Beruflich Dokumente
Kultur Dokumente
P ROJECT U NITY
AUTHOR
REVIEW
YANICK GAUTHIER
423524079.doc Page 1 of 88
Project Unity Functional Specification - Manufacturing Master Data
APPROVAL
423524079.doc Page 2 of 88
Project Unity Functional Specification - Manufacturing Master Data
Document History
Paragraph # Change
423524079.doc Page 3 of 88
Project Unity Functional Specification - Manufacturing Master Data
Table of Contents
1. Introduction.................................................................................................................... 5
1.1 Reference Documents............................................................................................. 5
1.2 Definitions & Acronyms...........................................................................................5
2. Document Purpose..................................................................................................... 7
3. Short Functional Description....................................................................................8
3.1 MFG01_Manufacturing Master Data.......................................................................8
3.1.1 MFG01-01_Bill of Material....................................................................................8
3.1.2 MFG01-02_Resources.......................................................................................... 9
3.1.3 MFG01-03_Recipe................................................................................................ 9
3.1.4 MFG01-04_Production Version...........................................................................13
3.1.5 MFG01-05_Material Master view (MRP, Work scheduling view).........................13
3.1.6 MFG01-06_Engineering Change Management...................................................14
4. Business Process Flow Chart..................................................................................17
5. Solution...................................................................................................................... 19
5.1 Bill of Material......................................................................................................... 19
5.2 Resources............................................................................................................... 25
5.3 Master Recipe......................................................................................................... 28
5.4 Production Version................................................................................................ 38
5.5 Material Master View.............................................................................................. 43
5.6 Engineering Change Management........................................................................48
5.7 Functional Message Codes & Content.................................................................54
6. Overview Of SAP Transactions & Customizing Activities..................................55
6.1 SAP Transactions................................................................................................... 55
6.2 Customizing Activities........................................................................................... 56
7. Overview of Additional Developments.................................................................87
7.1 Reports, Forms....................................................................................................... 87
7.2 Interfaces................................................................................................................ 87
7.3 Conversions........................................................................................................... 87
7.4 Enhancements........................................................................................................ 87
1. Introduction................................................................................................................ 5
1.1 Reference Documents............................................................................................. 5
1.2 Definitions & Acronyms...........................................................................................5
2. Document Purpose..................................................................................................... 6
3. Short Functional Description....................................................................................6
3.1 MFG01_Manufacturing Master Data.......................................................................6
3.1.1 MFG01-01_Bill of Material....................................................................................7
3.1.2 MFG01-02_Resources.......................................................................................... 8
3.1.3 MFG01-03_Recipe................................................................................................ 8
3.1.4 MFG01-04_Production Version...........................................................................11
3.1.5 MFG01-05_Material Master view (MRP, Work scheduling view).........................12
3.1.6 MFG01-06_Engineering Change Management...................................................13
4. Business Process Flow Chart..................................................................................15
5. Solution...................................................................................................................... 17
5.1 Bill of Material......................................................................................................... 17
5.2 Resources............................................................................................................... 23
5.3 Master Recipe......................................................................................................... 26
5.4 Production Version................................................................................................ 35
5.5 Material Master View.............................................................................................. 40
5.6 Engineering Change Management........................................................................45
5.7 Functional Message Codes & Content.................................................................50
6. Overview Of SAP Transactions & Customizing Activities..................................51
6.1 SAP Transactions................................................................................................... 51
6.2 Customizing Activities........................................................................................... 52
7. Overview of Additional Developments.................................................................84
7.1 Reports, Forms....................................................................................................... 84
423524079.doc Page 4 of 88
Project Unity Functional Specification - Manufacturing Master Data
7.2 Interfaces................................................................................................................ 84
7.3 Conversions........................................................................................................... 84
7.4 Enhancements.......................................................................................................... 84
423524079.doc Page 5 of 88
Project Unity Functional Specification - Manufacturing Master Data
1. INTRODUCTION
1.1 REFERENCE DOCUMENTS
Reference Document
Term/Acronyms Definition/Explanation
BoM Bill of Material; it is a complete, formally structured list of the components that make up a
product or assembly. The list contains the material number of each component, together
with the quantity and unit of measure.
ECM Engineering change management; it is an Engineering change document which is used for
BOM and recipe creation and changes.
FP Finished product; this term describes both the end product manufactured.
SFP Semi-finished Product; Terms describing an intermediate product, which could be used in
another intermediate product or in an end product manufactured.
PO Process Order; it is the main control instrument used in production. It is used to describe,
update and monitor all production-relevant factors, both planned and actual.
QA Quality Assurance
CM Change Master
MD Master Data
QM Quality Management
CP Control Panel
IH Injector Hood
PS Power Supply
423524079.doc Page 6 of 88
Project Unity Functional Specification - Manufacturing Master Data
Term/Acronyms Definition/Explanation
423524079.doc Page 7 of 88
Project Unity Functional Specification - Manufacturing Master Data
2. DOCUMENT PURPOSE
The purpose of this document is to describe how the solution will respond to user
requirements concerning Manufacturing Organizational Structure and, in particular, the major
guidelines for the business rules on creation/maintenance of Manufacturing master data.
Manufacturing Master Data are required in order to make full operational use of SAP
manufacturing processes in the Bracco Unity process scope.
In the context of the Global Service Model initiative Acist EU (AC11) and Binj Eu (SM01)
Plants, initially intended to be distribution centers will be enhanced to support assembly and
repair process through the PP-PI module extension as per UNITY template. The scope is
limited to two main business scenarios:
Assembly processes orders, based on discrete manufacturing and supporting the
transformation process of sub-assemblies into assemblies and devices (e.g. CT-
EXPRESS);
Rework process orders used to support internal repair activities (e.g. CVI)
QM core functionalities supporting the production process will be extended as well, for more
details please refer to [7]. Usage of the PP-PI functionalities will allows full batch/serial
number traceability via process order standard tracking, a better visibility and control on
assembly costs and a full integration with repair service management leveraging the
rework/repair order scenarios (S/N SKU case only). The usage of the PP-PI module will
requires material master data extension is order to manage relevant production master data
(e.g. Work Scheduling View) and additionally the creation from scratch of the relevant
production master data (Resources, BOMs, recipes and Production Versions) described into
the following paragraphs.
