JUSCO

Jamshedpur Utilities & Services Company Limited


Vendor Code : 16077 Specific Construction
107-D, Pocket-A, Dilshad Garden
Delhi WORK ORDER
IN Order No. :- 2500008180 /107
Pin Code :- 110095 Original Order Date :- 26.07.2018
E-mail :- construction62specific@gmail.com Revised Order Date :- 08.05.2019
Phone No. :- 7838949526 Contact Person :- Bimal Kumar Choudhary
Fax No. :- E-mail :-
Quotation :- MAIL QUOTE/10.04.2018 Phone No: :- 0657-6652328
Order validity Start Date:- 20.06.2018 Fax No :-
Order validity End Date :- 30.04.2020 Collective No :- 300014710
GSTIN:- 21AJNPM8111E1ZJ Indent By :- BHEL Rourkela Project
Vendor class:-Registered JUSCO GSTIN :-21AABCJ3604P1ZP

Version :- 1
Site Location :- ROURKELA
We are pleased to award contract on your esteemed organization, details of which are furnished below:
Please acknowledge receipt of this order within 48 hours failing which it will be deemed to be accepted & arrange to
execute the job as per details given below.
Invoices against job/supplies which have been completed shall be submitted at centralized bill collection centre of
respective location along with HR/IR clearances & material reconciliation statement (as applicable) within maximum of
3 months.

10% of invoices amount will be deducted for invoice for invoices submitted beyond 3 months but within 6 months.

20% of invoices amount will be deducted for invoice submitted beyond 6 months but within 9 months.

Invoices will not be accepted if submitted beyond 9 Months.

"Services bills falling under the purview of statutory compliance viz. PF,ESI,Wages,Leave,Bonus,etc must be
routed through contractor cell for certification prior to submission at Bill Desk(BST).Bills without the above
certification will not received at Bill Desk".
Item No. : - 00010 Description:- Intake Well & PumpHouse at Rourkela BHEL
SAC Code : -9983
Delivery Date : 31.03.2020
----------------------------------------------------------------------------
Price Schedule
Outline No. : - A 01 Brief Description : - Excavation Work
Item_ Service No Brief Description Quantity Unit Rate(INR) Amount
No

10 E/W in Exc. by Mech means upto 1.50 193.04 Cubic mete125.00 24130.00
M
Item Long Text :Earth work in excavation
by mechanical means in dense sand
over areasand stacking with in a lead of
50 M,with ramming, trimming and
dressingof sides etc., (authorised
working space, benching and side
slopes forthe excavation will be
measured and paid under this item).
Dewateringfor the trench has been
considered separately(a) upto 1.5 Mtr
depth from EGL

20 E/W in Exc. by Mech means 1.50 - 3.0 96.52 Cubic mete150.00 14478.00

Item_ Service No Brief Description Quantity Unit Rate(INR) Amount


No

M
Item Long Text :Earth work in excavation
by mechanical means in dense sand
over areasand stacking with in a lead of
50 M, with ramming, trimming and
dressingof sides etc., (authorised
working space, benching and side
slopes forthe excavation will be
measured and paid under this item).
Dewateringfor the trench has been
considered separately(b),,1.5 mtr to
3.00 mtr

30 Excavation in Weathered Rock 1.50M - 96.50 Cubic mete800.00 77200.00


3.0M
Item Long Text :Earth work in excavation
by mechanical means in weathered rock
overareas and stacking with in a lead of
50 M,with ramming, trimming
anddressing of sides etc.(authorised
working space, benching and sideslopes
for the excavation will be measured and
paid under this item)Dewatering for the
trench has been considered
separately(a),,1.5 mtr to 3.00 mtr
40 Exca. in Weathered Rock 3.0 M -4.50 160.87 Cubic mete900.00 144783.00
M
Item Long Text :Earth work in excavation
by mechanical means in weathered rock
overareas and stacking with in a lead of
50 M,with ramming, trimming
anddressing of sides etc.(authorised
working space, benching and sideslopes
for the excavation will be measured and
paid under this item)Dewatering for the
trench has been considered
separately(b),,3.00 Mtr to 4.50 Mtr

50 Excav. in Hard Rock 3.0 M -4.50 M 32.17 Cubic mete1,275.00 41016.75


Item Long Text :Earth work in excavation
by mechanical means in hard rock over
areas andstacking with in a lead of 50
M,with ramming, trimming and dressing
ofsides etc. (authorised working space,
benching and side slopes for
theexcavation will be measured and paid
under this item) Dewatering forthe trench
has been considered separately(a),,3.00
Mtr to

Item_ Service No Brief Description Quantity Unit Rate(INR) Amount


No

4.50 Mtr

60 Excav. in Hard Rock 4.50 M - 6.0M 96.52 Cubic mete1,430.00 138023.60

Item Long Text :Earth work in excavation


by mechanical means in hard rock over
areas andstacking with in a lead of 50
M,with ramming, trimming and dressing
ofsides etc.(authorised working space,
benching and side slopes for
theexcavation will be measuredand paid
under this item) Dewatering forthe trench
has been considered separately(b),,4.50
Mtr to 6.00 Mtr

70 Backfilling in all positions and heights 427.00 Cubic mete150.00 64050.00


Item Long Text :Backfilling in all positions
and heights and descents in
foundations,pits, around foundations with
approved excavated material obtained
fromsoil heaps at all heights,
transporting, depositing, dressing
&compacting complete all as per
drawings, specifications and directionsof
the Engineer, all tools, plant and labour
complete. Each layer shouldbe not more
than 150 mm thick when loose and
should be well rammed, withnecessary
watering, to obtain at least 90% of
maximum laboratory drydensity. as
directed by the Engineer- by excavated
soil.

Price Schedule
Outline No. : - A 02 Brief Description : - Concrete Work
Item_ Service No Brief Description Quantity Unit Rate(INR) Amount
No

10 Prov. laying PCC M-10 (1:3:6) 6.10 Cubic mete3,500.00 21350.00


Item Long Text :Providing, laying and
compacting plain cement concrete of
followinggrades as defined by IS:456
with graded stone aggregates in
allfoundations, bed blocks, chambers,
trenches, floors, roofs,
pavements,screedings, encasing etc at
all depthsbelow finished ground level
torequired levels, slopes etc including
the cost of shuttering all as perdrawings,
specifications and directions of the
Engineer/ Consultant, allmaterials, tools,
plant and labour complete.(a),,M10
Item_ Service No Brief Description Quantity Unit Rate(INR) Amount

No

grade (1:3:6)-100mm thick with 20mm


down graded stone aggregate

20 Prov. laying RCC M-25 in Column 9.18 Cubic mete3,500.00 32130.00


Item Long Text :Providing, transporting
and laying design-mix Reinforced
Cement Concreteof M25 grade
specified below using cement of
approved grade fromapproved
manufacturer,sand, 20mm and down
size coarse aggregates,necessary
admixtures approved by Consultants (if
required), includingall leads and lifts,
placing, vibrating/ compaction,
scaffoldingwherever necessary, curing
as directed, excluding cost of
shuttering andcentering.(a),,In Columns

30 Prov. laying RCC M-25 in Beam 18.74 Cubic mete3,550.00 66527.00


Item Long Text :Providing, transporting
and laying design-mix Reinforced
Cement Concreteof M25 grade
specified below using cement of
approved grade fromapproved
manufacturer,sand, 20mm and down
size coarse aggregates,necessary
admixtures approved by Consultants (if
required), includingall leads and lifts,
placing, vibrating/ compaction,
scaffoldingwherever necessary, curing
as directed, excluding cost of
shuttering andcentering.(b),,In Beams

40 Prov. laying RCC M-25 in Slab 35.86 Cubic mete3,575.00 128199.50


Item Long Text :Providing, transporting
and laying design-mix Reinforced
Cement Concreteof M25 grade
specified below using cement of
approved grade fromapproved
manufacturer,sand, 20mm and down
size coarse aggregates,necessary
admixtures approved by Consultants (if
required), includingall leads and lifts,
placing, vibrating/ compaction,
scaffoldingwherever necessary, curing
as directed, excluding cost of
shuttering andcentering.(c),,In Slab

50 Prov. laying RCC M-25 in Lintel 4.63 Cubic mete3,400.00 15742.00


Item Long Text :Providing, transporting
and laying design-mix Reinforced

Item_ Service No Brief Description Quantity Unit Rate(INR) Amount


No

Cement Concreteof M25 grade specified


below using cement of approved grade
fromapproved manufacturer,sand, 20mm
and down size coarse
aggregates,necessary admixtures
approved by Consultants (if required),
includingall leads and lifts, placing ,
vibrating/ compaction,
scaffoldingwherever necessary, curing as
directed, excluding cost of shuttering
andcentering.(d),,In Lintel

60 Prov. laying RCC M-30 in Foundation 225.09 Cubic mete4,500.00 1012905.00

Item Long Text :Providing, transporting


and laying design-mix Reinforced
Cement Concreteof M30 grade for water
retaining structures using cement from
approvedmanufacturer, sand, 20mm and
down size coarse aggregates,
necessaryadmixtures approved by
Consultants (if required), including all
leadsand lifts, pumping, vibrating/
compaction, scaffolding
wherevernecessary, curing as directed,
excluding cost of shuttering
andcentering.(a),,In Foundations
(including all components of intake well)

70 Supp & grouting M-20 of pocket holes 0.10 Cubic mete45,000.00 4500.00
Item Long Text :Supplying & grouting
(M20 grade) of pocket holes, pipe
sleeves and underbase plate of structural
steel work/ machinery/ pipe
supportingstructures including
roughening of surface, cleaning,
ramming, curingetc. all complete with
CM 1:2 (1 cement : 2 coarse sand) and
10 mm downgraded stonechips using
non shrink admixture. (Cost of all
material andcleaning the pocket by
compressed air shall be in the scope of
thecontractor).

80 Prov. 50mm thick PCC coping 10.50 Square me240.00 2520.00


Item Long Text :Providing 50mm thick
PCC coping of papapet wall including
curing,vibrating, formwork as required,
etc., complete.- 0.25 Mtr width and
M20grade

Price Schedule
Outline No. : - A 03 Brief Description : - Shuttering Work

Item_ Service No Brief Description Quantity Unit Rate(INR) Amount


No

Item_ Service No Brief Description Quantity Unit Rate(INR) Amount


No

10 Prov. Erec. Formwork in foundation 757.85 Square me600.00 454710.00


Item Long Text :Providing, fabricating
and erecting form work at all levels and
placesand profiles wherever
needed/specified as per drawing
including strikingwith 12mm marine
resistant waterproof ply/Smooth finished
MS plates withadjustable steel props of
acceptable Staging system and with
sufficientbracing as approved by
consultant. Cost to include designing of
properform work and staging system to
suit the requirements, sealing thejoints
with heavy duty brown self adhesive
tape, aligning to line andlevels including
M.S. Ties, PVC Spacer, Providing
openings/ cutouts/pockets, applying
deshuttering chemical, Deshuttering as
approved by theconsultant etc.,
complete at all levels, double/ tripple
heights andprofiles(a),,In Foundations

20 Prov. Erec. Formwork in Column/ Pires 102.00 Square me650.00 66300.00


Item Long Text :Providing, fabricating
and erecting form work at all levels and
placesand profiles wherever needed/
specified as per drawing
includingstriking with 12mm marine
resistant waterproof ply/ Smooth
finished MSplates with adjustable steel
props of acceptable Staging system
andwith sufficient bracing as approved
by consultant. Cost to includedesigning
of proper form work and staging system
to suit therequirements, sealing the
joints with heavy duty brown self
adhesivetape, aligning to line and levels
including M.S. Ties, PVC
Spacer,Providing openings/ cutouts/
pockets, applying deshuttering
chemical,Deshuttering as approved by
the consultant etc., complete at all
levels,double/tripple heights and
profiles(b),,In Columns & Pires

30 Prov. Erec. Formwork in Beam & slab 394.05 Square me750.00 295537.50
Item Long Text :Providing, fabricating
and erecting form work at all levels and
placesand profiles wherever needed/
specified as per drawing
includingstriking with 12mm marine
resistant waterproof ply/ Smooth

Item_ Service No Brief Description Quantity Unit Rate(INR) Amount


No

finished MSplates with adjustable steel


propsof acceptable Staging system and
withsufficient bracing as approved by
consultant. Cost to include designingof
proper form work and staging system to
suit the requirements, sealingthe joints
with heavy duty brown self adhesive tape,
aligning to lineand levels including M.S.
Ties, PVC Spacer, Providing openings/
cutouts/pockets, applying deshuttering
chemical, Deshuttering as approved by
theconsultant etc., complete at all levels,
double/tripple heights andprofiles(C) In
Beams & Slab

40 Prov. Erec. Formwork in Lintel / chajja 51.02 Square me800.00 40816.00


Item Long Text :Providing, fabricating and
erecting form work at all levels and
placesand profiles wherever needed/
specified as per drawing includingstriking
with 12mm marine resistant waterproof
ply/ Smooth finished MSplates with
adjustable steel propsof acceptable
Staging system and withsufficient bracing
as approved by consultant. Cost to
include designingof proper form work and
staging system to suit the requirements,
sealingthe joints with heavy duty brown
self adhesive tape, aligning to lineand
levels including M.S. Ties, PVC Spacer,
Providing openings/ cutouts/pockets,
applying deshuttering chemical,
Deshuttering as approved by
theconsultant etc., complete at all levels,
double/tripple heights andprofiles(d),,In
Lintel & Chajja
Price Schedule
Outline No. : - A 04 Brief Description : - Brick Work
Item_ Service No Brief Description Quantity Unit Rate(INR) Amount
No

10 Prov. Brick masonary work above FGL 50.50 Cubic mete5,000.00 252500.00
Item Long Text :Providing common burnt
clay brick masonry work.
Immersing the bricks inwater before use
in all necessary projections, cutting,
circularmoulding, corbelling etc.
including cost, conveyance, taxes &
royalties,loading and unloading of all
materials & cost of all
labours,scaffolding, watering & curing,

Item_ Service No Brief Description Quantity Unit Rate(INR) Amount


No

sundries, T&P etc. complete as per


thedirection of Engineer-in-
Charge(a),,Above FGL in CM (1:6)

Price Schedule

Outline No. : - A 05 Brief Description : - Plastering Work


Item_ Service No Brief Description Quantity Unit Rate(INR) Amount
No
10 Supp & laying 20mm thk in CM (1:6) 378.00 Square me200.00 75600.00
Item Long Text :Supplying and laying
plaster with cement sand mortar at all
heights,walls surface, beams,
staircases lintel soffits, chajjas,
projectionsnarrow bands and widths etc
including chipping of concrete
surfacesraking joints, scaffolding
cleaning and curing, all as per
drawings,specification and direction of
the Engineer, all materials, tools
plantand labour complete in all respect.
(a),,20mm thick outside plaster in CM
(1:6)

20 Supp & laying 15mm thk in CM (1:6) 340.00 Square me160.00 54400.00
Item Long Text :Supplying and laying
plaster with cement sand mortar at all
heights,walls surface, beams,
staircases lintel soffits, chajjas,
projectionsnarrow bands and widths etc
including chipping of concrete
surfacesraking joints, scaffolding
cleaning and curing, all as per
drawings,specification and direction of
the Engineer, all materials, tools
plantand labour complete in all
respect(b),,15 mm thick inside plaster in
CM (1:6)

