Sie sind auf Seite 1von 9

Person in charge: L. Langen Owner: Vessel: BGN: DEPT.

NO:
Phone: +49(0)4961 81-5157 AIDA Cruises S.689 725 V 1000
E-mail langen@meyerwerft.de
System: DIAGRAM OF FILLING & DRAIN PIPES FOR Alt.
Date: 24.09.2009 A
POOLS and JACUZZIS
List of Included Drawings List of Reference Drawings
BGN Sheet Description No. Drawing No. Description
725 V 1100 General Description 1) 725 V 2000 Diagram of Water Treatment System for Pools and Jacuzzies
725 V 1200 Material Standard for Pipes 2) 701 M 1000 Diagram of Cooling Sea Water System
725 V 1001 Forward Ship 3) 725 V 2005 Pax Pool 3
725 V 1002 Middle Ship 4) 725 V 2006 Pax Pool 2
725 V 1003 After Ship 5) 725 V 2007 Pax Pool 1
6) 725 V 2008 Kid’s Pool
7) 725 V 2009 Pax Jacuzzi 4 & 5
8) 725 V 2010 Pax Jacuzzi 2 & 3
9) 725 V 2011 Pax Jacuzzi 1
10) 725 V 2012 Crew Jacuzzi

List of Alterations
BGN Sheet Description Kind of Alteration No. Date Name Tel.Nr. FG

725 V 1100 General Description 0 29.05.2009 Langen 5157 100%

725 V 1200 Material Standard for Pipes 0 29.05.2009 Langen 5157 100%

725 V 1001 Forward Ship 0 29.05.2009 Langen 5157 100%

See alteration arrows.


725 V 1002 Mid Ship A 24.09.2009 Langen 5157 100%

See alteration arrows.


725 V 1003 After Ship A 24.09.2009 Langen 5157 100%

Name Date
Armatures Basis of this Drawing
680 725 V 1000 A
Labels
Person in charge: L. Langen Owner: Vessel: BGN: DEPT. NO:
Phone: +49(0)4961 81-5157 AIDA Cruises S.689 725 V 1100
E-mail langen@meyerwerft.de DIAGRAM OF FILLING & DRAIN PIPES FOR POOLS and JACUZZIS Alt.
System: General Description
Date: 29.05.2009 0
GENERAL DESCRIPTION 3. EQUIPMENT & CHARACTERISTICS

1. SPECIFICATION & AOM’s 3.1 Pax Pool 1

1.1 Specification - operated with sea water or fresh water


- pool located at deck 12, firezone 03, outdoor, pool equipped with beach area
Part 4 - “Ship Systems” - water treatment unit located at deck 11, firezone 03
4.2 Swimming Pools and whirlpool water systems - approx. size of pool (including beach area):
- average depth pool: 1,35 m
1.2 AOM’s - average depth beach: 0,15 m
- volume: abt. 50,00 m3
no AOM’s - surface abt. 116,00 m2
1 water treatment unit (606.1100)
2. CLASSIFICATIONS & REGULATIONS
3.2 Pax Pool 3
2.1 Classification
- operated with sea water or fresh water
Class: - pool located at deck 11, firezone 04, outdoor
Germanischer Lloyd (GL) - water treatment unit located at deck 10, firezone 04
- approx. diameter of pool: 5,00 m
* 100 A5 Passenger Ship IW - average depth: 1,35 m
* MC AUT RP 3 50% - volume: abt. 30,00 m3
GL Environmental Passport - surface abt. 20,00 m2
1 water treatment unit (606.3100)
The vessel is designed and constructed in accordance with the rules, resolutions, guidelines and
recommendations of the I.M.O. Assembly, its MSC and its MEPC for new vessels, adopted up to the 3.3 Kid’s Pool
date of contract signature.
- operated with freshwater
2.2 Regulations - pool located at deck 05, firezone 05, outdoor
- water treatment unit located at deck 04, firezone 05
USPHS - CDC - Construction Guidelines, 2005 - approx. diameter of pool: 4,00 m
Chapter 23.0 - Swimming Pools - volume: abt. 5 m3
Chapter 24.0 - Whirlpool Spas - surface abt. 14,00 m2
USPHS - CDC Vessel Sanitation Program - Operation Manual, 2005 1 water treatment unit (JLM No. 607.1100)
Chapter 6.0 - Swimming Pools and Whirlpool Spas
3.4 Pax Pool 2

- operated with fresh water


- pool located at deck 12, firezone 03, outdoor
- water treatment unit located at deck 11, firezone 03
- average depth pool: 1,35 m
- volume: abt. 20,00 m3
- surface abt. 30,00 m2
1 water treatment unit (JLM No. 606.2100)

