INITIAL TECHNICAL ASSESSMENT

Client: Buenarich Commissary Corporation


Site Location: Congressional Ave., Quezon City
Trade: Electrical Systems

Item
Actual Photo Remark/s Recommendation/s
No.
a. Busbar
corrosion/discolorat
ion.

b. Short elbow of
wires going to
breaker due to
insufficient width
Replacement of old
of the panel board
1 panel board with a new
enclosure. It may
assembly.
result to heating
and burn on circuit
breaker terminals.

c. Timeworn circuit
breakers might
malfunction during
fault conditions.

a. Indications of fault
(overload and/or
short circuit) on Replacement of old
busbar. panel board with a new
2 assembly incorporating
b. Timeworn circuit Thermal-Magnetic type
breakers might circuit breakers.
malfunction during
fault conditions.

27 – G Road 9, West Crame, City of San Juan, Metro Manila


e-mail: engineering.isdp@gmail.com | phone: (+63) 915 636 6103
Rewiring of feeder and
a. Deterioration/dama branch circuits.
ge on feeder and Existing wires will be
branch circuit subject for Megger test
3
wires may affect and will be reuse once
the integrity of test result value will
wire insulation. comply to the
minimum requirement.

Replacement of
existing cable tray with
an appropriate type
and size to
accommodate all the
feeder wires.
a. Congested cables
on cable tray and it
4 Rewiring of feeder and
might reduce the
branch circuits.
ampacity of wires.
Existing wires will be
subject for Megger test
and will be reuse once
test result value will
comply with the
minimum requirement.

Prepared By: MKA 5/29/2019

Reviewed By: CVS 5/31/2019

Checked/ Approved By:

Jervie A. Bagsik, REE


General Manager

27 – G Road 9, West Crame, City of San Juan, Metro Manila


e-mail: engineering.isdp@gmail.com | phone: (+63) 915 636 6103