REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


CAMARINES NORTE DISTRICT ENGINEERING OFFICE
F. PIMENTEL AVE. PASIG, DAET, CAMARINES NORTE REGION V

CADD BY :
PROJECT TITLE / LOCATION : SHEET CONTENT : SUBMITTED BY : RECOMMENDING APPROVAL : APPROVED : SET NO. : SHEET NO. :
SIEGFREY M. PANTE, uap
REPUBLIC OF THE PHILIPPINES ARCHITECT I
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
CONSTRUCTION OF · COVER PAGE PREPARED/ DESIGNED BY :
DONNA JEAN T. LACSON, uap PDS 1
OFFICE OF THE DISTRICT ENGINEER MULTI-PURPOSE BUILDING ARCHITECT/ SPECIAL AGENT I
CP 1
(W/ BLEACHER'S ROOFING) AGNES B. VILLALUZ VICTORIO F. CORPORAL RICARDO R. GUTIERREZ
PASIG, DAET, CAMARINES NORTE REGION V (15.00 x 7.60)
CHECKED BY :
ENGINEER III ASST. DISTRICT ENGINEER 1 1 1
ELMER CEZAR A. ZALETA, uap DISTRICT ENGINEER
BRGY. LIDONG, BASUD, CAMARINES NORTE CHIEF, PLANNING & DESIGN SECTION
ARCHITECT II
ar.zieg

REPUBLIC OF THE PHILIPPINES


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

SUMMARY OF QUANTITIES
TABLE OF CONTENT
ITEM DESCRIPTION UNIT QUANTITIES OFFICE OF THE BUILDING OFFICIAL
A. EARTHWORKS AS-PLAN ARCHITECTURAL
801(1) REMOVAL OF STRUCTURES AND OBSTRUCTION l.s 1.00
1
A 3 PERSPECTIVE
803(1) a STRUCTURE EXCAVATION cu.m 49.89
SITE DEVELOPMENT PLAN
804(1) a EMBANKMENT (FROM STRUCTURE EXCAVATION) cu.m 40.27
1 6
LOCATION PLAN
804(4) GRAVEL FILL FOR COLUMN FOOTING cu.m 4.93

B. CONCRETE WORKS 2
A 3 FLOOR PLAN
900(1)b2 STRUCTURAL CONCRETE (FOOTING) cu.m 8.19 ROOF PLAN
2 6
902(1)a1 REINFORCING STEEL (COLUMN FOOTING) kgs 465.15 TYPICAL SIDE ELEVATION LINE AND GRADE
COLOR SCHEME
900(1)b4 STRUCTURAL CONCRETE (COLUMNS) cu.m 5.82

902(1)a1 REINFORCING STEEL (COLUMNS) kgs 1,212.26


3
900(1)b6 STRUCTURAL CONCRETE (BEAMS AND CB) cu.m 5.41 A 3 FOUNDATION PLAN
3 6 ROOF FRAMING PLAN
902(1)a1 REINFORCING STEEL (BEAMS AND CB) kgs 972.12
SECTION THRU "A" AND "B"
C. FORMS AND FALSEWORKS
903(1) FORMS & FALSEWORKS l.s 1.00
D. ROOF AND ROOF FRAMING PLAN STRUCTURAL
1047(2)b STRUCTURAL STEEL (TRUSSES) kgs 4,332.72
1
1047(2)c STRUCTURAL STEEL (PURLINS) kgs 2,145.42 S 2
GENERAL CONSTRUCTION NOTES LAND USE AND ZONING
1047(3)b METAL STRUCTURE ACCESSORIES (SAGRODS) pcs. 74.00 4 6
1047(4) METAL STRUCTURE ACCESSORIES (CROSS BRACING) kgs 208.56

1047(1)a2 PRE-PAINTED METAL SHEETS sq.m. 310.53 2


S 2 DETAIL OF RC BEAM
E. FINISHING WORKS 5 6 COLUMN FOOTING DETAILS
1021(1)a CEMENT FLOOR FINISH sq.m. 24.64

1027(1) CEMENT PLASTER FINISH sq.m. 246.96


2
F. PAINTING WORKS S 2 TYPICAL TRUSS ANCHORAGE
1032(1)a1 PAINTING WORKS (MASONRY/ CONCRETE) sq.m. 246.96 6 6
STEEL TRUSS DETAILS
ROOF FRAMING PLAN
G. STANDARD ARCHITECTURAL

PERSPECTIVE
PLUMBING WORKS STEEL STRUT DETAILS
1001(9) STORM DRAINAGE & DOWNSPOUT l.s 1.00 MULTI-PURPOSE MODEL SPOT DETAILS
H. SAFETY AND HEALTH PROGRAM (REFER TO DETAILED PLANS)
B.7 OCCUPATIONAL SAFETY AND HEALTH PROGRAM month 2.50
S

E W 1 2 S
7.60
STRUCTURAL
3.80 3.80
25.30
N 3.15 3.08 3.86 3.65 3.25 3.88 4.43
E W
1.90
2.90

SLOPE SLOPE SLOPE

N
1.00

D Malacbang
Mahawan-hawan Awitan Labo
Napilihan Mangcayo Canimog Island

Bagacay Caiangcawan Norte

Fundado VINZONS
B II
BI Del Carmen
SANITARY
B III
5.00

San Jose Apuao


Sta. Cruz
Cabusay
Talobatib
Masalong Bakiad Guinacutan Vinzons Santa Elena
San Nicolas
Quinapaguian
SLOPE SLOPE Pang-pang Bulhao Sto. Nino San Francisco
Kalamunding San Isidro
Gumamela
TALISAY
C
Binanuaan
LABO Awitan
Poblacion Caringo
San RafaelCalintaan
Dalas Pinya Anahaw Malasugui Gahonon
Benit Sto. Domingo Itomang MERCEDES
VI
Caawigan Santa Cruz V VII
Lag-on IV San Roque
Mabilo II Bautista Cabanbanan Cahabaan
III
VIII
Del Rosario
Calabagas AlawihaoDAETII I
EXISTING STRUCTURE Iberica Dogongan
15.00

SAN VICENTE Camambugan


5.00

Manguisoc
Mang-Ogob Bibirao
Kanluran Mambalite
Magang
San Jose Silangan
Mabilo I
Calasgasan
Mambungalon
ELECTRICAL
Gaboc
Catandunganon
Daculang Bolo Mancruz
Fabrica Bactas
MampilI

