Descripción Und Presupuesto
($)
Acero corrugado Fy=4200 Kg/cm2 grado 60 kg 0.74
Alambre Negro N8 kg 0.97
Laca Desmoldadora gln 10.13
Waterstop 6" m 10.8
Sika Antisol S cilindro 200lt und 140
Geomembrana HDPE lisa 1.5mm m2 3
STOCK PILE FERROBAMBA 15 MT - FUNDACIÓN - TRAMO I
Monto de
Cantidad Cantidad
proyecto metrado SM Previsto
($)
22,885.70 16,935.41
2,016.00 1,955.52
33.768 342.07
288.75 3,118.50
4.754716 665.66 DESC
6,921.65 5,722.20 20,764.96 5,722.20
6,189.12 4,200.00 6,808.03 4,200.00 ML
24.07532 361.13
378.701552 113.61 UND
1.262341 3,787.02
2,525.56 985.30 8,334.35 985.30
56.65 0 365.39 -
1,453.85 442.50 31,984.59 442.50
8.8 0 1,012.00 -
0 -
4,078.80 3,805.50 530,244.00 3,805.50
486.8 200 1,460.40 200.00
8 0 40 -
244.1 75 2,929.20 75.00
660 0 13,200.00 -
48.5 12 3,395.00 12.00
8 8.00
7 7.00
1 1.00
16 1 800 1.00
3 44 270 44.00
46.5 15 223.2 15.00
12.1 0 302.5 -
1,215.40 1,215.40
1,280.30 1,280.30
23.60 23.60
26.00 26.00
6.00 6.00
0.00 -
206.00 206.00
217.00 217.00
2.00 2.00
1.00 1.00
30.00 30.00
8.00 8.00
TUB. 100 TUB. 150 TUB. 300 TUB. 900