0
Person in charge: L. Langen Owner: Vessel: BGN: DEPT. NO:
Phone: +49(0)4961 81-5157 AIDA Cruises S.689 725 V 1100
E-mail langen@meyerwerft.de DIAGRAM OF FILLING & DRAIN PIPES FOR POOLS and JACUZZIS Alt.
System: General Description
Date: 29.05.2009 0
3.5 Crew Jacuzzi 4. OPERATION
- operated with freshwater The pools and jacuzzis will be filled and operated with seawater or freshwater, for details see
- pool located on deck 06 firezone 01, outdoor chapter “3. – EQUIPMENT & CHARACTERISTICS”.
- water treatment unit located on deck 04, firezone 01
- approx. diameter of pool: 2,53 m 4.1 Swimming Pools
- volume: 1,5 m3
- surface abt. 2,80 m2 The swimming pools (main pools) will be operated with sea water or fresh water. For sea water
1 water treatment unit (JLM-No. 608.1100) operation they will be filled by a sea water filling pump (filling of largest pool within abt. 1 hour), for
fresh water operation they will be filled from the ships potable water system via the accessory
3.6 Pax Jacuzzi 1 overflow tanks and circulation pumps (filling within abt. 3 hours).
The pool water will be circulated by one pump (another one is in stand-by) from the overflow tanks
- operated with freshwater via filters and a heater back to the pool. In this circulation system also the desinfection and pH-
- pool located on deck 14, firezone 02, indoor (Health Club) correction of the pool water will take place. The disinfection will be done by dosing chlorine
- water treatment unit located on deck 11, firezone 02 chemicals either before or after the filter. The chlorine dosing is measured and regulated by an
- approx. diameter of pool: 4,00 m analyzer. The pH- value will also be measured and regulated by dosing acid to the water.
- volume: 5,00 m³ The swimming pools will be equipped with jet stream/counter stream devices, water effects,
- surface: 6,30 m² massage pumps, air blowers with silencers.
1 water treatment unit (JLM No. 608.2100)
The swimming pools will be operated in the following modes:
3.7 Pax Jacuzzi 2 & 3 a. sea water in circle, with and without heating, topping with potable water
b. sea water in circle, with and without heating, topping with sea water
- operated with freshwater c. potable water in circle, with and without heating, topping with potable water
- pools located at deck 15, firezone 02, outdoor d. sea water overflow, with and without heating (water temperature to be remain 28 °C)
- water treatment unit located at deck 14, firezone 03 All valves and heaters etc. change automatically according to the new mode.
- approx. diameter of pool: 2,53 m
- volume: 1,50 m3 4.2 Fresh Water Operated Pools (Pax Pool 2, Kid’s Pool , Jacuzzis, Crew Jacuzzi)
- surface abt. 2,80 m2
1 water treatment unit (JLM No. 608.3100) The fresh water pools and whirlpools will be operated with fresh water only therefore the
whirlpools will be filled from the ships potable water system via the accessory overflow tanks and
3.8 Pax Jacuzzi 4 & 5 circulation pumps (filling within abt. 1 hour). They will be filled with mixed hot and cold potable
water of the operation temperature. Electric heaters will be provided for keeping the temperature
- operated with freshwater upright after filling the whirlpools. For the circulation of the whirlpool water the same arrangement
- pools located at deck 12, firezone 03, outdoor will be used as for the swimming pools.
- water treatment unit located at deck 11, firezone 03 Furthermore there is a blower and one massage pump connected to each whirlpool. Also
- approx. diameter of pool: 2,53 m precautions are to be taken, that the water in the air piping system from blower to pool will be
- volume: 1,50 m3 circulated, if the blower is not running. Also an automatic valve will be installed, so that the blower
- surface abt. 2,80 m2 could start without load. These valve will be supplied lose. The control of this valve will be done
1 water treatment unit (JLM No. 608.4100) from the switchboard inside the corresponding water treatment unit.

3.9 Cleaning Equipment 5. MONITORING AND ALARMS VIA THE “IAMCS”


1 cartridge cleaning system See Description in 725 V 2100
1 basin for superchlorination of cartridges
2 water operated cleaning devices (one for pax pool 1, one for pax pool 2)

0
Person in charge: L. Langen Owner: Vessel: BGN: DEPT. NO:
Phone: +49(0)4961 81-5157 AIDA Cruises S.689 725 V 1200
E-mail langen@meyerwerft.de DIAGRAM OF FILLING & DRAIN PIPES FOR POOLS and JACUZZIS Alt.
System: Material Standard for Pipes
Date: 29.05.2009 0