30 Supp & laying 6mm thk in CM (1:4) 190.00 Square me140.00 26600.00
Item Long Text :Supplying and laying
plaster with cement sand mortar at all
heights,walls surface, beams,
staircases lintel soffits, chajjas,
projectionsnarrow bands and widths etc
including chipping of concrete
surfacesraking joints, scaffolding
cleaning and curing, all as per
drawings,specification and direction of
the Engineer, all materials, tools
plantand labour complete in all
respect(c),,6 mm thick ceiling plaster for
chajja in CM (1:4)

Price Schedule

Outline No. : - A 06 Brief Description : - Flooring/ False Ceiling Work

Item_ Service No Brief Description Quantity Unit Rate(INR) Amount

No
10 Supp & laying 25mm thk Cement 116.94 Square me88.00 10290.72
plaster
Item Long Text :Supplying and laying
25mm thick grey cement patent
concrete(granolithic) floor finish with
neat cement punning in panels in
floors.The concrete shall be in ratio
1:2:4. The cost of glass strips to
beincluded in this item. The quantity of
300 mm skirting included in thisitem

Price Schedule
Outline No. : - A 07 Brief Description : - Painting Works
Item_ Service No Brief Description Quantity Unit Rate(INR) Amount
No
10 Prov & apply acrylic emulsion paint 378.00 Square me150.00 56700.00
Item Long Text :Supplying and applying
two coats with Exterior Quality Acrylic
emulsionweather coat paint of approved
brand and shade over a coat of primer
asper drawings and as specified at all
heights and depths above and
belowplinth level including scaffolding,
all materials, tools, plant andlabour
complete in all respect. (For external
surfaces of buildings andother
structures)

20 Prov. & apply 2 coat distemper 530.00 Square me100.00 53000.00


Item Long Text :Providing and applying 2
coats of distemper over a coat of primer
byproviding all tools,
consumables, labours etc. including the
cost ofscaffolding etc. all complete and
at all heights. (For internal surfacesof
buildings)

30 Prov. & apply 2 coat enamel paint 70.00 Square me180.00 12600.00
Item Long Text :Supplying and applying
two coats with synthetic enamel paint of
approvedbrand and shade over a coat of
primer on new wooden/ steel surface
asper drawings and as specified at all
heights and depths above and
belowplinth level including scaffolding,
all materials, tools, plant andlabour
complete in all respect.

Item_ Service No Brief Description Quantity Unit Rate(INR) Amount


No

Price Schedule
Outline No. : - A 08 Brief Description : - Water Proofing Works
Item_ Service No Brief Description Quantity Unit Rate(INR) Amount
No
10 Prov. & application of Injection groutin 240.00 each 750.00 180000.00
Item Long Text :Providing and
application of injection grouting to the
concrete surfacesby providing &
grouting with deep penetrating polymer/
polyurethanegrouting material (either
single or multiple) of approved brand
andmanufacture, including
necessarysurface preparation, drilling of
holesfor grouting, fixing of nozzles and
grouting around the nozzles The
rateshall include for curing and finishing
and the same to be tested for
anyleakage by approved method. The
application procedures, grouting of
thejoints, mixing proportions of the
materials etc. all as permanufacturer's
recommendations, with all lead & lift for
all materials &labour and as directed, at
all levels and locations.

20 Prov. & fixing PVC water stopper 180.00 Meter 480.00 86400.00
Item Long Text :Providing and fixing
PVC water stopper (white) of size
230X8mm (serratedwith central bulb) at
construction joints including all
materials,tools, tackles, manpower etc.
complete

30 Roof water proofing concrete 162.72 Square me670.00 109022.40


Item Long Text :"Roof Water proofing
using lime concrete and pressed clay
tiles: Limeconcrete shall consist of
broken brick aggregates and lime.
Proportionof brickbat coba shall be 2.5
parts of brick jelly to one part of
lime.The brick jelly shall be hard, well
burnt and of size varying from 12mmto
25mm. The lime concrete is then laid
over roof to slope to givespecified
thickness and in slope of 1 in 80 or as
shown on the drawingfor proper roof
drainage as per roof drainage plan. Roof
shall befinally finished with one coarse
of machine pressed clay titles 20
mmthick laid over a 12mm thick of 1:3

Item_ Service No Brief Description Quantity Unit Rate(INR) Amount


No

mix cement mortar mixed with 5%crude


oil by weight of cement mixed in mortar.
Lime concrete and tilesshall be taken up
the parapet walls to a height of 150 mm
oras shown inthe drawing.The
specification of pressed clay titles shall
be as given in IS:2690(Part-I).The
specification of crude oil shall be as per
IS:2119."

40 Prov. & apply bitumen felt 350.00 Square me400.00 140000.00

Item Long Text :Providing and applying


bitumen felt type-3 of grade-2 conforming
to IS :1322, together with the specified
bonding material and primer on
outsidefaces of structures submerged in
water. The method of
laying the bitumenfelts and
workmanship shall in general conform to
IS : 1609.

Price Schedule
Outline No. : - A 09 Brief Description : - Reinforcement Works
Item_ Service No Brief Description Quantity Unit Rate(INR) Amount
No

10 Carrying cutting for Foundation 24.76 Tonnes 7,000.00 173320.00


Item Long Text :Carrying, cutting,
bending, cranking, placing and fixing in
positionsteel reinforcement including
angles/ pins provided for the
approvedwelded joints, at all levels above
and below finished ground level
forreinforced cement concrete and
precast reinforced cement concrete
worksincluding supplying approved 18
SWG annealed black binding wire,
coverblocks etc all as per drawings,
specifications and directions of
theEngineer all materials, tools, plant
and labour complete- Fe 500
gradereinforcement conforming to IS:
1786, Make: Approved(a),,with high yeld
strength deformed bars (Fe-500) for
foundations.

20 Carrying cutting for Column 1.06 Tonnes 7,500.00 7950.00


Item Long Text :Carrying, cutting,
bending, cranking, placing and fixing in
positionsteel reinforcement including
angles/ pins provided for the
approvedwelded joints, at all levels

Item_ Service No Brief Description Quantity Unit Rate(INR) Amount


No

above and below finished ground level


forreinforced cement concrete and
precast reinforced cement concrete
worksincluding supplying approved 18
SWG annealed black binding wire,
coverblocks etc all as per drawings,
specifications and directions of
theEngineer all materials, tools, plant
and labour complete- Fe 500
gradereinforcement conforming to IS:
1786, Make: Approved(b),,In Columns.

30 Carrying cutting for In Beams 6.83 Tonnes 8,000.00 54640.00

Item Long Text :Carrying, cutting,


bending, cranking, placing and fixing in
positionsteel reinforcement including
angles/pins provided for the
approvedwelded joints, at all levels above
and below finished ground level
forreinforced cement concrete and
precast reinforced cement concrete
worksincluding supplying approved 18
SWG annealed black binding wire,
coverblocks etc all as per drawings,
specifications and directions of
theEngineer all materials, tools, plant
and labour complete- Fe 500
gradereinforcement conforming to IS:
1786, Make: Approved(c),,In Beams and
Slab

40 Carrying cutting for In Lintel 0.44 Tonnes 8,500.00 3740.00


Item Long Text :Carrying, cutting,
bending, cranking, placing and fixing in
positionsteel reinforcement including
angles/pins provided for the
approvedwelded joints, at all levels above
and below finished ground level
forreinforced cement concrete and
precast reinforced cement concrete
worksincluding supplying approved 18
SWG annealed black binding wire,
coverblocks etc all as per drawings,
specifications and directions of
theEngineer all materials, tools, plant
and labour complete- Fe 500
gradereinforcement conforming to IS:
1786, Make: Approved(d),,In Lintel

Price Schedule
Outline No. : - A 10 Brief Description : - Structural Works
Item_ Service No Brief Description Quantity Unit Rate(INR) Amount

Item_ Service No Brief Description Quantity Unit Rate(INR) Amount

No

No
10 Fabr inserts and other fixtures 150.00 Kilogram 20.00 3000.00

Item Long Text :Loading, unloading,


transportation, fabrication, cleaning &
erection ofstructural steel with mild steel
rolled section/ built up
section/combination of both conforming
to IS:2062, pipes conforming to
IS:1161/IS:1239, in inserts, rungs,
gratings, edge angles, channel
sections,cleats, base plates, splice
plates, chequered plate flooring
etcincluding 2 coats of redoxide zinc-
chromate primer (one coat at shop
andone coat after erection) (DFT 30 to
40 Microns for each coat) & twocoats of
Single pack air drying high gloss
phenolic modified alkydsynthetic enamel
paint with 25-30 micron total dry film
thickness (DFT)of each coat. Total DFT
including paint and primer shall be 120
to 130microns(a),,inserts and other
fixtures, edge angles, ISMC etc.

20 Fabr inserts MS rungs-20mm dia 405.00 Kilogram 10.00 4050.00


Item Long Text :Loading, unloading,
transportation, fabrication, cleaning &
erection ofstructural steel with mild steel
rolled section / built up
section/combination of both conforming
to IS:2062, pipes conforming to
IS:1161/IS:1239, in inserts, rungs,
gratings, edge angles, channel sections,
cleats, base plates, splice plates,
chequered plate flooring etcincluding 2
coats of redoxide zinc-chromate primer
(one coat at shop andone coat after
erection) (DFT 30 to 40 Microns for each
coat) & twocoats of Single pack air
drying high gloss phenolic modified
alkydsynthetic enamel paint with 25-30
micron total dry film thickness (DFT)of
each coat. Total DFT including paint and
primer shall be 120 to
130microns(b),,MS rungs-20mm dia

30 Fabr 6 o/p chequred plate 479.00 Kilogram 10.00 4790.00


Item Long Text :Loading, unloading,
transportation, fabrication, cleaning &
erection ofstructural steel with mild steel
rolled section/ built up
section/combination of both conforming
to IS:2062, pipes conforming to
IS:1161/IS:1239, in inserts, rungs,

Item_ Service No Brief Description Quantity Unit Rate(INR) Amount


No

gratings, edge angles, channel


sections,cleats, base plates, splice
plates, chequered plate flooring
etcincluding 2 coats of redoxide zinc-
chromate primer (one coat at shop
andone coat after erection) (DFT 30 to
40 Microns for each coat) & twocoats of
Single pack air drying high gloss phenolic
modified alkydsynthetic enamel paint
with 25-30 micron total dry film thickness
(DFT)of each coat. Total DFT including
paint and primer shall be 120 to
130microns(c),,6 o/p chequred plate on
openings

40 Prov & fixing 1.0 M Handrail 5.00 Meter 2,000.00 10000.00


Item Long Text :Providing and fixing 1.0
Mtr height vertical 40NB MS Handrail of
mediumduty (Class- 'C') conforming to IS:
1161 at 1.2 Mtr spacing, 40 NB
MSHandrail as top rail and 25 NB MS
Handrail as middle rail etc. completeand
as per drawing. The handrails should be
coated with 02 coats ofapproved primer
and 02 coats of synthetic enamel paint of
approved makeand colour. (Top
Horizontal Row=40 NB, Middle
Horizontal Row=25 NB,Vertical=40
NB@1.2 Mtr spacing)

50 Prov. & fixing 750 X 750mm 2.00 NOS 7,000.00 14000.00


Item Long Text :Providing and fixing 750 X
750mm size CI lockable manhole cover
andframe with locking arrangement.

Price Schedule
Outline No. : - A 11 Brief Description : - Doors and Windows
Item_ Service No Brief Description Quantity Unit Rate(INR) Amount
No

10 S/F/F MS normal type manually 16.65 Square me4,500.00 74925.00


operated
Item Long Text :Supplying, Fitting and
fixing in position MS normal type
manuallyoperated pull and push type
rolling shutter of min. 18 guage of
approvedmake confirming to IS 6248
including all fixtures and
fastenings,including cutting necessary
holes in wall and grouting with (1:1 1/2
:3)cement concreteand finishing neatly
Item_ Service No Brief Description Unit Rate(INR) Amount
No

to the stasifaction of engineer Incharge


with all materials, labour, tools & plant
complete includingpainting three coats of
synthetic enamel paint over zinc
chromate primercomplete in all respects
as per sizes.

20 Prov. & fixing MS Door along with frame 2.52 Square me4,575.00 11529.00
Item Long Text :Providing and fixing MS
Door along with frame, holdfast
arrangements (06nos), Hinges (06 nos),
sliding bolt etc. The doors frames shall
befabricated from 1.6 mm thick MS
sheets and shall meet the
generalrequirements of IS:4351.All steel
doors shall consist of double plateflush
door shutters. The door shutter shall be
35 mm (min.) thick withtwo outer sheets
of 1.2 mm rigidly connected with
continuous vertical1.0 mm stiffeners at
the rate of 150 mm centre to centre.
Side, top andbottom edges of shutters
shall be reinforced by continuous pressed
steelchannel with minimum 1.2 mm. The
door shall be sound deadened by
fillingthe inside void with mineral wool.
Doors shall be complete with allhardware
and fixtures like door closer, tower bolts,
handles, stoppers,aldrops, locks etc. The
cost of grouting the holes in brickwork
with PCC(1:2:4) shall also be included in
this cost.

30 MS openable windows 18.72 Square me3,000.00 56160.00


Item Long Text :Supplying and Fixing MS
openable windows along with 4mm thick
floatglass and all necessary accessories
etc. complete as per IS:
1361

Price Schedule
Outline No. : - A 12 Brief Description : - Cofferdam Works including de-watering
Item_ Service No Brief Description Quantity Unit Rate(INR) Amount
No

10 Prov. construct coffer dam in river 12,000.00 Cubic mete500.00 6000000.00


Item Long Text :Providing, constructing
coffer dam in river basin/ dam storages
as pertype design including excavation,
filling the middle portion with B.C.soil (in
gunny bags if required). Providing

Service No Brief Description Unit Rate(INR) Amount


No

impervious semimperviousmaterials on
both side of B.C. soil (in gunny bags if
required)including ramming, compacting
to satifaction of Engineer-in-charge, tillthe
completion of work including dismantling
coffer dam after completionof works and
disposing off material as directed by
theEngineer-in-charge.

