cm. Elevation : 4.16 m.

Terrain Condition :

Plain area, surface covered with silty sand with gravels & cobbles.

OBSERVATIONS
Spacing of
Electrodes
LINE - 1 LINE - 2 LINE - 1 LINE - 2
Average Apparent Resistivity
REMARKS / NOTES
(a) Reading Multiplier Reading Multiplier
in Meters in Ohms constant in Ohms constant in Ohm - meters

0.5 5.62 1 5.25 1 17.7 16.5

1.0 4.28 1 4.10 1 26.9 25.8

D
2.0 3.09 1 2.90 1 38.8 36.4 Line - 1 : EAST to WEST

BI
3.0 1.98 1 1.64 1 37.3 30.9 Line - 2 : NORTH to SOUTH

5.0 0.96 1 0.84 1 30.2 26.4

7.0 0.34 1 0.43 1


R 15.0 18.9
FO
Legend : LINE - 1 LINE - 2

50.0
APPARENT RESISTIVITY in Ohm-metres

45.0
ED

40.0

35.0
SU

30.0

25.0

20.0
IS

15.0

10.0

5.0

0.0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0
ELECTRODE SPACING in Meters

Project Title : Drawing Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu
EARTH RESISTIVITY &
Client / Owner :
ELECTRODE SPACING PLOT

Geotechnical File No. 2015/104 Figure No. G - 3


Test No. : SR - 03 Date : 06 May 2016
Location : Yanbu Distribution Hub, Yanbu Start Time : 0700 Hour
Weather : Sunny Tested By : Abbas
Method : Wenner's 4 - Pin Northing : 2650186.03
Instrument : MEGGER DET 5/4D Easting : 430050.49
Depth of Electrode : 10.0 cm. Elevation : 3.16 m.

Terrain Condition :

Plain area, surface covered with silty sand with gravels & cobbles.

OBSERVATIONS
Spacing of
Electrodes
LINE - 1 LINE - 2 LINE - 1 LINE - 2
Average Apparent Resistivity
REMARKS / NOTES
(a) Reading Multiplier Reading Multiplier
in Meters in Ohms constant in Ohms constant in Ohm - meters

0.5 2.26 1 2.80 1 7.1 8.8

1.0 1.47 1 1.72 1 9.2 10.8

D
2.0 0.81 1 0.92 1 10.2 11.6 Line - 1 : EAST to WEST

BI
3.0 0.36 1 0.47 1 6.8 8.9 Line - 2 : NORTH to SOUTH

5.0 0.09 1 0.17 1 2.8 5.3

7.0 -- --
R -- Very low values recorded
FO
Legend : LINE - 1 LINE - 2
15.0
APPARENT RESISTIVITY in Ohm-metres

13.5
ED

12.0

10.5
SU

9.0

7.5

6.0
IS

4.5

3.0

1.5

0.0
0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 5.5
ELECTRODE SPACING in Meters

Project Title : Drawing Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu
EARTH RESISTIVITY &
Client / Owner :
ELECTRODE SPACING PLOT

Geotechnical File No. 2015/104 Figure No. G - 4


Test No. : SR - 04 Date : 06 May 2016
Location : Yanbu Distribution Hub, Yanbu Start Time : 0730 Hour
Weather : Sunny Tested By : Abbas
Method : Wenner's 4 - Pin Northing : 2650089.91
Instrument : MEGGER DET 5/4D Easting : 429970.02
Depth of Electrode : 10.0 cm. Elevation : 3.48 m.

Terrain Condition :

Plain area, surface covered with silty sand with gravels & cobbles.

OBSERVATIONS
Spacing of
Electrodes
LINE - 1 LINE - 2 LINE - 1 LINE - 2
Average Apparent Resistivity
REMARKS / NOTES
(a) Reading Multiplier Reading Multiplier
in Meters in Ohms constant in Ohms constant in Ohm - meters

0.5 4.61 1 4.29 1 14.5 13.5

1.0 3.19 1 3.07 1 20.0 19.3

D
2.0 2.37 1 2.14 1 29.8 26.9 Line - 1 : EAST to WEST

BI
3.0 1.04 1 1.12 1 19.6 21.1 Line - 2 : NORTH to SOUTH

5.0 0.42 1 0.53 1 13.2 16.7

7.0 0.13 1 0.22 1


R 5.7 9.7
FO
Legend : LINE - 1 LINE - 2
40.0
APPARENT RESISTIVITY in Ohm-metres

36.0
ED

32.0

28.0
SU

24.0

20.0

16.0
IS

12.0

8.0

4.0

0.0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0
ELECTRODE SPACING in Meters

Project Title : Drawing Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu
EARTH RESISTIVITY &
Client / Owner :
ELECTRODE SPACING PLOT

Geotechnical File No. 2015/104 Figure No. G - 5


Test No. : SR - 05 Date : 06 May 2016
Location : Yanbu Distribution Hub, Yanbu Start Time : 0800 Hour
Weather : Sunny Tested By : Abbas
Method : Wenner's 4 - Pin Northing : 2650032.14
Instrument : MEGGER DET 5/4D Easting : 429921.65
Depth of Electrode : 10.0 cm. Elevation : 3.59 m.

Terrain Condition :

Plain area, surface covered with silty sand with gravels & cobbles.

OBSERVATIONS
Spacing of
Electrodes
LINE - 1 LINE - 2 LINE - 1 LINE - 2
Average Apparent Resistivity
REMARKS / NOTES
(a) Reading Multiplier Reading Multiplier
in Meters in Ohms constant in Ohms constant in Ohm - meters

0.5 2.24 1 2.18 1 7.0 6.8

1.0 1.48 1 1.31 1 9.3 8.2

D
2.0 0.53 1 0.38 1 6.7 4.8 Line - 1 : EAST to WEST

BI
3.0 -- -- Line - 2 : NORTH to SOUTH

5.0 -- --

7.0 -- --
R -- Very low values recorded
FO
Legend : LINE - 1 LINE - 2
10.0

9.0
APPARENT RESISTIVITY in Ohm-metres

ED

8.0

7.0
SU

6.0

5.0

4.0
IS

3.0

2.0

1.0

0.0
0.0 0.5 1.0 1.5 2.0 2.5
ELECTRODE SPACING in Meters

Project Title : Drawing Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu
EARTH RESISTIVITY &
Client / Owner :
ELECTRODE SPACING PLOT

Geotechnical File No. 2015/104 Figure No. G - 6


Test No. : SR - 06 Date : 06 May 2016
Location : Yanbu Distribution Hub, Yanbu Start Time : 0830 Hour
Weather : Sunny Tested By : Abbas
Method : Wenner's 4 - Pin Northing : 2650382.59
Instrument : MEGGER DET 5/4D Easting : 429839.16
Depth of Electrode : 10.0 cm. Elevation : 4.45 m.

Terrain Condition :

Plain area, surface covered with silty sand with gravels & cobbles.

OBSERVATIONS
Spacing of
Electrodes
LINE - 1 LINE - 2 LINE - 1 LINE - 2
Average Apparent Resistivity
REMARKS / NOTES
(a) Reading Multiplier Reading Multiplier
in Meters in Ohms constant in Ohms constant in Ohm - meters

0.5 6.25 1 5.98 1 19.6 18.8

1.0 4.92 1 4.37 1 30.9 27.5

D
2.0 3.25 1 3.41 1 40.8 42.9 Line - 1 : EAST to WEST

BI
3.0 2.01 1 1.94 1 37.9 36.6 Line - 2 : NORTH to SOUTH

5.0 1.27 1 0.83 1 39.9 26.1

7.0 0.61 1 0.41 1


R 26.8 18.0
FO
Legend : LINE - 1 LINE - 2
50.0
APPARENT RESISTIVITY in Ohm-metres

45.0
ED

40.0

35.0
SU

30.0

25.0

20.0
IS

15.0

10.0

5.0

0.0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0

ELECTRODE SPACING in Meters

Project Title : Drawing Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu
EARTH RESISTIVITY &
Client / Owner :
ELECTRODE SPACING PLOT

Geotechnical File No. 2015/104 Figure No. G - 7


Test No. : SR - 07 Date : 06 May 2016
Location : Yanbu Distribution Hub, Yanbu Start Time : 0900 Hour
Weather : Sunny Tested By : Abbas
Method : Wenner's 4 - Pin Northing : 2650297.97
Instrument : MEGGER DET 5/4D Easting : 429768.31
Depth of Electrode : 10.0 cm. Elevation : 4.50 m.

Terrain Condition :

Plain area, surface covered with silty sand with gravels & cobbles.

OBSERVATIONS
Spacing of
Electrodes
LINE - 1 LINE - 2 LINE - 1 LINE - 2
Average Apparent Resistivity
REMARKS / NOTES
(a) Reading Multiplier Reading Multiplier
in Meters in Ohms constant in Ohms constant in Ohm - meters

0.5 5.61 1 5.28 1 17.6 16.6

1.0 4.50 1 4.19 1 28.3 26.3

D
2.0 3.42 1 3.50 1 43.0 44.0 Line - 1 : EAST to WEST

BI
3.0 2.60 1 2.46 1 49.0 46.4 Line - 2 : NORTH to SOUTH

5.0 1.25 1 1.10 1 39.3 34.6

7.0 0.48 1 0.56 1


R 21.1 24.6
FO
Legend : LINE - 1 LINE - 2

60.0
APPARENT RESISTIVITY in Ohm-metres

54.0
ED

48.0

42.0
SU

36.0

30.0

24.0
IS

18.0

12.0

6.0

0.0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0

ELECTRODE SPACING in Meters

Project Title : Drawing Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu
EARTH RESISTIVITY &
Client / Owner :
ELECTRODE SPACING PLOT

Geotechnical File No. 2015/104 Figure No. G - 8


Test No. : SR - 08 Date : 06 May 2016
Location : Yanbu Distribution Hub, Yanbu Start Time : 0930 Hour
Weather : Sunny Tested By : Abbas
Method : Wenner's 4 - Pin Northing : 2650213.37
Instrument : MEGGER DET 5/4D Easting : 429697.48
Depth of Electrode : 10.0 cm. Elevation : 3.95 m.

Terrain Condition :

Plain area, surface covered with silty sand with gravels & cobbles.

OBSERVATIONS
Spacing of
Electrodes
LINE - 1 LINE - 2 LINE - 1 LINE - 2
Average Apparent Resistivity
REMARKS / NOTES
(a) Reading Multiplier Reading Multiplier
in Meters in Ohms constant in Ohms constant in Ohm - meters

0.5 3.49 1 3.54 1 11.0 11.1

1.0 2.62 1 2.81 1 16.5 17.7

D
2.0 1.56 1 1.65 1 19.6 20.7 Line - 1 : EAST to WEST

BI
3.0 0.84 1 0.98 1 15.8 18.5 Line - 2 : NORTH to SOUTH

5.0 0.38 1 0.49 1 11.9 15.4

7.0 0.41 1 0.38 1


R 18.0 16.7
FO
Legend : LINE - 1 LINE - 2

25.0
APPARENT RESISTIVITY in Ohm-metres

22.5
ED

20.0

17.5
SU

15.0

12.5

10.0
IS

7.5

5.0

2.5

0.0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0
ELECTRODE SPACING in Meters

Project Title : Drawing Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu
EARTH RESISTIVITY &
Client / Owner :
ELECTRODE SPACING PLOT

Geotechnical File No. 2015/104 Figure No. G - 9


Test No. : SR - 09 Date : 06 May 2016
Location : Yanbu Distribution Hub, Yanbu Start Time : 1010 Hour
Weather : Sunny Tested By : Abbas
Method : Wenner's 4 - Pin Northing : 2650531.40
Instrument : MEGGER DET 5/4D Easting : 429591.34
Depth of Electrode : 10.0 cm. Elevation : 5.08 m.

Terrain Condition :

Plain area, surface covered with silty sand with gravels & cobbles.

OBSERVATIONS
Spacing of
Electrodes
LINE - 1 LINE - 2 LINE - 1 LINE - 2
Average Apparent Resistivity
REMARKS / NOTES
(a) Reading Multiplier Reading Multiplier
in Meters in Ohms constant in Ohms constant in Ohm - meters

0.5 6.91 1 6.26 1 21.7 19.7

1.0 5.25 1 5.19 1 33.0 32.6

D
2.0 4.36 1 4.11 1 54.8 51.6 Line - 1 : EAST to WEST

BI
3.0 3.09 1 2.82 1 58.2 53.2 Line - 2 : NORTH to SOUTH

5.0 2.12 1 1.91 1 66.6 60.0

7.0 1.32 1 0.84 1


R 58.1 36.9
FO
Legend : LINE - 1 LINE - 2
80.0
APPARENT RESISTIVITY in Ohm-metres

72.0
ED

64.0

56.0
SU

48.0

40.0

32.0
IS

24.0

16.0

8.0

0.0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0

ELECTRODE SPACING in Meters

Project Title : Drawing Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu
EARTH RESISTIVITY &
Client / Owner :
ELECTRODE SPACING PLOT

Geotechnical File No. 2015/104 Figure No. G - 10


Test No. : SR - 10 Date : 06 May 2016
Location : Yanbu Distribution Hub, Yanbu Start Time : 1030 Hour
Weather : Sunny Tested By : Abbas
Method : Wenner's 4 - Pin Northing : 2650412.27
Instrument : MEGGER DET 5/4D Easting : 429491.59
Depth of Electrode : 10.0 cm. Elevation : 5.65 m.

Terrain Condition :

Plain area, surface covered with silty sand with gravels & cobbles.

OBSERVATIONS
Spacing of
Electrodes
LINE - 1 LINE - 2 LINE - 1 LINE - 2
Average Apparent Resistivity
REMARKS / NOTES
(a) Reading Multiplier Reading Multiplier
in Meters in Ohms constant in Ohms constant in Ohm - meters

0.5 4.62 1 4.44 1 14.5 13.9

1.0 3.41 1 3.28 1 21.4 20.6

D
2.0 2.60 1 2.34 1 32.7 29.4 Line - 1 : EAST to WEST

BI
3.0 1.24 1 0.84 1 23.4 15.8 Line - 2 : NORTH to SOUTH

5.0 0.79 1 0.31 1 24.8 9.7

7.0 0.21 1 0.03 1


R 9.2 1.3
FO
Legend : LINE - 1 LINE - 2

40.0
APPARENT RESISTIVITY in Ohm-metres

36.0
ED

32.0

28.0

24.0
SU

20.0

16.0
IS

12.0

8.0

4.0

0.0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0

ELECTRODE SPACING in Meters

Project Title : Drawing Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu
EARTH RESISTIVITY &
Client / Owner :
ELECTRODE SPACING PLOT

Geotechnical File No. 2015/104 Figure No. G - 11


Test No. : SR - 11 Date : 06 May 2016
Location : Yanbu Distribution Hub, Yanbu Start Time : 1100 Hour
Weather : Sunny Tested By : Abbas
Method : Wenner's 4 - Pin Northing : 2650905.34
Instrument : MEGGER DET 5/4D Easting : 429593.64
Depth of Electrode : 10.0 cm. Elevation : 4.71 m.

Terrain Condition :

Plain area, surface covered with silty sand with gravels & cobbles.

OBSERVATIONS
Spacing of
Electrodes
LINE - 1 LINE - 2 LINE - 1 LINE - 2
Average Apparent Resistivity
REMARKS / NOTES
(a) Reading Multiplier Reading Multiplier
in Meters in Ohms constant in Ohms constant in Ohm - meters

0.5 3.92 1 3.76 1 12.3 11.8

1.0 2.81 1 2.67 1 17.7 16.8

D
2.0 1.69 1 1.49 1 21.2 18.7 Line - 1 : EAST to WEST

BI
3.0 0.84 1 0.92 1 15.8 17.3 Line - 2 : NORTH to SOUTH

5.0 0.28 1 0.46 1 8.8 14.5

7.0 0.08 1 0.09 1


R 3.5 4.0
FO
Legend : LINE - 1 LINE - 2
25.0
APPARENT RESISTIVITY in Ohm-metres

22.5
ED

20.0

17.5
SU

15.0

12.5

10.0
IS

7.5

5.0

2.5

0.0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0
ELECTRODE SPACING in Meters

Project Title : Drawing Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu
EARTH RESISTIVITY &
Client / Owner :
ELECTRODE SPACING PLOT

Geotechnical File No. 2015/104 Figure No. G - 12


Test No. : SR - 12 Date : 06 May 2016
Location : Yanbu Distribution Hub, Yanbu Start Time : 1130 Hour
Weather : Sunny Tested By : Abbas
Method : Wenner's 4 - Pin Northing : 2650795.38
Instrument : MEGGER DET 5/4D Easting : 429457.66
Depth of Electrode : 10.0 cm. Elevation : 4.70 m.

Terrain Condition :

Plain area, surface covered with silty sand with gravels & cobbles.

OBSERVATIONS
Spacing of
Electrodes
LINE - 1 LINE - 2 LINE - 1 LINE - 2
Average Apparent Resistivity
REMARKS / NOTES
(a) Reading Multiplier Reading Multiplier
in Meters in Ohms constant in Ohms constant in Ohm - meters

0.5 9.91 1 8.81 1 31.1 27.7

1.0 7.82 1 7.52 1 49.1 47.2

D
2.0 6.55 1 6.18 1 82.3 77.7 Line - 1 : EAST to WEST

BI
3.0 4.60 1 4.10 1 86.7 77.3 Line - 2 : NORTH to SOUTH

5.0 2.19 1 2.20 1 68.8 69.1

7.0 0.98 1 1.09 1


R 43.1 47.9
FO
Legend : LINE - 1 LINE - 2
100.0
APPARENT RESISTIVITY in Ohm-metres

90.0
ED

80.0

70.0
SU

60.0

50.0

40.0
IS

30.0

20.0

10.0

0.0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0
ELECTRODE SPACING in Meters

Project Title : Drawing Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu
EARTH RESISTIVITY &
Client / Owner :
ELECTRODE SPACING PLOT

Geotechnical File No. 2015/104 Figure No. G - 13


Test No. : SR - 13 Date : 06 May 2016
Location : Yanbu Distribution Hub, Yanbu Start Time : 1200 Hour
Weather : Sunny Tested By : Abbas
Method : Wenner's 4 - Pin Northing : 2649700.84
Instrument : MEGGER DET 5/4D Easting : 430757.73
Depth of Electrode : 10.0 cm. Elevation : 4.62 m.

Terrain Condition :

Plain area, surface covered with silty sand with gravels & cobbles.

OBSERVATIONS
Spacing of
Electrodes
LINE - 1 LINE - 2 LINE - 1 LINE - 2
Average Apparent Resistivity
REMARKS / NOTES
(a) Reading Multiplier Reading Multiplier
in Meters in Ohms constant in Ohms constant in Ohm - meters

0.5 2.91 1 3.41 1 9.1 10.7

1.0 1.86 1 2.09 1 11.7 13.1

D
2.0 0.92 1 1.46 1 11.6 18.3 Line - 1 : EAST to WEST

BI
3.0 0.38 1 0.77 1 7.2 14.5 Line - 2 : NORTH to SOUTH

5.0 0.11 1 0.39 1 3.5 12.3

7.0 0.03 1 0.04 1


R 1.3 1.8
FO
Legend : LINE - 1 LINE - 2
20.0
APPARENT RESISTIVITY in Ohm-metres

18.0
ED

16.0

14.0
SU

12.0

10.0

8.0
IS

6.0

4.0

2.0

0.0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0

ELECTRODE SPACING in Meters

Project Title : Drawing Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu
EARTH RESISTIVITY &
Client / Owner :
ELECTRODE SPACING PLOT

Geotechnical File No. 2015/104 Figure No. G - 14


Test No. : SR - 14 Date : 06 May 2016
Location : Yanbu Distribution Hub, Yanbu Start Time : 1230 Hour
Weather : Sunny Tested By : Abbas
Method : Wenner's 4 - Pin Northing : 2650773.19
Instrument : MEGGER DET 5/4D Easting : 429359.15
Depth of Electrode : 10.0 cm. Elevation : 5.46 m.

Terrain Condition :

Plain area, surface covered with silty sand with gravels & cobbles.

