Client : MEGA
Subject: DESIGN OF RCC PIER ARM AT PD LEVEL
Doc. No: MEGA-STAA-STN-EW-R2-GJU-STR-GFC-DN-201 Prepared : HR
Project Code : 1961
Station: GUJARAT UNIVERSITY STATION. Checked : VVR
Date : 21-06-2019 Rev : 0
CONTENTS
1 Introduction
2 Design of beam no. CRB10, CRB 11, CRB 12
3 Design of beam no. CRB1/CRB19, CRB2/CRB20, CRB3,CRB21
4 Design of beam no. CTP1
5 Design of beam no.CTP2
6 Design of beam no. CTP3
7 Design of beam no. CTP4
8
CONTENTS
1 Typical Cross section of station box
2 Extract of Via duct DBR or equivalent UDL for track loads (LL)
0
Project: #N/A
Client: #N/A
Subject: #N/A
Doc. No. #N/A Prepared: #N/A
Project Code : #N/A
Station. #N/A Checked: #N/A
Pier Arm no. EPDB – 13.5 m Date: #N/A Rev: #N/A
1.Section Properties Y
Breadth of the beam B B = 0.600 m
Depth of the beam • • • • D = 1.400 m
Clear cover = 0.040 m
Eff cover (For Bottom r/f) D = 0.100 m
Eff cover (For Top r/f) = 0.132 m
Eff depth (For Bottom r/f) • • • • = 1.300 m
Eff depth (For Top r/f) • • • • X
= 1.268 m
Length of the beam (schematic configuration) = 13.500 m
2.Material Properties
Characteristic strength of concrete, fck = 40 N/mm2
Characteristic strength of steel, fy for main reinforcement = 500 N/mm2
Characteristic strength of steel, fy for shear reinforcement = 415 N/mm2
3.Forces
Shear force due to design loads = 775 kN STAAD
Max Moment on the beam ( Bottom moment ) = 1160 KN-m STAAD
Max Moment on the beam ( Top moment ) = 5000 KN-m STAAD
Torsion moment considered if any ( For shear force) = 714 KN-m STAAD
Torsion moment considered if any ( For bottom moment) = 714 KN-m STAAD
Torsion moment considered if any ( For top moment) = 714 KN-m STAAD
Equivalent Shear due to Torsion Vt =1.6*(Tu)/b = 1904.000 KN
Longitudinal moment due to Torsion (Bottom moment) Mt = Tu*(1+D/b)/1.7 = 1400.000 KN-m
Longitudinal moment due to Torsion (Top moment) Mt = Tu*(1+D/b)/1.7 = 1400.000 KN-m
Max Shear force considered Ve = Vu +Vt = 2679.000 KN
Max Moment on the beam ( Bottom moment ) Met = Mu+Mt = 2920.000 KN-m
Max Moment on the beam ( Top moment ) Met = Mu+Mt = 6400.000 KN-m
The Moment due Construction Loads on Beam Bottom is Higher, This has been Considered for Design
The Top moment due to EQ Loads are higher than the moments due Construcion Loads
4.Design
For Bottom Moment
Moment/bd2 = 2.880 N/mm2 Singly
Design for Tension reinforcement
% area of steel,pt = 0.728 %
area of steel required=Ast = 5681 mm2
Min. Reinforcement (0.85*bd/fy) = 1326 mm2
Cl.26.5.1.1, IS456
Provide
(1st layer) 32 dia 6 Nos. S = 102.0 mm
Ast provided (2nd layer) 25 dia 2 Nos. = 5807 mm2
% of steel provided (3rd layer) dia Nos. = 0.745 % O.K
Moment of resistance of the section Mr = 0.87fy *Ast * d * (1 - (pt*fy) / (fck*100)) = 2978 KN-m O.K
Design for compression reinforcement
Singly section capacity = 5394.480 kNm
Additional moment = 0.000 kNm
Cover for compression steel = 0.040 m
Lever arm = 1.268 m
Ast required = 0.000 mm2
Total steel in tension zone = 5681.141 mm2
Provide 32 dia 6 Nos. = 804.248 mm2
Project: #N/A
Client: #N/A
Subject: #N/A
Doc. No. #N/A Prepared: #N/A
Project Code : #N/A
Station. #N/A Checked: #N/A
Pier Arm no. EPDB – 13.5 m Date: #N/A Rev: #N/A
25 2
Ast provided = 5807.049 mm2
Total steel in compression zone = 0.000 mm2 O.K
Provide 20 dia 6 Nos. = 314.159 mm2
Ast provided = 1884.956 mm2 O.K
Provide
(1st layer) 32 dia 6 Nos. S = 102.0 mm
(2nd layer) 32 dia 6 Nos.
Ast provided (3rd layer) 32 dia 3 Nos. = 12064 mm2
% of steel provided = 1.586 % O.K
Moment of resistance of the section Mr = 0.87fy *Ast * d * (1 - (pt*fy) / (fck*100)) = 5335 KN-m
0.600 m
° ° ° ° ° °
° ° ° ° ° °
#N/A
1.400
#N/A
° ° ° ° ° °
Fig 4 = 282 kN
IS:13920
Fig 4 = 1389 kN
IS:13920
Spacing of Hoops:
For a distance of 2d from the joint, spacing shall not be more than
Cl. 6.3.5 IS:13920
a) d/4 = 325.00 mm
b) 8 times the dia. of longitudinal bar = 200.00 mm
c) But need not be less than 100mm.
Hence Provide 10 dia @ 175 mm spacing up to 2d OKAY
=
Vuc=Tcbd = 614.07 KN
Tc max = 4.000 N/mm2
Vuc max = 3043.20 KN
The strength of shear reinforcement Vus=Vu-Vuc = 160.93 KN
Area of stirrup 6 Legged 10 Tor = 471.24 mm2
Spacing of stirrups Sv=(d*0.87*fy*Asv)/Vus = 1340.54 mm
Provide 10 dia stirrups @ 300 mm c/c spacing OKAY
Check for deflection
Steel stress of service fs=0.58*fy*Ast req/Ast provided = 283.70 N/mm2
As per Annex F
IS:456 acr pt x fs e1 e2 em WCR
mm % mm N/mm2 mm
66.32 0.74 357.39 126.43 0.0007 0.0002 0.001 0.095 <0.2 O.K
b)Top Reinforcement
Maximum moment at top M = 1080 Kn-m STAAD
Modular ratio m = Es/Ec = 7.00
Bar dia = 32.00 mm
Spacing or reinforcement S = 92.80 mm
Area of steel provided Ast pro = 13849.21 mm2
Percentage of steel provided pt = 1.82 %
Cracked Moment of Inertia Icr = 8.22E+10 mm4
Service stress in tension reinforcement fs = m x M x(d-x)/Icr = 6.96E+01 N/mm2
As per Annex F
IS:456 acr pt x fs e1 e2 em WCR
mm % mm N/mm2 mm
66.32 1.82 511.20 69.57 0.0004 0.0001 0.000 0.063 <0.2 O.K
As per clause
41.4.3, IS 456 – Spacing of stirrup Provided = 150 mm
2000
Equivalent Shear stress due to Torsion Tve = 1.78 N/mm2
Area of stirrups required
Asv = Tu*sv + Vu*sv = 608 mm2
b1*d1*(0.87*fy) 2.5*d1*(0.87*fy)
FINISH