REPUBLIC OF THE PHILIPPINES

2.20 OFFICE OF BUILDING OFFICIALS


SEPTIC 0.60 0.60 1.00 GUIHULNGAN CITY,NEGROS ORIENTAL
TANK 0.50 PHILIPPINES

OBO
VTR
RECOMMENDING APPROVAL: DATE

0.50
1.00
HEAD SANITARY SECTION DATE

APPROVED:
C.O C.O C.O
BUILDING OFFICIAL DATE

PLAN
USE 12mm dia. TEMP. BARS
SPACED AT 0.15 m. O.C B.W

AIR SPACE AIR SPACE


AIR SPACE
INLET
OUTLET

DIGESTIVE
1.60 LEACHING LEACHING CHAMBER

USE 1O mm dia. BARS


SPACED AT 0.20 m.
O.C B.W

0.10

01 PLUMBING LAYOUT PLAN


P1 SCALE 1: 100 MTS SECTION
USE 1O mm dia. VERT. BARS
AND HOR. BARS SPACED AT 0.60 m. O.C

PLUMBING SPECIFICATIONS
TO LA LIBERTAD
SEWER LINE THIS SITE
ALL PLUMBING WORKS AND INSTALLATIONS HEREIN SHALL BE IN ACCORDANCE W/
WC WATER CLOSET
THE LATEST RULES AND AND REGULATIONS OF THE PLUMBING CODE OF THE PHILIPPINES. FD FLOOR DRAIN P. ZAMORA ELEM. SCHOOL
REGULATION OF THE DEPT. OF HEALTH AND REQUIREMENTS OF UTILITY COMPANY. LAV LAVATORY EXISITING
HOUSE LNGAN
CO CLEAN OUT SITIO TUWAY
. GU
IHU
ALL PLUMBING FIXTURES, ACCESSORIES AND MATERIALS SHALL BE BRAND NEW POB
SS SOIL STACK TO
AND OF THE TYPE APPROVED FOR THE SPECIFIC SERVICE PURPOSE, USE AND LOCATION
INTENDED.

VERIFY ALL DIMENSIONS OF THE FIXTURES ACCESSORIES OF THE PIPES IN OTHER


DRAWINGS AND INVESTIGATE ALL POSSIBLE INTERFERRENCE AND CONDITION
AFFECTING PLUMBING WORKS. CERTIFICATION 02 VICINITY MAP
P1 NTS
PROVIDE 2% SLOPE OR 1 4" PER FOOT RUN TO ALL SOIL AND WASTE PIPE LINES. THIS IS TO CERTIFY THAT THERE IS NO ARTESIAN WELL WITH IN THE
USE PVC PIPES AND FITTINGS TO ALL SEWAGE LINES. RADIUS OF 25.00 M. AWAY FROM THE PROPOSED SEPTIC VAULT.

ALL PLUMBING WORKS AND INSTALLATIONS SHALL BE DONE BY EXPERIENCED


AND COMPETENT PLUMBERS UNDER THE DIRECT SUPERVISION OF A DULY LICENSED __________________________________
MASTER PLUMBER. MASTER PLUMBER

APPROVED BY PROJECT OWNER PROJECT TITLE REVISION SHEET CONTENT DATE ISSUED: SHEET NO. :

APPROVED BY:

MEL GACHO
PROPOSED 1-STOREY CHECKED BY: 1
PRC NO. PTR NO. RESIDENTIAL BLDG. DESIGNED BY:
DATE:
TIN:
ADD:
DATE:
PLACE:
ADD: SITIO TUWAY, BRGY. P.ZAMORA, GUIHULNGAN CITY ADD: SITIO TUWAY, BRGY. P.ZAMORA, GUIHULNGAN CITY DRAWN BY: P-