INVESTIGACION DE MERCADO

MATERIA:COSTOS Y PRESUPUESTOS
ING. ALBERTO ROMAN BONILLA VILLANUEVA
FECHA: 11 DE DICIEMBRE 2015

CATALAGO DE PRECIOS
OBRA NEGRA
IMPORTE IMPORTE IMPORTE
CODIGO CONCEPTO UNIDAD
MERCANTIL CERAMAT THE HOME DEPOT
CTP001 ALAMBRE DE AMARRE KILO $ 14.59 $ 14.50 $ 14.30
CTP002 ALAMBRON KILO $ 13.50 $ 13.60 $ 13.80
CTP003 CLAVO 1"-1 1/2 KILO $ 18.50 $ 37.82 $ 36.01
CTP004 CLAVO 2"-4" KILO $ 16.20 $ 12.28 $ 12.50
CTP005 CLAVO 1"-2" KILO $ 16.20 $ 12.80 $ 12.50
CTP006 CLAVO 2 1/2 KILO $ 16.20 $ 12.80 $ 12.50
CTP007 CLAVO 5"-8" KILO $ 16.20 $ 12.80 $ 12.50
CTP008 CEMENTO GRIS PORTLAND APASCO TON $ 2,018.00 $ 2,540.00 $ 2,260.00
CTP009 CEMENTO BLANCO TON $ 3,474.00 $ 4,000.00 $ 3,760.00
CTP010 VARILLA CORRUGADA DIF. MEDIDAS KILO $ 13.51 $ 13.63 $ 14.06
CTP011 ARMEX 10*10 -4 PIEZA $ 101.00 $ 105.00 $ 98.90
CTP012 ARMEX 15*20 -4 PIEZA $ 102.30 $ 102.00 $ 102.50
CTP013 ARMEX 15*30 -4 PIEZA $ 117.20 $ 124.89 $ 131.79
CTP014 CALHIDRA TON $ 619.82 $ 1,009.00 $ 880.00
CTP015 MALLA 6*6-6/6 M2 $ 40.00 $ 39.00 $ 37.00

INSTALACION HIDRAULICA
IMPORTE IMPORTE IMPORTE
CODIGO CONCEPTO UNIDAD
MERCANTIL CERAMAT THE HOME DEPOT
CTP016 REDUCC 1/2 *3/4 CAMPANA COBRE PIEZA $ 3.85 $ 4.00 $ 4.50
CTP017 REDUCC 1/2 *1 BUSHING COBRE PIEZA $ 8.50 $ 10.00 $ 9.20
CTP018 REDUCC 3/4 *1 BUSHING COBRE PIEZA $ 8.80 $ 9.00 $ 9.30
CTP019 EXT COFLEX P/FRE ALUMINIO 22" A PIEZA $ 17.50 $ 18.00 $ 18.86
CTP020 EXT COFLEX P/LAV ALUMINIO 16" A PIEZA $ 14.50 $ 17.00 $ 18.86
CTP021 CODO COBRE 3/4 * 90º PIEZA $ 8.50 $ 8.76 $ 7.98
CTP022 CODO COBRE 1* 90º PIEZA $ 16.80 $ 17.00 $ 16.23
CTP023 CODO COBRE 1/2* 90º PIEZA $ 5.90 $ 5.78 $ 4.98
CTP024 TEE SENCILLA PVC 2 PIEZA $ 6.00 $ 5.90 $ 6.24
CTP025 TEE SENCILLA PVC 3 PIEZA $ 8.00 $ 8.30 $ 8.00
CTP026 TEE SENCILLA PVC 4 PIEZA $ 12.50 $ 12.00 $ 12.50
CTP027 TUBO COBRE 1" M. L. $ 97.17 $ 80.91 $ 100.94
CTP028 TUBO DE COBRE 1/2" M. L. $ 31.66 $ 36.36 $ 43.46
CTP029 TEE DE COBRE DE 1/2" PIEZA $ 4.40 $ 4.00 $ 3.65
CTP030 TEE DE COBRE DE 3/4" PIEZA $ 13.20 $ 15.00 $ 13.89
CTP031 TEE DE COBRE DE 1" PIEZA $ 41.80 $ 40.00 $ 40.98
CTP032 TUERCA UNION SOLDABLE DE 3/4" PIEZA $ 28.05 $ 28.00 $ 28.50
CTP033 TUERCA UNION SOLDABLE DE 1" PIEZA $ 57.20 $ 56.98 $ 57.36
CTP034 VALVULA DE COMPUERTA ROSCABLE 1/2" PIEZA $ 28.00 $ 29.00 $ 28.55
CTP035 VALVULA COMPUERTA ROSCABLE 3/4" PIEZA $ 35.50 $ 35.00 $ 35.66
CTP036 COPLE DE COBRE 1/2" PIEZA $ 3.50 $ 4.00 $ 3.99
CTP037 TUBO GALVANIZADO CB 1 1/4" M. L. $ 148.16 $ 125.00 $ 134.00
CTP038 TUBO PVC H 1" M. L. $ 7.50 $ 8.00 $ 7.87
CTP039 TUBO PVC H 1/2" M. L. $ 5.00 $ 5.30 $ 5.80
CTP040 TUBO PVC H 3/4" M. L. $ 8.40 $ 7.80 $ 7.99
CTP041 CODO PIPA DE COBRE 1/2" PIEZA $ 18.50 $ 19.00 $ 18.70
CTP042 CODO PVC 2 * 90 PIEZA $ 9.50 $ 8.99 $ 10.00
CTP043 CODO PVC 3 * 90 PIEZA $ 12.00 $ 12.30 $ 12.70
CTP044 CODO PVC 4 * 90 PIEZA $ 16.00 $ 15.80 $ 16.20
CTP045 VALVULA DE COMPUERTA SOLDABLE 1/2" PIEZA $ 27.50 $ 29.00 $ 29.20

AJPOP MERIDA SELVIN NAZARIO____________


GARCIA OROZCO MIGUEL ANGEL____________
INVESTIGACION DE MERCADO
MATERIA:COSTOS Y PRESUPUESTOS
ING. ALBERTO ROMAN BONILLA VILLANUEVA
FECHA: 11 DE DICIEMBRE 2015

IMPORTE IMPORTE IMPORTE


CODIGO CONCEPTO UNIDAD
MERCANTIL CERAMAT THE HOME DEPOT
CTP046 TUBO PVC 3" M. L. $ 13.00 $ 12.00 $ 11.00
CTP047 TUBO PVC 4" M. L. $ 29.00 $ 30.60 $ 30.90
CTP048 COPLE GALVANIZADO DE 3/4" PIEZA $ 4.50 $ 4.00 $ 3.90
CTP049 LLAVE DE EMPOTRAR DE 1/2" PIEZA $ 86.50 $ 88.00 $ 89.30
CTP050 LLAVE DE NARIZ PIEZA $ 35.00 $ 2.00 $ 30.00
CTP051 REGADERA CON BRAZO Y CHAPETON PIEZA $ 53.50 $ 70.00 $ 78.00
CTP052 CALENTADOR CINSA DE 40 LTS PIEZA $ 1,298.00 $ 2,000.00 $ 1,856.00
CTP053 TINACO ROTOPLAS DE 450 LTS PIEZA $ 890.00 $ 1,261.82 $ 1,500.00
INSTALACION SANITARIA
IMPORTE IMPORTE IMPORTE
CODIGO CONCEPTO UNIDAD
MERCANTIL CERAMAT THE HOME DEPOT
CTP054 TUBO PVC SANITARIO 3" M. L. $ 14.00 $ 15.00 $ 16.00
CTP055 TUBO PVC SANITARIO DE 4" M. L. $ 35.00 $ 32.00 $ 33.00
CTP056 CODO DE 90º PVC SALIDA TRASERA DE 4" PIEZA $ 30.00 $ 31.50 $ 30.80
CTP057 CODO DE PVC 2" PIEZA $ 6.00 $ 6.50 $ 6.80
CTP058 CESPOL DE PLOMO PIEZA $ 50.00 $ 51.16 $ 56.00
CTP059 CESPOL DE PVC FREGADERO PIEZA $ 45.00 $ 60.00 $ 74.00
CTP060 CESPOL PVC LAVABO PIEZA $ 40.00 $ 50.00 $ 79.00
CTP061 COPLE PVC 2" PIEZA $ 4.50 $ 4.00 $ 5.00
CTP062 COPLE PVC 3" PIEZA $ 5.90 $ 5.50 $ 6.00
CTP063 JUNTA PROEL PIEZA $ 7.00 $ 6.36 $ 6.50
CTP064 YEE GALVANIZADA 1/2" PIEZA $ 19.00 $ 26.36 $ 22.00
CTP065 YEE SENCILLA 4*4 SANITARIO PIEZA $ 17.00 $ 15.45 $ 30.00
CTP066 YEE SENCILLA 2*2 SANITARIO PIEZA $ 4.00 $ 2.73 $ 7.24
CTP067 CODO 2" * 90º PVC SANITARIO PIEZA $ 4.00 $ 5.00 $ 4.50
CTP068 CODO 3" * 90º PVC SANITARIO PIEZA $ 6.50 $ 6.00 $ 6.30
CTP069 CODO 4" * 90º PVC SANITARIO PIEZA $ 16.00 $ 16.80 $ 16.90
CTP070 TEE 2" PVC SANITARIO PIEZA $ 12.80 $ 12.00 $ 12.50
CTP071 TEE 3" PVC SANITARIO PIEZA $ 15.00 $ 15.80 $ 15.30
CTP072 TEE 4" PVC SANITARIO PIEZA $ 16.50 $ 18.00 $ 20.00
CTP073 CESPOL DE BOTE 2" PIEZA $ 34.00 $ 28.55 $ 30.00
CTP074 CODO 4 * 2 S/TRASERA PVC SANITARIO PIEZA $ 19.00 $ 19.50 $ 19.80
INSTALACION ELECTRICA
IMPORTE IMPORTE IMPORTE
CODIGO CONCEPTO UNIDAD
MERCANTIL CERAMAT THE HOME DEPOT
ELECTRODUCTO 1/2" (CORRUGADO) M.L. $ 2.00 $ 6.91 $ 7.50
CTP075 ELECTRODUCTO 3/4" M.L. $ 4.00 $ 8.18 $ 8.56
CTP076 MUFA 32 MM 1 1/4" PIEZA $ 12.00 $ 11.36 $ 15.07
CTP077 CABLE THW90 No. 10 IUSA M.L. $ 6.57 $ 5.91 $ 10.00
CTP078 CABLE THW90 No.12 IUSA M.L. $ 4.48 $ 3.82 $ 7.90
CTP079 CABLE THW90 No. 14 IUSA M.L. $ 3.17 $ 2.93 $ 3.50
CTP080 CONEC COPPERR-WELD 5/8 * 1,5 PIEZA $ 45.00 $ 4.27 $ 4.50
CTP081 INTERRUPTOR TERM QOW120 PIEZA $ 88.74 $ 69.00 $ 70.50
CTP082 INTERRUPTOR TERM QOW130 PIEZA $ 88.74 $ 70.00 $ 71.50
CTP083 SOQUET SENCILLO NEGRO 111 IUSA PIEZA $ 4.00 $ 80.95 $ 82.85
CTP084 APAGADOR SENCILLO MODUS PIEZA $ 14.50 $ 13.15 $ 14.00
CTP085 BASE PARA MEDIDOR MONOF 4/T IUSA PIEZA $ 67.00 $ 65.60 $ 73.00
CTP086 CABLE THW90 No. 8 IUSA M.L. $ 10.90 $ 10.45 $ 20.18
CTP087 FOCOS DE DIFERENTES WATTS OSRAM PIEZA $ 3.00 $ 2.65 $ 5.00
CTP088 CAJA DE CONEXIÓN CUADRADA PIEZA $ 2.00 $ 2.00 $ 5.09
CTP089 TAPA CUADRADA PIEZA $ 1.00 $ 1.50 $ 3.09

AJPOP MERIDA SELVIN NAZARIO____________


GARCIA OROZCO MIGUEL ANGEL____________
INVESTIGACION DE MERCADO
MATERIA:COSTOS Y PRESUPUESTOS
ING. ALBERTO ROMAN BONILLA VILLANUEVA
FECHA: 11 DE DICIEMBRE 2015

IMPORTE IMPORTE IMPORTE


CODIGO CONCEPTO UNIDAD
MERCANTIL CERAMAT CONSTRURAMA
CAJA CHALUPA PIEZA $ 2.00 $ 2.00 $ 4.30
CTP090 CAJA DE REGISTRO PIEZA $ 4.00 $ 2.00 $ 4.00
CTP091 INTERR DE SEGURIDAD SQUARED DE 15-50 A PIEZA $ 65.00 $ 60.00 $ 67.00
CTP092 APAGADOR SENCILLO ROYER PIEZA $ 8.00 $ 5.45 $ 8.00
CTP093 POLIDUCTO NARANJA DE 1/2" M.L. $ 1.50 $ 1.09 $ 2.62
CTP094 POLIDUCTO NARANJA DE 3/4" M.L. $ 2.50 $ 2.27 $ 4.76
CTP095 INTERRUPTOR TERMOMAGNETICO 1 *20 A PIEZA $ 75.50 $ 69.09 $ 86.37
CTP096 TABLERO DE CONTROL QO-816 L 100F PIEZA $ 519.00 $ 515.85 $ 517.50
CTP097 CAJA DE REGISTRO DE 1/2" GALV. PIEZA $ 2.00 $ 2.00 $ 5.09
CTP098 CHALUPA GALVANIZADA PIEZA $ 2.00 $ 2.00 $ 4.30
CTP099 CINTA DE AISLAR PIEZA $ 6.00 $ 4.97 $ 5.50
CTP100 TUBO CONDUIT 19 MM PD M.L. $ 8.75 $ 36.58 $ 36.50
CTP101 TUBO CONDUIT 13 MM PD M.L. $ 6.00 $ 5,068.00 $ 51.50
CTP102 PLACA METALICA DE 1,2,3 VENTANAS ROYER PIEZA $ 8.50 $ 25.90 $ 19.91
CTP103 CONECTOR CONDUIT GALVANIZADO 13 MM PIEZA $ 4.00 $ 3.00 $ 3.00
CTP104 CONECTOR CONDUIT GALVANIZADO 19 MM PIEZA $ 5.00 $ 4.85 $ 4.50
CTP105 COPLE CONDUIT GALVANIZADO 13 MM PIEZA $ 3.00 $ 3.00 $ 3.00
CTP106 COPLE CONDUIT GALVANIZADO 19 MM PIEZA $ 4.00 $ 3.67 $ 4.00
CTP107 COPLE CONDUIT GALVANIZADO 25 MM PIEZA $ 5.00 $ 4.87 $ 5.00
CTP108 COPLE CONDUIT GALVANIZADO 32 MM PIEZA $ 15.50 $ 14.20 $ 14.50
CTP109 CODO DE Fo Go GALVANIZADO 90 * 13 MM PIEZA $ 2.00 $ 12.73 $ 14.00
CTP110 CODO DE Fo Go GALVANIZADO 90 * 25 MM PIEZA $ 8.00 $ 2.64 $ 8.50
CTP111 TUBO CONDUIT PVC P. R. 32 MM M.L. $ 13.00 $ 12.50 $ 13.80
CTP112 CODO DE Fo Go GALVANIZADO 90 * 32 MM PIEZA $ 12.50 $ 11.67 $ 12.00
CTP113 BOTON TIMBRE PIEZA $ 15.00 $ 12.00 $ 11.00
CTP114 CONTACTO POLARIZADO PIEZA $ 17.00 $ 16.00 $ 14.00
CTP115 BALASTRO 2*39 W PIEZA $ 170.00 $ 167.00 $ 159.00
CTP116 BASE SLIM LINA ASTRO JGO $ 9.00 $ 9.60 $ 10.00
CTP117 LAMPARA SLIM LINE 39 W OSRAM PIEZA $ 13.00 $ 14.00 $ 14.50
CTP118 CONDULET MOD 56104/051 1/2" LL SOLA B PIEZA $ 19.00 $ 5.45 $ 14.50
CTP119 CONDULET MOD.56106/053 1" T-39 SOLA B PIEZA $ 37.50 $ 35.35 $ 28.50
CTP120 APAGADOR DE ESCALERA OCULTO PIEZA $ 14.00 $ 15.00 $ 14.00
OTROS ARTICULOS
IMPORTE IMPORTE IMPORTE
CODIGO CONCEPTO UNIDAD
MERCANTIL CERAMAT THE HOME DEPOT
CTP121 PEGAZULEJO ADHEZUSA BOLSA $ 145.00 $ 130.00 $ 140.00
CTP122 PEGAAZULEJO PEGAMIX CEMIX BOLSA $ 146.00 $ 143.00 $ 150.00
CTP123 PEGAMENTO PVC 1 LITRO PIEZA $ 95.50 $ 80.00 $ 90.00
CTP124 SOLDADURA OMEGA 50*50 PIEZA $ 84.50 $ 78.00 $ 80.00
CTP125 IMPERFACIL BCO 5 AÑOS LITRO $ 37.00 $ 36.80 $ 36.60
CTP126 CERRADURA MOD. 715 CL I/D PHILLIPS PIEZA $ 109.05 $ 88.18 $ 90.00
CTP127 CERRADURA FANAL MOD. 625NCRD PIEZA $ 68.00 $ 279.21 $ 120.00
CTP128 PUERTA LISA 80*2.10 20001345.77 PIEZA $ 835.00 $ 789.00 $ 899.00
CTP129 PUERTA LISA 70*1.20 20002845.77 PIEZA $ 781.50 $ 789.00 $ 877.00
CTP130 PUERTA LISA 90*2.10 20002845.77 PIEZA $ 940.00 $ 999.00 $ 1,000.00
CTP131 FIERRO COMERCIAL REDONDOS M. L. $ 11.40 $ 11.09 $ 11.50
CTP132 FIERRO COMERCIAL CUADRADO M. L. $ 11.40 $ 10.18 $ 11.50
CTP133 FIERRO COMERCIAL ANGULOS 3/4" -4" M. L. $ 11.40 $ 11.09 $ 12.00
CTP134 TAZA AVANTE BCO LAMOSA PIEZA $ 321.00 $ 370.00 $ 500.00
CTP135 TANQUE AVANTE /410) BCO LAMOSA PIEZA $ 255.55 $ 250.00 $ 350.00
CTP136 LAVABO BLANCO GEMINIS PIEZA $ 227.00 $ 300.00 $ 380.00

AJPOP MERIDA SELVIN NAZARIO____________


GARCIA OROZCO MIGUEL ANGEL____________
INVESTIGACION DE MERCADO
MATERIA:COSTOS Y PRESUPUESTOS
ING. ALBERTO ROMAN BONILLA VILLANUEVA
FECHA: 11 DE DICIEMBRE 2015

IMPORTE IMPORTE IMPORTE


CODIGO CONCEPTO UNIDAD
MERCANTIL CERAMAT THE HOME DEPOT
CTP137 ACCESORIOS BLANCO LAMOSA JGO $ 17.00 $ 180.00 $ 198.00
CTP138 AZULEJO LISO 20*15 2ª M2 $ 89.00 $ 80.00 $ 87.90
CTP139 AZULEJO LISO 20*20 2ª M2 $ 98.00 $ 120.00 $ 150.00
CTP140 BISAGRA TUBULAR 5/8 PIEZA $ 3.50 $ 3.00 $ 4.00
CTP141 VIBRADORA VALSI DE 5.5 HP PIEZA $ 9,558.00 $ 8,556.00
CTP142 REVOLVEDORA MOD. MAXI-10 8 H.P. DE 1 SACO PIEZA $ 20,390.00 $ 21,356.00
MADERA
GUADALUPAN
CLAVE CONCEPTO UNIDAD LOS PINOS THE HOME DEPOT
A
CTP143 MADERA DE PINO 30 * 2,5 *1" PIEZA $ 97.00 $ 80.00 $ 99.50
CTP144 POLIN DE 4*4*2,5 PIEZA $ 76.00 $ 89.00 $ 67.00
CTP145 CIMBRAPLAY DE 1,22m *2.44m*16mm PIEZA $ 366.00 $ 412.00 $ 328.00
CTP146 CHAFLAN DE 1" * 2,5m PIEZA $ 10.50 $ 9.00 $ 9.89
CTP147 TABLON DE 2" *12 *2,5m PIEZA $ 195.00 $ 80.00 $ 90.00
CTP148 TABLON DE 1" *10 *2,5m PIEZA $ 89.00 $ 160.00 $ 89.00
CTP149 TABLON DE 1" *8 *2,5m PIEZA $ 40.00 $ 64.00 $ 75.00
CTP150 TABLON DE 1" *30 *2,5m PIEZA $ 60.00 $ 80.00 $ 7.00
CTP151 DUELA PIEZA $ 30.00 $ 36.00 $ 35.00
PINTURAS

