OGPI TENDER FOR: SMP INSTALLATION WORKS FOR GRAVITY CIRCUIT UPGRADE

DIDIPIO PROJECT
WORK PACKAGE No: D0372
TENDER SCHEDULE - TENDER FORM 10/C TENDERER: ______________________________

DATE
Item ACTIVITY Week No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14

1.00 PRELIMINARIES
1.01 Mobilisation
1.02 Site Establishment (offices, toilet, etc.)
1.03 As Constructed Documentation (incl. test results, shop drawings)

2.00 STRUCTURAL
A. Grinding Area (Area 21)
2.01 Structural Steel less than 30 kg/m - light
2.02 Structural Steel 30 kg/m to 60 kg/m - medium
2.03 Structural Steel greater than 60 kg/m - heavy
2.04 Floor grating, forge-welded steel, with 32x5mm load bars at 40mm centres, bitumen-dipped
2.06 Handrail and kickplate
2.07 Stair treads, 750 wide, forge-welded steel grating with 32x5 load bars at 40mm centres, c/w
2.08 Security fence typical with 50X50 mesh with 3 mm wire secured to 50X6 equal angle framing
2.09 Security mesh door (2100X800 nominal size) with 50X6 EA angle framing and 50X50 mesh wi
2.10 Demolition of existing steel including temporary supports to remove from existing framing an
B. Gold Room Area (Area 25)
2.11 Structural Steel less than 30 kg/m - light
2.12 Structural Steel 30 kg/m to 60 kg/m - medium
2.13 Structural Steel greater than 60 kg/m - heavy
2.14 Floor grating, forge-welded steel, with 32x5mm load bars at 40mm centres, bitumen-dipped
2.15 Handrail and kickplate
2.16 Stair treads, 750 wide, forge-welded steel grating with 32x5 load bars at 40mm centres, c/w
2.17 Demolition of existing steel including temporary supports to remove from existing framing an
C. Miscellaneous Structural Steel & Pipe Supports
2.19 Structural Steel less than 30 kg/m - light
2.20 Structural Steel 30 kg/m to 60 kg/m - medium
3.00 MECHANICAL
A. Grinding Area (Area 21)
3.01 PRIMARY GRAVITY SCREEN FEED PUMP
3.02 PRIMARY GRAVITY SCREEN FEED BOX
3.03 PRIMARY GRAVITY SCREEN
3.04 PRIMARY GRAVITY SCREEN O/S CHUTE
3.05 PRIMARY GRAVITY SCREEN UNDER PAN
3.06 GRAVITY CIRCUIT HOIST
3.07 PRIMARY GRAVITY CONCENTRATOR
3.08 PRIMARY GRAVITY CONCENTRATOR CONTROL PANEL
3.09 PINCH VALVE AIR RECEIVER
B. Gold Room Area (Area 25)
3.10 PRIMARY GRAVITY MAGNETIC SEPARATOR
3.11 PRIMARY GRAVITY MAGNETIC SEPARATOR CHUTE
3.12 SHAKING TABLE
3.13 SHAKING TABLE TAILINGS PUMP
3.14 SECONDARY GRAVITY CONCENTRATOR
3.15 SECONDARY GRAVITY CONCENTRATOR CONTROL PANEL
3.16 SECONDARY GRAVITY CONCENTRATOR TAILINGS PUMP
3.17 SECONDARY GRAVITY SURGE HOPPER PUMP
3.18 GOLD ROOM VIBRATING SCREEN
4.00 PLATEWORK
5.00 PIPING
5.01 Fabricated Pipe Supply and Installation
5.08 Site-run Piping Supply and Installation
5.74 Valve Installation
6.00 GENERAL
6.01 Site-Clean Up
6.02 Demobilisation
No. of On-Site Personnel - STAFF: 7 9 9 9 9 9 9 9 8 8 7 7 0
No. of On-Site Personnel - DIRECT LABOUR: 1 19 19 19 19 19 19 19 13 13 8 8 0

The Tenderer shall incorporate all Contract Key Dates listed in Clause 9.2 "Contract Key Dates" in Signature of Witness:
the Tender Schedule. If the Tenderer considers that insufficient activities are listed then it
should insert additional items as it requires. Show Key Dates: Name of Witness:

Address of Witness: