SPECS-LAB-188
Rev. 1
Page 1 of 1
SAMPLE COLLECTION
AIR DRILLING
DESCRIPTION:
While Drilling with Air, the sample collection is done by using a 3 – 4 in sample
valve installed directly in the flow line. This valve is a stainless steel Ball vale that is
welded to a 3 – 4 flare pipe directly in the flow line. Lag time is calculated with the
SLS software specifically designed for Air drilling operations providing accurate
sample lag time.
At the sampling time, the logger will open the valve to collect the desired and sample
and prepare it as per client requirements.