Setup
Open project “IEC_WrkShopEx_1” (system from “Creating One-Line Diagram” exercise).
Procedure
1. Create Configurations: The configurations can be created from the configuration manager.
2. Create, Merge Revisions: The revisions can be created from the data manager.
a. Revision Merge - I
Create Revision4
Merge Revision 1 and Revision 2 to Revision 4.
Check the difference between Revision 1 and 4.
b. Revision Merge - II
Merge Revision 1 to Revision 3.
Check T1 and T3 impedance. Are they same and why?
c. Change in Base Revision Data
In Base Revision, change Cable1 and Cable 2: Length = 300 m, Size = 400.
Run load flow calculation
Check cable data in Revision 1 – 4. Are they same as Base and why?
Check report