Sie sind auf Seite 1von 6
ATTACHMENT 1 a6 Procedure for the Seal packing exchan Dr Stem Drive for hydraulic decoking systems ana a FLOWSERVE SS Dismantling the seal casing / bushing A gd ‘Switch the machine OFF before starting repair and / or maintenance work and secure it against being switched ON inadvertently! 1. Prepare the workplace. 2. Provide lifting gear (load capacity min. 250 kg). Warning of a danger zone! ‘There is a danger of injury through rotating parts. STEP AA 3. Secure the tool (1) 1HGKO02505 by the lifting eye (2) to the lifting gear. 4, Loosen and remove the bolts (3) from the packing giand (4). 5. Loosen and remove the bolts (7) from the cylinder liner (6) 6 734 24 FLOWSERVE JAPAN ATTACHMENT 1 Cae Drill Stom Drive for hydraulic decoking systems 26 FLOWSERVE —S STEPA2 6. Secure the tool (1) to the packing gland (3) using the bolts (5). 7. Reise the tool (1) with packing gland (3). 8 Secure the tool (1) to the cylinder liner (8) using the botts (6). FLOWSERVE JAPAN = rit Stem Drive for hydraulic decoking syste ATIBCHMENT tem Drive for hydraulic decoking systems FLOWSERVE 3/6 STEPAS 9. Carefully remove the packing gland (3) and cylinder liner (6) together with the tool (1) from the dril stem drive, NOTE! QE ake care rot to damage te oye eth eye ner (6 who ptng it down, 6 3 a4 \ | a STEP AA 10. Remove the tool (1). 11, Carefully remove the cylinder liner (3) from the packing gland (6). 412, Take care not to damage the running surface of the cylinder liner (6) when doing so. FLOWSERVE JAPAN

Das könnte Ihnen auch gefallen