Date: 2/26/2019 Note No.

11559/E/DR-B-101

STUP Consultants Pvt. Ltd. By: LKB Sheet No.

DESIGN OF CROSS GIRDER

t1
t2
b2
b1 Span of Cross Girder = 9.71 m

Y b3 Grade of Conc 40
t3 Ecm = 33000 Mpa
Es = 200000 Mpa
m_Perm = 2*200000/33000
X t4 = 12.12 <15
m_Perm = 15.00
b4 t5
m_Tran = 2*200000/33000
b5 = 6.06 <7.5
m_Tran = 7.50
Location L/2 3L/8 L/4 L/8 At Support
Deck Thk. (d) 250 250 250 250 250 mm
C/c Width (W) 2200 2200 2200 2200 2200 mm
Eff Width (W) 2200 2200 2200 2200 2200 mm beff = L0/4 <= (B1+B2)/2 (Cl. 603.2.1, IRC:22-2015)
b1 400 400 400 400 400 mm beff = 2.43 m
t1 20 20 20 20 20 mm
b2 0 0 0 0 0 mm
t2 0 0 0 0 0 mm
b3 628 610 580 550 519 mm
t3 12 12 12 12 12 mm
b4 0 0 0 0 0 mm
t4 0 0 0 0 0 mm
b5 500 500 500 500 500 mm
t5 32 32 32 32 32 mm
Design Forces
Bending Moment (Factored)
DL 20.00 18.50 15.00 9.00 0 T-m
SIDL 6.60 6.24 5.10 3.36 0 T-m
LL 79.00 76.00 50.00 25.00 0 T-m

Thermal Stress
At top of deck 3.31 3.31 3.31 3.31 3.31 Mpa
At top of girder -8.92 -8.92 -8.92 -8.92 -8.92 Mpa
At bottom of girder 4.62 4.62 4.62 4.62 4.62 Mpa

Individual Girder
Area (m2) 0.032 0.031 0.031 0.031 0.030 (400x20+0x0+628x12+0x0+500x32)/10^6= 0.032
cg from Bott. (m) 0.261 0.253 0.241 0.229 0.217 (500x32x32x0.5+0x0x(0x0.5+32)+628x12x(628x0.5+0+32)+
0x0x(0x0.5+628+0+32)+400x20x(20x0.5+0+628+0+32))/0.031536/10^9= 0.261
4 (400*20^3/12+400*20*(20*0.5+0+628+0+32-0.260*1000)^2+0*0^3/12+0*0*(0*0.5+628+0+32-
Ixx (m ) 0.002602 0.002453 0.002214 0.001988 0.001769
0.260*1000)^2+12*628^3/12+12*628*(628*0.5+0+32-0.260*1000)^2+0*0^3/12+0*0*(0*0.5+32-
0.260*1000)^2+500*32^3/12+500*32*(32*0.5-0.260*1000)^2)/10^12
0.002602
Date: 2/26/2019 Note No. 11559/E/DR-B-101

STUP Consultants Pvt. Ltd. By: LKB Sheet No.

