Sie sind auf Seite 1von 1

TEXT SIZE??

Correct KEYPLAN, a
survey attachment
seems to be
show Tee and attached, we just
straight trough have to keep OS tiles
entering into LOCs as discussed.
base as RED and rest
keep in GREY

Shift earth pot in front


timber boards similar to drg 150
wrongly shown with
gap

IN ACCORDANCE WITH NETWORK


RAIL STANDARD DRAWING NR/CIV/SD/665

confirm all SOPs

Should be in BLACK
and show the Track
support zone on both
sides
RDG1/14/438

* TO BE CONFIRMED
* *
are we having LEVELs from any survey at this location. in case
YES, put the level over proposed trough route entering into LOCS

should be in RED

Das könnte Ihnen auch gefallen