Sie sind auf Seite 1von 1

REPUBLIC OF THE PHILIPPINES

A B C
DESIGN ANALYSIS DPWH
18.0
BRANCH CIRCUIT CALCULATION OFFICE OF THE BUILDING OFFICIAL

9.0 9.0 CIRCUIT 1 - LIGHT OUTLET CIRCUIT 2 - LIGHT OUTLET

I = 4 X 100 / 0.80 (220) I = 4 X 100 / 0.80 (220)


APPROVED:
= 2.27 AMPERE = 2.27 AMPERE
USE 2-#14 THHN CU.WIRE USE 2-#14 THHN CU.WIRE
BUILDING OFFICIAL
1 BRANCH CIRCUIT PROTECTION BRANCH CIRCUIT PROTECTION
USE 15 AT 2P C.B USE 15 AT 2P C.B
1-14 THHN CU.WIRE (GROUND) 1-14 THHN CU.WIRE (GROUND)
3.50

3.50
CIRCUIT 3 - CONVENIENCE OUTLET CIRCUIT 3 - CONVENIENCE OUTLET

CEMENT FINISHED CEMENT FINISHED I = 3 X 180 / 220 I = 3 X 180 / 220


7.00

7.00
2 = 2.46 AMPERE = 2.46 AMPERE
USE 2-#12 THHN CU.WIRE USE 2-#12 THHN CU.WIRE

BRANCH CIRCUIT PROTECTION BRANCH CIRCUIT PROTECTION


3.50

3.50
USE 20 AT 2P C.B USE 20 AT 2P C.B APPROVED:
1-#12 THHN CU.WIRE (GROUND) 1-#12 THHN CU.WIRE (GROUND)

S2 S2
3 M SECTION CHIEF
9.0 9.0

18.0

C3 C4
C1 C2

POWER & LIGHTING LAYOUT


SCALE 1:100M
SINGLE LINE DIAGRAM GENERAL NOTES
M TO SERVICE DROP

100 AT

15 AT 15 AT
C1 L.O. L.O. C2

20 AT 20 AT
C3 C.O. C.O. C4

LEGENDS
1-#10 THHN CU.WIRE
SYMBOLS DESCRIPTION QUANTITY (GROUND)

LIGHT OUTLET 8PCS.

DUPLEX CONVENIENCE OUTLET 6PCS.


SCHEDULE OF LOADS:
S2 TWO GANG SWITCH 2PCS. CIRCUIT NO. DESCRIPTION UNIT LOAD AMPERE VOLTS CIRCUIT PROTECTION SIZE OF CONDUIT SIZE AND TYPE OF WIRE

CIRCUIT LINE (light oulet) 2- #14 THHN CU.WIRE


CIRCUIT 1 LIGHT OUTLET 4 2.27 220 15 AT 1- #14 THHN CU.WIRE
CIRCUIT LINE (conv. outlet)
2- #14 THHN CU.WIRE
CIRCUIT LINE (Switch outlet) CIRCUIT 2 LIGHT OUTLET 4 2.27 220 15 AT 1- #14 THHN CU.WIRE

PANEL DISTRIBUTION BOARD 2- #12 THHN CU.WIRE


CIRCUIT 3 CONVENIENCE OUTLET 3 2.46 220 20 AT 1- #12 THHN CU.WIRE
CIRCUIT HOMERUN
2- #12 THHN CU.WIRE
SERVICE ENTRANCE CIRCUIT 4 CONVENIENCE OUTLET 3 2.46 220 20 AT 1- #12 THHN CU.WIRE

CIRCUIT BREAKER
2- #30 THHN CU.WIRE
TOTAL CONNECTED LOAD 9.46 220 100 AT 1- #8.0 THHN CU.WIRE
M KILOWATT HOUR METER

DRAFTED AND AUTOCAD BY: CERTIFIED BY: PROJECT TITLE AND LOCATION: SHEET CONTENTS: REVISIONS: SHEET NO.

PRC NO.: LIGHTING LAYOUT DESIGN ANALYSIS

PTR NO.:

DATE ISSUED:
PROPOSED 1 UNIT 2 CL BUILDING
FOR CAPINIAHAN PRIMARY SCHOOL
POWER LAYOUT
E
PAULINE JOY B. AQUINO
DRAFSTMAN
TOMAS LAUREA
CIVIL ENGINEER
PLACE ISSUED:
TIN: BARANGAY CAPINIAHAN,LEMERY ILOILO
LEGEND & SYMBOL
SCHEDULE OF LOADS
SINGLE LINE DIAGRAM
1

Das könnte Ihnen auch gefallen