1.3 Costs for obligations, equipment or labour, although not specified, is required t
complete the Contract in terms of the specification and Statutory Requirement
1.4
Establishment of site camp and stores including site clearance for civil contract
requirements
1.5
Demolish existing Control room, switchgear room, Cable tunnels, toilets, Wor
2.1.1
Control Room
Redundant Building
Garage
Residential House
Brick Wall
demolish
BUNDA-T 132/66
2.1.3
2.1.4
P& G
HEAVY DUTY BREAKER
4 Formwork Required
4.1 Scaffolding for Form Work
4.2 Side Nett for Dust protection
BUNDA-T 132/66
3.1
Dismantle existing gantries and demolish foundations. Gantries to be transport
Reuven Stores.
3.2
Dismantle double circuit lattice Terminal Tower and transported to Reuven Stor
7 WATER SUPPLY
B1-4.9.7.23 page 189 7.1 Supply and install 2000L conservancy tank to Control Building above ground inc
B1-4.9.7.23 page 189 7.2 excavation,backfilling,
Supply and install 250Lpipework and tank
conservancy fittings to sit
under theonroof
a concrete foundation
of the Control co
Building
aHot
motor pump
water that will
dispenser be controlled
capacity 80L by water level controlled switch in the sm
B1-4.9.7.23 page 189 7.3 50mm Diameter PVC pipe
B1-4.9.7.23 page 189 7.4 25mm Diameter PVC pipe
B1-4.9.7.23 page 189 7.5 15mm Diameter PVC pipe
8 ROAD
BUNDA-T 132/66
9 YARD WORKS
B1-4.9.7.17 page 171 9.1 The complete, supply and installation of a security fence, including earthing of
B1-4.9.7.17 page 171 9.2 parts,
5m Widegates etc. 2m High
motorised diamond
electric mesh
gate, with plasticheight
a frame coatedthat
galvanised steel
match the wire an
fence.
9.3 5m Wide gate, with a frame height that match the fence
B1-4.9.7.17 page 171 9.4 1m Wide pedestrian gate with a frame height that matches the fence
B1-4.9.7.14 page 155 9.5 Prepare and comply with an approved weed control and spread over substatio
B1-4.9.7.14 page 156 9.6 Supply and application of 10 to 30mm stone, 200mm deep, to one meter beyo
including levelling and rolling to compact the stone layer.
B1-4.9.7.2 page 137 9.7 Construct a fire equipment brickwork kiosk
B1-3.6.2.13 page 46 9.8 Landscaping - Planting of medium-high growing plants and grass (Subject to ap
Employer)
2 no 22 R 2,375.00
1 no 1 R 1,250.00
1 no 1 R 1,250.00
1 no 22 R 2,090.00
1 no 22 R 3,942.50
1 no 1 R 6,350.00
1 no 1 R 3,000.00
1 no 1 R 6,350.00
1 no 2 R 3,000.00
1 no 22 R 2,346.00
1 no 1 R 137.50
SUM
1 Item 1 $ 26,500.00
nsisting of:
1 Item 1 $ 2,100.00
1 1 $ 12,500.00
Item
2 1 $ 500.00
Item
1 1 $ 500.00
Item
1 1 $ 3,000.00
allow for Purchase of 7.5kVa Generator Item
1 6 $ 500.00
Month
1 Month 6 $ 550.00
1 Item 1 $ 600.00
1 Month 6 $ 1.00
ording to ABB specifications 1 Item 1 $ 100.00
h and 1 x person for night watch) 2 Month 6 $ 500.00
1 Item 1 $ 1.00
1 Item 1 $ 20,000.00
806 m2 R 450.00
101.25 m2 R 350.00
90 m2 R 350.00
220 m2 R 350.00
146 m2 R 200.00
BUNDA-T 132/66/33kV Substation
60 m R 50.00
1894.1252 m2 R 60.00
TOTAL
4.84 m3 2 R 13,000.00
undations
4.84 m3 2 R 15,000.00
er foundations
2 no 11 R 2,375.00
1 no 1 R 1,250.00
1 no 1 R 1,250.00
1 no 11 R 2,090.00
1 no 11 R 3,942.50
1 no 1 R 6,350.00
1 no 1 R 3,000.00
1 no 1 R 6,350.00
1 no 2 R 3,000.00
1 no 11 R 2,346.00
1 no 1 R 137.50
SUM
1 no 11 R 1,000.00
1 no 11 R 200.00
BUNDA-T 132/66/33kV Substation
1 Item $ -
BUNDA-T 132/66/33kV Substation
1 Item $ 3,000.00
1 Item $ 500.00
10.75 m3 9 $ 5.75
0.51 m3 9 $ 231.00
5.04 m2 9 $ 27.00
3.84 m 2
9 $ 25.00
4.84 m 3
9 $ 270.00
7.76 m2 9 $ 10.00
5.60 m 9 $ 4.00
1.96 m2 9 $ 2.00
ths of 150mm to 97% Mod AASHTO 5.80 m3 9 $ 7.50
away) 4.96 m 3
9 $ 4.00
267.00 kg 9 $ 2.55
supply bolts) 1 No 9 $ 20.00
0.10 m3 9 $ 920.00
8 No 9 $ 2.00
4 No 18 $ 2.00
162 m3 $ 5.75
MOD AASHTO 81 m3 $ 35.00
d to 98% MOD AASHTO 72.00 m 3
$ 35.00
adam grade 60/70 penetration 16.8 m 3
$ 875.00
218.40 m3 $ 5.75
MOD AASHTO 109.20 m3 $ 35.00
d to 98% MOD AASHTO 95.55 m3 $ 35.00
adam grade 60/70 penetration 18.20 m 3
$ 875.00
ench.Precast concrete culvet (size 1200 x
0mm thick) 8 No $ 1,000.00
terlocking concrete pavers including 50 mm 227.28 m2 $ 29.00
utting of units where required: Strength: 25
ructed in front of control building doors to be 5 No $ 330.00
303.00 m $ 23.00
3 Item $ 75.00
1 Item $ 75.00
25 m $ 2.00
Rate
e item Unit Qty
Supply Install
Sum 1
e tunnels, toilets, Workshop etc
Sum 1
Sum 1
BUNDA-T 132/66/33kV Substation
Gantries to be transported to
Sum 1
R 104,500.00
R 1,250.00
R 1,250.00
R 45,980.00
R 86,735.00
R 6,350.00
R 3,000.00
R 6,350.00
R 6,000.00
R 51,612.00
R 137.50
R 313,164.50
T
#REF!