CLAVE CONCEPTO UNIDAD COMEX LA BROCHA BEREL

CTP151 IMPERMEABILIZANTE LTS $ 42.10 $ 35.00 $ 37.50


CTP152 PINTURA VINILICA PARA INTERIORES LTS $ 48.00 $ 43.00 $ 40.00
CTP153 PINTURA VINILICA PARA EXTERIORES LTS $ 51.00 $ 45.00 $ 48.00
CTP154 PINTURA ANTICORROSIVA LTS $ 52.95 $ 42.58 $ 59.47
CTP155 PLASTICEMENTO PARA CUBRIR GRIETAS LTS $ 36.99 $ 42.00 $ 45.00
CTP156 SELLADOR LTS $ 36.42 $ 25.00 $ 50.00
CTP157 BROCHA 2" PIEZA $ 12.00 $ 12.70 $ 12.90
CTP158 BROCHA 4" PIEZA $ 28.00 $ 26.00 $ 28.00
CTP159 BROCHA 5" PIEZA $ 35.00 $ 33.00 $ 36.00
CTP160 RODILLO PACHON PIEZA $ 25.00 $ 24.00 $ 26.00
CTP161 RODILLO TIROLEADO PIEZA $ 27.50 $ 32.00 $ 23.00
OTROS CONCEPTOS DE MATERIALES.
CLAVE CONCEPTO UNIDAD PRECIO PRECIO PRECIO
CTP162 GASOLINA LTS $ 11.91 $ 11.91 $ 11.91
CTP163 ACEITE LTS $ 59.30 $ 70.50 $ 85.00
CTP164 LLANTAS PZA $ 600.00 $ 800.00 $ 950.00
CTP165 AGUA M3 $ 32.00 $ 34.00 $ 38.00
CTP166 DIESEL LTS $ 12.50 $ 12.50 $ 12.50
CTP167 ARENA M3 $ 137.00 $ 100.00 $ 180.00
CTP168 GRAVA 3/4" M3 $ 200.00 $ 250.00 $ 230.00
CTP169 GRAVA M3 $ 130.00 $ 200.00 $ 250.00
CTP170 TABICON 10X12X28 PZ/1000 $ 4.00 $ 4.00 $ 3,300.00
CTP171 TABICON 7X12X24 PZ/1000 $ 3.00 $ 3.00 $ 2,300.00
CTP172 BLOCK HUECO PZ/100 $ 7.00 $ 7.00 $ 550.00

AJPOP MERIDA SELVIN NAZARIO____________


GARCIA OROZCO MIGUEL ANGEL____________
SALARIOS MINIMOS DE ACUERDO A LA CTM

SALARIO CALCULO DEL SALARIO REAL

CONSIDERACIONES

EN BASE A LA LEY FEDERAL DEL TRABAJO DIAS


DIAS DEL PERIODO DE TRABAJADO 365
AGUINALDO (MINIMO 15 DIAS ) 1.5
PRIMA VACACIONAL 15
TOTAL= 381.5

DIAS DE DESCANSO DIAS


DIAS POR LEY 7.17
POR FIESTAS DE COSTUMBRE 3
POR AGENTES FISICOS- METEOROLOGICOS 4
POR ENFERMEDAD NO PROFECIONAL 2
DESCANSO POR SEPTIMO DIA 52
VACACIONES DE LEY (MINIMO 6 DIAS) 6
TOTAL= 74.17

DIAS PAGADOS AL TRABAJADOR 381.5


DIAS TRABAJADOS 290.83

% PARA SALARIO MINIMO 0.2190


% PARA SALARIO MAYOR AL MINIMO 0.2134

FACTOR DE SALARIO REAL


PRESTACIONES DE LEY SALARIO MINIMO SALARIO MAYOR AL MINIMO
INCREMENTO POR LA LEY FEDERAL DEL TRABAJO 1.3118 1.3118
PAGO DEL IMSS 0.2873 0.2799
GUARDERIAS 0.0126 0.0126
INFONAVIT 0.0656 0.0656
S.A.R 0.0262 0.0262
I.S.P.T 0.0131 0.0131
TOTAL= 1.7165 1.709

TABULADOR DE SALARIO REAL


CLAVE CUADRO DE CATEGORIAS S.M F. S. R. SALARIO REAL
SRPN PEON $ 170.00 1.7106 $ 290.80
SROF OFICIAL DE ALBAÑILERIA $ 280.00 1.7106 $ 478.97
SRCO CARPINTERO DE OBRA NEGRA $ 280.00 1.7106 $ 478.97
SRCM COLOCADOR DE MOSAICOS Y AZULEJOS $ 280.00 1.7106 $ 280.00
SRYC YESERO EN CONSTRUCCION $ 280.00 1.7106 $ 478.97
SRFC FIERRERO EN CONSTRUCCION $ 280.00 1.7106 $ 478.97
SROE OFICIAL ELECTRICISTA $ 280.00 1.7106 $ 478.97
SROP OFICIAL PINTOR DE CASAS $ 280.00 1.7106 $ 478.97
SRVL VELADOR $ 180.00 1.7106 $ 307.91
SRCC CHOFER DE CAMION DE CARGA GENERAL $ 180.00 1.7106 $ 307.91
SREB ENCARGADO DE BODEGA Y/O ALMACEN $ 180.00 1.7106 $ 307.91
SRAL ALUMINERO $ 280.00 1.7106 $ 478.97
SRHR HERRERO $ 280.00 1.7106 $ 478.97

AJPOP MERIDA SELVIN NAZARIO____________


GARCIA OROZCO MIGUEL ANGEL___________
COSTO HORARIO
FECHA: 11 DE DICIMBRE 2015
MATERIA: COSTOS Y PRESUPUESTOS

ESPECIDICACIONES TECNICAS

COEFICIENTE
VALOR DE HORAS EFECTIVAS TASA DE INTERES
VALOR DE CARGO DE DE
COMBUSTIBLE EQUIPO HP RESCATE (5%- VIDA ECONOMICA EN EL AÑO (MENOR INTERBANCARIA DE
ADQUISICION SEGURO (3%-6%) MANTENIMIENT
20%) A 2000 HRS) EQUILIBRIO (TIIE)
O (0,75-1,00)
REVOLVEDORA
GASOLINA 8 0.19 2000 1600 0.0751 $20,390.00 0.06 0.8
SIPSA

GASOLINA VIBRADOR VAISI 4 0.15 2000 1650 0.0751 $9,558.00 0.04 0.75

DATOS DE OPERACIÓN DATOS DE CONSUMO


SALARIO REAL DEL OPERADOR $290.81 PRECIO DE COMBUSTIBLE $14.38
HRS EFECTIVAS DE TRABAJO (EN 8 HRS) 6 PRECIO DE LUBRICANTE $59.30
EFICIENCIA 0.75 CAPACIDAD DEL CARTER (LT) 2.5
HORAS ENTRE CAMBIO DE ACEITE 100

COSTO HORARIO DE REVOLVEDORA SIPSA

CARGOS FIJOS CARGOS POR CONSUMO


DEPRESIACION D=(Va-Vr)/Ve $7.20 COMBUSTIBLE E= e*Pc $27.61
INVERCION I = {(Va+Vr)/2Ha}i $0.49 LUBRICANTES L = a* Pl $2.91
SEGUROS S= {(Va-Vr)/2Ha}s $0.65 TOTAL= $30.52
MANTENIMIENTO M = Q*D $5.76
TOTAL= $14.10

CARGOS POR OPERACIÓN COSTO HORARIO DE REVOLVEDORA


OPERACIÓN O = S/H $48.47 CARGOS FIJOS $14.11
TOTAL= $48.47 CARGOS POR CONSUMO $30.52
CARGOS POR OPERACIÓN $48.47
TOTAL= $93.10

AJPOP MERIDA SELVIN NAZARIO____________


GARCIA OROZCO MIGUEL ANGEL___________
COSTO HORARIO
FECHA: 11 DE DICIMBRE 2015
MATERIA: COSTOS Y PRESUPUESTOS

COSTO HORARIO DE VIBRADOR VAISI

CARGOS FIJOS CARGOS POR CONSUMO


DEPRESIACION D=(Va-Vr)/Ve $2.68 COMBUSTIBLE E= e*Pc $18.98
INVERCION I = {(Va+Vr)/2Ha}i $0.18 LUBRICANTES L = a* Pl $2.46
SEGUROS S= {(Va-Vr)/2Ha}s $0.16 TOTAL= $21.44
MANTENIMIENTO M = Q*D $2.01
TOTAL= $5.03

CARGOS POR OPERACIÓN COSTO HORARIO DE VIBRADOR


OPERACIÓN O = S/H $48.47 CARGOS FIJOS $5.03
TOTAL= $48.47 CARGOS POR CONSUMO $21.44
CARGOS POR OPERACIÓN $48.47
TOTAL= $74.94

COSTO HORARIO RENDIMIENTO HORAS COSTO POR


EQUIPO
POR HORA POR JORNAL EFECTIVAS M3
REVOLVEDORA SIPSA $93.09 8 6 $69.82
VIBRADOR VAISI $74.94 15 6 $29.98

AJPOP MERIDA SELVIN NAZARIO____________


GARCIA OROZCO MIGUEL ANGEL___________
PIE TABLON
COSTOS Y PRESUPUESTOS
FECHA: 11 DE DICIMBRE 2015

CALCULO DE PRECIO POR PIE TABLON


COD. DESCRIPCION UNIDAD LADO DIMENC. VOLUMEN P.U COSTO P.T
PLG A 1
PT001 MADERA DE PINO 30* 2,5* 1" PLG B 12 8.20 $80.00 $9.75
M C 2.5
PLG A 4
PT002 POLINES DE 4*4*2,5" PLG B 4 10.94 $117.38 $10.73
M C 2.5
PLG A 2
PT004 TABLON DE 2" *12 *2.5M PLG B 4.72 6.45 $80.00 $12.40
M C 2.5
PLG A 1
PT005 TABLON 1" *10 *2,5M PLG B 10 6.84 $72.06 $10.54
M C 2.5
PLG A 1
PT006 TABLON 1" *8 *2,5M PLG B 8 5.47 $57.65 $10.54
M C 2.5

COSTO TOTAL DE P.T. = $10.79

COD DESCRIPCION UNIDAD DIMENC. ÁREA P.U COSTO


1.22
PT003 CIMBRAPLAY DE 16MM M2 2.98 $404.00 $135.72
2.44

AJPOP MERIDA SELVIN NAZARIO____________


GARCIA OROZCO MIGUEL ANGEL___________
COSTOS
MATERIA: COSTOS Y PRESUPUESTO BASICOS
FECHA: 11 DE DICIMBRE 2015

LECHADA
CEMENTO GRIS (M3)
CLAVE MATERIAL UNIDAD CANTIDAD P.U. IMPORTE
OBN008 CEMENTO GRIS TON 1.339 $ 2,362.00 $ 3,162.72
000H2O AGUA M3 1.17 $ 50.00 $ 58.50
TOTAL = $ 3,221.22

MORTEROS
CEMENTO, ARENA 1:5 (M3)
CLAVE MATERIAL UNIDAD CANTIDAD P.U. IMPORTE
OBN008 CEMENTO GRIS TON 0.360 $ 2,362.00 $ 850.32
MTAR ARENA M3 1.150 $ 216.66 $ 249.16
000H2O AGUA M3 0.261 $ 50.00 $ 13.05
TOTAL = $ 1,112.53

CEMENTO, CAL, ARENA 1:3:12 (M3)


CLAVE MATERIAL UNIDAD CANTIDAD P.U. IMPORTE
OBN008 CEMENTO GRIS TON 0.124 $ 2,362.00 $ 292.89
OBN014 CALHIDRA TON 0.173 $ 1,620.40 $ 280.33
MTAR ARENA M3 1.090 $ 216.66 $ 236.16
000H2O AGUA M3 0.240 $ 50.00 $ 12.00
TOTAL= $ 821.38

CEMENTO,CAL, ARENA 1:3:20 (M3)


CLAVE MATERIAL UNIDAD CANTIDAD P.U. IMPORTE
OBN008 CEMENTO GRIS TON 0.081 $ 2,362.00 $ 191.32
OBN014 CALHIDRA TON 0.116 $ 1,620.40 $ 187.97
MTAR ARENA M3 1.090 $ 216.66 $ 236.16
000H2O AGUA M3 0.240 $ 50.00 $ 12.00
TOTAL= $ 627.45

CONCRETOS
F´C 50 KG/CM2 (M3)
CLAVE MATERIAL UNIDAD CANTIDAD P.U. IMPORTE
OBN008 CEMENTO GRIS TON 0.177 $ 2,362.00 $ 418.07
MTAR ARENA M3 0.467 $ 216.66 $ 101.18
GRAVA 1´ M3 0.701 $ 233.33 $ 163.56
000H2O AGUA M3 0.202 $ 50.00 $ 10.10
TOTAL= $ 692.92

F´C 100 KG/CM2 (M3)


CLAVE MATERIAL UNIDAD CANTIDAD P.U. IMPORTE
OBN008 CEMENTO GRIS TON 0.262 $ 2,362.00 $ 618.84
MTAR ARENA M3 0.605 $ 216.66 $ 131.08
GRAVA 3/4´´ M3 0.630 $ 233.33 $ 147.00
000H2O AGUA M3 0.202 $ 50.00 $ 10.10
TOTAL= $ 907.02

AJPOP MERIDA SELVIN NAZARIO____________


GARCIA OROZCO MIGUEL ANGEL____________
COSTOS
MATERIA: COSTOS Y PRESUPUESTO BASICOS
FECHA: 11 DE DICIMBRE 2015

F´C 150 KG/CM2 (M3)


CLAVE MATERIAL UNIDAD CANTIDAD P.U. IMPORTE
OBN008 CEMENTO GRIS TON 0.306 $ 2,362.00 $ 722.77
MTAR ARENA M3 0.580 $ 216.66 $ 125.66
GRAVA 3/4´´ M3 0.630 $ 233.33 $ 147.00
000H2O AGUA M3 0.202 $ 50.00 $ 10.10
TOTAL= $ 1,005.53

F´C 200 KG/CM2 (M3)


CLAVE MATERIAL UNIDAD CANTIDAD P.U. IMPORTE
OBN008 CEMENTO GRIS TON 0.348 $ 2,362.00 $ 821.98
MTAR ARENA M3 0.555 $ 216.66 $ 120.25
GRAVA 3/4´´ M3 0.630 $ 200.00 $ 126.00
000H2O AGUA M3 0.202 $ 50.00 $ 10.10
TOTAL= $ 1,078.32

F´C 250 KG/CM2 (M3)


CLAVE MATERIAL UNIDAD CANTIDAD P.U. IMPORTE
OBN008 CEMENTO GRIS TON 0.388 $ 2,362.00 $ 916.46
MTAR ARENA M3 0.535 $ 216.66 $ 115.91
GRAVA 3/4´´ M3 0.630 $ 200.00 $ 126.00
000H2O AGUA M3 0.202 $ 50.00 $ 10.10
TOTAL= $ 1,168.47

CIBRAS
COMÚN EN CIMENTACIÓN (M2)
CLAVE MATERIAL UNIDAD CANTIDAD P.U. IMPORTE
MADERA DE PINO P.T 5 $ 10.79 $ 53.96
SEPARADORES KG 0.6 $ 11.00 $ 6.60
CLAVO KG 0.075 $ 31.08 $ 2.33
ALAMBRE KG 0.165 $ 12.07 $ 1.99
DIESEL LT 1 $ 14.20 $ 14.20
TOTAL= $ 79.08

COMÚN EN LOSAS (M2)


CLAVE MATERIAL UNIDAD CANTIDAD P.U. IMPORTE
MADERA DE PINO P.T 6.1 $ 10.79 $ 65.83
CLAVO KG 0.075 $ 31.08 $ 2.33
DIESEL LT 1 $ 12.50 $ 12.50
TOTAL= $ 80.67

APARENTE EN LOSAS (M2)


CLAVE MATERIAL UNIDAD CANTIDAD P.U. IMPORTE
TRIPLAY 16MM M2 0.176 $ 135.71 $ 23.88
MADERA DE PINO P.T 4 $ 10.79 $ 43.17
CLAVO KG 0.12 $ 31.08 $ 3.73
DIESEL LT 1 $ 12.50 $ 12.50
TOTAL= $ 83.28

AJPOP MERIDA SELVIN NAZARIO____________


GARCIA OROZCO MIGUEL ANGEL____________
COSTOS
MATERIA: COSTOS Y PRESUPUESTO BASICOS
FECHA: 11 DE DICIMBRE 2015

COMÚN EN MUROS Y COLUMNAS (M2)


CLAVE MATERIAL UNIDAD CANTIDAD P.U. IMPORTE
MADERA DE PINO PT 5 $ 10.79 $ 53.96
CLAVO KG 0.15 $ 31.08 $ 4.66
ALAMBRE KG 0.25 $ 12.07 $ 3.02
DIESEL LT 1 $ 12.50 $ 12.50
TOTAL= $ 74.14

COMÚN EN TRABES (M2)


CLAVE MATERIAL UNIDAD CANTIDAD P.U. IMPORTE
MADERA DE PINO TN 5.7 $ 10.79 $ 61.52
CLAVO KG 0.2 $ 31.08 $ 6.22
ALAMBRE KG 0.12 $ 12.07 $ 1.45
DIESEL LT 1 $ 12.50 $ 12.50
SEPARADORES KG 0.21 $ 11.00 $ 2.31
CHAFLAN 3/4´´ MT 2 $ 3.76 $ 7.52
TOTAL= $ 91.51

APARENTE ENCADENAS Y CASTILLOS (M2)


CLAVE MATERIAL UNIDAD CANTIDAD P.U. IMPORTE
TRIPLAY 16MM M2 0.176 $ 135.71 $ 23.88
MADERA DE PINO P.T 1.17 $ 10.79 $ 12.63
CLAVO KG 0.1 $ 31.08 $ 3.11
ALAMBRE KG 0.1 $ 12.07 $ 1.21
DIESEL LT 1 $ 12.50 $ 12.50
TOTAL= $ 53.33

REFUERZO
ALAMBRON 1/4´´ (KG)
CLAVE MATERIAL UNIDAD CANTIDAD P.U. IMPORTE
ALAMBRON 1/4´´ KG 1.1 $ 11.64 $ 12.80
ALAMBRE KG 0.03 $ 12.07 $ 0.36
TOTAL= $ 13.17

ACERO DE REFUERZO No 2-5 (KG)


CLAVE MATERIAL UNIDAD CANTIDAD P.U. IMPORTE
REFUERZO KG 1.1 $ 11.00 $ 12.10
ALAMBRE KG 0.03 $ 12.07 $ 0.36
TOTAL= $ 12.46

AJPOP MERIDA SELVIN NAZARIO____________


GARCIA OROZCO MIGUEL ANGEL____________
PRESUPUESTO DE OBRA
PROYECTO: CASA HABITACION
MUNICIPIO: TAPACHULA CHIAPAS
FECHA:11 DE DICIEMBRE 2015

CATALAGO DE CONCEPTOS
CODIGO CONCEPTO UNIDAD
PRELIMINARES

LIMPIEZA, TRAZO Y NIVELACIÓN EN ÁREA DE EDIFICACION INCLUYE MATERIAL, MANO DE


PREOO1 M2
OBRA Y HERRAMIENTA MENOR.

EXCAVACIÓN A MANO EN TERRENO TIPO "B" DE 0.0 A 0.80 METROS DE PROFUNDIDAD


PRE002 INCLUYE: ACARREO A 20 METROS, AFINES DE TALUDES, TRASPALEOS, AFINES DE FONDO, M3
HERRAMIENTA MENOR, MANO DE OBRA.

CIMENTACION
PLANTILLA DE CONCRETO SIMPLE CON F'C=100 KG/CM2 CON ESPESOR PROMEDIO DE 5 CM
DE ESPESOR ELABORADO EN OBRA CON MAQUINA REVOLVEDORA; INCLUYE MATERIALES,
CIM001 M2
MANO DE OBRA EN ELABORACION, COLOCADO, CIMBRADO, DESCIMBRADO, HERRAMIENTA
Y/O EQUIPO.

CONCRETO EN ZAPATA DE F'C=200 KG/CM2 CON AGRAGADO MÁXIMO DE 3/4" ELABORADO EN


CIM002 OBRA CON MAQUINA REVOLVEDORA, INCLUYE MATERIALES, MANO DE OBRA EN M3
ELABORACION, COLOCADO Y HERRAMIENTA Y/O EQUIPO.

