FAUCHERE Christian

Pont Bernard Quartier Chandouren


04310 Peyruis ( France )
Tel : +33(0)4-92-68-11-31
Mail : fau04310@aol.com

LEADER – SUPERVISOR
ANALYSER-INSTRUMENTATION
Familial status

Date of birth : 07-05-1968 Marital status: Married


Place of birth: Paris 15ème Childrens : 3
Nationality : French

Education

1987 - Bac F2 (electronic) with mention : Lycée Pierre Mendès France 13127 Vitrolles ( FRANCE )
1989 - BTS CIRA : Lycée Pierre Mendès France 13127 Vitrolles ( FRANCE )

Foreign languages : English

Training

1997 : Fisher Rosemount : Maintenance on DCS PROVOX


1997 : AP2I : Maintenance on PLC APRIL 5000 , PB 600 , PB 400 , PB 200
2001 : ABB : Chromatography in gaseous phase on VISTA
2002 : MECI : Training on metering unit
2003 : IRA : Flowmeter liquid and gas – Analysers
2003 : Panamétrics : Ultrasonic flowmeters

Habilitations

2001 : GIES 2 Safety for petrochemical plants


2011 : Basic Offshore Safety Induction Emergency Training
2005 : Electrical habilitation C18510: Refresher course

Leisures

Fireman , sport ( Karate ) , mini model


Professional experience
Customer PTTEP
Unit Bongkot Phase 4A
Place KOREA / ITALY / INDONESIA / Thailand
Date 03/2010 to 12/2011 ( 1 year 9 months )

Instrument Leader

In charge of the instrumentation on QPS ( accommodation ) and PPS ( Production ) .


Commissioning Onshore and Offshore , and start-up .
Following EDS / F&G , utility all units .
I was in charge of two turbo compressors unit for instrumentation part , following the
construction and FAT of the UCP and RIO panels in subcontractor of Nuovo Pignone ( PREI-
Milan ) .
Following the erection of the units in test bed and loop check with UCP .
Following the string test and FAT ( Massa )
Following all instrumentation and system control on the accommodation ( F&G , utilities ).

Equipments :

Turbine Nuovo Pignone GE : PGT-25


System :
ABB , Triconex , Autochim

Customer TOTAL
Unit FPSO AKPO
Place KOREA and NIGERIA
Date 07/2007 to 12/2009 ( 2 years 6 months )

Instrument Supervisor

In charge of commissioning all units hull and topside , water treatment , potable water , UV
sterilizer , hydraulic unit , essential and emergency generator , water tight door , Fire and gas
system., turbo generation .
Start-up seawater lift-pump , sand filter , water injection , inert gas generator , turbine RR , test
all deluge skid , offloading pump .
Completion phase

Equipments :

2HE Caterpillar , HPU Framo , Autochim F&G


Turbine Rolls Royce RB211-24G .
Weir pump

System
Emerson Delta V, Triconex
Customer TOTAL
Unit FPSO DALIA
Place KOREA / ANGOLA
Date 10/2005 to 05/2007( 1 year 7 months )

SUPERVISOR in Korea and LEADER for towing and start-up in ANGOLA

Leader of instrumentation team for commissioning , OTP validation and start-up .


Commissioning water treatment and water injection units . Checking and starting all analysers.

Equipments :

FOXBORO supervision
SOLAR turbine & SULZER pump , rack Bentley Nevada
US-filter / AXSIA

Customer EXXON-MOBIL
Unit FPSO ERHA
Place SINGAPORE
Date 07/2005 to 10/2005 ( 3 months )

INSTRUMENTATION ENGINEER

Support end of commissioning all units .


Commissioning all Bentley-Nevada rack cabinet .

