DEMAND MANAGEMENT
Page 1 of 21
SAP USER MANUAL
CONTENTS
1. ZPLAN .......................................................................................................................................................................................... 3
c) Release DEMAND................................................................................................................................................................... 8
Page 2 of 21
SAP USER MANUAL
1. ZPLAN
General Information: User can upload demand for multiple material , and release demand for MRP at
different level of approval stage by this T-code.
A) UPLOAD DEMAND
Procedure:
T-Code ZPLAN
INMPCO_DEMADN
UPLOAD.xlsx
Page 3 of 21
SAP USER MANUAL
Requirement Plan - (Key which can be given to create and to identify one or more planned independent
Eg IMPCO@02)
Planning Horizon date – Enter Planning horizon from- to date,
System will update demand sequentially from excel sheet to system as per planning
horizon date
Version - Enter Version ( Eg 00 ,ZA,ZB)
File name - Select file from upload file.
4. Execute
Result
Page 4 of 21
SAP USER MANUAL
Page 5 of 21
SAP USER MANUAL
MD79_OUTPUT.xlsx
Page 6 of 21
SAP USER MANUAL
Planning Horizon)
4. Execute
5. Demand will be displayed without any active version ie demand will not considered for planning.
Page 7 of 21
SAP USER MANUAL
Active version is
blank
C) RELEASE DEMAND
PREREQUISTE
In Z-table ZDEM_APPROVAL
(Note : IMPCO will provide USER ID APPROVAL MATRIX DATA, INITALLLY WILL BE MAINTINED BY AIS )
Page 8 of 21
SAP USER MANUAL
Page 9 of 21
SAP USER MANUAL
PROCEDURE
Page 10 of 21
SAP USER MANUAL
4. System will display Requirement Plan number to be release to responsible user ID as per Demand
approval matrix.
5. Select Plan no to be release and execute
6. Mail will be triggered for next level approval.
7. Requirement plan number will be disappeared form demand approval screen of released level stage.
Page 11 of 21
SAP USER MANUAL
(Note: Each approval stage has to login and execute t-code ZPLAN to approve release stage )
Page 12 of 21
SAP USER MANUAL
When CMD/CEO will release last level of requirement plan number system will activate Demand plan against requirement plan
number.
Procedure
Version activated
Result –
System will not execute MRP against material for which Material Requirement Plan is not released.
Page 13 of 21
SAP USER MANUAL
Page 14 of 21
SAP USER MANUAL
6. Execute Tcode MD04 and check plan receipt generated with MRP run
Page 15 of 21
SAP USER MANUAL
Result
No Demand & Planned receipt displayed if MRP executed before demand approval
If MRP executed for Material after last level release of Demand System will consider Demand for Planning
Page 16 of 21
SAP USER MANUAL
Page 17 of 21
SAP USER MANUAL
3. After MRP run Execute Tcode MD04 and check plan receipt generated with MRP run
Result
Page 18 of 21
SAP USER MANUAL
Page 19 of 21
SAP USER MANUAL
1. Procedure
2. Enter Tcode ZSERG
Enter material –
3. Execute
4. Execute
5. Report will display sale in particular period.
Page 20 of 21
SAP USER MANUAL
Page 21 of 21