B
Bayan-Bayan Lugui San Antonio Cayucyucan
Hinampacan
Dagotdotan
Iraya Sur Laniton Matnog Pob. 2
Mocong Tacad
Tulay na Lupa Maisog Pob. 1
Taba-Taba
SLOPE SLOPE Langga Laniton BASUD Angas
Mampurog
Manmuntay
Taisan
5.00

Langga San Jose Pinagwarasan


Mangcamagong
SAN LORENZO RUIZ Mandazo
Pagsangahan
Matacong Binatagan Oliva
Mantugawe
Lidong Matoog-toog
Guinatungan
San Felipe
Hinipaan

A San Isidro
Masalong-Salong MECHANICAL
1.00

Plaridel San Pascual Pambuhan

SITE DEVELOPMENT PLAN LOCATION MAP THIS SITE


SCALE NTS SCALE NTS

CADD BY :
PROJECT TITLE / LOCATION : SHEET CONTENT : SUBMITTED BY : RECOMMENDING APPROVAL : APPROVED : SET NO. : SHEET NO. :
REPUBLIC OF THE PHILIPPINES
Ar. Sieg

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


CONSTRUCTION OF ·
·
PERSPECTIVE
SITE DEVELOPMENT PLAN PREPARED/ DESIGNED BY :
DONNA JEAN T. LACSON, uap PDS 1
OFFICE OF THE DISTRICT ENGINEER MULTI-PURPOSE BUILDING · LOCATION MAP A 3
ARCHITECT/ SPECIAL AGENT I
(W/ BLEACHER'S ROOFING) AGNES B. VILLALUZ VICTORIO F. CORPORAL RICARDO R. GUTIERREZ
PASIG, DAET, CAMARINES NORTE REGION V (15.00 x 7.60)
CHECKED BY :
ENGINEER III ASST. DISTRICT ENGINEER 1 1 6
ELMER CEZAR A. ZALETA, uap DISTRICT ENGINEER
BRGY. LIDONG, BASUD, CAMARINES NORTE CHIEF, PLANNING & DESIGN SECTION
ARCHITECT II
ar.zieg
ar.zieg

0.40mm. THK. HI-RIB 1030 0.40mm. THK STD.


PRE-PAINTED ROOFING PANEL RIDGE ROLL
0.40mm. THK. HI-RIB 1030 0.30mm. THK STD. RIDGE ROLL
5 1 2 3 4 5 6 PRE-PAINTED ROOFING PANEL

0.50 5.50 5.50


23.60
5.00 3.80 3.80
A B
APEX OF ROOF TRUSS APEX OF ROOF TRUSS
2.50

2.50
TOP OF RC-BEAM TOP OF RC-BEAM

RCB-1 RCB-1 RCB-1 RCB-1 RCB-1


1.90
RCB-2 RCB-2 RCB-2
5.00

5.00
3.80

3.80
PLAIN CEMENT PAINTED FINISH
FINISH

FIN. GRADE LINE CONCRETE PAVEMENT FIN. GRADE LINE

FRONT ELEVATION
TYPICAL SIDE ELEVATION 1 2
SCALE 1:100mts
SCALE 1:100mts

7.60
1 2
7.60
3.80 3.80
25.30 3.80 3.80
3.15 3.08 3.86 3.65 3.25 3.88 4.43 25.30
3.15 3.08 3.86 3.65 3.25 3.88 4.43
1.90

1.90
REPAIR/ REHABILITATION OF ROOFING
2.90

2.90
SLOPE SLOPE SLOPE
1.00

1.00
D D
5.00

5.00
SLOPE SLOPE

C C

PROPOSED
15.00

15.00
5.00

5.00
EXISTING STRUCTURE STRUCTURE EXISTING STRUCTURE

B B
SLOPE SLOPE
5.00

5.00
A A

1.00
FLOOR PLAN BRGY. HALL STAGE BRGY. HALL STORAGE ROOF PLAN
SCALE 1:100mts SCALE 1:100mts
TOILET

CADD BY :
PROJECT TITLE / LOCATION : SHEET CONTENT : SUBMITTED BY : RECOMMENDING APPROVAL : APPROVED : SET NO. : SHEET NO. :
REPUBLIC OF THE PHILIPPINES
Ar. Sieg
· FLOOR PLAN
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
CONSTRUCTION OF · ROOF PLAN PREPARED/ DESIGNED BY :
· TYPICAL SIDE ELEVATION DONNA JEAN T. LACSON, uap PDS 2
OFFICE OF THE DISTRICT ENGINEER MULTI-PURPOSE BUILDING · FRONT ELEVATION A 3
ARCHITECT/ SPECIAL AGENT I
(W/ BLEACHER'S ROOFING) AGNES B. VILLALUZ VICTORIO F. CORPORAL RICARDO R. GUTIERREZ
PASIG, DAET, CAMARINES NORTE REGION V (15.00 x 7.60)
CHECKED BY :
ENGINEER III ASST. DISTRICT ENGINEER 1 2 6
ELMER CEZAR A. ZALETA, uap DISTRICT ENGINEER
BRGY. LIDONG, BASUD, CAMARINES NORTE CHIEF, PLANNING & DESIGN SECTION
ARCHITECT II
ar.zieg
ar.zieg

0.40mm. THK. HI-RIB 1030 0.30mm. THK STD. RIDGE ROLL 0.40mm. THK. HI-RIB 1030 0.30mm. THK STD. RIDGE ROLL
PRE-PAINTED ROOFING PANEL PRE-PAINTED ROOFING PANEL

A B A B
APEX OF ROOF TRUSS

APEX OF ROOF TRUSS

2.50
2.50
TOP OF RC-BEAM

TOP OF RC-BEAM

STEEL TRUSS
(SEE DETAIL)
RCB-2 RCB-2 RCB-2

5.00
RCB-2 RCB-2 RCB-2
PAINTED FINISH

5.00
PAINTED FINISH

3.80
FIN. GRADE LINE

FIN. GRADE LINE PROPOSED COVERED COURT

SECTION THRU "B" SECTION THRU "B" 12mm.Ø THREADED SAGROD 2.5mm. THK. x 100 x 50mm. G.I.
SCALE 1:100mts SCALE 1:100mts C-PURLINS SP. @ ± 0.78m. O.C. w/
w/ STD. NUTS & WASHERS
25.30 50mm.x 50mm. ANGULAR CLEATS
3.15 3.08 3.86 3.65 3.25 3.88 4.43

