Sie sind auf Seite 1von 4

GOVERNMENT OF ANDHRA PRADESH

ABSTRACT

Water Resources Department – Streamlining the Powers of Administrative


Approval, Technical Sanction, Calling for Tenders and Finalization of Tenders
- Applicable to all the Engineering Departments - Orders – Issued.
----------------------------------------------------------------------------------
WATER RESOURCES (REFORMS) DEPARTMENT

G.O.MS.No. 41 Dated: 24-05-2018


Read the following:-

1. G.O.Ms.No.1007, TR&B (C1) Dept., dated 05-11-1976.


2. G.O.Ms.No.195, PR&RD (PROGS.II) Dept., dated 10-05-1999.
3. G.O.Ms.No.94, I&CAD (PW-COD) Dept., dated 01-07-2003.
4. G.O.Ms.No.129, PR & RD (RD-II) Dept., dated 09-06-2011.
5. From the ENC (PR) Dept., Lr.No.AE(T)/TS Sanction Powers/
2015, dated 01-11-2016.
6. From the ENC (R&B), Admn, SH, CPs, NABARD, PPP, RDF, NH,
CRF & MD, APRDC, AP Dept., Lr.No.201/DEE/MC/AEE2/2012/2,
dated 19-09-2017.
7. From the Engineer-in-Chief (Admin) (FAC), Water Resources
Department, Lr.No.ENC/IW/P&M/EE.I/DEE.2/AEE(K)/BoCEs/
Vol.7/1st BoCEs-2018, dated 05-03-2018.
<<>>

ORDER

In the Government Orders issued vide References 1st and 3rd read
above, certain powers with respect to Administrative Approval, Technical
Sanction, Calling and Finalization of Tenders were delegated to
Officers/Engineers at various levels.

2. In the references 5th and 6th read above, the Departments of


Panchayath Raj, TR&B have informed that powers were delegated long back
and revision of these powers are required and therefore requested to revise
the delegation of powers and submitted proposals for revision of these
powers.

3. The matter was referred to the Board of Chief Engineers (BoCEs) for
their examination. The BoCEs have discussed the proposals in their meeting
held on 22-02-2018 and the Engineer-in-Chief (Admin), Water Resources
Department and the Chiarman, BoCE has submitted the recommendations of
the Board of Chief Engineers (BoCEs) vide his letter 7th read above.

4. Government, after careful examination, hereby accept the


recommendations of the Board of Chief Engineers (BoCEs) with certain
modifications and issue the following comprehensive orders applicable to all

(PTO)
::2::

the engineering departments for enhancement of powers as tabulated


below:

Nature of Cadre Delegation of Powers as Revised Delegation of


Powers per G.O.Ms.No.1007, Powers
TR&B (C1) Departments,
dated 05-11-1976
For Plain For Tribal For Plain For Tribal
Areas in Rs. Areas in Rs. Areas in Rs. Areas in Rs.
Administrative CE Rs.10 Lakhs Rs.15 Lakhs Rs.20 Lakhs Rs.30 Lakhs
Approval to SE Rs.3 Lakhs Rs.4 Lakhs Rs.10 Lakhs Rs.15 Lakhs
estimates for EE Rs.40,000/- Rs.60,000/- Rs.1,00,000/- Rs.1,50,000/-
works (other
than
residential
buildings and
electrical
works )
Administrative CE Full powers Full powers
approval to SE Rs.1 Lakh Rs.2 Lakhs
full EE Rs.15,000/- Rs.30,000/-
contributional
works
Powers over CE Rs.1,00,000/- Rs.3,00,000/-
nomination SE Rs.50,000/- Rs.2,00,000/-
EE Rs.20,000/- Rs.1,00,000/-
Excess over CE 15% above the amount of No Change
estimates Technical sanction
SE 10% subject to a limit of No change
powers of technical
sanction
EE 5% subject to a limit of No change
powers of technical
sanction
Passing CE Rs.10,000/- No change
excess SE Rs.6000/- SE has no No change
expenditure powers to sanction excess
on all works over revised estimate
in irrespective sanctioned by higher
of total authority
sanctioned EE Rs.2000/- EE has no No change
estimate powers to sanction excess
without over revised estimate
percentage sanctioned by higher
limit authority

(PTO)
::3::

Nature of Cadre Delegation of powers Revised Delegation of


Powers as per G.O.Ms.No.94, Powers
I&CAD(PW-COD) Dept.,
dated 01-07-2003
Technical CE Up to Administrative No change
sanction to Approval
detailed SE Up to Rs.50.00 Lakhs Up to Rs.200.00 Lakhs
estimate of EE Up to Rs.10.00 Lakhs Up to Rs.40.00 Lakhs
works
Acceptance CoT Can accept tenders above Can accept tenders above
Tenders Rs.2 Crores Rs.10 Crores
CE Can accept tenders up to Can accept tenders up to Rs.
Rs.2 Crores 10 Crores
SE Can accept tenders up to Can accept tenders up to
their Technical Sanction Rs.200.00 lakhs
Powers
EE Can accept tenders up to Can accept tenders up to
their Technical Sanction Rs.40.00 lakhs
powers

5. The Engineer-in-Chief (AW/IW) shall take necessary action


accordingly.

6. This order issues with the concurrence of the Finance (W.R.I)


Department vide their U.O.No.47027/144/(FMU WRD I)/2018, dated
17-05-2018.

(BY ORDER AND IN THE NAME OF THE GOVERNOR OF ANDHRA PRADESH)

SHASHI BHUSHAN KUMAR


SECRETARY TO GOVERNEMNT
To
All the Engineers-in-Chief, Water Resources Department, Andhra Pradesh.
All the Chief Engineers, Water Resources Department, Andhra Pradesh
The Engineer-in-Chief, Transport, Roads and Buildings Department.
The Engineer-in-Chief, Panchayat Raj & Rural Development Department.
The Engineer-in-Chief, MA&UD Department.
The Engineer-in-Chief, Public Health, Vijayawada.
The Engineer-in-Chief, Rural Water Suppy, Vijayawada.
The Commissioner, Commissionerate of Tenders, Andhra Pradesh,
Vijayawada.
Copy to:
The Accountant General, Andhra Pradesh, Vijayawada.
The Director, Works & Accounts, Andhra Pradesh, Vijayawada
The Private Secretary to Secretary to Hon’ble Chief Minister.
The Private Secretary to Hon‘ble Minister, Water Resources Department.
The Private Secretary to Hon'ble Minister, Finance Department.
The Private Secretary to Hon'ble Minister, TR&B Department
The Private Secretary to Chief Secretary to Government
The Secretary to Government, Finance Department.
The Secretary to Government, Law Department.
The Special Chief Secretary to Government, TR & B Department.
The Principal Secretary to Government., PR & RD Department.
The Principal Secretary to Government., MA&UD Department.
(PTO)
::4::

The Private Secretary to Secretary to Government., Water Resources


Department.
The Finance (FMU- WR I) Department.
The Deputy Director (Monitoring)
All sections in Water Resources Department.
SF/SC

//FORWARDED::BY ORDER//
SECTION OFFICER