OBSERVATIONS
Spacing of
Electrodes
LINE - 1 LINE - 2 LINE - 1 LINE - 2
Average Apparent Resistivity
REMARKS / NOTES
(a) Reading Multiplier Reading Multiplier
in Meters in Ohms constant in Ohms constant in Ohm - meters

0.5 6.25 1 5.90 1 19.6 18.5

1.0 5.36 1 4.17 1 33.7 26.2

D
2.0 4.10 1 3.50 1 51.5 44.0 Line - 1 : EAST to WEST

BI
3.0 3.45 1 2.37 1 65.0 44.7 Line - 2 : NORTH to SOUTH

5.0 2.19 1 1.10 1 68.8 34.6

7.0 1.07 1 0.78 1


R 47.1 34.3
FO
Legend : LINE - 1 LINE - 2
80.0
APPARENT RESISTIVITY in Ohm-metres

72.0
ED

64.0

56.0
SU

48.0

40.0

32.0
IS

24.0

16.0

8.0

0.0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0

ELECTRODE SPACING in Meters

Project Title : Drawing Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu
EARTH RESISTIVITY &
Client / Owner :
ELECTRODE SPACING PLOT

Geotechnical File No. 2015/104 Figure No. G - 15


Test No. : SR - 15 Date : 06 May 2016
Location : Yanbu Distribution Hub, Yanbu Start Time : 1300 Hour
Weather : Sunny Tested By : Abbas
Method : Wenner's 4 - Pin Northing : 2649611.78
Instrument : MEGGER DET 5/4D Easting : 430662.62
Depth of Electrode : 10.0 cm. Elevation : 4.21 m.

Terrain Condition :

Plain area, surface covered with silty sand with gravels & cobbles.

OBSERVATIONS
Spacing of
Electrodes
LINE - 1 LINE - 2 LINE - 1 LINE - 2
Average Apparent Resistivity
REMARKS / NOTES
(a) Reading Multiplier Reading Multiplier
in Meters in Ohms constant in Ohms constant in Ohm - meters

0.5 5.58 1 6.09 1 17.5 19.1

1.0 3.92 1 4.11 1 24.6 25.8

D
2.0 2.19 1 3.42 1 27.5 43.0 Line - 1 : EAST to WEST

BI
3.0 1.28 1 2.14 1 24.1 40.3 Line - 2 : NORTH to SOUTH

5.0 0.73 1 1.40 1 22.9 44.0

7.0 0.14 1 0.38 1


R 6.2 16.7
FO
Legend : LINE - 1 LINE - 2
50.0
APPARENT RESISTIVITY in Ohm-metres

45.0
ED

40.0

35.0
SU

30.0

25.0

20.0
IS

15.0

10.0

5.0

0.0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0

ELECTRODE SPACING in Meters

Project Title : Drawing Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu
EARTH RESISTIVITY &
Client / Owner :
ELECTRODE SPACING PLOT

Geotechnical File No. 2015/104 Figure No. G - 16


Test No. : SR - 16 Date : 06 May 2016
Location : Yanbu Distribution Hub, Yanbu Start Time : 1330 Hour
Weather : Sunny Tested By : Abbas
Method : Wenner's 4 - Pin Northing : 2650695.72
Instrument : MEGGER DET 5/4D Easting : 429443.25
Depth of Electrode : 10.0 cm. Elevation : 5.33 m.

Terrain Condition :

Plain area, surface covered with silty sand with gravels & cobbles.

OBSERVATIONS
Spacing of
Electrodes
LINE - 1 LINE - 2 LINE - 1 LINE - 2
Average Apparent Resistivity
REMARKS / NOTES
(a) Reading Multiplier Reading Multiplier
in Meters in Ohms constant in Ohms constant in Ohm - meters

0.5 9.18 1 8.84 1 28.8 27.8

1.0 7.90 1 6.95 1 49.6 43.7

D
2.0 6.10 1 5.19 1 76.7 65.2 Line - 1 : EAST to WEST

BI
3.0 4.60 1 4.12 1 86.7 77.7 Line - 2 : NORTH to SOUTH

5.0 2.55 1 2.96 1 80.1 93.0

7.0 1.09 1 1.18 1


R 47.9 51.9
FO
Legend : LINE - 1 LINE - 2

100.0
APPARENT RESISTIVITY in Ohm-metres

90.0
ED

80.0

70.0
SU

60.0

50.0

40.0
IS

30.0

20.0

10.0

0.0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0
ELECTRODE SPACING in Meters

Project Title : Drawing Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu
EARTH RESISTIVITY &
Client / Owner :
ELECTRODE SPACING PLOT

Geotechnical File No. 2015/104 Figure No. G - 17


Test No. : SR - 17 Date : 06 May 2016
Location : Yanbu Distribution Hub, Yanbu Start Time : 1400 Hour
Weather : Sunny Tested By : Abbas
Method : Wenner's 4 - Pin Northing : 2649854.44
Instrument : MEGGER DET 5/4D Easting : 430867.72
Depth of Electrode : 10.0 cm. Elevation : 2.98 m.

Terrain Condition :

Plain area, surface covered with silty sand with gravels & cobbles.

OBSERVATIONS
Spacing of
Electrodes
LINE - 1 LINE - 2 LINE - 1 LINE - 2
Average Apparent Resistivity
REMARKS / NOTES
(a) Reading Multiplier Reading Multiplier
in Meters in Ohms constant in Ohms constant in Ohm - meters

0.5 6.71 1 6.52 1 21.1 20.5

1.0 4.22 1 4.10 1 26.5 25.8

D
2.0 3.02 1 2.86 1 38.0 35.9 Line - 1 : EAST to WEST

BI
3.0 1.27 1 1.13 1 23.9 21.3 Line - 2 : NORTH to SOUTH

5.0 0.76 1 0.84 1 23.9 26.4

7.0 0.29 1 0.19 1


R 12.8 8.4
FO
Legend : LINE - 1 LINE - 2

40.0
APPARENT RESISTIVITY in Ohm-metres

36.0
ED

32.0

28.0
SU

24.0

20.0

16.0
IS

12.0

8.0

4.0

0.0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0

ELECTRODE SPACING in Meters

Project Title : Drawing Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu
EARTH RESISTIVITY &
Client / Owner :
ELECTRODE SPACING PLOT

Geotechnical File No. 2015/104 Figure No. G - 18


Test No. : SR - 18 Date : 06 May 2016
Location : Yanbu Distribution Hub, Yanbu Start Time : 1430 Hour
Weather : Sunny Tested By : Abbas
Method : Wenner's 4 - Pin Northing : 2650405.51
Instrument : MEGGER DET 5/4D Easting : 430103.69
Depth of Electrode : 10.0 cm. Elevation : 4.10 m.

Terrain Condition :

Plain area, surface covered with silty sand with gravels & cobbles.

OBSERVATIONS
Spacing of
Electrodes
LINE - 1 LINE - 2 LINE - 1 LINE - 2
Average Apparent Resistivity
REMARKS / NOTES
(a) Reading Multiplier Reading Multiplier
in Meters in Ohms constant in Ohms constant in Ohm - meters

0.5 3.14 1 3.29 1 9.9 10.3

1.0 2.26 1 2.44 1 14.2 15.3

D
2.0 1.45 1 1.30 1 18.2 16.3 Line - 1 : EAST to WEST

BI
3.0 0.89 1 0.78 1 16.8 14.7 Line - 2 : NORTH to SOUTH

5.0 0.47 1 0.39 1 14.8 12.3

7.0 0.09 1 0.03 1


R 4.0 1.3
FO
Legend : LINE - 1 LINE - 2
20.0
APPARENT RESISTIVITY in Ohm-metres

18.0
ED

16.0

14.0

12.0
SU

10.0

8.0
IS

6.0

4.0

2.0

0.0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0

ELECTRODE SPACING in Meters

Project Title : Drawing Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu
EARTH RESISTIVITY &
Client / Owner :
ELECTRODE SPACING PLOT

Geotechnical File No. 2015/104 Figure No. G - 19


Test No. : SR - 19 Date : 06 May 2016
Location : Yanbu Distribution Hub, Yanbu Start Time : 1510 Hour
Weather : Sunny Tested By : Abbas
Method : Wenner's 4 - Pin Northing : 2650700.54
Instrument : MEGGER DET 5/4D Easting : 429309.70
Depth of Electrode : 10.0 cm. Elevation : 5.74 m.

Terrain Condition :

Plain area, surface covered with silty sand with gravels & cobbles.

OBSERVATIONS
Spacing of
Electrodes
LINE - 1 LINE - 2 LINE - 1 LINE - 2
Average Apparent Resistivity
REMARKS / NOTES
(a) Reading Multiplier Reading Multiplier
in Meters in Ohms constant in Ohms constant in Ohm - meters

0.5 4.81 1 4.74 1 15.1 14.9

1.0 3.37 1 3.29 1 21.2 20.7

D
2.0 2.42 1 2.12 1 30.4 26.6 Line - 1 : EAST to WEST

BI
3.0 1.29 1 1.04 1 24.3 19.6 Line - 2 : NORTH to SOUTH

5.0 0.78 1 0.62 1 24.5 19.5

7.0 0.22 1 0.16 1


R 9.7 7.0
FO
Legend : LINE - 1 LINE - 2
40.0
APPARENT RESISTIVITY in Ohm-metres

36.0
ED

32.0

28.0

24.0
SU

20.0

16.0
IS

12.0

8.0

4.0

0.0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0

ELECTRODE SPACING in Meters

Project Title : Drawing Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu
EARTH RESISTIVITY &
Client / Owner :
ELECTRODE SPACING PLOT

Geotechnical File No. 2015/104 Figure No. G - 20


Test No. : SR - 20 Date : 06 May 2016
Location : Yanbu Distribution Hub, Yanbu Start Time : 1530 Hour
Weather : Sunny Tested By : Abbas
Method : Wenner's 4 - Pin Northing : 2649985.63
Instrument : MEGGER DET 5/4D Easting : 429819.22
Depth of Electrode : 10.0 cm. Elevation : 3.77 m.

Terrain Condition :

Plain area, surface covered with silty sand with gravels & cobbles.

OBSERVATIONS
Spacing of
Electrodes
LINE - 1 LINE - 2 LINE - 1 LINE - 2
Average Apparent Resistivity
REMARKS / NOTES
(a) Reading Multiplier Reading Multiplier
in Meters in Ohms constant in Ohms constant in Ohm - meters

0.5 7.38 1 6.89 1 23.2 21.6

1.0 5.46 1 5.18 1 34.3 32.5

D
2.0 3.91 1 3.72 1 49.1 46.7 Line - 1 : EAST to WEST

BI
3.0 2.22 1 2.08 1 41.8 39.2 Line - 2 : NORTH to SOUTH

5.0 1.16 1 0.99 1 36.4 31.1

7.0 0.69 1 0.47 1


R 30.3 20.7
FO
Legend : LINE - 1 LINE - 2
60.0
APPARENT RESISTIVITY in Ohm-metres

54.0
ED

48.0

42.0
SU

36.0

30.0

24.0
IS

18.0

12.0

6.0

0.0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0

ELECTRODE SPACING in Meters

Project Title : Drawing Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu
EARTH RESISTIVITY &
Client / Owner :
ELECTRODE SPACING PLOT

Geotechnical File No. 2015/104 Figure No. G - 21


RESISTIVITY RANGE IN OHM - METERS ( OHM - FOOT )

0 - 10 10 - 20 20 - 50 50 - 100 > 100

D
( 0 - 33 ) ( 33 - 66 ) ( 66 - 164 ) ( 164 - 328 ) ( > 328 )
CORROSIVITY

BI
VERY SEVERE SEVERE MODERATE MILD VERY MILD

R
FO
CORROSIVITY IS BASED ON THE CORRELATION PRESENTED BY JD PALMER
IN AN ARTICLE ENTITLED " SOIL RESISTIVITY MEASUREMENT AND ANALYSIS, "

ED
PUBLISHED IN MATERIALS PERFORMANCE, VOL. 13, 1974
SU
IS

Drawing Title : Project Title :

Geotechnical Investigation for Geotechnical File No. 2015/104 Figure No. G - 22


YANBU DISTRIBUTION HUB Project, Yanbu
CORRELATION BETWEEN CORROSIVITY
AND SOIL RESISTIVITY Client / Owner :
IS
SU
ED
FO
R
BI
D
LEGEND
SAMPLES Top Base ASTM Depth in
DEPTH
Depth Depth
DESCRIPTION OF STRATA Meters
Depth, m. TYPE No. D-2487 D-3282
0.00 0.00 0.00

DRS 1 0.00 0.50 Brown, silty sand with occasional gravel & traces of clay.

D
BI
SM A-2-4

R
DRS 2 0.50 1.00 Ditto.

FO
1.00 1.00 1.00
End of Excavation @ 1.00 m.

ED
SU
LEGEND:
DRS - Disturbed Representative Sample Remarks / Observations:

Excavation Method : MECHANICAL


IS

Ground Water Table

Project Title : Drawing Title :


Trial Pit No. TP - 01 COORDINATES
Geotechnical File No. Geotechnical Investigation for YANBU
2015/104
Location : Yanbu Distribution Hub, Yanbu Northing: 2651070.34 DISTRIBUTION HUB Project, Yanbu
TEST PIT LOG
22 April 2016 429644.40 Client / Owner :
Date : Easting:
Figure No. H - 1
Logged By : Abbas Elevation: 4.45 m.
LEGEND
SAMPLES Top Base ASTM Depth in
DEPTH
Depth Depth
DESCRIPTION OF STRATA Meters
Depth, m. TYPE No. D-2487 D-3282
0.00 0.00 0.00

DRS 1 0.00 0.50 Brown, poorly graded sand with silt & gravel.

D
BI
SP-SM A-1-b

R
DRS 2 0.50 1.00 Ditto but grey.

FO
1.00 1.00 1.00
End of Excavation @ 1.00 m.

ED
SU
LEGEND:
DRS - Disturbed Representative Sample Remarks / Observations:

Excavation Method : MECHANICAL


IS

Ground Water Table

Project Title : Drawing Title :


Trial Pit No. TP - 02 COORDINATES
Geotechnical File No. Geotechnical Investigation for YANBU
2015/104
Location : Yanbu Distribution Hub, Yanbu Northing: 2650559.91 DISTRIBUTION HUB Project, Yanbu
TEST PIT LOG
22 April 2016 430310.50 Client / Owner :
Date : Easting:
Figure No. H - 2
Logged By : Abbas Elevation: 3.20 m.
LEGEND
SAMPLES Top Base ASTM Depth in
DEPTH
Depth Depth
DESCRIPTION OF STRATA Meters
Depth, m. TYPE No. D-2487 D-3282
0.00 0.00 0.00

DRS 1 0.00 0.50 Brown, silty clayey sand with gravel.

D
BI
SC-SM A-2-4

R
DRS 2 0.50 1.00 Ditto but with crystals of anhydrite.

FO
1.00 1.00 1.00
End of Excavation @ 1.00 m.

ED
SU
LEGEND:
DRS - Disturbed Representative Sample Remarks / Observations:

Excavation Method : MECHANICAL


IS

Ground Water Table

Project Title : Drawing Title :


Trial Pit No. TP - 03 COORDINATES
Geotechnical File No. Geotechnical Investigation for YANBU
2015/104
Location : Yanbu Distribution Hub, Yanbu Northing: 2650196.53 DISTRIBUTION HUB Project, Yanbu
TEST PIT LOG
22 April 2016 430744.51 Client / Owner :
Date : Easting:
Figure No. H - 3
Logged By : Abbas Elevation: 3.06 m.
LEGEND
SAMPLES Top Base ASTM Depth in
DEPTH
Depth Depth
DESCRIPTION OF STRATA Meters
Depth, m. TYPE No. D-2487 D-3282
0.00 0.00 0.00

DRS 1 0.00 0.50 SC-SM A-2-4 Brown, silty clayey sand.

D
BI
R
DRS 2 0.50 1.00 SC-SM A-2-4 Brown, silty sand with crystals of anhydrite.

FO
1.00 1.00 1.00
End of Excavation @ 1.00 m.

ED
SU
LEGEND:
DRS - Disturbed Representative Sample Remarks / Observations:

Excavation Method : MECHANICAL


IS

Ground Water Table

Project Title : Drawing Title :


Trial Pit No. TP - 04 COORDINATES
Geotechnical File No. Geotechnical Investigation for YANBU
2015/104
Location : Yanbu Distribution Hub, Yanbu Northing: 2649962.43 DISTRIBUTION HUB Project, Yanbu
TEST PIT LOG
22 April 2016 431024.12 Client / Owner :
Date : Easting:
Figure No. H - 4
Logged By : Abbas Elevation: 2.04 m.
LEGEND
SAMPLES Top Base ASTM Depth in
DEPTH
Depth Depth
DESCRIPTION OF STRATA Meters
Depth, m. TYPE No. D-2487 D-3282
0.00 0.00 0.00

DRS 1 0.00 0.50 Brown, silty clayey sand with gravel.

D
BI
SC-SM A-2-4

R
DRS 2 0.50 1.00 Ditto.

FO
1.00 1.00 1.00
End of Excavation @ 1.00 m.

ED
SU
LEGEND:
DRS - Disturbed Representative Sample Remarks / Observations:

Excavation Method : MECHANICAL


IS

Ground Water Table

Project Title : Drawing Title :


Trial Pit No. TP - 05 COORDINATES
Geotechnical File No. Geotechnical Investigation for YANBU
2015/104
Location : Yanbu Distribution Hub, Yanbu Northing: 2650887.77 DISTRIBUTION HUB Project, Yanbu
TEST PIT LOG
22 April 2016 429444.27 Client / Owner :
Date : Easting:
Figure No. H - 5
Logged By : Abbas Elevation: 4.81 m.
LEGEND
SAMPLES Top Base ASTM Depth in
DEPTH
Depth Depth
DESCRIPTION OF STRATA Meters
Depth, m. TYPE No. D-2487 D-3282
0.00 0.00 0.00

DRS 1 0.00 0.50 Brown, silty sand with occasional gravel & traces of clay.

D
BI
SM A-2-4

R
DRS 2 0.50 1.00 Ditto but greyish brown.

FO
1.00 1.00 1.00
End of Excavation @ 1.00 m.

ED
SU
LEGEND:
DRS - Disturbed Representative Sample Remarks / Observations:

Excavation Method : MECHANICAL


IS

Ground Water Table

Project Title : Drawing Title :


Trial Pit No. TP - 06 COORDINATES
Geotechnical File No. Geotechnical Investigation for YANBU
2015/104
Location : Yanbu Distribution Hub, Yanbu Northing: 2650383.18 DISTRIBUTION HUB Project, Yanbu
TEST PIT LOG
22 April 2016 430162.53 Client / Owner :
Date : Easting:
Figure No. H - 6
Logged By : Abbas Elevation: 3.49 m.
LEGEND
SAMPLES Top Base ASTM Depth in
DEPTH
Depth Depth
DESCRIPTION OF STRATA Meters
Depth, m. TYPE No. D-2487 D-3282
0.00 0.00 0.00

DRS 1 0.00 0.50 SC-SM A-2-4 Brown, silty clayey sand with gravel.

D
BI
R
DRS 2 0.50 1.00 SC-SM A-2-4 Brown, silty clayey sand with gravel.

FO
1.00 1.00 1.00
End of Excavation @ 1.00 m.

ED
SU
LEGEND:
DRS - Disturbed Representative Sample Remarks / Observations:

Excavation Method : MECHANICAL


IS

Ground Water Table

Project Title : Drawing Title :


Trial Pit No. TP - 07 COORDINATES
Geotechnical File No. Geotechnical Investigation for YANBU
2015/104
Location : Yanbu Distribution Hub, Yanbu Northing: 2650019.80 DISTRIBUTION HUB Project, Yanbu
TEST PIT LOG
22 April 2016 430596.54 Client / Owner :
Date : Easting:
Figure No. H - 7
Logged By : Abbas Elevation: 4.58 m.
LEGEND
SAMPLES Top Base ASTM Depth in
DEPTH
Depth Depth
DESCRIPTION OF STRATA Meters
Depth, m. TYPE No. D-2487 D-3282
0.00 0.00 0.00

DRS 1 0.00 0.50 Brown, silty clayey sand with gravel.

D
BI
SC-SM A-2-4

R
DRS 2 0.50 1.00 Ditto but light grey with crystals of anhydrite.

FO
1.00 1.00 1.00
End of Excavation @ 1.00 m.

ED
SU
LEGEND:
DRS - Disturbed Representative Sample Remarks / Observations:

Excavation Method : MECHANICAL


IS

Ground Water Table

Project Title : Drawing Title :


Trial Pit No. TP - 08 COORDINATES
Geotechnical File No. Geotechnical Investigation for YANBU
2015/104
Location : Yanbu Distribution Hub, Yanbu Northing: 2649855.07 DISTRIBUTION HUB Project, Yanbu
TEST PIT LOG
22 April 2016 430793.29 Client / Owner :
Date : Easting:
Figure No. H - 8
Logged By : Abbas Elevation: 3.42 m.
LEGEND
SAMPLES Top Base ASTM Depth in
DEPTH
Depth Depth
DESCRIPTION OF STRATA Meters
Depth, m. TYPE No. D-2487 D-3282
0.00 0.00 0.00

DRS 1 0.00 0.50 Brown, silty clayey gravel with sand.

D
BI
GC-GM A-2-4

DRS 2 0.50 0.75 Ditto but brownish white with crystals of anhydrite.

R
FO
DRS 3 0.75 1.00 Ditto but brown.
1.00 1.00 1.00
End of Excavation @ 1.00 m.