1.90
12mm.Ø THREADED SAGROD
2 3 4 ROOF FRAMING PLAN "BLEACHERS"
w/ STD. NUTS & WASHERS

1 7.60
SCALE 1:100mts
2.5mm. THK. x 150 x 50mm. G.I.
C-PURLINS SP. @ ± 0.78m. O.C. w/
50mm.x 50mm. ANGULAR CLEATS
1.50 3.80 3.80 16mm.Ø PLAIN BAR CROSS
BRACE w/ STD. TURN BUCKLE
2 3
REPAIR/ REHABILITATION OF ROOFING 1 7.60
1.62 3.80 3.80

CB

CB
RCB RCB
C2F2 D
C1F1 C1F1
5.00

RCB-2
5.00

STEEL TRUSS

STEEL TRUSS

STEEL TRUSS
C
C2F2 C2F2 C
PROPOSED
15.00
5.00

EXISTING STRUCTURE STRUCTURE

RCB-2
15.00
5.00
EXISTING STRUCTURE STEEL STRUT STEEL STRUT

B
C2F2 C2F2 B

STEEL TRUSS

STEEL TRUSS

STEEL TRUSS
5.00

RCB-2
5.00
A
C2F2 A RCB RCB

CB

CB
C1F1 C1F1

FOUNDATION PLAN ROOF FRAMING PLAN


SCALE 1:100mts SCALE 1:100mts

CADD BY :
PROJECT TITLE / LOCATION : SHEET CONTENT : SUBMITTED BY : RECOMMENDING APPROVAL : APPROVED : SET NO. : SHEET NO. :
REPUBLIC OF THE PHILIPPINES
Ar. Sieg
· FOUNDATION PLAN
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
CONSTRUCTION OF · ROOF FRAMING PLAN PREPARED/ DESIGNED BY :
· SECTION THRU "A" AND "B" DONNA JEAN T. LACSON, uap PDS 3
OFFICE OF THE DISTRICT ENGINEER MULTI-PURPOSE BUILDING A 3
ARCHITECT/ SPECIAL AGENT I
(W/ BLEACHER'S ROOFING) AGNES B. VILLALUZ VICTORIO F. CORPORAL RICARDO R. GUTIERREZ
PASIG, DAET, CAMARINES NORTE REGION V (15.00 x 7.60)
CHECKED BY :
ENGINEER III ASST. DISTRICT ENGINEER 1 3 6
ELMER CEZAR A. ZALETA, uap DISTRICT ENGINEER
BRGY. LIDONG, BASUD, CAMARINES NORTE CHIEF, PLANNING & DESIGN SECTION
ARCHITECT II
ar.zieg
ar.zieg

GENERAL CONSTRUCTION NOTES


GENERAL NOTES NOTES ON REINFORCEMENT NOTES ON COLUMNS
1. IN THE INTERPRETATION OF THE DRAWING, INDICATED DIMENSIONS SHALL GOVERN 1. UNLESS OTHERWISE NOTED IN PLANS, THE STRENGTH OF REINFORCING BARS SHALL BE: 1. PROVIDE EXTRA SETS OF TIES AT 100mm OC FOR TIED COLUMN REINFORCEMENT ABOVE AND
AND DISTANCES AND SIZES SHALL NOT BE SCALED FOR CONSTRUCTION PURPOSES. BELOW BEAM - COLUMN CONNECTIONS FOR A DISTANCE FROM FACE OF CONNECTION
A. FOOTINGS, FOOTING BEAMS AND GIRDERS -------------- fy = 275 mpa ( 40,000 psi ) NOTE:
B. COLUMNS AND SHEAR WALLS ------------------------------- fy = 275 mpa ( 40,000 psi ) EQUAL TO THE GREATER OF THE OVERALL THICKNESS OF COLUMN, 1 / 6 THE CLEAR HEIGHT
2. IN REFERENCE TO THE DRAWING, SEE ARCHITECTURAL DRAWINGS FOR DEPRESSIONS PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED
OF COLUMN OR 450mm.
IN FLOOR SLABS, OPENINGS IN THE WALLS AND SLABS, INTERIOR PARTITIONS, LOCATION C. BEAMS AND GIRDER -------------------------------------------- fy = 275 mpa ( 40,000 psi ) IMPLEMENTING RULES AND REGULATION OF R.A. 9184, APPROVAL
2. COLUMN TIES SHALL BE PROTECTED EVERYWHERE BY A COVERING OF CONCRETE CAST
OF DRAWING ETC. BY AUTHORIZED DPWH OFFICIALS OF DETAILED ENGINEERING
D. NON-LOAD BEARING WALL PARTITION, BEDDED SLABS, FLOOR & ROOF SLABS, MONOLITHICALLY WITH THE CORE WITH THE MINIMUM THICKNESS OF 40mm AND NOT LESS
THAN 40 TIMES THE MAXIMUM SIZE OF COARSE AGGREGATE IN MILLIMETERS. SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTS NEITHER
3. IN CASE OF DISCREPANCIES AS TO THE LAYOUT, DIMENSIONS, AND ELEVATION BETWEEN PARAPET, CATCH BASIN, SIDE WALK ------------------------- fy = 227.5 mpa ( 33,000 psi )
3. WHERE COLUMNS CHANGE SIZE, VERTICAL REINFORCEMENTS SHALL BE OFFSET AT A SLOPE DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE
THE STRUCTURAL PLANS AND ARCHITECTURAL DRAWINGS, THE CONTRACTOR SHALL NOTIFY 2. ALL REINFORCING BARS SIZE 10mm OR LARGER SHALL BE DEFORMED IN ACCORDANCE WITH TECHNICAL INTEGRITY OF THE SURVEYS AND DESIGN NOR
OF NOT MORE THAN 1 IN 6 AND EXTRA 10mm TIES AT 100mm SHALL BE PROVIDED THRU OUT
BOTH THE STRUCTURAL ENGINEER AND THE ARCHITECT. ASTM A 706. BARS SMALLER THAN 10mm MAY PLAIN. TRANSFER ANY PART OF THAT RESPONSIBILITY TO THE APPROVING
THE OFFSET REGION
3. SPLICES SHALL BE SECURELY WIRED TOGETHER & SHALL LAP OR EXTEND IN ACCORDANCE 4. UNLESS OTHERWISE INDICATED IN THE PLANS , LAP SPLICES FOR VERTICAL COLUMN OFFICIALS.
4. ALL CONCRETE WORK SHALL BE DONE IN ACCORDANCE WITH THE ACI. 318 95 BUILDING WITH TABLE A. & TABLE B ( TABLE OF LAP SPLICE & ANCHORAGE LENGTH ) UNLESS OTHERWISE REINFORCEMENT SHALL BE MADE WITHIN THE CENTER HALF OF COLUMN HEIGHT, AND THE
CODE REQUIREMENTS FOR REINFORCED CONCRETE AND ALL STRUCTURAL STEEL WORK SHOWN ON DRAWINGS, SPLICES SHALL BE STAGGERED WHENEVER POSSIBLE. THE DESIGN CONSULTANT SHALL BE HELD FULLY
SPLICE LENGTH SHALL NOT BE LESS THAN 40 BAR ∅. WELDING OR APPROVED MECHANICAL
ACCORDING WITH AISC SPECIFICATION ( 9th EDITION ) IN SO FAR AS THEY DO NOT CONFLICT DEVICES MAY BE USED PROVIDED THAT NOT MORE THAN ALTERNATE BARS ARE WELDED OR RESPONSIBLE FOR THE FAILURE OF THE FACILITY / IES /
WITH THE LOCAL BUILDING CODE REQUIREMENT. MECHANICALLY SPLICED AT ANY LEVEL AND THE VERTICAL DISTANCES BETWEEN THESE STRUCTURES DUE TO FAULTY DESIGN EXCEPT FOR THE CHANGES
WELDS OR SPLICES OF ADJACENT BAR IS NOT LESS THAN 600mm MADE WITHOUT THE CONFORMITY OF THE CONSULTANTS.
5. ACI REFERS TO AMERICAN CONCRETE INSTITUTE, AISC TO AMERICAN INSTITUTE OF STEEL NOTES ON CONCRETE SLABS
CONSTRUCTION AND ASTM TO AMERICAN SOCIETY FOR TESTING MATERIALS.
1. ALL SLAB REINFORCEMENTS SHALL BE 20mm CLEAR MINIMUM FROM BOTTOM AND FROM
6. CONSTRUCTION NOTES AND TYPICAL DETAILS APPLY TO ALL DRAWINGS UNLESS OTHERWISE H NOTES ON BEAMS AND GIRDERS
TOP OF SLAB.
SHOWN OR NOTED. MODIFY TYPICAL DETAILS AS DIRECTED TO MEET SPECIAL CONDITION. CROSS-TIE