For each of the above sub-processes, the following entities are in scope:
423524079.doc Page 8 of 88
Project Unity Functional Specification - Manufacturing Master Data
Master Data is an integral part of the SAP ECC System. Manufacturing Master Data is the
general grouping terminology for all individual master objects used during manufacturing
process.
Different master data objects are used as inputs for the creation and management of the
Production Execution process. These components are:
Bill of Materials;
Resources;
Master Recipes (Routings);
Production Versions;
Material Master;
Engineering Change Management (ECM).
All these key master data elements will be described in the rest of this chapter.
The Bill of Material (BoM) is a complete, formally structured list of components and related
information (e.g., quantity, unity of measure, scrap information, stock category, etc.) to be
used during manufacturing of semi-finished products, finished products (FP), sub-assemblies,
assemblies and devices. Substantially, a bill of material includes the link between the
produced material and the list of components needed to produce/assemble it.
A BoM is defined at plant level for a specific material code and it is basically composed by an
header and an Item Master.
423524079.doc Page 9 of 88
Project Unity Functional Specification - Manufacturing Master Data
Material Code;
Material Description;
Quantity to be used (based on the quantity needed to produce the semi-
finished/finished product reference quantity);
Unit of Measure;
Material reference scrap for production process (only for continous production);
Stock Item Category (stock managed and non-stock managed materials).
It is also possible to maintain BoM status levels to allow material planning and procurement
prior to release BoM for production.
There are two ways for creating a BoM (both under change control process):
create Bill of Material from scratch inserting all header and item data required;
with reference to an existing BoM (creation for copy).
During the creation or change of BOMs it is possible to define a validity period and to track
changes with a specific validity date that reflects when the changes will become effective for
production.
3.1.2 MFG01-02_Resources
The resource represents the logical modeling of a transformation element for the production
process (e.g., production line, operating unit, work center, etc.) as well as the related
persons involved.
A resource is assigned to operations and phases in the master recipe and inherited in process
orders to specify where in the plant and by whom a process step is carried out.
It is possible to create, change or delete a resource in the system. During resource creation
the following elements have to be specified:
a resource category (e.g., a processing unit, a person, an intermediate storage area);
a cost center;
a default Resource Supply Area to manage the material replenishment process;
a Resource Validity period;
a Resource Controlling Area.
2
During the association of the BoM to the Product, it is necessary to define if it has to be used as the
primary BoM for the product or as one among the alternative ones. In the latter case we are talking
about multiple BOMs and the “Alternative BoM Code” field is used.
423524079.doc Page 10 of 88
Project Unity Functional Specification - Manufacturing Master Data
3.1.3 MFG01-03_Recipe
All these key elements are described in detail into the following sections.
Once the change request for a recipe has been created and released for changes the
creation/modification process can start. Concerning the recipe header data, department
Master Data Operator inserts/modifies at least the following header information:
System allows the management of version counter (recipe counter) for master recipes in
order to differentiate different alternatives available (e.g. different reference quantities,
different recipe structure, etc…).
As an alternative to normal process flow, Master Data personnel can decide to create a new
recipe by duplicating an existing one in the system. Duplication of a recipe means that
destination recipe shall inherit all the attributes of the source recipe. Specifically, by
duplicating a recipe, Master Data operator assigns to the destination recipe the header data
taken from the source one. However, it is possible to assign a copied recipe to a different
product code.
Note: Once the Master Data operator has created a recipe header by duplicating an existing
one, the newly created recipe undergoes normal flow for recipe elements assignment.
In order to define the recipe structure the Master Data personnel has to define the following
main set of information:
Operation/phase/section structure (numbering, relationships, resource assignment,
description, etc…);
Standard times definition;
In Process Controls assignment.
423524079.doc Page 11 of 88
Project Unity Functional Specification - Manufacturing Master Data
Operations, identified by a unique and sequential code ID into the recipe, can be actual
processing steps (e.g., mixing, filling, burn-in testing, assembling, etc.), preparatory steps
(e.g., pre-printed materials preparation, dispensing) or steps executed after actual processing
(e.g., quality controls).
In the recipe is defined the sequencing of the operations to be executed during the
production process and the direct relationship with related sections and phases.
Labor and machine standard times measure the resources (machine and operators) required
to complete the operation and can be used for planning, cost accounting and process revision
purposes.
Note: If the Master Data operator is creating/modifying recipes using the duplication
functionality he/she can assign to destination recipe the operation element inherited from the
source recipe or choose another one.
423524079.doc Page 12 of 88
Project Unity Functional Specification - Manufacturing Master Data
A phase represents the steps performed on a resource in order to process a well defined set
of instructions. Typical phases, which make up the operations, are:
Once a resource has been associated to an operation, Master Data operator assigns/modifies
the labor and machine standard times for selected operation, performs a consistency check
for Production version (execution), create/modify relationships between phases.
Master Data Operator assigns/modifies standard labor and machine times for the operation
on the basis of the time needed to execute the activities foreseen. Labor and machine times
are assigned considering the specific product, whose recipe is being created/modified, and its
recipe types (if different recipe types exist).
Specifically, MD operator assigns/modifies the following data for labor and machine activities:
Fixed time (time spent on production activity that does not depend on produced
quantity);
Variable time versus unitary produced quantity (time spent on production activity to
produce a unitary quantity).
Note: if the operator is creating/modifying the recipe using the duplication functionality
he/she can assign to the destination recipe the recipe structure elements inherited from the
source recipe or choose another one.
Master Data Operator will include in the recipe the complete information relating to In-
process controls (IPC) to be executed in the Shop Floor.
Regarding the IPCs the Master Data operator will describe the tests or examinations to be
conducted, directly in the Shop Floor, on appropriate samples of in-process materials of each
batch/lot (associated to a run section). Such control procedures are established to monitor
the output and to validate the performance of those manufacturing processes that may be
responsible for causing variability in the characteristics of in-process material and the drug
product/assembly. Operator will describe the acceptance criteria for the IPC execution (e.g.,
limits, frequency and preset catalog) and appropriate statistical quality control criteria as a
condition for their conformance. IPCs are defined at operation level using an In-Process
Control (IPC) master file containing the following information:
Note: It is always possible for MD operators to create, modify or delete predefined Master
inspection characteristics for a specific recipe.
423524079.doc Page 13 of 88
Project Unity Functional Specification - Manufacturing Master Data
For Acist EU and BINJ EU Process orders, covering basically assembly and rework scenarios
on S/N SKUs, IPC will be not defined at recipe level. The QA release process will rely only on
inspection plans linked to the inspection lots created at the goods receipt posting. For more
details please refer to [7].
