Sie sind auf Seite 1von 5

Jitendra Sharma

Mobile no:-7277160321 Mail Id:-jewo.sharma@gmail.com

TOTAL EXPERIENCE 12 YEARS .

EDUCATIONAL QUALIFICATIONS

1. B.E – Electrical Engineering from Asian Institute of Engineering & Management, Govt. of
Delhi (2008-2011) with 73.13%. (Distance course)
2. Polytechnic Engineering – 3 years Diploma in Computer Application from Mining Institute of
Koderma, State Board of Technical Education, Jharkhand March 2007 with 79.35%.

ORGANIZATION

1. Reliance Jio Infocomm Limited. (April 2017 to till date)


2. SASKEN COMMUNICATION TECHNOLGIES LIMTED. (MAY 2010 to April 2017).
3. ZEPPELIN MOBILE SYSTEMS INDIA ltd. (OCT 2009 to MAY 2010).
4. RT Outsourcing Services Limited. (DEC 2008 OCT 2009).
5. GUPTAS AIRON SWITCH SERVICES PRIVATE LIMITED (April 2007 to Dec 2008).

SKILL SUMMARY

 SAE, MME,E-UTRAN,S-GW,EPS, EPC,P-GW, NAS, RB.


 Alarm handling RTRV-ALM(inf,list,log,sev,conf,ctrl,hist) & CHG (conf,ctrl,thr)
 Backhaul activity-MW to Fiber conversion, Port configuration, Port enable & disable.
 Alarm and Performance monitoring.
 MML command ZEOL, ZEEI, ZEOH, ZEAP, ZERO, ZEQO, ZEAT, ZEFO, ZEAO
 CDMA, EVDO, GSM and WCDMA Drive Test & Optimization.
 Network KPI report Analysis.
 Drive Test and Data Analysis.
 Interference Analysis, Traffic Analysis.
 Indoor Walk test.

Tools Worked On

 LSMR login-Alarm, Outage, Performance & Fault.


 Airspan login-Check all Node ISC alarm
 JCP tool login- Generate NWA report & Mute Cell %, Volte Call Drop Rate %, Call Drop Rate
%, Utilization %
 Granite Inventory Report generate IP MW report.
 Xshell 5 login- CSS ping end to end tracking issue & rectify.
 Rjilauto login- Generate IP MPLS report.
 Everest login-Infrastructure Management Frameworks.
 Net act OSS tool
 Drive Test Tool: TEMS, Agilent E6474A, GNEX-PROBE and X-Cal.
 Post Processing Tool: MapInfo, X-CAP, Actix, QGIS, Google Earth & TEMS Discovery.
CURRENT EXPERIENCE

Posted as Backhaul Engineer

 Planning, deployment and operations of IP Access links (CSS+AG1).


 Planning, deployment and operations of MW links.
 Planning, deployment and operations of FTTH Backhaul.
 Deliver the operations KPI’s as per target.
 IMS deployment and operations of IP Access.

PREVIOUS EXPERIENCE

SASKEN COMMUNICATION TECHNOLGIES LIMTED. (MAY 2010 to April 2017).

Project: USRD AT&T work on (NSN System) (JAN 2016 to April 2017)

 Working as RF Optimization Engineer located in Bangalore for USRD AT&T (NSN System).
 Generate and download ND reports by reporting suite/CNN and used different types of MML
command such as ZEOL, ZEEI, ZEOH, ZEAP, ZERO, ZEQO, ZEAT, ZEFO, ZEAO from the
Remote Login of the NSN System (Net act OSS).
 Achieve and maintain the Radio Network Performance as per the contracted KPIs (Accessibility,
Retain ability and Mobility & Service Integrity).
 Daily KPI, Performance and Alarm monitoring and improve the same by reducing the
CSSR_Call set up failure rate, DCR_Drop call rate, Improve HOSR etc.

Project: Drive test & Optimization for TTSL-TENXC GSM SWAP project (OCT 2015 to JAN
2016)
 Working as a Drive test Engineer for 2G sites Drive test & optimization of GSM in UP East &
Delhi circle
 Give optimization recommendations for improving the performance of the system after analysis
of the pre drive & post drive test result.

 Performing regular network health checks by doing Idle, dedicated long & short call voice
drives, GPRS test and SMS test, checking the GSM network parameters like RX LEVEL, RX
Quality

Project: Cluster Drive test & Optimization for UNINOR-ALU BTS SWAP project (FEB 2015 to
OCT 2015)

 Working as a Drive test Engineer for 2G sites Drive test & optimization of GSM in AP,
Hyderabad & Karnataka circle
 Give optimization recommendations for improving the performance of the system after
analysis of the pre-drive & post-drive test result.
 Performing regular network health checks by doing Idle, dedicated long & short call voice
drives, GPRS test and SMS test, checking the GSM network parameters like RX LEVEL, RX
Quality

Project: Drive Test & Optimization for TATA DOCOMO-NSN project (AUG 2014 to FEB
2015)

 Working as a Drive test Engineer for 2G sites Drive test & optimization of GSM in Hyderabad
circle.
 Give optimization recommendations for improving the performance of the system after
analysis of the drive test result.
 Performing regular network health checks by doing idle, dedicated long & short call voice
drives, GPRS test and SMS test.