350mm MAX.
2. UNLESS OTHERWISE SHOWN, REINFORCEMENT IN CONTINUOUS SLAB SHALL BE CUT AS 1. UNLESS , OTHERWISE NOTED IN PLANS, CAMBER ALL BEAMS AND GIRDER AT
FOLLOWS. LEAST 6mm∅ FOR EVERY 4.50m OF SPAN, EXCEPT CANTILEVERS FOR WHICH THE
7. SHOP DRAWINGS WITH ERECTION AND PLACING DIAGRAMS OF ALL STRUCTURAL STEEL,
MISCELLANEOUS IRON, PRE-CAST CONCRETE, ETC. SHALL BE SUBMITTED FOR ENGINEERS CAMBER SHALL BE AS NOTED IN PLANS OR AS ORDERED BY THE ENGINEER BUT

10
APPROVAL BEFORE FABRICATION. IN NO CASE LESS THAN 20mm FOR EVERY 3.0m OF FREE SPAN.

H
mi
L1 L2

n.
8. CONTRACTOR SHALL NOTE AND PROVIDE ALL MISCELLANEOUS CURBS, SILLS, STOOLS, 2. TYPICAL BARS BENDING AND CUTTING DETAILS SHALL BE AS SHOWN IN FIG. B - 1
L1/3 L1/3 L2/3
EQUIPMENT'S AND MECHANICAL BASES THAT ARE REQUIRED BY THE ARCHITECTURAL, TOP BAR TOP BAR
ELECTRICAL AND MECHANICAL DRAWINGS.
LAP SPLICES ARE ALLOWED
9. ALL RESULTS OF MATERIAL TESTING FOR CONCRETE, REINFORCING BARS & STRUCTURAL ONLY IN THIS PORTION

CONF. REINF.
L1/6 BOTTOM BAR L1/5 L2/5 BOTTOM BAR JOINT HOOP SPACE @ "2Sh" WHEN THERE ARE
STEEL MUST BE NOTED & APPROVED BY THE STRUCTURAL DESIGNER. BEAMS HAVING WIDTH OF AT LEAST ONE-HALF THE L1 L2 L3

D
COLUMN WIDTH & DEPTHS NOT LESS THAN THREE L2/3 L2/3 L3/3 L3/3
NOTES ON CONCRETE MIXES & PLACING QUARTERS OF THE DEEPEST BEAM THAT FRAME 2D 2D 2D 2D 2D

JOINT REINF.CONF. REINF. PER SCHEDULE CONF. REINF.JOINT REINF.


TYPICAL BAR BENDING AND CUTTING DETAILS FOR SLABS INTO FOUR SIDES OF THE COLUMN. ALL OTHER
LOCATION CONDITIONS USE HOOP @ "Sh" CENTER

1. ALL CONCRETE SHALL DEVELOP A MINIMUM COMPRESSIVE STRENGTH AT THE END OF


TWENTY EIGHT ( 28) DAYS W/ CORRESPONDING MAXIMUM SIZE AGGREGATE & SLUMPS AS L2/5 L2/5 L3/5 L3/6

0.96
FOLLOW. 3. IF SLABS ARE REINFORCED BOTHWAYS BARS ALONG THE SHORTER SPAN SHALL BE PLACED

Sh
D
28 DAYS STRENGTH BELOW THOSE ALONG THE LONG SPAN AT THE CENTER AND OVER THE LONGER SPAN BOTTOM BARS WEB BARS
MAXIMUM SIZE OF MAXIMUM SLUMP 2-12mm∅ SIDE BARS
AGGREGATE FOR REINFORCING BARS NEAR THE SUPPORTS. THE SPACING OF THE BARS AT THE COLUMN TOP BARS
FOR COL. BAR SPLICES SEE TABLE OF MIN. LAP

