Beruflich Dokumente
Kultur Dokumente
BUDGET OF WORK
PERFORMANCE
WEEK # CONTENT CONTENT STANDARD LEARNING COMPETENCIES CODE
STANDARD
FIRST QUARTER:
WEEK 1 Types and parts of The learners demonstrate an The learners shall be able to 1.1 Plan unit assembly to ensure OHS policies and TLE_IACSS9-12ICCS-
computers understanding of concepts and install and configure computer procedures are followed in accordance with Ia-e-28
Computer operating systems principles in installing systems based on established systems requirements
Windows / MAC OS X /Linux configuring computer systems. procedures and system 1.2 Prepare unit assembly to ensure OHS policies and
Peripheral devices requirements. procedures are followed in accordance with
Computer systems design systems requirements
WEEK 2 & 3 Computer assembly 1.3 Identify materials necessary to complete the work
procedures in accordance with established procedures and
Power ON self-test and check against system requirements
basic-input-output-system 1.4 Obtain materials necessary to complete the work
(BIOS) configuration in accordance with established procedures and
procedures check against system requirements
WEEK 4 CMOS 1.5 Obtain tools, equipment and testing devices
Motherboards needed to carry out installation work in
WEEK 5 Multimedia storage devices: accordance with established procedures and
o Video cards check for correct operation and safety
o Sound cards 1.6 Assemble computer hardware in accordance with
Graphical user interface established procedures and system requirements
1.7 Perform BIOS configuration in accordance with
hardware requirements
WEEK 6 Installers preparation and The learners demonstrate an The learners shall be able to 2.1 Create portable bootable devices in accordance TLE_IACSS9-12ICCS-
OS installation procedures understanding of concepts and install and configure computer with software manufacturer instruction If-j-29
WEEK 7 Application and principles in installing systems based on established 2.2 Prepare customized installers in accordance with
devices/drivers installation configuring computer systems. procedures and system software utilization guide and end user agreement
procedures requirements. 2.3 Carry out installation of portable applications in
WEEK 8 Desktop PC interface/ hook accordance with software user guide and software
up procedures license
WEEK 9 Application packages and
use of application programs
WEEK 10 Bootable devices
o CD/DVD bootable
o USB bootable using
Rufus software
o USB bootable using
diskpart/CMD
Software installers
SECOND QUARTER:
WEEK 1 – 5 Installation of Operating The learners demonstrate an The learners shall be able to 3.1 Install Operating System (OS) in accordance with TLE_IACSS9-12ICCS-
System understanding of concepts and install and configure computer established installation procedures and to comply IIa-j-30
o Windows Server principles in installing systems based on established with end-user requirements
2008/higher version configuring computer systems. procedures and system 3.2 Install peripherals/ devices in accordance with
o Windows XP/7/8/10 requirements. manufacturer’s instructions and/ or OS installation
procedures
WEEK 6 – 7 Install and configure of 3.3 Configure peripherals/ devices in accordance with
peripherals devices manufacturer’s instructions and/ or OS installation
procedures
WEEK 8 – 9 Install /Update Operating 3.4 Access OS and drivers updates/ patches in
system accordance with manufacturer’s
recommendations and requirements
WEEK 10 Checking of work 3.5 Install OS and drivers updates/ patches in
accordance with manufacturer’s
recommendations and requirements
3.6 Check the quality of the work undertaken in
accordance with established procedures
THIRD QUARTER:
WEEK 1 Installation of applications The learners demonstrate an The learners shall be able to 4.1 Install Application Software based on software TLE_IACSS9-12ICCS-
software with different understanding of concepts and install and configure computer installation guides, end-user requirements and IIIa-e-31
variations principles in installing systems based on established software license agreement
configuring computer systems. procedures and system 4.2 Carry out variation to application software in
WEEK 2 Software updates requirements. accordance to customer/ client requirements
4.3 Access software updates in accordance with
WEEK 3 Virtualization software manufacturer’s recommendations and
Disk management software requirements
4.4 Install software updates in accordance with
manufacturer’s recommendations and
WEEK 4 Antivirus / diagnostic software
requirements
Prepared by: