Sie sind auf Seite 1von 10

Site Code 2G BTS 3G BTS Latitude Longitude Site Type Address/Land Mark

DXB0581 25.1328621 55.118553 LTE IBS Atlantis Hotel-Palm Jumeirah


Road Site Shared
PAT date Building Name (RT/Inddor site) Floor number
access Boundary (Y/N )

RRU 1 ,Mezzanine flr


RRU 2,3, G/F flr
RRU 4,4flr W
5-Sep-13 RRU 5,14flr W
Normal Atlantis Hotel Not Required Yes
RRU 6,6flr E
RRU 7,16 flr E
ETC site ID Access Procedure Site Category key Cabinet Location

Cabinet7 – 16th Floor East wing BTS


room (near ICE section),
MetroHub – Ground Floor DU room;
CAB 1: FOLLOW SECURITY OFFICE
CORRIDOR AND LOOK FOR
“DEDICATED SMOKE AREA” AT LEFT
HAND.TURN TOWARDS IT AND
TAKE STAIRS TO M-LEVEL.NOW
TURN RIGHT AND TAKE STAIRS
INFRONT OF YOU FOR UPPER
GET LEVEL.
CONTRA
FILL UP PTW Form and send CTOR CAB2: FOLLOW SECURITY OFFICE
To: PASS CORRIDOR AND LOOK FOR “GSM
walter.wehner@atlantisthep FROM ROOM 219” AT RIGHT HAND.
alm.com; SECURI
Briggette.Kangara@atlantist TY. “DU CAB 4: FOLLOW SECURITY OFFICE
DXB218 hepalm.com; Class C IDF AND CORRIDOR AND TAKE SERVICE LIFT
Christina.Alicer@atlantisthep GSM OPPOSITE TO “DV ROOM” AND
alm.com; dxb- ROOM GOTO 4TH FLOOR.NOW LOOK FOR
ithelpdesk@atlantisthepalm. KEYS” ‘ICE SECTION’.
com; IT FROM
DEPARTMENT SECURI CAB5: FOLLOW SECURITY OFFICE
TY CORRIDOR AND TAKE SERVICE LIFT
OFFICE. OPPOSITE TO ‘DV ROOM’ AND GOTO
1 4TH FLOOR.NOW LOOK FOR ‘ICE
SECTION’.

CAB6: FOLLOW SECURITY OFFICE


CORRIDOR AND TAKE SERVICE LIFT
AT THE END AFTER CROSSING ‘DV
ROOM’ (50 meters) AND GOTO 6TH
FLOOR.NOW LOOK FOR ‘ICE
SECTION’.
Power Standby Fuel tank
account number Meter number 2G Backup 3G Backup
Source Genset shape/capcity

No
Commercial BUILDING BUILDING Standby No Tank DC System DC System
DG
Fix Transmission is
Transmission Mobile site is dependent having Battery Backup(if
LTE Backup AC Type
Backup on fixed transmission Mobile Transmission via
Fix)

DC System None Yes No Bldg AC


Nb of Rec
Fire Alarm Type PS1 Type PS1 Battery Make Battery size Installation date
Moules in PS1

CAB 1= 4
POWER
CAB 2= 4
ONE IN
CAB 3=4
CAB 1,2,4
Bldg CAB 4= 4 POWER SAFE 12V(155ah) no date
AND DELTA
CAB 5=4
IN CAB
CAB 6=4
5,6,7
CAB 7=4
Nb of
Nb of Batteries Nb of Rec PS2 Battery Fire Fighting
PS2 Type Batteries in Nb of 2G Cab
in PS1 Moules in PS2 Make System
PS2

Bldg 7 (ONE IN
8 (SAME FOR
N/A N/A N/A N/A Suppression EACH
ALL CABINETS)
System CABINET)
Nb of TXN Site Folder No. of
Nb of 3G Cab UPS (Y/N) UPS capcity UPS Make UPS status
Racks on Site UPSs

2 ( 1 IN
7* RRU (ONE
CAB 1 AND
IN EACH
METRO
CABINET) +
HUB IN DV Yes No No NO No NA
7*LTE RRU
ROOM
(ONE IN EACH
GROUND
CABINET)
FLOOR)
In case no battery
backup for any
equipment, check
UPS connected to
UPS monitored if there is enough
Fix/Mobile
space to add
additional DC
system or UPS

NA NA Yes
In case no battery backup for any equipment, check
if there is enough Power provision to add additional
DC system or UPS? Mention # of spare breakers and
their rating (or if extra breakers can be added to site DB)

YES