CIM003 KG

ACERO EN CIMENTACION DE F'Y= 4500 KG/CM2 INCLUYE SUMINISTRO, HABILITADO Y


CIM004 KG
ARMADO

CIM005 M2

CIMBRA PARA CIMENTACION CON MADERA DE PINO DE 1RA ACABADO COMÚN INCLUYE
CIM006 M2
CIMBRADO Y DESCIMBRADO.

MURETE DE 12 CM DE ESPESOR DE TABICON DE 7X12X24 JUNTEADO CON MORTERO


CIM007 CEMENTO- CALHIDRA -ARENA RELACIÓN 1:3:12 INCLUYE MATERIALES, MANO DE OBRA, M2
HERRAMIENTA Y/O EQUIPO.

CIM008 ML

FIRME PARA PISO DE 15 CM DE ESPESOR PROMEDIO CON CONCRETO F'C= 150 KG/CM2 CON
AGREGADO MÁXIMO 3/4" HECHO EN OBRA CON MAQUINA REVOLVEDORA INCLUYE
CIM009 M2
ACARREOS, MATERIALES, MANO DE OBRA EN ELABORACION, COLOCADO, HERRAMIENTA Y/O
EQUIPO.

CIM010 SUPERESTRUCTURA

CADENA TIPO CC Y CE DE 10X20-4 CON CONCRETO F'C= 200 KG/CM2 HECHO EN OBRA CON
MAQUINA REVOLVEDORA TAMAÑO MÁXIMO DE AGREGADO DE 3/4", ACABADO COMUN,
SUP001 ML
INCLUYE ACARREOS, MATERIALES, MANO DE OBRA EN ELABORACION, COLOCADO,
CIMBRADO, DESCIMBRADO, VIBRADO, HERRAMIENTA Y/O EQUIPO..

CASTILLO TIPO K DE 15 x 20 DE CONCRETO F'C= 150KG/CM2 HECHO EN OBRA CON MAQUINA


REVOLVEDORA TAMAÑO MÁXIMO DE AGREGADO 3/4" ARMADO CON ARMEX DE 10X10-4
SUP002 Y10X30X4 RESPECTIVAMENTE; INCLUYE ACARREOS, MATERIALES, MANO DE OBRA EN ML
ELABORACION, COLOCADO, CIMBRADO, DESCIMBRADO, VIBRADO, HERRAMIENTA Y/O
EQUIPO.

AJPOP MERIDA SELVIN NAZARIO_____________


GARCIA OROZCO MIGUEL ANGEL____________
PRESUPUESTO DE OBRA
PROYECTO: CASA HABITACION
MUNICIPIO: TAPACHULA CHIAPAS
FECHA:11 DE DICIEMBRE 2015

SUP003

MURO DE 15 CM DE ESPESOR DE DE TABIQUE ROJO DE BARRO RECOCIDO DE 7X14X28


JUNTEADO CON MORTERO CEMENTO-CALHIDRA- ARENA RELACIÓN 1:5 CON ACABADO
SUP004 M2
COMÚN INCLUYE MATERIALES, MANO DE OBRA EN ELABORACION, COLOCADO, Y
HERRAMIENTA MENOR.

CIMBRA EN LOSA DE AZOTEA, CON MADERA DE 1RA Y ACABADO COMÚN EN LOSAS, INCLUYE
SUP005 P.T
MATERIALES, MANO DE OBRA, HERRAMIENTA Y/O EQUIPO.

ACERO EN LOSA CON VARILLA #3 Fy= 4200KG/CM2, INCLUYE: SUMINISTRO, ACARREOS


INTERNOS HABILITADO, TRASLAPES, COLOCACION, AMARRES, GANCHOS, DOBLECES,
SUP006 KG
DESPERDICIOS, HERRAMIENTA MENOR, MANO DE OBRA Y TODO LO NECESARIO PARA SU
CORRECTA EJECUCION.

CONCRETO EN LOSA DE AZOTEA F'C= 200 KG/CM2 HECHO EN OBRA CON MAQUINA
REVOLVEDORA TAMAÑO MÁXIMO DE AGREGADO DE 3/4" INCLUYE MATERIALES, MANO DE
SUP007 M3
OBRA EN ELABORACION, COLOCADO,CIMBRADO,DESCIMBRADO, VIBRADO, HERRAMIENTA Y/O
EQUIPO

INSTALACION ELECTRICA

SUMINISTRO Y COLOCACION DE CENTRO DE CARGA QOD-2, MARCA SQUARE'D; INCLUYE:


IE001 ACARREO,CONEXION, PRUEBA, MATERIALES PARA SU FIJACION, HERRAMIENTA MENOR, PZA
MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION.

SUMINISTRO Y COLOCACION DE CENTRO DE CARGA TIP QO-816- L100 F, BIFASICO, MARCA


SQUARE'D; INCLUYE: ACARREO, CONEXION, PRUEBA, MATERIALES PARA SU FIJACION,
IE002 PZA
HERRAMIENTA MENOR, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA
EJECUCION.

SUMINISTRO Y COLOCACION DE INTERRUPTOR TERMOMAGNETICO TIPO QO DE 1 POLO 15 A


IE003 50 AMPER'S, MARCA SQUARE'D; INCLUYE: ACARREO, CONEXIÓN, PRUEBA, HERRAMIENTA PZA
MENOR, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION.

SUMINISTRO Y COLOCACION DE INTERRUPTOR DE SEGURIDAD DE 2x30 AMPER'S, CAT. D 221


IE004 N, MARCA SQUARE'D; INCLUYE: ACARREO, FUSIBLES, CONEXIÓN, PRUEBA, HERRAMIENTA PZA
MENOR, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION.

SUMINISTRO Y TENDIDO DE TUBO POLIDUCTO NARANJA DE 13 MM. DE DIAMETRO; INCLUYE:


IE005 ACARREO, MATERIALES PARA SU FIJACION, ANDAMIOS, HERRAMIENTA MENOR, MANO DE ML
OBRA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION.

SUMINISTRO Y TENDIDO DE TUBO POLIDUCTO NARANJA DE 19 MM. DE DIAMETRO; INCLUYE:


IE006 ACARREO, MATERIALES PARA SU FIJACION, ANDAMIOS, HERRAMIENTA MENOR, MANO DE ML
OBRA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION.

SUMINISTRO Y COLOCACION DE SALIDA PARA APAGADOR Y/O CONTACTO MARCA ROYER CON
POLIDUCTO NARANJA 13 mm, INCLUYE: ACARREO, MATERIALES PARA SU FIJACION, CHALUPA
IE007 GALVANIZADA, CABLES DEL No. 12 Y 14, SOBRETAPA DE ALUMINIO, CONEXIÓN, PRUEBA, SAL
HERRAMIENTA MENOR, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA
EJECUCION.

AJPOP MERIDA SELVIN NAZARIO_____________


GARCIA OROZCO MIGUEL ANGEL____________
PRESUPUESTO DE OBRA
PROYECTO: CASA HABITACION
MUNICIPIO: TAPACHULA CHIAPAS
FECHA:11 DE DICIEMBRE 2015

SUMISTRO Y COLOCACION DE SALIDA DE CENTRO EN CAJA DE LAMINA GALVANIZADA CON


POLIDUTO NARANJA 3/4"; INCLUYE: ACARREOS, CHALUPA GALVANIZADA, APAGADORES,
IE008 SAL
CABLES, CHASIS Y SOBRETAPA DE ALUMINIO, PRUEBAS, CONEXIONES, HERRAMIENTA
MENOR, MANO DE OBRA, Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION.

SUMINISTRO Y COLOCACION DE TOMA DOMICILIARIA, INCLUYE: ACARREO, CABLE No. 8, BASE


PARA MEDIDOR BIFASICO, TUBO CONDUIT GALVANIZADO, MUFA SECA, CONEXIÓN, PRUEBA,
IE009 SAL
MATERILAES PARA SU FIJACION, HERRAMINETA MENOR, MANO DE OBRA Y TODO LO
NECESARIO PARA SU CORRECTA EJECUCION.

SUMINISTRO Y COLOCACION DE SISTEMA DE TIERRA FISICA PARA ACOMETIDA MONOFASICA,


CON VARILLA COPPER-WELD DE 1.5 M., CABLE DESNUDO DEL No. 8, TUBO CONDUIT 19 mm.
IE010 SAL
PARED DELGADA, CONECTOR. INCLUYE: ACARREO, CONEXIÓN, PRUEBA, MATERIALES PARA
SU FIJACION, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION.

SUMINISTRO Y COLOCACION DE CABLE ALIMNETADOR THW No. 8 INCLUYE: ACARREO


IE011 CONEXIÓN, PRUEBA, HERRAMINETA MENOR, MANO DE OBRA Y TODO LO NECESARIO PARA SU ML
CORECTA EJECUCION.

SALIDA PARA SEÑAL DE T.V. EN CAJA DE LAMINA GALVANIZADA CON TUBO CONDUIT DE
FIERRO GALVANIZADO PARED DELGADA; INCLUYE: ACARREOS, CONECTORES, COPLES,
IE012 CHALUPA GALVANIZADA, CABLES TV, CHASIS Y SOBRETAPA DE ALUMINIO, PRUEBAS, SAL
CONEXIONES, HERRAMIENTA MENOR, MANO DE OBRA Y TODO LO NECESARIO PARA SU
CORRECTA EJECUCION.

SALIDA DE CONTACTO MONOFASICO DUPLEX POLARIZADO 127 VOLTS 15 AMP. CON


POLIDUCTO NARANJA 1/2"; INCLUYE: ACARREOS, CHALUPA GALVANIZADA, CONTACTO
IE013 SAL
DUPLEX POLARIZADO, CABLES, PLACAS, CONEXIONES, PRUEBAS, HERRAMIENTA MENOR,
MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION.

SALIDA PARA TELEFONO EN CAJA DE LAMINA GALVANIZADA CON TUBO CONDUIT DE FIERRO
GALVANIZADO PARED DELGADA; INCLUYE: ACARREOS, CONECTORES, COPLES, CHALUPA
IE013 GALVANIZADA, CABLES DE 2 VIAS, CHASIS Y SOBRETAPA DE ALUMINIO, PRUEBAS, SAL
CONEXIONES, HERRAMIENTA MENOR, MANO DE OBRA Y TODO LO NECESARIO PARA SU
CORRECTA EJECUCION.

SUMISTRO Y COLOCACION DE SALIDA INCANDECENTE EN CAJA DE LAMINA GALVANIZADA


TIPO BOTE CON POLIDUTO NARANJA 3/4"; INCLUYE: ACARREOS, CHALUPA GALVANIZADA,
IE014 APAGADORES, CABLES, CHASIS Y SOBRETAPA DE ALUMINIO 1,2 Y 3 VENTANAS, PRUEBAS, SAL
CONEXIONES, HERRAMIENTA MENOR, MANO DE OBRA Y TODO LO NECESARIO PARA SU
CORRECTA EJECUCION.

SUMINISTRO Y COLOCACION DE LUMINARIO DE SOBREPONER EN SALIDA TIPO BOTE,


INCLUYE: ACARREO, ARMADO, MATERIALES PARA SU FIJACION, CINTA AISLANTE, FOCO
IE015 PZA
FLUORESCENTES DE 13 WATTS, CONEXIONES, PRUEBAS, HARRAMIENTA, MANO DE OBRA Y
TODO LO NECESARIO PARA SU CORRECTA EJECUCION.

SUMINISTRO Y COLOCACION DE BOMBA CENTRIFUGA DE 1/4 H.P. MARCA CORONA, INCLUYE:


ACARREO, CABLE No. 12, CINTA AISLANTE, CONEXIÓN, PRUEBA, PUESTA EN MARCHA,
IE016 PZA
MATERIALES PARA SU FIJACION, HERRAMIENTA, MANO DE OBRA Y TODO LO NECESARIO PARA
SU CORRECTA EJECUCION.

INSTALACION HIDRAULICA

SUMINISTRO Y COLOCACION DE TINACO PVC DE 750 LTS. MARCA ROTOPLAS O SIMILAR,


IH001 INCLUYE: ACARREO, ELEVACIÓN, CONEXIÓN A LA ALIMENTACIÓN, DESCARGA, HERRAMIENTA PZA
MENOR, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION.

AJPOP MERIDA SELVIN NAZARIO_____________


GARCIA OROZCO MIGUEL ANGEL____________
PRESUPUESTO DE OBRA
PROYECTO: CASA HABITACION
MUNICIPIO: TAPACHULA CHIAPAS
FECHA:11 DE DICIEMBRE 2015

SUMINISTRO Y COLOCACIÓN DE ACCESORIOS BLANCO LAMOSA O SIMILAR, JABONERA CON


AGARRADERA DE PORCELANA LAMOSA O SIMILAR, GANCHOS DE PORCELANA LAMOSA O
IH002 SIMILAR, TOALLERO DE PORCELANA; INCLUYE: ACARREO, APERTURA DEL HUECO EN MURO, PZA
COLOCACIÓN, AMACIZADO CON MORTERO DE CEMENTO-ARENA 1:4, LIMPIEZA, HERRAMIENTA
MENOR, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION.

SUMINISTRO Y COLOCACION DE REGADERA HELVEX No. 100, CON DOS LLAVES O SIMILAR;
INCLUYE: ACARREO, PRUEBAS, CONEXIONES, ENSAMBLE PARA MEZCLADORA, EMPOTRADO,
IH003 PZA
HERRAMIENTA MENOR, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA
EJECUCION.

SUMINISTRO Y COLOCACIÓN DE CALENTADOR AUTOMATICO CINSA DE 40 LTS., CLASIC-101 O


SIMILAR; INCLUYE: ACARREO, INSTALACIÓN, PRUEBAS, CONEXIÓN A LAS LÍNEAS DE
IH004 ALIMENTACIÓN, SOPORTES, HERRAMIENTA MENOR, ALIMENTACIÓN, SOPORTES, PZA
HERRAMIENTA MENOR, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA
EJECUCION.

SUMINISTRO Y COLOCACIÓN DE LAVABO MARCA GEMINIS O SIMILAR BLANCO CON LLAVE


INDIV P/LAVABO RUGO 16Q, CONTRA REJILLA Y CESPOL CROMADO, LIMPIEZA CON AGUA Y
IH005 JABON, CONEXIÓN A LA ALIMENTACIÓN Y AL DESAGUE; INCLUYE: ACARREO, MATERIALES PZA
PARA SU FIJACION, CONEXION, HERRAMIENTA, MANO DE OBRA Y TODO LO NECESARIO PARA
SU CORRECTA EJECUCION.

SUMINISTRO Y COLOCACIÓN DE LLAVE MEZCLADORA DE CUELLO CORTO DE 8" CON


CARTUCHO CERAMICO 1/4 DE VUELTA, CUBIERTA DE LATON Y MANERALES; INCLUYE:
IH006 PZA
ACARREOS, CONEXIÓN A LA ALIMENTACIÓN CON COFLEX PARA LAVABO, PRUEBAS,
HERRAMIENTA MENOR, MANO DE OBRA Y TODO LO

SUMINISTRO Y COLOCACIÓN DE FREGADERO METÁLICO DE 90 X 45 CM. CON ESCURRIDERO,


TIPO LADO DERECHO, CON LLAVE DE NARIZ, CESPOL CROMADO, SOPORTADO POR DOS
IH007 MUROS CAPUCHINOS, FORRADO DE AZULEJO BLANCO DE 15 X 15 CM. EN AMBAS CARAS; PZA
INCLUYE: ACARREOS, MATERIALES PARA SU FIJACIÓN, PRUEBAS, HERRAMIENTA MENOR,
MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION.

SUMINISTRO Y TENDIDO DE TUBO DE COBRE TIPO "M" DE 19 MM. DE DIAMETRO; INCLUYE:


SOLDADURA, ACARREOS, CONEXIONES, TENDIDO, LUBRICACIÓN, JUNTEO, ALINEACIÓN,
IH009 ML
PRUEBAS, HERRAMIENTA MENOR, MANO DE OBRA Y TODO LO NECESARIO PARA SU
CORRECTA EJECUCION.

SALIDA MUEBLE SANITARIO CON TUBO HIDRÁULICO COBRE TIPO "M" 13mm.; INCLUYE:
VALVULA DE PASO Y VÁLVULA DE CONTROL GENERAL, RAMALEO CON TUBO DE COBRE DE 13
IH010 A 100 MM DE DIÁMETRO, CONEXIONES, ALIMENTACIÓN Y DESCARGA DE TINACO, ACARREO, SAL
PRUEBA HIDROSTÁTICA, SOLDADURA, HERRAMIENTA, MANO DE OBRA Y TODO LO
NECESARIO PARA SU CORRECTA EJECUCION.

SALIDA DE LAVABO CON TUBO HIDRÁULICO DE COBRE TIPO " M" Y ACCESORIOS EN 13mm;
INCLUYE:CONEXIONES, RAMALEO, CONEXIONES A BAJADA DE AGUAS NEGRAS,
IH011 SAL
HERRAMIENTA MENOR, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA
EJECUCION.

SALIDA DE REGADERA CON TUBO HIDRÁULICO DE COBRE TIPO " M" Y ACCESORIOS EN 13mm;
INCLUYE:CONEXIONES, RAMALEO, CONEXIONES A BAJADA DE AGUAS NEGRAS,
IH012 SAL
HERRAMIENTA MENOR, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA
EJECUCION.

SALIDA DE LLAVE DE NARIZ EN EXTERIOR CON TUBO HIDRÁULICO DE COBRE TIPO " M" Y
IH013 ACCESORIOS EN 13mm; INCLUYE:CONEXIONES, RAMALEO, HERRAMIENTA MENOR, MANO DE SAL
OBRA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION.

AJPOP MERIDA SELVIN NAZARIO_____________


GARCIA OROZCO MIGUEL ANGEL____________
PRESUPUESTO DE OBRA
PROYECTO: CASA HABITACION
MUNICIPIO: TAPACHULA CHIAPAS
FECHA:11 DE DICIEMBRE 2015

SUMINISTRO Y COLOCACIÓN DE CISTERNA DE PLÁSTICO ROTOPLAS O SIMILAR EQUIPADA DE


2800 LT, FABRICADA CON PLÁSTICO AB-ANTI-BACTERIAS, INCLUYE: TUBERÍA DE
IH014 ALIMENTACIÓN INTERNA, FILTRO, VÁLVULA DE PIE O PICHANCHA, VÁLVULA DE LLENADO DE PZA
3/4", VÁLVULA DE ESFERA 3/4" CON REDUCCIÓN A A 1/2", MANO DE OBRA DE COLOCACIÓN,
HERRAMIENTA MENOR Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION.

INSTALACION SANITARIA

SUMINISTRO Y TENDIDO DE TUBERIA P.V.C. SANITARIO DE 4" PARA ALBAÑAL; INCLUYE:


ACARREO, INSTALACION, CONEXIONES,JUNTEO, DESPERDICIOS, ACCESORIOS,
IS001 ML
HERRAMIENTA MENOR, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA
EJECUCION.

REGISTRO DE 0.6m x 0.6m. DE MEDIDAS INTERIORES Y 1.00M. DE PROFUNDIDAD, A BASE DE


MUROS DE TABIQUE ROJO RECOCIDO DE 13 CMS. DE ESPESOR, ASENTADO CON MORTERO
DE CEMENTO ARENA EN PROPORCIÓN DE 1:5, DE 1 CM. DE ESPESOR. APLANADO ACABADO
IS002 PULIDO EN INTERIOR CON MORTERO CEMENTO ARENA 1:5. FIRME DE 0.05 CMS. DE ESPESOR PZA
DE CONCRETO HECHO EN OBRA DE F'C= 150 KG/CM2. INCLUYE: ACARREO, MATERIALES,
MANO DE OBRA, HERRAMIENTA, LIMPIEZA Y TODO LO NECESARIO PARA SU CORRECTA
EJECUCION.

SUMINISTRO Y COLOCACION DE TAPA PARA REGISTRO DE CONCRETO DE 0.06m. X 0.06m. Y


0.05 M.DE ESPESOR. ARMADA CON VARILLA DEL NO. 3 @ 10 EN AMBOS SENTIDOS, CON
IS003 MARCO DE ANGULO DE ACERO DE 1 1/4"x 1/8" Y CONTRAMARCO DE 1 1/2" x 1/4". CONCRETO PZA
DE 150 KG/CM2.; INCLUYE: ACARREO, MATERIALES, MANO DE OBRA, HERRAMIENTA, LIMPIEZA
Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION.

SUMINISTRO Y COLOCACION DE SALIDA MUEBLE SANITARIO CON TUBO DE PVC LISO


SANITARIO DE 4" Y DEMAS ACCESORIOS, INLCUYE: ACARREOS, CONEXIONES, RAMALEO CON
IS004 TUBO DE PVC, CONEXIONES A BAJADA DE AGUAS NEGRAS, TENDIDO, JUNTEO, PEGAMENTO SAL
DE PVC, ALINEACIÓN, PRUEBAS, HERRAMIENTA MENOR, MANO DE OBRA. Y TODO LO
NECESARIO PARA SU CORRECTA EJECUCION.