DESIGN OF CROSS GIRDER

3
Zxx_top_girder (m ) 0.00621 0.00600 0.00567 0.00534 0.00500 0.00245/((20+0+610+0+32)/1000-0.253
Zxx_bott(m3) 0.00998 0.00968 0.00917 0.00867 0.00815 0.00245/0.253
Composite Girder (Permanent Load)
Area (m2) 0.06820 0.06799 0.06763 0.06727 0.06689 (400x20+0x0+628x12+0x0+500x32)/10^6+2200x250/10^6/15= 0.06820
cg from Bott. (m) 0.553 0.541 0.521 0.501 0.480 (500x32x32x0.5+0x0x(0x0.5+32)+628x12x(628x0.5+0+32)+
0x0x(0x0.5+628+0+32)+400x20x(20x0.5+0+628+0+32)+
250x2200/15x(250x0.5+20+0+0+32+628)/0.0682/10^9= 0.553
Ixx (m4) 0.008 0.007 0.007 0.006 0.006 ((400*20^3/12+400*20*(20*0.5+0+628+0+32-0.582*1000)^2+0*0^3/12+0*0*(0*0.5+628+0+32-
0.582*1000)^2+12*628^3/12+12*628*(628*0.5+0+32-0.582*1000)^2+0*0^3/12+0*0*(0*0.5+32-
0.582*1000)^2+500*32^3/12+500*32*(32*0.5-
0.582*1000)^2)+2200*250^3/12/15.00+2200*250/15.00*(250*0.5+20+0+628+0+32-0.582*1000)^2)/10^12
0.008
Zxx_top_girder (m3) 0.062 0.060 0.060 0.060 0.060 0.008/((20+0+628+0+32)/1000-0.553)=
3
Zxx_top_deck (m ) 0.021 0.020 0.019 0.018 0.017 0.008/((250+20+0+628+0+32)/1000-0.553)=
3
Zxx_bott(m ) 0.014 0.010 0.010 0.010 0.010 0.007/0.541
Composite Girder (Transient Load)
2
Area (m ) 0.105 0.105 0.104 0.104 0.104 (400x20+0x0+628x12+0x0+500x32)/10^6+2200x250/10^6/7.5= 0.105
cg from Bott. (m) 0.641 0.625 0.606 0.580 0.554
((500*32*32*0.5+0*0*(0*0.5+32)+628*12*(628*0.5+0+32)+0*0*(0*0.5+628+0+32)+400*20
*(20*0.5+0+628+0+32)+250*2200*(250*0.5+20+0+628+0+32)/7.50)/0.122/10^9) 0.641
((400*20^3/12+400*20*(20*0.5+0+628+0+32-0.666*1000)^2+0*0^3/12+0*0*(0*0.5+628+0+32-
Ixx (m4) 0.010 0.009 0.008 0.008 0.007
0.666*1000)^2+12*628^3/12+12*628*(628*0.5+0+32-0.666*1000)^2+0*0^3/12+0*0*(0*0.5+32-
0.666*1000)^2+500*32^3/12+500*32*(32*0.5-
0.666*1000)^2)+2200*250^3/12/7.50+2200*250/7.50*(250*0.5+20+0+628+0+32-0.666*1000)^2)/10^12
0.010
Zxx_top_girder (m3) 0.240 0.250 0.320 0.350 0.420 0.01/((20+0+628+0+32)/1000-0.641)=
Zxx_top_deck (m3) 0.030 0.032 0.030 0.028 0.026 0.01/((250+20+0+628+0+32)/1000-0.641)=
Zxx_bott(m3) 0.015 0.015 0.014 0.013 0.013 0.009/0.625

Calculated Bending Stress (T/m2) L/2 3L/8 L/4 L/8


6.6/0.0207490477295455/15+7 6.24/0.02/15+76/0.03
Comp. at deck top 703.3 668.5 571.1 462.5 331.0 9/0.03/7.5= 2/7.5= 5.1/0.019/15+50/0.03/7.5= 3.36/0.018/15+25/0.028/7.5=
20/0.00621+6.6/0.06170734435 18.5/0.006+6.24/0.06 9/0.00534+3.36/0.06+25/0.35
Comp. at girder top 2764.7 2599.3 1994.8 920.8 -892.0 53455+79/0.24= +76/0.25= 15/0.00567+5.1/0.06+50/0.32= =
20/0.00998+6.6/0.01412313778 18.5/0.00968+6.24/0. 9/0.00867+3.36/0.01+25/0.01
Tensile at bottom 8200.0 8063.8 6179.2 3759.1 462.0 39088+79/0.015= 01+76/0.015= 15/0.00917+5.1/0.01+50/0.014= 3=
Tensile at bottom due to
LL only 5267 5067 3571 1923 0 79/0.015= 76/0.015= 50/0.014= 25/0.013=

2
Allowable Bending Stress (T/m )
Comp. at deck top 1333.3 1333.3 1333.3 1333.3 1333.3 40/3x100= 40/3x100= 40/3x100= 40/3x100=
Comp. at girder top 14200 14200 14200 14200 14200
Tensile at bottom 14200 14200 14200 14200 14200
% Stress used at T 19.470 18.305 14.048 6.485 0
% Stress used at B 57.746 56.787 43.515 26.473 0
OK OK OK OK OK
Shear Force at Support
Va = 8.04+2.67+26.5= 37.21 T
Shear stress = 37.21/(((519+20+0+32)*12)/10^6)= 5430.53 T/m2
Allowable shear stress = 8700 T/m2 Hence OK