Sie sind auf Seite 1von 13

Company Name

Contact Person (Name & Tel;)


MYANMAR LOGISTICS CENTER ,(115 x 30 x 7M)Warehouse Unit -1 & Unit 2
Electrical Installation Works
SUMMARY Issue Date

No. Particulars Material Installation Total (MMK) Remark

1 Electrical Work Warehouse Unit -1

2 Electrical Work Warehouse Unit -2

3 External Cabling Work for Unit 1+Unit 2

4 Automatic Fire Alarm Work for Unit 1+Unit 2

Sub Total

Commercial Tax;(5%)

Total Amount (MMK)

Remark:
(Currency mention with Myanmar Kyats - MMK)

1
MYANMAR LOGISTICS CENTER
1. (115 x 30 x 7M) Warehouse Unit -1 Date - ……….………..
Electrical Installation Works (Internal Work Only) (Currency mention with Myanmar Kyats - MMK)
Material Installation(Labour) M+L
No. Particulars Qty Unit Remark
Rate Amount Rate Amount Total Amount
A Lighting Fixture
1 50W LED High Bay (IP-65) 28 Set Co Supply Co Supply
2 150W LED High Bay (IP-65) 56 Set Co Supply Co Supply
3 150W LED Flood Light (IP-65) 7 Set Co Supply Co Supply
4 40W Fluorescent Lamp (Exposed Type) 3 Set Co Supply Co Supply
5 150W LED Street Lamp (Arm+Bracket) 13 Set Co Supply Co Supply
6 Emergency Light 15 Set Co Supply Co Supply
7 Exit Light 9 Set Co Supply Co Supply
8 Suspension Hood for Lighting Fitting 131 Set
A - Total
B Switch & Power Outlet Fitting
1 1 Gang 1 Way Switch 3 Pcs Ref;- Schneider-Vivace
2 2 Gang 1 Way Switch 2 Pcs Ref;- Schneider-Vivace
3 1 Gang 2Way Switch 8 Pcs Ref;- Schneider-Vivace
4 2 Gang 2 Way Switch 2 Pcs Ref;- Schneider-Vivace
5 13A 3Pin Multi Socket 28 Pcs Ref;- Schneider-Vivace
6 13A 3Pin Multi Socket (Wearther Proof) 4 Pcs Ref;- Schneider-Vivace
7 5-10A 3Pin Multi Socket 15 Pcs Ref;- Schneider-Vivace
8 Base Cup (3"x3"x1") 62 Nos Ref;- Sogo-A (Exposed Type)
9 Switch Board (14s Switch) 1 Pcs Co Supply Co Supply Ref;- (Exposed Type)
10 Industrial Socket Outlet (5 pin) 3 Pcs Ref;- Schneider
11 Base Frame Work of Industrial SSO 3 Set
B - Total
2
MYANMAR LOGISTICS CENTER
1. (115 x 30 x 7M) Warehouse Unit -1 Date - ……….………..
Electrical Installation Works (Internal Work Only) (Currency mention with Myanmar Kyats - MMK)
Material Installation(Labour) M+L
No. Particulars Qty Unit Remark
Rate Amount Rate Amount Total Amount
C Wire & Cable Laying
1 1.5mm2(PVC/Cu) 4,500 Mtr Co Supply Co Supply
2 2.5mm2(PVC/Cu) 9,800 Mtr Co Supply Co Supply
3 4 mm2(PVC/Cu) 6,000 Mtr Co Supply Co Supply
4 50 mm x1C (PVC/XLPE/Cu)
2
120 Mtr Co Supply Co Supply
5 70 mm2 x1C (PVC/XLPE/Cu) - Mtr Co Supply Co Supply
C - Total
D DB & Circuit Breaker Fitting
1 MSB Panel (2) Complete Set 1 No Co Supply Co Supply Ref;- (Setting & Termination)
2 WareHouse SDB 1+2 1 No Co Supply Co Supply Ref;- (Setting & Termination)
3 200A ATS Panel 1 No Co Supply Co Supply Ref;- (Setting & Termination)
4 Control Cabe Laying of Gen; & ATS Panel 1 Lot
5 Cable Termination Work 1 Lot Ref;- (Setting & Termination)
D - Total
E Earthing System
1 Building+Panel Earth System (R<2Ω) 1 Lot (include all Panel with bonding)
2 Earth Test Box+Earth Pit 1 No
3 Generator Earth System (R<2Ω) 1 Lot (include ATS Panel with bonding)
4 Earth Test Box+Earth Pit 1 No
E - Total
F Lightning Protection System 1 Item Co Supply Co Supply Co Supply Co Supply Co Supply Ref;-P3
F - Total