SUMISTRO Y COLOCACION DE SALIDA LABAVO CON TUBO DE PVC LISO SANITARIO DE 2" Y
DEMAS ACCESORIOS, INLCUYE: ACARREOS, CONEXIONES, RAMALEO CON TUBO DE PVC,
IS005 CONEXIONES A BAJADA DE AGUAS NEGRAS, TENDIDO, JUNTEO, PEGAMENTO DE PVC, SAL
ALINEACIÓN, PRUEBAS, HERRAMIENTA MENOR, MANO DE OBRA Y TODO LO NECESARIO PARA
SU CORRECTA EJECUCION.

SUMINISTRO Y COLOCACIÓN DE COLADERA HELVEX No. 2514 (PISO), INCLUYE: ACARREO,


INSTALACIÓN, SELLO CON MORTERO CEMENTO-ARENA, PROPORCIÓN 1:4, PRUEBAS,
IS006 PZA
PEGAMENTO DE PVC, CONEXIONES, HERRAMIENTA MENOR, MANO DE OBRA Y TODO LO
NECESARIO PARA SU CORRECTA EJECUCION.

IS007 HERRERIA Y VENTANERIA

SUMINISTRO E INSTALACION DE PUERTA TIPO MULTIPANEL LISA, DIFERENTES MEDIDAS CON


CERRADURA MARCA PHILLIPS 715 O SIMILAR. INCLUYE. ACARREO, INSTALACION, LIMPIEZA,
IS008 PZA
PREPARACION DE LA SUPERFICIE, MATERIALES PARA SU FIJACION, HERRAMIENTA, MANO DE
OBRA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION.

SUMINISTRO E INSTALACION DE PUERTA TIPO MULTIPANEL LISA, DIFERENTES MEDIDAS CON


CERRADURA MARCAFANAL 525 O SIMILAR. INCLUYE. ACARREO, INSTALACION, LIMPIEZA,
IS009 PZA
PREPARACION DE LA SUPERFICIE, MATERIALES PARA SU FIJACION, HERRAMIENTA, MANO DE
OBRA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION.

SUMINISTRO Y COLOCACION DE VENTANAS DE ALUMINIO ANODIZADO NATURAL, DOS


SECCIONES, FIJO Y CORREDIZO CON CRISTAL CLARO DE 3 MM. DE ESPESOR. INCLUYE.
IS010 ACARREO, INSTALACION, LIMPIEZA, PREPARACION DE LA SUPERFICIE, MATERIALES PARA SU PZA
FIJACION, HERRAMIENTA, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA
EJECUCION.

AJPOP MERIDA SELVIN NAZARIO_____________


GARCIA OROZCO MIGUEL ANGEL____________
PRESUPUESTO DE OBRA
PROYECTO: CASA HABITACION
MUNICIPIO: TAPACHULA CHIAPAS
FECHA:11 DE DICIEMBRE 2015

IS011 ACABADOS

SUMINISTRO Y COLOCACION DE PISO DE LOSETA INTERCERAMIC 20 X 20 CMS. ASENTADO


CON PEGAZULEJO; INCLUYE: ACARREOS, CORTES, LECHADEADO CON CEMENTO BLANCO,
ACA001 M2
AJUSTES, DESPERDICIOS, LIMPIEZA, NIVELACIÓN, HERRAMIENTA MENOR, MANO DE OBRA Y
TODO LO NECESARIO PARA SU CORRECTA EJECUCION.

SUMINISTRO Y COLOCACION DE ZOCLO VITROMEX DE 10X15 CM, ASENTADO CON MORTERO


CEMENTO-ARENA 1:4 Y LECHADEADO CON CEMENTO BLANCO; INCLUYE: HABILITADO DE
ACA002 M2
PIEZA, CORTES, AJUSTES, DESPERDICIOS, MANO DE OBRA, LIMPIEZA Y TODO LO NECESARIO
PARA SU CORRECTA EJECUCION.

SUMINISTRO Y COLOCACION DE MOSAICO DE PASTA LISO DE 20X20 CM, ASENTADO CON


MORTERO CEMENTO - ARENA 1:4 Y LECHADEADO CON CEMENTO GRIS; INCLUYE: CORTES,
ACA003 M2
AJUSTES, DESPERDICIOS, MANO DE OBRA, LIMPIEZA Y TODO LO NECESARIO PARA SU
CORRECTA EJECUCION.

SUMINISTRO Y COLOCACION DE AZULEJO LISO EN MURO DE 20x30 CM, ASENTADO CON PEGA
AZULEJO Y LECHADEADO CON CEMENTO BLANCO; INCLUYE: CORTES, AJUSTES,
ACA004 M2
DESPERDICIOS, NIVELACIÓN, MANO DE OBRA, LIMPIEZA Y TODO LO NECESARIO PARA SU
CORRECTA EJECUCION.

ACA005 M2

ACA006 M2

APLANADO EN COLUMNA CON MORTERO CEMENTOCAL-ARENA 1:2:6 A PLOMO Y REGLA,


ACABADO CON PLANA DE MADERA; INCLUYE: REMATES, BOQUILLAS, PREPARACIÓN DE LA
ACA006 M2
SUPERFICIE, PLOMEADO, ANDAMIOS, MANO DE OBRA Y TODO LO NECESARIO PARA SU
CORRECTA EJECUCION.

APLANADO DE MURO CON MORTERO CEMENTO-CALARENA 1:2:6 A PLOMO Y REGLA,


ACABADO ESPONJEADO; INCLUYE: REMATES, BOQUILLAS, PREPARACIÓN DE LA SUPERFICIE,
ACA007 M2
PLOMEADO, ANDAMIOS, MANO DE OBRA. (0.00 A 3.00 M DE ALTURA). Y TODO LO NECESARIO
PARA SU CORRECTA EJECUCION

SUMINISTRO Y COLOCACION DE PINTURA VINILICA DE PARA INTERIORES MARCA COMEX


VARIOS COLORES. INCLUYE: LIMPIEZA, PREPARACION DE LA SUPERFICIE, MATERIALES,
ACA008 M2
MANO DE OBRA, HERRAMIENTA, ANDAMIOS Y TODO LO NECESARIO PARA SU CORRECTA
EJECUCION.

SUMINISTRO Y COLOCACION DE PINTURA VINILICA DE PARA EXTERIORES MARCA COMEX


VARIOS COLORES. INCLUYE: LIMPIEZA, PREPARACION DE LA SUPERFICIE, MATERIALES,
ACA009 M2
MANO DE OBRA, HERRAMIENTA, ANDAMIOS Y TODO LO NECESARIO PARA SU CORRECTA
EJECUCION.

SUMINISTRO Y COLOCACION DE IMPERMEABILIZANTE INTEGRAL FESTERGRAL O SIMILAR DE


ACA010 10 CM. SECCIÓN TRIANGULAR ACABADO PULIDO CON CONCRETO F'c=150 KG/CM2. INCLUYE M2
TODO LO NECESARIO PARA SU CORRECTA EJECUCION.

ACA011 M2

AJPOP MERIDA SELVIN NAZARIO_____________


GARCIA OROZCO MIGUEL ANGEL____________
COSTOS Y PRESUPUESTO
FECHA: 11 DE DICIMBRE 2015 ANALISIS DE PRECIOS UNITARIOS
UNIDAD: M2
LIMPIEZA, TRAZO Y NIVELACIÓN EN ÁREA DE EDIFICACION INCLUYE MATERIAL,
MANO DE OBRA Y HERRAMIENTA MENOR.
RENDIMIENTO: 100

MATERIALES

CLAVE CONCEPTO UNIDAD CANTIDAD P.U IMPORTE


1 CALHIDRA TON 0.015 $1,620.40 $24.31
2 MADERA P.T 0.08 $10.79 $0.86
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTAL= $25.17

MANO DE OBRA

CLAVE DESCRIPCION UNIDAD CANTIDAD S.R IMPORTE


1 LIMPIEZA: 1 PEON J 0.010 $290.80 $2.91
2 TRAZO Y NIVELACION: 1PEON J 0.010 $290.80 $2.91
3 1 OFICIAL ALBAÑIL J 0.010 $478.97 $4.79
4 1 MAESTRO DE OBRA 10% % $0.10 $10.61 $1.06
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTAL= $11.67

HERRAMIENTA Y/O EQUIPO

CLAVE DESCRIPCION UNIDAD CANTIDAD P.U IMPORTE


1 HERRAMIENTA MENOR % 0.03 $10.61 $0.32
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTAL= $0.32

TOTAL DE MATERIALES: $25.17


TOTAL DE MANO DE OBRA: $11.67
TOTAL DE HTA Y/O EQUIPO: $0.32
COSTO DIRECTO: $37.15
COSTO INDIRECTO: $11.15
P.U: $48.30

AJPOP MERIDA SELVIN NAZARIO____________


GARCIA OROZCO MIGUEL ANGEL____________
COSTOS Y PRESUPUESTO
FECHA: 11 DE DICIMBRE 2015 ANALISIS DE PRECIOS UNITARIOS

EXCAVACIÓN A MANO EN TERRENO TIPO "B" DE 0.0 A 0.80 METROS DE UNIDAD: M3


PROFUNDIDAD INCLUYE: ACARREO A 20 METROS, AFINES DE TALUDES,
TRASPALEOS, AFINES DE FONDO, HERRAMIENTA MENOR, MANO DE OBRA. RENDIMIENTO: 2.5

MATERIALES
CLAVE CONCEPTO UNIDAD CANTIDAD P.U IMPORTE
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTAL= $0.00

MANO DE OBRA
CLAVE DESCRIPCION UNIDAD CANTIDAD S.R IMPORTE
1 1 PEON J 0.400 $290.80 $116.32
2 1 MAESTRO DE OBRA % 0.1 $116.32 $11.63
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTAL= $127.95

HERRAMIENTA Y/O EQUIPO


CLAVE DESCRIPCION UNIDAD CANTIDAD P.U IMPORTE
1 HERRAMIENTA MENOR % 0.03 $116.32 $3.49
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTAL= $3.49

TOTAL DE MATERIALES: $0.00


TOTAL DE MANO DE OBRA: $127.95
TOTAL DE HTA Y/O EQUIPO: $3.49
COSTO DIRECTO: $131.44
COSTO INDIRECTO: $39.43

AJPOP MERIDA SELVIN NAZARIO____________


GARCIA OROZCO MIGUEL ANGEL____________
COSTOS Y PRESUPUESTO
FECHA: 11 DE DICIMBRE 2015 ANALISIS DE PRECIOS UNITARIOS
P.U: $170.88

PLANTILLA DE CONCRETO SIMPLE CON F'C=100 KG/CM2 CON ESPESOR UNIDAD: M2


PROMEDIO DE 5 CM DE ESPESOR ELABORADO EN OBRA CON MAQUINA
REVOLVEDORA; INCLUYE MATERIALES, MANO DE OBRA EN ELABORACION,
COLOCADO, CIMBRADO, DESCIMBRADO, HERRAMIENTA Y/O EQUIPO. RENDIMIENTO: 17

MATERIALES
CLAVE CONCEPTO UNIDAD CANTIDAD P.U IMPORTE
1 CONCRETO F´C=100 KG/CM2 M3 0.063 $692.92 $43.65
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTAL= $43.65

MANO DE OBRA
CLAVE DESCRIPCION UNIDAD CANTIDAD S.R IMPORTE
1 1 PEON J 0.059 $290.80 $17.11
2 1 OFICIAL DE ALBAÑILERIA J 0.059 $478.97 $28.17
3 1 MAESTRO DE OBRA % 0.1 $45.28 $4.53
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTAL= $49.81

HERRAMIENTA Y/O EQUIPO


CLAVE DESCRIPCION UNIDAD CANTIDAD P.U IMPORTE
1 REVOLVEDORA M3 0.063 $69.82 $4.40
2 HERRAMIENTA MENOR % 0.03 $45.28 $1.36
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTAL= $5.76

TOTAL DE MATERIALES: $43.65


TOTAL DE MANO DE OBRA: $49.81
TOTAL DE HTA Y/O EQUIPO: $5.76
COSTO DIRECTO: $99.22

AJPOP MERIDA SELVIN NAZARIO____________


GARCIA OROZCO MIGUEL ANGEL____________
COSTOS Y PRESUPUESTO
FECHA: 11 DE DICIMBRE 2015 ANALISIS DE PRECIOS UNITARIOS
COSTO INDIRECTO: $29.77
P.U: $128.99

CONCRETO EN ZAPATA DE F'C=200 KG/CM2 CON AGRAGADO MÁXIMO DE 3/4" UNIDAD: M3


ELABORADO EN OBRA CON MAQUINA REVOLVEDORA, INCLUYE MATERIALES,
MANO DE OBRA EN ELABORACION, COLOCADO Y HERRAMIENTA Y/O EQUIPO. RENDIMIENTO: 15

MATERIALES
CLAVE CONCEPTO UNIDAD CANTIDAD P.U IMPORTE
CONCRETO F'C=200 KG/CM2 CON 5% DE DESPERDICIO M3 1.05 $1,078.32 $1,132.24
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTAL= $1,132.24

MANO DE OBRA
CLAVE DESCRIPCION UNIDAD CANTIDAD SR IMPORTE
1 ELABORACION DE CONCRETO $0.00
5 PEONES J 0.35 $290.80 $101.78
COLOCACIÓN $0.00
2 1PEON J 0.067 $290.80 $19.39
3 1 OFICIAL DE ALBAÑILERIA J 0.067 $478.97 $31.93
4 1 MAESTRO DE OBRA % 0.1 $153.10 $15.31
$0.00
$0.00
$0.00
$0.00
TOTAL= $168.41

HERRAMIENTA Y/O EQUIPO


CLAVE DESCRIPCION UNIDAD CANTIDAD P.U IMPORTE
1 REVOLVEDORA M3 1.05 $69.82 $73.31
2 VIBRADOR M3 1 $29.98 $29.98
3 HERRAMIENTA MENOR % 0.03 $153.10 $4.59
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTAL= $107.88

TOTAL DE MATERIALES: $1,132.24


TOTAL DE MANO DE OBRA: $168.41
TOTAL DE HTA Y/O EQUIPO: $107.88

AJPOP MERIDA SELVIN NAZARIO____________


GARCIA OROZCO MIGUEL ANGEL____________
COSTOS Y PRESUPUESTO
FECHA: 11 DE DICIMBRE 2015 ANALISIS DE PRECIOS UNITARIOS
COSTO DIRECTO: $1,408.52
COSTO INDIRECTO: $422.56
P.U: $1,831.08

UNIDAD: KG
ACERO EN CIMENTACION DE F'Y= 4500 KG/CM2 INCLUYE SUMINISTRO,
HABILITADO Y ARMADO
RENDIMIENTO: 75

MATERIALES
CLAVE CONCEPTO UNIDAD CANTIDAD P.U IMPORTE
1 VARILLA #3 KG 1 $12.46 $12.46
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTAL= $12.46

MANO DE OBRA
CLAVE DESCRIPCION UNIDAD CANTIDAD SR IMPORTE
1 1 OFICIAL FIERRERO J 0.0133 $478.9680 $6.39
2 I PEON J 0.0133 $290.80 $3.88
3 I MAESTRO DE OBRA % 0.1 $10.26 $1.03
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTAL= $11.29

HERRAMIENTA Y/O EQUIPO


CLAVE DESCRIPCION UNIDAD CANTIDAD P.U IMPORTE
1 HERRAMIENTA MENOR % 0.03 $10.26 $0.31
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTAL= $0.31

TOTAL DE MATERIALES: $12.46


TOTAL DE MANO DE OBRA: $11.29
TOTAL DE HTA Y/O EQUIPO: $0.31

AJPOP MERIDA SELVIN NAZARIO____________


GARCIA OROZCO MIGUEL ANGEL____________
COSTOS Y PRESUPUESTO
FECHA: 11 DE DICIMBRE 2015 ANALISIS DE PRECIOS UNITARIOS
COSTO DIRECTO: $24.06
COSTO INDIRECTO: $7.22
P.U: $31.28

UNIDAD: M2
CIMBRA PARA CIMENTACION CON MADERA DE PINO DE 1RA ACABADO COMÚN
INCLUYE CIMBRADO Y DESCIMBRADO.
RENDIMIENTO: 6

MATERIALES
CLAVE CONCEPTO UNIDAD CANTIDAD P.U IMPORTE
1 MADERA PARA CIMBRA COMÚN EN CIMENTACION M2 0.6 $79.08 $47.45
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTAL= $47.45

MANO DE OBRA
CLAVE DESCRIPCION UNIDAD CANTIDAD SR IMPORTE
1 I CARPINTERO DE OBRA NEGRA J 0.1666667 $478.97 $79.83
2 1 PEON J 0.1666667 $0.00 $0.00
3 MAESTRO DE OBRA NEGRA % 0.1 $79.83 $7.98
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTAL= $87.81

HERRAMIENTA Y/O EQUIPO


CLAVE DESCRIPCION UNIDAD CANTIDAD P.U IMPORTE
1 HERRAMIENTA MENOR % 0.03 $79.83 $2.39
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTAL= $2.39

AJPOP MERIDA SELVIN NAZARIO____________


GARCIA OROZCO MIGUEL ANGEL____________
COSTOS Y PRESUPUESTO
FECHA: 11 DE DICIMBRE 2015 ANALISIS DE PRECIOS UNITARIOS
TOTAL DE MATERIALES: $47.45
TOTAL DE MANO DE OBRA: $87.81
TOTAL DE HTA Y/O EQUIPO: $2.39
COSTO DIRECTO: $137.66
COSTO INDIRECTO: $41.30
P.U: $178.95

MURETE DE 12 CM DE ESPESOR DE TABICON DE 7X12X24 JUNTEADO CON UNIDAD: M2


MORTERO CEMENTO- CALHIDRA -ARENA RELACIÓN 1:3:12 INCLUYE
MATERIALES, MANO DE OBRA, HERRAMIENTA Y/O EQUIPO. RENDIMIENTO: 8

MATERIALES
CLAVE CONCEPTO UNIDAD CANTIDAD P.U IMPORTE
1 TABICON CON 5 % DESPERDICIO PZA 52.5 $3.00 $157.50
2 MORTERO 1:3:12 CON 10% DESPERDICIO M3 0.01584 $627.45 $9.94
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTAL= $167.44

MANO DE OBRA
CLAVE DESCRIPCION UNIDAD CANTIDAD SR IMPORTE
1 1 OFICIAL DE ALBAÑILERIA J 0.125 $478.97 $59.87
2 1 PEON J 0.125 $0.00 $0.00
3 MAESTRO DE OBRA % 0.1 $59.87 $5.99
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTAL= $65.86

HERRAMIENTA Y/O EQUIPO


CLAVE DESCRIPCION UNIDAD CANTIDAD P.U IMPORTE
1 HERRAMIENTA MENOR % 0.03 $59.87 $1.80
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTAL= $1.80

AJPOP MERIDA SELVIN NAZARIO____________


GARCIA OROZCO MIGUEL ANGEL____________
COSTOS Y PRESUPUESTO
FECHA: 11 DE DICIMBRE 2015 ANALISIS DE PRECIOS UNITARIOS

TOTAL DE MATERIALES: $167.44


TOTAL DE MANO DE OBRA: $65.86
TOTAL DE HTA Y/O EQUIPO: $1.80
COSTO DIRECTO: $235.09
COSTO INDIRECTO: $70.53
P.U: $305.62

CADENA TIPO CC Y CE DE 10X20-4 CON CONCRETO F'C= 200 KG/CM2 HECHO EN UNIDAD: ML
OBRA CON MAQUINA REVOLVEDORA TAMAÑO MÁXIMO DE AGREGADO DE 3/4",
ACABADO COMUN, INCLUYE ACARREOS, MATERIALES, MANO DE OBRA EN
ELABORACION, COLOCADO, CIMBRADO, DESCIMBRADO, VIBRADO, RENDIMIENTO: 8
HERRAMIENTA Y/O EQUIPO..

