Sie sind auf Seite 1von 5

i

LETTER OF TRANSMITTAL

January, 2007

EDMUNDO E. NICOLAS, JR
Instructor
TUP-CIT-CET

S I R:

I have the privilege to submit, with great pride and confidence, the completed
integrated development plan and other necessary documents to complete the
requirements of the course in CET 122 – National Building Code

A project entitled “A PROPOSED MASTER PLAN FOR


LE CHATELIER MEDICAL
HOSPITAL”

It is my hope that this project would provide great help to other students, who,
like me, would have taken the same field of interest in the construction industry.

Thank You.

Yours Truly,

MA. CORAZON C. YU
January, 2007
ii

APPROVAL SHEET

With the highest level of workmanship, Integrity and professionalism, I


found out that this project entitled “A PROPOSED MASTER PLAN FOR LE
CHATELIER MEDICAL CENTER” pass /do not pass the necessary
standard set in order to meet the requirements to complete the course in CET 122 –
National Building Code.

Defending on the outcome of the final checking of the project a corresponding

grade of 1.00 is given.

Remarks are as follows:

EDMUNDO E. NICOLAS, JR.


Instructor
National Building Code
CET 122
iii

ACKNOWLEDGEMENT

I am indebted to many people for making this research project a reality:

I have greatly benefited from the lectures, experiences and insights of Prof.
Edmundo E. Nicolas, Jr. whom we have the privilege of being his students. With
great admiration, this research project is dedicated to him.

I also wish to acknowledge the contribution made to the project by Ms.


Rowena Aguilar and Engr. Edgardo A. Cristobal who was involved in the
development of major components of the project.

To the faculty, who made specific resources available and Engr. Erwin Gelle
for providing constructive criticism, advice and encouragement.

I would like to give a special thanks to my family for their love, patience and
encouragement.

And also to my friends and fellow classmates who coordinated and supported
me in the development of this project.

To Manila Library for the resources and information that has been gather up,
for their warmth patience and for helping us to formulate a accurate and more
informative research.

And lastly I would like to extend my gratitude to God for giving me the
strength and the knowledge to finish this research.
iv

INTRODUCTION

Most of the triple A construction company is well known as one of the best
when it comes to the building domestic project types, including new construction and
renovation of commercial, airport, distribution and industrial, correctional, public
assembly, sports, health care, institutional, residential, mixed use, retail, hospitality,
mass transportation, entertainment, microelectronics, research and development,
laboratory facilities., high technology, industrial, leisure, and public and
transportation facilities, as well as a variety of other project types. These projects
have been built for both public and private clients using various delivery methods.
The company works with developers, building owners, contractors, consultants,
manufacturers, software vendors and academic institutions to fit information
technologies to needs.

Current key project developments include automated building code checking,


product library support and construction information integration. They are dedicated
to elevating the standards for safety in the construction industry through a wide
variety of methods—from zero-tolerance drug testing to our aggressive fall-
protection program, which includes partnering with the leaders in the insurance
industry to develop the next generation of fall-protection systems. Through
innovative training and education programs, they also provide their employees and
subcontractors with the tools, knowledge and resources they need to increase
safety, reduce risk and improve loss control on every project they manage. Since
1975, founded on an uncompromising commitment to performing quality
construction in a cost-effective manner. The company has established itself as one
of the industry's most profitable and highly regarded companies by continually
improving the quality of its work product and the opportunities for its employees.

The implementation Continuous Improvement Process (CIP) is a logical


progression in this tradition of continual quality improvement. CIP broadens the
focus of the company's quality improvement efforts for all aspects of the company's
business. It empowers every employee to thoroughly examine every aspect of the
manner in which his or her job is performed. It provides a vehicle for bringing
potential improvements to the attention of the company's managers for evaluation
and implementation. Since inception of CIP in 1983, more than 33,000 ideas have
v

been submitted by 6,000 individual employees and subcontractors. These ideas


have saved our clients in excess of 50 million pesos.

Das könnte Ihnen auch gefallen