Beruflich Dokumente
Kultur Dokumente
Shilpa Shukla
Shilpashikla1991@gmail.com
H.No-49/2,Gopal Nagar +91818653275
Bus stand,Gurgaon,
Sector-12,Gurgaon,
Haryana-122022
PERSONAL PROFILE
Presently working as Design Engineer & Process Planning Engineer (Pneumatic)-at EBZ SYSTEC
INDIA PVT LTD, GURGAON, Haryana-122022, and India.
Good knowledge of welding process or other joining process. Motion Study and Layout.
Excellent commands over CAD tools like SolidWorks, CATIA-V5, Micro station, AUTOCAD, and UG
(NX).
Project management including Customer requirement understanding & study, Time Estimation, and
Project execution.
Co-ordination with customers for daily work input and design iterations, quality & delivery.
Responsible for Quality checks, Quality Assurance for customer deliverables & issue resolutions.
CONTRIBUTION:
Page 1 of 4
BOM
Concept of fixture and gripper
Pneumatic Training Presentation.
Design validation Review
Check fixture clash.
Montashe document.
Pneumatic Plan-
1. Tool Overview
2. Valve connections with Actuators (Cylinders, Clamps, Pin cylinders, Suction cup)
3. RIP for all the Robots (Grippers & Welding robots).
Ablauf Plan (A-Plan is basically Sequence plan with Cycle time chart)-
1. Station overview
2. Roller conveyor overview
3. Overview for the Underbody clamping only if we have underbody clmaping.
4. Tool overview for all the fixtures & grippers from stations
5. Overview for Rack
5. Cycle time chart for Roller conveyor
6. Cycle time chart for Underbody clamping
7. Cycle time chart for all fixtures and grippers
8. Cycle time chart for Rack (if there are any Pneumatical components).
Cooling water Plan-K-Plan is basically Cooling Water Plan for those Robots which are for
Welding (Except Stud Welding).1. HIP Connections
2. RIP Connections
Communication with customer for process changes technical queries for successful execution of
project.
2d detailing.
Bill of material generation as per specified series by customer.
SAP (for PO)
PROFESSIONAL EXPERIENCE
Presently working:-
ROLE:
Process Planning
Pneumatic plan
Ablauf(Sequence) Plan
Cooling Water Plan.
Page 2 of 4
Cycle time chart
2D detailing
3d finish
Concept of gripper and fixture
BOM
PROJECT UNDERTAKEN:-
Project Software Team
Sr.no. Role Duration
Name Used Size
2d detailing,3d finish,Pneumatic
1. VW 270 SolidWorks 3 6 month
Plan, Shim Plan,cycle time chart
2d detailing, 3d finish,Pneumatic
2. VW 536 Catia-24 3 6 month
Plan, Ablauf Plan
2d detailing,3d finish,Pneumatic
3. Z1 Excel 12 6 month
Plan,cycle time chart
Solid
4 Z3,BMW 2d detailing,Cycle time chart 30 3 month
works
Professional Strengths:
Team Work
Problem Analyzing skills
Good listening skills
Good Communication
EDUCATION
Bachelor degree
Discipline : Mechanical Engineering
University : Uttar Pradesh Technical University (U.P)
Percentage : 72%
Year of Passing : 2014
H.S.C.
Institute : K.V New Cant
Percentage : 70.00%
Year of Passing : March 2009
S.S.C.
School : K.V New Cant
Percentage : 71%
Year of Passing : March 2006
Page 3 of 4
PERSONAL DETAILS
Full Name : Shilpa Shukla
Mobile : +919818653275
Nationality : Indian.
PASSPORT NO :
DECLARATION:
I hereby declare that the above mentioned information is correct up to my knowledge and I
here the responsibility for the correctness of the above mentioned particulars.
Shilpa Shukla
Page 4 of 4