MATERIALES
CLAVE CONCEPTO UNIDAD CANTIDAD P.U IMPORTE
1 CONCRETO F´C = 150 kg/cm2 CON 5% DESPERDICIO M3 0.0236 $1,005.53 $23.73
2 ACERO REFUERZO #3 KG 2.24 $12.46 $27.92
3 ALAMBRON #2 KG 0.6696 $13.17 $8.82
4 CIMBRA COMÚN EN CADENAS M2 0.3 $53.33 $16.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTAL= $76.46

MANO DE OBRA
CLAVE DESCRIPCION UNIDAD CANTIDAD SR IMPORTE
1 ¨ELABORACION DEL CONCRETO REND 10M3/J $0.00
2 5 PEONES J 0.0118 $0.00 $0.00
3 ¨CIMBRADO, COLDADO Y ARMADO $0.00
4 I OFICIAL DE ALBAÑILERIA J 0.125 $478.97 $59.87
5 I PEON J 0.125 $0.00 $0.00
$0.00
6 MAESTRO DE OBRA % 0.1 $59.87 $5.99
$0.00
$0.00
$0.00
TOTAL= $65.86

HERRAMIENTA Y/O EQUIPO


CLAVE DESCRIPCION UNIDAD CANTIDAD P.U IMPORTE
1 HERRAMIENTA MENOR % 0.03 $59.87 $1.80
2 REVOLVEDORA M3 0.0236 $69.82 $1.65
3 VIBRADOR M3 1 $29.98 $29.98
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTAL= $33.42

AJPOP MERIDA SELVIN NAZARIO____________


GARCIA OROZCO MIGUEL ANGEL____________
COSTOS Y PRESUPUESTO
FECHA: 11 DE DICIMBRE 2015 ANALISIS DE PRECIOS UNITARIOS

TOTAL DE MATERIALES: $76.46


TOTAL DE MANO DE OBRA: $65.86
TOTAL DE HTA Y/O EQUIPO: $33.42
COSTO DIRECTO: $175.74
COSTO INDIRECTO: $52.72
P.U: $228.46

FIRME PARA PISO DE 15 CM DE ESPESOR PROMEDIO CON CONCRETO F'C= 150 UNIDAD: M2
KG/CM2 CON AGREGADO MÁXIMO 3/4" HECHO EN OBRA CON MAQUINA
REVOLVEDORA INCLUYE ACARREOS, MATERIALES, MANO DE OBRA EN
RENDIMIENTO: 10
ELABORACION, COLOCADO, HERRAMIENTA Y/O EQUIPO.

MATERIALES
CLAVE CONCEPTO UNIDAD CANTIDAD P.U IMPORTE
1 CONCRETO F´C = 150 KG/CM2 CON 10 M3 0.165 $1,005.53 $165.91
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTAL= $165.91

MANO DE OBRA
CLAVE DESCRIPCION UNIDAD CANTIDAD SR IMPORTE
¨ELABORACION DEL CONCRETO F´C =150 KG/CM2 $0.00
1 4 PEONES CON REND DE 10 M3/J C/U J 0.0825 $290.80 $23.99
$0.00
¨FIRME DE CONCRETO DE 15 CM DE ESPESOR PROMEDIO $0.00
2 1 OFICIAL DE ALBAÑILERIA J 0.1 $478.97 $47.90
3 2 PEONES J 0.2 $290.80 $58.16
$0.00
4 MAESTRO DE OBRA % 0.1 $130.05 $13.00
$0.00
$0.00
TOTAL= $143.05

HERRAMIENTA Y/O EQUIPO


CLAVE DESCRIPCION UNIDAD CANTIDAD P.U IMPORTE
$0.00
1 HERRAMIENTA MENOR % 0.03 $130.05 $3.90
$0.00
2 REVOLVEDORA M3 0.165 $69.82 $11.52
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00

AJPOP MERIDA SELVIN NAZARIO____________


GARCIA OROZCO MIGUEL ANGEL____________
COSTOS Y PRESUPUESTO
FECHA: 11 DE DICIMBRE 2015 ANALISIS DE PRECIOS UNITARIOS
TOTAL= $15.42

TOTAL DE MATERIALES: $165.91


TOTAL DE MANO DE OBRA: $143.05
TOTAL DE HTA Y/O EQUIPO: $15.42
COSTO DIRECTO: $324.39
COSTO INDIRECTO: $97.32
P.U: $421.70

CASTILLO TIPO K DE 15 x 20 DE CONCRETO F'C= 150KG/CM2 HECHO EN OBRA UNIDAD: ML


CON MAQUINA REVOLVEDORA TAMAÑO MÁXIMO DE AGREGADO 3/4" ARMADO
CON ARMEX DE 10X10-4 Y10X30X4 RESPECTIVAMENTE; INCLUYE ACARREOS,
MATERIALES, MANO DE OBRA EN ELABORACION, COLOCADO, CIMBRADO, RENDIMIENTO: 8
DESCIMBRADO, VIBRADO, HERRAMIENTA Y/O EQUIPO.

MATERIALES
CLAVE CONCEPTO UNIDAD CANTIDAD P.U IMPORTE
1 CONCRETO F´C=150 KG/CM2 M3 0.033 $1,005.53 $33.18
2 ARMEX DE 15*15-4 PZA 1 $101.00 $101.00
3 CIMBRA COMÚN M2 0.4 $74.14 $29.66
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTAL= $163.84

MANO DE OBRA
CLAVE DESCRIPCION UNIDAD CANTIDAD SR IMPORTE
¨ELABORACION DEL CONCRETO $0.00
1 4 PEONES CON REND DE 10M3/J C/U J 0.0132 $206.69 $2.73
¨CIMBRADO, ARAMDO Y COLADO $0.00
2 1 OFICIAL DE ALBAÑILERIA J 0.125 $378.94 $47.37
3 1 PEON J 0.125 $206.69 $25.84
$0.00
4 MAESTRO DE OBRA % 0.1 $75.93 $7.59
$0.00
$0.00
$0.00
TOTAL= $83.53

HERRAMIENTA Y/O EQUIPO


CLAVE DESCRIPCION UNIDAD CANTIDAD P.U IMPORTE
1 HERRAMIENTA MENOR % 0.03 $75.93 $2.28
2 REVOLVEDORA M3 0.033 $69.82 $2.30
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00

AJPOP MERIDA SELVIN NAZARIO____________


GARCIA OROZCO MIGUEL ANGEL____________
COSTOS Y PRESUPUESTO
FECHA: 11 DE DICIMBRE 2015 ANALISIS DE PRECIOS UNITARIOS
$0.00
$0.00
TOTAL= $4.58

TOTAL DE MATERIALES: $163.84


TOTAL DE MANO DE OBRA: $83.53
TOTAL DE HTA Y/O EQUIPO: $4.58
COSTO DIRECTO: $251.95
COSTO INDIRECTO: $75.58
P.U: $327.53

UNIDAD: 0

0
RENDIMIENTO: 7

MATERIALES
CLAVE CONCEPTO UNIDAD CANTIDAD P.U IMPORTE
1 CONCRETO F´C=200KG/CM2 CON 10% DESPERDICIO M3 0.0495 $1,078.32 $53.38
2 ARMEX DE 15X30-4 PZA 1 $117.20 $117.20
3 CIMBRA COMÚN M2 0.75 $91.51 $68.63
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTAL= $239.21

MANO DE OBRA
CLAVE DESCRIPCION UNIDAD CANTIDAD SR IMPORTE
¨ELABORACION DEL CONCRETO DE 200 KG/CM2 $0.00
1 4 PEONES CON RENDIMIENTO DE 9 M3/J C/U J 0.022 $206.69 $4.55
¨ARMADO, CIMBRADO Y COLADO $0.00
2 1 0FICIAL DE ALBAÑILERIA J 0.1428571 $378.94 $54.13
3 2 PEONES J 0.2857143 $206.69 $59.05
$0.00
4 MAESTRO DE OBRA % 0.1 $117.74 $11.77
$0.00
$0.00
$0.00
TOTAL= $129.51

HERRAMIENTA Y/O EQUIPO


CLAVE DESCRIPCION UNIDAD CANTIDAD P.U IMPORTE
1 HERRAMIENTA MENOR % 0.03 $117.74 $3.53
2 REVOLVEDROA M3 0.0495 $69.82 $3.46
3 VIBRADOR M3 1 $29.98 $29.98
$0.00
$0.00

AJPOP MERIDA SELVIN NAZARIO____________


GARCIA OROZCO MIGUEL ANGEL____________
COSTOS Y PRESUPUESTO
FECHA: 11 DE DICIMBRE 2015 ANALISIS DE PRECIOS UNITARIOS
$0.00
$0.00
$0.00
$0.00
$0.00
TOTAL= $36.96

TOTAL DE MATERIALES: $239.21


TOTAL DE MANO DE OBRA: $129.51
TOTAL DE HTA Y/O EQUIPO: $36.96
COSTO DIRECTO: $405.68
COSTO INDIRECTO: $121.71
P.U: $527.39

MURO DE 15 CM DE ESPESOR DE DE TABIQUE ROJO DE BARRO RECOCIDO DE UNIDAD: M2


7X14X28 JUNTEADO CON MORTERO CEMENTO-CALHIDRA- ARENA RELACIÓN 1:5
CON ACABADO COMÚN INCLUYE MATERIALES, MANO DE OBRA EN
RENDIMIENTO: 7
ELABORACION, COLOCADO, Y HERRAMIENTA MENOR.

MATERIALES
CLAVE CONCEPTO UNIDAD CANTIDAD P.U IMPORTE
1 BLOCK HUECO C/5% DESPERDICIO PZA 33 $7.00 $231.00
2 MORTERO CEMENTO-CALHIDRA-ARENA 1:3:12 DESP 10% M3 0.0161 $821.38 $13.22
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTAL= $244.22

MANO DE OBRA
CLAVE DESCRIPCION UNIDAD CANTIDAD P.U IMPORTE
1 1 OFICIAL DE ALBAÑILERIA J 0.142857 $478.97 $68.42
2 1 PEON J 0.142857 $206.69 $29.53
$0.00
3 MAESTRO DE OBRA % 0.1 $97.95 $9.80
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTAL= $107.75

HERRAMIENTA Y/O EQUIPO


CLAVE DESCRIPCION UNIDAD CANTIDAD P.U IMPORTE
1 HERRAMIENTA MENOR % 0.03 $97.95 $2.94
$0.00
$0.00

AJPOP MERIDA SELVIN NAZARIO____________


GARCIA OROZCO MIGUEL ANGEL____________
COSTOS Y PRESUPUESTO
FECHA: 11 DE DICIMBRE 2015 ANALISIS DE PRECIOS UNITARIOS
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTAL= $2.94

TOTAL DE MATERIALES: $244.22


TOTAL DE MANO DE OBRA: $107.75
TOTAL DE HTA Y/O EQUIPO: $2.94
COSTO DIRECTO: $354.91
COSTO INDIRECTO: $106.47
P.U: $461.38

UNIDAD: P.T
CIMBRA EN LOSA DE AZOTEA, CON MADERA DE 1RA Y ACABADO COMÚN EN
LOSAS, INCLUYE MATERIALES, MANO DE OBRA, HERRAMIENTA Y/O EQUIPO.
RENDIMIENTO: 7

MATERIALES
CLAVE CONCEPTO UNIDAD CANTIDAD P.U IMPORTE
1 CIMBRA COMÚN PARA LOZAS P.T 1 $80.67 $80.67
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTAL= $80.67

MANO DE OBRA
CLAVE DESCRIPCION UNIDAD CANTIDAD SR IMPORTE
1 I CARPINTERO DE OBRA NEGRA J 0.142857 $478.97 $68.42
2 2 PEONES J 0.285714 $206.69 $59.05
$0.00
3 MAESTRO DE OBRA % 0.1 $127.48 $12.75
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTAL= $140.23

HERRAMIENTA Y/O EQUIPO


CLAVE DESCRIPCION UNIDAD CANTIDAD P.U IMPORTE

AJPOP MERIDA SELVIN NAZARIO____________


GARCIA OROZCO MIGUEL ANGEL____________
COSTOS Y PRESUPUESTO
FECHA: 11 DE DICIMBRE 2015 ANALISIS DE PRECIOS UNITARIOS
1 HERRAMIENTA MENOR % 0.03 $127.48 $3.82
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTAL= $3.82

TOTAL DE MATERIALES: $80.67


TOTAL DE MANO DE OBRA: $140.23
TOTAL DE HTA Y/O EQUIPO: $3.82
COSTO DIRECTO: $224.72
COSTO INDIRECTO: $67.41
P.U: $292.13

ACERO EN LOSA CON VARILLA #3 Fy= 4200KG/CM2, INCLUYE: SUMINISTRO, UNIDAD: KG


ACARREOS INTERNOS HABILITADO, TRASLAPES, COLOCACION, AMARRES,
GANCHOS, DOBLECES, DESPERDICIOS, HERRAMIENTA MENOR, MANO DE OBRA
Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION. RENDIMIENTO:

MATERIALES
CLAVE CONCEPTO UNIDAD CANTIDAD P.U IMPORTE
1 MALLA ELECTROSOLDADA DE 6*6 - 4/4 M2 1 $12.69 $12.69
2 ACERO #3 KG 1 $12.18 $12.18
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTAL= $24.87

MANO DE OBRA
CLAVE DESCRIPCION UNIDAD CANTIDAD P.U IMPORTE
1 1 OFICIAL FIERRERO J 0.011765 $378.9400 $4.46
2 1 PEON J 0.011765 $206.69 $2.43
3 MAESTRO DE OBRA % 0.1 $6.89 $0.69
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTAL= $7.58

AJPOP MERIDA SELVIN NAZARIO____________


GARCIA OROZCO MIGUEL ANGEL____________
COSTOS Y PRESUPUESTO
FECHA: 11 DE DICIMBRE 2015 ANALISIS DE PRECIOS UNITARIOS
HERRAMIENTA Y/O EQUIPO
CLAVE DESCRIPCION UNIDAD CANTIDAD P.U IMPORTE
1 HERRAMIENTA MENOR % 0.03 $6.89 $0.21
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTAL= $0.21

TOTAL DE MATERIALES: $24.87


TOTAL DE MANO DE OBRA: $7.58
TOTAL DE HTA Y/O EQUIPO: $0.21
COSTO DIRECTO: $32.66
COSTO INDIRECTO: $9.80
P.U: $42.45

CONCRETO EN LOSA DE AZOTEA F'C= 200 KG/CM2 HECHO EN OBRA CON UNIDAD: M3
MAQUINA REVOLVEDORA TAMAÑO MÁXIMO DE AGREGADO DE 3/4" INCLUYE
MATERIALES, MANO DE OBRA EN ELABORACION,
COLOCADO,CIMBRADO,DESCIMBRADO, VIBRADO, HERRAMIENTA Y/O EQUIPO RENDIMIENTO: 1.5

MATERIALES
CLAVE CONCEPTO UNIDAD CANTIDAD P.U IMPORTE
1 CONCRETO F´C=200 KG/CM2 CON 10% DESPERDICIO M3 0.11 $1,078.32 $118.62
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTAL= $118.62

MANO DE OBRA
CLAVE DESCRIPCION UNIDAD CANTIDAD SR IMPORTE
¨ELABORACION DEL CONCRETO $0.00
1 10 PEONES CON RENDIMIENTO DE 10M3/J J 0.11 $290.80 $31.99
$0.00
¨COLADO DE LA LOZA $0.00
2 I OFICIAL DE ALBAÑILERIA REND 6M3/J J 0.166667 $478.97 $79.83
3 6 PEONES J 4 $290.80 $1,163.21
$0.00
4 MAESTRO DE OBRA % 0.1 $1,275.02 $127.50
$0.00
$0.00
TOTAL= $1,402.53

AJPOP MERIDA SELVIN NAZARIO____________


GARCIA OROZCO MIGUEL ANGEL____________
COSTOS Y PRESUPUESTO
FECHA: 11 DE DICIMBRE 2015 ANALISIS DE PRECIOS UNITARIOS

HERRAMIENTA Y/O EQUIPO


CLAVE DESCRIPCION UNIDAD CANTIDAD P.U IMPORTE
1 HERRAMIENTA MENOR % 0.03 $1,275.02 $38.25
2 REVOLVEDORA M3 0.11 $69.82 $7.68
3 VIBRADOR M3 1 $29.98 $29.98
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTAL= $75.91

TOTAL DE MATERIALES: $118.62


TOTAL DE MANO DE OBRA: $1,402.53
TOTAL DE HTA Y/O EQUIPO: $75.91
COSTO DIRECTO: $1,597.05
COSTO INDIRECTO: $479.11
P.U: $2,076.16

UNIDAD: SALIDA
CONCEPTO: INSTALACION HIDROSANITARIA, INCLUYE MATERIAL, MANO DE
OBRA Y HERRAMIENTA MENOR
RENDIMIENTO:

MATERIALES
CLAVE CONCEPTO UNIDAD CANTIDAD P.U IMPORTE
$0.00
1 INSTALACION HIDRAULICA SALIDA 1 $467.40 $467.40
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTAL= $467.40

MANO DE OBRA
CLAVE DESCRIPCION UNIDAD CANTIDAD P.U IMPORTE
1 1 OFICIAL PLOMERO J 0.5 $378.94 $189.47
2 SAL/J $0.00
$0.00
2 1 MAESTRO DE OBRA 10% % 0.1 $189.47 $18.95
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTAL= $208.42

AJPOP MERIDA SELVIN NAZARIO____________


GARCIA OROZCO MIGUEL ANGEL____________
COSTOS Y PRESUPUESTO
FECHA: 11 DE DICIMBRE 2015 ANALISIS DE PRECIOS UNITARIOS

HERRAMIENTA Y/O EQUIPO


CLAVE DESCRIPCION UNIDAD CANTIDAD P.U IMPORTE
$0.00
1 HERRAMIENTA MENOR % 0.03 $189.47 $5.68
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTAL= $5.68

TOTAL DE MATERIALES: $467.40


TOTAL DE MANO DE OBRA: $208.42
TOTAL DE HTA Y/O EQUIPO: $5.68
COSTO DIRECTO: $681.50
COSTO INDIRECTO: $204.45
P.U: $885.95

UNIDAD: SALIDA
CONCEPTO: INSTALACION ELECTRICA, INCLUYE MANO DE OBRA, MATERIALES,
Y HERRRAMIENTA MENOR
RENDIMIENTO:

MATERIALES
CLAVE CONCEPTO UNIDAD CANTIDAD P.U IMPORTE
$0.00
1 INSTALACION ELECTRICA SALIDA 1 $67.40 $67.40
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTAL= $67.40

MANO DE OBRA
CLAVE DESCRIPCION UNIDAD CANTIDAD P.U IMPORTE
$0.00
1 ELECTRICISTA J 0.5 $378.94 $189.47
2 SAL/J $0.00
$0.00
2 1 MAESTRO DE OBRA % 0.1 $189.47 $18.95
$0.00
$0.00
$0.00
$0.00

AJPOP MERIDA SELVIN NAZARIO____________


GARCIA OROZCO MIGUEL ANGEL____________
COSTOS Y PRESUPUESTO
FECHA: 11 DE DICIMBRE 2015 ANALISIS DE PRECIOS UNITARIOS
$0.00
TOTAL= $208.42

HERRAMIENTA Y/O EQUIPO


CLAVE DESCRIPCION UNIDAD CANTIDAD P.U IMPORTE
$0.00
1 HERRAMIENTA MENOR % 0.03 $189.47 $5.68
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTAL= $5.68

TOTAL DE MATERIALES: $67.40


TOTAL DE MANO DE OBRA: $208.42
TOTAL DE HTA Y/O EQUIPO: $5.68
COSTO DIRECTO: $281.50
COSTO INDIRECTO: $84.45
P.U: $365.95

UNIDAD: M2
CONCEPTO: PINTURA VINILICA DE UN SOLO COLOR, A 2 MANOS, INCLUYE MANO
DE OBRA Y HERRAMIENTA MENOR
RENDIMIENTO:

MATERIALES
CLAVE CONCEPTO UNIDAD CANTIDAD P.U IMPORTE
$0.00
1 PINTURA LT 0.125 $35.00 $4.38
8M2/LT $0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTAL= $4.38

MANO DE OBRA
CLAVE DESCRIPCION UNIDAD CANTIDAD P.U IMPORTE
$0.00
1 PINTOR J 0.028 $378.94 $10.61
35 M2/J $0.00
$0.00
2 1 MAESTRO DE OBRA % 0.1 $10.61 $1.06
$0.00
$0.00

AJPOP MERIDA SELVIN NAZARIO____________


GARCIA OROZCO MIGUEL ANGEL____________
COSTOS Y PRESUPUESTO
FECHA: 11 DE DICIMBRE 2015 ANALISIS DE PRECIOS UNITARIOS
$0.00
$0.00
$0.00
TOTAL= $11.67

HERRAMIENTA Y/O EQUIPO


CLAVE DESCRIPCION UNIDAD CANTIDAD P.U IMPORTE
$0.00
1 HERRAMIENTA MENOR % 0.03 $10.61 $0.32
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTAL= $0.32

TOTAL DE MATERIALES: $4.38


TOTAL DE MANO DE OBRA: $11.67
TOTAL DE HTA Y/O EQUIPO: $0.32
COSTO DIRECTO: $16.36
COSTO INDIRECTO: $4.91
P.U: $37.64

CADENA TIPO CC Y CE DE 10X20-4 CON CONCRETO F'C= 200 KG/CM2 HECHO EN


OBRA CON MAQUINA REVOLVEDORA TAMAÑO MÁXIMO DE AGREGADO DE 3/4", UNIDAD: M2
ACABADO COMUN, INCLUYE ACARREOS, MATERIALES, MANO DE OBRA EN
ELABORACION, COLOCADO, CIMBRADO, DESCIMBRADO, VIBRADO, RENDIMIENTO:
HERRAMIENTA Y/O EQUIPO..