Installation Regulations Installation Regulations

Location Pipe material Pipe connections Location Bulkhead and deck Pipe bends and fittings Holders
Engine/ seamless CuNi 10 Fe pipes • pipe couplings penetrations
machinery WWN 4.24.03 • loose flanges, DIN 86037 for Engine/ CuNi 10 Fe pipes: Form C •  ≤DN 25 Plastic brackets
rooms, service CuNiFe pipes machinery WWN. 4.61.31 Suckers WWN. 4.63.37 •  ≤DN 100 WWN 4.63.65
alleyways, rooms, service WWN 4.61.27-B for cunife pipes: with EPDM
engine casing • #DN 25 brazed pipe unions or alleyways, Elbows WWN. 4.61.84 • >DN100 WWN 4.63.38
pressfitttings for CuNiFe pipes engine casing Reducers WWN 4.61.83
steel pipe: with rubber. steel pipe:
WWN. 4.61.31 with out rubber
Engine control Same as engine/machinery rooms Same as engine/machinery rooms
room, switch-
board rooms, Pipe laying above switchboards and No detachable connection above stainless steel pipe:
converter electric devices to be avoided switchboards and electric devices WWN. MWS 0.7--0006
rooms, El. WWN. 4.61.31
stations Engine control Same as engine/ Same as engine/ Same as engine/
Tanks room, switch- machinery rooms machinery rooms machinery rooms
board rooms,
Voids, Same as engine/machinery rooms Same as engine/machinery rooms converter rooms,
cofferdams, El. stations
special casings Tanks
General
accommodation Voids, Same as engine/ Same as engine/ Same as engine/
Accom. galleys, Same as engine/machinery rooms Same as engine/machinery rooms cofferdams, machinery rooms machinery rooms machinery rooms
pantries, prov. special casings
stores, cold General
In pool equipment room and pool Glued fittings accommodation
stores, USPH
areas
trunk: all pipes plastic (ABS) Accom., galleys,
pantries, prov.
Scupper line: stores, cold
welded stainless steel pipe WWN pipe couplings DIN 86128 stores, USPH
4.14.08 areas
Wet rooms (AC
Same as engine/machinery rooms rooms, PE
Discharge lines from pools from shut-
rooms, public
off valve to outboards: toilets)
Same as engine/machinery rooms Outer deck areas
Wet rooms (AC
rooms, PE
rooms, public
toilets)
Outer deck
areas

1
Person in charge: L. Langen Owner: Vessel: BGN: DEPT. NO:
Phone: +49(0)4961 81-5157 AIDA Cruises S.689 725 V 1200
E-mail langen@meyerwerft.de DIAGRAM OF FILLING & DRAIN PIPES FOR POOLS and JACUZZIS Alt.
System: Material Standard for Pipes
Date: 29.05.2009 0

Installation Regulations for Sea Water Pools Installation Regulations for Fresh Water Pools

Insulation Sea water filling line: Insulation


Type and strength Type and strength
<= DN 50 20 mm insulating material: mineral wool
>DN 65 30 mm Cleaning and commissioning

Insulation of all pipes in handling areas one the engine room


and engine casing will be covered with glass fibre-material as Flange gasket Klinger Novapress 815
damage protection Surface treatment Steel pipes galvanised DIN EN ISO 1461
Cleaning and commissioning

Pipe tests
Flange gasket Klinger Novapress 815
Surface treatment and welding Steel pipes galvanised DIN EN ISO 1461
Fitting tests

Pipe tests
Test pressures Fresh water swimmingpool inside Pool room:
Visual Inspection
Fitting tests
Drain pipes:
Press Test "Static water column"
Test pressures Partial pressure tests, medium: water, test pressure: 1,5 x
working pressure
Test with complete system on board, max. working pressure.
System running, pumps running with system shut off, medium:
water.

2
Person in charge: L. Langen Owner: Vessel: BGN: DEPT. NO:
Phone: +49(0)4961 81-5157 AIDA Cruises S.689 725 V 1200
E-mail langen@meyerwerft.de DIAGRAM OF FILLING & DRAIN PIPES FOR POOLS and JACUZZIS Alt.
System: Material Standard for Pipes
Date: 29.05.2009 0

Pipe Dimension Lists

ABS WWN 4.14.08


Plastic Pipes Welded pipes
WWN 4.24.06 made of 1.4571
DN D S DN D S
[mm] [mm] [mm] [mm] [mm] [mm]

15 20,0 1,5 32 42,4 2,0


20 25,0 1,8 40 48,3 2,0
25 32,0 2,0 50 60,3 2,0
32 40,0 2,5
40 50,0 3,2 100 114,3 2,6
50 63,0 4,0 125 139,7 2,6
65 75,0 4,7 150 168,3 2,6
80 90,0 5,7
100 110,0 6,9
125 140,0 8,8
150 160,0 10,0
200 225,0 14,1

WWN 4.24.03
Seamless pipes
Pipe Dimension Lists CuNi10Fe1,6Mn
DN D S
WWN 4.14.01 [mm] [mm] [mm]
Welded steel pipes
Line 3 50 57,0 1,5
D
DN S 65 76,0 2,0
[mm]
[mm] [mm] 80 89,0 2,5
100 108,0 2,5
125 139,7 8,8 125 133,0 2,5
150 168,3 12,5 150 159,0 2,5
200 219,1 12,5 200 219,0 3,0
250 273,0 12,5 250 267,0 3,0

Das könnte Ihnen auch gefallen