ABSTRACT OF COST

Annexure -A
NAME OF WORK:-Upgration of Road from Badran to Garli
Via Jol ,Dabriana,Garli,Usnar Kalan,Nara,Darkoti to Harsour
in Km. 0/000 to 27/300.
( SH :- Improvement of curve at Various Rd'S) )
S.No Description Unit Qty. As per Through
. Rate Rate
Amount
1 Excavation in soil in Hilly Area by Cum 581.00 84.95 49356.00
mechanical means including cutting and
trimming of side slopes and disposing of
excavated earth with a lift upto 1.5 m and a
lead upto 20 m as per drawing and Technical
Specification Clause 1603.1
2 Excavation in Hilly Areas in Ordinary Cum 0.00 134.45 0.00
Rock by mechanical means not requiring
blasting.Excavation in hilly area in ordinary
rock not requiring blasting by mechanical
means including cutting and trimming of
slopes and disposal of cut material with a lift
upto 1.5 m and lead upto 20 m as per Clause
1603.2.
Total :- 49356.00
2

DETAIL OF MEASUREMENTS
NAME OF WORK:-Upgration of Road from Badran to Garli Via Jol
,Dabriana,Garli,Usnar Kalan,Nara,Darkoti to Harsour in Km. 0/000 to 27/300.

( SH :- Improvement of curve at Various Rd'S) )


R.D. X-Section Mean Length Qty. CLASSIFICAT CLASSIFICATION
Area Area ION % Qty.

SOIL O/R SOIL O/R


1 2 3 4 5 6 7 9 10
0/000 2.61
15 2.57 2.59 15.00 38.85 100 0 38.85 0.00
30 2.55 2.56 15.00 38.40 100 0 38.40 0.00
45 3.06 2.81 15.00 42.15 100 0 42.15 0.00
60 2.23 2.65 15.00 39.75 100 0 39.75 0.00
75 2.18 2.21 15.00 33.15 100 0 33.15 0.00
90 2.96 2.57 15.00 38.55 100 0 38.55 0.00
105 3.23 3.10 15.00 46.50 100 0 46.50 0.00
120 2.52 2.88 15.00 43.20 100 0 43.20 0.00
135 2.81 2.67 15.00 40.05 100 0 40.05 0.00
150 2.15 2.48 15.00 37.20 100 0 37.20 0.00
165 3.12 2.64 15.00 39.60 100 0 39.60 0.00
180 3.23 3.18 15.00 47.70 100 0 47.70 0.00
195 2.52 2.88 15.00 43.20 100 0 43.20 0.00
210 2.76 2.64 15.00 39.60 100 0 39.60 0.00
215 2.47 2.62 5.00 13.10 100 0 13.10 0.00
Total 583.00 581.00 581