Sie sind auf Seite 1von 1

QTY UNIT UNIT COST TOTAL COST

RAMP SAND BAGS


Mixing Sand 25.56 cu.m. ₱ 780.00 ₱ 19,936.80
Subtotal ₱ 19,936.80
GRAVEL BEDDING
Gravel 3.63 cu.m. ₱ 1,320.00 ₱ 4,795.56
Subtotal ₱ 4,795.56
AREA OF FOOTING 36.33 sq.m. NO. OF UNITS 1
BATCHER 3.67 5
DECLINING BELT 2.97 2
MIXER 4.02 2
CEMENT HOPPER 4.00
CONCRETE
CONCRETE VOLUME 16.96 cu.m. NO. OF UNITS 1
BATCHER 1.85 5
DECLINING BELT 1.19 2
MIXER 2.19 2
CEMENT HOPPER 0.95 1
Cement 153.00 bags ₱ 195.00 ₱ 29,835.00
Wash Sand 9.33 cu.m. ₱ 1,010.00 ₱ 9,420.17
Gravel 16.96 cu.m. ₱ 1,120.00 ₱ 18,992.96
Subtotal ₱ 58,248.13
CUT LENGTH QTY LENGTH EXCESS
REINFORCEMENT
Column & Footing
BATCHER 114.00
DECLINING BELT 19.00
MIXER 38.00
CEMENT HOPPER
total 171.00

12mm DIA. DSB 171.00 length ₱ 188.40 ₱ 32,216.40


Ties
BATCHER 25.00
DECLINING BELT 10.00
MIXER 14.00
total 49.00
10mm DIA. DSB 49.00 length ₱ 130.70 ₱ 6,404.30
Subtotal ₱ 38,620.70

FORMWORKS
3/4" Phenolic Board 10.00 sheets ₱ 1,620.00 ₱ 16,200.00
COCO LUMBER 100.00 lengths ₱ -
CW NAILS 3.00 box ₱ -
Subtotal ₱ 16,200.00
PLATE AND BOLT
10mm MS PLATE 2.00 sheets ₱ 9,500.00 ₱ 19,000.00
25mm MS PLATE 1.00 sheets ₱ 23,000.00 ₱ 23,000.00
1/2" Cold Rolled Shaft 3.00 lengths ₱ 320.00 ₱ 960.00
1/2" NUTS NC 72.00 pcs ₱ 24.00 ₱ 1,728.00
Subtotal ₱ 44,688.00

TOTAL ₱ 182,489.19

Das könnte Ihnen auch gefallen