20 Dewatering the excavated trenches 5,000.00 Hour 40.00 200000.00

Item Long Text :Dewatering the


excavated trenches and pools of water in
the buildingtrenches/ pipe line trenches,
well works by using pumps and
otherdevices including disposing off water
to safe distance as directed byEngineer-
in -charge (including costof machinery,
labour fuel) etc.complete.
Rate to be calculate per HP/HR basis.
Basic Price 10,320,065.47 INR 10,320,065.47 INR
IN: Integrated GST 18.00 % 1,857,611.78 INR
----------------------------------------------------------------------------------------------------------------------------------------------------
Total : 12,177,677.25 INR
Item No. : - 00020 Description:- Const of Approach Bridge at RourkelaBHEL
SAC Code : -9983
Delivery Date : 31.03.2020
----------------------------------------------------------------------------
Price Schedule
Outline No. : - A 01 Brief Description : - Excavation Work
Item_ Service No Brief Description Quantity Unit Rate(INR) Amount
No

10 E/W excavation upto 1.5 M fro 547.20 Cubic mete125.00 68400.00


Item Long Text :Earth work in
excavation by mechanical means in
dense sand over areas and stacking
with in a lead of 50 M, with ramming,
trimming anddressing of sides etc.,
(authorised working space, benching
and sideslopes for the excavation will
be measured and paid under this
item).Dewatering for the trench has
been considered
separately(a),,upto 1.5 Mtr depth from
EGL

Item_ Service No Brief Description Quantity Unit Rate(INR) Amount

No

20 E/W excavation from 1.5 M - 3.0M 547.20 Cubic mete150.00 82080.00


Item Long Text :Earth work in excavation
by mechanical means in dense sand
over areasand stacking with in a lead of
50 M,with ramming, trimming and
dressingof sides etc.,(authorised
working space, benching and side
slopes forthe excavation will be
measured and paid under this item).
Dewateringfor the trench has been
considered separately(b),,1.50 mtr to
3.00 mtr

30 E/W excavation from 3.0 M-4.50 M 383.04 Cubic mete180.00 68947.20


Item Long Text :Earth work in excavation
by mechanical means in dense sand
over areas and stacking with in a lead of
50 M,with ramming, trimming and
dressingof sides etc.,(authorised
working space, benching and side
slopes forthe excavation will be
measured and paid under this item).
Dewateringfor the trench has been
considered separately(c),,3.00 Mtr to
4.50 Mtr

40 E/W excavation in rocks 3.0M - 4.50 M 164.16 Cubic mete800.00 131328.00


Item Long Text :Earth work in excavation
by mechanical means in weathered rock
overareas and stacking with in a lead of
50 M,with ramming, trimming
anddressing of sides etc.(authorised
working space, benching and sideslopes
for the excavation will be measured and
paid under this item)Dewatering for the
trench has been considered
separately(a),,3.00 Mtr to 4.50 Mtr

50 E/W excavation in rocks 4.50M - 6.0 M 576.38 Cubic mete900.00 518742.00


Item Long Text :Earth work in excavation
by mechanical means in weathered rock
overareas and stacking with in a lead of
50 M,with ramming, trimming
anddressing of sides etc.(authorised
working space, benching and sideslopes
for the excavation will be measured and
paid under this item)Dewatering for the
trench has been considered
separately(b),,4.50 Mtr to

Item_ Service No Brief Description Quantity Unit Rate(INR) Amount


No

6.00 Mtr

60 Backfilling in all positions & heights 2,098.00 Cubic mete100.00 209800.00

Item Long Text :"Backfilling in all


positions and heights and descents in
foundations,pits, around foundations with
approved excavated material obtained
fromsoil heaps at all heights,
transporting, depositing, dressing
&compacting complete all as per
drawings, specifications and directionsof
the Engineer, all tools, plant and labour
complete. Each layer shouldbe not more
than 150 mm thick when looseand should
be well rammed, with necessary
watering, to obtain at least90% of
maximum laboratory dry density. as
directed by the Engineer- byexcavated
soil "

Price Schedule
Outline No. : - A 02 Brief Description : - Concrete Work
Item_ Service No Brief Description Quantity Unit Rate(INR) Amount
No

10 Prov. & laying PCC (1:3:6) M-10 13.41 Cubic mete3,500.00 46935.00
Item Long Text :Providing, laying and
compacting plain cement concrete of
followinggrades as defined by IS:456
with graded stone aggregates in
allfoundations, bed blocks, chambers,
trenches, floors, roofs,
pavements,screedings, encasing etc at
all depthsbelow finished ground level
torequired levels, slopes etc including
the cost of shuttering all as perdrawings,
specifications and directions of the
Engineer/ Consultant, allmaterials, tools,
plant and labour complete.(a),,M10
grade (1:3:6)-100mm thick with 20mm
down graded stone aggregate

20 Prov. & laying RCC M-25 in RCC slab 48.00 Cubic mete4,000.00 192000.00
Item Long Text :Providing, transporting
and laying design-mix Reinforced
Cement Concreteof M25 grade specified
below using cement of approved grade
fromapproved manufacturer,sand, 20mm
and down size coarse
aggregates,necessary admixtures
approved by Consultants (if required),
includingall leads and lifts,

Item_ Service No Brief Description Quantity Unit Rate(INR) Amount

No

placing, vibrating/ compaction,


scaffoldingwherever necessary, curing
as directed, excluding cost of shuttering
andcentering.(a),,In Slab

30 Prov. & laying RCC M-30 in Foundation 75.78 Cubic mete4,000.00 303120.00
Item Long Text :Providing, transporting
and laying design-mix Reinforced
Cement Concreteof M30 grade for water
retaining structures using cement from
approvedmanufacturer, sand, 20mm and
down size coarse aggregates,
necessaryadmixtures approved by
Consultants (if required), including all
leadsand lifts, pumping, vibrating/
compaction, scaffolding
wherevernecessary, curing as directed,
excluding cost of shuttering
andcentering.(a),,In Foundations

40 Prov. & laying RCC M-30 in Column 84.48 Cubic mete4,500.00 380160.00
Item Long Text :Providing, transporting
and laying design-mix Reinforced
Cement Concreteof M30 grade for water
retaining structures using cement from
approvedmanufacturer, sand, 20mm and
down size coarse aggregates,
necessaryadmixtures approved by
Consultants (if required), including all
leadsand lifts, pumping, vibrating/
compaction, scaffolding
wherevernecessary, curing as directed,
excluding cost of shuttering
andcentering.(b),,In Columns

50 Prov. & laying RCC M-30 in Beams 20.00 Cubic mete4,500.00 90000.00
Item Long Text :Providing, transporting
and laying design-mix Reinforced
Cement Concreteof M30 grade for water
retaining structures using cement from
approvedmanufacturer, sand, 20mm and
down size coarse aggregates,
necessaryadmixtures approved by
Consultants (if required), including all
leadsand lifts, pumping, vibrating/
compaction, scaffolding
wherevernecessary, curing as directed,
excluding cost of shuttering
andcentering.(c),,In Beams

60 Supp & grouting of pocket holes 0.20 Cubic mete45,000.00 9000.00

Item_ Service No Brief Description Quantity Unit Rate(INR) Amount


No
Item Long Text :Supplying & grouting
(M20 grade) of pocket holes , pipe
sleeves andunder base plate of structural
steel work/ machinery/ pipe
supportingstructures including roughening
of surface, cleaning, ramming, curingetc.
all complete with CM 1:2 (1 cement : 2
coarse sand) and 10 mm downgraded
stonechips using non shrink admixture.
(Cost of all material andcleaning the
pocket by compressed air shall be in the
scope of thecontractor).

Price Schedule
Outline No. : - A 03 Brief Description : - Shuttering Work
Item_ Service No Brief Description Quantity Unit Rate(INR) Amount
No
10 Prov. Fabr Erect. Formwork in Fdn 97.00 Square me450.00 43650.00
Item Long Text :Providing, fabricating
and erecting form work at all levels and
placesand profiles wherever
needed/specified as per drawing
including strikingwith 12mm marine
resistant waterproof ply/Smooth finished
MS plates with adjustable steel props of
acceptable Staging system and
withsufficient bracing as approved by
consultant. Cost to include designingof
proper form work and staging system to
suit the requirements, sealingthe joints
with heavy duty brown self adhesive
tape, aligning to lineand levels including
M.S. Ties, PVC Spacer, Providing
openings/ cutouts/pockets, applying
deshuttering chemical, Deshuttering as
approved by theconsultant etc.,
complete at all levels, double/tripple
heights andprofiles(a),,In Foundations

20 Prov. Fabr Erect. Formwork in Column 256.00 Square me600.00 153600.00


Item Long Text :Providing, fabricating
and erecting form work at all levels and
placesand profiles wherever
needed/specified as per drawing
including strikingwith 12mm marine
resistant waterproof ply/Smooth finished
MS plates with adjustable steel props of
acceptable Staging system and
withsufficient bracing as approved by
consultant. Cost to include designingof
proper form work and staging system to

Item_ Service No Brief Description Quantity Unit Amount


No

suit the requirements, sealingthe joints


with heavy duty brown self adhesive tape,
aligning to lineand levels including M.S.
Ties, PVC Spacer, Providing openings/
cutouts/pockets, applying deshuttering
chemical, Deshuttering as approved by
theconsultant etc., complete at all levels,
double/tripple heights andprofiles(b),,In
Columns & Pires

30 Prov. Fabr Erect. Formwork in Beams 122.00 Square me550.00 67100.00


Item Long Text :Providing, fabricating and
erecting form work at all levels and
placesand profiles wherever
needed/specified as per drawing including
strikingwith 12mm marine resistant
waterproof ply/Smooth finished MS plates
with adjustable steel props of acceptable
Staging system and withsufficient bracing
as approved by consultant. Cost to
include designingof proper form work and
staging system to suit the requirements,
sealingthe joints with heavy duty brown
self adhesive tape, aligning to lineand
levels including M.S. Ties, PVC Spacer,
Providing openings/ cutouts/pockets,
applying deshuttering chemical,
Deshuttering as approved by
theconsultant etc., complete at all levels,
double/tripple heights andprofiles(c),,In
Beams & Slab

Price Schedule
Outline No. : - A 04 Brief Description : - Reinforcement Works
Item_ Service No Brief Description Quantity Unit Rate(INR) Amount
No

10 C & fixing Reinf. Steel inFoundation 9.10 Tonnes 6,500.00 59150.00


Item Long Text :Carrying, cutting,
bending, cranking, placing and fixing in
positionsteel reinforcement including
angles/ pins provided for the
approvedwelded joints, at all levels
above and below finished ground level
forreinforced cement concrete and
precast reinforced cement concrete
worksincluding supplying approved 18
SWG annealed black binding wire,
coverblocks etc all as per drawings,
specifications and directions of
theEngineer all materials, tools, plant
and labour complete- Fe 500
gradereinforcement conforming to IS:

Item_ Service No Brief Description Unit Rate(INR) Amount


No

1786, Make: Approved(a),,with high yeld


strength deformed bars (Fe-500) for
foundations

20 C & fixing Reinf. Steel in Column 10.56 Tonnes 7,000.00 73920.00

Item Long Text :Carrying, cutting,


bending, cranking, placing and fixing in
positionsteel reinforcement including
angles/pins provided for the
approvedwelded joints, at all levels above
and below finished ground level
forreinforced cement concrete and
precast reinforced cement concrete
worksincluding supplying approved 18
SWG annealed black binding wire,
coverblocks etc all as per drawings,
specifications and directions of
theEngineer all materials, tools, plant and
labour complete- Fe 500
gradereinforcement conforming to IS:
1786, Make: approved(b),,In Columns

30 C & fixing Reinf. Steel in Beams 2.50 Tonnes 7,500.00 18750.00


Item Long Text :Carrying, cutting,
bending, cranking, placing and fixing in
positionsteel reinforcement including
angles/pins provided for the
approvedwelded joints, at all levels above
and below finished ground level
forreinforced cement concrete and
precast reinforced cement concrete
worksincluding supplying approved 18
SWG annealed black binding wire,
coverblocks etc all as per drawings,
specifications and directions of
theEngineer all materials, tools, plant and
labour complete- Fe 500
gradereinforcement conforming to IS:
1786, Make: Approved(c),,In Beams and
Slab

Price Schedule
Outline No. : - A 05 Brief Description : - Structural Works
Item_ Service No Brief Description Quantity Unit Rate(INR) Amount
No

10 Fab. Erec. of Structural steel ISMC etc 86,070.00 Kilogram 25.00 2151750.00
Item Long Text :Loading, unloading,
transportation, fabrication, cleaning &
erection ofstructural steel with mild steel
rolled section / built up
section /combination of both conforming
to
Item_ Service No Brief Description Quantity Unit Rate(INR) Amount

No

IS:2062, pipes conforming to


IS:1161/IS:1239, in inserts,
rungs,gratings, edge angles, channel
sections, cleats, base plates, splice
plates, chequered plate flooring
etcincluding 2 coats of redoxide zinc-
chromate primer (one coat at shop
andone coat after erection) (DFT 30 to
40 Microns for each coat) & twocoats of
Single pack air drying high gloss
phenolic modified alkydsynthetic enamel
paint with 25-30 micron total dry film
thickness (DFT)of each coat. Total DFT
including paint and primer shall be 120 to
130microns(a),,inserts and other fixtures,
edge angles, ISMC etc.

20 Fab. Erec. of Structural / Rail section 19,800.00 Kilogram 22.00 435600.00


Item Long Text :Loading, unloading,
transportation, fabrication, cleaning &
erection ofstructural steel with mild steel
rolled section / built up section
/combination of both conforming to
IS:2062, pipes conforming to
IS:1161/IS:1239, in inserts, rungs,
gratings, edge angles, channel
sections,cleats, base plates, splice
plates, chequered plate flooring
etcincluding 2 coats of redoxide zinc-
chromate primer (one coat at shop
andone coat after erection) (DFT 30 to
40 Microns for each coat) & twocoats of
Single pack air drying high gloss
phenolic modified alkydsynthetic enamel
paint with 25-30 micron total dry film
thickness (DFT)of each coat. Total DFT
including paint and primer shall be 120 to
130microns(b),,Standard rail section

30 Prov. & fixing 1.0M height MS Handrail 162.00 Meter 2,000.00 324000.00
Item Long Text :Providing and fixing 1.0
Mtr height vertical 40NB MS Handrail of
mediumduty (Class- 'C') conforming to
IS: 1161 at 1.2 Mtr spacing, 40 NB
MSHandrail as top rail and 25 NB MS
Handrail as middle rail etc. completeand
as per drawing. The handrails should be
coated with 02 coats ofapproved primer
and 02 coats of synthetic enamel paint of
approved makeand colour. (Top
Horizontal Row=40 NB, Middle
Horizontal Row=25 NB,Vertical=40
NB@1.2 Mtr spacing)

Price Schedule
Outline No. : - A 06 Brief Description : - Cofferdam Works including de-watering

Item_ Service No Brief Description Quantity Unit Rate(INR)


No
10 Constn of coffer dam in river basin 4,000.00 Cubic meter 500.00
Item Long Text :Providing, constructing
coffer dam in river basin / dam storages
as pertype design including excavation,
filling the middle portion with B.C.soil (in
gunny bags if required). Providing
impervious/ semimperviousmaterials on
both side of B.C. soil (in gunny bags if
required)including ramming ,
compacting to satifaction of
Engineer-in-charge,till the completion of
work including dismantling coffer dam
aftercompletion of works and
disposing off material as directed by
theEngineer-in-charge.
20 Dewatering the excavated trenches 5,000.00 Hours 40.00
Item Long Text :Dewatering the
excavated trenches and pools of water
in the buildingtrenches/ pipe line
trenches, well works by using pumps
and otherdevices including disposing off
water to safe distance as directed
byEngineer- in -charge (including costof
machinery , labour fuel) etc.complete

Basic Pric7,628,032.20 INR 7,628,032.20 INR


IN: Integr 18.00 % 1,373,045.80 INR
----------------------------------------------------------------------------------------------------------------------------------------------------
Total : 9,001,078.00 INR
Item No. : - 00030 Description:- Switchgear Room & Transformer Yard SAC Code : -9983
Delivery Date : 31.03.2020
----------------------------------------------------------------------------
Price Schedule
Outline No. : - A 01 Brief Description : - Excavation Work
Item_ Service No Brief Description Quantity Unit Rate(INR)
No