MATERIALES
CLAVE CONCEPTO UNIDAD CANTIDAD P.U IMPORTE
$0.00
1 PINTURA LT 0.02 $35.00 $0.70
8M2/LT $0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTAL= $0.70

MANO DE OBRA
CLAVE DESCRIPCION UNIDAD CANTIDAD P.U IMPORTE
$0.00
1 ALBAÑIL J 0.028 $378.94 $10.61
$0.00
$0.00
2 1 MAESTRO DE OBRA % 0.1 $10.61 $1.06

AJPOP MERIDA SELVIN NAZARIO____________


GARCIA OROZCO MIGUEL ANGEL____________
COSTOS Y PRESUPUESTO
FECHA: 11 DE DICIMBRE 2015 ANALISIS DE PRECIOS UNITARIOS
$0.00
$0.00
$0.00
$0.00
$0.00
TOTAL= $11.67

HERRAMIENTA Y/O EQUIPO


CLAVE DESCRIPCION UNIDAD CANTIDAD P.U IMPORTE
$0.00
1 HERRAMIENTA MENOR % 0.03 $10.61 $0.32
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTAL= $0.32

TOTAL DE MATERIALES: $0.70


TOTAL DE MANO DE OBRA: $11.67
TOTAL DE HTA Y/O EQUIPO: $0.32
COSTO DIRECTO: $12.69
COSTO INDIRECTO: $3.81
P.U: $29.19

AJPOP MERIDA SELVIN NAZARIO____________


GARCIA OROZCO MIGUEL ANGEL____________
COSTOS Y PRESUPUESTOS
FECHA: 11 DE DICIEMBRE 2015 NUMEROS GENERADORES
LOCALIZACIÓN RESULTADOS
CLAVE CONCEPTO U LARGO ANCHO ALTO PZA
EJE TRAMO TIPO PARCIAL TOTAL

A01 Trabajos Preliminares


LIMPIEZA, TRAZO Y NIVELACIÓN EN ÁREA DE
PRE00 EDIFICACION INCLUYE MATERIAL, MANO DE OBRA Y M2 18.84 7 131.88
HERRAMIENTA MENOR.
1
131.88

1 A-C M3 4.58 0.8 0.8 1 2.9312


1´ C-D M3 3.08 0.8 0.8 1 1.9712
2 A-D M3 7 0.8 0.8 1 4.48
3 A-B´ M3 2.8 0.8 0.8 1 1.792
EXCAVACIÓN A MANO EN TERRENO TIPO "B" DE
0.0 A 0.80 METROS DE PROFUNDIDAD 4 A-B´ M3 2.8 0.8 0.8 1 1.792
PRE00
INCLUYE: ACARREO A 20 METROS, AFINES DE 4´ A-B M3 0.9 0.8 0.8 1 0.576
2 TALUDES, TRASPALEOS, AFINES DE FONDO,
5 B´-D M3 3.86 0.8 0.8 1 2.4704
HERRAMIENTA MENOR, MANO DE OBRA.
A 1-5 M3 7.86 0.8 0.8 1 5.0304
B 2-3 M3 1.14 0.8 0.8 1 0.7296
B´ 3-5 M3 3.58 0.8 0.8 1 2.2912
C 1-2 M3 2.24 0.8 0.8 1 1.4336
D 1-5 M3 7.94 0.8 0.8 1 5.0816
30.5792

AJPOP MERIDA SELVIN NAZARIO_____________


GARCIA OROZCO MIGUEL ANGEL_____________
COSTOS Y PRESUPUESTOS
FECHA: 11 DE DICIEMBRE 2015 NUMEROS GENERADORES

CIMENTACION

1 A-C M2 4.58 0.8 1 3.664


1´ C-D M2 3.08 0.8 1 2.464
2 A-D M2 7 0.8 1 5.6
PLANTILLA DE CONCRETO SIMPLE CON F'C=100
3 A-B´ M2 2.8 0.8 1 2.24
KG/CM2 CON ESPESOR PROMEDIO DE 5 CM DE 4 A-B´ M2 2.8 0.8 1 2.24
ESPESOR ELABORADO EN OBRA CON MAQUINA 4´ A-B M2 0.9 0.8 1 0.72
CIM001 REVOLVEDORA; INCLUYE MATERIALES, MANO
DE OBRA EN ELABORACION, COLOCADO, 5 B´-D M2 3.86 0.8 1 3.088
CIMBRADO, DESCIMBRADO, HERRAMIENTA Y/O A 1-5 M2 7.86 0.8 1 6.288
EQUIPO.
B 2-3 M2 1.14 0.8 1 0.912
B´ 3-5 M2 3.58 0.8 1 2.864
C 1-2 M2 2.24 0.8 1 1.792
D 1-5 M2 7.94 0.8 1 6.352
38.224

1 A-C M3 4.58 0.8 0.2 0.7328


1´ C-D M3 3.08 0.8 0.2 0.4928
2 A-D M3 7 0.8 0.2 1.12
3 A-B´ M3 2.8 0.8 0.2 0.448
CONCRETO EN ZAPATA DE F'C=200 KG/CM2 4 A-B´ M3 2.8 0.8 0.2 0.448
CON AGRAGADO MÁXIMO DE 3/4" ELABORADO
EN OBRA CON MAQUINA REVOLVEDORA, 4´ A-B M3 0.9 0.8 0.2 0.144
INCLUYE MATERIALES, MANO DE OBRA EN
ELABORACION, COLOCADO Y HERRAMIENTA 5 B´-D M3 3.86 0.8 0.2 0.6176
Y/O EQUIPO.
A 1-5 M3 7.86 0.8 0.2 1.2576
B 2-3 M3 1.14 0.8 0.2 0.1824
B´ 3-5 M3 3.58 0.8 0.2 0.5728
C 1-2 M3 2.24 0.8 0.2 0.3584
D 1-5 M3 7.94 0.8 0.2 1.2704

7.6448

AJPOP MERIDA SELVIN NAZARIO_____________


GARCIA OROZCO MIGUEL ANGEL_____________
COSTOS Y PRESUPUESTOS
FECHA: 11 DE DICIEMBRE 2015 NUMEROS GENERADORES

1 A-C M3 4.58 0.2 0.2 0.1832


1´ C-D M3 3.08 0.2 0.2 0.1232
2 A-D M3 7 0.2 0.2 0.28
3 A-B´ M3 2.8 0.2 0.2 0.112
4 A-B´ M3 2.8 0.2 0.2 0.112
4´ A-B M3 0.9 0.2 0.2 0.036
5 B´-D M3 3.86 0.2 0.2 0.1544
A 1-5 M3 7.86 0.2 0.2 0.3144
B 2-3 M3 1.14 0.2 0.2 0.0456
B´ 3-5 M3 3.58 0.2 0.2 0.1432
C 1-2 M3 2.24 0.2 0.2 0.0896
D 1-5 M3 7.94 0.2 0.2 0.3176
1.9112

suma 9.556

largo peso pza parcial # varilla parcial


1 A-C Kg 4.13 0.557 5 11.5021 3/8`
ACERO EN CIMENTACION DE F'Y= 4500 Kg 0.97 0.557 21 11.3461 3/8`
KG/CM2 INCLUYE SUMINISTRO, Kg 4.43 0.996 4 17.6491 1/2`
HABILITADO Y ARMADO Kg 1.56 0.251 21 8.22276 1/4`
48.72

1´ C-D Kg 2.63 0.557 5 7.32455


Kg 0.97 0.557 14 7.56406
Kg 2.78 0.996 4 11.0755
Kg 1.56 0.251 14 5.48184
31.446

2 A-D Kg 6.95 0.557 5 19.3558


0.97 0.557 36 19.4504
7.25 0.996 4 28.884

AJPOP MERIDA SELVIN NAZARIO_____________


GARCIA OROZCO MIGUEL ANGEL_____________
COSTOS Y PRESUPUESTOS
FECHA: 11 DE DICIEMBRE 2015 NUMEROS GENERADORES
1.56 0.251 36 14.0962
81.7864

3 A-B´ Kg 2.35 0.557 5 6.54475


0.97 0.557 13 7.02377
2.65 0.996 4 10.5576
1.56 0.251 13 5.09028
29.2164

4 A-B´ Kg 2.35 0.557 5 6.54475


0.97 0.557 13 7.02377
2.65 0.996 4 10.5576
1.56 0.251 13 5.09028
29.2164

4´ A-B Kg 0.9 0.557 5 2.5065


0.97 0.557 5 2.70145
1.2 0.996 4 4.7808
1.56 0.251 5 1.9578
11.94655

5 B´-D Kg 3.37 0.557 5 9.38545


0.97 0.557 18 9.72522
3.67 0.996 4 14.6213
1.56 0.251 18 7.04808
2.361

A 1-5 Kg 9.09 0.557 5 25.3157


0.97 0.557 46 24.8533
9.4 0.996 4 37.4496
1.56 0.251 46 18.0118
105.63

B 2-3 Kg 1.5 0.557 5 4.1775

AJPOP MERIDA SELVIN NAZARIO_____________


GARCIA OROZCO MIGUEL ANGEL_____________
COSTOS Y PRESUPUESTOS
FECHA: 11 DE DICIEMBRE 2015 NUMEROS GENERADORES
0.97 0.557 8 4.32232
1.8 0.996 4 7.1712
1.56 0.251 8 3.13248
18.8035

B´ 3-5 Kg 3.53 0.557 5 9.83105


0.97 0.557 18 9.72522
3.83 0.996 4 15.2587
1.56 0.251 18 7.04808
41.8631

C 1-2 Kg 2.35 0.557 5 6.54475


0.97 0.557 12 6.48348
2.65 0.996 4 10.5576
1.56 0.251 12 4.69872
28.2846

D 1-5 Kg 9.09 0.557 5 25.3157


0.97 0.557 46 24.8533
9.39 0.996 4 37.4098
1.56 0.251 46 18.0118
105.591

suma total del acero en cimentacion 534.865

unidad lado dime P.T


Plg A 1 40.0766
1 A-C P.T Plg B 8
CIMBRA PARA CIMENTACION CON MADERA DE m C 18.32
PINO DE 1RA ACABADO COMÚN INCLUYE
CIMBRADO Y DESCIMBRADO.
Plg A 1
1´ C-D P.T Plg B 8 26.9511
m C 12.32

Plg A 1
2 A-D P.T Plg B 8 61.2524

AJPOP MERIDA SELVIN NAZARIO_____________


GARCIA OROZCO MIGUEL ANGEL_____________
COSTOS Y PRESUPUESTOS
FECHA: 11 DE DICIEMBRE 2015 NUMEROS GENERADORES 61.2524
m C 28

Plg A 1
3 A-B´ P.T Plg B 8 24.501
m C 11.2

Plg A 1
4 A-B´ P.T Plg B 8 24.501
m C 11.2

Plg A 1
4´ A-B P.T Plg B 8 7.87531
m C 3.6

5 B´-D Plg A 1
P.T Plg B 8 33.7763
m C 15.44

A 1-5 P.T Plg A 1


Plg B 8 25.026
m C 11.44

B 2-3 P.T Plg A 1


Plg B 8 9.97539
m C 4.56

B´ 3-5 P.T Plg A 1


Plg B 8 31.3262
m C 14.32

C 1-2 P.T Plg A 1


Plg B 8 19.6008
m C 8.96

D 1-5 P.T Plg A 1


Plg B 8 69.4777
m C 31.76

AJPOP MERIDA SELVIN NAZARIO_____________


GARCIA OROZCO MIGUEL ANGEL_____________
COSTOS Y PRESUPUESTOS
FECHA: 11 DE DICIEMBRE 2015 NUMEROS GENERADORES

suma total d cimbra en cimentacion 374.34

largo ancho alto


1 A-C M2 3.96 0.35 11.31
MURETE DE 12 CM DE ESPESOR DE TABICON
DE 7X12X24 JUNTEADO CON MORTERO 1´ C-D M2 2.48 0.35 7.09
CEMENTO- CALHIDRA -ARENA RELACIÓN 1:3:12
INCLUYE MATERIALES, MANO DE OBRA, 2 A-D M2 6 0.35 17.14
HERRAMIENTA Y/O EQUIPO.

3 A-B´ M2 2.2 0.35 6.29

4 A-B´ M2 2.2 0.35 6.29

4´ A-B M2 3 0.35 8.57

5 B´-D M2 3.26 0.35 9.31

A 1-5 M2 8.46 0.35 24.17

B 2-3 M2 1.34 0.35 3.83

B´ 3-5 M2 4.36 0.35 12.46

C 1-2 M2 2.94 0.35 8.40

D 1-5 M2 8.34 0.35 23.83


muro
de
138.69
enrrac
e

AJPOP MERIDA SELVIN NAZARIO_____________


GARCIA OROZCO MIGUEL ANGEL_____________
COSTOS Y PRESUPUESTOS
FECHA: 11 DE DICIEMBRE 2015 NUMEROS GENERADORES

AJPOP MERIDA SELVIN NAZARIO_____________


GARCIA OROZCO MIGUEL ANGEL_____________
COSTOS Y PRESUPUESTOS
FECHA: 11 DE DICIEMBRE 2015 NUMEROS GENERADORES

largo ancho alto


1 A-C ML 3.96 2 3.96
7.92
1´ C-D ML 2.48 2 2.48
CADENA TIPO CC Y CE DE 10X20-4 CON 4.96
CONCRETO F'C= 200 KG/CM2 HECHO EN
OBRA CON MAQUINA REVOLVEDORA 2 A-D ML 6 2 6.00
TAMAÑO MÁXIMO DE AGREGADO DE 3/4", 12
ACABADO COMUN, INCLUYE ACARREOS, 3 A-B´ ML 2.2 2 2.20
MATERIALES, MANO DE OBRA EN 4.4
ELABORACION, COLOCADO, CIMBRADO, 4 A-B´ ML 2.2 2 2.20
DESCIMBRADO, VIBRADO, HERRAMIENTA
Y/O EQUIPO.. 4.4
4´ A-B ML 3 2 3.00
6
5 B´-D ML 3.26 2 3.26
6.52
A 1-5 ML 8.46 2 8.46
16.92
B 2-3 ML 1.34 2 1.34
2.68
B´ 3-5 ML 4.36 2 4.36
8.72
C 1-2 ML 2.94 2 2.94
5.88
D 1-5 ML 8.34 2 8.34
16.68
muro de enrrace 97.08

AJPOP MERIDA SELVIN NAZARIO_____________


GARCIA OROZCO MIGUEL ANGEL_____________
COSTOS Y PRESUPUESTOS
FECHA: 11 DE DICIEMBRE 2015 NUMEROS GENERADORES

AJPOP MERIDA SELVIN NAZARIO_____________


GARCIA OROZCO MIGUEL ANGEL_____________
COSTOS Y PRESUPUESTOS
FECHA: 11 DE DICIEMBRE 2015 NUMEROS GENERADORES

piso
long ancho alto
1--2 A-B´ M2 3.25 3.39 11.02
FIRME PARA PISO DE 15 CM DE ESPESOR
PROMEDIO CON CONCRETO F'C= 150
KG/CM2 CON AGREGADO MÁXIMO 3/4" 1´--2 B´-C M2 2.25 0.78 1.76
HECHO EN OBRA CON MAQUINA 2´--2 B´-C 0.99 0.78
REVOLVEDORA INCLUYE ACARREOS,
MATERIALES, MANO DE OBRA EN 1´--2 C--D M2 2.49 2.53 6.30
ELABORACION, COLOCADO,
HERRAMIENTA Y/O EQUIPO.
2--5 B´-D M2 3.31 6.35 21.02

2--3 B--B´ 1.00 1.9400 1.94

2--3 A-B M2 2.25 1.40 3.15

3--4 A-B M2 2.25 0.7 1.58

3--4 A-B´ M2 3.10 3.25 10.08

4--4´ A-B 0.55 1.25 0.69

total d concreto en piso 57.52

AJPOP MERIDA SELVIN NAZARIO_____________


GARCIA OROZCO MIGUEL ANGEL_____________
COSTOS Y PRESUPUESTOS
FECHA: 11 DE DICIEMBRE 2015 NUMEROS GENERADORES

SUPERESTRUCTURA

CASTILLO TIPO K DE 15 x 20 DE ML 2.70 28.00


CONCRETO F'C= 150KG/CM2 HECHO EN
75.6
OBRA CON MAQUINA REVOLVEDORA
TAMAÑO MÁXIMO DE AGREGADO 3/4"
ARMADO CON ARMEX DE 10X10-4
Y10X30X4 RESPECTIVAMENTE; INCLUYE
ACARREOS, MATERIALES, MANO DE OBRA
EN ELABORACION, COLOCADO,
CIMBRADO, DESCIMBRADO, VIBRADO,
HERRAMIENTA Y/O EQUIPO.

1 A-C M2 4.03 2.70 1 10.88


MURO DE 15 CM DE ESPESOR DE DE
TABIQUE ROJO DE BARRO RECOCIDO DE
7X14X28 JUNTEADO CON MORTERO 1´ C-D M2 2.53 2.70 1 6.83
CEMENTO-CALHIDRA- ARENA RELACIÓN
1:5 CON ACABADO COMÚN INCLUYE 2 A-D M2 6.85 2.70 1 18.50
MATERIALES, MANO DE OBRA EN
ELABORACION, COLOCADO, Y
3 A-B´ M2 2.25 2.70 1 6.08
HERRAMIENTA MENOR.

4 A-B´ M2 2.25 2.70 1 6.08

4´ A-B M2 0.80 2.70 1 2.16

5 B´-D M2 3.27 2.70 1 8.83

A 1-5 M2 9.00 2.70 1 24.30

B 2-3 M2 1.40 2.70 1 3.78

B´ 3-5 M2 3.43 2.70 1 9.26

C 1-2 M2 2.25 2.70 1 6.08

D 1-5 M2 9.00 2.70 1 24.30

area de pared 127.06

AJPOP MERIDA SELVIN NAZARIO_____________


GARCIA OROZCO MIGUEL ANGEL_____________
COSTOS Y PRESUPUESTOS
FECHA: 11 DE DICIEMBRE 2015 NUMEROS GENERADORES

TABLA
Plg A 1.00 1.00 812.38
CIMBRA EN LOSA DE AZOTEA, CON Plg B 275.59
MADERA DE 1RA Y ACABADO COMÚN EN
m C 10.78
LOSAS, INCLUYE MATERIALES, MANO DE
OBRA, HERRAMIENTA Y/O EQUIPO. 812.38

REGLA
Plg A 2.00 11.00 15.31
Plg B 4.00
m C 7.00
168.44

Plg A 2.00 8.00 23.58


Plg B 4.00
m C 10.78
188.66

PIES DERECHO
Plg A 4.00 88.00 11.81
Plg B 4.00
m C 2.70
1039.54

CUNA, CONTRA VIENTO CACHETES,


0.10
ETC
103.95

SUB TOTAL DE P.T 2312.97

DESPERDICIO 231.30

TOTAL DE P.T 2544.27

AJPOP MERIDA SELVIN NAZARIO_____________


GARCIA OROZCO MIGUEL ANGEL_____________
COSTOS Y PRESUPUESTOS
FECHA: 11 DE DICIEMBRE 2015 NUMEROS GENERADORES

M3 10.78 7.00 0.10 1.00 7.55


M3 3.42 0.58 0.10 1.00 0.20
CONCRETO EN LOSA DE AZOTEA F'C= 200
KG/CM2 HECHO EN OBRA CON MAQUINA
REVOLVEDORA TAMAÑO MÁXIMO DE M3 TOTAL DE CONCRETO 7.35
AGREGADO DE 3/4" INCLUYE
MATERIALES, MANO DE OBRA EN
ELABORACION,
COLOCADO,CIMBRADO,DESCIMBRADO,
VIBRADO, HERRAMIENTA Y/O EQUIPO

KG 48.00 11.00 1.00 0.557 294.10


47.00 11.00 1.00 0.556 287.45
ACERO EN LOSA CON VARILLA #3 Fy=
36.00 1.73 2.00 0.557 69.38
4200KG/CM2, INCLUYE: SUMINISTRO,
ACARREOS INTERNOS HABILITADO, 36.00 1.02 2.00 0.557 40.91
TRASLAPES, COLOCACION, AMARRES,
GANCHOS, DOBLECES, DESPERDICIOS,
HERRAMIENTA MENOR, MANO DE OBRA Y 73.00 7.22 1.00 0.557 293.57
TODO LO NECESARIO PARA SU
72.00 7.22 1.00 0.557 289.55
CORRECTA EJECUCION.
55.00 0.96 2.00 0.557 58.82
22.00 0.96 2.00 0.557 23.53
19.00 0.98 2.00 0.557 20.74

TOTAL DE ACERO 1378.05

AJPOP MERIDA SELVIN NAZARIO_____________


GARCIA OROZCO MIGUEL ANGEL_____________
COSTOS Y PRESUPUESTOS
FECHA: 11 DE DICIEMBRE 2015 NUMEROS GENERADORES

INSTALACION ELECTRICA
SUMINISTRO Y COLOCACION DE CENTRO
DE CARGA QOD-2, MARCA SQUARE'D; pza 1 1
INCLUYE: ACARREO,CONEXION, PRUEBA, 1
MATERIALES PARA SU FIJACION,
HERRAMIENTA MENOR, MANO DE OBRA Y
TODO LO NECESARIO PARA SU
CORRECTA EJECUCION.