COLUMN TIES AS
ALL OTHERS, INCLUDING STRIPS SHALL NOT BE MORE THAN ONE AND A HALF ( 1 21 ) SLAB THICKNESS
SUSPENDED SLABS 4000 psi ( 27.6 mpa ) 20mm 100mm SPLICE LENGTH OF COLUMN REINFORCEMENT
4. TEMPERATURE BARS FOR SLAB SHALL BE GENERALLY PLACED NEAR THE FACE IN TENSION (SPACING OF TIES ALONG THIS REGION SHALL NOT
COLUMNS 4000 psi ( 27.6 MPA ) 20mm 100mm AND SHALL NOT BE LESS THAN 0.0025 x GROSS CROSS-SECTIONAL AREA ( Ag ) OF THE SLAB BE LESS THAN 100mm)
BEAMS, SLABS 4000 psi ( 27.6 MPA ) 20mm 100mm ( SEE SCHEDULE BELOW )
TABLE "A" TABLE "B"
TENSION BARS COMPRESSION BARS
SLAB ON FILL 3000 psi ( 27.6 MPA ) 20mm 100mm EMBEDMENT LENGTHS AND LAPPED EMBEDMENT LENGTHS AND LAPPED

Sh
SPLICES IN MILLIMETERS SPLICES IN MILLIMETERS

D
BAR SIZE fc' = 20.7MPa (3000psi) fc' = 20.7MPa (4000psi) BAR SIZE fc' = 20.7MPa (3000psi) fc' = 20.7MPa (4000psi)
2. MAINTAIN MINIMUM CONCRETE COVER FOR REINFORCING STEEL AS FOLLOWS SCHEDULE OF MINIMUM SLAB REINFORCEMENT (DEFORMED) EMBEDMENT LAPPED (DEFORMED) EMBEDMENT LAPPED
EMBEDMENT LAPPED EMBEDMENT LAPPED
SUSPENDED SLABS ------------------------------------------------------------------ 20mm NOTE:
THICKNESS MINIMUM TEMPERATURE BARS 10mmØ 300 300 300 300 10mmØ 225 300 200 300
SLAB ON GRADE ----------------------------------------------------------------------- 40mm ALL CONCRETE REINF. DETAIL SHOULD BE
WALLS ABOVE GRADE --------------------------------------------------------------- 25mm 100mm 10mm∅ @ 250mm EACH WAY DONE IN ACCORDANCE WITH THE LATEST 12mmØ 300 300 300 300 12mmØ 275 300 250 300
BEAM STIRRUPS AND COLUMN TIES ----------------------------------------------- 40mm

CONF. REINF.
125mm 10mm∅ @ 225mm EACH WAY EDITION OF ACI DETAILING MANUAL. 16mmØ 300 400 300 400 16mmØ 350 400 325 400
WHERE CONCRETE IS EXPOSED TO 20mmØ 20mmØ
400 550 350 500 450 500 475 500

D
EARTH BUT POURED AGAINST FORMS -------------------------------------------- 50mm 150mm 10mm∅ @ 185mm EACH WAY
25mmØ 25mmØ
WHERE CONCRETE IS DEPOSITED 600 800 550 750 550 625 550 625
175mm 10mm∅ @ 150mm EACH WAY 28mmØ 28mmØ
750 1000 650 850 625 675 625 675
DIRECTLY AGAINST THE EARTH ----------------------------------------------------- 75mm
3. CONCRETE SHALL BE DEPOSITED IN ITS FINAL POSITION WITHOUT SEGREGATION. 200mm 10mm∅ @ 140mm EACH WAY 32mmØ 950 1300 850 1100 32mmØ 700 775 700 775
RE-HANDLING OR PLACING SHALL BE DONE PREFERABLY WITH BUGGIES, BUCKETS OR TYPICAL COLUMN ELEVATION SHOWING
WHEELBARROWS, NO CHUTES WILL BE ALLOWED EXCEPT TO TRANSFER CONCRETE FROM
HOPPER TO BUGGIES, WHEELBARROWS OR BUCKETS IN WHICH CASE THEY SHALL NOT EXCEED DOWELS AND TIES SPACING 3. IF THE BEAM REINFORCING BARS END IN A WALL THE CLEAR DISTANCE FROM THE BAR TO THE
SIX ( 6 ) METERS IN AGGREGATE LENGTH. FARTHER FACE OF THE WALL NOT BE LESS THAN 25mm. EMBEDMENT LENGTH SHALL BE AS
4. NO DEPOSITING OF CONCRETE SHALL BE ALLOWED WITHOUT THE USE OF VIBRATORS SHOWN IN A TABLE "A" FOR TENSION BARS AND TABLE "B" FOR COMPRESSION BARS UNLESS
LAP SPACE LENGTH: SPECIFIED IN PLAN. TOP BAR SHALL NOT BE SPLICED WITHIN THE COLUMN. AT LEAST TWO
UNLESS AUTHORIZED IN WRITING BY THE DESIGNERS AND ONLY FOR UNUSUAL CONDITIONS
5. UNLESS OTHERWISE NOTED IN THE PLANS ALL BEDDED SLABS SHALL BE REINFORCED WITH AT ANY LEVEL NO MORE THAN ALTERNATE BARS SHOULD BE SPLICED MIN. STIRRUPS SHALL BE PROVIDED AT ALL SPLICES.
WHERE VIBRATIONS IS EXTREMELY DIFFICULT TO ACCOMPLISH.
10mm∅ AT 250mm O.C EACH WAY TO CENTER OF SLAB AND CONSTRUCTION JOINTS FOR SAME DISTANCE BETWEEN TWO ADJACENT BARS SPLICES SHALL BE 600mm.
5. ALL ANCHOR BOLTS, DOWELS, AND OTHER INSERTS, SHALL BE PROPERLY POSITIONED & SHALL NOT BE LESS THAN 3.65 METER APART
SECURED IN PLACE PRIOR TO PLACING OF CONCRETE. 4. IF THERE ARE TWO OR MORE LAYERS OF REINFORCING BARS, USE 25mm ∅ BAR SEPARATORS
SPACED AT 1.0m ON CENTER IN NO CASE SHALL THERE BE LESS THAN TWO
6. ALL CONCRETE SHALL BE KEPT MOIST FOR A MINIMUM OF SEVEN ( 7 ) CONSECUTIVE DAYS 6. PROVIDE EXTRA REINFORCEMENTS FOR CORNER SLAB ( TWO ADJACENT DISCONTINUOUS
( 2 ) SEPARATORS BETWEEN TWO LAYERS OF BARS.
IMMEDIATELY AFTER POURING BY THE USE OF WET BURLAP, FOG SPRAYING, CURING EDGES ) AS SHOWN BELOW.
COMPOUNDS OR OTHER APPROVED METHODS. TYPICAL DETAIL OF COLUMN LAP SPLICE AND
7. CONCRETE SLAB REINFORCEMENTS SHALL BE PROPERLY SUPPORTED WITH 10mm∅ STEEL 5. MINIMUM CONCRETE PROTECTION FOR REINFORCING BARS OR STEEL SHAPES BE AS
7. STRIPPING OF FORMS AND SHORES : CHAIR OR APPROVED EQUIVALENT SPACED AT 1.0 METER ON CENTER BOTHWAYS EXTERIOR GIRDER TO COLUMN CONNECTION SHOWN IN FIG. B - 2 UNLESS SPECIFIED ELSEWHERE.
FOUNDATION -------------------------------------------------------------------------- 24 hrs.
SUSPENDED SLAB EXCEPT WHEN ----------------------------------------------- 8 days A
ADDITIONAL LOADS ARE IMPOSED
WALLS --------------------------------------------------------------------------------- 24 days ∅12 x 1000 LONG @
MID-DEPTH OF SLAB b
BEAMS --------------------------------------------------------------------------------- 24 days DOWN INTO EDGE BEAM. EXTENDED
4-∅ 12@ 1800 LONG TOP BARS BEND @ EACH CORNER LAP SPLICE LENGTH:
COLUMNS ----------------------------------------------------------------------------- 24 days
BARS MINIMUM OF 1200 ( 4'-0" ) INTO BARS. 1-∅12 TOP & AT ANY LEVEL NO MORE THAN