10 E/W in excv. upto 1.5 Mtr depth from 283.50 Cubic meter 125.00
EGL
Item Long Text :Earth work in excavation
by mechanical means in dense sand
over areasand stacking with in a lead of
50 M,with ramming, trimming and
dressingof sides

Item_ Service No Brief Description Quantity Unit Rate(INR)

No

etc.,(authorised working space,


benching and side slopes forthe
excavation will be measured and paid
under this item). Dewateringfor the
trench has been considered
separately(a),,upto 1.5 Mtr depth from
EGL
20 E/W in excv. from 1.50M - 3.0M 170.20 Cubic mete150.00 25530.00

Item Long Text :Earth work in excavation


by mechanical means in dense sand
over areasand stacking with in a lead of
50 M, with ramming, trimming and
dressingof sides etc.,(authorised
working space, benching and side
slopes forthe excavation will be
measured and paid under this item).
Dewateringfor the trench has been
considered separately(b),,1.5 mtr to
3.00 mtr

30 E/W in excv. weathered rock 113.40 Cubic mete500.00 56700.00


1.50M-3.0M
Item Long Text :Earth work in excavation
by mechanical means in weathered rock
overareas and stacking with in a lead of
50 M,with ramming, trimming
anddressing of sides etc.(authorised
working space, benching and sideslopes
for the excavation will be measured and
paid under this item)Dewatering for the
trench has been considered
separately(a),,1.5 mtr to 3.00 mtr

40 E/W in excv. weathered rock 189.00 Cubic mete700.00 132300.00


3.0M-4.50M
Item Long Text :Earth work in excavation
by mechanical means in weathered rock
overareas and stacking with in a lead of
50 M,with ramming, trimming
anddressing of sides etc.(authorised
working space, benching and sideslopes
for the excavation will be measured and
paid under this item)Dewatering for the
trench has been considered
separately(b),,3.00 Mtr to 4.50 Mtr

50 E/W in excv. in hard rock 3.0M-4.50M 94.50 Cubic mete1,200.00 113400.00


Item Long Text :Earth work in
Item_ Service No Brief Description Quantity Unit Rate(INR) Amount
No

excavation by mechanical means in


hard rock over areas and stacking with
in a lead of 50 M,with ramming,
trimming and dressingof sides etc.
(authorised working space, benching
and side slopes for theexcavation will be
measured and paid under this item)
Dewatering for thetrench has been
considered separately(a) 3.00 Mtr to
4.50 Mtr

60 E/W in excv. in hard rock 4.50M-6.0M 283.50 Cubic mete1,400.00 396900.00


Item Long Text :Earth work in excavation
by mechanical means in hard rock over
areas and stacking with in a lead of 50
M,with ramming, trimming and
dressingof sides etc.(authorised working
space, benching and side slopes for
theexcavation will be measured and paid
under this item) Dewatering for thetrench
has been considered separately(b),,4.50
Mtr to 6.00 Mtr

70 E/W in excv. in hard rock 6.0M-7.50M 283.50 Cubic mete1,600.00 453600.00


Item Long Text :Earth work in excavation
by mechanical means in hard rock over
areas and stacking with in a lead of 50
M, with ramming, trimming anddressing
of sides etc.(authorised working space,
benching and sideslopes for the
excavation will be measured and paid
under this item)Dewatering for the trench
has been considered separately(c),,6.00
Mtr to 7.500 Mtr
80 E/W in excv. in hard rock 7.50M-9.0M 18.90 Cubic mete1,900.00 35910.00
Item Long Text :Earth work in excavation
by mechanical means in hard rock over
areas andstacking with in a lead of 50
M,with ramming, trimming and dressing
ofsides etc.(authorised working space,
benching and side slopes for
theexcavation will be measuredand paid
under this item) Dewatering for thetrench
has been considered
separately(d),,7.500 Mtr to 9.00 Mtr

90 Backfilling in all position & heights 1,369.49 Cubic mete150.00 205423.50

Item_ Service No Brief Description Quantity Unit Rate(INR) Amount


No

Item Long Text :"Backfilling in all


positions and heights and descents in
foundations,pits, around foundations with
approved excavated material obtained
fromsoil heaps at all heights,
transporting, depositing, dressing
&compacting complete all as per
drawings, specifications and directionsof
the Engineer, all tools, plant and labour
complete. Each layer shouldbe not more
than 150 mm thick when looseand should
be well rammed, with necessary
watering, to obtain at least90% of
maximum laboratory dry density. as
directed by the Engineer- byexcavated
soil "

Price Schedule

Outline No. : - A 02 Brief Description : - Concrete Work


Item_ Service No Brief Description Quantity Unit Rate(INR) Amount
No
10 Prov. laying PCC (1:3:6) M-10 10.17 Cubic mete3,500.00 35595.00
Item Long Text :Providing, laying and
compacting plain cement concrete of
followinggrades as defined by IS:456
with graded stone aggregates in
allfoundations, bed blocks, chambers,
trenches, floors, roofs,
pavements,screedings, encasing etc at
all depths below finished ground level
torequired levels, slopes etc including
the cost of shuttering all as perdrawings,
specifications and directions of the
Engineer/ Consultant, allmaterials, tools,
plant and labour complete.(a),,M10
grade (1:3:6)-100mm thick with 20mm
down graded stone aggregate

20 Prov. laying RCC M-25 in Foundation 25.20 Cubic mete3,500.00 88200.00


Item Long Text :Providing, transporting
and laying design-mix Reinforced
Cement Concreteof M25 grade specified
below using cement of approved grade
fromapproved manufacturer,sand, 20mm
and down size coarse
aggregates,necessary admixtures
approved by Consultants (if required),
includingall leads and lifts, placing,
vibrating/ compaction,
scaffoldingwherever necessary, curing
as directed, excluding cost of shuttering
andcentering.(a),,In Foundations

Item_ Service No Brief Description Quantity Unit Rate(INR) Amount


No

30 Prov. laying RCC M-25 in Column 94.93 Cubic mete3,550.00 337001.50


Item Long Text :Providing, transporting
and laying design-mix Reinforced
Cement Concreteof M25 grade
specified below using cement of
approved grade fromapproved
manufacturer,sand, 20mm and down
size coarse aggregates,necessary
admixtures approved by Consultants (if
required), includingall leads and lifts,
placing , vibrating/ compaction,
scaffoldingwherever necessary, curing
as directed, excluding cost of
shuttering andcentering.(b),,In Columns

40 Prov. laying RCC M-25 in Beam 57.57 Cubic mete3,575.00 205812.75

Item Long Text :Providing, transporting


and laying design-mix Reinforced
Cement Concreteof M25 grade
specified below using cement of
approved grade fromapproved
manufacturer,sand, 20mm and down
size coarse aggregates,necessary
admixtures approved by Consultants (if
required), includingall leads and lifts,
placing , vibrating/ compaction,
scaffoldingwherever necessary, curing
as directed, excluding cost of
shuttering andcentering.(c),,In Beams

50 Prov. laying RCC M-25 in Slab 110.11 Cubic mete3,650.00 401901.50


Item Long Text :Providing, transporting
and laying design-mix Reinforced
Cement Concreteof M25 grade
specified below using cement of
approved grade fromapproved
manufacturer,sand, 20mm and down
size coarse aggregates,necessary
admixtures approved by Consultants (if
required), includingall leads and lifts,
placing , vibrating/ compaction,
scaffoldingwherever necessary, curing
as directed, excluding cost of
shuttering andcentering.(d) In Slab

60 Prov. laying RCC M-25 in Lintel 6.07 Cubic mete3,700.00 22459.00


Item Long Text :Providing, transporting
and laying design-mix Reinforced
Cement Concreteof M25 grade
specified below using cement of

Item_ Service No Brief Description Quantity Unit Rate(INR) Amount


No

approved grade fromapproved


manufacturer,sand, 20mm and down size
coarse aggregates,necessary admixtures
approved by Consultants (if required),
includingall leads and lifts, placing,
vibrating/ compaction,
scaffoldingwherever necessary, curing as
directed, excluding cost of shuttering
andcentering.(e),,In Lintel

70 Prov. & grouting of pocket holes 0.20 Cubic mete45,000.00 9000.00

Item Long Text :Supplying & grouting


(M20 grade) of pocket holes, pipe sleeves
and underbase plate of structural steel
work/ machinery/ pipe
supportingstructures including roughening
of surface, cleaning, ramming, curingetc.
all complete with CM 1:2 (1 cement : 2
coarse sand) and 10 mm downgraded
stone chips using non shrink admixture.
(Cost of all material andcleaning the
pocket by compressed air shall be in the
scope of thecontractor).

80 Prov. 50mm thk PCC coping 18.59 Square me240.00 4461.60


Item Long Text :Providing 50mm thick
PCC coping of papapet wall including
curing,vibrating, formwork as required,
etc., complete.- 0.25 Mtr width and
M20grade
Price Schedule
Outline No. : - A 03 Brief Description : - Shuttering Work
Item_ Service No Brief Description Quantity Unit Rate(INR) Amount
No

10 Prov. / Fabr/erec. Formwork in Fdn 50.40 Square me400.00 20160.00


Item Long Text :Providing, fabricating
and erecting form work at all levels and
placesand profiles wherever needed/
specified as per drawing
includingstriking with 12mm marine
resistant waterproof ply/ Smooth
finished MSplates with adjustable steel
propsof acceptable Staging system and
withsufficient bracing as approved by
consultant. Cost to include designingof
proper form work and staging system to
suit the requirements, sealingthe joints
with heavy duty brown self adhesive
tape, aligning to lineand levels including

Item_ Service No Brief Description Quantity Unit Rate(INR) Amount

No

M.S. Ties, PVC Spacer, Providing


openings/ cutouts/pockets, applying
deshuttering chemical, Deshuttering as
approved by theconsultant etc.,
complete at all levels, double/tripple
heights andprofiles(a),,In Foundations

20 Prov. / Fabr/erec. Formwork in Pires 717.36 Square me500.00 358680.00


Item Long Text :Providing, fabricating
and erecting form work at all levels and
placesand profiles wherever
needed/specified as per drawing
including strikingwith 12mm marine
resistant waterproof ply/ Smooth
finished MS plateswith adjustable steel
props of acceptable Staging system and
withsufficient bracing as approved by
consultant. Cost to include designingof
proper form work and staging system to
suit the requirements, sealingthe joints
with heavy duty brown self adhesive
tape, aligning to lineand levels including
M.S. Ties, PVC Spacer, Providing
openings/ cutouts/pockets, applying
deshuttering chemical, Deshuttering as
approved by theconsultant etc.,
complete at all levels, double/ tripple
heights andprofiles(b),,In Columns &
Pires

30 Prov. / Fabr/erec. Formwork in Beams 1,463.25 Square me600.00 877950.00


Item Long Text :Providing, fabricating
and erecting form work at all levels and
placesand profiles wherever
needed/specified as per drawing
including strikingwith 12mm marine
resistant waterproof ply/Smooth finished
MS plates with adjustable steel props of
acceptable Staging system and
withsufficient bracing as approved by
consultant. Cost to include designingof
proper form work and staging system to
suit the requirements, sealingthe joints
with heavy duty brown self adhesive
tape, aligning to lineand levels including
M.S. Ties, PVC Spacer, Providing
openings/ cutouts/pockets, applying
deshuttering chemical, Deshuttering as
approved by theconsultant etc.,
complete at all levels, double/tripple
heights andprofilesc,,In Beams & Slab

40 Prov. / Fabr/erec. Formwork in In Lintel 48.50 Square me700.00 33950.00

Item_ Service No Brief Description Quantity Unit Rate(INR) Amount


No
Item Long Text :Providing, fabricating and
erecting form work at all levels and
placesand profiles wherever
needed/specified as per drawing including
strikingwith 12mm marine resistant
waterproof ply/Smooth finished MS plates
with adjustable steel props of acceptable
Staging system and withsufficient bracing
as approved by consultant. Cost to
include designingof proper form work and
staging system to suit the requirements,
sealingthe joints with heavy duty brown
self adhesive tape, aligning to lineand
levels including M.S. Ties, PVC Spacer,
Providing openings/ cutouts/pockets,
applying deshuttering chemical,
Deshuttering as approved by
theconsultant etc., complete at all levels,
double/tripple heights andprofiles(d) ,,In
Lintel & Chajja

Price Schedule
Outline No. : - A 04 Brief Description : - Brick Work
Item_ Service No Brief Description Quantity Unit Rate(INR) Amount
No
10 Prov. Brick masonary work in CM (1:6) 103.05 Cubic mete5,000.00 515250.00
Item Long Text :Providing common burnt
clay brick masonry work.
Immersing the bricks inwater before use
in all necessary projections, cutting,
circularmoulding, corbelling etc.
including cost, conveyance, taxes &
royalties,loading and unloading of all
materials & cost of all
labours,scaffolding, watering & curing,
sundries, T&P etc.complete as per
thedirection of Engineer-in-
Charge(a),,Above FGL in CM (1:6)

20 Prov. Brick masonary work in CM (1:4) 60.00 Square me700.00 42000.00


Item Long Text :"Providing kiln burnt
bricks masonry work
(230mmx110mmx80mmsize)
havingcrushing strength not less than
75Kg/Sqcm in cement mortar (1:4)
forhalf brick masonry (110mm) walls
with provision of 2nos 6mm
dia.M.S.bars at every third course of half
brick masonry Immersing thebricks in
water before use in all necessary
projections plays cutting,circular

Item_ Service No Brief Description Quantity Unit Rate(INR) Amount


No

moulding, corbelling etc including cost


conveyance, taxes,royalties, loading and
unloading ofall materials & cost of all
labours,scaffolding, watering & curing,
sundries, T&P etc. complete as per
thedirection of Engineer-in-charge .above
FGL- In CM (1:4) "a,,Above FGL in CM
(1:4)

Price Schedule
Outline No. : - A 05 Brief Description : - Plastering Work
Item_ Service No Brief Description Quantity Unit Rate(INR) Amount
No
10 Prov. laying 20mm thk Outside plaster 445.00 Square me200.00 89000.00
Item Long Text :Supplying and laying
plaster with cement sand mortar at all
heights,walls surface, beams,
staircases lintel soffits, chajjas,
projectionsnarrow bands and widths etc
including chipping of concrete
surfacesraking joints, scaffolding
cleaning and curing, all as per
drawings,specification and direction of
the Engineer/ Consultant, all
materials,tools plant and labour
complete in all respect.(a),,20 mm thick
outside plaster in CM (1:6)
20 Prov. laying 15mm thk inside plaster 400.00 Square me150.00 60000.00
Item Long Text :Supplying and laying
plaster with cement sand mortar at all
heights,walls surface, beams,
staircases lintel soffits, chajjas,
projectionsnarrow bands and widths etc
including chipping of concrete
surfacesraking joints, scaffolding
cleaning and curing, all as per
drawings,specification and direction of
the Engineer/ Consultant, all
materials,tools plant and labour
complete in all respect(b),,15 mm thick
inside plaster in CM (1:6)

30 Prov. laying 6mm thk ceiling plaster 330.00 Square me140.00 46200.00
Item Long Text :Supplying and laying
plaster with cement sand mortar at all
heights,walls surface, beams,
staircases lintel soffits, chajjas,
projectionsnarrow bands and widths etc
including chipping of concrete
surfacesraking joints, scaffolding
cleaning and curing, all as per
drawings,specification and direction of
the Engineer/ Consultant, all

