Sie sind auf Seite 1von 1

BRV30

ON SITE (from TOC)


PILING NO No Piling No. BH (Ref) Start Boring Date Stop Boring Date Casting Date TOC (m) PPL/EGL (m) COL (m) Hit Rock Depth (m) Revised Rock Socket (m) Revised Termination Depth (m) Final Depth (m) Over Bore (m) SLT PDA MLT
1 BRV30/Abut A-D09-01 4DBH-01 4/19/2019 4/20/2019 4/20/2019 38.339 37.586 36.17 18.3 3.3 21.6 21.7 0.1 /
2 BRV30/Abut A-D09-02 4DBH-01 4/15/2018 4/15/2019 4/16/2019 38.174 37.735 36.17 16.7 3.4 20.1 20.6 0.5
3 BRV30/Abut A-D09-03 4DBH-01 4/21/2019 4/22/2019 4/22/2019 38.176 37.511 36.17 16.8 3.4 20.2 20.4 0.2
ABUT A 4 BRV30/Abut A-D09-04 4DBH-01 4/16/2019 4/17/2019 4/17/2019 38.151 37.613 36.17 19.3 3.3 22.6 22.6 0
5 BRV30/Pier 1-D10-01 4DBH-02 3/31/2019 4/5/2019 4/5/2019 38.04 37.489 34.965 14.7 5.2 19.9 20.4 0.5
6 BRV30/Pier 1-D10-02 4DBH-02 4/10/2019 4/11/2019 4/11/2019 37.81 37.474 34.965 13.8 5.1 18.9 18.9 0
7 BRV30/Pier 1-D10-03 4DBH-02 4/5/2019 4/7/2019 4/8/2019 38.002 37.597 34.965 14.8 5 19.8 19.8 0 /
PIER 1 8 BRV30/Pier 1-D10-04 4DBH-02 3/30/2019 3/31/2019 4/1/2019 38.1 37.612 34.965 13.1 5.3 18.4 18.4 0
9 BRV30/Pier 2-D10-01 4DBH-03 4/12/2019 4/13/2019 4/13/2019 37.963 37.351 34.965 10.5 5.4 15.9 15.9 0
10 BRV30/Pier 2-D10-02 4DBH-03 4/8/2019 4/9/2019 4/10/2019 38.054 37.31 34.965 12.8 5 19.8 19.8 0
11 BRV30/Pier 2-D10-03 4DBH-03 4/14/2019 4/15/2019 4/15/2019 37.924 37.472 34.965 12.8 5.4 18.2 18.7 0.5 /
PIER 2 12 BRV30/PIER 2-D10-04 4DBH-03 4/20/2019 4/20/2019 4/22/2019 37.919 37.42 34.964 13.3 5.4 18.7 19.2 0.5 /
13 BRV30/Abut B-D09-01 4DBH-04 4/18/2019 4/18/2109 4/19/2019 37.675 37.817 35.31 13.8 3.3 17.1 17.3 0.2 /
14 BRV30/Abut B-D09-02 4DBH-04 4/22/2019 4/22/2019 4/23/2019 38.159 37.179 35.31 17.9 3.3 21.2 21.7 0.5
15 BRV30/Abut B-D09-03 4DBH-04 4/18/2019 4/19/2019 4/19/2019 37.542 37.376 35.31 22 3.1 25.1 25.5 0.4
ABUT B 16 BRV30/Abut B-D09-04 4DBH-04 4/23/2019 4/24/2019 4/24/2019 37.904 37.42 35.31 20.3 3.1 23.4 23.8 0.4 /