3
MYANMAR LOGISTICS CENTER
1. (115 x 30 x 7M) Warehouse Unit -1 Date - ……….………..
Electrical Installation Works (Internal Work Only) (Currency mention with Myanmar Kyats - MMK)
Material Installation(Labour) M+L
No. Particulars Qty Unit Remark
Rate Amount Rate Amount Total Amount
G Piping Work
1 20Æmm PVC Conduit (Impact) Mtr Ref;- (Exposed Type)
2 25Æmm PVC Conduit (Impact) Mtr Ref;- (Expose Attach with Purling)
3 200x50mm Metal Trunking (with Cover)Gray Mtr Ref;-
4 300x50mm Metal Trunking(with Cover)Gray Mtr Ref;-
5 Metal Trunking Accessories 1 Lots Ref;- (L+Tee+Cross+Reduce)
6 Bracing Making Work (For Metal Trunking) 1 Lots Ref;-(long Thread+Angle Iron)
7 20mm Flexible Pipe Mtr Ref;-
8 Miscellaneous 1 Lot
9 Other Accessories (for Installer Mention) 1 Lot
G - Total
A to G - Total

Warehouse Unit -1 of Material Total Amount

4
MYANMAR LOGISTICS CENTER
1. (115 x 30 x 7M) Warehouse Unit -1 Date - ……….………..
Electrical Installation Works (Internal Work Only) (Currency mention with Myanmar Kyats - MMK)
Material Installation(Labour) M+L
No. Particulars Qty Unit Remark
Rate Amount Rate Amount Total Amount
8 Miscellaneous
a Ø20mm Circular Box (3Way) Tee 1 Pcs
b Ø20mm PVC Inspection Elbow 1 Pcs
c Ø20mm PVC Socket 1 Pcs
d Ø25mm PVC Socket 1 Pcs
e Ø20mm PVC Saddle 1 Pcs
f Ø25mm PVC Saddle 1 Pcs
g 4"x4" Joint Box 1 Pcs
h 1" Black Screw (6#) 1 Pcs
i M-7 Wall Plug 1 Pcs
j Wire Tape (R/Y/B/BL) 1 Pcs
k 20A Connector 1 Pcs
l 2" Steel Screw 1 Pcs
m 1/4" GI Wall Plug 1 Pcs
o Bolt & Nut 1 Pcs
9 Supplementary (fill for Contractor)
a
b
c
d
e
f

5
MYANMAR LOGISTICS CENTER
2. (115 x 30 x 7M) Warehouse Unit -2 Date - ……….………..
Electrical Installation Works (Internal Work Only) (Currency mention with Myanmar Kyats - MMK)
Material Installation(Labour) M+L
No. Particulars Qty Unit Remark
Rate Amount Rate Amount Total Amount
A Lighting Fixture
1 50W LED High Bay (IP-65) 28 Set Co Supply Co Supply
2 150W LED High Bay (IP-65) 56 Set Co Supply Co Supply
3 150W LED Flood Light (IP-65) 7 Set Co Supply Co Supply
4 40W Fluorescent Lamp (Exposed Type) 3 Set Co Supply Co Supply
5 150W LED Street Lamp (Arm+Bracket) 13 Set Co Supply Co Supply
6 Emergency Light 15 Set Co Supply Co Supply
7 Exit Light 9 Set Co Supply Co Supply
8 Suspension Hood for Lighting Fitting 131 Set
A - Total
B Switch & Power Outlet Fitting
1 1 Gang 1 Way Switch 3 Pcs Ref;- Schneider-Vivace
2 2 Gang 1 Way Switch 2 Pcs Ref;- Schneider-Vivace
3 1 Gang 2Way Switch 8 Pcs Ref;- Schneider-Vivace
4 2 Gang 2 Way Switch 2 Pcs Ref;- Schneider-Vivace
5 13A 3Pin Multi Socket 28 Pcs Ref;- Schneider-Vivace
6 13A 3Pin Multi Socket (Wearther Proof) 4 Pcs Ref;- Schneider-Vivace
7 5-10A 3Pin Multi Socket 15 Pcs Ref;- Schneider-Vivace
8 Base Cup (3"x3"x1") 62 Nos Ref;- Sogo-A (Exposed Type)
9 Switch Board (14s Switch) 1 Pcs Co Supply Co Supply Ref;- (Exposed Type)
10 Industrial Socket Outlet (5 pin) 3 Pcs Ref;- Schneider
11 Base Frame Work of Industrial SSO 3 Set