ED
SU
LEGEND:
DRS - Disturbed Representative Sample Remarks / Observations:

Excavation Method : MECHANICAL


IS

Ground Water Table

Project Title : Drawing Title :


Trial Pit No. TP - 09 COORDINATES
Geotechnical File No. Geotechnical Investigation for YANBU
2015/104
Location : Yanbu Distribution Hub, Yanbu Northing: 2650357.64 DISTRIBUTION HUB Project, Yanbu
TEST PIT LOG
22 April 2016 429284.40 Client / Owner :
Date : Easting:
Figure No. H - 9
Logged By : Abbas Elevation: 5.85 m.
LEGEND
SAMPLES Top Base ASTM Depth in
DEPTH
Depth Depth
DESCRIPTION OF STRATA Meters
Depth, m. TYPE No. D-2487 D-3282
0.00 0.00 0.00

DRS 1 0.00 0.50 Brown, silty sand with occasional gravel & traces of clay.

D
BI
SM A-2-4

R
DRS 2 0.50 1.00 Ditto but with anhydrite.

FO
1.00 1.00 1.00
End of Excavation @ 1.00 m.

ED
SU
LEGEND:
DRS - Disturbed Representative Sample Remarks / Observations:

Excavation Method : MECHANICAL


IS

Ground Water Table

Project Title : Drawing Title :


Trial Pit No. TP - 10 COORDINATES
Geotechnical File No. Geotechnical Investigation for YANBU
2015/104
Location : Yanbu Distribution Hub, Yanbu Northing: 2650007.52 DISTRIBUTION HUB Project, Yanbu
TEST PIT LOG
22 April 2016 429702.58 Client / Owner :
Date : Easting:
Figure No. H - 10
Logged By : Abbas Elevation: 3.94 m.
LEGEND
SAMPLES Top Base ASTM Depth in
DEPTH
Depth Depth
DESCRIPTION OF STRATA Meters
Depth, m. TYPE No. D-2487 D-3282
0.00 0.00 0.00

DRS 1 0.00 0.50 Brown, silty clayey gravel with sand.

D
BI
GC-GM A-2-4

R
DRS 2 0.50 1.00 Ditto but light grey.

FO
1.00 1.00 1.00
End of Excavation @ 1.00 m.

ED
SU
LEGEND:
DRS - Disturbed Representative Sample Remarks / Observations:

Excavation Method : MECHANICAL


IS

Ground Water Table

Project Title : Drawing Title :


Trial Pit No. TP - 11 COORDINATES
Geotechnical File No. Geotechnical Investigation for YANBU
2015/104
Location : Yanbu Distribution Hub, Yanbu Northing: 2649577.47 DISTRIBUTION HUB Project, Yanbu
TEST PIT LOG
22 April 2016 430216.22 Client / Owner :
Date : Easting:
Figure No. H - 11
Logged By : Abbas Elevation: 3.51 m.
LEGEND
SAMPLES Top Base ASTM Depth in
DEPTH
Depth Depth
DESCRIPTION OF STRATA Meters
Depth, m. TYPE No. D-2487 D-3282
0.00 0.00 0.00

DRS 1 0.00 0.50 Brown, silty sand with gravel & taces of clay.

D
BI
SM A-2-4

R
DRS 2 0.50 1.00 Ditto but light grey with anhydrite.

FO
1.00 1.00 1.00
End of Excavation @ 1.00 m.

ED
SU
LEGEND:
DRS - Disturbed Representative Sample Remarks / Observations:

Excavation Method : MECHANICAL


IS

Ground Water Table

Project Title : Drawing Title :


Trial Pit No. TP - 12 COORDINATES
Geotechnical File No. Geotechnical Investigation for YANBU
2015/104
Location : Yanbu Distribution Hub, Yanbu Northing: 2649338.46 DISTRIBUTION HUB Project, Yanbu
TEST PIT LOG
22 April 2016 430501.69 Client / Owner :
Date : Easting:
Figure No. H - 12
Logged By : Abbas Elevation: 3.31 m.
LEGEND
SAMPLES Top Base ASTM Depth in
DEPTH
Depth Depth
DESCRIPTION OF STRATA Meters
Depth, m. TYPE No. D-2487 D-3282
0.00 0.00 0.00

DRS 1 0.00 0.50 Brown, silty clayey sand with gravel.

D
BI
SC-SM A-2-4

R
DRS 2 0.50 1.00 Ditto but with crystals of anhydrite.

FO
1.00 1.00 1.00
End of Excavation @ 1.00 m.

ED
SU
LEGEND:
DRS - Disturbed Representative Sample Remarks / Observations:

Excavation Method : MECHANICAL


IS

Ground Water Table

Project Title : Drawing Title :


Trial Pit No. TP - 13 COORDINATES
Geotechnical File No. Geotechnical Investigation for YANBU
2015/104
Location : Yanbu Distribution Hub, Yanbu Northing: 2649920.50 DISTRIBUTION HUB Project, Yanbu
TEST PIT LOG
22 April 2016 430942.68 Client / Owner :
Date : Easting:
Figure No. H - 13
Logged By : Abbas Elevation: 2.25 m.
LEGEND
SAMPLES Top Base ASTM Depth in
DEPTH
Depth Depth
DESCRIPTION OF STRATA Meters
Depth, m. TYPE No. D-2487 D-3282
0.00 0.00 0.00

DRS 1 0.00 0.50 Brown, silty clayey sand with gravel.

D
BI
SC-SM A-2-4

R
DRS 2 0.50 1.00 Ditto but with crystals of anhydrite.

FO
1.00 1.00 1.00
End of Excavation @ 1.00 m.

ED
SU
LEGEND:
DRS - Disturbed Representative Sample Remarks / Observations:

Excavation Method : MECHANICAL


IS

Ground Water Table

Project Title : Drawing Title :


Trial Pit No. TP - 14 COORDINATES
Geotechnical File No. Geotechnical Investigation for YANBU
2015/104
Location : Yanbu Distribution Hub, Yanbu Northing: 2649936.10 DISTRIBUTION HUB Project, Yanbu
TEST PIT LOG
22 April 2016 430924.05 Client / Owner :
Date : Easting:
Figure No. H - 14
Logged By : Abbas Elevation: 2.66 m.
SUMMARY OF LABORATORY TEST RESULTS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu

ATTERBERG
Natural SIEVE ANALYSIS ( ASTM D - 422 ) CLASSIFICATION MOISTURE DENSITY CBR VALUE
TEST SAMPLE LIMITS
Moisture RELATIONSHIP

D
PIT/BULK DEPTH
DESCRIPTION Content PERCENT PASSING ASTM D-4318 ASTM ASTM (ASTM D- 1557) (ASTM D-1883) REMARKS
SAMPLE
No. OMC,

BI
m % #4 # 10 # 20 # 40 # 140 # 200 LL, % PI, % D - 2487 D - 3282 MDD, g/cc 95% 100%
%
Brown, silty sand with occasional gravel &
TP - 01 0.00-1.00 traces of clay 1.0 88 76 61 50 26 20 20 02 SM A-2-4 2.147 8.4 23 50

R
FO
Brown to grey, poorly graded
TP - 02 0.00-1.00 sand with silt & gravel 2.6 64 54 42 18 07 06 NP SP-SM A-1-b 2.210 6.1 50 68

Brown, silty clayey sand

ED
TP - 03 0.00-1.00 with gravel & crystals of anhydrite 7.0 78 61 51 41 27 24 26 06 SC-SM A-2-4 2.120 9.3 15 24
SU
TP - 04 0.00-0.50 Brown, silty clayey sand 1.8 96 89 83 74 44 33 26 06 SC-SM A-2-4 2.063 10.1 12 32

Brown, silty clayey sand


0.50-1.00 with crystals of anhydrite 13.3 99 78 53 30 17 15 25 05 SC-SM A-2-4 -- -- -- --
IS

TP - 05 0.00-1.00 Brown, silty clayey sand with gravel 1.8 69 60 53 47 30 25 24 04 SC-SM A-2-4 2.182 6.0 22 35

Site Location: YANBU DISTRIBUTION HUB Project, Yanbu - Saudi Arabia Geotechnical File No. 2015/104 Figure No. H - 15
OEO - GF - 07, Rev. 00
NP - Non Plastic
SUMMARY OF LABORATORY TEST RESULTS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu

ATTERBERG
Natural SIEVE ANALYSIS ( ASTM D - 422 ) CLASSIFICATION MOISTURE DENSITY CBR VALUE
TEST SAMPLE LIMITS
Moisture RELATIONSHIP

D
PIT/BULK DEPTH
DESCRIPTION Content PERCENT PASSING ASTM D-4318 ASTM ASTM (ASTM D- 1557) (ASTM D-1883) REMARKS
SAMPLE
No. OMC,

BI
m % #4 # 10 # 20 # 40 # 140 # 200 LL, % PI, % D - 2487 D - 3282 MDD, g/cc 95% 100%
%
Brown to greyish brown, silty sand
TP - 06 0.00-1.00 with occasional gravel & traces of clay 2.9 90 80 66 52 23 22 22 03 SM A-2-4 2.231 6.7 44 66

R
FO
TP - 07 0.00-0.50 Brown, silty clayey sand with gravel 1.5 81 65 50 41 22 17 25 05 SC-SM A-2-4 2.172 7.8 24 40

0.50-1.00 Brown, silty clayey sand with gravel 5.6 64 51 41 29 17 16 26 06 SC-SM A-2-4 -- -- -- --

TP - 08 0.00-1.00
Brown to light grey, silty clayey sand
with gravel & crystals of anhydrite 3.1
ED 82 65 56 50 27 22 24 04 SC-SM A-2-4 2.140 5.7 56 70
SU
Brown to brownish white, silty clayey
TP - 09 0.00-1.00 gravel with sand & anhydrite 2.1 47 40 36 30 20 18 25 05 GC-GM A-2-4 2.186 4.2 51 69
IS

Brown, silty sand with anhydrite,


TP - 10 0.00-1.00 occasional gravel & traces of clay 1.4 91 84 76 44 25 24 20 02 SM A-2-4 2.123 5.0 49 69

Site Location: YANBU DISTRIBUTION HUB Project, Yanbu - Saudi Arabia Geotechnical File No. 2015/104 Figure No. H - 16
OEO - GF - 07, Rev. 00
NP - Non Plastic
SUMMARY OF LABORATORY TEST RESULTS
Geotechnical Investigation for YANBU DISTRIBUTION HUB Project, Yanbu

ATTERBERG
Natural SIEVE ANALYSIS ( ASTM D - 422 ) CLASSIFICATION MOISTURE DENSITY CBR VALUE
TEST SAMPLE LIMITS
Moisture RELATIONSHIP

D
PIT/BULK DEPTH
DESCRIPTION Content PERCENT PASSING ASTM D-4318 ASTM ASTM (ASTM D- 1557) (ASTM D-1883) REMARKS
SAMPLE
No. OMC,

BI
m % #4 # 10 # 20 # 40 # 140 # 200 LL, % PI, % D - 2487 D - 3282 MDD, g/cc 95% 100%
%
Brown to light grey, silty clayey
TP - 11 0.00-1.00 gravel with sand 4.4 52 47 43 38 26 23 24 04 GC-GM A-2-4 2.287 4.2 51 71

R
FO
Brown to light grey, silty sand with
TP - 12 0.00-1.00 gravel, anhydrite & traces of clay 3.2 80 74 68 60 34 30 20 03 SM A-2-4 2.225 4.3 52 70

Brown, silty clayey sand

ED
TP - 13 0.00-1.00 with gravel & crystals of anhydrite 8.9 83 69 59 56 32 26 24 04 SC-SM A-24 2.152 6.6 40 62
SU
Brown, silty clayey sand
TP - 14 0.00-1.00 with gravel & crystals of anhydrite 8.7 77 64 54 48 33 29 25 05 SC-SM A-24 2.148 6.2 38 58
IS

Site Location: YANBU DISTRIBUTION HUB Project, Yanbu - Saudi Arabia Geotechnical File No. 2015/104 Figure No. H - 17
OEO - GF - 07, Rev. 00
NP - Non Plastic
Soil Classification
Criteria for Assigning Group Symbols and Group Names Using Laboratory TestsA Group
Group NameB
Symbol
COARSE - GRAINED SOILS Gravels Clean Gravels Cu ≥ 4 and 1 ≤ Cc ≤ 3E GW Well - graded gravelF
More than 50 % retained More than 50 % of coarse Less than 5 % fines C
Cu < 4 and/or 1 > Cc > 3 E
GP Poorly graded gravelF
on No. 200 sieve fraction retained on No. 4 sieve Gravels with fines Fines classify as ML or MH GM Silty gravelF, G, H
More than 12 % fines C
Fines classify as CL or CH GC Clayey gravelF, G, H
E
Sands Clean Sands Cu ≥ 6 and 1 ≤ Cc ≤ 3 SW Well - graded sandI

D
50 % or more of coarse Less than 5 % fines D
Cu < 6 and/or 1 > Cc > 3 E
SP Poorly graded sandI
fraction passes No. 4 sieve Sands with fines Fines classify as ML or MH SM Silty sandG, H, I
More than 12 % fines D
Fines classify as CL or CH SC Clayey sandG, H, I

BI
FINE - GRAINED SOILS Silts and Clays Inorganic PI > 7 and plots on or above "A" line J CL Lean clayK, L, M
50 % or more passes Liquid limit less than 50 PI < 4 or plots below "A" lineJ ML SiltK, L, M
the No. 200 sieve Organic Liquid limit - oven dried Organic clayK, L, M, N
< 0.75 OL
Organic siltK, L, M, O

R
Liquid limit - not dried
Silts and Clays Inorganic PI plots on or above "A" line CH Fat clayK, L, M
Liquid limit 50 or more PI plots below "A" line MH Elastic siltK, L, M

FO
Organic Liquid limit - oven dried Organic clayK, L, M, P
< 0.75 OH
Liquid limit - not dried Organic siltK, L, M, Q
HIGHLY ORGANIC SOILS Primarily organic matter, dark in color, and organic odor PT Peat
A
Based on the material passing the 3-in. (75-mm) sieve E ( D30 )2 M
If soil contains ≥ 30 % plus No. 200,
B
Cu = D60/D10 Cc =
If field sample contained cobbles or boulders, or both D10 X D60 predominantly gravel, add "gravelly" to group name.

ED
F N
add "with cobbles or boulders, or both" to group name If soil contains ≥ 15 % sand, add "with sand" to group name PI ≥ 4 and plots on or above "A" line.
C G O
Gravels with 5 to 12 % fines require dual symbols: If fines classify as CL-ML, use dual symbol PI < 4 or plots below "A" line.
P
GW - GM well - graded gravel with silt GC - GM or SC - SM PI plots on or above "A" line.
H Q
GW - GC well - graded gravel with clay If fines are organic, add "with organic fines" to group name PI plots below "A" line.
SU
I
GP - GM poorly graded gravel with silt If soil contains ≥ 15 % gravel, add "with gravel" to group name
J
GP - GC poorly graded gravel with clay If Atterberg limits plot in hatched area, soil is a
D
Sands with 5 to 12 % fines require dual symbols: CL - ML, silty clay.
K
SW - SM well - graded sand with silt If soil contains 15 to 29 % plus No. 200, add "with sand"
SW - SC well - graded sand with clay or "with gravel," whichever is predominant.
IS

L
SP - SM poorly graded sand with silt If soil contains ≥ 30 % plus No. 200, predominantly sand,
SP - SC poorly graded sand with clay add "sandy" to group name.

Drawing Title : Project Title :


Geotechnical Investigation for Geotechnical File No. 2015/104 Figure No. H - 18
YANBU DISTRIBUTION HUB Project, Yanbu
CLASSIFICATION OF SOILS FOR
ENGINEERING PURPOSES (ASTM D-2487) Client / Owner :
Granular Materials Silt - Clay Materials
General Classification
( 35 % or less passing No. 200 ) ( More than 35 % passing No. 200 )
A-1 A - 2 A-7
Group Classification A-3 A-4 A-5 A-6 A-7-5
A-1-a A-1-b A-2-4 A-2-5 A-2-6 A-2-7 A-7-6

D
Sieve Analysis, % passing
No. 10 ( 2.00 mm. ) 50 max. ... ... ... ... ... ... ... ... ... ...

BI
No. 40 ( 425 µm. ) 30 max. 50 max. 51 min. ... ... ... ... ... ... ... ...
No. 200 ( 75 µm. ) 15 max. 25 max. 10 max. 35 max. 35 max. 35 max. 35 max. 36 min. 36 min. 36 min. 36 min.
Characteristic of fraction passing

R
No. 40 ( 425 µm. ) :
Liquid Limit ... ... 40 max. 41 min. 40 max. 41 min. 40 max. 41 min. 40 max. 41 min.

FO
Plasticity Index 6 max. N. P. 10 max. 10 max. 11 min. 11 min. 10 max. 10 max. 11 min. 11 min.A
Usual types of significant Stone Fragments, Fine
Silty or Clayey Gravel & Sand Silty Soils Clayey Soils
constituent materials Gravel & Sand Sand

ED
General rating as subgrade Excellent to Good Fair to Poor

A
Plasticity Index of A - 7 - 5 subgroup is equal to or less than L L minus 30. Plasticity Index of A - 7 - 6 subgroup is greater than L L minus 30.

Reprinted with permission of American Association of State Highway and Transportation Officials.
SU
IS

Drawing Title : Project Title :

Geotechnical Investigation for Geotechnical File No. 2015/104 Figure No. H - 19


Classification of Soils & Soil - YANBU DISTRIBUTION HUB Project, Yanbu
Aggregate Mixtures for Highway
Client / Owner :
Construction Purposes (ASTM D-3282)
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER

1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001
ED

Grain Size in Millimeters

Test Pit Depth % Passing Atterberg Limit


SU

Symbol U.S.C. Group


No. (m) #4 # 40 # 200 LL (%) PI (%)

TP - 01 0.00 - 1.00 87.53 49.84 20.38 20 02 SM


IS

Test Pit No. TP - 01 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : JC/Nauman

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. H - 20
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER

1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001
ED

Grain Size in Millimeters

Test Pit Depth % Passing Atterberg Limit


SU

Symbol U.S.C. Group


No. (m) #4 # 40 # 200 LL (%) PI (%)

TP - 02 0.00 - 1.00 63.66 18.02 5.61 N P SP-SM


IS

Test Pit No. TP - 02 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : JC/Nauman

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. H - 21
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER

1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001
ED

Grain Size in Millimeters

Test Pit Depth % Passing Atterberg Limit


SU

Symbol U.S.C. Group


No. (m) #4 # 40 # 200 LL (%) PI (%)

TP - 03 0.00 - 1.00 77.98 40.93 23.90 26 06 SC-SM


IS

Test Pit No. TP - 03 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : JC/Nauman

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. H - 22
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER

1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001
ED

Grain Size in Millimeters

Borehole Depth % Passing Atterberg Limit


SU

Symbol U.S.C. Group


No. (m) #4 # 40 # 200 LL (%) PI (%)

TP - 04 0.00 - 0.50 95.94 74.22 33.19 26 06 SC-SM


IS

TP - 04 0.50 - 1.00 99.29 30.09 15.18 25 05 SC-SM

Borehole No. TP - 04 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : JC/Nauman

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. H - 23
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER

1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001
ED

Grain Size in Millimeters

Test Pit Depth % Passing Atterberg Limit


SU

Symbol U.S.C. Group


No. (m) #4 # 40 # 200 LL (%) PI (%)

TP - 05 0.00 - 1.00 68.99 46.91 24.87 24 04 SC-SM


IS

Test Pit No. TP - 05 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : JC/Nauman

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. H - 24
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER

1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001
ED

Grain Size in Millimeters

Test Pit Depth % Passing Atterberg Limit


SU

Symbol U.S.C. Group


No. (m) #4 # 40 # 200 LL (%) PI (%)

TP - 06 0.00 - 1.00 90.00 51.61 21.93 22 03 SM


IS

Test Pit No. TP - 06 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : JC/Nauman

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. H - 25
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER

1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001
ED

Grain Size in Millimeters

Borehole Depth % Passing Atterberg Limit


SU

Symbol U.S.C. Group


No. (m) #4 # 40 # 200 LL (%) PI (%)

TP - 07 0.00 - 0.50 81.04 40.52 16.89 25 05 SC-SM


IS

TP - 07 0.50 - 1.00 64.23 29.39 16.05 26 06 SC-SM

Borehole No. TP - 07 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : JC/Nauman

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. H - 26
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER

1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001
ED

Grain Size in Millimeters

Test Pit Depth % Passing Atterberg Limit


SU

Symbol U.S.C. Group


No. (m) #4 # 40 # 200 LL (%) PI (%)

TP - 08 0.00 - 1.00 82.00 50.00 22.00 24 04 SC-SM


IS

Test Pit No. TP - 08 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : JC/Nauman

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. H - 27
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER

1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001
ED

Grain Size in Millimeters

Borehole Depth % Passing Atterberg Limit


SU

Symbol U.S.C. Group


No. (m) #4 # 40 # 200 LL (%) PI (%)

TP - 09 0.00 - 1.00 47.00 30.00 18.00 25 05 GC-GM


IS

Borehole No. TP - 09 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : JC/Nauman

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. H - 28
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER

1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001
ED

Grain Size in Millimeters

Test Pit Depth % Passing Atterberg Limit


SU

Symbol U.S.C. Group


No. (m) #4 # 40 # 200 LL (%) PI (%)

TP - 10 0.00 - 1.00 90.94 43.63 24.35 20 02 SM


IS

Test Pit No. TP - 10 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : JC/Nauman

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. H - 29
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER

1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001
ED

Grain Size in Millimeters

Test Pit Depth % Passing Atterberg Limit


SU

Symbol U.S.C. Group


No. (m) #4 # 40 # 200 LL (%) PI (%)

TP - 11 0.00 - 1.00 52.00 38.00 23.00 24 04 GC-GM


IS

Test Pit No. TP - 11 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : JC/Nauman

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. H - 30
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER

1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001
ED

Grain Size in Millimeters

Test Pit Depth % Passing Atterberg Limit


SU

Symbol U.S.C. Group


No. (m) #4 # 40 # 200 LL (%) PI (%)

TP - 12 0.00 - 1.00 80.36 60.41 29.64 20 03 SM


IS

Test Pit No. TP - 12 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : JC/Nauman

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. H - 31
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER

1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001
ED

Grain Size in Millimeters

Test Pit Depth % Passing Atterberg Limit


SU

Symbol U.S.C. Group


No. (m) #4 # 40 # 200 LL (%) PI (%)

TP - 13 0.00 - 1.00 82.97 55.65 25.54 24 04 SC-SM


IS

Test Pit No. TP - 13 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : JC/Nauman

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. H - 32
OEO - GF - 03, Rev. 00
GRAVEL SAND
SILT OR CLAY
coarse fine coarse medium fine

U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER

1/2" 3/8"
3" 2" 1 1" 3/4" #4 #10 #20 #40 #60 #140 #200
100

90

80
Percent Finer by Weight

70

60

D
50

BI
40

30

20
R
FO
10

0
100 10 1 0.1 0.01 0.001
ED

Grain Size in Millimeters

Test Pit Depth % Passing Atterberg Limit


SU

Symbol U.S.C. Group


No. (m) #4 # 40 # 200 LL (%) PI (%)

TP - 14 0.00 - 1.00 76.76 48.16 28.52 25 05 SC-SM


IS

Test Pit No. TP - 14 Date Sampled : April 2016 Drawing Title :

Location: Yanbu Distribution Sampled By : Abbas


Hub Project, Yanbu Dated Tested : May 2016
Saudi Arabia Tested By : JC/Nauman

Project Title : Client / Owner :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Geotechnical File No. 2015/104
Project, Yanbu Figure No. H - 33
OEO - GF - 03, Rev. 00
CLASSIFICATION OF SOILS FOR ENGINEERING PURPOSES
( ASTM D - 2487 )

60
For classification of fine-grained
soils and fine-grained fraction of
coarse-grained soils
50
Equation of "A" Line
PLASTICITY INDEX ( PI ), %

Horizontal at PI = 4 to LL = 25.5,
then PI = 0.73 (LL - 20)
40
Equation of "U" Line
Vertical at LL = 16 to PI = 7,
then PI = 0.90 (LL - 8)
30

D
20

BI
10
7
4
4
0
0 10
16
20 30 40 50
R 60
LIQUID LIMIT ( LL ), %
70 80 90 100 110
FO

Unified Soil Classification


Borehole # Depth (m) Symbols LL (%) PI (%) Minus # 200 Sieve, (%)
( ASTM D - 2487 )
ED

TP - 01 0.00-1.00 20 2 20 SM

TP - 03 0.00-1.00 26 6 24 SC-SM
SU

TP - 04 0.00-0.50 26 6 33 SC-SM

0.50-1.00 25 5 15 SC-SM
IS

TP - 05 0.00-1.00 24 4 25 SC-SM

TP - 06 0.00-1.00 22 3 22 SM

TP - 07 0.00-0.50 25 5 17 SC-SM

Project Title : Drawing Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu
PLASTICITY CHART
Client / Owner :

Geotechnical File No. 2015/104 Figure No. H - 34

OEO - GF - 04, Rev. 00


CLASSIFICATION OF SOILS FOR ENGINEERING PURPOSES
( ASTM D - 2487 )

60
For classification of fine-grained
soils and fine-grained fraction of
coarse-grained soils
50
Equation of "A" Line
PLASTICITY INDEX ( PI ), %

Horizontal at PI = 4 to LL = 25.5,
then PI = 0.73 (LL - 20)
40
Equation of "U" Line
Vertical at LL = 16 to PI = 7,
then PI = 0.90 (LL - 8)
30

D
20

BI
10
7
4
4

0
0 10 20 30 40 50
R 60 70 80 90 100 110
FO
16 LIQUID LIMIT ( LL ), %

Unified Soil Classification


Borehole # Depth (m) Symbols LL (%) PI (%) Minus # 200 Sieve, (%)
ED

( ASTM D - 2487 )

TP - 07 0.50-1.00 26 6 16 SC-SM

TP - 08 0.00-1.00 24 4 22 SC-SM
SU

TP - 09 0.00-1.00 25 5 18 GC-GM
IS

TP - 10 0.00-1.00 20 2 24 SM

TP - 11 0.00-1.00 24 4 23 GC-GM

TP - 12 0.00-1.00 20 3 30 SM

Project Title : Drawing Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu
PLASTICITY CHART
Client / Owner :

Geotechnical File N o. 2015/104 Figure No. H - 35

OEO - GF - 04, Rev. 00


CLASSIFICATION OF SOILS FOR ENGINEERING PURPOSES
( ASTM D - 2487 )

60
For classification of fine-grained
soils and fine-grained fraction of
coarse-grained soils
50
Equation of "A" Line
PLASTICITY INDEX ( PI ), %

Horizontal at PI = 4 to LL = 25.5,
then PI = 0.73 (LL - 20)
40
Equation of "U" Line
Vertical at LL = 16 to PI = 7,
then PI = 0.90 (LL - 8)
30

D
20

BI
10
7
4
4

0
0 10 20 30 40 50
R 60 70 80 90 100 110
FO
16 LIQUID LIMIT ( LL ), %

Unified Soil Classification


Borehole # Depth (m) Symbols LL (%) PI (%) Minus # 200 Sieve, (%)
ED

( ASTM D - 2487 )

TP - 13 0.00-1.00 24 4 26 SC-SM

TP - 14 0.00-1.00 25 5 29 SC-SM
SU
IS

Project Title : Drawing Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu
PLASTICITY CHART
Client / Owner :

Geotechnical File N o. 2015/104 Figure No. H - 36

OEO - GF - 04, Rev. 00


Sample No. : TP - 01 Date Sampled : April 2016
Location : Yanbu Distribution Hub, Yanbu Sampled By : Abbas
Depth : 0.00 - 1.00 m. Date Tested : May 2016
Brown, silty sand with occasional
Description : gravel & traces of clay Tested By : JC/Nauman

DESCRIPTION 1 2 3 4 5

Weight of Mold & Wet Soil g 6344 6427 6489 6498 6465
Weight of Mold g 4338 4338 4338 4338 4338
Weight of Soil g 2006 2089 2151 2160 2127
Wet Density g / cc 2.137 2.225 2.291 2.300 2.265
Dry Density g / cc 2.012 2.070 2.092 2.065 2.015

D
Weight of Container & Soil g 850.5 858.0 867.3 877.9 868.0
Weight of Container & Dry Soil g 808.9 807.9 805.0 804.1 788.7

BI
Weight of Container g 138.8 139.7 149.1 156.8 148.6
Weight of Dry Soil g 670.1 668.2 655.9 647.3 640.1
Weight of Moisture
Moisture Content
g
%
41.6
6.2
R 50.1
7.5
62.3
9.5
73.8
11.4
79.3
12.4
FO
2.13 ASTM D - 1557
Standard :
Method " A "
2.11
Maximum Dry Density, g/cc : 2.092
ED

2.09 2.092
Optimum Moisture Content, % : 9.5
Dry Density, g / cc

Natural Moisture Content, % : 1.0


2.07
SU

Oversize Material Correction


2.05
Ref. Standard: ASTM D-4718

Fine Fraction (%) : 88


2.03
IS

Oversize Fraction (%) : 12


2.01
Specific Gravity of Oversize : 2.66

1.99 Water Content Oversize (%) : 0.1


9.5

1.97 Corrected Optimum Moisture


5.0 7.0 9.0 11.0 13.0 Content (%) : 8.4
Moisture Content, % Corrected Maximum Dry
Density (g/cc) : 2.147

Project Title : Drawing Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu MOISTURE DENSITY
Client / Owner :
RELATIONSHIP
Geotechnical File No. 2015/104 Figure No. H - 37

OEO - GF - 08, Rev. 00


Sample No. : TP - 02 Date Sampled : April 2016
Location : Yanbu Distribution Hub, Yanbu Sampled By : Abbas
Depth : 0.00 - 1.00 m. Date Tested : May 2016
Brown to grey, poorly graded
Description : sand with silt & gravel Tested By : JC/Nauman

DESCRIPTION 1 2 3 4 5

Weight of Mold & Wet Soil g 10344 10461 10600 10612 10604
Weight of Mold g 5764 5764 5764 5764 5764
Weight of Soil g 4580 4697 4836 4848 4840
Wet Density g / cc 2.168 2.223 2.289 2.294 2.291
Dry Density g / cc 2.079 2.101 2.125 2.099 2.073

D
Weight of Container & Soil g 485.4 501.3 620.8 494.8 647.2
Weight of Container & Dry Soil g 470.3 479.0 584.8 465.1 598.9

BI
Weight of Container g 116.5 94.8 117.6 145.7 139.2
Weight of Dry Soil g 353.8 384.2 467.2 319.4 459.7
Weight of Moisture
Moisture Content %
g 15.1
4.3
R 22.3
5.8
36.0
7.7
29.7
9.3
48.3
10.5
FO
2.14 ASTM D - 1557
Standard :
Method " C "
2.13
2.125 Maximum Dry Density, g/cc : 2.124
ED

2.12
Optimum Moisture Content, % : 7.5
Dry Density, g / cc

2.11 Natural Moisture Content, % : 2.6


SU

Oversize Material Correction


2.10 Ref. Standard: ASTM D-4718

2.09 Fine Fraction (%) : 81


IS

2.08 Oversize Fraction (%) : 19


Specific Gravity of Oversize : 2.67
2.07
Water Content Oversize (%) : 0.3
7.5

2.06
3.5 4.5 5.5 6.5 7.5 8.5 9.5 10.5 11.5
Corrected Optimum Moisture
Moisture Content, % Content (%) : 6.1
Corrected Maximum Dry Density
(g/cc) : 2.210

Project Title : Drawing Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu MOISTURE DENSITY
Client / Owner :
RELATIONSHIP
Geotechnical File No. 2015/104 Figure No. H - 38

OEO - GF - 08, Rev. 00


Sample No. : TP - 03 Date Sampled : April 2016
Location : Yanbu Distribution Hub, Yanbu Sampled By : Abbas
Depth : 0.00 - 1.00 m. Date Tested : May 2016
Brown, silty clayey sand with
Description : gravel & crystals of anhydrite Tested By : JC/Nauman

DESCRIPTION 1 2 3 4 5

Weight of Mold & Wet Soil g 6320 6377 6438 6448 6450
Weight of Mold g 4338 4338 4338 4338 4338
Weight of Soil g 1982 2039 2100 2110 2112
Wet Density g / cc 2.111 2.171 2.236 2.247 2.249
Dry Density g / cc 1.954 1.979 2.004 1.981 1.956

D
Weight of Container & Soil g 654.6 658.8 669.8 615.7 583.8
Weight of Container & Dry Soil g 613.6 610.4 610.9 557.0 530.9

BI
Weight of Container g 101.4 111.7 103.5 119.2 178.0
Weight of Dry Soil g 512.2 498.7 507.4 437.8 352.9
Weight of Moisture
Moisture Content %
g 41.0
8.0
R 48.4
9.7
58.9
11.6
58.7
13.4
52.9
15.0
FO
2.02 ASTM D - 1557
Standard :
Method " C "
2.01
Maximum Dry Density, g/cc : 2.004
ED

2.004
2.00 Optimum Moisture Content, % : 11.6
Dry Density, g / cc

Natural Moisture Content, % : 7.0


1.99
SU

Oversize Material Correction


1.98 Ref. Standard: ASTM D-4718

1.97
Fine Fraction (%) : 78
IS

Oversize Fraction (%) : 22


1.96
Specific Gravity of Oversize : 2.67

1.95 Water Content Oversize (%) : 1.1


11.6

1.94
Corrected Optimum Moisture
7.5 9.5 11.5 13.5 15.5 Content (%) : 9.3
Moisture Content, %
Corrected Maximum Dry Density
(g/cc) : 2.120

Project Title : Drawing Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu MOISTURE DENSITY
Client / Owner :
RELATIONSHIP
Geotechnical File No. 2015/104 Figure No. H - 39

OEO - GF - 08, Rev. 00


Sample No. : TP - 04 Date Sampled : April 2016
Location : Yanbu Distribution Hub, Yanbu Sampled By : Abbas
Depth : 0.00 - 0.50 m. Date Tested : May 2016
Description : Brown, silty clayey sand Tested By : JC/Nauman

DESCRIPTION 1 2 3 4 5

Weight of Mold & Wet Soil g 6353 6409 6471 6482 6486
Weight of Mold g 4338 4338 4338 4338 4338
Weight of Soil g 2015 2071 2133 2144 2148
Wet Density g / cc 2.146 2.206 2.272 2.283 2.288
Dry Density g / cc 2.013 2.038 2.063 2.040 2.016

D
Weight of Container & Soil g 647.4 651.3 662.1 609.1 578.5
Weight of Container & Dry Soil g 613.6 610.4 610.9 557.0 530.9

BI
Weight of Container g 101.4 111.7 103.5 119.2 178.0
Weight of Dry Soil g 512.2 498.7 507.4 437.8 352.9
Weight of Moisture
Moisture Content %
g 33.8
6.6
R 40.9
8.2
51.2
10.1
52.1
11.9
47.6
13.5
FO
2.08 ASTM D - 1557
Standard :
Method " A "
2.07
Maximum Dry Density, g/cc : 2.063
ED

2.063
2.06 Optimum Moisture Content, % : 10.1
Dry Density, g / cc

Natural Moisture Content, % : 1.8


2.05
SU

Oversize Material Correction


2.04 Ref. Standard: ASTM D-4718

2.03 Fine Fraction (%) : --


IS

Oversize Fraction (%) : --


2.02
Specific Gravity of Oversize : --
2.01 Water Content Oversize (%) : --
10.1

2.00
Corrected Optimum Moisture
6.0 7.0 8.0 9.0 10.0 11.0 12.0 13.0 14.0
Content (%) : --
Moisture Content, %
Corrected Maximum Dry Density
(g/cc) : --

Project Title : Drawing Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu MOISTURE DENSITY
Client / Owner :
RELATIONSHIP
Geotechnical File No. 2015/104 Figure No. H - 40

OEO - GF - 08, Rev. 00


Sample No. : TP - 05 Date Sampled : April 2016
Location : Yanbu Distribution Hub, Yanbu Sampled By : Abbas
Depth : 0.00 - 1.00 m. Date Tested : May 2016
Description : Brown, silty clayey sand with gravel Tested By : JC/Nauman

DESCRIPTION 1 2 3 4 5

Weight of Mold & Wet Soil g 6301 6365 6426 6439 6431
Weight of Mold g 4338 4338 4338 4338 4338
Weight of Soil g 1963 2027 2088 2101 2093
Wet Density g / cc 2.091 2.159 2.224 2.237 2.229
Dry Density g / cc 2.001 2.038 2.063 2.040 2.004

D
Weight of Container & Soil g 494.4 570.6 613.0 562.6 487.1
Weight of Container & Dry Soil g 477.7 546.5 577.7 524.6 449.2

BI
Weight of Container g 102.3 138.6 125.4 132.8 112.1
Weight of Dry Soil g 375.4 407.9 452.3 391.8 337.1
Weight of Moisture
Moisture Content
g
%
16.7
4.4
R 24.1
5.9
35.3
7.8
38.0
9.7
37.9
11.2
FO
2.08 ASTM D - 1557
Standard :
Method " B "
2.07
2.063 Maximum Dry Density, g/cc : 2.063
ED

2.06
Optimum Moisture Content, % : 7.8
2.05
Dry Density, g / cc

Natural Moisture Content, % : 1.8


2.04
SU

Oversize Material Correction


2.03 Ref. Standard: ASTM D-4718

2.02
Fine Fraction (%) : 76
IS

2.01 Oversize Fraction (%) : 24


2.00 Specific Gravity of Oversize : 2.67

1.99 Water Content Oversize (%) : 0.2


7.8

1.98
3.0 5.0 7.0 9.0 11.0 13.0 Corrected Optimum Moisture
Moisture Content, % Content (%) : 6.0
Corrected Maximum Dry Density
(g/cc) : 2.182

Project Title : Drawing Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu MOISTURE DENSITY
Client / Owner :
RELATIONSHIP
Geotechnical File No. 2015/104 Figure No. H - 41

OEO - GF - 08, Rev. 00


Sample No. : TP - 06 Date Sampled : April 2016
Location : Yanbu Distribution Hub, Yanbu Sampled By : Abbas
Depth : 0.00 - 1.00 m. Date Tested : May 2016
Brown to greyish brown, silty sand
Description : with occasional gravel & traces of clay Tested By : JC/Nauman

DESCRIPTION 1 2 3 4 5

Weight of Mold & Wet Soil g 6380 6438 6505 6514 6517
Weight of Mold g 4338 4338 4338 4338 4338
Weight of Soil g 2042 2100 2167 2176 2179
Wet Density g / cc 2.175 2.236 2.308 2.317 2.321
Dry Density g / cc 2.071 2.096 2.121 2.095 2.068

D
Weight of Container & Soil g 542.4 528.1 597.2 587.7 612.1
Weight of Container & Dry Soil g 521.7 502.3 559.6 545.6 558.1

BI
Weight of Container g 107.8 117.2 132.3 148.5 115.8
Weight of Dry Soil g 413.9 385.1 427.3 397.1 442.3
Weight of Moisture
Moisture Content
g
%
20.7
5.0
R 25.8
6.7
37.6
8.8
42.1
10.6
54.0
12.2
FO
2.14 ASTM D - 1557
Standard :
Method " A "
2.13

Maximum Dry Density, g/cc : 2.121


ED

2.12 2.121

Optimum Moisture Content, % : 8.7


2.11
Dry Density, g / cc

Natural Moisture Content, % : 2.9


2.10
SU

Oversize Material Correction


2.09 Ref. Standard: ASTM D-4718

2.08 Fine Fraction (%) : 76


IS

2.07 Oversize Fraction (%) : 24

2.06 Specific Gravity of Oversize : 2.67


Water Content Oversize (%) : 0.2
2.05
8.7

2.04
Corrected Optimum Moisture
3.5 5.5 7.5 9.5 11.5 13.5
Content (%) : 6.7
Moisture Content, %
Corrected Maximum Dry Density
(g/cc) : 2.231

Project Title : Drawing Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu MOISTURE DENSITY
Client / Owner :
RELATIONSHIP
Geotechnical File No. 2015/104 Figure No. H - 42

OEO - GF - 08, Rev. 00


Sample No. : TP - 07 Date Sampled : April 2016
Location : Yanbu Distribution Hub, Yanbu Sampled By : Abbas
Depth : 0.00 - 0.50 m. Date Tested : May 2016
Description : Brown, silty clayey sand with gravel Tested By : JC/Nauman

DESCRIPTION 1 2 3 4 5

Weight of Mold & Wet Soil g 6356 6415 6478 6491 6496
Weight of Mold g 4338 4338 4338 4338 4338
Weight of Soil g 2018 2077 2140 2153 2158
Wet Density g / cc 2.149 2.212 2.279 2.293 2.298
Dry Density g / cc 2.031 2.056 2.081 2.053 2.028

D
Weight of Container & Soil g 495.3 492.1 655.4 557.0 629.0
Weight of Container & Dry Soil g 473.5 465.0 608.5 516.9 569.2

BI
Weight of Container g 98.4 108.2 115.1 174.0 119.5
Weight of Dry Soil g 375.1 356.8 493.4 342.9 449.7
Weight of Moisture
Moisture Content %
g 21.8
5.8
R 27.1
7.6
46.9
9.5
40.1
11.7
59.8
13.3
FO
2.10 ASTM D - 1557
Standard :
Method " A "
2.09