The Production Version is the object that references a unique combination of a BoM and a
master recipe for the production of a material on a specific key date.
A production version is mainly composed by the following data:
Details on the material you want to produce, for example, the material number and
storage location where the material has to be stored;
o The date and status of the latest consistency check run on production
version.
Material Master contains the information related to all the materials involved in the production
process. The main grouping criteria used to classify the materials are the following:
Material type
It represents the first level of classification for the materials and it is used by the system to
group together materials with the same properties to manage them properly.
Unit of measure
It contains all the units of measure (UoM) managed by the system and its properties such as
number of significant digits, number of decimal digit, etc. In the material master also the
conversion factors between UoM assigned to the same material will be managed.
423524079.doc Page 14 of 88
Project Unity Functional Specification - Manufacturing Master Data
Lot size
It represents the specific lot size to consider for produced goods (fixed, variable with/without
rounding value) and its related reference values (target value, minimum lot size, maximum
lot size, rounding value).
Batch entry
It contains the rule to allocate the batch in process order for BoM components. The possible
options are:
Backflush
It is possible to set this flag (in the MRP2 view of the material Master) in order to define
whether a material has to be managed using backflushing or not.
423524079.doc Page 15 of 88
Project Unity Functional Specification - Manufacturing Master Data
The process starts when the requester submits a change request, the change control
administrator processes this change request and assign an ECR number to it. Then there is
an impact analysis on all the area related to the master data included in the ECR. After that,
the Change review board reviews it and decides to approve or reject the change request.
All this process is managed on paper (for Acist) and on Trackwise (for Ezem), in both cases
outside SAP.
Once the Change review board approves the ECR, then a change master is created on SAP in
order to authorize and track the maintenance of the master data in the system.
Change master is an object used by the system with basically two main parts:
The Valid from date is the key date from which the object change is effective with the
corresponding change number. It is used to decide when a change performed using the
change number must become effective in the system. The picture below describes graphically
the usage of this date:
The master data impacted by the Change master are the following:
Master Recipe
Bill of Material
Production version (only if both previous two object linked to the PV are selected
in the CM)
Quality assurance is responsible to create, maintain, approve and close the change master in
SAP.
The processing status of a change master is controlled by the Change number status. This
status contains the following information:
423524079.doc Page 16 of 88
Project Unity Functional Specification - Manufacturing Master Data
With these statuses and with the authorizations that will be given to specific users it will be
possible to control the process of the Engineering change management.
The “Authorization group” is used as identification for the plant which the CM is referred to:
this data is filled in the header screen of the CM with one of the following plant specific
values:
“0010” – for Ezem
“0020” – for Acist US
“0030” – for Acist EU
“0040” – for SMC/BINJ EU
In this way, the user can immediately recognize which plant the CM is impacting.
2. Quality assurance operator uses the change number to change the master data
impacted by the change; after that changes have been implemented, the Quality
assurance operator changes the Change no. status to “04”. This user is not
authorized to move the status to “05” or “06”.
3. Quality assurance approver reviews the change and, in case of approval, moves the
Change no. status to “05”. Now Quality assurance approver can change the VFD to
the correct one. If required, Quality assurance approver can access to C223
transaction in order to align the VFD of the Production versions eventually linked to a
recipe/BOM assigned to the CM.
4. If other modifications are required, Quality assurance approver can move back the
Change no. status to “03”, so CM can be used again.
5. If a change must be rejected, Quality assurance approver must set the Valid from
date to 31.12.2099, so the change will never be considered by the system.
6. When Quality assurance approver decides to close the CM, can set the Change no.
status to “06”. In this case the CM cannot be used for any further change on relevant
objects.
423524079.doc Page 17 of 88
Project Unity Functional Specification - Manufacturing Master Data
423524079.doc Page 18 of 88
Project Unity Functional Specification - Manufacturing Master Data
423524079.doc Page 19 of 88
Project Unity Functional Specification - Manufacturing Master Data
5. SOLUTION
5.1 BILL OF MATERIAL
Line No. Description of solution with Business process step number T.Code Cust. No Dev. No URS Reference
SMC/BINJ EU
Acist Asia
Acist US
Acist EU
Ezem
BDI
UNITY-FSP- BOM structure: header CS01 001 MFG01-01_0010 X X X X
MFG-00-0010
A BoM is defined at plant level for a specific material code and consists of an CS02 002 MFG01-01_0020
header and an Item Master that can be displayed accessing CS03 by material
CS03 003 MFG01-01_0060
code.
004 MFG01-01_0070
The BoM header contains:
Material Code; MFG01-01_0080
Material Description; MFG01-01_0090
Validity Period;
Product reference quantity; MFG01-01_0110
BoM usage;
CO01-08_0020
BoM status;
Alternative BoM Code;
BOM Text (valid for all the alternative BOM for the semi-finished
and finished products);
Alternative text (valid for the specific alternative BOM);
Base Quantity: quantity which all component quantities in a BOM
refer to;
From and To lot size.
423524079.doc Page 20 of 88
Project Unity Functional Specification - Manufacturing Master Data
Line No. Description of solution with Business process step number T.Code Cust. No Dev. No URS Reference
SMC/BINJ EU
Acist Asia
Acist US
Acist EU
Ezem
BDI
The alternative BoM code is used in case the BoM for the material is not the
primary BoM, but one of the alternative ones (Multiple BoM).
Note: purified water and nitrogen are managed as non-stock item into the Bill of
Materials for produced products (daily batch is created by quality department and
mandatory assigned on process order prior order release; for more details please
refer to [7]).
423524079.doc Page 21 of 88
Project Unity Functional Specification - Manufacturing Master Data
Line No. Description of solution with Business process step number T.Code Cust. No Dev. No URS Reference
SMC/BINJ EU
Acist Asia
Acist US
Acist EU
Ezem
BDI
CS02 MFG01-01_0040
externally procured components – raw materials & packaging
components; CS03 CO01-08_0020
externally procured components – “sub-assemblies”;
internally produced components - "semi-finished products";
internally produced components - "sub-assemblies";
internally produced components - "assemblies" (CP, IH, PS);
internally produced components - "serialized finished products" (in
case of re-work process);
internally produced components - "finished products" (in case of re-
work process);
Potency based components: Active ingredients are defined in the
BOM in alternative UoM (GAI or KAI) and the quantity is expressed
at 100% of the potency. Refer to line UNITY-FSP-MFG-00-0585 for
details.
Example:
X X X X
The component scrap component is available through selecting a line for an item
(in the General item overview screen) and pressing the button “item”, the system
will open the “Item: all data” screen.
423524079.doc Page 22 of 88
Project Unity Functional Specification - Manufacturing Master Data
Line No. Description of solution with Business process step number T.Code Cust. No Dev. No URS Reference
SMC/BINJ EU
Acist Asia
Acist US
Acist EU
Ezem
BDI
008 MFG01-01_0160
Note: for the details of the change number request please refer of dedicated ECM
section of this document. MFG01-06_0010
SD01-03_0230
BOM usage can be one of the following:
Note: values 1, 2, 6 are standard in SAP, while 8 is a customizing profile added for
Validation BOM. Validation BOM will be not used by Acist EU and BINJ EU.
During the access to the transaction, system verifies that the user is authorized to
perform the creation of the BoM.
During the access to the transaction, system verifies that the user is authorized to
perform the creation of the BoM.
423524079.doc Page 23 of 88
Project Unity Functional Specification - Manufacturing Master Data
Line No. Description of solution with Business process step number T.Code Cust. No Dev. No URS Reference
SMC/BINJ EU
Acist Asia
Acist US
Acist EU
Ezem
BDI
The creation of the costing BOM should be done only after approval of the
production BOM to avoid additional changes in case the QA approval requires a
modification to the BOM
Additional costing BOM for simulation purposes will be handled directly by the
controlling teams.
4
The possibility of modifying a BoM without change number is blocked implementing “SAP Note 420878 - BOM change without change number possible (W 29 045)”
423524079.doc Page 24 of 88
Project Unity Functional Specification - Manufacturing Master Data
Line No. Description of solution with Business process step number T.Code Cust. No Dev. No URS Reference
SMC/BINJ EU
Acist Asia
Acist US
Acist EU
Ezem
BDI
During the access to the transaction, system verifies that the user is authorized to
perform changes on the BoM.
During the access to the transaction, system verifies that the user is authorized to
delete the BoM.
If you delete the BOM with reference to a change number, the system takes the
valid-from data from the change master record as the deletion date and the BOM
is deleted on this date. X X X X
Note: You can only use a change number with a valid-from date within the validity
period of the BOM.
Example 1:
The authorized user wants to delete the BOM with change number D1 .
The change master record has the valid-from date 01/01/1997 .
The authorized user cannot delete the BOM with change number D1, because the
BOM is not valid on 01/01/1997.
UNITY-FSP- Change documents attached to the BOM can be visualized through transaction CS80 MFG01-01_0120
MFG-00-0120 CS80 or directly though the Audit Trail functionality (transaction AUT10). X X X X
AUT10 MFG07-01_0020
For the details of the audit trail please refer to [6].
423524079.doc Page 25 of 88
Project Unity Functional Specification - Manufacturing Master Data
423524079.doc Page 26 of 88
Project Unity Functional Specification - Manufacturing Master Data
5.2 RESOURCES
Line No. Description of solution with Business process step number T.Code Cust. No Dev. No URS Reference
SMC/BINJ EU
Acist Asia
Acist US
Acist EU
Ezem
BDI
UNITY-FSP- Resource creation CRC1 010 MFG01-02_0010 X X X X
MFG-00-0130 The resource represents the logical modeling of a transformation element for the C201 011 MFG01-02_0030
production process (e.g., production line, operating unit, work center, etc.) as well
as the related persons involved. C202 023 MFG01-02_0040
A resource is assigned to operations and phases in the master recipe (C201/C202)
COR1 024 MFG01-02_0050
and in process orders (COR1/COR2) to specify with whom or at which parts of the
plant a process step is carried out. COR2 025 MFG01-02_0060
Note: resource category ‘0008’ (costing relevant) is used for Ezem Montreal and
Acist; resource category ‘Z008’ (not costing relevant) is used for Ezem Mississippi
in order to not perform product costing calculation; for Acist EU and Binj EU both
resource categories ‘0008’ and ‘Z008’ are used, as mainly assembly processes are
managed used work centers represent assembly station.
The system allows the assignment of a standard value key in order to define
standard values to be maintained, at master recipe level, for operations assigned
to the specific resource.
423524079.doc Page 27 of 88
Project Unity Functional Specification - Manufacturing Master Data
Line No. Description of solution with Business process step number T.Code Cust. No Dev. No URS Reference
SMC/BINJ EU
Acist Asia
Acist US
Acist EU
Ezem
BDI
ZLAB_F for fixed labor time;
ZMAC_V for variable machine time;
ZLAB V for variable labor time;
ZQC_V for QC laboratory time (variable).
For the standard values is activated the possibility to define the yield factor at
operation level in the master recipe.
During the access to the transaction, system verifies that the user is authorized to
perform the creation of the resource.
X X X X
During the access to the transaction, system verifies that the user is authorized to
perform the creation of the resource.
UNITY-FSP- Creation of a resource is traced in the system. A report can be accessed using CR10 MFG01-02_0020 X X X X
MFG-00-0150 transaction CR10.
Selection parameter in the initial screen are: MFG01-02_0030
423524079.doc Page 28 of 88
Project Unity Functional Specification - Manufacturing Master Data
Line No. Description of solution with Business process step number T.Code Cust. No Dev. No URS Reference
SMC/BINJ EU
Acist Asia
Acist US
Acist EU
Ezem
BDI
Plant;
Resource (work center) name;
Resource (work center) category;
Person responsible;
From-to date.
UNITY-FSP- It is possible to find the where-used list of a resource. This report will be run using CA81 MFG01-02_0020
MFG-00-0160 selection criteria such as resource code and plant. The system gives information X X X X
about master recipe in which the resource code is used. MFG01-02_0030
UNITY-FSP- In Costing tab of the resource, a cost center must be assigned in order to CRC1 MFG01-02_0080
MFG-00-0170 associate Activity Type with a Cost rate.
CRC2 CO01- X X X X
08_0061_GSM
UNITY-FSP- Accessing the CR05 transaction with the plant code it is possible to view the list of CR05 MFG01-02_0020
X X X X
MFG-00-0180 all the resources created for the given plant.