7
MYANMAR LOGISTICS CENTER
2. (115 x 30 x 7M) Warehouse Unit -2 Date - ……….………..
Electrical Installation Works (Internal Work Only) (Currency mention with Myanmar Kyats - MMK)
Material Installation(Labour) M+L
No. Particulars Qty Unit Remark
Rate Amount Rate Amount Total Amount
B - Total
C Wire & Cable Laying
1 1.5mm2(PVC/Cu) 4,500 Mtr Co Supply Co Supply
2 2.5mm2(PVC/Cu) 9,800 Mtr Co Supply Co Supply
3 4 mm (PVC/Cu)
2
6,000 Mtr Co Supply Co Supply
4 50 mm2 x1C (PVC/XLPE/Cu) 120 Mtr Co Supply Co Supply
5 70 mm2 x1C (PVC/XLPE/Cu) - Mtr Co Supply Co Supply

C - Total
D DB & Circuit Breaker Fitting
1 MSB Panel (2) Complete Set 1 No Co Supply Co Supply Ref;- (Setting & Termination)
2 WareHouse SDB 1+2 1 No Co Supply Co Supply Ref;- (Setting & Termination)
3 200A ATS Panel 1 No Co Supply Co Supply Ref;- (Setting & Termination)
4 Control Cabe Laying of Gen; & ATS Panel 1 Lot
5 Cable Termination Work 1 Lot Ref;- (Setting & Termination)

D - Total
E Earthing System
1 Building+Panel Earth System (R<2Ω) 1 Lot (include all Panel with bonding)
2 Earth Test Box+Earth Pit 1 No
3 Generator Earth System (R<2Ω) 1 Lot (include ATS Panel with bonding)
4 Earth Test Box+Earth Pit 1 No

8
MYANMAR LOGISTICS CENTER
2. (115 x 30 x 7M) Warehouse Unit -2 Date - ……….………..
Electrical Installation Works (Internal Work Only) (Currency mention with Myanmar Kyats - MMK)
Material Installation(Labour) M+L
No. Particulars Qty Unit Remark
Rate Amount Rate Amount Total Amount
E - Total
F Lightning Protection System 1 Item Co Supply Co Supply Co Supply Co Supply Co Supply Ref;-P3
F - Total

9
MYANMAR LOGISTICS CENTER
2. (115 x 30 x 7M) Warehouse Unit -2 Date - ……….………..
Electrical Installation Works (Internal Work Only) (Currency mention with Myanmar Kyats - MMK)
Material Installation(Labour) M+L
No. Particulars Qty Unit Remark
Rate Amount Rate Amount Total Amount
G Piping Work
1 20Æmm PVC Conduit (Impact) Mtr Ref;- (Exposed Type)
2 25Æmm PVC Conduit (Impact) Mtr Ref;- (Expose Attach with Purling)
3 200x50mm Metal Trunking (with Cover)Gray Mtr Ref;-
4 300x50mm Metal Trunking(with Cover)Gray Mtr Ref;-
5 Metal Trunking Accessories 1 Lots Ref;- (L+Tee+Cross+Reduce)
6 Bracing Making Work (For Metal Trunking) 1 Lots Ref;-(long Thread+Angle Iron)
7 20mm Flexible Pipe Mtr Ref;-
8 Miscellaneous 1 Lot
9 Other Accessories (for Installer Mention) 1 Lot
G - Total
A to G - Total

