Beruflich Dokumente
Kultur Dokumente
LEAD CONSULTANT
DESIGN CONSULTANT
SUBCONSULTANT
HJ HJ HJ HJ KEY PLAN
300 200
325
150 200
LT-HR-202
200
MH
+2.76 +3.16 QIBLA SIGN AS PER
965
175
255 DIRECTION ON SITE
H4 H4 CLF-HR-101 CLT-HR-103 H4 H4
160 125
CLF-HR-101 LT-HR-301
NOTES
EQ
LT-HR-101
1. DND
2070
LT-HR-401 2. MUR
265
3. Welcome scene: Corridor
+3.16 downlights; Bedside pendant and
bedside table lamp; Headboard LED;
4960
175
4. Relaxation scene: Headboard
EQ EQ LED; Floor lamp
5. Reading scene: Bedside table
lamp/ Pendant light (depending on
the side)
W.A10 6. Master - On/Off
EQ
1935
100
125
100 LT-HR-401
2020 2155
LT-HR-201
165 125
175 165
90 110 465
240
W.A10
160
100
590
+2.90
W.A10
385
1425
03
315
LT-HR-102
EQ
EQ
CLT-HR-102
250
CLF-HR-102
02
EQ
EQ
EQ
1225
+2.60
920
650
395
EQ
EQ
EQ
3550
CS
2.Master On/Off - All
175
EQ EQ 3. Relaxation scene: Cove at tub; Cove
EQ
EQ
CLT-HR-101
610
750
Vanity wall lights
345 230
1195
1 07.04.2019 STAGE 2A - 50% DD SUBMISSION
610
M
100
350
1245
downlights; Bedside pendant and
EQ
EQ EQ EQ EQ ISSUES & REVISIONS
990
1050
Floor lamp; Bathroom ceiling coves
EQ
W.I11 CLIENT
EQ EQ Same button is Master On/Off
835
EQ
295
EQ
460
01
200
EP
240
1. Doorbell
2. Card reader
3. DND + MUR indicator
PROJECT TITLE
DETAILED PLANS
SETTING OUT PLAN
REFLECTED CEILING PLAN
4/5/2019 6:29:43 PM
ID-45-22-001 1