A B C
DESIGN ANALYSIS DPWH
18.0
BRANCH CIRCUIT CALCULATION OFFICE OF THE BUILDING OFFICIAL
3.50
CIRCUIT 3 - CONVENIENCE OUTLET CIRCUIT 3 - CONVENIENCE OUTLET
7.00
2 = 2.46 AMPERE = 2.46 AMPERE
USE 2-#12 THHN CU.WIRE USE 2-#12 THHN CU.WIRE
3.50
USE 20 AT 2P C.B USE 20 AT 2P C.B APPROVED:
1-#12 THHN CU.WIRE (GROUND) 1-#12 THHN CU.WIRE (GROUND)
S2 S2
3 M SECTION CHIEF
9.0 9.0
18.0
C3 C4
C1 C2
100 AT
15 AT 15 AT
C1 L.O. L.O. C2
20 AT 20 AT
C3 C.O. C.O. C4
LEGENDS
1-#10 THHN CU.WIRE
SYMBOLS DESCRIPTION QUANTITY (GROUND)
CIRCUIT BREAKER
2- #30 THHN CU.WIRE
TOTAL CONNECTED LOAD 9.46 220 100 AT 1- #8.0 THHN CU.WIRE
M KILOWATT HOUR METER
DRAFTED AND AUTOCAD BY: CERTIFIED BY: PROJECT TITLE AND LOCATION: SHEET CONTENTS: REVISIONS: SHEET NO.
PTR NO.:
DATE ISSUED:
PROPOSED 1 UNIT 2 CL BUILDING
FOR CAPINIAHAN PRIMARY SCHOOL
POWER LAYOUT
E
PAULINE JOY B. AQUINO
DRAFSTMAN
TOMAS LAUREA
CIVIL ENGINEER
PLACE ISSUED:
TIN: BARANGAY CAPINIAHAN,LEMERY ILOILO
LEGEND & SYMBOL
SCHEDULE OF LOADS
SINGLE LINE DIAGRAM
1