Sie sind auf Seite 1von 1

1-lr-r"i"1 r-t ii.f j-i j i i-i.

i i i

/Cheaper power on the horizon


CHEAPER electricity may soon be enioyed by con- Stranded debts refer to any unpaid financial obliga-
sumersi. tions of the NPC which have not been liquidated by the
Up for President Rodrigo Duterte's signature is the proceeds from the sales and privatization of NPC assets.
ratified MurangKuryente Act. Thebill provides that P20Sbillionof the proceeds of the
Ahead of the session adjoumment, the House of netrrational govemmentshare from the Malampaya fund
Representatives has ratifie<i the bicarneral conference shallbe utilized for the payment of stranded contract costs
reportreconciling thedisagreeingprovisions of House Bill of and stranded debis of the NPC.
8869and Senate BiIl 1950, both ofwhich seek to reduce TheMalampaya fund shall furtherbe used to cover all
elecficity rates. anticipated shorffalls in the course of payment of such
Under the bill, electricity rates will be reduced by liabilities after applying the P.ower Sector Assets and
allocating.thenational goveminer"rtsharefromtheMalarn- Liabilities Managenieni Corporation {t SALM's) collec-
payaNaturalGasProjectforthepayrnentof the stranded tions from privatization of the NPC's assets, independent
contract.costs and stranded debts of the National Power pewer producers'contracts, and proceeds from opera-
Corporation (NPC). tions of existing assets.
Theproposgd "Murang Kuryente Act" mandates This is provided, however, that thebnnual allocations
provision of reliable, securel and affordable supply of from the Malampaya fund fof the pay'rnent of stranded
electric power to consurners. entacf,cqsts and stranded debts, includinga{ anticipat-
lt defines the Malampaya fund as the existing and ed shortfalls, shall be included in the General Appropria-
fufure government Share from the net production pro- tions Acr
nons consistent wlrntne
Act cons]*sreru withthe nscar
fiscal program oI the govem-
of tne
ceeds--the balance of gross proceeds after deducting the ment. Moreover, anyrerraining and futureproceeds of the
Filipino Participation incentive; if any, and all operating netnational qovemment share from the
netnationalgovemment l\,tfalamoava fund
theNfalampayafund
expenses--of the Malampaya Natural Gas Project. over and abovethe amountindicated inthe measdreshall
Meanwhile, shanded contract costs refer to tlre excess remainintheSpecialAccountinthe generalfundtofinance
of the contracted costof electricityunder eligibleindepen- energy resource developmentand exploitationprograms.
dent porver producer conkacts over the actual selling Finally, theuseof theMalampaya fund shall notimpair
price of the contracted mergy output of such contracts inanyway.theuse or application of theremaining amount
in the market. or futwe proceeds of thenetnational.lester lUlainlastas

ila
t' , i t -"J
t'

Das könnte Ihnen auch gefallen