Republic of the Philippines

Batangas City

OFFICE OF THE CITY ENGINEER

PROJECT: CONSTRUCTION OF TWO (2) STOREY EIGHT (8) CLASSROOM


SCHOOL BUILDING

LOCATION: BAGONG SILANG ELEMENTARY SCHOOL, SAN JOSE SICO,


BATANGAS CITY

SPECIFICATION

I.GENERAL CONDITION
1. The contractor shall furnish all labor, materials, equipment and perform incidental construction
necessary to complete the project in accordance with the plans, verbal & written instruction of the
Project Engineer as specified.

2. The “Standard specification for Highways & Bridges Revised 1988 Vol. II.” As adopted by the
Philippine Government is hereby made a part of the specification to the extent is herein written in
full.

3. All provisions embodied in Government Procurement Reform Act (Republic Act No. 9184) and
its implementing rules and regulations – A governing infrastructure projects is hereby made a part
of the specification.

4. Bidders shall thoroughly examine the site and note carefully the conditions therein before
submitting proposals and verify from the City Engineer’s Office and other pertinent data of
information for proper guidance in estimating the work.

5. The contractor shall perform all the Quality Control Test necessary, in the presence of the City
Engineer’s Office authorized representative and shoulder all the necessary expenses incurred.

6. The contractor shall pay the lights, power and water required for the completion of the project.
7. The contractor shall be responsible for all the damages that might occur to all persons and
materials as a result of his fault or negligence in connection with the execution of work.
8. All works to be done shall be in the best quality of workmanship under the supervision of
qualified Civil Engineer / Architect.

II. SCOPE OF WORK: (CHECK AND FILL-OUT)


A. X Construction Rehabilitation
Completion Installation
Repair Additional
Alteration Fabrication

III. SITE OF WORK


All necessary excavation for the canal to grades indicated in the drawing shall be executed by the
Contractor.

IV. CONCRETE CONSTRUCTION


1. Materials:
Type of Cement Portland Cement, Type 1
Sand S1
Gravel Size ¾
Water quality clean and potable
2. Mixture and Proportion:
Canal Class A
3. All reinforcing deformed steel bars shall be Grade 40.
PART II

ELECTRICAL WORKS

GENERAL PROVISIONS FOR ELECTRICAL WORKS FOR BUILDINGS

It is understood and agreed that the Contractor has by careful examination of the electrical plan
and specifications and the site where appropriate satisfied himself as to the nature and location of the
work and all of work and all conditions which must be met in order to carry out under this project.

1. All electrical installation herein and other related works to be done on this building shall conform
in a accordance with the provisions and code, standard of the following:
1.1 Latest edition of the Philippine Electrical Code
1.2 Republic Act 7920
1.3 National Building Code
1.4 Fire Code of the Philippines
1.5 Local Power Company Standards
1.6 Other requirements of the City Government of Batangas

2. The electrical installation shall be done under the direct supervision of a dully registered
electrical practitioner, e.g. RME, REE and PEE. The Electrical Engineer shall be responsible in
the interpretation of the design intent, plans and specifications and the required standard of the
electrical and other related codes.

3. As required by the RA 7920, for 200AT main capacity and above the Contractor shall have
PCAB LICENSE with specialty in electrical works (S-EE category).

4. Service entrance facilities to the building shall be single phase (1 Ø), 3 wire, 60Hz, 230V, from
the local utility company unless otherwise specified.

5. All materials and equipment to be used shall be new and / or the approved type and shall have an
Imported Commodity Clearance (ICC) seal for foreign made products and a “PS” marks for local
products as proof of clearance for Bureau of Product Standards (BPS).

6. A grounding system shall be provided to all lighting and power circuits and non current carry
metal parts including telephone, data control and relax circuits.

7. All panelboards, main distribution panel, over current protection, etc. shall have a grounding
system shall be provided.