Equipments :

FOXBORO supervision
Nuovo Pignone generator and HP compressor
Bentley Nevada

Customer TOTAL
Unit FPSO GIRASSOL
Place ANGOLA
Date 06/2001 to 06/2005 ( 4 years )

ANALYSER & INSTRUMENTATION ENGINEER

Start up assistance
In charge of maintenance of analysers on Girassol , BSW , RVP, OIL in WATER , Dew –
Point , O2 measure ,
In charge of flow measures ,Ultrasonic , Vortex , Mass flowmeters , Turbine
Responsible of OFFLOADING by BUOY or TANDEM

Equipments :

YOKOGAWA supervision
AGAR for BSW / ABB for RVP / SERES for oil in water / SHAW for Dew Point /
AMETECK for humidity in gas
OLDHAM et OMICRON for measure O2
PANAMETRICS for ultrasonic flowmeter / KHRONE for mass flowmeter
YOKOGAWA , EMCO , for VORTEX insertion
MECI for offloading system
Customer BP
Unit HCQ , HDS2 , BENZENE
Place LAVERA - France
Date 02/2001 to 06/2001 (4 months)

INSTRUMENTATION ENGINEER

Annual shutdown of HCQ , HDS2 , BENZENE units.


Responsible for tests and synchronisation of instruments on units during the annual
overhauling works of the differents units.

Equipment :

HONEYWELL supervision

Customer ELF ATOCHEM


Unit CHLOE PVC, VRC, Heater unit
Place Saint Auban - France
Date 01/95 au 02/2001 (6 ans)

Unit CHLOE
Date 11/97 au 02/2001 (3 ans 4 mois)

ANALYSER SUPERVISOR

In charge of maintenance of analysers on CHLOE units, heaters unit , VRC and water
treatment.

Equipments :

- Chemical PLC SERES (Cl2, NaOH, Silice)


- ZELLWEGER PH/Conductivimeter
- ABB Chromatography
- ABB Infra red
- AQUAMAX sampling
- AUTOCHIM Fire & gas

Unit PVC, CHLOE, VRC units and heaters


Date 01/1995 to 10/1997 (2 years 10 months)

INSTRUMENTATION ENGINEER

In charge of maintenance of units: PLC and DCS.


In charge of new works.
Precommissioning, commissioning and start up assistance of the units.

Equipments:

- PLC: APRIL 5000, PB 400, PB 600


- SNCC DCS: PROVOX
- Flowmeters : MICRO, MOTION, ENDRESS & HAUSER
Customer BP
Unit Viscoreductor
Place LAVERA - France
Date 09/94 to 12/94 (4 months)

INSTRUMENTATION ENGINEER

Commissioning of instrumentation.
Start up assistance of the plants.

Equipment :

HONEYWELL TDC 3000 supervision

Customer SHELL
Unit Heater unit
Place BERRE L’ETANG – France
Date 06/94 to 08/94 (3 months)

INSTRUMENTATION ENGINEER

In charge of new works.


Follow up of instrumentation assembly, synchronisation of control loops and start up
assistance.

Water treatment unit

ANALYSER ENGINEER

In charge of maintenance of industrial analysers on water treatment unit.

Equipments :
- pHmetre ZELLEWEGER
- Chemical PLC SERES (COT/CL2)
- Turbidimeter

Unit KRATON unit


Lieu BERRE L’ETANG - France
Date 04/94 (1 month)

INSTRUMENTATION ENGINEER

In charge of new works.


In charge of instrumentation assembly team.
Follow up of the assembly accordance, precommissioning and commissioning of the control
loops.

Unit PVC
Place BERRE L’ETANG - France
Date 01/94 to 03/94 (3 months)

INSTRUMENTATION ENGINEER

Preparation of works for control room modifications.


Follow up of synchronisation of the control loops
Start up assistance
Customer ARCO CHIMIE
Unit Utilities
Place France
Date 05/91 to 12/93 (2 years 8 months)

INSTRUMENTATION ENGINEER

In charge of general maintenance: boilers, water treatment, pumping station , air compressor.

Equipments :

- SNCC HONEYWELL (TDC 3000) / MODICON PLC


Customer NAPHTACHIMIE
Unit Petrochemical units / Metrology department
Place LAVERA - France
Date 02/91 to 04/91 (3 months)

INSTRUMENTATION ENGINEER

In charge of instrumentation maintenance.


Setting up of a quality process concerning oil products.

Equipment :
SCHLUMBERGER turbines measurment

Customer SOCIETE DU PIPELINE SUD EUROPEEN


Unit Crude oil pipeline
Place FOS SUR MER - France
Date 12/89 to 02/90 (3 months)

INSTRUMENTATION ENGINEER

In charge of maintenance of electronic equipments.