2.081 Maximum Dry Density, g/cc : 2.081


ED

2.08
Optimum Moisture Content, % : 9.6
2.07
Dry Density, g / cc

Natural Moisture Content, % : 1.5


2.06
SU

Oversize Material Correction


2.05 Ref. Standard: ASTM D-4718

2.04
Fine Fraction (%) : 81
IS

2.03
Oversize Fraction (%) : 19
2.02 Specific Gravity of Oversize : 2.67
2.01 Water Content Oversize (%) : 0.2
9.6

2.00
4.5 6.5 8.5 10.5 12.5 14.5 Corrected Optimum Moisture
Moisture Content, % Content (%) : 7.8
Corrected Maximum Dry Density
(g/cc) : 2.172

Project Title : Drawing Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu MOISTURE DENSITY
Client / Owner :
RELATIONSHIP
Geotechnical File No. 2015/104 Figure No. H - 43

OEO - GF - 08, Rev. 00


Sample No. : TP - 08 Date Sampled : April 2016
Location : Yanbu Distribution Hub, Yanbu Sampled By : Abbas
Depth : 0.00 - 1.00 m. Date Tested : May 2016
Brown to light grey, silty clayey sand
Description : with gravel & crystals of anhydrite Tested By : JC/Nauman

DESCRIPTION 1 2 3 4 5

Weight of Mold & Wet Soil g 6305 6356 6395 6417 6420
Weight of Mold g 4338 4338 4338 4338 4338
Weight of Soil g 1967 2018 2057 2079 2082
Wet Density g / cc 2.095 2.149 2.191 2.214 2.218
Dry Density g / cc 2.018 2.041 2.051 2.039 2.016

D
Weight of Container & Soil g 432.9 447.8 447.1 457.6 455.9
Weight of Container & Dry Soil g 421.0 430.3 425.4 429.4 423.6

BI
Weight of Container g 107.8 100.1 105.3 101.5 100.6
Weight of Dry Soil g 313.2 330.2 320.1 327.9 323.0
Weight of Moisture
Moisture Content
g
%
11.9
3.8
R 17.5
5.3
21.7
6.8
28.2
8.6
32.3
10.0
FO
2.07 ASTM D - 1557
Standard :
Method " A "
2.06
Maximum Dry Density, g/cc : 2.051
ED

2.051
2.05 Optimum Moisture Content, % : 6.9
Dry Density, g / cc

Natural Moisture Content, % : 3.1


2.04
SU

Oversize Material Correction


2.03 Ref. Standard: ASTM D-4718

2.02 Fine Fraction (%) : 82


IS

Oversize Fraction (%) : 18


2.01
Specific Gravity of Oversize : 2.66

2.00 Water Content Oversize (%) : 0.2


6.9

1.99
Corrected Optimum Moisture
3.0 5.0 7.0 9.0 11.0
Content (%) : 5.7
Moisture Content, %
Corrected Maximum Dry
Density (g/cc) : 2.140

Project Title : Drawing Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu MOISTURE DENSITY
Client / Owner :
RELATIONSHIP
Geotechnical File No. 2015/104 Figure No. H - 44

OEO - GF - 08, Rev. 00


Sample No. : TP - 09 Date Sampled : April 2016
Location : Yanbu Distribution Hub, Yanbu Sampled By : Abbas
Depth : 0.00 - 1.00 m. Date Tested : May 2016
Brown to brownish white, silty clayey
Description : Tested By : JC/Nauman
gravel with sand & anhydrite

DESCRIPTION 1 2 3 4 5

Weight of Mold & Wet Soil g 10132 10223 10304 10345 10343
Weight of Mold g 5764 5764 5764 5764 5764
Weight of Soil g 4368 4459 4540 4581 4579
Wet Density g / cc 2.067 2.110 2.149 2.168 2.167
Dry Density g / cc 2.001 2.021 2.031 2.019 1.999

D
Weight of Container & Soil g 449.0 487.3 480.5 489.6 476.9
Weight of Container & Dry Soil g 437.9 471.1 460.0 462.8 447.7

BI
Weight of Container g 101.5 102.9 105.1 100.6 100.1
Weight of Dry Soil g 336.4 368.2 354.9 362.2 347.6
Weight of Moisture
Moisture Content
g
%
11.1
3.3
R 16.2
4.4
20.5
5.8
26.8
7.4
29.2
8.4
FO
2.05 ASTM D - 1557
Standard :
Method " C "
2.04
Maximum Dry Density, g/cc : 2.031
ED

2.03 2.031
Optimum Moisture Content, % : 5.9
Dry Density, g / cc

2.02 Natural Moisture Content, % : 2.1


SU

Oversize Material Correction


2.01 Ref. Standard: ASTM D-4718

2.00 Fine Fraction (%) : 70


IS

1.99 Oversize Fraction (%) : 30


Specific Gravity of Oversize : 2.66
1.98
Water Content Oversize (%) : 0.1
5.9

1.97
1.5 3.5 5.5 7.5 9.5
Corrected Optimum Moisture
Moisture Content, % Content (%) : 4.2
Corrected Maximum Dry Density
(g/cc) : 2.186

Project Title : Drawing Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu MOISTURE DENSITY
Client / Owner :
RELATIONSHIP
Geotechnical File No. 2015/104 Figure No. H - 45

OEO - GF - 08, Rev. 00


Sample No. : TP - 10 Date Sampled : April 2016
Location : Yanbu Distribution Hub, Yanbu Sampled By : Abbas
Depth : 0.00 - 1.00 m. Date Tested : May 2016
Brown, silty sand with anhydrite,
Description : occasional gravel & traces of clay Tested By : JC/Nauman

DESCRIPTION 1 2 3 4 5

Weight of Mold & Wet Soil g 6318 6361 6398 6416 6417
Weight of Mold g 4338 4338 4338 4338 4338
Weight of Soil g 1980 2023 2060 2078 2079
Wet Density g / cc 2.108 2.154 2.193 2.213 2.214
Dry Density g / cc 2.051 2.071 2.081 2.068 2.048

D
Weight of Container & Soil g 440.7 460.3 474.8 474.6 471.4
Weight of Container & Dry Soil g 431.5 446.5 455.9 450.1 443.6

BI
Weight of Container g 101.5 102.9 105.1 100.6 100.1
Weight of Dry Soil g 330.0 343.6 350.8 349.5 343.5
Weight of Moisture
Moisture Content
g
%
9.2
2.8
R 13.8
4.0
18.9
5.4
24.5
7.0
27.8
8.1
FO
2.10 ASTM D - 1557
Standard :
Method " A "
2.09
Maximum Dry Density, g/cc : 2.081
ED

2.08 2.081
Optimum Moisture Content, % : 5.5
Dry Density, g / cc

Natural Moisture Content, % : 1.4


2.07
SU

Oversize Material Correction


2.06 Ref. Standard: ASTM D-4718

2.05 Fine Fraction (%) : 91


IS

Oversize Fraction (%) : 9


2.04
Specific Gravity of Oversize : 2.67

2.03 Water Content Oversize (%) : 0.2


5.5

2.02
Corrected Optimum Moisture
1.5 3.5 5.5 7.5 9.5
Content (%) : 5.0
Moisture Content, %
Corrected Maximum Dry Density
(g/cc) : 2.123

Project Title : Drawing Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu MOISTURE DENSITY
Client / Owner :
RELATIONSHIP
Geotechnical File No. 2015/104 Figure No. H - 46

OEO - GF - 08, Rev. 00


Sample No. : TP - 11 Date Sampled : April 2016
Location : Yanbu Distribution Hub, Yanbu Sampled By : Abbas
Depth : 0.00 - 1.00 m. Date Tested : May 2016
Brown to light grey, silty clayey
Description : gravel with sand Tested By : JC/Nauman

DESCRIPTION 1 2 3 4 5

Weight of Mold & Wet Soil g 10396 10490 10573 10621 10622
Weight of Mold g 5764 5764 5764 5764 5764
Weight of Soil g 4632 4726 4809 4857 4858
Wet Density g / cc 2.192 2.237 2.276 2.299 2.299
Dry Density g / cc 2.124 2.144 2.154 2.142 2.122

D
Weight of Container & Soil g 444.8 473.6 479.7 486.6 476.5
Weight of Container & Dry Soil g 434.2 458.2 459.8 460.4 447.6

BI
Weight of Container g 102.9 100.1 107.8 101.5 100.6
Weight of Dry Soil g 331.3 358.1 352.0 358.9 347.0
Weight of Moisture
Moisture Content %
g 10.6
3.2
R 15.4
4.3
19.9
5.7
26.2
7.3
28.9
8.3
FO
2.17 ASTM D - 1557
Standard :
Method " A "
2.16
Maximum Dry Density, g/cc : 2.154
ED

2.154
2.15
Optimum Moisture Content, % : 5.8
Dry Density, g / cc

2.14 Natural Moisture Content, % : 4.4


SU

Oversize Material Correction


2.13 Ref. Standard: ASTM D-4718

2.12 Fine Fraction (%) : 70


IS

Oversize Fraction (%) : 30


2.11
Specific Gravity of Oversize : 2.67
2.10
Water Content Oversize (%) : 0.7
5.8

2.09
1.5 3.5 5.5 7.5 9.5 Corrected Optimum Moisture
Moisture Content, % Content (%) : 4.2
Corrected Maximum Dry Density
(g/cc) : 2.287

Project Title : Drawing Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu MOISTURE DENSITY
Client / Owner :
RELATIONSHIP
Geotechnical File No. 2015/104 Figure No. H - 47

OEO - GF - 08, Rev. 00


Sample No. : TP - 12 Date Sampled : April 2016
Location : Yanbu Distribution Hub, Yanbu Sampled By : Abbas
Depth : 0.00 - 1.00 m. Date Tested : May 2016
Brown to light grey, silty sand with
Description : gravel, anhydrite & traces of clay Tested By : JC/Nauman

DESCRIPTION 1 2 3 4 5

Weight of Mold & Wet Soil g 6364 6407 6448 6469 6470
Weight of Mold g 4338 4338 4338 4338 4338
Weight of Soil g 2026 2069 2110 2131 2132
Wet Density g / cc 2.158 2.204 2.247 2.269 2.270
Dry Density g / cc 2.105 2.125 2.136 2.123 2.102

D
Weight of Container & Soil g 439.1 461.6 473.7 474.0 462.0
Weight of Container & Dry Soil g 430.9 448.7 456.0 449.9 435.3

BI
Weight of Container g 102.9 100.1 116.0 100.6 101.5
Weight of Dry Soil g 328.0 348.6 340.0 349.3 333.8
Weight of Moisture
Moisture Content %
g 8.2
2.5
R 12.9
3.7
17.7
5.2
24.1
6.9
26.7
8.0
FO
2.16 ASTM D - 1557
Standard :
Method " A "
2.15
Maximum Dry Density, g/cc : 2.136
ED

2.14
Optimum Moisture Content, % : 5.3
2.136
Dry Density, g / cc

2.13 Natural Moisture Content, % : 3.2


SU

Oversize Material Correction


2.12 Ref. Standard: ASTM D-4718

2.11 Fine Fraction (%) : 80


IS

Oversize Fraction (%) : 20


2.10
Specific Gravity of Oversize : 2.67
2.09
Water Content Oversize (%) : 0.3
5.3

2.08
1.0 3.0 5.0 7.0 9.0 Corrected Optimum Moisture
Moisture Content, % Content (%) : 4.3
Corrected Maximum Dry Density
(g/cc) : 2.225

Project Title : Drawing Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu MOISTURE DENSITY
Client / Owner :
RELATIONSHIP
Geotechnical File No. 2015/104 Figure No. H - 48

OEO - GF - 08, Rev. 00


Sample No. : TP - 13 Date Sampled : April 2016
Location : Yanbu Distribution Hub, Yanbu Sampled By : Abbas
Depth : 0.00 - 1.00 m. Date Tested : May 2016
Brown, silty clayey sand with
Description : Tested By : JC/Nauman
gravel & crystals of anhydrite

DESCRIPTION 1 2 3 4 5

Weight of Mold & Wet Soil g 6355 6398 6435 6452 6455
Weight of Mold g 4338 4338 4338 4338 4338
Weight of Soil g 2017 2060 2097 2114 2117
Wet Density g / cc 2.148 2.194 2.234 2.251 2.254
Dry Density g / cc 2.040 2.060 2.070 2.058 2.038

D
Weight of Container & Soil g 451.8 475.1 466.1 491.9 469.1
Weight of Container & Dry Soil g 434.1 452.3 438.9 458.9 434.0

BI
Weight of Container g 100.1 101.5 95.3 107.8 102.9
Weight of Dry Soil g 334.0 350.8 343.6 351.1 331.1
Weight of Moisture
Moisture Content %
g 17.7
5.3
R 22.8
6.5
27.2
7.9
33.0
9.4
35.1
10.6
FO
2.09 ASTM D - 1557
Standard :
Method " A "
2.08
Maximum Dry Density, g/cc : 2.070
ED

2.07 2.070
Optimum Moisture Content, % : 7.9
Dry Density, g / cc

2.06 Natural Moisture Content, % : 8.9


SU

Oversize Material Correction


2.05
Ref. Standard: ASTM D-4718

2.04
Fine Fraction (%) : 83
IS

2.03 Oversize Fraction (%) : 17


Specific Gravity of Oversize : 2.67
2.02
0.3
7.9

Water Content Oversize (%) :


2.01
4.0 6.0 8.0 10.0 12.0
Corrected Optimum Moisture
Moisture Content, %
Content (%) : 6.6
Corrected Maximum Dry Density
(g/cc) : 2.152

Project Title : Drawing Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu MOISTURE DENSITY
Client / Owner :
RELATIONSHIP
Geotechnical File No. 2015/104 Figure No. H - 49

OEO - GF - 08, Rev. 00


Sample No. : TP - 14 Date Sampled : April 2016
Location : Yanbu Distribution Hub, Yanbu Sampled By : Abbas
Depth : 0.00 - 1.00 m. Date Tested : May 2016
Brown, silty clayey sand with
Description : gravel & crystals of anhydrite Tested By : JC/Nauman

DESCRIPTION 1 2 3 4 5

Weight of Mold & Wet Soil g 6319 6361 6397 6414 6415
Weight of Mold g 4338 4338 4338 4338 4338
Weight of Soil g 1981 2023 2059 2076 2077
Wet Density g / cc 2.110 2.154 2.193 2.211 2.212
Dry Density g / cc 2.002 2.021 2.031 2.019 2.000

D
Weight of Container & Soil g 436.3 449.0 460.7 459.1 454.2
Weight of Container & Dry Soil g 419.1 427.4 435.1 428.2 420.4

BI
Weight of Container g 100.6 100.1 114.5 102.9 101.5
Weight of Dry Soil g 318.5 327.3 320.6 325.3 318.9
Weight of Moisture
Moisture Content %
g 17.2
5.4
R 21.6
6.6
25.6
8.0
30.9
9.5
33.8
10.6
FO
2.05 ASTM D - 1557
Standard :
Method " A "
2.04
Maximum Dry Density, g/cc : 2.031
ED

2.03 2.031
Optimum Moisture Content, % : 8.0
Dry Density, g / cc

2.02 Natural Moisture Content, % : 8.7


SU

Oversize Material Correction


2.01 Ref. Standard: ASTM D-4718

2.00
Fine Fraction (%) : 77
IS

1.99 Oversize Fraction (%) : 23


Specific Gravity of Oversize : 2.66
1.98
Water Content Oversize (%) : 0.3
8.0

1.97
4.0 6.0 8.0 10.0 12.0
Corrected Optimum Moisture
Moisture Content, % Content (%) : 6.2
Corrected Maximum Dry Density
(g/cc) : 2.148

Project Title : Drawing Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu MOISTURE DENSITY
Client / Owner :
RELATIONSHIP
Geotechnical File No. 2015/104 Figure No. H - 50

OEO - GF - 08, Rev. 00


Sample No. : TP - 01 Date Sampled : April 2016
Location : Yanbu Distribution Hub, Yanbu Sampled By : Abbas
Description : Brown, silty sand with occasional Date Tested : May 2016
with gravel & traces of clay Tested By : JC / Nauman

Legend : 10 Blows 25 Blows 56 Blows

1000

900

800

D
700

BI
S T R E S S ( PSI )

600

500 R
FO
400

300
ED

200
SU

100

0
IS

0.000 0.050 0.100 0.150 0.200 0.250 0.300 0.350 0.400


PENETRATION IN INCHES

56 BLOWS 25 BLOWS 10 BLOWS


Remarks :
CBR Value @ 0.100 " 47 31 23
CBR Value @ 0.200 " 52 32 23
Percent Swell 0.10 0.16 0.28

Standard : ASTM D - 1883

Project Title : Drawing Title :

Geotechnical Investigation for


YANBU DISTRIBUTION HUB Project, Yanbu
CBR TEST PLOT
Client / Owner :

Geotechnical File No. 2015/104 Figure No. H - 51

OEO - GF - 10, Rev. 00


Sample No. : TP - 01 Date Sampled : April 2016
Location : Yanbu Distribution Hub, Yanbu Sampled By : Abbas
Description : Brown, silty sand with occasional Date Tested : May 2016
with gravel & traces of clay Tested By : JC / Nauman

10 Blows 25 Blows 56 Blows


Legend :
95% of MDD ( 2.040 ) 100% of MDD ( 2.147 )
60

50 50

D
40

BI
VALUE

30
R
CBR

FO
23

20
ED

10
2.040

2.147
SU

0
2.010 2.050 2.090 2.130 2.170
DRY DENSITY ( g/cc )
IS

56 BLOWS 25 BLOWS 10 BLOWS


Remarks :

CBR Value 52 32 23
Dry Density, g/cc 2.151 2.092 2.035
CBR Value @ 95 % of MDD = 23
CBR Value @ 100 % of MDD = 50

Standard : ASTM D - 1883

Project Title : Drawing Title :

Geotechnical Investigation for


YANBU DISTRIBUTION HUB Project, Yanbu
PLOT OF CBR VALUE
Client / Owner :
VERSUS DRY DENSITY

Geotechnical File No. 2015/104 Figure No. H - 51(a)

OEO - GF - 10, Rev. 00


Sample No. : TP - 02 Date Sampled : April 2016
Location : Yanbu Distribution Hub, Yanbu Sampled By : Abbas
Description : Brown to grey, poorly graded Date Tested : May 2016
sand with silt & with gravel Tested By : JC / Nauman

Legend : 10 Blows 25 Blows 56 Blows


1500

1400

1300

1200

1100

D
1000

BI
S T R E S S ( PSI )

900

800

700
R
FO
600

500

400
ED

300

200
SU

100

0
0.000 0.050 0.100 0.150 0.200 0.250 0.300 0.350 0.400
IS

PENETRATION IN INCHES

56 BLOWS 25 BLOWS 10 BLOWS


Remarks :
CBR Value @ 0.100 " 59 50 40
CBR Value @ 0.200 " 69 61 47
Percent Swell Nil Nil Nil

Standard : ASTM D - 1883

Project Title : Drawing Title :

Geotechnical Investigation for


YANBU DISTRIBUTION HUB Project, Yanbu
CBR TEST PLOT
Client / Owner :

Geotechnical File No. 2015/104 Figure No. H - 52

OEO - GF - 10, Rev. 00


Sample No. : TP - 02 Date Sampled : April 2016
Location : Yanbu Distribution Hub, Yanbu Sampled By : Abbas
Description : Brown to grey, poorly graded Date Tested : May 2016
sand with silt & with gravel Tested By : JC / Nauman

10 Blows 25 Blows 56 Blows


Legend :
95% of MDD ( 2.100 ) 100% of MDD ( 2.210 )
80

70
68

60

D
BI
50 50
VALUE

40
R
CBR

FO
30

20
ED

10
2.100

2.210
SU

0
2.040 2.080 2.120 2.160 2.200 2.240
DRY DENSITY ( g/cc )
IS

56 BLOWS 25 BLOWS 10 BLOWS


Remarks :

CBR Value 69 61 47
Dry Density, g/cc 2.217 2.172 2.070
CBR Value @ 95 % of MDD = 50
CBR Value @ 100 % of MDD = 68

Standard : ASTM D - 1883

Project Title : Drawing Title :

Geotechnical Investigation for


YANBU DISTRIBUTION HUB Project, Yanbu
PLOT OF CBR VALUE
Client / Owner :
VERSUS DRY DENSITY

Geotechnical File No. 2015/104 Figure No. H - 52(a)

OEO - GF - 10, Rev. 00


Sample No. : TP - 03 Date Sampled : April 2016
Location : Yanbu Distribution Hub, Yanbu Sampled By : Abbas
Description : Brown, silty clayey sand with Date Tested : May 2016
gravel & crystals of anhydrite Tested By : JC / Nauman