8. All 250V, single-phase, 15 & 20 Ampere receptacles installed in the locations specified shall have
ground – fault circuit interrupter protection for personnel.
8.1 Bathrooms
8.2 Outdoors

9. Mounting heights for all wiring devices shall be as follows:


9.1 Lighting Fixtures - ceiling mounted
9.2 Convenience Outlet (wall industrial fan) - 1200mm above finished floor line
9.3 Convenience Outlet (ordinary outlet) - 500mm above finished floor line
9.4 Panelboards and Cabinets - 1400mm from the finish floor line
*Panelboard with box over 100cm high shall be located 75cm from the floor to the
bottom of the box except that the highest branch circuit unit should not be more 195cm
from the floor.
10. Wiring Methods shall be as follows:
10.1 Service Entrance - Polyvinyl Chloride (PVC) in concrete
Casement in pedestal/Rigid Metallic Conduit
10.2 Service Entrance Secondary - Rigid Metallic Conduit (RMC) in concrete
Encasement / Rigid Metallic Conduit
10.3 Feeder Lateral - Rigid Metallic Conduit (RMC) in concrete
Encasement / Rigid Metallic Conduit
10.4 Lighting and Power System - Polyvinyl Chloride (uPVC) or cable tray where
Necessary for grounded conduit
10.5 Lighting Fixture, Junction Box - Polyvinyl Chloride (PVC) or electrical metallic
Tubing (EMT)
10.6 Auxiliary System - Polyvinyl Chloride (PVC) or cable tray where
Necessary (i.e. Telephone, Cable TV, Intercom,
Data, E.R.)
11. Color Coding for cables shall be as follows:
11.1 Phase A - Black
11.2 Phase B - Red
11.3 Phase C - Blue
11.4 Equipment Grounding - Green
11.5 Grounding conductor to
Electrode conductor - White

12. Where spare / empty conduits are provided, A pull wire shall be inserted from junction box for
future use.

13. Prior to mounting the termination of lighting fixtures, wiring devices, equipment, etc. the
Electrical Contractor shall engage with the Project Engineer of the Construction Division for the
following inspection and field acceptance test.
13.1 Correctness, type and quality of fixture, device of equipment provided if conforming to
specifications as designed or requested.
13.2 Service entrance facilities, main distribution, branch circuit and sub-feeder
continuity and insulation resistance test if required.
13.3 Grounding integrity
13.4 Workmanship

14. No change or modification shall be done on these plans without the approval of the Project
Engineer.

15. This specification shall be sole reference of the Contractor on the selection and purchasing of
materials for the project. Any new item / brand / model the Contractor may wish to utilize than
the specifications stated there in shall require approval by the Engineer.

16. All works shall be executed in a professional manner while the job site shall be maintained neat
and orderly at all times.

SCOPE OF WORK

1. The scope of work consist of the furnishing and installation of complete electrical system
exterior and interior – including miscellaneous system. The contractor shall provide ll
supervision, labor, materials, equipment, machinery and all item necessary to complete electrical
system (s).

2. The contractor shall note that all items and equipment are specified in singular; however, the
contractor shall provide and install the number of items in the drawing required for complete
electrical system (s).
3. It is the intention of the specifications and drawings to call for finish works, tested and ready to
use and operation.

4. Any appliance, apparatus, material or work not shown in the drawings but mentioned in the
program of works / specifications or vice versa, or any incidental accessories to make complete
and perfect to all aspects and ready for operation, even if not particular specified, shall be
furnished delivered and installed by the contractor without additional expense of the City
Government of Batangas.

5. Minor details not usually shown or specified but necessary for proper installation and operation
shall be furnished and installed by the contractor.