423524079.doc Page 29 of 88
Project Unity Functional Specification - Manufacturing Master Data
SMC/BINJEU
Acist Asia
Acist US
Acist EU
Ezem
BDI
UNITY-FSP- Master Recipe creation C201 012 MFG01-03_0020 X X X X
MFG-00-0200 Master recipe represents a sequence of operations each of them representing a 013 MFG01-03_0030
step required actually to produce semi-finished products, finished products, sub-
assemblies, assemblies and devices. MFG01-03_0130
MFG01-03_0140
A recipe can be created accessing C201 transaction and inserting recipe group, or
material and plant and the change request number. MFG01-03_0150
Note: for the details of the change number request please refer of dedicated ECM MFG01-03_0160
section of this document.
MFG01-03_0180
Each recipe is defined at Plant level. MFG01-03_0290
When creating a recipe, the authorized user has to insert at least the following MFG01-06_0010
information in the recipe header:
Master Recipe description;
Master Recipe Usage (e.g., Production, Engineering, Costing);
Master Recipe group;
Master Recipe validity period;
Product code;
Product Reference quantity (product quantity from which needed
component quantities are calculated).
During the access to the transaction, system verifies that the user is authorized to
423524079.doc Page 30 of 88
Project Unity Functional Specification - Manufacturing Master Data
Line No. Description of solution with Business process step number T.Code Cust. No Dev. No URS Reference
SMC/BINJEU
Acist Asia
Acist US
Acist EU
Ezem
BDI
perform the creation of the recipe.
UNITY-FSP- Master Recipe creation for copy C201 MFG01-03_0020
MFG-00-0210 As an alternative to normal process flow, the authorized user can decide to create MFG01-03_0050
a new recipe by duplicating an existing one in the system. Also in this case the
authorized user has to specify the change number in order to start the creation MFG01-03_0110
process.
MFG01-03_0190
Duplication of a recipe means that destination recipe shall inherit all the attributes
of the source recipe. However, it is possible to assign a copied recipe to a different MFG01-03_0200
product code. X X X X
Specifically, by duplicating a recipe, the authorized user assigns to the destination MFG01-03_0210
recipe the header data and the item data taken from the source one. MFG01-03_0220
However, it is possible for the authorized user to apply changes to the originally
item data inserting a new operation/phase, deleting an existing one, etc. MFG01-03_0290
During the access to the transaction, system verifies that the user is authorized to MFG01-06_0010
perform the creation of the recipe.
X X X X
When a recipe is created the status is set as “1”, once it is ready to be used for
production activities it is set as “4”.
Note: status “2” and “3” are mentioned since they are possible entries from
standard SAP, however, they are not planned to be used.
423524079.doc Page 31 of 88
Project Unity Functional Specification - Manufacturing Master Data
Line No. Description of solution with Business process step number T.Code Cust. No Dev. No URS Reference
SMC/BINJEU
Acist Asia
Acist US
Acist EU
Ezem
BDI
UNITY-FSP- If no code is filled in the Recipe group field in the initial screen, when the Recipe is C201 022 MFG01-03_0020
MFG-00-0230 saved the system automatically assigns an internal number to the Recipe.
The following number ranges are configured in the system for internal and
external master recipe group assignment:
423524079.doc Page 32 of 88
Project Unity Functional Specification - Manufacturing Master Data
Line No. Description of solution with Business process step number T.Code Cust. No Dev. No URS Reference
SMC/BINJEU
Acist Asia
Acist US
Acist EU
Ezem
BDI
described into paragraph 3.1.6
In combination with the recipe also the Production version are created.
Recipe Description
Usage
1 Production
2 Engineering/Design
7 Costing
8 Validation
423524079.doc Page 33 of 88
Project Unity Functional Specification - Manufacturing Master Data
Line No. Description of solution with Business process step number T.Code Cust. No Dev. No URS Reference
SMC/BINJEU
Acist Asia
Acist US
Acist EU
Ezem
BDI
Packing, etc.), preparatory steps (e.g., pre-printed materials preparation, etc.) or MFG01-03_0230
steps executed after actual processing (e.g., quality controls).
423524079.doc Page 34 of 88
Project Unity Functional Specification - Manufacturing Master Data
Line No. Description of solution with Business process step number T.Code Cust. No Dev. No URS Reference
SMC/BINJEU
Acist Asia
Acist US
Acist EU
Ezem
BDI
ZLAB_F for fixed labor time;
ZMAC_V for variable machine time;
ZLAB V for variable labor time;
ZQC_V for QC laboratory time (variable).
Please refer to resource master section of this document for more details.
For Acist EU and BINJ EU Machine times are not relevant as assembly and repair
processes require mainly labour time
UNITY-FSP- In the General Data tab the authorized user has to insert the operations, phases, C201 017 MFG01-03_0160
MFG-00-0280 resources and control keys as required.
C202
Five control keys have been identified so far:
UNITY-FSP- To be able to schedule the recipe, plan capacities, enable confirmation by C201 016 MFG01-03_0100 X X X X
MFG-00-0290 milestone, relationships that determine how phases relate to each other in terms
of time are entered, selecting the phases in Operations tab and pushing C202
Relationships button.
Indicator Predecessor/Successor is used to specify how the authorized user
defines the relationship of a phase record to other phases.
The type of relation is the key used to determine the type of relationship between
phases. The following are allowed:
SF = Start to Finish;
SS = Start to Start;
FS = Finish to Start (Usual default);
FF = Finish to Finish.
423524079.doc Page 35 of 88
Project Unity Functional Specification - Manufacturing Master Data
Line No. Description of solution with Business process step number T.Code Cust. No Dev. No URS Reference
SMC/BINJEU
Acist Asia
Acist US
Acist EU
Ezem
BDI
Furthermore, user can define sections within an Operation such as:
Set-up (preparation for production activity);
Run (actual production activity);
Closure (closure for production activity).
To allocate the BOM to the recipe the following actions are carried out in the
system:
1. The tab “Materials” is selected. If more than one material is assigned to
the recipe, the authorized user has to select the correct one. X X X X
2. The system displays the Production Version creation screen; the
following data need to be filled:
The system will load automatically the BOM that has been indicated and it will be
possible to assign each component of this BOM at the phase where it will be
consumed, by selecting the material and pressing the Create assignment button.
value “Automatic valuation based on Inspection Point definition” for the parameter
Inspection Point Completion.
423524079.doc Page 36 of 88
Project Unity Functional Specification - Manufacturing Master Data
Line No. Description of solution with Business process step number T.Code Cust. No Dev. No URS Reference
SMC/BINJEU
Acist Asia
Acist US
Acist EU
Ezem
BDI
during assembly/repair processes.