Legend : 10 Blows 25 Blows 56 Blows

550

500

450

D
400

BI
350
S T R E S S ( PSI )

300

250
R
FO
200

150
ED

100
SU

50

0
IS

0.000 0.050 0.100 0.150 0.200 0.250 0.300 0.350 0.400


PENETRATION IN INCHES

56 BLOWS 25 BLOWS 10 BLOWS


Remarks :
CBR Value @ 0.100 " 20 14 12
CBR Value @ 0.200 " 25 17 13
Percent Swell Nil Nil Nil

Standard : ASTM D - 1883

Project Title : Drawing Title :

Geotechnical Investigation for


YANBU DISTRIBUTION HUB Project, Yanbu
CBR TEST PLOT
Client / Owner :

Geotechnical File No. 2015/104 Figure No. H - 53

OEO - GF - 10, Rev. 00


Sample No. : TP - 03 Date Sampled : April 2016
Location : Yanbu Distribution Hub, Yanbu Sampled By : Abbas
Description : Brown, silty clayey sand with Date Tested : May 2016
gravel & crystals of anhydrite Tested By : JC / Nauman

10 Blows 25 Blows 56 Blows


Legend :
95% of MDD ( 2.014 ) 100% of MDD ( 2.120 )
30

28

26

24 24

22

D
20

BI
18
VALUE

16

14
15 R
CBR

FO
12

10

8
ED

4
2.014

2.120
2
SU

0
1.940 1.990 2.040 2.090 2.140
DRY DENSITY ( g/cc )
IS

56 BLOWS 25 BLOWS 10 BLOWS


Remarks :

CBR Value 25 17 13
Dry Density, g/cc 2.129 2.050 1.957
CBR Value @ 95 % of MDD = 15
CBR Value @ 100 % of MDD = 24

Standard : ASTM D - 1883

Project Title : Drawing Title :

Geotechnical Investigation for


YANBU DISTRIBUTION HUB Project, Yanbu
PLOT OF CBR VALUE
Client / Owner :
VERSUS DRY DENSITY

Geotechnical File No. 2015/104 Figure No. H - 53(a)

OEO - GF - 10, Rev. 00


Sample No. : TP - 04 Date Sampled : April 2016
Location : Yanbu Distribution Hub, Yanbu Sampled By : Abbas
Description : Brown, silty clayey sand Date Tested : May 2016
Tested By : JC / Nauman

Legend : 10 Blows 25 Blows 56 Blows


600

550

500

450

D
400

BI
S T R E S S ( PSI )

350

300 R
FO
250

200

150
ED

100
SU

50

0
0.000 0.050 0.100 0.150 0.200 0.250 0.300 0.350 0.400
IS

PENETRATION IN INCHES

56 BLOWS 25 BLOWS 10 BLOWS


Remarks :
CBR Value @ 0.100 " 29 21 10
CBR Value @ 0.200 " 33 23 11
Percent Swell Nil Nil Nil

Standard : ASTM D - 1883

Project Title : Drawing Title :

Geotechnical Investigation for


YANBU DISTRIBUTION HUB Project, Yanbu
CBR TEST PLOT
Client / Owner :

Geotechnical File No. 2015/104 Figure No. H - 54

OEO - GF - 10, Rev. 00


Sample No. : TP - 04 Date Sampled : April 2016
Location : Yanbu Distribution Hub, Yanbu Sampled By : Abbas
Description : Brown, silty clayey sand Date Tested : May 2016
Tested By : JC / Nauman

10 Blows 25 Blows 56 Blows


Legend :
95% of MDD ( 1.960 ) 100% of MDD ( 2.063 )
40

35

32

30

D
BI
25
VALUE

20
R
CBR

FO
15

12

10
ED

5
1.960

2.063
SU

0
1.930 1.970 2.010 2.050 2.090
DRY DENSITY ( g/cc )
IS

56 BLOWS 25 BLOWS 10 BLOWS


Remarks :

CBR Value 33 23 11
Dry Density, g/cc 2.069 2.007 1.955
CBR Value @ 95 % of MDD = 12
CBR Value @ 100 % of MDD = 32

Standard : ASTM D - 1883

Project Title : Drawing Title :

Geotechnical Investigation for


YANBU DISTRIBUTION HUB Project, Yanbu
PLOT OF CBR VALUE
Client / Owner :
VERSUS DRY DENSITY

Geotechnical File No. 2015/104 Figure No. H - 54(a)

OEO - GF - 10, Rev. 00


Sample No. : TP - 05 Date Sampled : April 2016
Location : Yanbu Distribution Hub, Yanbu Sampled By : Abbas
Description : Brown, silty clayey sand Date Tested : May 2016
with gravel Tested By : JC / Nauman

Legend : 10 Blows 25 Blows 56 Blows

800

700

600

D
BI
500
S T R E S S ( PSI )

400 R
FO
300
ED

200

100
SU

0
0.000 0.050 0.100 0.150 0.200 0.250 0.300 0.350 0.400
IS

PENETRATION IN INCHES

56 BLOWS 25 BLOWS 10 BLOWS


Remarks :
CBR Value @ 0.100 " 29 26 18
CBR Value @ 0.200 " 36 32 21
Percent Swell 0.08 0.16 0.31

Standard : ASTM D - 1883

Project Title : Drawing Title :

Geotechnical Investigation for


YANBU DISTRIBUTION HUB Project, Yanbu
CBR TEST PLOT
Client / Owner :

Geotechnical File No. 2015/104 Figure No. H - 55

OEO - GF - 10, Rev. 00


Sample No. : TP - 05 Date Sampled : April 2016
Location : Yanbu Distribution Hub, Yanbu Sampled By : Abbas
Description : Brown, silty clayey sand Date Tested : May 2016
with gravel Tested By : JC / Nauman

10 Blows 25 Blows 56 Blows


Legend :
95% of MDD ( 2.073 ) 100% of MDD ( 2.182 )
40

35
35

30

D
BI
25
VALUE

22
20
R
CBR

FO
15

10
ED

5
2.073

2.182
SU

0
2.040 2.080 2.120 2.160 2.200
DRY DENSITY ( g/cc )
IS

56 BLOWS 25 BLOWS 10 BLOWS


Remarks :

CBR Value 36 32 21
Dry Density, g/cc 2.191 2.165 2.060
CBR Value @ 95 % of MDD = 22
CBR Value @ 100 % of MDD = 35

Standard : ASTM D - 1883

Project Title : Drawing Title :

Geotechnical Investigation for


YANBU DISTRIBUTION HUB Project, Yanbu
PLOT OF CBR VALUE
Client / Owner :
VERSUS DRY DENSITY

Geotechnical File No. 2015/104 Figure No. H - 55(a)

OEO - GF - 10, Rev. 00


Sample No. : TP - 06 Date Sampled : April 2016
Location : Yanbu Distribution Hub, Yanbu Sampled By : Abbas
Description : Brown to greyish brown, silty sand Date Tested : May 2016
with occasional gravel & traces of clay Tested By : JC / Nauman

Legend : 10 Blows 25 Blows 56 Blows


1400

1300

1200

1100

D
1000

900

BI
S T R E S S ( PSI )

800

700

600
R
FO
500

400
ED

300

200
SU

100

0
0.000 0.050 0.100 0.150 0.200 0.250 0.300 0.350 0.400
IS

PENETRATION IN INCHES

56 BLOWS 25 BLOWS 10 BLOWS


Remarks :
CBR Value @ 0.100 " 64 44 33
CBR Value @ 0.200 " 69 52 38
Percent Swell 0.08 0.10 0.16

Standard : ASTM D - 1883

Project Title : Drawing Title :

Geotechnical Investigation for


YANBU DISTRIBUTION HUB Project, Yanbu
CBR TEST PLOT
Client / Owner :

Geotechnical File No. 2015/104 Figure No. H - 56

OEO - GF - 10, Rev. 00


Sample No. : TP - 06 Date Sampled : April 2016
Location : Yanbu Distribution Hub, Yanbu Sampled By : Abbas
Description : Brown to greyish brown, silty sand Date Tested : May 2016
with occasional gravel & traces of clay Tested By : JC / Nauman

10 Blows 25 Blows 56 Blows


Legend :
95% of MDD ( 2.119 ) 100% of MDD ( 2.231 )
80

70
66

60

D
BI
50
VALUE

44
40
R
CBR

FO
30

20
ED

10
2.119

2.231
SU

0
2.020 2.060 2.100 2.140 2.180 2.220 2.260
DRY DENSITY ( g/cc )
IS

56 BLOWS 25 BLOWS 10 BLOWS


Remarks :

CBR Value 69 52 38
Dry Density, g/cc 2.240 2.170 2.050
CBR Value @ 95 % of MDD = 44
CBR Value @ 100 % of MDD = 66

Standard : ASTM D - 1883

Project Title : Drawing Title :

Geotechnical Investigation for


YANBU DISTRIBUTION HUB Project, Yanbu
PLOT OF CBR VALUE
Client / Owner :
VERSUS DRY DENSITY

Geotechnical File No. 2015/104 Figure No. H - 56(a)

OEO - GF - 10, Rev. 00


Sample No. : TP - 07 Date Sampled : April 2016
Location : Yanbu Distribution Hub, Yanbu Sampled By : Abbas
Description : Brown, silty clayey sand Date Tested : May 2016
Tested By : JC / Nauman

Legend : 10 Blows 25 Blows 56 Blows

900

800

700

D
600

BI
S T R E S S ( PSI )

500

400
R
FO

300
ED

200

100
SU

0
0.000 0.050 0.100 0.150 0.200 0.250 0.300 0.350 0.400
IS

PENETRATION IN INCHES

56 BLOWS 25 BLOWS 10 BLOWS


Remarks :
CBR Value @ 0.100 " 35 27 16
CBR Value @ 0.200 " 40 34 21
Percent Swell 0.12 0.17 0.24

Standard : ASTM D - 1883

Project Title : Drawing Title :

Geotechnical Investigation for


YANBU DISTRIBUTION HUB Project, Yanbu
CBR TEST PLOT
Client / Owner :

Geotechnical File No. 2015/104 Figure No. H - 57

OEO - GF - 10, Rev. 00


Sample No. : TP - 07 Date Sampled : April 2016
Location : Yanbu Distribution Hub, Yanbu Sampled By : Abbas
Description : Brown, silty clayey sand Date Tested : May 2016
Tested By : JC / Nauman

10 Blows 25 Blows 56 Blows


Legend :
95% of MDD ( 2.063 ) 100% of MDD ( 2.172 )
50

40 40

D
BI
30
VALUE

24 R
CBR

FO
20
ED

10
2.063

2.172
SU

0
2.030 2.070 2.110 2.150 2.190
DRY DENSITY ( g/cc )
IS

56 BLOWS 25 BLOWS 10 BLOWS


Remarks :

CBR Value 40 34 21
Dry Density, g/cc 2.180 2.119 2.050
CBR Value @ 95 % of MDD = 24
CBR Value @ 100 % of MDD = 40

Standard : ASTM D - 1883

Project Title : Drawing Title :

Geotechnical Investigation for


YANBU DISTRIBUTION HUB Project, Yanbu
PLOT OF CBR VALUE
Client / Owner :
VERSUS DRY DENSITY

Geotechnical File No. 2015/104 Figure No. H - 57(a)

OEO - GF - 10, Rev. 00


Sample No. : TP - 08 Date Sampled : April 2016
Location : Yanbu Distribution Hub, Yanbu Sampled By : Abbas
Description : Brown to light grey, silty clayey sand Date Tested : May 2016
with gravel & crystals of anhydrite Tested By : JC / Nauman

Legend : 10 Blows 25 Blows 56 Blows


1500

1400

1300

1200

1100

D
1000

BI
S T R E S S ( PSI )

900

800

700
R
FO
600

500

400
ED

300

200
SU

100

0
0.000 0.050 0.100 0.150 0.200 0.250 0.300 0.350 0.400
IS

PENETRATION IN INCHES

56 BLOWS 25 BLOWS 10 BLOWS


Remarks :
CBR Value @ 0.100 " 60 56 42
CBR Value @ 0.200 " 70 64 48
Percent Swell 0.15 0.70 0.55

Standard : ASTM D - 1883

Project Title : Drawing Title :

Geotechnical Investigation for


YANBU DISTRIBUTION HUB Project, Yanbu
CBR TEST PLOT
Client / Owner :

Geotechnical File No. 2015/104 Figure No. H - 58

OEO - GF - 10, Rev. 00


Sample No. : TP - 08 Date Sampled : April 2016
Location : Yanbu Distribution Hub, Yanbu Sampled By : Abbas
Description : Brown to light grey, silty clayey sand Date Tested : May 2016
with gravel & crystals of anhydrite Tested By : JC / Nauman

10 Blows 25 Blows 56 Blows


Legend :
95% of MDD ( 2.033 ) 100% of MDD ( 2.140 )
80

70 70

60

D
56

BI
50
VALUE

40
R
CBR

FO
30

20
ED

10
2.033

2.140
SU

0
1.970 2.010 2.050 2.090 2.130 2.170
DRY DENSITY ( g/cc )
IS

56 BLOWS 25 BLOWS 10 BLOWS


Remarks :

CBR Value 70 64 48
Dry Density, g/cc 2.144 2.082 1.998
CBR Value @ 95 % of MDD = 56
CBR Value @ 100 % of MDD = 70

Standard : ASTM D - 1883

Project Title : Drawing Title :

Geotechnical Investigation for


YANBU DISTRIBUTION HUB Project, Yanbu
PLOT OF CBR VALUE
Client / Owner :
VERSUS DRY DENSITY

Geotechnical File No. 2015/104 Figure No. H - 58(a)

OEO - GF - 10, Rev. 00


Sample No. : TP - 09 Date Sampled : April 2016
Location : Yanbu Distribution Hub, Yanbu Sampled By : Abbas
Description : Brown to brownish white, silty Date Tested : May 2016
clayey gravel with sand & anhydrite Tested By : JC / Nauman

Legend : 10 Blows 25 Blows 56 Blows

1400

1300

1200

1100

D
1000

BI
900
S T R E S S ( PSI )

800

700 R
FO
600

500

400
ED

300

200
SU

100

0
0.000 0.050 0.100 0.150 0.200 0.250 0.300 0.350 0.400
IS

PENETRATION IN INCHES

56 BLOWS 25 BLOWS 10 BLOWS


Remarks :
CBR Value @ 0.100 " 62 53 39
CBR Value @ 0.200 " 70 62 46
Percent Swell 0.11 0.16 0.20

Standard : ASTM D - 1883

Project Title : Drawing Title :

Geotechnical Investigation for


YANBU DISTRIBUTION HUB Project, Yanbu
CBR TEST PLOT
Client / Owner :

Geotechnical File No. 2015/104 Figure No. H - 59

OEO - GF - 10, Rev. 00


Sample No. : TP - 09 Date Sampled : April 2016
Location : Yanbu Distribution Hub, Yanbu Sampled By : Abbas
Description : Brown to brownish white, silty Date Tested : May 2016
clayey gravel with sand & anhydrite Tested By : JC / Nauman

10 Blows 25 Blows 56 Blows


Legend :
95% of MDD ( 2.077 ) 100% of MDD ( 2.186 )
80

70 69

60

D
51

BI
50
VALUE

40
R
CBR

FO
30

20
ED

10
2.077

2.186
SU

0
2.040 2.080 2.120 2.160 2.200
DRY DENSITY ( g/cc )
IS

56 BLOWS 25 BLOWS 10 BLOWS


Remarks :

CBR Value 70 62 46
Dry Density, g/cc 2.192 2.127 2.060
CBR Value @ 95 % of MDD = 51
CBR Value @ 100 % of MDD = 69

Standard : ASTM D - 1883

Project Title : Drawing Title :

Geotechnical Investigation for


YANBU DISTRIBUTION HUB Project, Yanbu
PLOT OF CBR VALUE
Client / Owner :
VERSUS DRY DENSITY

Geotechnical File No. 2015/104 Figure No. H - 59(a)

OEO - GF - 10, Rev. 00


Sample No. : TP - 10 Date Sampled : April 2016
Location : Yanbu Distribution Hub, Yanbu Sampled By : Abbas
Description : Brown, silty sand with anhydrite, Date Tested : May 2016
occasional gravel & traces of clay Tested By : JC / Nauman

Legend : 10 Blows 25 Blows 56 Blows


1400

1300

1200

1100

D
1000

900

BI
S T R E S S ( PSI )

800

700

600
R
FO
500

400
ED

300

200
SU

100

0
0.000 0.050 0.100 0.150 0.200 0.250 0.300 0.350 0.400
IS

PENETRATION IN INCHES

56 BLOWS 25 BLOWS 10 BLOWS


Remarks :
CBR Value @ 0.100 " 58 55 39
CBR Value @ 0.200 " 69 62 46
Percent Swell 0.11 0.14 0.19

Standard : ASTM D - 1883

Project Title : Drawing Title :

Geotechnical Investigation for


YANBU DISTRIBUTION HUB Project, Yanbu
CBR TEST PLOT
Client / Owner :

Geotechnical File No. 2015/104 Figure No. H - 60

OEO - GF - 10, Rev. 00


Sample No. : TP - 10 Date Sampled : April 2016
Location : Yanbu Distribution Hub, Yanbu Sampled By : Abbas
Description : Brown, silty sand with anhydrite, Date Tested : May 2016
occasional gravel & traces of clay Tested By : JC / Nauman

10 Blows 25 Blows 56 Blows


Legend :
95% of MDD ( 2.017 ) 100% of MDD ( 2.123 )
80

70
69

60

D
BI
50 49
VALUE

40
R
CBR

FO
30

20
ED

10
2.017

2.123
SU

0
1.980 2.020 2.060 2.100 2.140
DRY DENSITY ( g/cc )
IS

56 BLOWS 25 BLOWS 10 BLOWS


Remarks :

CBR Value 69 62 47
Dry Density, g/cc 2.127 2.072 2.008
CBR Value @ 95 % of MDD = 49
CBR Value @ 100 % of MDD = 69

Standard : ASTM D - 1883

Project Title : Drawing Title :

Geotechnical Investigation for


YANBU DISTRIBUTION HUB Project, Yanbu
PLOT OF CBR VALUE
Client / Owner :
VERSUS DRY DENSITY

Geotechnical File No. 2015/104 Figure No. H - 60(a)

OEO - GF - 10, Rev. 00


Sample No. : TP - 11 Date Sampled : April 2016
Location : Yanbu Distribution Hub, Yanbu Sampled By : Abbas
Description : Brown to light grey, silty clayey Date Tested : May 2016
gravel with sand Tested By : JC / Nauman

Legend : 10 Blows 25 Blows 56 Blows

1500

1400

1300

1200

D
1100

1000

BI
S T R E S S ( PSI )

900

800

700
R
FO
600

500
ED

400

300

200
SU

100

0
IS

0.000 0.050 0.100 0.150 0.200 0.250 0.300 0.350 0.400


PENETRATION IN INCHES

56 BLOWS 25 BLOWS 10 BLOWS


Remarks :
CBR Value @ 0.100 " 62 50 40
CBR Value @ 0.200 " 72 61 48
Percent Swell 0.35 0.62 0.80

Standard : ASTM D - 1883

Project Title : Drawing Title :

Geotechnical Investigation for


YANBU DISTRIBUTION HUB Project, Yanbu
CBR TEST PLOT
Client / Owner :

Geotechnical File No. 2015/104 Figure No. H - 61

OEO - GF - 10, Rev. 00


Sample No. : TP - 11 Date Sampled : April 2016
Location : Yanbu Distribution Hub, Yanbu Sampled By : Abbas
Description : Brown to light grey, silty clayey Date Tested : May 2016
gravel with sand Tested By : JC / Nauman

10 Blows 25 Blows 56 Blows


Legend :
95% of MDD ( 2.173 ) 100% of MDD ( 2.287 )
90

80

71
70

D
60

BI
VALUE

50 51

R
CBR

40
FO
30

20
ED

10
2.173

2.287
SU

0
2.140 2.180 2.220 2.260 2.300
DRY DENSITY ( g/cc )
IS

56 BLOWS 25 BLOWS 10 BLOWS


Remarks :

CBR Value 72 61 48
Dry Density, g/cc 2.291 2.221 2.160
CBR Value @ 95 % of MDD = 51
CBR Value @ 100 % of MDD = 71

Standard : ASTM D - 1883

Project Title : Drawing Title :

Geotechnical Investigation for


YANBU DISTRIBUTION HUB Project, Yanbu
PLOT OF CBR VALUE
Client / Owner :
VERSUS DRY DENSITY

Geotechnical File No. 2015/104 Figure No. H - 61(a)

OEO - GF - 10, Rev. 00


Sample No. : TP - 12 Date Sampled : April 2016
Location : Yanbu Distribution Hub, Yanbu Sampled By : Abbas
Description : Brown to light grey, silty sand with Date Tested : May 2016
gravel, anhydrite & traces of clay Tested By : JC / Nauman

