DOCUMENT ENGINEERING DELIVERI LIST PROYEK PEMASANGAN SPM KAPASITAS 50.

000 DWT BERIKUT JALUR PIPA KE TBBM PENGAPON


(QA/QC)

MARINE
ITP MR QA/QC SMG-SPM2-ITP-70-0001-A4 Inspection & Test Plan for Offshore Pipelaying A4
ITP MR QA/QC SMG-SPM2-ITP-70-0002-A4 Inspection & Test Plan for Shore Pull A4
ITP MR QA/QC SMG-SPM2-ITP-70-0003-A4 Inspection & Test Plan for Field Joint Coating A4
PR MR QA/QC SMG-SPM2-PR-70-0001-A4 Welding Qualification Procedure for Offshore Pipeline and Subsea Spool A4
PR MR QA/QC SMG-SPM2-PR-70-0002-A4 Welder Qualification Procedure for Offshore Pipeline and Subsea Spool A4
PR MR QA/QC SMG-SPM2-PR-70-0003-A4 Welding Consumable Control Procedure A4
PR MR QA/QC SMG-SPM2-PR-70-0004-A4 Material & Welding Repair Protocol for Offshore Pipeline A4
PR MR QA/QC SMG-SPM2-PR-70-0005-A4 Welding Offshore Pipeline Inspection Procedure A4
PR MR QA/QC SMG-SPM2-PR-70-0006-A4 Field Joint Coating Procedure A4
PR MR QA/QC SMG-SPM2-PR-70-0007-A5 NDE Procedure A4
PR MR QA/QC SMG-SPM2-PR-70-0008-A4 Coated Pipes Loading and Unloading Procedure A4
PR MR QA/QC SMG-SPM2-PR-70-0009-A4 Survey & Positioning Procedure A4
PR MR QA/QC SMG-SPM2-PR-70-0010-A4 Pre-Trenching Procedure A4
PR MR QA/QC SMG-SPM2-PR-70-0011-A4 Shore Approach Pipeline Installation Procedure A4
PR MR QA/QC SMG-SPM2-PR-70-0012-A4 Barge Towing Procedure A4
PR MR QA/QC SMG-SPM2-PR-70-0013-A4 Anchor Handling and Mooring Procedure A4
PR MR QA/QC SMG-SPM2-PR-70-0014-A4 Diving Procedure A4
PR MR QA/QC SMG-SPM2-PR-70-0015-A4 Offshore Pipeline Installation Procedure A4
PR MR QA/QC SMG-SPM2-PR-70-0016-A4 Subsea Spool Installation Procedure A4
PR MR QA/QC SMG-SPM2-PR-70-0017-A4 Pipeline As-Laid Survey Procedure A4
PR MR QA/QC SMG-SPM2-PR-70-0018-A4 Post Trenching Procedure A4
PR MR QA/QC SMG-SPM2-PR-70-0019-A4 Subsea Pipeline Precommissioning Procedure A4
PR MR QA/QC SMG-SPM2-PR-70-0020-A4 PLEM Installation Procedure A4
PR MR QA/QC SMG-SPM2-PR-70-0021-A4 SPM Installation Procedure A4
PR MR QA/QC SMG-SPM2-PR-70-0022-A4 SPM System Leak Test Procedure A4
PR MR QA/QC SMG-SPM2-PR-70-0023-A4 Pipeline As-Built Survey Procedure A4
LST MR QA/QC SMG-SPM2-LST-70-0001-A4 NDE Personnel Qualification & Equipment List A4
DOCUMENT ENGINEERING DELIVERI LIST PROYEK PEMASANGAN SPM KAPASITAS 50.000 DWT BERIKUT JALUR PIPA KE TBBM PENGAPON
(QA/QC)

QA-QC
PR QA/QC QA/QC SMG-SPM2-PR-70-0024-A4 Project Quality Plan A4
PR QA/QC QA/QC SMG-SPM2-PR-70-0025-A4 General Requirements for QA/QC A4
PR QA/QC QA/QC SMG-SPM2-PR-70-0026-A4 Shop Inspection Procedure A4
PR QA/QC QA/QC SMG-SPM2-PR-70-0027-A4 Site Quality Control Procedure A4
PR QA/QC QA/QC SMG-SPM2-PR-70-0028-A4 Welder/Welding Operator Control Procedure A4
ITP QA/QC QA/QC SMG-SPM2-ITP-70-0006-A4 Shop Inspection and Test Plan A4
ITP QA/QC QA/QC SMG-SPM2-ITP-70-0007-A4 Site Inspection and Test Plan A4
PR QA/QC QA/QC SMG-SPM2-PR-70-0029-A4 QC Requirements for Vendor & Subcontractor A4
PR QA/QC QA/QC SMG-SPM2-PR-70-0030-A4 Ditjen MIGAS Requirements for WPS, PQR & WPQT A4
PR QA/QC QA/QC SMG-SPM2-PR-70-0031-A4 Ditjen MIGAS Requirements for Persetujuan Penggunaan (PP) A4
PR QA/QC QA/QC SMG-SPM2-PR-70-0032-A4 Ditjen MIGAS Requirements for Persetujuan Layak Operasi (PLO) A4
PR QA/QC QA/QC SMG-SPM2-PR-70-0033-A4 Control of Punch List Procedure A4
PR QA/QC QA/QC SMG-SPM2-PR-70-0034-A4 Calibration Inspection Test Procedure A4
PR QA/QC QA/QC SMG-SPM2-PR-70-0035-A4 General Requirements for NDE A4
PR QA/QC QA/QC SMG-SPM2-PR-70-0036-A4 FAT and SAT Procedure A4
PR QA/QC QA/QC SMG-SPM2-PR-70-0037-A4 Procedure for MDR Equipment A4
PR QA/QC QA/QC SMG-SPM2-PR-70-0038-A4 Procedure for MDR Bulk Materials A4
PR QA/QC QA/QC SMG-SPM2-PR-70-0039-A4 System of Cleaning, Gauging, Pressure Testing, and Disposal A4
PR QA/QC QA/QC SMG-SPM2-PR-70-0040-A4 Welding Material/Consumable Control Procedure for Onshore A4
PR QA/QC QA/QC SMG-SPM2-PR-70-0041-A4 Non-Conformance Procedure A4