Warehouse Unit -1 of Material Total Amount

10
MYANMAR LOGISTICS CENTER
2. (115 x 30 x 7M) Warehouse Unit -2 Date - ……….………..
Electrical Installation Works (Internal Work Only) (Currency mention with Myanmar Kyats - MMK)
Material Installation(Labour) M+L
No. Particulars Qty Unit Remark
Rate Amount Rate Amount Total Amount
8 Miscellaneous
a Ø20mm Circular Box (3Way) Tee 1 Pcs
b Ø20mm PVC Inspection Elbow 1 Pcs
c Ø20mm PVC Socket 1 Pcs
d Ø25mm PVC Socket 1 Pcs
e Ø20mm PVC Saddle 1 Pcs
f Ø25mm PVC Saddle 1 Pcs
g 4"x4" Joint Box 1 Pcs
h 1" Black Screw (6#) 1 Pcs
i M-7 Wall Plug 1 Pcs
j Wire Tape (R/Y/B/BL) 1 Pcs
k 20A Connector 1 Pcs
l 2" Steel Screw 1 Pcs
m 1/4" GI Wall Plug 1 Pcs
o Bolt & Nut 1 Pcs
9 Supplementary (fill for Contractor)
a
b
c
d
e
f

11
MYANMAR LOGISTICS CENTER
3. Electrical Work External Cabling Work for Unit 1+Unit 2 Date - ……….………..
Electrical Installation Works (Internal Work Only) (Currency mention with Myanmar Kyats - MMK)
Material Installation(Labour) M+L
No. Particulars Qty Unit Remark
Rate Amount Rate Amount Total Amount
H External Cabling Work
1 300 mm2 x1C (PVC/XLPE/Cu) 80 Mtr Co Supply Co Supply Ref;- (For MSB -1)
2 100mm (or) 4"Æ PVC Conduit (Heavy Guage) 160 Mtr Ref;- (For MSB -1)
3 70 mm2 x1C (PVC/XLPE/Cu) (50+150)M 800 Mtr Co Supply Co Supply Ref;- (For MSB-2 & MSB-3)
4 150mm (or) 6"Æ PVC Conduit (Heavy Guage) 200 Mtr Ref;- (For MSB-2 & MSB-3)
5 Electrical Manhole (With Cover)4'L x 4'Wx 4'D 2 Nos
6 Excavation+ sand filling & back filling work 200 Mtr Ref;- (Including Sand filling work)
7 Panel Earth System (R<2Ω) 1 Lot (include all Panel with bonding)
8 Earth Test Box+Earth Pit 1 No Ref;- (For MSB -1)
9 Miscellaneous 1 Lot
H - Total

Filling

12
PROJECT NAME : KMA- SUZUE WAREHOUSE EXTENSION
WORK TITLE : Development of 2 numbers of Warehouse (2 x 136m x 30m)
MAIN CONTRACTOR : STERLING CONSTRUCTION COM., LTD
Qty/ Tol Material Material Labour Labour Total
Sr Item Description Unit Remarks
bdl Qty (Rate) cost (Rate) cost Amount

1 FIRE ALARM SYSTEM

Conventional Fire Alarm Control Panel 7zone with back up battery 1 2 set at office

Announciator Panel at (guard house) 1 2 set

Fixed Temp , Heat Detector 1CD-70-LS 3 6 set

Beam Smoke Detector (Emitter & receiver) CKLD-KPT 6 12 m

Bell & Call point 9 18 set

PVC conduit 550 1100 m

Fitting (Tee box,cross box, end box,through box, joint box, etc..) 1 2 lot -

Hanger & Support 1 2 lot

FR cable 2C x 1.5sqmm 1100 2200 m

Cable accessories (cable tie, cable link, cable connector, insulation tape ,etc..) 1 2 lot

Other if any (please describe)

External

4'' UPVC pipe 380 m

Cable pull pit 3 nos

FR cable (to office & guard house) m pls describe Qty

Accessories for above 1 2 lot

Other if any(please describe)

Testing & Comissioning Fee

Grand Total

Das könnte Ihnen auch gefallen