Item_ Service No Brief Description Unit Rate(INR) Amount


No

materials,tools plant and labour complete


in all respect(c),,6 mm thick ceiling
plaster for chajja in CM (1:4)

Price Schedule

Outline No. : - A 06 Brief Description : - Flooring/ False Ceiling Work


Item_ Service No Brief Description Quantity Unit Rate(INR) Amount
No
10 Prov. laying Patent concrete 245.00 Square me88.00 21560.00
Item Long Text :Supplying and laying
25mm thick grey cement patent
concrete(granolithic) floor finish with
neat cement punning in panels in
floors.The concrete shall be in ratio
1:2:4. The cost of glass strips to
beincluded in this item. The quantity of
300 mm skirting included in thisitem

Price Schedule
Outline No. : - A 07 Brief Description : - Painting Works
Item_ Service No Brief Description Quantity Unit Rate(INR) Amount
No

10 Prov. & apply weather coat paint 435.00 Square me150.00 65250.00
Item Long Text :Supplying and applying
two coats with Exterior Quality Acrylic
emulsionweather coat paint of approved
brand and shade over a coat of primer
asper drawings and as specified at all
heights and depths above and
belowplinth level including scaffolding,
all materials, tools, plant andlabour
complete in all respect. (For external
surfaces of buildings andother
structures)

20 Prov. & apply 2 coat distemper 730.00 Square me130.00 94900.00


Item Long Text :Providing and applying 2
coats of distemper over a coat of primer
byproviding all tools,
consumables, labours etc. including the
cost ofscaffolding etc. all complete and
at all heights. (For internal surfacesof
buildings )

Price Schedule
Outline No. : - A 08 Brief Description : - Water Proofing Works
Item_ Service No Brief Description Quantity Unit Rate(INR) Amount
No

10 Prov. & apply of Injection grouting 1.00 each 750.00 750.00


Item Long Text :Providing and application
of injection grouting to the concrete
surfacesby providing & grouting with deep
penetrating polymer/polyurethanegrouting
material (either single or multiple) of
approved brand andmanufacture,
including necessary surface preparation,
drilling of holesfor grouting, fixing of
nozzles and grouting around the nozzles
Therate shall include for curing and
finishing and the same to be testedfor
any leakage by approved method. The
application procedures, groutingof the
joints, mixing proportions of the materials
etc. all as permanufacturer's
recommendations, with all lead & lift for
all materials &labour and as directed, at
all levels and locations.

20 Prov. Roof Waterproofing using lime 275.66 Square me670.00 184692.20

conc
Item Long Text :"Roof Water proofing
using lime concrete and pressed clay
tiles: Limeconcrete shall consist of
broken brick aggregates and lime.
Proportionof brickbat coba shall be 2.5
parts of brick jelly to one part of lime.The
brick jelly shall be hard, well burnt and of
size varying from 12mmto 25mm. The
lime concrete is then laid over roof to
slope to givespecified thickness and in
slope of 1 in 80 or as shown on the
drawingfor proper roof drainage as per
roof drainage plan. Roof shall befinally
finished with one coarse of machine
pressed clay titles 20 mmthick laid over a
12mm thick of 1:3 mix cement mortar
mixed with 5%crude oil by weight of
cement mixed in mortar. Lime concrete
and tilesshall be taken up the parapet
walls to a height of 150 mm oras shown
inthe drawing.The specification of
pressed clay titles shall be as given in
IS:2690(Part-I).The specification of crude
oil shall be as per IS:2119."

Price Schedule
Outline No. : - A 09 Brief Description : - Reinforcement Works
Item_ Service No Brief Description Quantity Unit Rate(INR) Amount
No

Item_ Service No Brief Description Quantity Unit Rate(INR) Amount

No

10 C & placing Reinforcement steel in Fdn 3.03 Tonnes 6,500.00 19695.00


Item Long Text :Carrying, cutting,
bending, cranking, placing and fixing in
positionsteel reinforcement including
angles/pins provided for the
approvedwelded joints, at all levels
above and below finished ground level
forreinforced cement concrete and
precast reinforced cement concrete
worksincluding supplying approved 18
SWG annealed black binding wire,
coverblocks etc all as per drawings,
specifications and directions of
theEngineer all materials, tools, plant
and labour complete- Fe 500
gradereinforcement conforming to IS:
1786, Make: Approved(a),,with high yeld
strength deformed bars (Fe-500) for
foundations

20 C & placing Reinforcement steel- 11.39 Tonnes 7,000.00 79730.00


Column
Item Long Text :Carrying, cutting,
bending, cranking, placing and fixing in
positionsteel reinforcement including
angles/pins provided for the
approvedwelded joints, at all levels
above and below finished ground level
forreinforced cement concrete and
precast reinforced cement concrete
worksincluding supplying approved 18
SWG annealed black binding wire,
coverblocks etc all as per drawings,
specifications and directions of
theEngineer all materials, tools, plant
and labour complete- Fe 500
gradereinforcement conforming to IS:
1786, Make: approved(b),,In Columns

30 C & placing Reinf steel in Beam slab 20.12 Tonnes 7,500.00 150900.00
Item Long Text :Carrying, cutting,
bending, cranking, placing and fixing in
positionsteel reinforcement including
angles/pins provided for the
approvedwelded joints, at all levels
above and below finished ground level
forreinforced cement concrete and
precast reinforced cement concrete
worksincluding supplying approved 18
SWG annealed black binding wire,
coverblocks etc all as per drawings,
specifications and directions of
theEngineer all materials, tools, plant
and labour complete- Fe 500
gradereinforcement conforming to IS:

Item_ Service No Brief Description Quantity Unit Rate(INR) Amount


No

1786, Make: Approved(c),,In Beams and


Slab

40 C & placing Reinf steel in Lintel 0.75 Tonnes 8,000.00 6000.00


Item Long Text :Carrying, cutting,
bending, cranking, placing and fixing in
positionsteel reinforcement including
angles/pins provided for the
approvedwelded joints, at all levels above
and below finished ground level
forreinforced cement concrete and
precast reinforced cement concrete
worksincluding supplying approved 18
SWG annealed black binding wire,
coverblocks etc all as per drawings,
specifications and directions of
theEngineer all materials, tools, plant and
labour complete- Fe 500
gradereinforcement conforming to IS:
1786, Make: approved(d) In Lintel

Price Schedule
Outline No. : - A 10 Brief Description : - Structural Works
Item_ Service No Brief Description Quantity Unit Rate(INR) Amount
No

10 Fab & Erec. of Structrl work ISMC etc 0.25 Kilogram 20.00 5.00
Item Long Text :Loading, unloading,
transportation, fabrication, cleaning &
erection ofstructural steel with mild steel
rolled section / built up section
/combination of both conforming to
IS:2062, pipes conforming to
IS:1161/IS:1239, in inserts, rungs,
gratings, edge angles, channel
sections,cleats, base plates, splice
plates, chequered plate flooring
etcincluding 2 coats of redoxide zinc-
chromate primer (one coat at shop
andone coat after erection) (DFT 30 to
40 Microns for each coat) & twocoats of
Single pack air drying high gloss
phenolic modified alkydsynthetic enamel
paint with 25-30 micron total dry film
thickness (DFT)of each coat. Total DFT
including paint and primer shall be 120
to 130microns(a),,inserts and other
fixtures , edge angles, ISMC etc.

20 Fab & Erec. of Strl work chequered 96.00 Kilogram 10.00 960.00
plate
Item Long Text :Loading,
Item_ Service No Brief Description Quantity Unit Rate(INR) Amount
No

unloading,transportation, fabrication,
cleaning & erection ofstructural steel with
mild steel rolled section / built up section
/combination of both conforming to
IS:2062, pipes conforming to
IS:1161/IS:1239, in inserts, rungs,
gratings, edge angles, channel
sections,cleats, base plates, splice
plates, chequered plate flooring
etcincluding 2 coats of redoxide zinc-
chromate primer (one coat at shop
andone coat after erection) (DFT 30 to
40 Microns for each coat) & twocoats of
Single pack air drying high gloss phenolic
modified alkydsynthetic enamel paint
with 25-30 micron total dry film thickness
(DFT)of each coat. Total DFT including
paint and primer shall be 120 to
130microns(b),,6 o/p chequred plate on
openings

Price Schedule
Outline No. : - A 11 Brief Description : - Doors and Windows
Item_ Service No Brief Description Quantity Unit Rate(INR) Amount
No
10 Prov. & fixing MS Door along with 19.64 Square me4,000.00 78560.00
frame
Item Long Text :Providing and fixing MS
Door along with frame, holdfast
arrangements(06nos), Hinges (06 nos),
sliding bolt etc. The doors frames shall
befabricated from 1.6 mm thick MS
sheets and shall meet the
generalrequirements of IS:4351.All steel
doors shall consist of double plateflush
door shutters. The door shutter shall be
35 mm (min.) thick withtwo outer sheets
of 1.2 mm rigidly connected with
continuous vertical1.0 mm stiffeners at
the rate of 150 mm centre to centre.
Side, top andbottom edgesof shutters
shall be reinforced by continuous
pressed steelchannel with minimum 1.2
mm. The door shall be sound deadened
by fillingthe inside void with mineral
wool. Doors shall be complete with
allhardware and fixtureslike door closer,
tower bolts, handles, stoppers,aldrops,
locks etc. The cost of grouting the holes
in brickwork with PCC(1:2:4) shall also
be included in this cost.

20 MS openable windows 20.16 Square me3,200.00 64512.00

Item_ Service No Brief Description Unit Rate(INR) Amount


No

Item Long Text :Supplying and Fixing MS


openable windows along with 4mm thick
floatglass and all necessary accessories
etc. complete as per IS:
1361

Price Schedule
Outline No. : - A 12 Brief Description : - Miscellaneous Works
Item_ Service No Brief Description Quantity Unit Rate(INR) Amount
No
10 Prov. Fabricating chain link fenc57.00 Square me2,500.00 142500.00
Item Long Text :Supplying, fabricating
and fixing PVC coated chain linked
fencing in MSstructural member with
one no of Gate made out of MS
structural membaras per drawing
including synthetic enamel painting over
a coat of primerin structural member
andall necessary arrangements tools,
plants,consumable material etc.

Price Schedule
Outline No. : - A 13 Brief Description : - River Bank Protection Works
Item_ Service No Brief Description Quantity Unit Rate(INR) Amount
No

10 River bank protection works 23,550.00 Square me1,200.00 28260000.00


Item Long Text :River bank protection
works by providing stone pitching of
500mmthickness (250mm size stone)
for a velocity of 3 m/s. in the form
ofstones in crates of size 0.5 m X 0.5 m
X 0.5 m provided over a
suitablesynthetic filter from 100 m
upstream to the 50 m downstream of
proposedIntake well as per approved
scheme, drawing and direction of
Engineer.

Basic Price 33,772,836.55 INR 33,772,836.55 INR


IN: Integrated GST 18.00 % 6,079,110.58 INR
----------------------------------------------------------------------------------------------------------------------------------------------------
Total : 39,851,947.13 INR
Item No. : - 00040 Description:- Monorail Arrangement & Structural P.Form
SAC Code : -9983
Delivery Date : 31.03.2020

----------------------------------------------------------------------------
Price Schedule

Outline No. : - A 01 Brief Description : - Excavation Work

Item_ Service No Brief Description Quantity Unit Rate(INR) Amount


No
10 E/W in excvation upto 1.5 Mtr depth 162.00 Cubic mete125.00 20250.00
Item Long Text :Earth work in excavation
by mechanical means in dense sand
over areas and stacking with in a lead of
50 M, with ramming, trimming
anddressing of sides etc.,(authorised
working space, benching and sideslopes
for the excavation will be measured and
paid
under this item).(a) upto 1.5 Mtr depth
from EGL

20 E/W in excvation from 1.5 Mtr -3.0M 97.20 Cubic mete150.00 14580.00
Item Long Text :Earth work in excavation
by mechanical means in dense sand
over areasand stacking with in a lead of
50 M,with ramming, trimming and
dressingof sides etc.,(authorised
working space, benching and side
slopes forthe excavation will be
measured and paid under this item).
(b),,1.5 mtr to 3.00 mtr

30 E/W in excv. in weathered rock 64.80 Cubic mete550.00 35640.00


1.50-3.0M
Item Long Text :Earth work in excavation
by mechanical means in weathered rock
overareas and stacking with in a lead of
50 M, with ramming, trimming
anddressing of sides etc.(authorised
working space, benching and sideslopes
for the excavation will be
measured and paid under this item)
(a),,1.5 mtr to 3.00 mtr

40 E/W in excv. in weathered rock 3.0-4.0 108.00 Cubic mete650.00 70200.00


M

50 E/W in excv. in Hard Rock 3.0-4.50 M 54.00 Cubic mete1,200.00 64800.00


Item Long Text :Earth work in excavation
by mechanical means in hard rock over
areas and stacking with in a lead of 50
M, with ramming, trimming anddressing
of sides

Item_ Service No Brief Description Quantity Unit Rate(INR) Amount


No

etc.(authorised working space, benching


and sideslopes for the excavation will be
measured and paid under this item)(a)
3.00 Mtr to 4.50 Mtr

60 E/W in excv. in Hard Rock 4.50-6.0 M 162.00 Cubic mete1,400.00 226800.00


Item Long Text :Earth work in excavation
by mechanical means in hard rock over
areas andstacking with in a lead of 50
M,with ramming, trimming and dressing
ofsides etc.(authorised working space,
benching and side slopes for
theexcavation will be measuredand paid
under this item)(b),,4.50 Mtr to 6.00 Mtr

70 E/W in excv. in Hard Rock 6.0-7.50 M 162.00 Cubic mete1,600.00 259200.00

Item Long Text :Earth work in excavation


by mechanical means in hard rock over
areas andstacking with in a lead of 50
M,with ramming, trimming and dressing
ofsides etc.(authorised working space,
benching and side slopes for
theexcavation will be measuredand paid
under this item)(c),,6.00 Mtr to 7.500
Mtr

80 E/W in excv. in Hard Rock 7.50-9.0 M 10.80 Cubic mete1,800.00 19440.00


Item Long Text :Earth work in excavation
by mechanical means in hard rock over
areas andstacking with in a lead of 50
M,with ramming, trimming and dressing
ofsides etc.(authorised working space,
benching and side slopes for
theexcavation will be measuredand paid
under this item)(d),,7.500 Mtr to 9.00
Mtr

90 Backfilling in all positions & height 800.00 Cubic mete150.00 120000.00


Item Long Text :"Backfilling in all
positions and heights and descents in
foundations,pits, around foundations
with approved excavated material
obtained fromsoil heaps at all heights,
transporting, depositing, dressing
&compacting complete all as per
drawings, specifications and directionsof
the Engineer, all tools, plant and labour
complete. Each layer shouldbe not more
than 150 mm thick when looseand
should be well rammed, with necessary

Item_ Service No Brief Description Quantity Unit Rate(INR) Amount


No

watering, to obtain at least90% of


maximum laboratory dry density. as
directed by the Engineer- byexcavated
soil "