Legend : 10 Blows 25 Blows 56 Blows


1500

1400

1300

1200

1100

D
1000

BI
S T R E S S ( PSI )

900

800

700
R
FO
600

500

400
ED

300

200
SU

100

0
0.000 0.050 0.100 0.150 0.200 0.250 0.300 0.350 0.400
IS

PENETRATION IN INCHES

56 BLOWS 25 BLOWS 10 BLOWS


Remarks :
CBR Value @ 0.100 " 61 56 40
CBR Value @ 0.200 " 70 64 47
Percent Swell 0.09 0.12 0.17

Standard : ASTM D - 1883

Project Title : Drawing Title :

Geotechnical Investigation for


YANBU DISTRIBUTION HUB Project, Yanbu
CBR TEST PLOT
Client / Owner :

Geotechnical File No. 2015/104 Figure No. H - 62

OEO - GF - 10, Rev. 00


Sample No. : TP - 12 Date Sampled : April 2016
Location : Yanbu Distribution Hub, Yanbu Sampled By : Abbas
Description : Brown to light grey, silty sand with Date Tested : May 2016
gravel, anhydrite & traces of clay Tested By : JC / Nauman

10 Blows 25 Blows 56 Blows


Legend :
95% of MDD ( 2.114 ) 100% of MDD ( 2.225 )
90

80

70 70

D
60

BI
VALUE

52
50

R
CBR

40
FO
30
ED

20

10
2.114

2.225
SU

0
2.080 2.120 2.160 2.200 2.240
DRY DENSITY ( g/cc )
IS

56 BLOWS 25 BLOWS 10 BLOWS


Remarks :

CBR Value 70 64 47
Dry Density, g/cc 2.231 2.177 2.095
CBR Value @ 95 % of MDD = 52
CBR Value @ 100 % of MDD = 70

Standard : ASTM D - 1883

Project Title : Drawing Title :

Geotechnical Investigation for


YANBU DISTRIBUTION HUB Project, Yanbu
PLOT OF CBR VALUE
Client / Owner :
VERSUS DRY DENSITY

Geotechnical File No. 2015/104 Figure No. H - 62(a)

OEO - GF - 10, Rev. 00


Sample No. : TP - 13 Date Sampled : April 2016
Location : Yanbu Distribution Hub, Yanbu Sampled By : Abbas
Description : Brown, silty clayey sand with Date Tested : May 2016
gravel & crystals of anhydrite Tested By : JC / Nauman

Legend : 10 Blows 25 Blows 56 Blows

1200

1100

1000

900

D
800

BI
S T R E S S ( PSI )

700

600 R
FO
500

400
ED

300

200
SU

100

0
0.000 0.050 0.100 0.150 0.200 0.250 0.300 0.350 0.400
IS

PENETRATION IN INCHES

56 BLOWS 25 BLOWS 10 BLOWS


Remarks :
CBR Value @ 0.100 " 58 41 31
CBR Value @ 0.200 " 63 50 37
Percent Swell 0.08 0.13 0.17

Standard : ASTM D - 1883

Project Title : Drawing Title :

Geotechnical Investigation for


YANBU DISTRIBUTION HUB Project, Yanbu
CBR TEST PLOT
Client / Owner :

Geotechnical File No. 2015/104 Figure No. H - 63

OEO - GF - 10, Rev. 00


Sample No. : TP - 13 Date Sampled : April 2016
Location : Yanbu Distribution Hub, Yanbu Sampled By : Abbas
Description : Brown, silty clayey sand with Date Tested : May 2016
gravel & crystals of anhydrite Tested By : JC / Nauman

10 Blows 25 Blows 56 Blows


Legend :
95% of MDD ( 2.044 ) 100% of MDD ( 2.152 )
80

70

62
60

D
BI
50
VALUE

40 40
R
CBR

FO
30

20
ED

10
2.044

2.152
SU

0
2.010 2.050 2.090 2.130 2.170
DRY DENSITY ( g/cc )
IS

56 BLOWS 25 BLOWS 10 BLOWS


Remarks :

CBR Value 63 50 37
Dry Density, g/cc 2.158 2.098 2.030
CBR Value @ 95 % of MDD = 40
CBR Value @ 100 % of MDD = 62

Standard : ASTM D - 1883

Project Title : Drawing Title :

Geotechnical Investigation for


YANBU DISTRIBUTION HUB Project, Yanbu
PLOT OF CBR VALUE
Client / Owner :
VERSUS DRY DENSITY

Geotechnical File No. 2015/104 Figure No. H - 63(a)

OEO - GF - 10, Rev. 00


Sample No. : TP - 14 Date Sampled : April 2016
Location : Yanbu Distribution Hub, Yanbu Sampled By : Abbas
Description : Brown, silty clayey sand with Date Tested : May 2016
gravel & crystals of anhydrite Tested By : JC / Nauman

Legend : 10 Blows 25 Blows 56 Blows


1200

1100

1000

900

D
800

BI
S T R E S S ( PSI )

700

600 R
FO
500

400

300
ED

200
SU

100

0
0.000 0.050 0.100 0.150 0.200 0.250 0.300 0.350 0.400
IS

PENETRATION IN INCHES

56 BLOWS 25 BLOWS 10 BLOWS


Remarks :
CBR Value @ 0.100 " 52 42 31
CBR Value @ 0.200 " 59 50 36
Percent Swell 0.11 0.13 0.18

Standard : ASTM D - 1883

Project Title : Drawing Title :

Geotechnical Investigation for


YANBU DISTRIBUTION HUB Project, Yanbu
CBR TEST PLOT
Client / Owner :

Geotechnical File No. 2015/104 Figure No. H - 64

OEO - GF - 10, Rev. 00


Sample No. : TP - 14 Date Sampled : April 2016
Location : Yanbu Distribution Hub, Yanbu Sampled By : Abbas
Description : Brown, silty clayey sand with Date Tested : May 2016
gravel & crystals of anhydrite Tested By : JC / Nauman

10 Blows 25 Blows 56 Blows


Legend :
95% of MDD ( 2.041 ) 100% of MDD ( 2.148 )
70

60
58

D
50

BI
VALUE

40
38

R
CBR

30
FO

20
ED

10
2.041

2.148
SU

0
2.010 2.050 2.090 2.130 2.170
DRY DENSITY ( g/cc )
IS

56 BLOWS 25 BLOWS 10 BLOWS


Remarks :

CBR Value 59 50 36
Dry Density, g/cc 2.155 2.098 2.030
CBR Value @ 95 % of MDD = 38
CBR Value @ 100 % of MDD = 58

Standard : ASTM D - 1883

Project Title : Drawing Title :

Geotechnical Investigation for


YANBU DISTRIBUTION HUB Project, Yanbu
PLOT OF CBR VALUE
Client / Owner :
VERSUS DRY DENSITY

Geotechnical File No. 2015/104 Figure No. H - 64(a)

OEO - GF - 10, Rev. 00


D
BI
R
FO
ED
SU

Source : HUNT , ROY. E.


IS

Drawing Title : Project Title :


Geotechnical Investigation for
Geotechnical File No. 2015/104 Figure No. H - 65
Approximate Correlation of Soil Ratings YANBU DISTRIBUTION HUB Project, Yanbu
Based on CBR Values for Use in Design
Client / Owner :
of Light Traffic Pavements
Test No. FDT-1 FDT-2 FDT-3 FDT-4

Depth m 0.00 0.30 0.60 0.90

1. Wt. of Wet Soil & Bag g 4033 3747 3684 2854

2. Wt. of Bag g 29 29 29 29

3. Wt. of Soil g 4004 3718 3655 2825

4. Wt. of Sand & Bottle, before g 9841 9801 9711 10450

5. Wt. of Sand & Bottle, after g 4967 4255 4896 6078

6. Wt. of Sand in Hole & Cone g 4874 5546 4815 4372

D
7. Wt. of Sand in Cone g 1575 1575 1575 1575

8. Wt. of Sand in Hole g 3299 3971 3240 2797

BI
9. Density of Sand g/cc 1.507 1.507 1.507 1.507

10. Volume of Hole cc 2189 2635 2150 1856

11. Wet Density of Soil g/cc


R
1.829 1.411 1.700 1.522
FO
CAN No. D6 D24 E99 1

12. Wt. of can & wet soil g 515.2 523.4 469.8 569.6

13. Wt. of can & dry soil g 498.3 514.6 463.8 563
ED

14. Wt. of can g 40.0 71.0 70.6 39.0

15. Wt. of dry soil g 458.3 443.6 393.2 524.0


SU

16. Wt. of moisture g 16.9 8.8 6.0 6.6

17. Moisture Content % 3.69 1.98 1.53 1.26


IS

18. Dry Density of Soil g/cc 1.764 1.384 1.675 1.503

Standard : ASTM D - 1556

Sample No. TP - 01 Date : 11 May 2016 Drawing Title :

Location: Yanbu Distribution Tested By : Wajahat


Hub Project, Yanbu Method : SAND CONE FIELD DENSITY TEST
Saudi Arabia

Project Title : Client / Owner : Geotechnical File No. 2015/104 Fig. No. H - 66
Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Project, Yanbu
Test No. FDT-1 FDT-2 FDT-3 FDT-4

Depth m 0.00 0.30 0.60 0.90

1. Wt. of Wet Soil & Bag g 4123 3747

2. Wt. of Bag g 26 29

3. Wt. of Soil g 4097 3718

4. Wt. of Sand & Bottle, before g 10335 9801

5. Wt. of Sand & Bottle, after g 5504 4255

6. Wt. of Sand in Hole & Cone g 4831 5546

1575 1575

D
7. Wt. of Sand in Cone g

8. Wt. of Sand in Hole g 3256 3971

BI
9. Density of Sand g/cc 1.507 1.507

10. Volume of Hole cc 2160 2635

11. Wet Density of Soil g/cc


R
1.896 1.411
FO
CAN No. Y-3 G-9

12. Wt. of can & wet soil g 560.4 441.2

13. Wt. of can & dry soil g 554.7 432.4


ED

14. Wt. of can g 39.4 39.0

15. Wt. of dry soil g 515.3 393.4


SU

16. Wt. of moisture g 5.7 8.8

17. Moisture Content % 1.11 2.24


IS

18. Dry Density of Soil g/cc 1.876 1.380

Standard : ASTM D - 1556

Sample No. TP - 02 Date : 11 May 2016 Drawing Title :

Location: Yanbu Distribution Tested By : Wajahat


Hub Project, Yanbu Method : SAND CONE FIELD DENSITY TEST
Saudi Arabia

Project Title : Client / Owner : Geotechnical File No. 2015/104 Fig. No. H - 67
Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Project, Yanbu
Test No. FDT-1 FDT-2 FDT-3 FDT-4

Depth m 0.00 0.30 0.60 0.90

1. Wt. of Wet Soil & Bag g 3722 4472

2. Wt. of Bag g 27 27

3. Wt. of Soil g 3695 4445

4. Wt. of Sand & Bottle, before g 10156 10430

5. Wt. of Sand & Bottle, after g 5534 5208

6. Wt. of Sand in Hole & Cone g 4622 5222

D
7. Wt. of Sand in Cone g 1575 1575

8. Wt. of Sand in Hole g 3047 3647

BI
9. Density of Sand g/cc 1.507 1.507

10. Volume of Hole cc 2022 2420

11. Wet Density of Soil g/cc


R
1.828 1.837
FO
CAN No. 31 15

12. Wt. of can & wet soil g 372.3 409.1

13. Wt. of can & dry soil g 368.1 403.9


ED

14. Wt. of can g 41.7 39.5

15. Wt. of dry soil g 326.4 364.4


SU

16. Wt. of moisture g 4.2 5.2

17. Moisture Content % 1.29 1.43


IS

18. Dry Density of Soil g/cc 1.804 1.811

Standard : ASTM D - 1556

Sample No. TP - 03 Date : 11 May 2016 Drawing Title :

Location: Yanbu Distribution Tested By : Wajahat


Hub Project, Yanbu Method : SAND CONE FIELD DENSITY TEST
Saudi Arabia

Project Title : Client / Owner : Geotechnical File No. 2015/104 Fig. No. H - 68
Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Project, Yanbu
Test No. FDT-1 FDT-2 FDT-3 FDT-4

Depth m 0.00 0.30 0.60 0.90

1. Wt. of Wet Soil & Bag g 3256 2522 1908 2554

2. Wt. of Bag g 26 26 26 26

3. Wt. of Soil g 3230 2496 1882 2528

4. Wt. of Sand & Bottle, before g 8504 8034 7107 6956

5. Wt. of Sand & Bottle, after g 4430 3781 3341 3146

6. Wt. of Sand in Hole & Cone g 4074 4253 3766 3810

D
7. Wt. of Sand in Cone g 1575 1575 1575 1575

8. Wt. of Sand in Hole g 2499 2678 2191 2235

BI
9. Density of Sand g/cc 1.507 1.507 1.507 1.507

10. Volume of Hole cc 1658 1777 1454 1483

11. Wet Density of Soil g/cc


R
1.948 1.405 1.295 1.705
FO
CAN No. ER-4 Y-18 9 B2

12. Wt. of can & wet soil g 501.0 464.6 392.4 447.4

13. Wt. of can & dry soil g 498.6 444.2 374.2 434.1
ED

14. Wt. of can g 37.4 40.7 39.6 39.4

15. Wt. of dry soil g 461.2 403.5 334.6 394.7


SU

16. Wt. of moisture g 2.4 20.4 18.2 13.3

17. Moisture Content % 0.52 5.06 5.44 3.37


IS

18. Dry Density of Soil g/cc 1.938 1.337 1.228 1.649

Standard : ASTM D - 1556

Sample No. TP - 04 Date : 14 May 2016 Drawing Title :

Location: Yanbu Distribution Tested By : Wajahat


Hub Project, Yanbu Method : SAND CONE FIELD DENSITY TEST
Saudi Arabia

Project Title : Client / Owner : Geotechnical File No. 2015/104 Fig. No. H - 69
Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Project, Yanbu
Test No. FDT-1 FDT-2 FDT-3 FDT-4

Depth m 0.00 0.30 0.60 0.90

1. Wt. of Wet Soil & Bag g 4489 3804 2847 3833

2. Wt. of Bag g 26 26 26 26

3. Wt. of Soil g 4463 3778 2821 3807

4. Wt. of Sand & Bottle, before g 10605 10415 10225 10117

5. Wt. of Sand & Bottle, after g 5489 5217 5848 5230

6. Wt. of Sand in Hole & Cone g 5116 5198 4377 4887

D
7. Wt. of Sand in Cone g 1575 1575 1575 1575

8. Wt. of Sand in Hole g 3541 3623 2802 3312

BI
9. Density of Sand g/cc 1.507 1.507 1.507 1.507

10. Volume of Hole cc 2350 2404 1859 2198

11. Wet Density of Soil g/cc


R
1.899 1.572 1.517 1.732
FO
CAN No. E-30 E-33 E-17 E-11

12. Wt. of can & wet soil g 529.8 435.0 378.2 497.8

13. Wt. of can & dry soil g 524.4 426.8 371.4 492.3
ED

14. Wt. of can g 70.2 69.8 69.4 67.2

15. Wt. of dry soil g 454.2 357.0 302.0 425.1


SU

16. Wt. of moisture g 5.4 8.2 6.8 5.5

17. Moisture Content % 1.19 2.30 2.25 1.29


IS

18. Dry Density of Soil g/cc 1.877 1.536 1.484 1.710

Standard : ASTM D - 1556

Sample No. TP - 05 Date : 10 May 2016 Drawing Title :

Location: Yanbu Distribution Tested By : Wajahat


Hub Project, Yanbu Method : SAND CONE FIELD DENSITY TEST
Saudi Arabia

Project Title : Client / Owner : Geotechnical File No. 2015/104 Fig. No. H - 70
Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Project, Yanbu
Test No. FDT-1 FDT-2 FDT-3 FDT-4

Depth m 0.00 0.30 0.60 0.90

1. Wt. of Wet Soil & Bag g 3988 4637 3556 4129

2. Wt. of Bag g 27 27 27 27

3. Wt. of Soil g 3961 4610 3529 4102

4. Wt. of Sand & Bottle, before g 10453 10246 10196 10031

5. Wt. of Sand & Bottle, after g 5576 4680 5061 4258

6. Wt. of Sand in Hole & Cone g 4877 5566 5135 5773

D
7. Wt. of Sand in Cone g 1575 1575 1575 1575

8. Wt. of Sand in Hole g 3302 3991 3560 4198

BI
9. Density of Sand g/cc 1.507 1.507 1.507 1.507

10. Volume of Hole cc 2191 2648 2362 2786

11. Wet Density of Soil g/cc


R
1.808 1.741 1.494 1.473
FO
CAN No. G-21 2 G-23 T-3

12. Wt. of can & wet soil g 603.8 468.8 488.4 552.0

13. Wt. of can & dry soil g 598.3 454.7 466.8 544.4
ED

14. Wt. of can g 38.5 38.7 40.5 40.0

15. Wt. of dry soil g 559.8 416.0 426.3 504.4


SU

16. Wt. of moisture g 5.5 14.1 21.6 7.6

17. Moisture Content % 0.98 3.39 5.07 1.51


IS

18. Dry Density of Soil g/cc 1.790 1.684 1.422 1.451

Standard : ASTM D - 1556

Sample No. TP - 06 Date : 10 May 2016 Drawing Title :

Location: Yanbu Distribution Tested By : Wajahat


Hub Project, Yanbu Method : SAND CONE FIELD DENSITY TEST
Saudi Arabia

Project Title : Client / Owner : Geotechnical File No. 2015/104 Fig. No. H - 71
Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Project, Yanbu
Test No. FDT-1 FDT-2 FDT-3 FDT-4

Depth m 0.00 0.30 0.60 0.90

1. Wt. of Wet Soil & Bag g 3716 3667 3227 3100

2. Wt. of Bag g 26 26 26 26

3. Wt. of Soil g 3690 3641 3201 3074

4. Wt. of Sand & Bottle, before g 9372 9223 8997 8818

5. Wt. of Sand & Bottle, after g 4478 4380 4624 4168

6. Wt. of Sand in Hole & Cone g 4894 4843 4373 4650

D
7. Wt. of Sand in Cone g 1575 1575 1575 1575

8. Wt. of Sand in Hole g 3319 3268 2798 3075

BI
9. Density of Sand g/cc 1.507 1.507 1.507 1.507

10. Volume of Hole cc 2202 2168 1857 2040

11. Wet Density of Soil g/cc


R
1.676 1.679 1.724 1.507
FO
CAN No. E-21 ER-3 G E-11

12. Wt. of can & wet soil g 473.2 467.0 433.4 426.2

13. Wt. of can & dry soil g 461.7 452.2 407.0 402.0
ED

14. Wt. of can g 69.4 41.0 39.3 39.9

15. Wt. of dry soil g 392.3 411.2 367.7 362.1


SU

16. Wt. of moisture g 11.5 14.8 26.4 24.2

17. Moisture Content % 2.93 3.60 7.18 6.68


IS

18. Dry Density of Soil g/cc 1.628 1.621 1.609 1.412

Standard : ASTM D - 1556

Sample No. TP - 07 Date : 12 May 2016 Drawing Title :

Location: Yanbu Distribution Tested By : Wajahat


Hub Project, Yanbu Method : SAND CONE FIELD DENSITY TEST
Saudi Arabia

Project Title : Client / Owner : Geotechnical File No. 2015/104 Fig. No. H - 72
Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Project, Yanbu
Test No. FDT-1 FDT-2 FDT-3 FDT-4

Depth m 0.00 0.30 0.60 0.90

1. Wt. of Wet Soil & Bag g 3934 3256 2973 3395

2. Wt. of Bag g 25 25 25 25

3. Wt. of Soil g 3909 3231 2948 3370

4. Wt. of Sand & Bottle, before g 9783 9671 9506 9492

5. Wt. of Sand & Bottle, after g 4899 5070 5012 4992

6. Wt. of Sand in Hole & Cone g 4884 4601 4494 4500

D
7. Wt. of Sand in Cone g 1575 1575 1575 1575

8. Wt. of Sand in Hole g 3309 3026 2919 2925

BI
9. Density of Sand g/cc 1.507 1.507 1.507 1.507

10. Volume of Hole cc 2196 2008 1937 1941

11. Wet Density of Soil g/cc


R
1.780 1.609 1.522 1.736
FO
CAN No. Y-25 E-14 D-14 11

12. Wt. of can & wet soil g 526.2 501.2 437.6 488.0

13. Wt. of can & dry soil g 515.4 492.6 424.3 474.3
ED

14. Wt. of can g 39.5 38.6 39.4 39.6

15. Wt. of dry soil g 475.9 454.0 384.9 434.7


SU

16. Wt. of moisture g 10.8 8.6 13.3 13.7

17. Moisture Content % 2.27 1.89 3.46 3.15


IS

18. Dry Density of Soil g/cc 1.741 1.579 1.471 1.683

Standard : ASTM D - 1556

Sample No. TP - 08 Date : 12 May 2016 Drawing Title :

Location: Yanbu Distribution Tested By : Wajahat


Hub Project, Yanbu Method : SAND CONE FIELD DENSITY TEST
Saudi Arabia

Project Title : Client / Owner : Geotechnical File No. 2015/104 Fig. No. H - 73
Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Project, Yanbu
Test No. FDT-1 FDT-2 FDT-3 FDT-4

Depth m 0.00 0.30 0.60 0.90

1. Wt. of Wet Soil & Bag g

2. Wt. of Bag g

3. Wt. of Soil g

4. Wt. of Sand & Bottle, before g

5. Wt. of Sand & Bottle, after g

6. Wt. of Sand in Hole & Cone g

D
7. Wt. of Sand in Cone g

8. Wt. of Sand in Hole g

BI
9. Density of Sand g/cc

10. Volume of Hole cc

11. Wet Density of Soil g/cc


R
FO
CAN No.