t
8. THE CONTRACTOR SHALL SUBMIT THE SCHEDULE OF POURING AND THE LOCATION OF THE
BOTTOM BARS ALTERNATE BARS SHOULD BE MAIN REINFORCEMENT
CONSTRUCTION JOINTS TO THE STRUCTURAL ENGINEER AT LEAST ( 4 ) DAYS PRIOR TO THE SPLICED. MIN. DISTANCE BET. see note
4-∅12 BOTTOM BARS WEB BARS

t or 1/4D
WITHIN CENTER
POURING FOR APPROVAL.
400

ht
1-∅12 EA. TWO ADJACENT BARS SPLICES see note

HALF OF "H"

t
9. THE CONTRACTOR SHALL FURNISH AND MAINTAIN ADEQUATE FORMS AND SHORING UNTIL TOP & BOTTOM SHALL BE 600mm. SLEEVES FOR UTILITY
THE CONCRETE MEMBERS HAVE ATTAINED THEIR WORKING CONDITION AND STRENGTH PIPES MAX 1/5D

D
0 L/4
0 SLAB
6 38mm TOP BARS @ SUPPORT (CONT.) 0.025m∅ SEPARATOR
OPENING
NOTES ON FOOTINGS CLEAR see note PROVIDE 3-10∅ EXTRA STIRR.
REQ'D. BOTT. BARS @ SUPPORT EACH SIDE OF SLEEVES

JT. REINF.
400

1. FOOTINGS ARE DESIGNED FOR AN ALLOWABLE SOIL BEARING PRESSURE OF 96 kpa


0

1-∅12 EA.
0

( 2000 psf ). CONTRACTOR SHALL REPORT TO THE ENGINEER, IN WRITING, THE ACTUAL TOP & BOTTOM

D
6

SOIL CONDITION UNCOVERED AND CONFIRM ACTUAL BEARING CAPACITY OF SOIL BEFORE
DEPOSITING CONCRETE. INTO TWO WAY SLAB EXTEND SECTION "A" 6. WHEN A BEAM CROSSES A GIRDER, REST BEAM ON TOP OF GIRDER BARS, BEAM
BARS UP TO BEAM SUPPORT REINFORCING BAR SHALL BE SYMMETRICAL ABOUT CENTER LINE WHENEVER POSSIBLE.
2. FOOTINGS SHALL REST AT LEAST 15800mm BELOW NATURAL GRADE LINE UNLESS 6 OMIT TRIMMER BARS WHERE
0
OTHERWISE INDICATED IN PLANS. NO FOOTING SHALL REST ON FILL. 0 OPENING IS FRAMED BY BEAM SPLICE BOTTOM BARS AT 7. GENERALLY NO SPLICES SHALL BE PERMITTED AT POINTS WHERE CRITICAL BENDING
MID SPAN STRESSES OCCUR, SPLICES WHERE NO PERMITTED SHALL BE INDICATED IN THE TABLE "A"
3. MINIMUM CONCRETE PROTECTION FOR REINFORCEMENTS SHALL BE 75mm CLEAR TYPICAL SLAB AND "B" WELDED SPLICES SHALL BE DEVELOP IN TENSION AT LEAST 125% OF THE
TYPICAL CORNER SLAB DETAIL EXTRA TOP BARS
FOR CONCRETE DEPOSITED THE GROUND AND 50mm FOR CONCRETE OPENING DETAIL SPECIFIED YIELD STRENGTH OF THE BAR. NOT MORE THAN 50% OF THE BARS AT ANY ONE
DEPOSITED AGAINST A FORMWORK. @ SUPPORT SECTION IS ALLOWED TO BE SPLICED THEREIN.
CADD BY :
PROJECT TITLE / LOCATION : SHEET CONTENT : SUBMITTED BY : RECOMMENDING APPROVAL : APPROVED : SET NO. : SHEET NO. :
REPUBLIC OF THE PHILIPPINES
Ar. Sieg

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


CONSTRUCTION OF · GENERAL CONSTRUCTION NOTES 1
PREPARED/ DESIGNED BY :
DONNA JEAN T. LACSON, uap PDS 1
OFFICE OF THE DISTRICT ENGINEER MULTI-PURPOSE BUILDING S 3
ARCHITECT/ SPECIAL AGENT I
(W/ BLEACHER'S ROOFING) AGNES B. VILLALUZ VICTORIO F. CORPORAL RICARDO R. GUTIERREZ
PASIG, DAET, CAMARINES NORTE REGION V (15.00 x 7.60)
CHECKED BY :
ENGINEER III ASST. DISTRICT ENGINEER 1 4 6
ELMER CEZAR A. ZALETA, uap DISTRICT ENGINEER
BRGY. LIDONG, BASUD, CAMARINES NORTE CHIEF, PLANNING & DESIGN SECTION
ARCHITECT II
ar.zieg
ar.zieg

1 2 L
L/4 2-16mm. Ø 1-16mm. Ø L/4 7 - 16mm ∅ DOWEL,
7.60
0.25 0.25 TOP BARS EXTRA-CUT BARS 1.00m EXTENDED
S M
1.47 3.80 3.80 1-16mm
RD RD RD RD RD RD 4-16mm 4-16mm

0.35

0.35
CB CB
1.00 2-16mm 2-16mm
D 1-16mm
@ SUPPORT @ MIDSPAN 1-16mm. Ø 2-16mm. Ø
L/5 EXTRA-CUT BARS L/5
SECTIONS BOTTOM BARS
5.00