UNITY-FSP- Inspection Characteristic: C201 MFG01-03_0250
MFG-00-0320
System associates at the operation an In-Process Control (IPC) master file C202 MFG01-03_0260
containing the following information: C203 MFG01-03_0270
Master Inspection Characteristic (MIC) Code;
Master Inspection Characteristic Description;
Master Inspection Characteristic Type (IPC Qualitative or Quantitative).
X X X
In the Operation folder of the recipe, when a master recipe is created user can
insert
or display the IPC information in the production operations with the push button
Inspection Characteristic.
For Acist EU and BINJ EU the functionality is marked as applicable (as covered by
standard SAP) even if for current business scenario IPC execution is not requested
during assembly/repair processes.
Each MIC must be inserted in a row. Each Row is uniquely identified with the
number Inspection Characteristic number: it explicitly identifies an inspection
characteristic within an operation.
For Acist EU and BINJ EU the functionality is marked as applicable (as covered by
standard SAP) even if for current business scenario IPC execution is not requested
during assembly/repair processes.
423524079.doc Page 37 of 88
Project Unity Functional Specification - Manufacturing Master Data
Line No. Description of solution with Business process step number T.Code Cust. No Dev. No URS Reference
SMC/BINJEU
Acist Asia
Acist US
Acist EU
Ezem
BDI
UNITY-FSP- Material assignment C201 MFG01-03_0240
MFG-00-0340
Material assignment consists in assigning BoM materials to specific C202
phases/operations. To perform material assignment, the authorized user has to X X X X
access the C201/C202 transaction and to select the material/s to assign to the
phases and the subordination relationship between phases and operations in the
Material tab.
Accessing a recipe in change modality, the authorized user can insert a new
operation/phase, deleting an existing one, modify header data, modify material
assignment, etc.
Note: During the access to the transaction, system verifies that the user is
authorized to perform changes on the recipe.
UNITY-FSP- Master Recipe deletion C202 MFG01-03_0020 X X X X
MFG-00-0370
Authorized user can also delete a recipe. In this case, he has to set the deletion MFG01-03_0290
indicator in the master recipe header. When this indicator is selected the recipe
cannot longer be used for production activities.
423524079.doc Page 38 of 88
Project Unity Functional Specification - Manufacturing Master Data
Line No. Description of solution with Business process step number T.Code Cust. No Dev. No URS Reference
SMC/BINJEU
Acist Asia
Acist US
Acist EU
Ezem
BDI
Note: During the access to the transaction, system verifies that the user is
authorized to perform changes on the recipe.
X X X X
For BINJ EU the need to manage recipe having operation not relevant for costing
purposes arises from the need to manage the specific scenario where assembly
activities for Empower and CT-Express (under the ownership of BINJ EU and
created under the plant SM01) are performed from ACIST EU technicians. In this
specific case the business requirement is to track just the actual labor hour spent
for the order completion, without post any cost in accounting. As a result, also in
the standard cost calculation of the manufactured material involved in this process
flow, labor hours costs must not be considered.
423524079.doc Page 39 of 88
Project Unity Functional Specification - Manufacturing Master Data
SMC/BINJ EU
Acist Asia
Acist EU
Acist US
Ezem
BDI
UNITY-FSP- Production Version structure C201 MFG01-01_0050
MFG-00-0400 The Production Version is the object that references a unique combination of a
C202 MFG01-03_0040
material list (BoM) and a recipe for the production of a material on a key date.
MFG01-04_0010
It is defined at plant level and it is logically created at the act of linking a BoM to a
MFG01-04_0020
Master Recipe.
CO01-
User shall be able to define one or more Production Versions for each material that 08_0081_GSM
is produced internally. The following information associated to one Production
Version are managed into the system:
Plant;
Material Code;
Production Version (four-character field representing the Production X X X X
Version, and its description);
The Lock flag (two options available: “Not Locked” and “Locked for any
usage”. By default, the flag is set to “Not Locked”. This flag will be used to
block any production versions that are not ready to be used in production
execution or must no longer be used in production);
Lot size range;
Validity period for the PV (valid from and valid to date);
Task list type: “Master recipe” = 2;
Recipe group and counter;
Alternative BOM and BOM usage;
Change number assignment.
Note: only specific users are authorized to lock a production version to avoid its use
in production.
UNITY-FSP- A production version is unique for the following combination: C201 MFG01-04_0020 X X X X
MFG-00-0410 Material Code/ Plant/ Production Version Code. Therefore, a product version is
created for a dedicated plant. C202 MFG01-04_0050
C223 MFG01-04_0060
It is possible to create a production version from transaction code C223 or
C201/C202. In order to limit the number of transaction in the system, it is MFG01-04_0070
recommended to create a production version using the Recipe transactions
C201/C202 while no production version/”usage type” exists for the material.
423524079.doc Page 40 of 88
Project Unity Functional Specification - Manufacturing Master Data
Line No. Description of solution with Business process step number T.Code Cust. No Dev. No URS Reference
SMC/BINJ EU
Acist Asia
Acist EU
Acist US
Ezem
BDI
Otherwise, the Production Version should be created using C223 transaction.
UNITY-FSP- Production Version created for copy/duplication C223 MFG01-04_0030
MFG-00-0420
The Production Version can also be created for copy of an existing one. In this case MFG01-04_0040
the authorized user has to access the C223 transaction, selecting a plant to see all
the available production versions, select the one to copy, and then click on the copy X X X X
button. The system will ask to the user a code for the new production version. It is
also possible to assign a different product code to the new production version
created for copy.
In the Production version group box, the authorized user has to choose the fields to
modify (for example, its validity period). X X X X
Once the production version has been created, the authorized user can no longer
change the production version key or its BOM assignment.
To check the status of a Production Version, the authorized user has to access the
C201/C202/C203 transaction with the details of the recipe. Then, in the Materials
tab the user has to click on the production version to open the Production Version
view.