Price Schedule
Outline No. : - A 02 Brief Description : - Concrete Work
Item_ Service No Brief Description Quantity Unit Rate(INR) Amount
No
10 Prov. laying PCC (1:3:6) M-10 5.81 Cubic mete3,500.00 20335.00
Item Long Text :Providing, laying and
compacting plain cement concrete of
followinggrades as defined by IS:456
with graded stone aggregates in
allfoundations, bed blocks, chambers,
trenches, floors, roofs,
pavements,screedings, encasing etc at
all depths below finished ground level
torequired levels, slopes etc including
the cost of shuttering all as perdrawings,
specifications and directions of the
Engineer/ Consultant, allmaterials, tools,
plant and labour complete.(a) M-10
grade (1:3:6)-100mm thick with 20mm
down graded stone aggregate

20 Prov. & laying RCC M-25 in Foundation 14.40 Cubic mete3,500.00 50400.00
Item Long Text :Providing, transporting
and laying design-mix Reinforced
Cement Concreteof M25 grade specified
below using cement of approved grade
fromapproved manufacturer,sand, 20mm
and down size coarse
aggregates,necessary admixtures
approved by Consultants (if required),
includingall leads and lifts, placing ,
vibrating/ compaction,
scaffoldingwherever necessary, curing
as directed, excluding cost of shuttering
andcentering. (a) In Foundations

30 Prov. & laying RCC M-25 in Column 41.10 Cubic mete3,550.00 145905.00
Item Long Text :Providing, transporting
and laying design-mix Reinforced
Cement Concreteof M25 grade specified
below using cement of approved grade
fromapproved manufacturer,sand, 20mm
and down size coarse
aggregates,necessary admixtures
approved by Consultants (if

Item_ Service No Brief Description Quantity Unit Rate(INR) Amount


No

required), includingall leads and lifts,


placing, vibrating/ compaction,
scaffoldingwherever necessary, curing
as directed, excluding cost of shuttering
andcentering.b,,In Columns

40 Prov. & laying RCC M-25 in Beam 7.82 Cubic mete3,575.00 27956.50
Item Long Text :Providing, transporting
and laying design-mix Reinforced
Cement Concreteof M25 grade specified
below using cement of approved grade
fromapproved manufacturer,sand, 20mm
and down size coarse
aggregates,necessary admixtures
approved by Consultants (if required),
includingall leads and lifts, placing ,
vibrating/ compaction,
scaffoldingwherever necessary, curing
as directed, excluding cost of shuttering
andcentering.c,,In Beams

50 Prov. & laying RCC M-25 in Slab 20.74 Cubic mete3,650.00 75701.00
Item Long Text :Providing, transporting
and laying design-mix Reinforced
Cement Concreteof M25 grade specified
below using cement of approved grade
fromapproved manufacturer,sand, 20mm
and down size coarse
aggregates,necessary admixtures
approved by Consultants (if required),
includingall leads and lifts, placing ,
vibrating/ compaction,
scaffoldingwherever necessary, curing
as directed, excluding cost of shuttering
andcentering.(d) ,,In Slab

60 Supp & grouting of Pocket Hole 0.60 Cubic mete45,000.00 27000.00


Item Long Text :Supplying & grouting
(M20 grade) of pocket holes , pipe
sleeves andunder base plate of
structural steel work/ machinery/ pipe
supportingstructures including
roughening of surface, cleaning,
ramming, curingetc. all complete with
CM 1:2 (1 cement : 2 coarse sand) and
10 mm downgraded stonechips using
non shrink admixture. (Cost of all
material andcleaning the pocket by
compressed air shall be in the scope of
thecontractor). (File 4.5.3.1, Pg 193/628
& File 4.5.3.1, Pg 289/628)

Price Schedule
Outline No. : - A 03 Brief Description : - Shuttering Work

Item_ Service No Brief Description Quantity Unit Rate(INR) Amount


No
10 Prov. Fabr. Formwork in Foundation 28.80 Square me400.00 11520.00
Item Long Text :Providing, fabricating
and erecting form work at all levels and
placesand profiles wherever needed/
specified as per drawing
includingstriking with 12mm marine
resistant waterproof ply/ Smooth
finished MSplates with adjustable steel
propsof acceptable Staging system and
withsufficient bracing as approved by
consultant. Cost to include designingof
proper form work and staging system to
suit the requirements, sealingthe joints
with heavy duty brown self adhesive
tape, aligning to lineand levels including
M.S. Ties, PVC Spacer, Providing
openings/ cutouts/pockets, applying
deshuttering chemical, Deshuttering as
approved by theconsultant etc.,
complete at all levels, double/tripple
heights andprofiles.(a) In Foundations

20 Prov. Fabr. Formwork in Column 328.80 Square me500.00 164400.00


Item Long Text :Providing, fabricating
and erecting form work at all levels and
placesand profiles wherever
needed/specified as per drawing
including strikingwith 12mm marine
resistant waterproof ply/ Smooth
finished MS plateswith adjustable steel
props of acceptable Staging system and
withsufficient bracing as approved by
consultant. Cost to include designingof
proper form work and staging system to
suit the requirements, sealingthe joints
with heavy duty brown self adhesive
tape, aligning to lineand levels including
M.S. Ties, PVC Spacer, Providing
openings/ cutouts/pockets, applying
deshuttering chemical, Deshuttering as
approved by theconsultant etc.,
complete at all levels, double/tripple
heights andprofiles(b),,In Columns &
Pires

30 Prov. Fabr. Formwork in Beams 224.88 Square me600.00 134928.00


Item Long Text :Providing, fabricating
and erecting form work at all levels and
placesand profiles wherever
needed/specified as per drawing
including strikingwith 12mm marine
resistant waterproof ply/ Smooth
finished MS plates with adjustable steel
propsof acceptable Staging system and

Item_ Service No Brief Description Quantity Unit Rate(INR) Amount


No

withsufficient bracing as approved by


consultant. Cost to include designingof
proper form work and staging system to
suit the requirements, sealingthe joints
with heavy duty brown self adhesive tape,
aligning to lineand levels including M.S.
Ties, PVC Spacer, Providing openings/
cutouts/pockets, applying deshuttering
chemical, Deshuttering as approved by
theconsultant etc., complete at all levels,
double/tripple heights andprofiles(c),,In
Beams & Slab
Price Schedule
Outline No. : - A 04 Brief Description : - Painting Works
Item_ Service No Brief Description Quantity Unit Rate(INR) Amount
No
10 Prov apply synthetic enamel paint 500.00 Square me190.00 95000.00
Item Long Text :Supplying and applying
two coats with synthetic enamel paint
of approvedbrand and shade over a coat
of primer on new wooden/ steel surface
asper drawings and as specified at all
heights and depths above and
belowplinth level including scaffolding,
all materials, tools, plant andlabour
complete in all respect.

Price Schedule
Outline No. : - A 05 Brief Description : - Reinforcement Works
Item_ Service No Brief Description Quantity Unit Rate(INR) Amount
No

10 C & fixing Reinf Steel in Fdn 1.73 Tonnes 6,500.00 11245.00


Item Long Text :Carrying, cutting,
bending, cranking, placing and fixing in
positionsteel reinforcement including
angles/ pins provided for the
approvedwelded joints, at all levels above
and below finished ground level
forreinforced cement concrete and
precast reinforced cement concrete
worksincluding supplying approved 18
SWG annealed black binding wire,
coverblocks etc all as per drawings,
specifications and directions of
theEngineer all materials, tools, plant
and labour complete- Fe 500
gradereinforcement conforming to IS:
1786, Make: Approved(a),,with high yeld
strength deformed bars (Fe-500) for
foundations
Item_ Service No Brief Description Unit Rate(INR) Amount
No

20 C & fixing Reinf Steel in Column 4.93 Tonnes 7,000.00 34510.00


Item Long Text :Carrying, cutting,
bending, cranking, placing and fixing in
positionsteel reinforcement including
angles/pins provided for the
approvedwelded joints, at all levels above
and below finished ground level
forreinforced cement concrete and
precast reinforced cement concrete
worksincluding supplying approved 18
SWG annealed black binding wire,
coverblocks etc all as per drawings,
specifications and directions of
theEngineer all materials, tools, plant and
labour complete- Fe 500
gradereinforcement conforming to IS:
1786, Make: Approvedb,,In Columns

30 C & fixing Reinf Steel in Beams 3.43 Tonnes 7,500.00 25725.00


Item Long Text :Carrying, cutting,
bending, cranking, placing and fixing in
positionsteel reinforcement including
angles/pins provided for the
approvedwelded joints, at all levels above
and below finished ground level
forreinforced cement concrete and
precast reinforced cement concrete
worksincluding supplying approved 18
SWG annealed black binding wire,
coverblocks etc all as per drawings,
specifications and directions of
theEngineer all materials, tools, plant and
labour complete- Fe 500
gradereinforcement conforming to IS:
1786, Make: Approved(c),,In Beams and
Slab
Price Schedule
Outline No. : - A 06 Brief Description : - Structural Works
Item_ Service No Brief Description Quantity Unit Rate(INR) Amount
No

10 Fab. & Erection structural steel 41,223.84 Kilogram 25.00 1030596.00


Item Long Text :Loading , Unloading,
transportation, fabrication, cleaning &
erection ofstructural steel with mild steel
rolled section / built up section
/combination of both conforming to
IS:2062, pipes conforming to
IS:1161/IS:1239, in inserts, rungs,
gratings, edge angles, channel

Service No Brief Description Quantity Unit Rate(INR) Amount


No

sections,cleats, base plates, splice


plates, chequered plate flooring
etcincluding 2 coats of redoxide zinc-
chromate primer (one coat at shop
andone coat after erection) (DFT 30 to
40 Microns for each coat) & twocoats of
Single pack air drying high gloss phenolic
modified alkydsynthetic enamel paint
with 25-30 micron total dry film thickness
(DFT)of each coat. Total DFT including
paint and primer shall be 120 to
130microns(a) inserts and other fixtures,
edge angles, ISMC etc.

20 Prov. & fixing MS bolts 0.25 Tonnes 20.00 5.00

Item Long Text :Providing/ Supplying of


all materials, fabricating and fixing
inposition at all level, permanent mild
steel bolts (Property class 4.6 asper
IS:1367 and Product grade #C# as per
IS:1363), nuts, washers, etc.up to and
inclusive of 39 mm diameter and up to
100mm grip length forstructural steel
works, including all labour, material,
equipment,handling, transportation,
testing, all complete, as per
specifications,drawings and instructions
of the ENGINEER.

Basic Pric2,686,136.2,686,136.50 INR


IN: Integr 18.00 % 483,504.57 INR
----------------------------------------------------------------------------------------------------------------------------------------------------
Total : 3,169,641.07 INR
Item No. : - 00050 Description:- Bio digester, Reed Bed & Storage Tank SAC Code : -9983
Delivery Date : 31.03.2020
----------------------------------------------------------------------------
Price Schedule
Outline No. : - A 01 Brief Description : - Excavation Work
Item_ Service No Brief Description Quantity Unit Rate(INR) Amount
No

10 E/W in excavation upto 1.50 Mtr 30.84 Cubic mete125.00 3855.00


Item Long Text :Earthwork in excavation
by mechanical means in dense sand
over areas andstacking with in a lead of
50 M,with ramming, trimming and
dressing ofsides etc.,(authorised

Item_ Service No Brief Description Quantity Unit Rate(INR) Amount


No

working space, benching and side slopes


for theexcavation will be measured and
paid under this item).(a) upto 1.5 Mtr
depth from EGL
20 Backfilling in all positions & height 24.32 Cubic mete100.00 2432.00
Item Long Text :Backfilling in all positions
and heights and descents in
foundations,pits, around foundations with
approved excavated material obtained
fromsoil heaps at all heights,
transporting, depositing, dressing
&compacting complete all as per
drawings, specifications and directionsof
the Engineer, all tools, plant and labour
complete. Each layer shouldbe not more
than 150 mm thick when looseand should
be well rammed, with necessary
watering, to obtain at least90% of
maximum laboratory dry density.as
directed by the Engineer- byexcavated
soil "

Price Schedule
Outline No. : - A 02 Brief Description : - Concrete Work
Item_ Service No Brief Description Quantity Unit Rate(INR) Amount
No

10 Prov. & laying PCC (1:3:6) 1.33 Cubic mete3,500.00 4655.00


Item Long Text :Providing, laying and
compacting plain cement concrete of
followinggrades as defined by IS:456
with graded stone aggregates in
allfoundations, bed blocks, chambers,
trenches, floors, roofs,
pavements,screedings, encasing etc at
all depthsbelow finished ground level
torequired levels, slopes etc including
the cost of shuttering all as perdrawings,
specifications and directions of the
Engineer/ Consultant, allmaterials, tools,
plant and labour complete.(a) M-10
grade (1:3:6)-100mm thick with 20mm
down graded stone aggregate

20 Prov. & laying RCC M-30 in Foundation 1.63 Cubic mete4,000.00 6520.00
Item Long Text :Providing, transporting
and laying design-mix Reinforced
Cement Concreteof M30 grade for water
retaining structures using cement, sand,
20mm anddown size coarse aggregates,
necessary admixtures
Item_ Service No Brief Description Quantity Unit Rate(INR) Amount
No

approved byConsultants (if required),


including all leads and lifts,
pumping,vibrating/ compaction,
scaffolding wherever necessary, curing
asdirected, excluding cost of shuttering
and centering.(a) In Foundations

30 Prov. & laying RCC M-30 in Walls 2.97 Cubic mete4,500.00 13365.00
Item Long Text :Providing, transporting
and laying design-mix Reinforced Cement
Concreteof M30 grade for water retaining
structures using cement , sand,
20mmand down size coarse aggregates,
necessary admixtures approved
byConsultants (if required),
including all leads and lifts,
pumping,vibrating/ compaction,
scaffolding wherever necessary, curing
asdirected, excluding cost of shuttering
and centering.(b),,In Walls

40 Prov. & laying RCC M-30 in Slab 0.96 Cubic mete4,500.00 4320.00
Item Long Text :Providing, transporting
and laying design-mix Reinforced Cement
Concreteof M30 grade for water
retaining structures using cement, sand,
20mm anddown size coarse aggregates,
necessary admixtures approved
byConsultants (if required),
including all leads and lifts,
pumping,vibrating/ compaction,
scaffolding wherever necessary, curing
asdirected, excluding cost of shuttering
and centering.(c),,In Slab
Price Schedule
Outline No. : - A 03 Brief Description : - Shuttering Work
Item_ Service No Brief Description Quantity Unit Rate(INR) Amount
No

10 Prov. Fabr Erect of Formwork in Fdn 3.48 Square me270.00 939.60


Item Long Text :Providing, fabricating
and erecting form work at all levels and
placesand profiles wherever needed/
specified as per drawing
includingstriking with 12mm marine
resistant waterproof ply/ Smooth
finished MSplates with adjustable steel
propsof acceptable Staging system and
withsufficient bracing as approved by
consultant. Cost to include designingof
proper form work and staging system to

Item_ Service No Brief Description Quantity Unit Rate(INR) Amount

No

suit the requirements, sealingthe joints


with heavy duty brown self adhesive
tape, aligning to lineand levels including
M.S. Ties, PVC Spacer, Providing
openings/ cutouts/pockets, applying
deshuttering chemical, Deshuttering as
approved by theconsultant etc.,
complete at all levels, double/tripple
heights andprofiles(a),,In Foundations