SUMINISTRO Y COLOCACION DE CENTRO


DE CARGA TIP QO-816- L100 F, BIFASICO, pza 1 1
MARCA SQUARE'D; INCLUYE: ACARREO, 1
CONEXION, PRUEBA, MATERIALES PARA
SU FIJACION, HERRAMIENTA MENOR,
MANO DE OBRA Y TODO LO NECESARIO
PARA SU CORRECTA EJECUCION.

INTERRUPTOR TERMOMAGNETICO TIPO pza 1 1


QO DE 1 POLO 15 A 50 AMPER'S, MARCA 1
SQUARE'D; INCLUYE: ACARREO,
CONEXIÓN, PRUEBA, HERRAMIENTA
MENOR, MANO DE OBRA Y TODO LO
NECESARIO PARA SU CORRECTA

INTERRUPTOR DE SEGURIDAD DE 2x30 pza 1 1


AMPER'S, CAT. D 221 N, MARCA 1
SQUARE'D; INCLUYE: ACARREO,
FUSIBLES, CONEXIÓN, PRUEBA,
HERRAMIENTA MENOR, MANO DE OBRA Y
TODO LO NECESARIO PARA SU
SUMINISTRO Y TENDIDO DE TUBO
POLIDUCTO NARANJA DE 13 MM. DE ML 10 10
DIAMETRO; INCLUYE: ACARREO, 10
MATERIALES PARA SU FIJACION,
ANDAMIOS, HERRAMIENTA MENOR, MANO
DE OBRA Y TODO LO NECESARIO PARA SU
CORRECTA EJECUCION.

AJPOP MERIDA SELVIN NAZARIO_____________


GARCIA OROZCO MIGUEL ANGEL_____________
COSTOS Y PRESUPUESTOS
FECHA: 11 DE DICIEMBRE 2015 NUMEROS GENERADORES
SUMINISTRO Y TENDIDO DE TUBO
POLIDUCTO NARANJA DE 19 MM. DE ML 10 10
DIAMETRO; INCLUYE: ACARREO, 10
MATERIALES PARA SU FIJACION,
ANDAMIOS, HERRAMIENTA MENOR, MANO
DE OBRA Y TODO LO NECESARIO PARA SU
CORRECTA EJECUCION.

ROYER CON POLIDUCTO NARANJA 13 mm, SAL 12 12


INCLUYE: ACARREO, MATERIALES PARA 12
SU FIJACION, CHALUPA GALVANIZADA,
CABLES DEL No. 12 Y 14, SOBRETAPA DE
ALUMINIO, CONEXIÓN, PRUEBA,
HERRAMIENTA MENOR, MANO DE OBRA Y

DOMICILIARIA, INCLUYE: ACARREO,


CABLE No. 8, BASE PARA MEDIDOR PZA 1 1
BIFASICO, TUBO CONDUIT GALVANIZADO, 1
MUFA SECA, CONEXIÓN, PRUEBA,
MATERILAES PARA SU FIJACION,
HERRAMINETA MENOR, MANO DE OBRA Y
TODO LO NECESARIO PARA SU

MONOFASICA, CON VARILLA COPPER- PZA 1 1


WELD DE 1.5 M., CABLE DESNUDO DEL No. 1
8, TUBO CONDUIT 19 mm. PARED
DELGADA, CONECTOR. INCLUYE:
ACARREO, CONEXIÓN, PRUEBA,
MATERIALES PARA SU FIJACION,

SUMINISTRO Y COLOCACION DE CABLE ML 10 10


ALIMNETADOR THW No. 8 INCLUYE: 10
ACARREO CONEXIÓN, PRUEBA,
HERRAMINETA MENOR, MANO DE OBRA Y
TODO LO NECESARIO PARA SU CORECTA
EJECUCION.

AJPOP MERIDA SELVIN NAZARIO_____________


GARCIA OROZCO MIGUEL ANGEL_____________
COSTOS Y PRESUPUESTOS
FECHA: 11 DE DICIEMBRE 2015 NUMEROS GENERADORES
CONDUIT DE FIERRO GALVANIZADO SAL 1 1
PARED DELGADA; INCLUYE: ACARREOS, 1
CONECTORES, COPLES, CHALUPA
GALVANIZADA, CABLES TV, CHASIS Y
SOBRETAPA DE ALUMINIO, PRUEBAS,
CONEXIONES, HERRAMIENTA MENOR,

DUPLEX POLARIZADO 127 VOLTS 15 AMP.


CON POLIDUCTO NARANJA 1/2"; INCLUYE: SAL 1 1
ACARREOS, CHALUPA GALVANIZADA, 1
CONTACTO DUPLEX POLARIZADO,
CABLES, PLACAS, CONEXIONES,
PRUEBAS, HERRAMIENTA MENOR, MANO
DE OBRA Y TODO LO NECESARIO PARA

CONDUIT DE FIERRO GALVANIZADO SAL 1 1


PARED DELGADA; INCLUYE: ACARREOS, 1
CONECTORES, COPLES, CHALUPA
GALVANIZADA, CABLES DE 2 VIAS, CHASIS
Y SOBRETAPA DE ALUMINIO, PRUEBAS,
CONEXIONES, HERRAMIENTA MENOR,

GALVANIZADA TIPO BOTE CON POLIDUTO SAL 9 9


NARANJA 3/4"; INCLUYE: ACARREOS, 9
CHALUPA GALVANIZADA, APAGADORES,
CABLES, CHASIS Y SOBRETAPA DE
ALUMINIO 1,2 Y 3 VENTANAS, PRUEBAS,
CONEXIONES, HERRAMIENTA MENOR,

LUMINARIO DE SOBREPONER EN SALIDA


TIPO BOTE, INCLUYE: ACARREO, PZA 9 9
ARMADO, MATERIALES PARA SU 9
FIJACION, CINTA AISLANTE, FOCO
FLUORESCENTES DE 13 WATTS,
CONEXIONES, PRUEBAS, HARRAMIENTA,
MANO DE OBRA Y TODO LO NECESARIO

AJPOP MERIDA SELVIN NAZARIO_____________


GARCIA OROZCO MIGUEL ANGEL_____________
COSTOS Y PRESUPUESTOS
FECHA: 11 DE DICIEMBRE 2015 NUMEROS GENERADORES
CENTRIFUGA DE 1/4 H.P. MARCA CORONA, PZA 1 1
INCLUYE: ACARREO, CABLE No. 12, CINTA 1
AISLANTE, CONEXIÓN, PRUEBA, PUESTA
EN MARCHA, MATERIALES PARA SU
FIJACION, HERRAMIENTA, MANO DE OBRA
Y TODO LO NECESARIO PARA SU

INSTALACION HIDRAULICA

PZA 1.00
1.00
SUMINISTRO Y COLOCACION DE TINACO
PVC DE 750 LTS. MARCA ROTOPLAS O
SIMILAR, INCLUYE: ACARREO,
ELEVACIÓN, CONEXIÓN A LA
ALIMENTACIÓN, DESCARGA,
HERRAMIENTA MENOR, MANO DE OBRA Y
TODO LO NECESARIO PARA SU
CORRECTA EJECUCION.

PZA 1.00
SUMINISTRO Y COLOCACIÓN DE
ACCESORIOS BLANCO LAMOSA O 1.00
SIMILAR, JABONERA CON AGARRADERA
DE PORCELANA LAMOSA O SIMILAR,
GANCHOS DE PORCELANA LAMOSA O
SIMILAR, TOALLERO DE PORCELANA;
INCLUYE: ACARREO, APERTURA DEL
HUECO EN MURO, COLOCACIÓN,
AMACIZADO CON MORTERO DE
AJPOP MERIDA SELVIN NAZARIO_____________
CEMENTO-ARENA 1:4, LIMPIEZA,
GARCIA OROZCO MIGUEL
HERRAMIENTA MENOR,ANGEL_____________
MANO DE OBRA Y
TODO LO NECESARIO PARA SU
CORRECTA EJECUCION.
SIMILAR, JABONERA CON AGARRADERA
DE PORCELANA LAMOSA O SIMILAR,
GANCHOS DE PORCELANA LAMOSA O
COSTOS Y PRESUPUESTOS
SIMILAR, TOALLERO DE PORCELANA;
FECHA:INCLUYE:
11 DE DICIEMBRE 2015 DEL
ACARREO, APERTURA
NUMEROS GENERADORES
HUECO EN MURO, COLOCACIÓN,
AMACIZADO CON MORTERO DE
CEMENTO-ARENA 1:4, LIMPIEZA,
HERRAMIENTA MENOR, MANO DE OBRA Y
TODO LO NECESARIO PARA SU
CORRECTA EJECUCION.

SUMINISTRO Y COLOCACIÓN DE PZA 1.00


CALENTADOR AUTOMATICO CINSA DE 40 1.00
LTS., CLASIC-101 O SIMILAR; INCLUYE:
ACARREO, INSTALACIÓN, PRUEBAS,
CONEXIÓN A LAS LÍNEAS DE
ALIMENTACIÓN, SOPORTES,
HERRAMIENTA MENOR, ALIMENTACIÓN,
SOPORTES, HERRAMIENTA MENOR,
MANO DE OBRA Y TODO LO NECESARIO
PARA SU CORRECTA EJECUCION.

PZA 1.00

1.00
SUMINISTRO Y COLOCACIÓN DE LAVABO
MARCA GEMINIS O SIMILAR BLANCO CON
LLAVE INDIV P/LAVABO RUGO 16Q,
CONTRA REJILLA Y CESPOL CROMADO,
AJPOPLIMPIEZA
MERIDACONSELVIN
AGUA NAZARIO_____________
Y JABON, CONEXIÓN
GARCIA OROZCO MIGUEL ANGEL_____________
A LA ALIMENTACIÓN Y AL DESAGUE;
INCLUYE: ACARREO, MATERIALES PARA
SU FIJACION, CONEXION, HERRAMIENTA,
COSTOS Y PRESUPUESTOS
SUMINISTRO
FECHA: Y COLOCACIÓN
11 DE DICIEMBRE DE LAVABO
2015 NUMEROS GENERADORES
MARCA GEMINIS O SIMILAR BLANCO CON
LLAVE INDIV P/LAVABO RUGO 16Q,
CONTRA REJILLA Y CESPOL CROMADO,
LIMPIEZA CON AGUA Y JABON, CONEXIÓN
A LA ALIMENTACIÓN Y AL DESAGUE;
INCLUYE: ACARREO, MATERIALES PARA
SU FIJACION, CONEXION, HERRAMIENTA,
MANO DE OBRA Y TODO LO NECESARIO
PARA SU CORRECTA EJECUCION.

SUMINISTRO Y COLOCACIÓN DE LLAVE PZA 1.00


MEZCLADORA DE CUELLO CORTO DE 8" 1.00
CON CARTUCHO CERAMICO 1/4 DE
VUELTA, CUBIERTA DE LATON Y
MANERALES; INCLUYE: ACARREOS,
CONEXIÓN A LA ALIMENTACIÓN CON
COFLEX PARA LAVABO, PRUEBAS,
HERRAMIENTA MENOR, MANO DE OBRA Y
TODO LO

PZA 1.00
SUMINISTRO Y COLOCACIÓN DE 1.00
FREGADERO METÁLICO DE 90 X 45 CM.
CON ESCURRIDERO, TIPO LADO
DERECHO, CON LLAVE DE NARIZ, CESPOL
CROMADO, SOPORTADO POR DOS
MUROS CAPUCHINOS, FORRADO DE
AZULEJO BLANCO DE 15 X 15 CM. EN
AMBAS CARAS; INCLUYE: ACARREOS,
MATERIALES PARA SU FIJACIÓN,
PRUEBAS, HERRAMIENTA MENOR, MANO
DE OBRA Y TODO LO NECESARIO PARA SU
CORRECTA EJECUCION.
AJPOP MERIDA SELVIN NAZARIO_____________
GARCIA OROZCO MIGUEL ANGEL_____________
MUROS CAPUCHINOS, FORRADO DE
AZULEJO BLANCO DE 15 X 15 CM. EN
AMBAS CARAS; INCLUYE: ACARREOS,
COSTOSMATERIALES
Y PRESUPUESTOS
PARA SU FIJACIÓN,
PRUEBAS,
FECHA: 11 DEHERRAMIENTA
DICIEMBREMENOR,
2015 MANO NUMEROS GENERADORES
DE OBRA Y TODO LO NECESARIO PARA SU
CORRECTA EJECUCION.

ML 28.75 1.00 28.75


SUMINISTRO Y TENDIDO DE TUBO DE 28.75
COBRE TIPO "M" DE 19 MM. DE DIAMETRO;
INCLUYE: SOLDADURA, ACARREOS,
CONEXIONES, TENDIDO, LUBRICACIÓN,
JUNTEO, ALINEACIÓN, PRUEBAS,
HERRAMIENTA MENOR, MANO DE OBRA Y
TODO LO NECESARIO PARA SU
CORRECTA EJECUCION.

SAL 1.00
SALIDA MUEBLE SANITARIO CON TUBO 1.00
HIDRÁULICO COBRE TIPO "M" 13mm.;
INCLUYE: VALVULA DE PASO Y VÁLVULA
DE CONTROL GENERAL, RAMALEO CON
TUBO DE COBRE DE 13 A 100 MM DE
DIÁMETRO, CONEXIONES, ALIMENTACIÓN
Y DESCARGA DE TINACO, ACARREO,
PRUEBA HIDROSTÁTICA, SOLDADURA,
HERRAMIENTA, MANO DE OBRA Y TODO
LO NECESARIO PARA SU CORRECTA
EJECUCION.

SAL 1.00
1.00
SALIDA DE REGADERA CON TUBO
HIDRÁULICO DE COBRE TIPO " M" Y
ACCESORIOS EN 13mm;
INCLUYE:CONEXIONES, RAMALEO,
CONEXIONES A BAJADA DE AGUAS
NEGRAS, HERRAMIENTA MENOR, MANO
DE OBRA Y TODO LO NECESARIO PARA SU
CORRECTA EJECUCION.
AJPOP MERIDA SELVIN NAZARIO_____________
GARCIA OROZCO MIGUEL ANGEL_____________
SALIDA DE REGADERA CON TUBO
HIDRÁULICO DE COBRE TIPO " M" Y
ACCESORIOS EN 13mm;
COSTOSINCLUYE:CONEXIONES,
Y PRESUPUESTOS RAMALEO,
FECHA:
CONEXIONES A BAJADA DE AGUAS
11 DEHERRAMIENTA
DICIEMBRE 2015 MANO NUMEROS GENERADORES
NEGRAS, MENOR,
DE OBRA Y TODO LO NECESARIO PARA SU
CORRECTA EJECUCION.

SAL 1.00
1.00
SALIDA DE REGADERA CON TUBO
HIDRÁULICO DE COBRE TIPO " M" Y
ACCESORIOS EN 13mm;
INCLUYE:CONEXIONES, RAMALEO,
CONEXIONES A BAJADA DE AGUAS
NEGRAS, HERRAMIENTA MENOR, MANO
DE OBRA Y TODO LO NECESARIO PARA SU
CORRECTA EJECUCION.

SAL 1.00
1.00
SALIDA DE LLAVE DE NARIZ EN EXTERIOR
CON TUBO HIDRÁULICO DE COBRE TIPO "
M" Y ACCESORIOS EN 13mm;
INCLUYE:CONEXIONES, RAMALEO,
HERRAMIENTA MENOR, MANO DE OBRA Y
TODO LO NECESARIO PARA SU
CORRECTA EJECUCION.

PZA 1.00
SUMINISTRO Y COLOCACIÓN DE
CISTERNA DE PLÁSTICO ROTOPLAS O 1.00
SIMILAR EQUIPADA DE 2800 LT,
FABRICADA CON PLÁSTICO AB-ANTI-
BACTERIAS, INCLUYE: TUBERÍA DE
ALIMENTACIÓN INTERNA, FILTRO,
VÁLVULA DE PIE O PICHANCHA, VÁLVULA
DE LLENADO DE 3/4", VÁLVULA DE
ESFERA 3/4" CON REDUCCIÓN A A 1/2",
MANO DE
AJPOP MERIDA OBRANAZARIO_____________
SELVIN DE COLOCACIÓN,
HERRAMIENTA
GARCIA OROZCO MENOR
MIGUEL Y TODO LO
ANGEL_____________
NECESARIO PARA SU CORRECTA
EJECUCION.
SIMILAR EQUIPADA DE 2800 LT,
FABRICADA CON PLÁSTICO AB-ANTI-
BACTERIAS, INCLUYE: TUBERÍA DE
COSTOSALIMENTACIÓN INTERNA, FILTRO,
Y PRESUPUESTOS
VÁLVULA DE PIE O PICHANCHA, VÁLVULA
FECHA: DE
11 LLENADO
DE DICIEMBRE 2015 DE NUMEROS GENERADORES
DE 3/4", VÁLVULA
ESFERA 3/4" CON REDUCCIÓN A A 1/2",
MANO DE OBRA DE COLOCACIÓN,
HERRAMIENTA MENOR Y TODO LO
NECESARIO PARA SU CORRECTA
EJECUCION.

INSTALACION SANITARIA

ML 24.70 1.00 24.70


SUMINISTRO Y TENDIDO DE TUBERIA P.V.C.
SANITARIO DE 4" PARA ALBAÑAL; INCLUYE:
ACARREO, INSTALACION, 24.70
CONEXIONES,JUNTEO, DESPERDICIOS,
ACCESORIOS, HERRAMIENTA MENOR, MANO
DE OBRA Y TODO LO NECESARIO PARA SU
CORRECTA EJECUCION.

PZA 4.00
4.00
REGISTRO DE 0.6m x 0.6m. DE MEDIDAS
INTERIORES Y 1.00M. DE PROFUNDIDAD, A
AJPOP MERIDA
BASE DESELVIN
MUROSNAZARIO_____________
DE TABIQUE ROJO
GARCIA RECOCIDO
OROZCO MIGUEL ANGEL_____________
DE 13 CMS. DE ESPESOR,
ASENTADO CON MORTERO DE CEMENTO
ARENA EN PROPORCIÓN DE 1:5, DE 1 CM.
COSTOS Y PRESUPUESTOS
FECHA: 11 DE DICIEMBRE 2015 NUMEROS GENERADORES
REGISTRO DE 0.6m x 0.6m. DE MEDIDAS
INTERIORES Y 1.00M. DE PROFUNDIDAD, A
BASE DE MUROS DE TABIQUE ROJO
RECOCIDO DE 13 CMS. DE ESPESOR,
ASENTADO CON MORTERO DE CEMENTO
ARENA EN PROPORCIÓN DE 1:5, DE 1 CM.
DE ESPESOR. APLANADO ACABADO
PULIDO EN INTERIOR CON MORTERO
CEMENTO ARENA 1:5. FIRME DE 0.05 CMS.
DE ESPESOR DE CONCRETO HECHO EN
OBRA DE F'C= 150 KG/CM2. INCLUYE:
ACARREO, MATERIALES, MANO DE OBRA,
HERRAMIENTA, LIMPIEZA Y TODO LO
NECESARIO PARA SU CORRECTA
EJECUCION.

PZA 4.00
4.00

SUMINISTRO Y COLOCACION DE TAPA


PARA REGISTRO DE CONCRETO DE 0.06m.
X 0.06m. Y 0.05 M.DE ESPESOR. ARMADA
CON VARILLA DEL NO. 3 @ 10 EN AMBOS
SENTIDOS, CON MARCO DE ANGULO DE
ACERO DE 1 1/4"x 1/8" Y CONTRAMARCO
DE 1 1/2" x 1/4". CONCRETO DE 150
KG/CM2.; INCLUYE: ACARREO,
MATERIALES, MANO DE OBRA,
HERRAMIENTA, LIMPIEZA Y TODO LO
NECESARIO PARA SU CORRECTA
EJECUCION.