423524079.doc Page 41 of 88
Project Unity Functional Specification - Manufacturing Master Data
Line No. Description of solution with Business process step number T.Code Cust. No Dev. No URS Reference
SMC/BINJ EU
Acist Asia
Acist US
Acist EU
Ezem
BDI
and error messages about inconsistencies are displayed in the
check result. The check status for each object is displayed as an
icon in the production version. The following icons may be
displayed:
423524079.doc Page 42 of 88
Project Unity Functional Specification - Manufacturing Master Data
Line No. Description of solution with Business process step number T.Code Cust. No Dev. No URS Reference
SMC/BINJ EU
Acist Asia
Acist US
Acist EU
Ezem
BDI
At the production version level, the check status is summarized as follows:
“Not Locked”, set when the Production Version can be used within the
validity date timeframe;
“Locked for any usage”, set when the Production version cannot be used
within the validity date timeframe;
X X X X
Bringing together the “Production Version Lock status” with “valid from” and “valid
to dates”, we may have additional intended status like:
423524079.doc Page 43 of 88
Project Unity Functional Specification - Manufacturing Master Data
Line No. Description of solution with Business process step number T.Code Cust. No Dev. No URS Reference
SMC/BINJ EU
Acist Asia
Acist US
Acist EU
Ezem
BDI
PXXX where XXX is the revision version of the normal internal production
version;
CXXX where XXX is the revision version of the clinical production version;
RXXX where XXX is the revision version of the rework production version.
UNITY-FSP- It is possible to have multiple Production Versions ‘not locked’ at the same time and C223 MFG01-04_0010
MFG-00-0490 coexisting in the system.
X X X X
The system allows creation of different Production versions valid at the same time,
each of them having alternative bill of materials or/and different recipe.
423524079.doc Page 44 of 88
Project Unity Functional Specification - Manufacturing Master Data
Line No. Description of solution with Business process step number T.Code Cust. No Dev. No URS Reference
SMC/BINJ EU
Acist Asia
Acist US
Acist EU
Ezem
BDI
UNITY-FSP- Material Master: general features MM01 MFG01-05_0020
MFG-00-0500 Material Master contains the information related to all the materials involved in the MM02
production process. Materials are classified in Material Master by type.
It is possible to define all the information related to the production process MM03
accessing into the material master the views managed by manufacturing X X X X
department: Work Scheduling and MRP views.
For more details on material master data, please refer to Master Data Functional
Specification.
UNITY-FSP- Material Master: Procurement details (MRP2 view) MM01 MFG01-05_0010
MFG-00-0510
In the MRP2 view of the material master it is possible to set the following fields: MM02
Procurement type: it specifies whether the material has to be produced
in house (E) or to be procured outside (F) or both (X);
Prod. Stor. location: the default storage location where produced goods X X X X
will be posted during the Goods Receipt from Production;
Storage Loc. for EP: the first storage location for materials bought
outside (external procurement);
Special Procurement: it explains in more details what kind of
procurement the material has to undergo (e.g., Subcontracting).
Backflush Description
01 Always backflush
02
Workcenter decides whether to
423524079.doc Page 45 of 88
Project Unity Functional Specification - Manufacturing Master Data
backflush.
Always backflush means that the material is always managed for backflushing
consumption on all the process orders where the material is used.
Note: Batch entry indicator refers to the components of an order, not to the
finished product to be manufactured.
For Ezem value “3” is used for all materials, except for potency-based
components, purified water and nitrogen which has to be set with value “1”.
For Acist value “2” is used for all materials to be replenished in production area.
For Acist EU and BINJ EU the batch entry field will be left blank as BOM
components for assembly/repair process are mainly S/N SKUs. The option will be
still available for spare parts used in repair process in case
For the details of how this field is managed at Inventory level, please refer to [2].
423524079.doc Page 46 of 88
Project Unity Functional Specification - Manufacturing Master Data
the production scheduling profile that has to be used for the material. The MFG01-05_0110
scheduling profile is used to manage specific rules for:
ZACAUT: for Automatic Batch Creation (at Order Release) in ACIST US;
Note: the production scheduling profile is then automatically copied by the system
into the order during order creation.
In the Tolerance Data tab of Work scheduling view it is also possible to:
423524079.doc Page 47 of 88
Project Unity Functional Specification - Manufacturing Master Data
423524079.doc Page 48 of 88
Project Unity Functional Specification - Manufacturing Master Data
423524079.doc Page 49 of 88
Project Unity Functional Specification - Manufacturing Master Data
SMC/BINJ EU
Acist Asia
Acist US
Acist EU
Ezem
BDI
UNITY-FSP- Change Master CC01 019 MFG01-06_0030 X X X X
MFG-00-0590
Change Master document management is composed by two subprocesses: 020 MFG01-06_0040
Change Number Creation; MFG01-06_0100
Change Number Release (Closure). MFG01-06_0110
Note: The approval process is not mentioned since it is managed outside SAP (in
Trackwise for Ezem, through paper-based process in Acist).
Authorized users are able to create/modify master data objects managed with
Change Master document management process only using created, and not
closed, Change Numbers.
The following information for a Change Master are maintained into the system:
Validity Date;
Change Document Profile (which is the plant in charge of the change);
Reason for change (contains a link to the Change Request number);
Master Data Objects linked to the Change Document;
Change Request Status.
Following Change Master Profiles are defined into the system to segregate master
data activities at the different locations:
ZMD001 - Change Master Record Profile – Ezem
ZMD002 - Change Master Record Profile -– Acist US
ZMD004 – Change Master Record Profile – Acist EU
ZMD005 – Change Master Record Profile – SMC/Binj EU
423524079.doc Page 50 of 88
Project Unity Functional Specification - Manufacturing Master Data
Line No. Description of solution with Business process step number T.Code Cust. No Dev. No URS Reference
SMC/BINJ EU
Acist Asia
Acist US
Acist EU
Ezem
BDI
Note: Only authorized users are able to modify Change Number validity date.
423524079.doc Page 51 of 88
Project Unity Functional Specification - Manufacturing Master Data
Line No. Description of solution with Business process step number T.Code Cust. No Dev. No URS Reference
SMC/BINJ EU
Acist Asia
Acist US
Acist EU
Ezem
BDI
ZMD002 - Change Master Record Profile -– Acist US
ZMD004 - Change Master Record Profile – Acist EU
ZMD005 – Change Master Record Profile – SMC/Binj EU
In the Change header screen user must enter the following information:
Change number description (40 digits);
Valid from date, to indicate the date from which the changes will be
valid;
Reason for change, general information about the reason of the
modification (40 digits, not mandatory).
UNITY-FSP- In order to assign specific master data objects which must be changed with a CM, CC01 MFG01-06_0010
MFG-00-0620 the authorized user has to push the button Objects and enter in the appropriate
tabs the reference to the master data.
