Chapter II
Methodology
This chapter presents the design stages of the project, development process
construction procedure, tools and equipment, and supplies and materials. This also includes
This section covers the different stages conducted and accomplished by the
researchers in designing the project. This includes the pre-design stage, the development of
the actual design and design modifications based from the results of the preliminary testing
of the device.
The pre design stage involved the actual gathering of the data and information
necessary as basis for carrying out an actual plan for the construction of the project.
Consultations from experts and opinions from the adviser and panel members were solicited
The actual design stage involved determining the components best suited for the
project. It involved drawing the circuitry and creating diagrams which will suffice the purpose
of the project. This stage also involved determining the best methods that should be
The design stage may also involve design modification which may occur after
preliminary testing of how the device functions. Design modification may be done in order to
This part of the study provides a discussion of the major processes undertaken by
the researchers in undertaking this project development. This includes designing, estimating,
constructing and assembling, and testing and evaluating of the completed project.
Designing
In this stage the researchers started with problem identification. The purpose of this
project design is to modernize and upgrade the utilization and system of existing lockers.
This project is to provide the enough security for their belongings to satisfy the user’s needs.
The researchers aimed to create an E-Locker for Batangas State University JPLPC Campus
Malvar Batangas. The researchers thought of a design that can be help the student in their
things. The ideas and information that helped and guided the researchers were from their
interviews and observation. The specifications of the needed materials were also identified
Estimating
In this stage the researcher estimated the cost of supplies and materials used in
constructing the project. The researcher selected the proper materials which are of good
quality with low cost and which are available locally. Canvass from hardware supply stores
were conducted to decide on the best materials to be used and to determine the estimate of
In this process, the researchers rendered the time in gathering all the parts and
components used in constructing and assembling the project. The researchers constructed
the project following the planned procedures. Step by step processes had been obtained to
The construction and assembly of the project consists of two major stages. First was
the programming of the RFID system and the construction of the locker. Secondly was the
All necessary tests had been conducted to evaluate the effectiveness of the project.
Testing and evaluation allowed the researcher to implement improvements in the design and
features of the completed project. The researchers made several trial and error testing to
achieve the projects fullest function. The researchers have noted important instructions to be
followed by the users for the full utilization of its function and performance.
The project development process lasted for almost for 10 weeks. The different stages
and the time spent in the completion of each stage were given in table 1. Table 1 presents
the work sequence of activities and the corresponding duration for the completion of the
project.
The table reveals that it took the researchers two weeks to come up with the design
of the project. Careful planning was carried to achieve the simplest yet the most effective
8
design for the project. Another week was spent for estimating the cost of the supplies,
materials, and components that were used in the project. The researchers went to suppliers
and retail outlets where the supplies and materials were sold. Cheap yet materials of good
Table 1
1 2 3 4 5 6 7 8 9 10
Designing
Estimating
Constructing/Assembling
The construction and assembly phase of the development was the most difficult stage
for the researchers; it took five weeks before the project was completed. The researchers
constructed the frame and once completed the assembly of the parts and components
followed. A two weeks was spent for final testing and evaluation of the functionality of the
finished project.
9
Construction Procedures
This part of the study gives a visual presentation and a discussion of the systematic
steps that were carried out by the researchers in developing this project; the E-Locker. The
construction and assembly procedures that were undertaken to come up with the project
output was divided into three stages. The construction stage of the project consists of two
major stages. First was the programming of the RFID system and the construction of the
locker . Secondly was the installation the RFID system in the locker.
1. Install the Arduino Ide for programing the software for the Arduino RFID project.
10
2.Assemble the electronics parts based on the diagram.(See in the picture below)
4. Create code RFID including the relation of servo, buzzer and led.
1.Cut the Anchor Plywood. Carefully measured and cut the cabinet pieces form 49x44 ( 49
meter/160.761 Ft, of its Height and with the measure of its width is 144.357 Ft/44 cm).
13
2. Assemble the parts. Use of Wood Glue and Nails and carefully assemble the “box” part
of the cabinet.
4. Cut and attaching the door with dimension of 49m/160.761 Ft and 44m/144.357 Ft.
This part of the paper presents the tools and equipment used by the researchers in
the construction of the project. The respective functions of each tool and equipment are given
in table 2.
16
Table 2
wooden frame.
Table 2 shows that the project was completed with the use of listed tools which are
Table 3 presents the estimated cost of all the supplies and materials that were used
Table 3
The preceding table shows in detail the supplies and materials that were used in the
project in terms of quantity, unit, description, and unit price and total price. From the table it
can be concluded the researchers have spent a total of Php. 1,653.00 in the purchase of all
18
the needed supplies and materials. All the materials are locally available and can easily be
Quality refers to the distinct characteristic of having a good the product. Quality is a
maintain the product quality of this project, the researchers chose the best tools and materials
for the construction of the project, from the selection of the materials that were purchased to
the use of the appropriate tools and equipment to perform the necessary job.
To ensure the quality of the completed project, the researchers first checked the
functionality of all the materials and components for construction. The researchers made sure
that the chosen materials were in good condition and were able to perform their intended
purpose. During the construction of the project, the researchers consulted professionals and
technical persons to make sure that the procedures are carried out properly. Enough time
were taken so that each step in the construction procedure was done correctly.
After the completion of the project, testing and evaluation measures were undertaken
to ensure that the device is working properly. Adjustments were made to achieve the best
possible output that the project can perform. Safety and precautionary measures for the
operator of the device were also considered. The finished project was made through the use
19
of quality parts, properly constructed, and evaluated, and have shown to be good in
Financial Component
To obtain the financial viability of the completed project, the incurred cost of
Table 4
Table 4 shows the expenses on the different variables that are involved in the
gleaned from the table the researchers have spent a Php 1,653.00 for the completion of the
project. The cost of supplies and materials composed the biggest part of the total sum.
Miscellaneous cost of Php 347.00. The total cost spent in the product is Php. 2,000.00.