Sie sind auf Seite 1von 20

A work for 2 days, then B complete the remaining work in 9

days. If A work for 3 days, then B complete the remaining


work in 6 days. In how many days will A and B do this work
alone?
A takes 6 hours more than (A+B+C) together to complete a
work. B takes 1 hours more than (A+B+C) together to
complete a work. C takes twice as (A+B+C) together to
complete a work. In how many days will A and B together
complete this work?
A and C working together can finish certain piece of work in
12 days. A and B can finish same piece of work in 20 days. If
A work for 24 days and B for 6 days then rest work done by
C in 2 days. Then find in how many days A,B and C can finish
same piece of work, working together?
Shashank started a work and left after 12 days, rest work
done by Nitish in 15 days. Had Shashank left work, 2 days
before, the rest work could have been done by Nitish in 18
days. If Shashank reduces his efficiency by 20% and Nitish
increase his efficiency by 50%. Then in how many day
working together they will finish the work?
A man can build a wall in 10 hours and another man can
build the same wall in 9 hours. If they work together 10
brick less are put together and they make the wall in 5
hours. Find the total number of bricks.
25 men and 15 women can complete a piece of work in 12
days. All of them start working together and after working
for 8 days all the women stopped working. 25 men
completed the remaining work in 6 days. How many days
will it take for completing the entire job if only 15 women
are put on the job?
The amount of work in a factory is increased by 50%, by
what percent is it necessary to increase the number of
workers to complete the niw amount of work in planned
time, if the new worker is 25% more efficient than previous
one.
Three men can do a piece of work in 20 hr. and 28 hrs. while
third person can destroy the whole work in 35 hours. If the
third person leaves the work before 3hrs. Of competition
and second are leaves work 4 hrs before competition then
How many hours since the beginnings did it take to
complete the work.
(A+B) can do a piece of work in 12 days. A works 3.5 days
and B works for 6 days, then one third of the work has been
completed. In how many days will A do this work alone?
12 men can complete a piece of work in 4 days, while 15
women can complete the same work in 4 days. 6 men start
working on the job and after working or 2 days, all of them
stopped working. How many women should be put on the
job to complete the remaining work, if it is to be completed
in 3 days?
A , B and C are assigned a piece of job that they can complete by
working together in 15 days. Their efficiencies (measured in
terms of rate of doing job) are in the ratio of 1:2:3. After one-
third of the job is completed, one of them has to be withdrawn
due to budget constraint. Their wages per day are in the ratio of
3:5:6. The number of days in which the remaining two persons
can finish the job (at optimal cost) is:
A alone would take 27 hrs more to complete a work than A & B
together. B takes 3 hrs more to complete a work alone than A &B
work together. In how many days A alone can do it.
10 men can build a wall in 4hrs but 6 women can do in 5hrs. But
if 5 men and 3 women work together then they use 3 women
work together then they use 20 less bricks per hours and build a
wall in 5 hrs. Find the number of bricks in the wall.
To do a piece of work, 8 children take 7/3 times as long as 7 men
and 5 women together, But 5 women takes 4 times as long as 7
men and 8 children together. If (7m+5w+8c) together complete
the work in 3 days. In how many days one woman complete the
whole work.
A alone would take 27 hrs more to complete a work than A & B
together. B takes 3 hrs more to complete a work alone than A&B
work together. In how many days A alone can do it.
Amar, Akbar and Anthony set out to complete a work, Anthony
being the eldest would take 1 day less than Amar if he were to
complete the work alone. All three together could complete the
work in a day. However, Anthony was kidnapped by Shakal. Amar
and Akbar began the work in his absence. After a day, Amar was
also kidnapped. Akbar took 3 more days to finish the work. How
much portion of the work Anthony could do in a day?
In Bilaspur village, 12 men and 18 boys completed construction
of a primary health center in 60 days, by working for 7.5 hours a
day. Subsequently the residents of the neighboring Harigarh
village also decided to construct a primary health center in their
locality, which would be twice the size of the facility build in
Bilaspur. If a man is able to perform the work equal to the same
done by 2 boys, then how many boys will be require to help 21
men to complete the work in Harigarh in 50 days, working 9
hours a day?
A work was completed by three persons of equal ability, first one
doing M hours for M days, second one doing N hours for N days
(M and N being integers) and third one doing 16 hours for 16
days. The work could have been completed in 29 days by third
person alone with his respective working hours. If all of them do
the work together with their respective working hours, then they
can complete it in about. (approximate)
(a) 12 days (b) 13 days
(c) 14 days (d) 15 days
Three labourers worked together for 30 days. In the course of
work, all of them remained absent for few days. One of them
was absent for 10 days more than the second laboured and the
third laboured did one-third of the total work How may days
more than the third labourer was the first one absent?
Two persons A and B can do a work alone in 29 days A takes the
rest of one day after every 4 days and B takes the rest of one day
after every 5 days if A and B starts working together then the
work will be completed on

Das könnte Ihnen auch gefallen