Project: Drive Test & Optimization for TATA DOCOMO-NSN project (DEC 2013 to AUG
2014)

 Working as a Drive test Engineer for new sites Drive test & optimization of CDMA and EVDO
in Bangalore circle.
 Give optimization recommendations for improving the performance of the system after
analysis of the drive test result.
 Performing regular network health checks by doing High speed data drives, Latency test, and
other data related tests, checking CDMA & EVDO network parameters like TX Power, RX
Power, Ec/Io, FER, PER, SINR, Retransmission Rate, DRC Distribution, TX throughput, RX
throughput

Project: LTE RF Survey for Samsung India Electronics Pvt. Ltd. (SEP 2013 to Dec 2013)

 Working as a Survey Engineer in LTE RF survey & LOS survey for finding the candidates as per
nominal given by end customer (Reliance) for new site in Bangalore.
 To search the candidate as per suitable RF condition and making the reports for the same.
 While doing the survey suggesting the azimuth, Height, Mechanical and electrical tilt of the
antenna for RF planning & optimization

Project: Idea Quality Audit (JAN 2012 to SEP 2013)

 Idea Quality Audit project as a Senior Quality Engineer.


Responsibilities:

 Working as a Senior Quality Engineer for Idea Ltd. company


 Checking & Detecting Quality punch points on Idea 2G & 3G BTS(NSN, ERICSSON, HUAWEI,
ALCATEL-LUCENT) sites as per the customer quality standards
 Preparing & Submitting Idea quality audit reports with snapshot & video to customer on
daily basis
 Conducting testing likes VSWR & Power measurement, DC voltage & current, Earth
resistance on Idea sites as per the customer needs
 Submitting final presentation reports to customer with common punch points & ratings as
per quality severity levels

Project: BTS Installation, Commissioning & Integration in AIRTEL, VODAFONE, IDEA, AIRCEL-
NSN project (May 2010 to JAN 2012)

 Working as a Project Engineer for 2G & 3G sites Installation, Commissioning & Integration of
GSM in Bihar, Jharkhand West Bengal circle
 Addressing performance bottlenecks and ensuring maximum uptime for systems,
equipment’s, etc.
 Handling the installation, commissioning, maintenance & alarm monitoring of Nokia (Ultra
and Flexi) BTS & Node-B (NSN 3G Equipment).
 Creating cross connection from backbone (SDH) site to Main (PDH) site.
 Checking the VSWR Measurements, Return loss, Cable loss with Site masters Make:-Bird,
Anritsu
 Handling the ODU & IDU commissioning and micro wave alignment(0.6m,1.2m,1.8m)
 Handling TRX shut down project, Splitting of Dual TRX, Segmentation of BTS, Cabinet
Expansion, Air-combining, TMA Installation, TRX addition, Sector Addition, 3G survey & RFI
checklist, Quality audit of site with self-assessment checklist.
 Designing network layouts and managing the installation, commissioning, configuration &
maintenance of a wide range of telecom equipment.
 Implanting the Ultra & Flexi site Edge BTS for Indoor BTS, Outdoor BTS, and High Traffic
capacity 12 TRX in one cabinet and using dual band GSM 900, 1800.
 Terminating the External alarms with colour coding in Krone block.
 To manage all activities related to BSS as site installation, commissioning and integration.

ZEPPELIN MOBILE SYSTEMS INDIA ltd. (Oct 2009 to MAY 2010)

PROJECT ENGINEER

 Co-ordination vendor teams.


 Commissioning Flexi EDGE BTS
 Swap Flexi EDGE BTS.
 Expansion Flexi EDGE BTS
 RSSI and SDCCH Drop Trouble shooting
 Alarm monitoring, site monitoring.
 Commissioning of IP10 & Flexi Hybrid equipment’s.
 Troubleshooting of Nokia (Flexi BTS, PDH hops) Equipment’s.
 TRX Cabinet Expansions, TRX additions & deletions, site integration.
 Performing the Acceptance Test for the new sites Alarm integration and testing.
 Operation & Maintenance of the Network elements (BTS/BSC).
 Acceptance test: call testing, alarms testing in BTS etc.
 Quality auditing and site clean-up of BTS.
 Performance analysis of BTS.
 Integration of Flexi EDGE BTS.
 Commissioning & Integration of ULTRA BTS.
RT Outsourcing Services Limited. (Dec 2008 to Sep 2009)

 Commissioning of Flexi MULTI Radio.


 Traffic shifting.
 Link Configuration.
 Commissioning & Integration of site.
 Internal & External alarm clearance of BTS.
 ODU swapping commissioning and reconfigure E1.
 Alarm clearance.
 NMS Troubleshooting and analyse activity.
 NMS visibility

GUPTAS AIRON SWITCH SERVICES PRIVATE LIMITED (April 2007 to Dec 2008)

 Posted at project Engineer


 Commissioning & Integration of site.
 Nokia BTS Ultra,Flexi & cabex sites.
 MW Link , sdh link

Personal Details:

Date of Birth : 22 August, 1987


Languages Known : English & Hindi
Address : Ho. No.-109, Sector 8’B more, Koyla dipo, Bokaro Steel City
Jharkhand 827009
Marital Status : Married
Passport Details : K1375190
Location Preference : Anywhere in India / Abroad
Nationality : Indian

Date: - 15-04-2019 Jitendra Kumar Sharma


Place: - Bangalore Mo no: - 7277160321

Das könnte Ihnen auch gefallen