AJPOP MERIDA SELVIN NAZARIO_____________


GARCIA OROZCO MIGUEL ANGEL_____________
COSTOS Y PRESUPUESTOS
FECHA: 11 DE DICIEMBRE 2015 NUMEROS GENERADORES

SUMINISTRO Y COLOCACION DE SALIDA SAL 1.00


MUEBLE SANITARIO CON TUBO DE PVC 1.00
LISO SANITARIO DE 4" Y DEMAS
ACCESORIOS, INLCUYE: ACARREOS,
CONEXIONES, RAMALEO CON TUBO DE
PVC, CONEXIONES A BAJADA DE AGUAS
NEGRAS, TENDIDO, JUNTEO, PEGAMENTO
DE PVC, ALINEACIÓN, PRUEBAS,
HERRAMIENTA MENOR, MANO DE OBRA. Y
TODO LO NECESARIO PARA SU
CORRECTA EJECUCION.

SAL 1.00
SUMISTRO Y COLOCACION DE SALIDA 1.00
LABAVO CON TUBO DE PVC LISO
SANITARIO DE 2" Y DEMAS ACCESORIOS,
INLCUYE: ACARREOS, CONEXIONES,
RAMALEO CON TUBO DE PVC,
CONEXIONES A BAJADA DE AGUAS
NEGRAS, TENDIDO, JUNTEO, PEGAMENTO
DE PVC, ALINEACIÓN, PRUEBAS,
HERRAMIENTA MENOR, MANO DE OBRA Y
TODO LO NECESARIO PARA SU
CORRECTA EJECUCION.

AJPOP MERIDA SELVIN NAZARIO_____________


GARCIA OROZCO MIGUEL ANGEL_____________
COSTOS Y PRESUPUESTOS
FECHA: 11 DE DICIEMBRE 2015 NUMEROS GENERADORES

PZA 1.00
1.00
SUMINISTRO Y COLOCACIÓN DE
COLADERA HELVEX No. 2514 (PISO),
INCLUYE: ACARREO, INSTALACIÓN, SELLO
CON MORTERO CEMENTO-ARENA,
PROPORCIÓN 1:4, PRUEBAS, PEGAMENTO
DE PVC, CONEXIONES, HERRAMIENTA
MENOR, MANO DE OBRA Y TODO LO
NECESARIO PARA SU CORRECTA
EJECUCION.

HERRERIA Y VENTANERIA

SUMINISTRO E INSTALACION DE PUERTA PZA 2.00


TIPO MULTIPANEL LISA, DIFERENTES 2.00
MEDIDAS CON CERRADURA MARCA
PHILLIPS 715 O SIMILAR. INCLUYE.
ACARREO, INSTALACION, LIMPIEZA,
PREPARACION DE LA SUPERFICIE,
MATERIALES PARA SU FIJACION,
HERRAMIENTA, MANO DE OBRA Y TODO
LO NECESARIO PARA SU CORRECTA
EJECUCION.

PZA 4.00
4.00
SUMINISTRO E INSTALACION DE PUERTA
TIPO MULTIPANEL LISA, DIFERENTES
AJPOP MERIDACON
MEDIDAS CERRADURA
SELVIN MARCAFANAL
NAZARIO_____________
525 O SIMILAR. INCLUYE. ACARREO,
GARCIA OROZCO MIGUEL ANGEL_____________
INSTALACION, LIMPIEZA, PREPARACION
DE LA SUPERFICIE, MATERIALES PARA SU
COSTOS Y PRESUPUESTOS
FECHA: 11 DE DICIEMBRE 2015 NUMEROS GENERADORES
SUMINISTRO E INSTALACION DE PUERTA
TIPO MULTIPANEL LISA, DIFERENTES
MEDIDAS CON CERRADURA MARCAFANAL
525 O SIMILAR. INCLUYE. ACARREO,
INSTALACION, LIMPIEZA, PREPARACION
DE LA SUPERFICIE, MATERIALES PARA SU
FIJACION, HERRAMIENTA, MANO DE OBRA
Y TODO LO NECESARIO PARA SU
CORRECTA EJECUCION.

PZA 4.00
SUMINISTRO Y COLOCACION DE 4.00
VENTANAS DE ALUMINIO ANODIZADO
NATURAL, DOS SECCIONES, FIJO Y
CORREDIZO CON CRISTAL CLARO DE 3
MM. DE ESPESOR. INCLUYE. ACARREO,
INSTALACION, LIMPIEZA, PREPARACION
DE LA SUPERFICIE, MATERIALES PARA SU
FIJACION, HERRAMIENTA, MANO DE OBRA
Y TODO LO NECESARIO PARA SU
CORRECTA EJECUCION.

ACABADOS

SUMINISTRO Y COLOCACION DE PISO DE long ancho alto


LOSETA INTERCERAMIC 20 X 20 CMS. 1--2 A-B´ M2 3.25 3.39 11.02
ASENTADO CON PEGAZULEJO; INCLUYE:
ACARREOS, CORTES, LECHADEADO CON 1´--2 B´-C M2 2.25 0.78 1.76
CEMENTO BLANCO, AJUSTES,
DESPERDICIOS, LIMPIEZA, NIVELACIÓN,
HERRAMIENTA MENOR, MANO DE OBRA Y 3--4 A-B M2 2.25 0.7 1.58
TODO LO NECESARIO PARA SU
CORRECTA EJECUCION. 3--4 A-B´ M2 3.10 3.25 10.08

4--4´ A-B 0.55 1.25 0.69

AJPOP MERIDA SELVIN NAZARIO_____________


GARCIA OROZCO MIGUEL ANGEL_____________
COSTOS Y PRESUPUESTOS
FECHA: 11 DE DICIEMBRE 2015 NUMEROS GENERADORES
TOTAL 25.11

LOSETA INTERCERAMIC 20 X 20 CMS.


ASENTADO CON PEGAZULEJO; INCLUYE: long ancho alto
ACARREOS, CORTES, LECHADEADO CON 1--2 A-B´ M2 3.25 3.39 11.02
CEMENTO BLANCO, AJUSTES,
DESPERDICIOS, LIMPIEZA, NIVELACIÓN, 1´--2 C--D M2 2.49 2.53 6.30
HERRAMIENTA MENOR, MANO DE OBRA Y
TODO LO NECESARIO PARA SU
2--5 B´-D M2 3.31 6.35 21.02

2--3 B--B´ 1.00 1.9400 1.94

2--3 A-B M2 2.25 1.40 3.15

3--4 A-B M2 2.25 0.7 1.58

3--4 A-B´ M2 3.10 3.25 10.08

4--4´ A-B 0.55 1.25 0.69

55.76

SUMINISTRO Y COLOCACION DE ZOCLO


long ancho alto
VITROMEX DE 10X15 CM, ASENTADO CON
MORTERO CEMENTO-ARENA 1:4 Y 1--2 A-B´ ML 3.25 1.00 3.25
LECHADEADO CON CEMENTO BLANCO; 3.39 2.00 6.78
INCLUYE: HABILITADO DE PIEZA, CORTES, 2.45 1.00 2.45
AJUSTES, DESPERDICIOS, MANO DE 1´--2 C--D 1.79 1.00 1.79
OBRA, LIMPIEZA Y TODO LO NECESARIO
2.53 2.00 5.06
PARA SU CORRECTA EJECUCION.
2--5 C-D 3.31 2.00 6.62
6.35 2.00 12.70
2--3 B--B´ 1.00 2.00 2.00
1.9400 1 1.94
2--3 A-B M2 2.25 2.00 4.50
1.40 2.00 2.80
3--4 A-B M2 2.25 2 4.50
0.7 2.00 1.40
3--4 A-B´ M2 3.10 2.00 6.20
3.25 2.00 6.50
4--4´ A-B 0.55 2.00 1.10
1.25 1.00 1.25

AJPOP MERIDA SELVIN NAZARIO_____________


GARCIA OROZCO MIGUEL ANGEL_____________
COSTOS Y PRESUPUESTOS
FECHA: 11 DE DICIEMBRE 2015 NUMEROS GENERADORES
70.84

SUMINISTRO Y COLOCACION DE
1´--2 C--D M2 2.49 2.53 6.30
MOSAICO DE PASTA LISO DE 20X20 CM,
ASENTADO CON MORTERO CEMENTO -
ARENA 1:4 Y LECHADEADO CON
CEMENTO GRIS; INCLUYE: CORTES, 6.30
AJUSTES, DESPERDICIOS, MANO DE
OBRA, LIMPIEZA Y TODO LO NECESARIO
PARA SU CORRECTA EJECUCION.

SUMINISTRO Y COLOCACION DE AZULEJO


A 2-3 M2 1.54 2.70 4.16
LISO EN MURO DE 20x30 CM, ASENTADO
CON PEGA AZULEJO Y LECHADEADO CON B 2-3 1.54 2.70 4.16
CEMENTO BLANCO; INCLUYE: CORTES, 3 A-B 2.40 2.70 6.48
AJUSTES, DESPERDICIOS, NIVELACIÓN, 4 A-B 2.40 2.70 6.48
MANO DE OBRA, LIMPIEZA Y TODO LO
NECESARIO PARA SU CORRECTA
21.28
EJECUCION.

APLANADO DE MURO CON MORTERO


CEMENTO-CALARENA 1:2:6 A PLOMO Y 1 A-C M2 4.03 2.70 2 21.76
REGLA, ACABADO ESPONJEADO;
INCLUYE: REMATES, BOQUILLAS, 1´ C-D M2 2.53 2.70 2 13.66
PREPARACIÓN DE LA SUPERFICIE,
PLOMEADO, ANDAMIOS, MANO DE OBRA.
(0.00 A 3.00 M DE ALTURA). Y TODO LO 2 A-D M2 6.85 2.70 2 36.99
NECESARIO PARA SU CORRECTA
EJECUCION 3 A-B´ M2 2.25 2.70 2 12.15

4 A-B´ M2 2.25 2.70 2 12.15

AJPOP MERIDA SELVIN NAZARIO_____________


GARCIA OROZCO MIGUEL ANGEL_____________
COSTOS Y PRESUPUESTOS
FECHA: 11 DE DICIEMBRE 2015 NUMEROS GENERADORES
4´ A-B M2 0.80 2.70 2 4.32

5 B´-D M2 3.27 2.70 2 17.66

A 1-5 M2 9.00 2.70 2 48.60

B 2-3 M2 1.40 2.70 2 7.56

B´ 3-5 M2 3.43 2.70 2 18.52

C 1-2 M2 2.25 2.70 2 12.15

D 1-5 M2 9.00 2.70 2 48.60

area de pared 254.12


area de pared del bañol 0.00
254.12

SUMINISTRO Y COLOCACION DE PINTURA


M2 127.06
VINILICA DE PARA INTERIORES MARCA
COMEX VARIOS COLORES. INCLUYE:
LIMPIEZA, PREPARACION DE LA
SUPERFICIE, MATERIALES, MANO DE
OBRA, HERRAMIENTA, ANDAMIOS Y TODO
LO NECESARIO PARA SU CORRECTA
EJECUCION.

SUMINISTRO Y COLOCACION DE PINTURA


M2 127.06
VINILICA DE PARA EXTERIORES MARCA
COMEX VARIOS COLORES. INCLUYE:
LIMPIEZA, PREPARACION DE LA
SUPERFICIE, MATERIALES, MANO DE
OBRA, HERRAMIENTA, ANDAMIOS Y TODO
LO NECESARIO PARA SU CORRECTA
EJECUCION.

SUMINISTRO Y COLOCACION DE M2 7.00 10.78 75.46


IMPERMEABILIZANTE INTEGRAL
FESTERGRAL O SIMILAR DE 10 CM.
SECCIÓN TRIANGULAR ACABADO PULIDO
CON CONCRETO F'c=150 KG/CM2.

AJPOP MERIDA SELVIN NAZARIO_____________


GARCIA OROZCO MIGUEL ANGEL_____________
COSTOS Y PRESUPUESTOS
FECHA: 11 DE DICIEMBRE 2015 NUMEROS GENERADORES
CON CONCRETO F'c=150 KG/CM2.
INCLUYE TODO LO NECESARIO PARA SU
CORRECTA EJECUCION.

AJPOP MERIDA SELVIN NAZARIO_____________


GARCIA OROZCO MIGUEL ANGEL_____________
COSTOS Y PRESUPUESTOS
FECHA: 11 DE DICIEMBRE 2015 NUMEROS GENERADORES

OBSERVACIONES

AJPOP MERIDA SELVIN NAZARIO_____________


GARCIA OROZCO MIGUEL ANGEL_____________
COSTOS Y PRESUPUESTOS
FECHA: 11 DE DICIEMBRE 2015 NUMEROS GENERADORES

AJPOP MERIDA SELVIN NAZARIO_____________


GARCIA OROZCO MIGUEL ANGEL_____________
COSTOS Y PRESUPUESTOS
FECHA: 11 DE DICIEMBRE 2015 NUMEROS GENERADORES

AJPOP MERIDA SELVIN NAZARIO_____________


GARCIA OROZCO MIGUEL ANGEL_____________
COSTOS Y PRESUPUESTOS
FECHA: 11 DE DICIEMBRE 2015 NUMEROS GENERADORES

AJPOP MERIDA SELVIN NAZARIO_____________


GARCIA OROZCO MIGUEL ANGEL_____________
COSTOS Y PRESUPUESTOS
FECHA: 11 DE DICIEMBRE 2015 NUMEROS GENERADORES

AJPOP MERIDA SELVIN NAZARIO_____________


GARCIA OROZCO MIGUEL ANGEL_____________
COSTOS Y PRESUPUESTOS
FECHA: 11 DE DICIEMBRE 2015 NUMEROS GENERADORES

AJPOP MERIDA SELVIN NAZARIO_____________


GARCIA OROZCO MIGUEL ANGEL_____________
COSTOS Y PRESUPUESTOS
FECHA: 11 DE DICIEMBRE 2015 NUMEROS GENERADORES

sentido largo

sentido corto

AJPOP MERIDA SELVIN NAZARIO_____________


GARCIA OROZCO MIGUEL ANGEL_____________
Concepto Unidad Cantidad P. Unitario Importe %

LIMPIEZA, TRAZO Y NIVELACION

LIMPIEZA, TRAZO Y NIV M2 131.88 48.30 6369.81

TOTAL 6369.81
EXCAVACION

EXCAVACIÓN A MANO EN M3 30.58 170.88 5225.23

TOTAL 5225.23

CIMENTACION

PLANTILLA DE CONCRET M2 38.22 5.76 220.05

CONCRETO EN ZAPATA DE
M3 9.56 1831.08 17497.82

ACERO EN CIMENTACIONKG 534.86 31.28 16729.47

CIMBRA PARA CIMENTAC P.T 374.34 178.95 66989.40

MURETE DE 12 CM DE E M2 138.69 305.62 42385.25

FIRME PARA PISO DE 15 M2 57.52 421.70 24255.64

CADENA TIPO CC Y CE D ML 97.08 228.46 22178.81

TOTAL 190256.44

SUPER ESTRUCTURA

CASTILLO TIPO K DE 15 ML 75.60 327.53 24761.30

MURO DE 15 CM DE ESP M2 127.06 461.381641 58624.0741

CIMBRA EN LOSA DE AZOP.T 2544.27 292.130135 743257.845

ACERO EN LOSA CON VAR


KG 1378.05 42.4523174 58501.2827

CONCRETO EN LOSA DE M3 7.35 2076.16337 15254.901

TOTAL 900399.41

INSTALACAION ELECTRICA

SUMINISTRO Y COLOCACIPZA 1 268.12 268.12

SUMINISTRO Y COLOCACIPZA 1 463.88 463.88

SUMINISTRO Y COLOCACIPZA 1 214.7 214.7

AJPOP MERIDA SELVIN NAZARIO___________


GARCIA OROZCO MIGUEL ANGEL____________
SUMINISTRO Y COLOCACIPZA 1 836.88 836.88

SUMINISTRO Y TENDIDO ML 10 41.17 411.7

SUMINISTRO Y COLOCACISAL 12 220.1 2641.2

SUMISTRO Y COLOCACION
SAL 1 440.86 440.86

SUMINISTRO Y COLOCACISAL 1 310.15 310.15

SUMINISTRO Y COLOCACISAL 1 25.1 25.1

SUMINISTRO Y COLOCACIML 10 19.33 193.3

SALIDA PARA SEÑAL DE SAL 1 150.38 150.38

SALIDA DE CONTACTO MOSAL 1 450.7 450.7

SALIDA PARA TELEFONO SAL 1 350.3 350.3

SUMINISTRO Y COLOCACIPZA 9 59.3 533.7

SUMINISTRO Y COLOCACIPZA 1 2002.58 2002.58

TOTAL 9293.55

INSTALACION HIDRAULICA

SUMINISTRO Y COLOCACIPZA 1.00 2307.17 2307.17

SUMINISTRO Y COLOCACPZA 1.00 59.5 59.5

SUMINISTRO Y COLOCACIPZA 1 2308 2308

SUMINISTRO Y COLOCACIPZA 1.00 1538 1538

SUMINISTRO Y COLOCACIPZA 1.00 120.3 120.3

SUMINISTRO Y COLOCACIPZA 1.00 3155.45 3155.45

SUMINISTRO Y TENDIDO ML 28.75 49.2 1414.5

SALIDA MUEBLE SANITARSAL 1.00 1040.2 1040.2

SALIDA DE LAVABO CON SAL 1.00 320.45 320.45

SALIDA DE REGADERA COSAL 1.00 1010.2 1010.2

SALIDA DE LLAVE DE NA SAL 1.00 720.15 720.15

SUMINISTRO Y COLOCACIPZA 1.00 1456.4 1456.4

AJPOP MERIDA SELVIN NAZARIO___________


GARCIA OROZCO MIGUEL ANGEL____________
TOTAL 15450.32

INSTALACION SANITARIA

SUMINISTRO Y TENDIDO ML 24.70 40.15 991.705

REGISTRO DE 0.6m x 0. PZA 4.00 1500 6000

SUMINISTRO Y COLOCACIO
PZA 4.00 610.39 2441.56

SUMINISTRO Y COLOCACISAL 1.00 2038.42 2038.42

SUMISTRO Y COLOCACION
SAL 1.00 320.48 320.48

SUMINISTRO Y COLOCACIPZA 1.00 350.2 350.2

TOTAL 12142.365

HERRERIA Y VENTANERIA

SUMINISTRO E INSTALACPZA 2.00 1420.58 2841.16

SUMINISTRO E INSTALACPZA 4.00 720.4 2881.6

SUMINISTRO Y COLOCACIPZA 4.00 515 2060

TOTAL 7782.76

ACABADOS

SUMINISTRO Y COLOCACIM2 25.11 538.22 13514.7042

SUMINISTRO Y COLOCACIML 70.84 120 8500.8

SUMINISTRO Y COLOCACIM2 6.30 495.22 3119.73743

SUMINISTRO Y COLOCACIM2 21.28 180.16 3833.08416

APLANADO DE MURO CON


M2 254.12 168.54 42830.059

SUMINISTRO Y COLOCACIM2 127.06 70.2 8919.7524

SUMINISTRO Y COLOCACIM2 127.06 75.12 9544.89744

SUMINISTRO Y COLOCACIM2 75.46 156.13 11781.5698

TOTAL 102044.604

AJPOP MERIDA SELVIN NAZARIO___________


GARCIA OROZCO MIGUEL ANGEL____________
AJPOP MERIDA SELVIN NAZARIO___________
GARCIA OROZCO MIGUEL ANGEL____________
PRESUPUESTO
PROYECTO: CASA HABITACION TOTAL DE LA OBRA
COSTOS Y PRESUPUESTOS
FECHA: 11 DE DICIMBRE 2015

CONCEPTO IMPORTE
LIMPIEZA, TRAZO Y NIVELACION $6,369.806
EXCAVACION $5,225.229
CIMENTACION $190,256.437
SUPER ESTRUCTURA $900,399.405
INSTALACAION ELECTRICA $9,293.550
INSTALACION HIDRAULICA $15,450.320
INSTALACION SANITARIA $12,142.365
HERRERIA Y VENTANERIA $7,782.760
ACABADOS $102,044.604

COSTO DIRECTO: $1,248,964.477


IVA 16 % $199,834.316
PRESUPUESTO: $1,448,798.793

AJPOP MERIDA SELVIN NAZARIO_____________


GARCIA OROZCO MIGUEL ANGEL_____________