Sie sind auf Seite 1von 2

01. What is the median of the following set of data? 1,-1,2,-2,3,-3,4,-4,5.

-5,6,-6,7,-7
02. Which of the following sets of data has the highest variability relative to the mean?
a. 10,15,19,26,28,34,48,55
b. 62,65,68,71,75,76,79,80
c. 120,120,124,125,128,128

03. Listed below are the average monthly incomes in pesos of filipino families for each
of the 13 regions in the country. Determine the ungrouped mean, median and modal
monthly income. Which of the three measures best describes the data? Why?

1249.50 7500.00 20,000.00


2250.00 7249.00 10,250.00
5249.00 8250.00 2250.00
6250.00 9249.00 6250.00
6500.00

04. During the dry season, when there is a peak of construction activity, shortages of
cement and consequent price fluctuations occur. A materials purchaser for a
construction firm makes a random check on 15vcement dealers and obtains the
following prices in pesos per 45 kg. bag of cement.

105,105,105,110,110,115,115,120,120,120,125,125,130,135

● What is the current price range of a 45kg bag of cement ?


● Compute for the standard and mean deviations of the given data.
05. The IQ distribution of first year engineering students has a mean of 120 and a
standard deviation of 8. Use chebyshev’s theorem to determine the interval
containing
● At least three-fourths of the IQs
● At least what percentage of these scores must lie between 104 and
136?
06. A real estate broker is in charge of selling lots in two new subdivisions. The mean
selling price of a lot in jade park village of P250,000 with a standard deviation of
P15,000. In Ruby Valley Subdivision, the mean price is P300,000 and the standard
deviation is P25,000. Which subdivision has the larger variation in lot prices?

07. Shown below are johns scores, mean, and the standard deviation of each of the
three tests given to 1000 students. On which test did john stand highest? lowest?

Test Mean Std, Deviation John’s score


Math 47,2 4.8 53
English 64.2 8.3 71
Physics 75.4 11.7 72
08. By stopwatch method, the competition time for a particular task in an assembly line
is measured for a sample of 40 workers. The results are summarized below. The
production manager has determined that median completion time of 3.75 minutes or
less is acceptable. He would however pull out workers for further training if the
median time is found to be greater than 3.75 minutes. Will training be necessary
Completion Time (min) Number of workers
5.9 - 5.5 2
5.4 - 5.0 5
4.9 - 4.6 7
4.4 - 4.0 10
3.9 - 3.5 8
3.4 - 3.0 5
2.9 - 2.5 2
2.4 - 2.0 1

Das könnte Ihnen auch gefallen