10mm. Ø STIRRUPS SPACED @ 3-50mm., 3-100mm., 3-150mm., &


REST @ 200mm. ON CENTER BOTHWAYS

SLOPE SLOPE DETAIL OF RC-BEAM (RCB-2)


SCALE 1:20mts

C 10mm. Ø STIRRUPS SPACED @ 3-50mm., 3-100mm.,


3-150mm., & REST @ 200mm. ON CENTER BOTHWAYS
L
L/4 L/4
4-16mm. Ø 1-16mm. Ø
15.00
5.00

TOP BARS EXTRA-CUT BARS


EXISTING STRUCTURE 0.30 0.30 S M
1-16mm
4-16mm 4-16mm

0.40

0.40
CB CB
B 2-16mm 2-16mm
1-16mm
SLOPE SLOPE
@ SUPPORT @ MIDSPAN
SECTIONS 1-16mm. Ø 2-16mm. Ø
L/5 L/5
5.00

EXTRA-CUT BARS BOTTOM BARS

DETAIL OF RC-BEAM (RCB-1) 7 - 16mmØ DOWEL,


SCALE 1:20mts
NOTE : 1.00m EXTENDED

A TIE JOINTS ( WHETHER HOOKS OR WELDS )


SHOULD BE ROTATED TO REDUCE THE RISK
1.00

OF FAILURE DUE TO SPALLING.


RD RD RD RD RD RD
NAT. GRADE LINE

STORM DRAINAGE LAYOUT


SCALE 1:100mts

8 - 16mm Ø VERT. BARS w/ 10mm. Ø LATERAL AND

1.20
8-16mm. Ø VERTICAL BARS w/ INNER LOOP TIES SP. @ 3-50mm., 3-100mm.,

1.65
10mm. Ø LATERAL (FIRST LAYER) 3-150mm., & REST @ 200mm. O.C. BOTHWAYS
& INNER LOOP TIES (SECOND
LAYER) SPACED @ 3-50mm.,
3-100mm., 3-150mm., & REST @
200mm. O.C. BOTHWAYS 5-16mm. Ø BASEBARS SPACED
0.075 @ 0.26m. O.C. BOTHWAYS
11-16mm. Ø BASEBARS SPACED
@ 0.185m. O.C. BOTHWAYS

0.35

0.30
1 2 3

0.075
7.60
1.62 3.80 3.80 0.20m. THK. BOULDER BEDDING
SECTION/ELEVATION 0.20m. THK. BOULDER BEDDING
APEX OF ROOF TRUSS 8-16mm. Ø VERTICAL BARS w/
10mm. Ø LATERAL (FIRST LAYER) SECTION/ELEVATION
& INNER LOOP TIES (SECOND 1.20

0
0.25

.5
LAYER) SPACED @ 3-50mm.,
2.50

STEEL STRUT

0
(SEE DETAIL) 3-100mm., 3-150mm., & REST @
200mm. O.C. BOTHWAYS
TOP OF RC-BEAM

0.30
2.00
RCB-1 RCB-1 RCB-1 RCB-1 RCB-1 8 - 16mm Ø VERT. BARS w/ 10mm. Ø LATERAL AND
INNER LOOP TIES SP. @ 3-50mm., 3-100mm.,
3-150mm., & REST @ 200mm. O.C. BOTHWAYS
11-16mm. Ø BASEBARS SPACED

0.35
@ 0.185m. O.C. BOTHWAYS

1.20
5.00

PLAIN CEMENT

0.075
FINISH 5-16mm. Ø BASEBARS SPACED
3.80

@ 0.26m. O.C. BOTHWAYS

0.075 0.40
FIN. GRADE LINE CONCRETE PAVEMENT 2.00
PLAN ( C1F1 )
PLAN ( C2F2 )

SECTION THRU "A" DETAIL OF COLUMN FOOTING COLUMN FOOTING DETAILS


SCALE 1:100mts SCALE 1:30mts SCALE 1:20mts

CADD BY :
PROJECT TITLE / LOCATION : SHEET CONTENT : SUBMITTED BY : RECOMMENDING APPROVAL : APPROVED : SET NO. : SHEET NO. :
REPUBLIC OF THE PHILIPPINES
Ar. Sieg

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


CONSTRUCTION OF - TYPICAL DETAIL OF RC-BEAM
- COLUMN FOOTING DETAILS PREPARED/ DESIGNED BY :
DONNA JEAN T. LACSON, uap PDS 2
OFFICE OF THE DISTRICT ENGINEER MULTI-PURPOSE BUILDING S 3
ARCHITECT/ SPECIAL AGENT I
(W/ BLEACHER'S ROOFING) AGNES B. VILLALUZ VICTORIO F. CORPORAL RICARDO R. GUTIERREZ
PASIG, DAET, CAMARINES NORTE REGION V (15.00 x 7.60)
CHECKED BY :
ENGINEER III ASST. DISTRICT ENGINEER 1 5 6
ELMER CEZAR A. ZALETA, uap DISTRICT ENGINEER
BRGY. LIDONG, BASUD, CAMARINES NORTE CHIEF, PLANNING & DESIGN SECTION
ARCHITECT II
ar.zieg
ar.zieg

1.00 7.50 7.50 1.00

3@0.25m. = 0.75m. 3@0.50m. = 1.50m. 4@0.87m.=3.50m. 2@0.50m.=1.00m. 3@0.58m.=1.75m.


0.40mm. THK. HI-RIBPRE-PAINTED
ROOFING PANEL
12mm.Ø THREADED SAGROD APEX OF ROOF TRUSS
w/ STD. NUTS & WASHERS

0.30
TEKSCREW 50mm. w/ NEOPRENE

2.5mm. THK. x 150 x 50mm. G.I. C-PURLINS SP. @ ±


0.87m. O.C. w/ 50mm.x 50mm. ANGULAR CLEATS 8.80

2∠ -5.0mm. THK. x 50mm. x 50mm. SEE SPOT DETAIL "A"


ANGLE BAR WEB MEMBER

2.50
2 ∠ -5.0mm. THK. x 65mm. x 65mm.
ANGLE BAR TOP & BOTTOM CHORD DETAIL OF STEEL TRUSS
SCALE 1:30mts
10mm. THK x 300 x 400mm. MS 7.23
BASEPLATE w/ 2-16mmØ BOLT HOLE