12. Wt. of can & wet soil g

13. Wt. of can & dry soil g


ED

14. Wt. of can g

15. Wt. of dry soil g


SU

16. Wt. of moisture g

17. Moisture Content %


IS

18. Dry Density of Soil g/cc

Standard : ASTM D - 1556

Sample No. TP - 09 Date : 14 May 2016 Drawing Title :

Location: Yanbu Distribution Tested By : Wajahat


Hub Project, Yanbu Method : SAND CONE FIELD DENSITY TEST
Saudi Arabia

Project Title : Client / Owner : Geotechnical File No. 2015/104 Fig. No. H - 74
Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Project, Yanbu
Test No. FDT-1 FDT-2 FDT-3 FDT-4

Depth m 0.00 0.30 0.60 0.90

1. Wt. of Wet Soil & Bag g 3315 2690 2476 2591

2. Wt. of Bag g 22 23 23 23

3. Wt. of Soil g 3293 2667 2453 2568

4. Wt. of Sand & Bottle, before g 9955 9775 9633 9445

5. Wt. of Sand & Bottle, after g 5601 5432 5245 4790

6. Wt. of Sand in Hole & Cone g 4354 4343 4388 4655

D
7. Wt. of Sand in Cone g 1575 1575 1575 1575

8. Wt. of Sand in Hole g 2779 2768 2813 3080

BI
9. Density of Sand g/cc 1.507 1.507 1.507 1.507

10. Volume of Hole cc 1844 1837 1866 2044

11. Wet Density of Soil g/cc


R
1.786 1.452 1.314 1.257
FO
CAN No. D1 T E-6 G-17

12. Wt. of can & wet soil g 512.0 459.6 441.8 444.6

13. Wt. of can & dry soil g 509.3 454.7 423.0 432.6
ED

14. Wt. of can g 38.6 39.7 39.6 49.4

15. Wt. of dry soil g 470.7 415.0 383.4 383.2


SU

16. Wt. of moisture g 2.7 4.9 18.8 12.0

17. Moisture Content % 0.57 1.18 4.90 3.13


IS

18. Dry Density of Soil g/cc 1.776 1.435 1.253 1.218

Standard : ASTM D - 1556

Sample No. TP - 10 Date : 14 May 2016 Drawing Title :

Location: Yanbu Distribution Tested By : Wajahat


Hub Project, Yanbu Method : SAND CONE FIELD DENSITY TEST
Saudi Arabia

Project Title : Client / Owner : Geotechnical File No. 2015/104 Fig. No. H - 75
Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Project, Yanbu
Test No. FDT-1 FDT-2 FDT-3 FDT-4

Depth m 0.00 0.30 0.60 0.90

1. Wt. of Wet Soil & Bag g 2912 2618 2435 2966

2. Wt. of Bag g 23 23 23 24

3. Wt. of Soil g 2889 2595 2412 2942

4. Wt. of Sand & Bottle, before g 9263 9045 8986 8775

5. Wt. of Sand & Bottle, after g 5153 4893 4738 4450

6. Wt. of Sand in Hole & Cone g 4110 4152 4248 4325

D
7. Wt. of Sand in Cone g 1575 1575 1575 1575

8. Wt. of Sand in Hole g 2535 2577 2673 2750

BI
9. Density of Sand g/cc 1.507 1.507 1.507 1.507

10. Volume of Hole cc 1682 1710 1774 1825

11. Wet Density of Soil g/cc


R
1.718 1.518 1.360 1.612
FO
CAN No. E-22 G-34 G-9 2

12. Wt. of can & wet soil g 476.0 521.2 424.6 513.7

13. Wt. of can & dry soil g 470.8 516.4 416.5 505.4
ED

14. Wt. of can g 73.2 38.8 39.3 83.4

15. Wt. of dry soil g 397.6 477.6 377.2 422.0


SU

16. Wt. of moisture g 5.2 4.8 8.1 8.3

17. Moisture Content % 1.31 1.01 2.15 1.97


IS

18. Dry Density of Soil g/cc 1.695 1.503 1.331 1.581

Standard : ASTM D - 1556

Sample No. TP - 11 Date : 14 May 2016 Drawing Title :

Location: Yanbu Distribution Tested By : Wajahat


Hub Project, Yanbu Method : SAND CONE FIELD DENSITY TEST
Saudi Arabia

Project Title : Client / Owner : Geotechnical File No. 2015/104 Fig. No. H - 76
Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Project, Yanbu
Test No. FDT-1 FDT-2 FDT-3 FDT-4

Depth m 0.00 0.30 0.60 0.90

1. Wt. of Wet Soil & Bag g 2914 3278 2855 2900

2. Wt. of Bag g 24 24 25 24

3. Wt. of Soil g 2890 3254 2830 2876

4. Wt. of Sand & Bottle, before g 8690 8484 8291 8120

5. Wt. of Sand & Bottle, after g 5049 4962 4897 4621

6. Wt. of Sand in Hole & Cone g 3641 3522 3394 3499

D
7. Wt. of Sand in Cone g 1575 1575 1575 1575

8. Wt. of Sand in Hole g 2066 1947 1819 1924

BI
9. Density of Sand g/cc 1.507 1.507 1.507 1.507

10. Volume of Hole cc 1371 1292 1207 1277

11. Wet Density of Soil g/cc


R
2.108 2.519 2.345 2.253
FO
CAN No. Z E-1 G-4 SG

12. Wt. of can & wet soil g 547.0 563.2 554.2 494.2

13. Wt. of can & dry soil g 543.3 560.0 550.8 489.6
ED

14. Wt. of can g 38.9 39.6 40.1 39.9

15. Wt. of dry soil g 504.4 520.4 510.7 449.7


SU

16. Wt. of moisture g 3.7 3.2 3.4 4.6

17. Moisture Content % 0.73 0.61 0.67 1.02


IS

18. Dry Density of Soil g/cc 2.093 2.503 2.329 2.230

Standard : ASTM D - 1556

Sample No. TP - 12 Date : 14 May 2016 Drawing Title :

Location: Yanbu Distribution Tested By : Wajahat


Hub Project, Yanbu Method : SAND CONE FIELD DENSITY TEST
Saudi Arabia

Project Title : Client / Owner : Geotechnical File No. 2015/104 Fig. No. H - 77
Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Project, Yanbu
Test No. FDT-1 FDT-2 FDT-3 FDT-4

Depth m 0.00 0.30 0.60 0.90

1. Wt. of Wet Soil & Bag g 3315 3255 3311 2988

2. Wt. of Bag g 27 27 27 27

3. Wt. of Soil g 3288 3228 3284 2961

4. Wt. of Sand & Bottle, before g 11024 10058 9838 9742

5. Wt. of Sand & Bottle, after g 5924 5583 5472 5321

6. Wt. of Sand in Hole & Cone g 5100 4475 4366 4421

D
7. Wt. of Sand in Cone g 1575 1575 1575 1575

8. Wt. of Sand in Hole g 3525 2900 2791 2846

BI
9. Density of Sand g/cc 1.507 1.507 1.507 1.507

10. Volume of Hole cc 2339 1924 1852 1888

11. Wet Density of Soil g/cc


R
1.406 1.678 1.773 1.568
FO
CAN No. C9 G-27 D-15 Y-2

12. Wt. of can & wet soil g 452.0 408.8 449.0 467.2

13. Wt. of can & dry soil g 447.0 384.6 409.6 428.7
ED

14. Wt. of can g 39.5 38.8 40.4 40.4

15. Wt. of dry soil g 407.5 345.8 369.2 388.3


SU

16. Wt. of moisture g 5.0 24.2 39.4 38.5

17. Moisture Content % 1.23 7.00 10.67 9.92


IS

18. Dry Density of Soil g/cc 1.389 1.568 1.602 1.427

Standard : ASTM D - 1556

Sample No. TP - 13 Date : 12 May 2016 Drawing Title :

Location: Yanbu Distribution Tested By : Wajahat


Hub Project, Yanbu Method : SAND CONE FIELD DENSITY TEST
Saudi Arabia

Project Title : Client / Owner : Geotechnical File No. 2015/104 Fig. No. H - 78
Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Project, Yanbu
Test No. FDT-1 FDT-2 FDT-3 FDT-4

Depth m 0.00 0.30 0.60 0.90

1. Wt. of Wet Soil & Bag g 3581 3709 3264 4016

2. Wt. of Bag g 27 27 27 27

3. Wt. of Soil g 3554 3682 3237 3989

4. Wt. of Sand & Bottle, before g 10071 9957 9851 9615

5. Wt. of Sand & Bottle, after g 5585 5209 5024 4678

6. Wt. of Sand in Hole & Cone g 4486 4748 4827 4937

D
7. Wt. of Sand in Cone g 1575 1575 1575 1575

8. Wt. of Sand in Hole g 2911 3173 3252 3362

BI
9. Density of Sand g/cc 1.507 1.507 1.507 1.507

10. Volume of Hole cc 1932 2105 2158 2231

11. Wet Density of Soil g/cc


R
1.840 1.749 1.500 1.788
FO
CAN No. G11 D-5 X-1 G-25

12. Wt. of can & wet soil g 561.6 458.4 482.8 477.4

13. Wt. of can & dry soil g 560.4 454.2 480.6 474.6
ED

14. Wt. of can g 40.3 41.0 37.9 40.5

15. Wt. of dry soil g 520.1 413.2 442.7 434.1


SU

16. Wt. of moisture g 1.2 4.2 2.2 2.8

17. Moisture Content % 0.23 1.02 0.50 0.65


IS

18. Dry Density of Soil g/cc 1.836 1.731 1.493 1.777

Standard : ASTM D - 1556

Sample No. TP - 14 Date : 11 May 2016 Drawing Title :

Location: Yanbu Distribution Tested By : Wajahat


Hub Project, Yanbu Method : SAND CONE FIELD DENSITY TEST
Saudi Arabia

Project Title : Client / Owner : Geotechnical File No. 2015/104 Fig. No. H - 79
Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Project, Yanbu
IS
SU
ED
FO
R
BI
D
COORDINATES
TR Value
TR # Depth (m.) Temperature, (oC)
(m.k/watt)
Northing Easting

TR - 01 0.50 2650687.96 429383.16 40.00 9.500

TR - 02 0.50 2649845.74 430846.57 43.00 8.779

TR - 03 0.50 2650385.28 430115.06 41.00 9.856

D
BI
TR - 04 0.50 2649957.22 429781.15 46.00 10.350

R
FO
TR - 05 0.50 2650739.03 429509.53 42.00 10.978
ED
SU
IS

Project Title : Drawing Title :


Geotechnical Investigation for
YANBU DISTRIBUTION HUB Project, Yanbu
FIELD THERMAL
Client / Owner :
RESISTIVITY TEST DATA

Geotechnical File No. 2015/104 Figure No. I - 1


IS
SU
ED
FO
R
BI
D
D
BI
R
FO
ED
SU
IS

Drawing Title: Site Classification Criterion as per ASCE 07-05


Project Title : Client / Owner : Geotechnical File No. 2015/104 Fig. No. J-1
Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Project, Yanbu
D
BI
R
FO
ED
SU
IS

Drawing Title: Site Classification Criterion as per ASCE 07-05


Project Title : Client / Owner : Geotechnical File No. 2015/104 Fig. No. J-1(a)
Geotechnical Investigation for
YANBU DISTRIBUTION HUB
Project, Yanbu
TYPICAL CALCULATION FOR SITE CLASSIFICATION

BOREHOLE_BH # 28 & 29
From-To BEGL di (m) Aver. Ni (di / Ni )

Ńch from borehole


Layer : I 0.0-3.0 3 24 0.12500
Layer : III 6.0-30.0 24 58 0.41379
Layer : IV
Layer : V
Layer: VII

Σ (di ) 27 Σ(di/Ni ) 0.53879

Ń =Σ(di ) / Σ(di/Ni ) 50

D
Śu from SPT-Su correlations di (m) Aver.. Sui (kPa) (di / Sui )
Layer : II 3.0-6.0 3 90 0.033333

BI
Σ(di )

R 3 Σ(di/Sui ) 0.033333333
FO
Śu =Σ(di ) / Σ(di/Sui ) 90
ED
SU

Referring ASCE 7-05, Site Class 'D' or as 'Stiff Soil Profile'


IS

Figure J-2
TYPICAL CALCULATION FOR SITE CLASSIFICATION

BOREHOLE_BH # 4 & 5
From-To BEGL di (m) Aver. Ni (di / Ni )

Ńch from borehole


Layer : I 0.0-1.5 1.5 26 0.05769
Layer : III 3.0-21.0 18 56 0.32143
Layer : IV 21.0-30.0 9 75 0.12000
Layer : V
Layer: VI

Σ (di ) 28.5 Σ(di/Ni ) 0.49912

Ń =Σ(di ) / Σ(di/Ni ) 57

D
Śu from SPT-Su correlations di (m) Aver.. Sui (kPa) (di / Sui )
Layer : II 1.5-3.0 1.5 90 0.016667

BI
Layer : III
Layer : VIII

Σ(di )

R 1.5 Σ(di/Sui ) 0.016666667


FO
Śu =Σ(di ) / Σ(di/Sui ) 90
ED
SU

Referring ASCE 7-05, Site Class 'D' or as 'Stiff Soil Profile'


IS

Figure J-3
TYPICAL CALCULATION FOR SITE CLASSIFICATION

BOREHOLE_BH # 16 & 17
From-To BEGL di (m) Aver. Ni (di / Ni )

Ńch from borehole


Layer : II 3.0-18.0 15 46 0.32609
Layer : IV 22.5-30.0 7.5 75 0.10000
Layer : V
Layer : VI
Layer: VII

Σ (di ) 22.5 Σ(di/Ni ) 0.42609

Ń =Σ(di ) / Σ(di/Ni ) 53

D
Śu from SPT-Su correlations di (m) Aver.. Sui (kPa) (di / Sui )
Layer : I 0.0-3.0 3 100 0.030000

BI
18.0-22.5 4.5 200 0.022500

Σ(di )

R 7.5 Σ(di/Sui ) 0.0525


FO
Śu =Σ(di ) / Σ(di/Sui ) 143
ED
SU

Referring ASCE 7-05, Site Class 'C' or as 'Stiff Soil Profile'


IS

Figure J-4
OEO YANBU DISTRIBUTION HUB, YANBU
Geotechnical File No. 2015/104

Input Parameters

Peak Ground Accel (g) = 0.04 CB = Correction factor for borehole diameter vc = Total overburden stress

Earthquake Magnitude, M = 5.5 CE = Correction factor for hammer energy ratio vc '= Effective overburden stress

water table depth (m) 1 CS = Correction factor for sample without liners & = Coefficients for correction of (N1)60 to an equivalent clean sand value (N 1)60C

D
3
Average g above water table (kN/m ) 19 CN = Correction factor for increasing overburden stress CSR = Cyclic Stress Ratio

3
Average g below water table (kN/m ) 20 N60 = Corrected SPT blow counts for hammer energy of 60% CRR = Cyclic Resistance Ratio

BI
Borehole Diameter (mm) 100 (N1)60 = Corrected N 60 for increasing overburden stress MSF = Magnitude Scaling Factor

Required correction for sampler liners (YES/NO) NO

R
Rod Lengths assumed equal to depth plus 0.5m (for above ground extension)

FO
Boring Sample Depth Measure Flag Fines Energy CE CB CR CS N60 svc svc' CN (N1)60 a b (N1)60-cs Stress CSR MSF for Ks for CRR for CRR Factor of
N
No ( )
(m) dN "Clay"
"Cl " or Content
C t t R
Ration,
ti Reductio
R d ti S d
Sand sand M=7.5,
M 75 S f t
Safety
"Unsatur (%) ER (%) n coeff, r d svc'=1at

BH-82 SPT-2 0.75 8 unsaturated 14 100.9 1.68167 1 0.75 1 10.1 14.3 14.3 1.70 17.2 2.2 1.04 20.1 1.00 0.026 1.80 1.00 0.216 n.a. n.a.

BH-82

BH-82
SPT-3

SPT-4
1.50

2.25
8

11
8

8
100.9

100.9
1.68167

1.68167
1

1
ED 0.75

0.75
1

1
10.1

13.9
29.0

44.0
24.1

31.7
1.70

1.62
17.2

22.5
0.3

0.3
1.01

1.01
17.7

23.1
0.98

0.97
0.031

0.035
1.80

1.80
1.00

1.00
0.188

0.259
0.339

0.466
11.0

13.4

BH-82 SPT-5 3.00 4 8 100.9 1.68167 1 0.8 1 5.4 59.0 39.4 1.68 9.1 0.3 1.01 9.5 0.95 0.037 1.80 1.00 0.108 0.195 5.3
SU

BH-82 SPT-6 3.75 5 15 100.9 1.68167 1 0.85 1 7.1 74.0 47.0 1.50 10.7 2.5 1.05 13.8 0.93 0.038 1.80 1.00 0.148 0.266 7.0

BH-82 SPT-7 4.50 12 5 100.9 1.68167 1 0.85 1 17.2 89.0 54.7 1.30 22.2 0.0 1.00 22.2 0.92 0.039 1.80 1.00 0.245 0.441 11.4

BH-82 SPT-8 6.00 23 5 100.9 1.68167 1 0.95 1 36.7 119.0 70.0 1.11 40.9 0.0 1.00 40.9 0.88 0.039 1.80 1.00 2.000 3.600 92.6
IS

Figure J-5
IS
SU
ED
FO
R
BI
D
IS
SU
ED
FO
R
BI
D
IS
SU
ED
FO
R
BI
D
D
BI
R
FO1000
ED
AS PER SAES-A-114
SU
IS

Drawing Title : Project Title :


Geotechnical Investigation for
Geotechnical File No. 2015/104 Figure No. K - 3
YANBU DISTRIBUTION HUB Project, Yanbu
TYPICAL TANK FOUNDATION
DETAIL PROVIDED BY CLIENT Client / Owner :
IS
SU
ED
FO
R
BI
D
IS
SU
ED
FO
R
BI
D
IS
SU
ED
FO
R
BI
D
IS
SU
ED
FO
R
BI
D
D
BI
R
FO
ED
SU
IS

Drawing Title : Project Title :

Geotechnical Investigation for Geotechnical File No. 2015/104 Figure No. K - 8


YANBU DISTRIBUTION HUB Project, Yanbu
CONCRETE EXPOSURE TYPES
Client / Owner :
D
BI
R
FO
ED
SU
IS

Project Title : Drawing Title :

Geotechnical Investigation for


YANBU DISTRIBUTION HUB Project, Yanbu

Client / Owner : CONCRETE EXPOSURE TYPES

Geotechnical File No. 2015/104 Figure No. K - 8(a)


D
BI
R
FO
ED
SU
IS

Project Title : Drawing Title :

Geotechnical Investigation for


YANBU DISTRIBUTION HUB Project, Yanbu

Client / Owner : CONCRETE EXPOSURE TYPES

Geotechnical File No. 2015/104 Figure No. K - 8(b)


IS
SU
ED
FO
R
BI
D
IS
SU
ED
FO
R
BI
D
IS
SU
ED
FO
R
BI
D
IS
SU
ED
FO
R
BI
D
IS
SU
ED
FO
R
BI
D
IS
SU
ED
FO
R
BI
D
IS
SU
ED
FO
R
BI
D
IS
SU
ED
FO
R
BI
D
IS
SU
ED
FO
R
BI
D
IS
SU
ED
FO
R
BI
D
IS
SU
ED
FO
R
BI
D
IS
SU
ED
FO
R
BI
D
IS
SU
ED
FO
R
BI
D
IS
SU
ED
FO
R
BI
D
IS
SU
ED
FO
R
BI
D
IS
SU
ED
FO
R
BI
D
IS
SU
ED
FO
R
BI
D
IS
SU
ED
FO
R
BI
D

Das könnte Ihnen auch gefallen