20 Prov. Fabr Erect of Formwork in Wall 39.56 Square me420.00 16615.20

Item Long Text :Providing, fabricating


and erecting form work at all levels and
placesand profiles wherever needed/
specified as per drawing includingstriking
with 12mm marine resistant waterproof
ply/ Smooth finished MSplates with
adjustable steel props of acceptable
Staging system andwith sufficient
bracing as approved by consultant. Cost
to includedesigning of proper form work
and staging system to suit
therequirements, sealing the joints with
heavy duty brown self adhesivetape,
aligning to line and levels including M.S.
Ties, PVC
Spacer,Providing openings/ cutouts/
pockets, applying deshuttering
chemical,Deshuttering as approved by
the consultant etc., complete at all
levels,double/tripple heights and
profilesb,,In Walls

30 Prov. Fabr Erect of Formwork in Beam 7.67 Square me430.00 3298.10


Item Long Text :Providing, fabricating
and erecting form work at all levels and
placesand profiles wherever
needed/specified as per drawing
including strikingwith 12mm marine
resistant waterproof ply/Smooth finished
MS plates with adjustable steel props of
acceptable Staging system and
withsufficient bracing as approved by
consultant. Cost to include designingof
proper form work and staging system to
suit the requirements, sealingthe joints
with heavy duty brown self adhesive
tape, aligning to lineand levels including
M.S. Ties, PVC Spacer, Providing
openings/ cutouts/pockets, applying
deshuttering chemical, Deshuttering as
approved by theconsultant etc.,
complete at all levels, double/tripple
heights andprofiles(c),,In Beams & Slab

Price Schedule

Outline No. : - A 04 Brief Description : - Reinforcement Works

Item_ Service No Brief Description Quantity Unit Rate(INR) Amount

No
10 C. laying & fixing Reinf Steel -Fdn. 0.16 Tonnes 6,500.00 1040.00
Item Long Text :Carrying, cutting,
bending, cranking, placing and fixing in
positionsteel reinforcement including
angles/ pins provided for the
approvedwelded joints, at all levels
above and below finished ground level
forreinforced cement concrete and
precast reinforced cement concrete
worksincluding supplying approved 18
SWG annealed black binding wire,
coverblocks etc all as per drawings,
specifications and directions of
theEngineer all materials, tools, plant
and labour complete- Fe 500
gradereinforcement conforming to IS:
1786, Make: Approved(a),,with high yeld
strength deformed bars (Fe-500) for
foundations

20 C. laying & fixing Reinf. in Walls 0.30 Tonnes 7,000.00 2100.00


Item Long Text :Carrying, cutting,
bending, cranking, placing and fixing in
positionsteel reinforcement including
angles/pins provided for the
approvedwelded joints, at all levels
above and below finished ground level
forreinforced cement concrete and
precast reinforced cement concrete
worksincluding supplying approved 18
SWG annealed black binding wire,
coverblocks etc all as per drawings,
specifications and directions of
theEngineer all materials, tools, plant
and labour complete- Fe 500
gradereinforcement conforming to IS:
1786, Make: approved(b) ,,In Walls

30 C. laying & fixing Reinf. in Beam 0.10 Tonnes 7,500.00 750.00


Item Long Text :Carrying, cutting,
bending, cranking, placing and fixing in
positionsteel reinforcement including
angles/ pins provided for the
approvedwelded joints, at all levels
above and below finished ground level
forreinforced cement concrete and
precast reinforced cement concrete
worksincluding supplying approved 18
SWG annealed black binding wire,
coverblocks etc all as per drawings,
specifications and directions of
theEngineer all materials, tools, plant
and labour complete- Fe 500

Item_ Service No Brief Description Quantity Unit Rate(INR)


No

gradereinforcement conforming to IS:


1786, Make: approved(d),,In Beams and
Slab

Basic Price 59,889.90 INR 59,889.90 INR

IN: Integrated GST 18.00 % 10,780.18 INR


----------------------------------------------------------------------------------------------------------------------------------------------------
Total : 70,670.08 INR
Item No. : - 00060 Description:- Const of Toilet at Rourkela BHEL Project SAC Code : -9983
Delivery Date : 31.03.2020
----------------------------------------------------------------------------
Price Schedule
Outline No. : - A 01 Brief Description : - Masonry Work
Item_ Service No Brief Description Quantity Unit Rate(INR)
No
10 Prov. 115 mm thk Flyash brick 20.00 Square me450.00
masonary
Item Long Text :"Providing Flyash brick
s masonry work using (230mm X
110mm X 80mm size)having crushing
strength not less than 75Kg/Sqcm in
cement mortar(1:6)Immersing the bricks
in water before use in all necessary
projectionsplays cutting, circular
moulding, corbelling etc. including
costconveyance ,taxes & royalties,
loading and unloading of all materials
&cost of all labours, scaffolding,
watering & curing, sundries, T&P
etc.complete as per the direction of
Engineer-in-Chargelevel in all shapes
and sizes in :"(a) ,,115mm thick half
brick massonry in cement morter 1:4 (1
cement : 4coarse sand)

Price Schedule
Outline No. : - A 02 Brief Description : - Cement Finishes
Item_ Service No Brief Description Quantity Unit Rate(INR)
No

10 Prov. & laying 12mm thk Cemen60.00 Square meter


plaster
Item Long Text :Providing and laying
plaster with cement sand mortar in
foundation depthupto 3.00 M), plinth,

Item_ Service No Brief Description Quantity Unit Rate(INR) Amount


No

walls surface, beams, staircases lintel


soffits,chajjas, projections narrow bands
and widths etc including chipping
ofconcrete surfaces raking joints,
scaffolding cleaning and curing, all asper
drawings, specification and direction of
the Engineer/ Consultant,all materials,
tools plant and labour complete in all
respect(a) 12 mm thick cement plaster,
proportion 1:6,

20 Prov. & laying 6mm thk Cement plaster 5.00 Square me140.00 700.00
Item Long Text :Providing and laying
plaster with cement sand mortar in
foundation depthupto 3.00 M ),
plinth,walls surface, beams, staircases
lintel soffits,chajjas, projections narrow
bands and widths etc including chipping
ofconcrete surfaces raking joints,
scaffolding cleaning and curing, all asper
drawings, specification and direction of
the Engineer/ Consultant,all materials,
tools plant and labour complete in all
respect(b) 6 mm thick cement plaster
proportion 1:4, to ceiling

Price Schedule
Outline No. : - A 03 Brief Description : - Flooring
Item_ Service No Brief Description Quantity Unit Rate(INR) Amount
No

10 Prov. & laying 300X300 non skid 5.00 Square me650.00 3250.00
ceramic
Item Long Text :Supplying and laying
non skid ceramic tiles of approved colour
and brandconforming to IS ranging from
thickness 6.9 to 7.3 mm as specified
bymanufacturer in floor over average 30
mm thick backing mortar 1:3 andjointing
with cement grout and matching
pigments including curing, complete in
all respect as per drawings,
specifications and directionsof the
Engineer/ Consultant.( for toilet &
Kitchen)a. 300 mm x 300 mm size tiles

20 Prov. & laying 300X200 white ceramic 20.00 Square me600.00 12000.00
Item Long Text :Supplying and laying 1st
class ceramic glazed tiles of approved
shadeand make conforming to IS over 12
mm thick cement mortar 1:3 and
jointedwith grey cement slurry
Item_ Service No Brief Description Quantity Unit Rate(INR) Amount
No

flush pointing with white cement


includingrubbing, and cost of curing at
any location all complete as
perspecifications and direction of
Engineer/ Consultant. - 300 mm x 200
mm tiles

Price Schedule
Outline No. : - A 04 Brief Description : - WOOD & DOOR WORK
Item_ Service No Brief Description Quantity Unit Rate(INR) Amount
No
10 S/F/F FRP Door Frames 1.60 Square me3,600.00 5760.00
Item Long Text :Supplying, Fitting and
fixing in masonry/RCC/steel,box type
FRP DoorFrames of size 50 mm x 75
mm with FRP Shutter made of
Fibre-glassReinforced Polymer with all
necessary inserts , hardwares,
matchingedges with shutter, painting,
cleaningcomplete in all respect as
perapproved drawing, design or
instruction of Engineer

Price Schedule
Outline No. : - A 05 Brief Description : - Soil,Waste,Rain water pipes
Item_ Service No Brief Description Quantity Unit Rate(INR) Amount
No

10 S/F & testing PVC soil waste SWR 10.00 Meter 300.00 3000.00
pipe
Item Long Text :Supplying, fixing and
testing PVC soil, waste and ventilating
pipes(SWR) of approved makes
conforming 'to IS:13592/ 1990 -Type B
withrubber ring (confirming to IS : 5382)
joints inclusive 'of all necessaryspecials
like bends, tee, offsets, door bends,
junctions, cowls etc.with proper pipe
support with MS angle / chanel,
hangers, brackets withnecessary 'grip
bolts, supports shall be painted with
two coats ofenamel paint over a coat of
'primer, laid under floor/ fixed on
wallsand in pipe shaft etc.,
complete.(internal & shafts )(a) 110 mm
dia. (Clear OD)

20 S/F & testing 32mm dia PVC 15.00 Meter 250.00 3750.00
Pressure pipe
Item Long Text :Supplying, fixing &

Item_ Service No Brief Description Quantity Unit Rate(INR) Amount


No

testing PVC pressure pipe (6 Kg/ Sq cm)


of approvedmake confirming to IS '4985
for waste connections from wash
basin,kitchen sink to floor trap with
'solvent cement joints, including allthe
fittings laid under floor concealed in wall
'etc., The work shallinclude wall chase
and making good the same in cement
'mortar completeto the satisfaction of
engineer-in-charge. Including proper
pipe'support, hangers, brackets with
necessary grip bolts, supports shall
be'painted with two coats of enamel paint
over a coat of primer. , laidunder floor /
fixed on walls and in pipe shaft etc.,
complete.(a) 32 mm dia

30 S/F & testing 15mm dia PVC Pressure 10.00 Meter 200.00 2000.00
pipe
Item Long Text :Supplying, fixing &
testing PVC pressure pipe (6 Kg / Sq
cm) of approvedmake confirming to IS
'4985 for waste connections from wash
basin,kitchen sink to floor trap with
'solvent cement joints, including allthe
fittings laid under floor concealed in wall
'etc., The work shallinclude wall chase
and making good the same in cement
'mortor completeto the satisfaction of
engineer-in-charge. Including proper
pipe'support, hangers, brackets with
necessary grip bolts, supports shall
be'painted with two coats of enamel paint
over a coat of primer. , laidunder floor /
fixed on walls and in pipe shaft etc.,
complete.(b) 15 mm dia

Price Schedule
Outline No. : - A 06 Brief Description : - Sanitary & water supply
Item_ Service No Brief Description Quantity Unit Rate(INR) Amount
No

10 Prov. & fixing EWC S trap 1.00 NOS 5,000.00 5000.00


Item Long Text :European type water
closet petit of parryware (S trap), and
slim linecistern of parryware make(white)
dual flush ,solid seat and cover
withpolythene buffers and flap, Pan
connector CP flanges, CP bolts and
nuts,a pair of CI chair bracket with nuts
and bolts etc.,
complete.equivalentcomplete or as per
approved specification, drawing and
instruction ofEngineer

Item_ Service No Brief Description Quantity Unit Rate(INR) Amount

No

20 Prov. & fixing Indus Wash basin 1.00 NOS 2,500.00 2500.00
Item Long Text :Indus Wash basin of
size 550X400mm with C.I. brackets,
C.P. pillar cock15 mm or equivalent and
32mm C.P.brass waste and PVC
connector ofapproved make and as per
approved specification, drawing,
instruction ofEngineer
30 Prov. & fixing C.P. bib cock -15 mm 1.00 NOS 450.00 450.00
Item Long Text :Supplying and fixing
C.P. bib cock of approved make -15 mm
dia.equivalent complete as per approved
specification, drawing andinstruction of
Engineer

40 Prov. & fixing Long body bib cock -15 1.00 NOS 600.00 600.00
mm
Item Long Text :Supplying and fixing
long body bib cock- 15mm dia
equivalent complete ofapproved make,
as per approved specification, drawing
and instruction ofEngineer

50 Prov. & fixing Angle Stop cock -15 mm 1.00 NOS 700.00 700.00
Item Long Text :Supplying and fixing
C.P. concealed angle stop cock 15mm
size equivalent complete of approved
make, as per approved
specification,drawing and instruction of
Engineer

60 Prov. & fixing Angle Stop cock M/F 1.00 NOS 700.00 700.00
end
Item Long Text :Supplying and fixing
C.P. angle stop cock 15mm dia. male or
female endor equivalent complete of
approved make, as per approved
specification,drawing and instruction of
Engineer

70 Prov. & fixing frameless glass mirror 1.00 NOS 1,200.00 1200.00
Item Long Text :Supplying and fixing 5.5
mm thick approved quality round edged
framelessplate glass mirror of 550mm X
400 mm with 4 nos dome headed
screws ofapproved make, as per
Service No Brief Description Quantity Unit Rate(INR) Amount
No

approved specification, drawing and


instruction ofEngineer

80 Prov. & fixing C. P. extension pi 2.00 NOS 400.00 800.00


Item Long Text :Providing and fixing C. P.
extension piece of 15mm dia. Of
approvedquality and brand of approved
make, as per approved
specification,drawing and instruction of
Engineer

90 Prov & fixing 8mm dia Health Fa1.00 NOS 700.00 700.00
Item Long Text :Providing & fixing
Health Faucet with 8 mm dia. 1m
Flexible Tube, wallhook & check nuts of
approved make, as per approved
specification,drawing and instruction of
Engineer

100 Prov. placing Water Storage Tan1.00 NOS 5,000.00 5000.00


Item Long Text :Supplying and placing in
position 500 litres capacity PVC water
storagetank (SINTEX or equivalent
approved make) at any location and
elevation,including making all plumbing
connections like inlet, outlet,
overflow,washout, etc complete.
(valves, pipes shall be paid separately),
as perapproved specification, drawing
and instruction of Engineer
Basic Pric64,310.00 INR 64,310.00 INR

IN: Integrated GST 18.00 % 11,575.80 INR


----------------------------------------------------------------------------------------------------------------------------------------------------
Total : 75,885.80 INR
---------------------------------------------------------------------------------------------------------------------------------------------------
Grand Total : 64,346,899.33 INR
----------------------------------------------------------------------------------------------------------------------------------------------------
Jusco's PANdetails:-
PAN No :- AABCJ3604P
Payment Terms : 95% Progress Payment, 2.5% + 2.5% Retention
Header text:
For any Technical Clarification, Please Contact
Contact Person: Saroj Kazi/ B Pani

EPC Department.

Pricing types:
THE RATES ARE EXCLUSIVE OF GOODS & SERVICES TAX (GST)/INTEGRATED GST
,WHICH IS TO BE BILLED & PAID SEPARATELY.

RATES WILL REMAIN FIRM AND WILL NOT BE REVISED DURING THE CONTRACT
PERIOD.
Deadlines:
TOTAL SCOPE OF WORK SHOULD BE COMPLETED AS PER INSTRUCTION OF PROJECT
MANAGER.
Terms of delivery:
JOB SHOULD BE EXECUTED AS PER INSTRUCTION OF SITE IN-CHARGE AND IN TOTAL
AGREEMENT WITH THE TERMS & CONDITIONS (RELATED TO SAFETY AND WORK RELATED PROCEDURES AND IN TOTAL
COMPLIANCE WITH OUR STATUTORY AND OTHER
REQUIREMENTS) MENTIONED IN THE WORK ORDER.