0.20
SEE STRUT DIAGRAM
0.40mm. THK 12mm.Ø THREADED SAGROD
STD. G.I GUTTER ON A FIBER END FLASHING LINE

+/-1.08
STD. RIDGE ROLL w/ STD. NUTS & WASHER
CEMENT FASCIA
0.40mm. THK. HIB-RIB 1030 TOP OF RCB
PRE-PAINTED ROOFING PANEL

0.40
RCB RCB
3"Ø DOWNSPOUT

0.30
CB 4-4.0mm. THK. x 65mm. x 65mm. CB
CB ANGLE BAR (FULLY WELD)
FULLY WELD TO

0.10
2-16mmØ, 300mm LONG ANCHOR
2-16mm. Ø RSB DOWEL
BOLTS w/ STD. NUTS. & WASHERS
4-16mm. Ø MAIN RSB w/ 10mm. Ø
LATERAL TIES SP. @ 3-50mm & REST 8-16mm. Ø VERT. BARS w/ 10mm. Ø
@ 100mm. ON CENTER LATERAL AND INNER LOOP TIES
SPACED @ 3-50mm., 3-100mm., 3-150mm., 0.55 0.40 0.55
& REST @ 200mm. O.C. BOTHWAYS 2∠ - 5.0mm. THK. x 65mm. 4∠ - 5.0mm. THK. x 65mm.
x 65mm TOP & BOTTOM CHORD x 65mm. ANGLE BAR KING
POST (FULLY WELD)
SPOT DETAIL "A"
SCALE 1:20mts
2∠ - 50mm. x 50mm. ANGLE NOTE:
4∠ - 65mm. x 65mm. ANGLE NOTE:
BAR TOP & BOTTOM CHORD BAR WEB MEMBER CROSS BRACE & TURN BUCKLE SHOULD ANGULAR CLEATS SHOULD BE WELD
11 EQUAL PARTS = 3.80m 2∠ -5.0mm. THK. x 50mm. x 50mm. BE PLACED ON TOP OF STEEL TRUSS VERTICALLY TO AVOID TWISTING
ANGLE BAR WEB MEMBER
2 ∠ -5.0mm. THK. x 65mm. x 65mm.
0.30

2 ∠ - 5.0mm. THK. x 65mm. ANGLE BAR TOP & BOTTOM CHORD


x 65mm TOP & BOTTOM CHORD 0.40mm. THK. HI-RIBPRE-PAINTED
ROOFING PANEL
16mm.Ø PLAIN BAR CROSS
12mm.Ø THREADED SAGROD 1.90 BRACE w/ STD. TURN BUCKLE
STEEL STRUT DETAILS w/ STD. NUTS & WASHERS
SCALE 1:20mts 2.5mm. THK. x 150 x 50mm. G.I. C-PURLINS SP. @ ± 2.10

RCB
0.87m. O.C. w/ 50mm.x 50mm. ANGULAR CLEATS 2.50mm x 150 x 50mm. G.I L.C
PURLINS SPACED @ ±0.68m. O.C.
w/ 50mm. x 50mm. ANGULAR
FIBER CEMENT FASCIA CLEATS VERTICALLY WELD

0.40

0.30
5.0mm. THK. x 50mm. x 50mm.
1.00 ANGLE BAR WEB MEMBER

1.00 10mm. THK x 300 x 400mm. MS


BASEPLATE w/ 2-16mmØ BOLT HOLE
CB
1.00 10mm. THK x 300 x 400mm MS
STEEL TRUSS 2
1.00

BASEPLATE w/ 2-16mmØ BOLT HOLE


1.00

RCB
(BLEACHER'S ROOFING)
1.00 SCALE 1:30mts

1.00
0.20
0.50
TYP. TRUSS ANCHORAGE DETAILS
1.00

SCALE 1:25mts
2 - 16mmØ, 300mm LONG
ANCHOR BOLTS w/ STD. 2 ∠ - 5.0mm. THK. x
NUTS & WASHERS 65mm. x 65mm TOP &
3mm.THK x 150mm x 50mm. G.I. BOTTOM CHORD
L.C PURLINS w/ STIFFENER
12mm.Ø THREADED SAGROD (STAGGERED)
2 ∠ - 5.0mm. THK. x 65mm. x 65mm w/ STANDARD NUTS & WASHERS
TOP & BOTTOM CHORD ( FULLY WELD ) 0.40mm. THK. HI-RIB 1030
1.00

0.05 3mm. THK. x 150 x PRE-PAINTED ROOFING PANEL 0.10


50mm. G.I. L.C PURLINS

0.40
50mm. x 50mm. ANGULAR RCB RCB
CLEATS VERTICALLY WELD
0.15

CB 2.50mm.THK x 150 x
FULLY WELD TO 2 -
50mm. G.I. PURLINS
CONCRETE COLUMN 16mm.Ø RSB DOWEL
SECTION
TOP VIEW 12mm.Ø THREADED SAGROD
w/ STD. NUTS & WASHER

SPOT DETAILS SPOT DETAILS "C" SPOT DETAIL "B"


BLOW UP DETAILS (SIDINGS) SCALE 1:20mts SCALE 1:15mts
SCALE 1:15mts
SCALE 1:30mts

CADD BY :
PROJECT TITLE / LOCATION : SHEET CONTENT : SUBMITTED BY : RECOMMENDING APPROVAL : APPROVED : SET NO. : SHEET NO. :
REPUBLIC OF THE PHILIPPINES
Ar. Sieg

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


CONSTRUCTION OF -
-
TYPICAL TRUSS ANCHORAGE DETAILS
STEEL TRUSS DETAILS PREPARED/ DESIGNED BY :
- SPOT DETAILS "A","B","C" DONNA JEAN T. LACSON, uap PDS 3
OFFICE OF THE DISTRICT ENGINEER MULTI-PURPOSE BUILDING - STEEL STRUT DETAILS S 3
- INTERMEDIATE TRUSS DIAGRAM ARCHITECT/ SPECIAL AGENT I
(W/ BLEACHER'S ROOFING) AGNES B. VILLALUZ VICTORIO F. CORPORAL RICARDO R. GUTIERREZ
PASIG, DAET, CAMARINES NORTE REGION V (15.00 x 7.60)
CHECKED BY :
ENGINEER III ASST. DISTRICT ENGINEER 1 6 6
ELMER CEZAR A. ZALETA, uap DISTRICT ENGINEER
BRGY. LIDONG, BASUD, CAMARINES NORTE CHIEF, PLANNING & DESIGN SECTION
ARCHITECT II
ar.zieg

Das könnte Ihnen auch gefallen