Depending on the object to create/modify, user has to enter the following data:
423524079.doc Page 52 of 88
Project Unity Functional Specification - Manufacturing Master Data
Line No. Description of solution with Business process step number T.Code Cust. No Dev. No URS Reference
SMC/BINJ EU
Acist Asia
Acist US
Acist EU
Ezem
BDI
change number, then user can enter in the Objects screen and set, for the
relevant object(s), the indicator “Lock”.
In this way, a master data for which that indicator is active cannot be changed
using that specific change number.
When the authorized user has performed all the required changes in the system,
he can enter in transaction CC02 and change the Change no. status from ‘01’ to
‘02’. With this status, user is not allowed to change the master data. Also the Valid
from date cannot longer be changed.
UNITY-FSP- QA can inquiry all the CMs with status “04” in order to verify if the change can be CC02 019 MFG01-06_0080
MFG-00-0660 approved or not.
C223
In transaction CC02, user can open the match code, select Change master by
description and change type and filter for Change no. status = “04”.
If a CM can be approved, QA can then set the Change no. status to “05”. With this
status, user is not allowed to change the master data, but Valid from date field X X X X
can be changed: QA will set it to the real one, in order to activate the change.
If required, QA can also access to C223 transaction in order to set the real Valid
from date for a Production version linked to a recipe/BOM assigned to the CM.
423524079.doc Page 53 of 88
Project Unity Functional Specification - Manufacturing Master Data
Line No. Description of solution with Business process step number T.Code Cust. No Dev. No URS Reference
SMC/BINJ EU
Acist Asia
Acist US
Acist EU
Ezem
BDI
UNITY-FSP- If a CM cannot be approved because modifications are required, then QA has to CC02 019 MFG01-06_0080
MFG-00-0670 move the Change no. status from “04” to “03” in order to enable the Functional
Data Expert to use it again. MFG01-06_0130
all the Master Recipes that have been changed through the ECM
process.
423524079.doc Page 54 of 88
Project Unity Functional Specification - Manufacturing Master Data
Line No. Description of solution with Business process step number T.Code Cust. No Dev. No URS Reference
SMC/BINJ EU
Acist Asia
Acist US
Acist EU
Ezem
BDI
It is also possible to inquire for a specific change number the list of all the master
data that have been created/changed through it or to see all the information
related to it (CC03 transaction).
In any moment, for the authorized user it is possible to see ECM reporting views
clicking on Environment Reporting on the top of the SAP screen and eventually
selecting some filtering criteria for showing the results.
423524079.doc Page 55 of 88
Project Unity Functional Specification - Manufacturing Master Data
423524079.doc Page 56 of 88
Project Unity Functional Specification - Manufacturing Master Data
423524079.doc Page 57 of 88
Project Unity Functional Specification - Manufacturing Master Data
423524079.doc Page 58 of 88
Project Unity Functional Specification - Manufacturing Master Data
423524079.doc Page 59 of 88
Project Unity Functional Specification - Manufacturing Master Data
007 Define priorities for BOM Usage (OPJI) SPRO/Production planning for
process industries/Master
Data/Process
Order/Operations/BOM
Selection/Define priorities for
BOM Usage (OPJI)
423524079.doc Page 60 of 88
Project Unity Functional Specification - Manufacturing Master Data
423524079.doc Page 61 of 88
Project Unity Functional Specification - Manufacturing Master Data
423524079.doc Page 62 of 88
Project Unity Functional Specification - Manufacturing Master Data
423524079.doc Page 63 of 88
Project Unity Functional Specification - Manufacturing Master Data
423524079.doc Page 64 of 88
Project Unity Functional Specification - Manufacturing Master Data
423524079.doc Page 65 of 88
Project Unity Functional Specification - Manufacturing Master Data
423524079.doc Page 66 of 88
Project Unity Functional Specification - Manufacturing Master Data
423524079.doc Page 67 of 88
Project Unity Functional Specification - Manufacturing Master Data
423524079.doc Page 68 of 88
Project Unity Functional Specification - Manufacturing Master Data
423524079.doc Page 69 of 88
Project Unity Functional Specification - Manufacturing Master Data
423524079.doc Page 70 of 88
Project Unity Functional Specification - Manufacturing Master Data
423524079.doc Page 71 of 88
Project Unity Functional Specification - Manufacturing Master Data
423524079.doc Page 72 of 88
Project Unity Functional Specification - Manufacturing Master Data
423524079.doc Page 73 of 88
Project Unity Functional Specification - Manufacturing Master Data
423524079.doc Page 74 of 88
Project Unity Functional Specification - Manufacturing Master Data
423524079.doc Page 75 of 88
Project Unity Functional Specification - Manufacturing Master Data
423524079.doc Page 76 of 88
Project Unity Functional Specification - Manufacturing Master Data
423524079.doc Page 77 of 88
Project Unity Functional Specification - Manufacturing Master Data
423524079.doc Page 78 of 88
Project Unity Functional Specification - Manufacturing Master Data
423524079.doc Page 79 of 88
Project Unity Functional Specification - Manufacturing Master Data
423524079.doc Page 80 of 88
Project Unity Functional Specification - Manufacturing Master Data
423524079.doc Page 81 of 88
Project Unity Functional Specification - Manufacturing Master Data
423524079.doc Page 82 of 88
Project Unity Functional Specification - Manufacturing Master Data
423524079.doc Page 83 of 88
Project Unity Functional Specification - Manufacturing Master Data
423524079.doc Page 84 of 88
Project Unity Functional Specification - Manufacturing Master Data
022 Define number ranges for Master Recipe SPRO/Production Planning for
Process Industries/Master
Data/Master Recipe/Settings
for the Task List Type/Define
number ranges for Master
Recipe
423524079.doc Page 85 of 88
Project Unity Functional Specification - Manufacturing Master Data
Create Work center category in copy from standard Work center category 0008
423524079.doc Page 86 of 88
Project Unity Functional Specification - Manufacturing Master Data
423524079.doc Page 87 of 88
Project Unity Functional Specification - Manufacturing Master Data
7.2 INTERFACES
Dev. No FS-I Document Name Description FS Line No.
7.3 CONVERSIONS
Dev. No FS-C Document Name Description FS Line No.
7.4 ENHANCEMENTS
Dev. No FS-R Document Name Description FS Line No.
423524079.doc Page 88 of 88