6. Provide new Main Circuit Breaker, panel board and service wire (2#50.0mm² THW Cu. Wire as
detailed in plan.

7. Installation of Lighting Fixtures power outlet, ACU and all other electrical equipment as detailed
in plan.

8. Installation of meter base and complete service equipment.

9. Testing and Energization.

MATERIAL SPECIFICATIONS
TYPE OF MATERIALS SIZE CLASSIFICATION / DESCRIPTION

1. Entrance Cap 50mmØ Weatherproof, HD


2. Clamp 50mmØ Malleable Iron
3. Conduit / Pipe 50mmØ RMC
20mmØ, 25mmØ PNS 14:1989
20mmØ, 25mmØ UPVC
4. Adapter 50mmØ ISO 3633; PNS 1950 : 2003
20mmØ, 25mmØ
5. Elbow 50mmØ ISO 3633; PNS 1950 : 2003
20mmØ, 25mmØ
6. Locknut with bushing 50mmØ ISO 3633; PNS 1950 : 2003
20mmØ, 25mmØ
7. Tox with screw #8
8. PVC Solvent Li Solvent
9. Service conductor #50.0mm² PNS 35:1996
Building Wiring / Power #22.0mm² THW / THWN; insulated
Lighting #14.0mm² PNS 35:1996
#5.5mm² Thermoplastic, wire, oil
#3.5mm² Heat and moisture, resistant
#2.0mm² Lead free, PEC, PNS NEC, ISO
ICEA SG1-402UL approved
10. Lighting Fixtures
10.1 Led Panels Lights 40W 12DL 300 x 1200mm, 6000K
3200lM surface / suspended
type
with fittings
40W 12DL 300 x 1200mm 6000K
3200lm recessed type with
fittings

10.2 Downlight 6ӯ Vertical Downlight Recessed Type with


Partial frosted glass cover, E27 base,
White

6ӯ Vertical Downlight surface and recessed


Type with fittings E27 base frosted
Glass cover
10.3 CFL 3 ½” ceiling receptacle plastic

10.4 Bulb 7W LED 560lm, 180-264, E27 base, Daylight


5W LED 400lm, 180-264, E27 base, Daylight

11. Power Outlet 0.120 x (0.070)2 Duplex convenience outlet with safety
shutter
12. Special Power Outlet ACU Outlet with 30AT KSB wall
Mounted ceiling fan

13. Switches 0.120 x (0.070) 1-gang switch with plate and cover wide series
0.120 x (0.070)2 2-gang switch with plate and cover wide series
0.120 x (0.070)3 3-gang switch with plate and cover wide series
14. Auxiliary
14.1 Utility Box 101.6mm x 101.6mm Red Orange
Utility Box
Thickwall
14.2 Junction Box Octagonal Red Orange
With cover and knockouts

15. Main Circuit Breaker PW 250 SP 2P 125A,600V 3P, single phase 60hz 230V, bolt-on
NEMA 3R frame flush mounted
industrial type CB, 380 x 205 x 101
16. Main Distribution Panel PW 250 SP 2P 125A,600V 2P, single phase 60hz 230V, bolt-on
PW 100 SPS 2P 60A 600V NEMA 3R frame flush mounted
PW 100 SP 2P 75A 600V industrial type CB, 565 x 355 x 100

17. Panelboard KHH 2P 75A, 15kA 2P single phase 60hz, 230V, bolt-on
KHH 2P 15A x 2 15kA commercial type CB NEMA 3R frame
KHH 2P 20A x 8 15kA flush mounted center main
KHH 2P 30A x 2 15kA
KHH 2P 20A x 2 x 2 spare

18. Panelboard KHH 2P 60, 15kA 2P single phase 60hz, 230V, bolt-on
KHH 2P 15A x 2 15kA commercial type CB NEMA 3R frame
KHH 2P 20A x 8 15kA flush mounted center main
KHH 2P 30A x 2 15kA
KHH 2P 20A x 2 x 2 spare

19. Ceiling Fan complete with Metal bladed heavy duty with
Fittings selector switch

Prepared by: Checked by:

ROSELYN C. ROCIO DWIGHT VIRGILIO C. ARELLANO


Engineer II Engineer IV

Recommending Approval: Approved by:

REYNATO L. MARAJAS ADELA B. HERNANDEZ


Asst City Engineer City Engineer

Mem 2018