Proposal for SARBAGITA Bali – Sustainable Municipality Solid Waste Factories

GRAND DESIGN SUSTAINABLE WASTE FACTORY BALI


Denpasar-Badung-Gianyar-Tabanan
EXECUTIVE SUMMARY

The Consortium that build the sustainable Waste Factory in Bali:


MM Sustainables&MultiMedia Ltd. – The Netherlands
Pierway Environmental Technologies Inc. – Canada
Environmental Technologies Exchange GmBH - Germany

Location

Denpasar - Suwung

Building Site
Space needed 6-10 ha whereby 10 ha for the waste factory and 4 ha for the housing area.
The Factory(ies) will have the following configurations for the bio-coal production:

1. VTA (Vapor Thermal Carbonization) reactor for the input capacity of 2000 mtons/day or 2
VTA reactors for the input capacity of 1000 mtons/day;
2. Gasification unit(s)
3. CHP (Combined Heat Power) units – if needed
4. All necessary equipment

The Municipality Waste Factory Management

1. Household and Industrial Waste


2. Hospital Waste
P a g e |1
Proposal for SARBAGITA Bali – Sustainable Municipality Solid Waste Factories

3. B3 Waste

We are handling only the Household and Industrial Waste of the cities.

We further on distinguish:
The Outside Management : The Waste Collection System
The Inside Management : The sustainable Waste Factory.

The waste collection system will be the second phase project for Bali.
We will prove first our abilities and capabilities to handle the MSW based upon our more than
20 years experienced in America, Europe and the Middle-East.

Type of Waste Factory for Bali:


1. Sustainable
2. Zero Waste according to the European definition, so no landfill needed
3. Contains 2 departments: A Waste2Energy unit producing bio-coal from the organic part and
recycled products (18-20) from the inorganic parts

The choice for bio-coal is made because Indonesian have lots of biomass that could be conversed
to bio-coal. The difference is that now with the high and advanced technology and on growing
price in the world especially the western world we will put this type of output (bio-coal) on first
priority.

P a g e |2
Proposal for SARBAGITA Bali – Sustainable Municipality Solid Waste Factories

Alternatives are bio-fuels, electricity and heat with less commercial possibilities.

Mr. Dipl-Ing. Peter Waschke


Chief Technical Officer and Vice-President of MM-S-MM/Owner

From inorganic MSW to


bio-coal
These all will be built
abroad and delivered
turnkey to the Project
Owner on site according
to the agreed planning
program.

The 3R waste conversion


equipment will be
manufactured in
Indonesia on the basis of
a Contracting Agreement
with a Machine Factory
in Indonesia.

This Contractor could also be the builder of all the buildings on the factory site.
If it’s not the case, then the 3R part will be put under a sub-contracting agreement whereby the
building contractor acts as the main contractor and takes responsibility for the sub-contractor(s).

The sustainable zero-waste (no more landfills) Waste Factory

The first Waste Factory in the Netherlands in WilpVoorst


Developed and built by MM-S-MM’s member of the Board of
Directors / Owner: Mr. Dipl-Ing Frits Arke in the seventies

Inside and outside the Factory: Clean, Orderly and Healthy


P a g e |3
Proposal for SARBAGITA Bali – Sustainable Municipality Solid Waste Factories

The factory is a so called “closed black box” system with most


advanced technologies like no odor because the system uses
“sought air” technology for the fermentation of the compost.

Thermo-Mur Building System


Modest housing for the scavengers who will be trained and labored as professional waste
workers. A high quality according to the Deutsche Industry Norm accredited certification for the
factory workers will be built. DIN is the highest level of building certificate in the world.
The houses are earth quake proof, non-flammable, non-hazardous, anti-termite and lifetime last
of 150 years.

A DIN-certificated house built in 6-7 days

Specially built to support the Thermo-Mur mobile factories that consist of:
1. 2 40 feet containers of material factories
2. 1 solar plant also built up in standard containers to energize the factories

Needed building site for the waste factory dwellings: 4 ha.

P a g e |4
Proposal for SARBAGITA Bali – Sustainable Municipality Solid Waste Factories

Business Analyses

P a g e |5
Proposal for SARBAGITA Bali – Sustainable Municipality Solid Waste Factories

P a g e |6
Proposal for SARBAGITA Bali – Sustainable Municipality Solid Waste Factories

P a g e |7
Proposal for SARBAGITA Bali – Sustainable Municipality Solid Waste Factories

The Environmental Covenant is our tool to guarantee a Judicial Basis that fore come
Business Risks during the building and exploitation period anarchistic problems like unrightfully
and unwanted illegal demonstrations etc.

Our grateful acknowledge for the invitation and opportunity to present our newest and most
innovative product of the sustainable Waste Factory, which is our humble contribution to
enhance the living, labor and leisure environment all over Indonesia.

P a g e |8

Das könnte Ihnen auch gefallen