TERMS OF REFERENCE
EVTL's safety system includes Gas Detection Systems, Automatic Deluge Systems,
Firewater Hydrants and Monitors with Foam Injection Unit, Fire Truck and Portable
Firefighting equipment.
A dedicated panel of professionals ensures health and safety of employees, using proven
expertise, tools and training methods. Engro aims to be industry-first in following global
standards set out in Health, Safety and Environment (HSE) management.
A large number of heavy trucks continuously come to the terminal for the
transportation of Chemical, Oil and Gas products to the whole country. The current
demand of tucks / trailers are 26700, which increase to 32000 in future. The total area
of the terminal is 102 acres.
1
TORs - Traffic Safety & Parking Management Study
Comprehensive and Reliable: Fulfilling all the needs and requirements of the
study
2
TORs - Traffic Safety & Parking Management Study
1. This is a Parking & Traffic Management study to address the concerns related to
safety of motorcyclists and pedestrians, traffic flow and parking area design. The study
will follow the engagement process of drivers and all related stakeholders. Necessary
data collection will be conducted including traffic volumes, topographical features, road
inventory, accidents data etc. The study will determine the issues and analyze
alternative solutions to the overarching goals.
2. To prepare a detailed Traffic Management Study document for the terminal
including but not limited to the following scope of services:
a. Master Planning of Terminal Area
b. Redesigning of Truck Parking Area
c. Signage Plan for Truck Parking Area
d. Road Marking Plan for Parking Bays and Vehicular Circulation
e. Motorcycle Parking and Circulation Plan
f. Pedestrian Movement Plan
g. Traffic Calming Plan
4. Scope of Services
The scope of services for this study is organized into the following major tasks as listed
and summarized below. Each major task is subdivided into subtasks showing the scope
of major tasks and desired output of the study.
3
TORs - Traffic Safety & Parking Management Study
4
TORs - Traffic Safety & Parking Management Study
entrance
Analysis of existing pedestrian movement facilities
Development of comprehensive Pedestrian Movement Plan
Pedestrian Movement Plan should consider conflict free passage and
segregated path.
Signage Plan for pedestrian passage with all details
Road marking plan for pedestrian movement
Task 7: Traffic Calming Plan
Development of comprehensive Traffic Calming Plan to make the vehicle and
pedestrian movement in parking area and loading area as safe as possible
with minimum conflicting point
Preparation of map showing proposed location for installation of Traffic
Calming devices.
Detail of each traffic calming device that will be proposed for installation.
5 Stakeholder Consultations
The Consultant shall identify the stakeholders of the project including the Engro
Management, drivers, workers and other stakeholders, who will be directly or
indirectly impacted by the proposed project. Identified stakeholders should be
consulted either through meetings, personal interviews, public information gatherings
or other similar means which may be suitable for different audience types. Results of
these stakeholder consultations should be a part of the final parking & traffic
management report.
6 Cost Estimates
The consultant shall prepare tentative cost estimates for complete:
Traffic Signage
Road Marking
Traffic Control Devices
Other Items (Kerb Stones, Fencing and other road furniture)
5
TORs - Traffic Safety & Parking Management Study
6
TORs - Traffic Safety & Parking Management Study
TIME DURATION