#REF!
$ 26,500.00
$ 38,500.00
$ 26,500.00
Total
$ 6,250.00
$ 2,100.00
$ 12,500.00
$ 1,000.00
$ 500.00
$ 3,000.00
$ 3,000.00
$ 3,300.00
$ 600.00
#REF!
$ 100.00
$ 6,000.00
#REF!
$ 20,000.00
R 362,700.00
R 35,437.50
R 31,500.00
R 77,000.00
R 29,200.00
Total
R 3,000.00
R 113,647.51
R 652,485.01
R 62,920.00
R 72,600.00
R 13,200.00
R 52,250.00
R 1,250.00
R 1,250.00
R 22,990.00
R 43,367.50
R 6,350.00
R 3,000.00
R 6,350.00
R 6,000.00
R 25,806.00
R 137.50
R 168,751.00
R 11,000.00
R 2,200.00
Total
$ 15,000.00
$ -
Total
$ 1,050.00
$ 3,000.00
$ 500.00
$ 556.42
$ 1,064.45
$ 1,224.72
$ 864.00
$ 11,751.48
$ 698.40
$ 201.60
$ 35.28
$ 391.23
$ 178.42
$ 6,127.65
$ 180.00
$ 811.44
$ 144.00
$ 144.00
$ 39,930.00
$ 26,967.00
$ 3,775.00
$ 550.00
$ 1,200.00
$ 1,765.00
$ 250.00
$ 120.00
$ 87.50
Total
$ 931.50
$ 2,835.00
$ 2,520.00
$ 14,700.00
$ 1,255.80
$ 3,822.00
$ 3,344.25
$ 15,925.00
$ 8,000.00
$ 6,591.12
$ 1,650.00
$ 6,969.00
$ 225.00
$ 75.00
$ 50.00
$ 9,905.00
$ 1,045.00
$ 500.00
$ 420.00
$ 2,005.20
$ 32,083.20
$ -
$ 731.90
#REF!
#REF!
Price
(R)
Total
1 P& G
1.1 HEAVY DUTY BREAKER 600 day 20 R 12,000.00 R 33,600.00
1.2
2 no 20 R 2,375.00 R 133,000.00
Tipper Truck 12 Cube
1.3 1 no 1 R 1,250.00 R 1,750.00
Establishment Cost
1.4 De-Establishment Cost 1 no 1 R 1,250.00 R 1,750.00
1.5 TLB - 4 x 4 1 no 20 R 2,090.00 R 58,520.00
1.6 Excavator - 30 Ton 1 no 20 R 3,942.50 R 110,390.00
1.7 Transport Lowbed 1 no 1 R 6,350.00 R 8,890.00
1.8 Permit for Abnormal 1 no 1 R 3,000.00 R 4,200.00
2
1 no 2 R 3,000.00 R 8,400.00
Permit for Abnormal 2
2.1 Pecker Attachment 1 no 20 R 2,346.00 R 65,688.00
2.2 1 no 1 R 1,370.50 R 1,918.70
Chisel - ABXD R 436,996.70
2 FORMWORK
2.1 Scaffolding for Form Work
1 no 20 R 28,000.00
R 1,000.00
2.2 Side Nett for Dust protection 1 no 20 R 500.00 R 14,000.00 R 42,000.00
3 LABOUR
R 14,000.00
3.1 Supervisor 1 day 20 500
3.2 Unskilled 5 day 20 80 R 11,200.00 R 25,200.00
3
SITE WORKS - DEMOLISHING
3.1 Demolish existing Control room, switchgear room, Cable tunnels, toilets,
Workshop etc
806 m2 R 500.00
Control Room R 725,400.00
Redundant Building 101 m2 R 350.00
R 70,875.00
Garage 90 m 2
R 350.00 R 63,000.00
Brick Wall 220 m2 R 350.00
Residential House R 154,000.00
demolish 146 m 2
R 200.00 R 58,400.00
3.5 Dismantle Existing Gantries and Demolish Foundations 4.84 m3 2 R 13,000.00 R 125,840.00
3.6 Demolish 4.84 m3 2 R 15,000.00
Demolish double
double circuit
circuit lattice
lattice terminal
terminal tower
tower foundations
foundations and R 145,200.00
3.7 transported to stores 4.84 m3 2 R 20,000.00 R 193,600.00 R 1,094,766.02
GRAND TOTAL R 1,598,962.72
Size............................................................. 1.00 m2
Size.............................................................. 1.00 m2
Size............................................................. 1.00 m2
Size............................................................ 1.00 m2
EQUIPMENT
LABOUR