℄ OF PIER/PILE CAP NOTES :-

GENERAL :
REFER GA 1. ALL DIMENSION ARE IN MILLIMETERS & LEVELS ARE METER UNLESS OTHERWISE SPECIFIED.
P.C.T. PIER REINFORCEMENT 2. DIMENSIONS SHALL NOT BE SCALED, ONLY WRITTEN DIMENSIONS SHOULD BE FOLLOWED.
3. THIS DRAWING SHOULD BE IN CONJUNCTION WITH GENERAL ARRANGEMENT DRAWING AND
PILE CAP OTHER RELATED DRAWING.
REFER GA
pc4
G.L.
MATERIALS :

1100

pc5

pc5
pc1

150
REFER GA

450
P.C.B. 4. REINFORCING STEEL SHALL BE HYSD (TMT) BARS FE-500D, CONFIRMING TO IS-1786 INCLUDING
REFER GA pc7 LATEST AMENDMENTS.
P.C.T. 5. GRADE OF CONCRETE SHALL BE AS FOLLOWS:

900
· PILE : M35
150 THK. PCC (M15) 300 · PILE CAP : M35
REFER GA (TYP) · PCC LEVELING COURSE : M15

2400
P.C.B. 6. CLEAR COVER TO ALL REINFORCEMENT BARS INCLUDING STIRRUPS SHALL BE AS FOLLOWS:
p3
p3a ADDITIONAL STIRRUPS
· PILE : 75mm
pc2 · PILE CAP : 75mm
pc3
4500 CONSTRUCTION
PILE REINFORCEMENT
p2 7. LAPPING OF REINFORCEMENT SHOULD BE AS PER PROVISION OF IRC-112.2011. NO LAP IS
ALLOWED IN TIE REINFORCEMENT OF PIER.
8. MORE THAN 50% OF REINFORCEMENT SHOULD NOT BE LAPPED AT ONE SECTION.
9. NUMBER OF BARS SHALL NOT BE COUNTED, BUT NUMBER OF BARS AND SPACING INDICATED
SHALL ADOPTED.
Ø1000 PILE 10. SUITABLE SPACER PINS SHALL BE PROVIDED BETWEEN ROWS OF MAIN BARS TO MAINTAIN
THEIR CORRECT SPACING.
SECTION B-B 11.SUITABLE CHAIRS SHALL BE PROVIDED TO SUPPORT AND MAINTAIN CORRECT POSITION OF
Z Z SCALE 1 : 50 REINFORCEMENT (12 mm DIA AS PER IS-2502).
12.FOR CLOSELY SPACED BARS LAPPING MAY BE AVOIDED BY PROVIDING SUITABLE TYPE OF
p3a MECHANICAL SPLICES. WELDING OF REINFORCEMENT BARS SHALL NOT BE PERMITTED.
℄ OF PIER/PILE CAP 13.BENDING OF REINFORCEMENT SHALL BE AS PER IS-2502.
14.DISTRIBUTION REINFORCEMENT SHALL BE WIRED TO MAIN REINFORCEMENT.
15.PILE SHOULD BE CAST 750mm ABOVE CUT OF LEVEL THIS PORTION IS TO BE CHISELED OUT
p1 BEFORE EXECUTION OF PILE CAP.
16.PILE SHOULD PROJECT 75mm INTO THE PILE CAP.
17.IF ANY AMBIGUITY FOUND IN DRAWINGS OR AT SITE BRING IT TO DESIGNER'S NOTICE BEFORE
PIER REINFORCEMENT EXECUTION.

REFER GA pc1
p3 G.L.
pc4

pc6

pc6
p2 REFER GA SHEDULE OF REINFORCEMENT
pc8
P.C.T.

900
300
Sr.No. Bar Mark Bar Shape Bar Dia Nos. / Spacing REMARKED
REFER GA (TYP) 1 p1 32 0 24 NOS. VERTICAL
P.C.B.

PILE
Y Y 2 p2 10 0 75mm PITCH HELICAL REINF.
pc3
pc2 3 p3 16 0 150 C/C RING
p1 4 p3a 16 0 1000 C/C RING
5 p4 16 0 2 NOS. RING
6 p5 16 0 2 NOS. LINK

7 pc1 16 0 100 C/C TOP


p3
8 pc2 25 0 100 C/C BOTTOM

PILE CAP
9 pc3 25 0 100 C/C BOTTOM
SECTION A-A
10 pc4 16 0 100 C/C TOP
150

SCALE 1 : 50
11 pc5 16 0 150 C/C SIDE FACE
p2
(pc5) B
℄ OF PIER/PILE CAP 12 pc6 16 0 150 C/C SIDE FACE
p1 (pc6) (pc6) 13 pc7 12 0 200 C/C 8 LEGGED
REFER GA 14 pc8 12 0 200 C/C 16 LEGGED
p4
(pc5)

(pc5)
P.B.
X p5 X
℄ OF PIER/PILE CAP

DETAILS OF PILE (pc1)

SCALE 1 : 50 (pc2)

LEGENDS:-
TOP REINFORCEMENT
BOTTOM REINFORCEMENT
(pc6)

(pc6)
TYP. = TYPICAL
PCC = PLAIN CEMENT CONCRETE

Ø1000 Ø1000 Ø1000


A A REFERENCES (LATEST REVISIONS) :
800 800 800 1. : GENERAL ARRANGEMENT DRAWING OF ROB.
LAP LAP LAP
p3a 2. MRIDC/NGP/ROB/LC-70/GA 01,02 : GENERAL ARRANGEMENT DRAWING OF PIER RP7
(pc5)

(pc5)
3. MRIDC/NGP/ROB/LC-70/RCC 04 : REINFORCEMENT DETAILS FOR PIER-RP7
p5
(pc6)
(pc3)
(pc4)

p4 p2 p3 500 THIS DRAWING IS APPLICATION FOR PIER (RP6 & RP7) ONLY
(pc6) (pc5) B

p1 p1 p1 CENTRAL RAILWAY
PILE CAP REINF. PLAN
NAGPUR DIVISION PULGAON - CHANDUR
(PILE & PIER RIENF. NOT SHOWN FOR CLARITY)
SECTION X-X SECTION Y-Y SECTION Z-Z SCALE 1 : 50 MRIDC
SCALE 1 : 30 SCALE 1 : 30 SCALE 1 : 30 DY. CE (C) - 1 CE (C) (SOUTH)

DESIGNATION SIGN.
XEN (C) I XEN (C) I

CHECKED BY
AXEN(C)/DGN DY. CE (C) (DEN)
SDP
TITLE :
CONSTRUCTION OF ROAD OVER BRIDGE ON IN LIEU OF L.C. NO. 70
DESIGNED BY AT KM. 692/6-8(ROAD KM.106/200 ON S.H. 296 PULGAON - CHANDUR
SSK RLY.ROAD) ON NAGPUR - MUMBAI MAIN RLY. LINE

CHECKED BY
MAHARASHTRA RAIL INFRASTRUCTURE DEVELOPMENT CORPORATION LTD. TAUQEER ALAM REINFORCEMENT PILE & PILE CAP DETAILS FOR PIER-RP6 & RP7
A Joint Venture of Govt. of Maharashtra and Ministry of Railway
DRAWN BY SCALE :- AS SHOWN DATE : 18-06-19
A B C D 2nd Floor, Hoechst House, Nariman Point, Mumbai - 400 021 ABHIJIT TANDEL