Sie sind auf Seite 1von 1

Part 3

Technical Requirement

ORGANIZATION STRUCTURE
PLTU SULBAGUT 1

1 GENERAL MANAGER

1 OPERATIONAL MANAGER 1 MAINTENANCE & ENGINEERING

1 Production Supervisor A 1 Mechanical Maintenance Supervisor 1 Finance, Adm, and HR Supervisor

3 CCR, DCS, and Electrical Senior Operator 1 BTG Senior Technician 1 HR & Administration Senior Staff
2 Boiler Operator 3 BTG Technician 2 Tool & Inventory Staff
2 Turbine Operator 1 Coal, Ash Handling & Common Senior Techn 1 Financial Senior Staff
5 Coal and Ash Handling Operator 3 Coal, Ash Handling & Common Technician 1 Financial Staff
2 WTP, WWTP, and Common Operator Sum of Personnel 9 1 Secretary Staff
Sum of Personnel 15 1 Procurement Senior Staff
1 Electrical & Instrument Supervisor 1 Procurement Staff
1 Production Supervisor B Sum of Personnel 9
1 Electrical & Instrument Senior Technician
3 CCR, DCS, and Electrical Senior Operator 5 Electrical & Instrument Technician 1 HSE Supervisor
2 Boiler Operator Sum of Personnel 7
2 Turbine Operator 1 HSE Senior Staff
5 Coal and Ash Handling Operator 1 Instrument Control Supervisor 1 HSE Staff
2 WTP, WWTP, and Common Operator Sum of Personnel 3
Sum of Personnel 15 1 I & C BTG Senior Technician Total Personnel 12
2 I & C BTG Technician
1 Production Supervisor C 1 Common I & C Senior Technician
Organic Personnel Total
2 Common I & C Technician
3 CCR, DCS, and Electrical Senior Operator Sum of Personnel 7 General Manager 1
2 Boiler Operator Manager 2
2 Turbine Operator 1 Outage & Maintenance Supervisor Supervisor 13
5 Coal and Ash Handling Operator Operator / Technician / Staff Senior 29
2 WTP, WWTP, and Common Operator 1 Outage & Maintenance Senior Staff Operator / Technician / Staff 76
Sum of Personnel 15 2 Outage & Maintenance Staff Sum 121
1 Inventory & Control Senior Staff
1 Production Supervisor D Sum of Personnel 5
Non-organic Personnel Total
3 CCR, DCS, and Electrical Senior Operator 1 Engineering Supervisor
2 Boiler Operator Heavy Duty Equipment Operator 12
2 Turbine Operator 1 Risk, Quality, and Performance Staff HSE Staff 4
5 Coal and Ash Handling Operator 1 Engineering Staff Security 21
2 WTP, WWTP, and Common Operator 1 Predictive Maintenance Senior Staff Cleaning Service 31
Sum of Personnel 15 1 Predictive Maintenance Staff Sum 68
Sum of Personnel 5
1 Operational Planning and Control Superv Total Personnel 34

2 Operational Planning and Control Senior Staf Organic Personnel 121


1 Fuel Senior Stafff Non-organic Personnel 68
1 Fuel Junior Stafff Provide by Contractor TOTAL PLANT PERSONNEL 189
Sum of Personnel 5
Provide by Employer
1 Chemical & Environment Supervisor

1 Chemical & Laboratorium Senior Stafff


1 Chemical Stafff
3 Laboratorium Stafff
1 Environment Senior Stafff
1 Environment Stafff
Sum of Personnel 8
Total Personnel 74

Figure 3.2 O&M Organization of PLTU Sulbagut 1

Mobilization of personnel based on mobilization plan approved by Employer upon Contract sign,
and first mobilization shall be executed no later than one (1) month after the Notice to Proceed
has been issued by the Employer.
The qualifications of key personnel are as follow:
a. Qualification of General Manager:
1. Educational background of minimum Bachelor or equivalent majoring Mechanical
Engineering, Electrical Engineering, and Control Instruments.
2. Capable to communicate well in English (Oral and Written), TOEFL score 550 or
equivalent.
3. Has minimum 10 years of experience in Managerial Level or General Manager in coal
fired power plant with a minimum capacity of 2x50 MW.
4. Have work reference in power plant O&M field with good performance in the last 5 years.
5. Understand and competent in managing power plant O&M with business process in
accordance with Management of Plant Assets.
6. Able and willing to cooperate with team and dutifully perform tasks, rules and regulations
applicable in Indonesia.

Bid Document Part 3 - 19 O&M Works for


PLTU Sulbagut-1 2x50 MW