INPUT RATES OF LUMPSUM ITEMS FOR THE 3rd QUARTER OF 2011 (July to Sep)

Chakwal
N/Sahib

G/Wala
R/Pindi

Jhelum
Lahore

Sialkot

Gujrat
S/Pura

Attock
Okara

H/Bad
Kasur
S. No. MATERIAL Unit

LS-01 Kitchen Expenses (tea, meat, milt fuel fat & appliances) Ch. 3 Item 16 (i) 300 300 300 300 300 300 300 300 300 300 300 300 300
LS-02 Lantern, Patromax lamp depreciation and K. oil consumption Ch. 3 Item 16 (i) 40 40 40 40 40 40 40 40 40 40 40 40 40
LS-03 Medical Charges 20 20 20 20 20 20 20 20 20 20 20 20 20
LS-04 Kitchen Utensil, cost of repair and replacement etc. Ch. 3 Item 16 (i) 20 20 20 20 20 20 20 20 20 20 20 20 20
LS-05 Construction of Temporary Island (Ch. 6 Item 7 (i) 12000 12000 12000 12000 12000 12000 12000 12000 12000 12000 12000 12000 12000
LS-06 Carriage of material to site of work (Boring Material) (Ch. 6 Item 7 (i) 500 500 500 500 500 500 500 500 500 500 500 500 500
LS-07 Hire charges of plant (Ch. 6 Item 8 (a) & (b) 800 800 800 800 800 800 800 800 800 800 800 800 800
LS-08 Hire charges of assembling bunch cable wire cutter stressing, jack Hydraulic
pump, conce, fixer grout injecting pump relievable observation and supply of 500 500 500 500 500 500 500 500 500 500 500 500 500
recorded data of stresses. (Ch. 6 Item 20)
LS-09 Repair of plate for the down struts spacers (Ch. 6 Item 21) 400 400 400 400 400 400 400 400 400 400 400 400 400
LS-10 Hire charges of wire cutter stressing, Jack, Hydraulic pump relievable cone,
200 200 200 200 200 200 200 200 200 200 200 200 200
observation and supply of recorded data of stress. (Ch. 6 Item 21)
LS-11 Fixture (Ch. 9 Item 18) 4 4 4 4 4 4 4 4 4 4 4 4 4
LS-12 Hire Charges of Spray Machine (Ch. 11 Item 6 i, ii & iii) 9 9 9 9 9 9 9 9 9 9 9 9 9
LS-13 Nail & Screws bolt and brackets (Ch. 12 Item 24 (a) 24 24 24 24 24 24 24 24 24 24 24 24 24
LS-14 Accessories for fixing of Eave Board (Ch. 12 Item 28 (b) 24 24 24 24 24 24 24 24 24 24 24 24 24
LS-15 Cost of Putty and Nails (Ch. 12 Item 44 a) 12 12 12 12 12 12 12 12 12 12 12 12 12
LS-16 Electricity Charges (Ch. 12 Item 51) 16 16 16 16 16 16 16 16 16 16 16 16 16
LS-17 Hold Fast (Ch. 12 Item. 57 b) 40 40 40 40 40 40 40 40 40 40 40 40 40
LS-18 Burner Charges, Kerosene Oil & Scraper (Ch. 13 Item 16) 12 12 12 12 12 12 12 12 12 12 12 12 12
LS-19 Misc. i.e. small T&P, working of Crane & Tar Boiler (Ch. 18 Item 10) 200 200 200 200 200 200 200 200 200 200 200 200 200
LS-20 Excavation and fixing (Ch. 18 Item 18 (iv) a) 2 2 2 2 2 2 2 2 2 2 2 2 2
LS-21 Jointing Plate with T Iron (Ch. 18 Item 18 (iv) a) 2 2 2 2 2 2 2 2 2 2 2 2 2
LS-22 Painting and lettering (Ch. 18 Item 18 (iv) a) 22 22 22 22 22 22 22 22 22 22 22 22 22
LS-23 Fixing manhole frame & cover including carriage to site (Ch. 21 Item. 15) 40 40 40 40 40 40 40 40 40 40 40 40 40
LS-24 Rental Charges of T&P (Ch. 21 Item. 19 a i) 80 80 80 80 80 80 80 80 80 80 80 80 80
LS-25 Carriage from store to site of work for reverse rotary drilling reg complete set
3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000
and generator set etc. (Ch. 23 Item 5 (a) i)
LS-26 Mix. Expenditure (Ch. 23 Item 5 (a) i) 600 600 600 600 600 600 600 600 600 600 600 600 600
LS-27 Taking and preserving box 2 lbs sample of strata. (Ch. 23 Item 7) 47.2 47.2 47.2 47.2 47.2 47.2 47.2 47.2 47.2 47.2 47.2 47.2 47.2
LS-28 23 Item 7) 40 40 40 40 40 40 40 40 40 40 40 40 40
LS-29 Sealing the water sample and providing necessary packing etc.(Ch. 23 Item 7) 20 20 20 20 20 20 20 20 20 20 20 20 20
LS-30 Handling charges (Ch. 23 Item 7) 30 30 30 30 30 30 30 30 30 30 30 30 30
LS-31 C. Oil (Ch. 23 item 17 i & ii) 20 20 20 20 20 20 20 20 20 20 20 20 20
LS-32 Providing and fixing temporary wooden tapered plug of hard wood to each end
0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6
of pipe line for 3" (Ch. 23 Table 19 C)
LS-33 Providing and fixing temporary wooden tapered plug of hard wood to each end
0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8
of pipe line for 4" (Ch. 23 Table 19 C)
LS-34 Providing and fixing temporary wooden tapered plug of hard wood to each end
0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84
of pipe line for 5" (Ch. 23 Table 19 C)