DELIVERY/COMPLETION DATE 28.02.2019 AND VALIDITY END DATE 30.06.2019 FOR BILL PURPOSE
Penalty for breach of contract:
RISK PURCHASE OF THE SERVICES:
------------------------------
IF YOU FAIL TO COMPLETE THE WORK WITHIN THE SPECIFIED COMPLETION
SCHEDULE, JUSCO RESERVES THE RIGHT TO RISK PURCHASE THE SAME SERVICES
FROM ANY OTHER SOURCE/ CONTRACTOR. IF THE RISK PURCHASE OF THE SERVICES
IS MADE AT HIGHER PRICE THAN THE PRICE IN THIS ORDER, THE ADDITIONAL
COST TO JUSCO WILL BE DEBITED TO YOU.
Contract riders (clauses):
ORDER MADE WITH REFERENCE TO YOUR QUOTATION REF.NO.NIL THROUGH E-MAIL
DATED 10.04.2018 AND FINAL RATES ACCEPTANCE DATED 23.05.2018.
ISSUED LOI REF.NO.JUSCO/PROC/220618 DATED 22.06.2018

YOU SHOULD ACCEPT AND ACKNOWLEDGE THIS ORDER, TERMS & CONDITIONS
MENTIONED IN THIS WORK ORDER WITHIN 3(THREE) DAYS FROM THE DATE OF RECEIPT OF THE SAME. IN CASE OF NO
RESPONSE FROM YOUR END, IT WOULD BE
DEEMED TO BE ACCEPTED BY YOU.

LIQUIDATED DAMAGES CLAUSE:


---------------------------
YOU SHALL BE CHARGED LIQUIDATED DAMAGES @0.5% OF THE TOTAL ORDER VALUE
OF EACH JOB CARD/WEEK DELAY IN WORK SUBJECT TO A MAXIMUM OF 5% OF TOTAL
ORDER VALUE.
Vendor memo (general):
Regarding Submission of Bills :
--------------------------------
Bills / Invoices must be prepared exactly as per the Order indicating the Item Nos. as given in the Order.

Bills/ Invoice in 2 copies (1 original + 1 signed copy) addressed to Site In charge indicating Project Name and Location thereon shall
be submitted to Site Office along with the following documents :-

Two (2) copies (1 original + 1 duplicate) of Bill duly signed by the Contractor.
Joint Measurement Sheet (JMR) duly signed by the Contractor and certified by Site In charge.

The bill shall contain the following information:

Work Order No. and date


Contractor's Vendor code
Bill Serial No. and date
GST No., if applicable
Name and Address of the Contractor
Period of Service Provided (Bill Period) and Date
Signature of Contractor / authorized official on behalf of the
Contractor
Separate line items for GST, if applicable
Purchaser's contact person name
Contractor's contact person's name and his e-mail address / telephone number / fax number.

Bills/ Invoice should be in the name of JUSCO Ltd.

Bills/ Invoice should be certified by the authorized representative of the concerned Department (Departmental Head or Chief)

To CFO, JUSCO
Thro.General Manager(EPC Dept.),
Jamshedpur Utilities & services Co. Ltd.
Sakchi Boulevard Road, Northern Town,
Jamshedpur - 831001
Jharkhand

You have to mention your GST number in every bill.


Please note that
JUSCO's GST No.: 20AABCJ3604P1ZR (Jharkhand)
JUSCO PAN No.: AABCJ3604P
Change Order Text:
REVISION NO. 02 DATED 08.05.2019
QUANTITY AMENDMENT ACCORDED AS PERCHANGE ORDER SANCTION REQUEST
024/04/19-20 DT 10.04.2019 AND MD's APPROVAL NO. J/SR-1/4168/19.
----------------------------------------------------------------
REVISION NO.01 DATED 09.10.2018
UNIT OF MEASUREMENT HAS BEEN CORRECTION FROM "SQUARE METER" TO "CUBIC
METER" OF OUTLINE NO. 12 COFFERDAM WORKS INCLUDING DE-WATERING OF ITEM
NO.10 FOR (PROV. CONSTRUCT COFFER DAM IN RIVER) VIDE YOUR E-MAIL DATED 10.08.2018
Scope:
Special Terms & Conditions:
===========================
1. Scope of Work: Civil work for Construction of following Structures for BHEL Rourkela Project as per the specification provided by
JUSCO and relevant IS codes.

Intake Well and Pump House


Approach Bridge
Switchgear Room & Transformer Yard
Monorail Arrangement and Structural Platform
Bio digester Tank, Reed Bed Tank & Storage Tank
Toilet

Price: The price shall include all taxes, royalties applied on all material to be purchased for civil construction work except GST.

Jurisdiction: All disputes relating to this work order shall be subject to and be referred to exclusive jurisdiction of Jamshedpur
Courts.

3 (A) Scope of supply : All construction materials except cement, reinforcements and structural steel, heavy tools , plant and
machinery
(i.e construction equipment's crane . concrete pump etc )will be in
Vendor's scope.

Watch & Ward: JUSCO Limited will supply the above free issue materials as per VENDOR's requirement. However unloading, storage,
watch and ward of the free issue materials issued to VENDOR by JUSCO shall be in VENDOR's scope. VENDOR shall become
custodian of free issue materials
from the day of issue till its final reconciliation to the satisfaction of JUSCO in line with the requirement of the works/ drawing.

Reconciliation of free issue materials: Reconciliation for Cement, reinforcements and structural steel neds to be done as per norms with
RA
bills.

6A. Reconciliation of cement & reinforcement bar: The materials issued shall be fully accounted for by the Contractor. In accounting of
the steel materials issued, an allowance up to a limit of 1% of the weight of reinforcement work as measured and certified respectively
will be allowed as unaccountable wastages and losses.

In addition to unaccountable wastages and losses permitted herein above, accountable wastages for reinforcement in the form of scrap
(off-cuts, cut pieces less than 2m) shall be within permissible limits as specified below:
Reinforcement Steel @2%

Reinforcement bars of 2 m length and above shall be considered as serviceable materials and not as scrap.

Only for re-conciliation of steel materials, rolling margin will be considered if the Vendor has jointly established with the Engineer
during the course of work that such margin exists. For this purpose, a joint record of weighment of random samples for each lot issued
shall be maintained. Rolling margin, however, will not be considered while making payment to the Vendor.

Issue of cement by the JUSCO shall be on the basis of actual weight. The weight of the empty gunny bags shall be duly accounted for.

Consumption norms for cement for controlled concrete will be based on design mix in accordance with IS Code and approved by the
Engineer and for the other items of work norms for consumption shall be based on consumption data indicated in TATA STEEL
Schedule of Rates.

The actual consumption of cement shall be computed based on the above norms and the actual quantum of work certified by the
Engineer. A maximum wastage allowance of up to 2% (Two) on the actual consumption shall be allowed for reconciliation purpose.
Cement consumed for making concrete test cubes, cylindrical test specimens, cement mortar cubes, uses for like cement slurry at
construction joints, finishing etc.
including buttering of concrete pumps and all other wastages incidental to concrete pumping shall be included in the aforesaid
maximum 2% (Two) wastage.

7. Water & Electricity: Construction Water & Power and area lighting shall be in vendor's scope.

7A. of sl no. a to g are in scope of Vendor


---------------------------------------
Shuttering and steel staging
Safety to be follow as per instruction of site in-charge
Quality aspects majors to be follow as per BOQ/IS standard and instructions of client/consultant/Engineer in-charge.
Rates is inclusive of all lead and lifts charges.
We will hand over the materials i.e Cement,Steel and Structural Steel, storing and safe keeping.
For mixing concrete RM 800 or mini batching plant requred.
Approved water proofing material to be use under project.
All plant & equpments to be deploy as per JUSCO rental policy.

PPE's: All the workmen should work with PPE, especially Helmet
& double lifeline safety belt with zero tolerance for working at HEIGHT. All other terms shall be as per our standard safety norms/
policy. If JUSCO will issue the PPE's the same will be deducted from the
Vendor's Bills.

Accommodation of Employee & Worker of Vendor: Under the scope of vendor only space shall provide by JUSCO.

Material Storage/ Site Office: Suitable storage facilities for your own equipment, materials & free issue material and Site office for your
requirement is under scope of Vendor. for same space will provide by JUSCO.

Civil Material Testing: Arranging civil material Testing, Periodic Calibration and Test Certificates of equipments, tools & Tackles required
for execution of work is under scope of Vendor. must folow the
JUSCO rental policy.

Insurance: Insurance to your Plant, Machinery, Labour and Staff is under scope of Vendor.

Scope: Includes all plant & machinery, materials, transportation, handling, dewatering (as per requirement), supervision and every other
incidental cost and charges whatsoever required completing the work in all aspects as per the specifications/ drawings.

Statutory Requirements: Compliance with all the statutory requirements prevailing in the State of Jharkhand and as required for carrying
out the works including labour license, minimum wage requirements, PF, ESI, Leave Wages, Bonus, Retrenchment benefits,
Accidental Insurance/ Workmen compensation and all other liabilities under Contract Labour (Regulation and Abolition) Act etc. All
payments to meet all the statutory requirements are deemed to have been included in the price indicated. Documentary proof for the
above is to be submitted to JUSCO along with R.A. Bills. No extra payment will be made for statutory compliances.

Compliance of Safety Standards: You will abide by all safety standards, specifications and practices in construction and also the
instructions of our Safety Engineer/ Steward at site. You are responsible for the safety of your staff and employees, employees of other
agencies working in your area of operation. You shall delegate the responsibility of implementation of safety rules to one of your staff. It
is obligatory for the contractors to issue the required personnel protective appliances to all the employees (including the supervisors)
and insure that the same are used while at work. Every employee shall wear safety shoes/boots, safety goggles and safety helmets at
all times. In case of repeated violation of safety rules and precautions by any of your workman, he will not be permitted inside the site
of work. Your authorized representative of safety shall attend all safety meetings/ PEP Talk convened by JUSCO Site Safety Engineer/
Steward, and abides by
his instructions.

Others: All other cost of works not indicated above but required for successful completion of work.

Price:
==========
The price shall include all taxes, royalties applied on all material to be purchased for the work except GST.

The Price also includes all the Statutory Liabilities of the Labour.

If any liability arises due to Service Tax on subcontract, the same


shall be reimbursed to the sub contractor at actual against documentary proof.

TDS will be as applicable as per norm.

The above prices shall remain firm till the entire scope of works is completed to the satisfaction of the JUSCO and no escalation or
revision of prices shall be entertained under any circumstances (increase in cost of material, machineries, transportation, manpower,
local expenses, etc.). There will not be any liability on JUSCO due to idling of Plant machinery/ Equipment or Labour.

DEFECT LIABILITY PERIOD:


===========================
The defect liability period shall be valid 18 months from the date of handing over and acceptance of the same by VENDOR should
rectify any defects found in this period at its own cost without any implications to
JUSCO.

LIQUIDATED DAMAGES:
======================
If VENDOR does not comply with completion period (s) specified herein or other obligations assumed under this VENDOR shall
automatically be liable for the liquidated damages. The Liquidity Damages shall be applied for the delayed period at the rate of 0.5
percent (0.5%) per week subject to a maximum of 5 percent (5%) of the contract value of
VENDOR.

<H>20. Bonus Clause: 1% of basic total order value shall be paid subject to completion of complete job within scheduled</>

<H>21. Payment Terms three orders: Monthly progress payment of 95% shall be released against progress bills within 30 to 45 days
against certification of invoices by us, 2.5% after completion of project and balance 2.5% defect liability period of 18 months.</>

<H>a),,You will deposit Rs.8.00 Lakh as PBG in by DD or Bank Guarantee instrument (should be valid till completion of project)</>

<H>b),,We will pay Rs.10.00 Lakh after success full mobilization, meaning construction of yard, hutment, office setup, deployment of
man & machinery including site engineers subject to certification from project manager.</>

<H>c),,Mobilization payment shall be adjusted @20% from each bill and in maximum within six months of mobilization date.</>

<H>D) Completion scheduled: (8) Eight months from date of order subject to clear availability of drawing and front from JUSCO. The
milestone schedule shall be separately signed off with project manager.</>

22. Extra Items Clause:


====================
Extra item of work if any, cropped up during execution of work, which is not covered in BOQ, shall be carried out by the contractor.
Contractor shall obtain written permission for execution of such extra jobs from the executing authority and shall submit the extra rate
with relevant documentary evidences before starting the job. Rate will be settled by rate settling committee and mutually agreed by the
party.

The rate of any extra item of work shall be determined by a Committee consisting of representatives of the Employer and the Engineer
and constituted by the Employer for this purpose.

All such rates shall be derived from the rates set out in the Priced
Bill of Quantities for a similar type of work if in the opinion of the
Committee the same shall be applicable.

If in the opinion of the Committee the Priced Bill of Quantities does not contain rates applicable for the extra items of work then rates
shall be derived from a similar type of work being executed by the same
Contractor for some other contract.

If in the opinion of the Committee, such similar type of work does not exist, then rates of such extra items of work shall be determined
by the Committee as may be considered reasonable by it. For this purpose the Contractor shall submit to the Engineer detailed
analysis of the rate proposed by the Contractor supported with relevant vouchers. While determining rates of extra items, the
Committee shall provide an allowance of 12½ % towards Contractor's overheads and profits.

23. Power of Varying Work:


=========================
Rates will remain firm, fixed and binding till the satisfactory completion of the job. The Engineer-in-charge reserves the right to vary
work. If the job is not done as per specification and instructions, the
same will be got done by some other agency at your risk and cost.
Total Order value : 64,346,899.33 INR ( SIX CRORE FORTY THREE LAKH FORTY SIX THOUSAND EIGHT HUNDRED NINETY
NINE Rupees THIRTY THREE Paise )
Further to our terms & conditions in our enquiry , you confirm and agree that you have read the contents of "General safety requirements
to be compiled by vendor effective from 10.08.2016 " , " JUSCO consequence management for safety violation by vendor /vendor's
employee " , Revised equipment hiring and deployement policy effective from 23.03.2017" & "General terms and conditions for work
order effective from 01.07.2017" and agree to abide by same during your association with JUSCO and shall be fully responsible for
any violation of the same . Please refer following web links for details http://www.juscoltd.com/notice-08aug16.pdf

http://www.juscoltd.com/notice-08aug16a.pdf http://www.juscoltd.com/notice-01jul17.pdf
For Jamshedpur Utilities & Services Company Limited
0
Amount

2000000.00
200000.00

Amount

35437.50

Amount
Amount

Amount

9000.00
Amount

7200.00
OTAL
F NO

n shall
ed by

storage,
me

orms with

nting of
ectively

m of scrap
er
ot issued

nted for.

by the
EL

he
pose.
rry at

ms/

for your

required

very other
r carrying

. All
for the

e
of other
ur staff. It
visors)
lmets at
the site
Engineer/

n or
npower,

ould

ll
of 0.5

5 days
</>

)</>

ment of

>

O. The

ctor.
ra rate
ed by the

Engineer

rates

rmined
ed

vary

NINETY

uirements
ndor's
work
ble for