CONCRETO
DESCRIPCION ANCHO / ESPESOR /
LARGO CANTIDAD
BASE ALTURA
LOSA 8.7 8.7 0.1 1
DADOS PARA ESCOTILLA DE INGRESO X-X 0.8 0.1 0.1 2
DADOS PARA ESCOTILLA DE INGRESO Y-Y 0.6 0.1 0.1 2
VIGAS X - X 4.25 0.2 0.25 2
VIGAS Y - Y 4.25 0.2 0.25 2
VIGA DE CORONA X 8.7 0.25 0.35 2
VIGA DE CORONA Y 8.7 0.25 0.35 2
PAREDES 8.7 0.25 2.25 4
COLUMNAS TIPO A 0.35 0.35 2.5 1
COLUMNAS TIPO B 0.2 0.2 2.6 4
PISO 9.2 9.2 0.25 1
ZAPATA 1.41 1.41 0.35 1
TAPADERA TANQUE DE DISTRIBUCION 0.9 0.9 0.1 1
ALISADO INTERIOR 8.7 2.6 0.01 4
TOTALES
ASPECTOS DIMENSIONALES
DESCRIPCION DIAMETRO
(PLGS.) LARGO RECUBRIMIENTO SEPARACION
ALAMBRE DE AMARRE
ASPECTOS DIMENSIONALES
ELEMENTO No. VARILLAS LONGITUD DE
No. AMARRES AMARRE
X-X Y-Y
PISO 61.00 46.00 2806 0.4
PAREDES 44.00 229.00 10076 0.4
LOSA 131.00 131 17161 0.4
VIGAS 111.20 4 444.8 0.4
VIGAS DE CORONA 229.87 4 919.47 0.4
COLUMNAS TIPO A 8.00 17.00 136 0.4
COLUMNAS TIPO B 16.00 65.00 1040 0.4
TAPADERA 4.00 4.00 16 0.4
ZAPATA 9.00 9.00 81 0.4
ACCESORIOS
ONCRETO MATERIALES
M3 DESPERDICIO M3 TOTALES CEMENTO ARENA (m3) PIEDRIN (m3)
ESTIMADOS (SACOS)
6.93 10% 7.62 68.60 4.19 5.72 1
0.02 10% 0.02 0.16 0.01 0.01 X
0.01 10% 0.01 0.12 0.01 0.01
0.43 10% 0.47 4.21 0.26 0.35
0.43 10% 0.47 4.21 0.26 0.35
1.52 10% 1.67 15.07 0.92 1.26
1.52 10% 1.67 15.07 0.92 1.26
19.58 10% 21.53 193.79 11.84 16.15
0.31 10% 0.34 3.03 0.19 0.25
0.42 5% 0.44 3.93 0.24 0.33
21.28 3% 21.92 197.26 12.05 16.44
0.70 3% 0.72 6.45 0.39 0.54
0.08 15% 0.09 0.84 0.05 0.07
0.90 10% 1.00 8.96 0.55
TOTALES 57.97 521.70 31.88 42.73
ACERO
ALAMBRE DE AMARRE
ACCESORIOS
0.04763 0.04763
1 0.09526 X= 20.9951711
0.14289
0.28578
CANTIDAD ACERO
TOTAL CANTIDAD/
BARRAS QUINTAL QUINTALES
98.14
74.01
77.38
124.75
14.84
18.67
26.72
38.33
2.44
2.27
3.40
6.90
6.50
36.54
19.47
35.39
36.54
19.47
35.39
0.48
0.48
2.21
13.50
13.50
108.00
PRESUPUESTO DE TANQUE DE DISTRIBUCIÓN 150 m3
MATERIALES global 1
MANO DE OBRA CALIFICADA día-hombre 300 Q125.00
COSTO TOTAL
150 m3
ETHANIA
PEQUE
ENANGO
Precio Total
Q1,523.52
Q2,520.00
Q1,000.00
Q479.66
Q97.71
Q175.31
Q1,409.59
Q522.67
Q77.84
Q1,718.29
Q350.02
Q628.03
Q1,148.75
Q383.33
Q160.91
Q11,243.81
Q2,290.41
Q4,109.58
Q7,402.21
Q491.05
Q3,973.62
Q809.44
Q1,452.35
Q5,145.23
Q3,005.98
Q209.83
Q135.00
Q100.00 Acabado (Alisado + impermeabilización) 190
Q290.00 Pintura anticorrosiva 85
Q0.00
Q0.00 incluye todo 70 - 125 m2
Q585.00
Q95.00
Q91.85
Q210.00
Q100,258.97
Q100,258.97
Q37,500.00
Q137,758.97
0.0254 m
0.3048 m
2.7432 m
m2/tabla
Dimensión de columna:
Bc =
hc =
Tablas a necesitar: Hc =
28.6 tablas A lateral =
53.1 tablas/muro Bc = hc =
Tablas a necesitar: Hc =
24.5 tablas Area =
o. De columnas: 1 muros
otal tablas = 15 unidades
otal tablas = 1.25 docenas