Page 1 of 4
INPUT RATES OF LUMPSUM ITEMS FOR THE 3rd QUARTER OF 2011 (July to Sep)

D.G.Khan

R.Y.Khan
Khushab

Lodhran
Bhakkar

P/Pattan
S/Godha
M.B.Din

B/Nagar
M/Garh

Sahiwal
T.Tsing

Layyah
M/Wali
Chiniot

Chiniot

Multan

K/Wal
N/Wal

Vehari
Jhung

R/Pur
F/Bad

B/Pur
S. No.
300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 LS-01
40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 LS-02
20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 LS-03
20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 LS-04
12000 12000 12000 12000 12000 12000 12000 12000 12000 12000 12000 12000 12000 12000 12000 12000 12000 12000 12000 12000 12000 12000 12000 12000 LS-05
500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 LS-06
800 800 800 800 800 800 800 800 800 800 800 800 800 800 800 800 800 800 800 800 800 800 800 800 LS-07

500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500 500
LS-08
400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 400 LS-09
200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200
LS-10
4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 LS-11
9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 LS-12
24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 LS-13
24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 LS-14
12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 LS-15
16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 LS-16
40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 LS-17
12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 LS-18
200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 LS-19
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 LS-20
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 LS-21
22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 LS-22
40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 LS-23
80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 LS-24
3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000
LS-25
600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 LS-26
47.2 47.2 47.2 47.2 47.2 47.2 47.2 47.2 47.2 47.2 47.2 47.2 47.2 47.2 47.2 47.2 47.2 47.2 47.2 47.2 47.2 47.2 47.2 47.2 LS-27
40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 LS-28
20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 LS-29
30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 LS-30
20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 LS-31
0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6
LS-32
0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8
LS-33
0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84
LS-34

Page 2 of 4
INPUT RATES OF LUMPSUM ITEMS FOR THE 3rd QUARTER OF 2011 (July to Sep)

Chakwal
N/Sahib

G/Wala
R/Pindi

Jhelum
Lahore

Sialkot

Gujrat
S/Pura

Attock
Okara

H/Bad
Kasur
S. No. MATERIAL Unit

LS-35 Providing and fixing temporary wooden tapered plug of hard wood to each end
0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88
of pipe line for 6" (Ch. 23 Table 19 C)
LS-36 Providing and fixing temporary wooden tapered plug of hard wood to each end
1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4
of pipe line for 8" (Ch. 23 Table 19 C)
LS-37 Providing and fixing temporary wooden tapered plug of hard wood to each end
1.6 1.6 1.6 1.6 1.6 1.6 1.6 1.6 1.6 1.6 1.6 1.6 1.6
of pipe line for 10" (Ch. 23 Table 19 C)
LS-38 Providing and fixing temporary wooden tapered plug of hard wood to each end
2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4
of pipe line for 12" (Ch. 23 Table 19 C)
LS-39 Providing and fixing temporary wooden tapered plug of hard wood to each end
3.2 3.2 3.2 3.2 3.2 3.2 3.2 3.2 3.2 3.2 3.2 3.2 3.2
of pipe line for 15" (Ch. 23 Table 19 C)
LS-40 Providing and fixing temporary wooden tapered plug of hard wood to each end
4 4 4 4 4 4 4 4 4 4 4 4 4
of pipe line for 18" (Ch. 23 Table 19 C)
LS-41 Soldering etc. (Ch. 24 Item 5 i) 8 8 8 8 8 8 8 8 8 8 8 8 8
LS-42 Locking arrangement (Ch. 24 Item 44 i) 60 60 60 60 60 60 60 60 60 60 60 60 60
LS-43 Extra labour for shuttering (Ch. 24 Item 44 i) 10 10 10 10 10 10 10 10 10 10 10 10 10
LS-44 Testing Fee (Ch. 24 Item 75 a & b) 120 120 120 120 120 120 120 120 120 120 120 120 120
LS-45 Leatheride Paper (Ch. 24 Item 76 i) 10 10 10 10 10 10 10 10 10 10 10 10 10
LS-46 Carriage from store to site (Ch. 24 Item 42 a) 80 80 80 80 80 80 80 80 80 80 80 80 80
LS-47 Carriage to site of work (Ch. 25 Item 41 a) 25 25 25 25 25 25 25 25 25 25 25 25 25
LS-48 Carriage to site of work (Ch. 25 Item 41 b) 20 20 20 20 20 20 20 20 20 20 20 20 20
LS-49 Electric charges with electrode (Ch. 24 Item 42 a) 120 120 120 120 120 120 120 120 120 120 120 120 120
LS-50 Sewing charges (Labour) (Ch. 26 Item 4) 6 6 6 6 6 6 6 6 6 6 6 6 6
LS-51 Cost of Polish & Nails (Ch. 26 Item 20) 6 6 6 6 6 6 6 6 6 6 6 6 6
LS-52 Rope, rags, etc. (Ch. 26 Item 22) 12 12 12 12 12 12 12 12 12 12 12 12 12
LS-53 Filling cement bags with coal (Ch. 26 Item 27) 12 12 12 12 12 12 12 12 12 12 12 12 12
LS-54 Cotton Waste, Grease & Packing etc. (Ch. 26 Item 35 b) 8 8 8 8 8 8 8 8 8 8 8 8 8
LS-55 Accessories, repair and replacement portion (Ch. 26 Item 35 b) 8 8 8 8 8 8 8 8 8 8 8 8 8
LS-56 Spraying Machine (Ch. 26 Item 42) 55 55 55 55 55 55 55 55 55 55 55 55 55

Page 3 of 4
INPUT RATES OF LUMPSUM ITEMS FOR THE 3rd QUARTER OF 2011 (July to Sep)

D.G.Khan

R.Y.Khan
Khushab

Lodhran
Bhakkar

P/Pattan
S/Godha
M.B.Din

B/Nagar
M/Garh

Sahiwal
T.Tsing

Layyah
M/Wali
Chiniot

Chiniot

Multan

K/Wal
N/Wal

Vehari
Jhung

R/Pur
F/Bad

B/Pur
S. No.
0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88
LS-35
1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4
LS-36
1.6 1.6 1.6 1.6 1.6 1.6 1.6 1.6 1.6 1.6 1.6 1.6 1.6 1.6 1.6 1.6 1.6 1.6 1.6 1.6 1.6 1.6 1.6 1.6
LS-37
2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4
LS-38
3.2 3.2 3.2 3.2 3.2 3.2 3.2 3.2 3.2 3.2 3.2 3.2 3.2 3.2 3.2 3.2 3.2 3.2 3.2 3.2 3.2 3.2 3.2 3.2
LS-39
4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
LS-40
8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 LS-41
60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 LS-42
10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 LS-43
120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 LS-44
10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 LS-45
80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 LS-46
25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 LS-47
20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 LS-48
120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 LS-49
6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 LS-50
6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 LS-51
12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 LS-52
12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 LS-53
8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 LS-54
8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 LS-55
55 55 55 55 55 55 55 55 55 55 55 55 55 55 55 55 55 55 55 55 55 55 55 55 LS-56

Page 4 of 4