MATERIAL HISTORY SHEET
REPORT NO SE3/2041/MHS/0037 DATE
PO NO 2041050130 DATE
CLIENT M/s. PETROFAC DRG. NO
PROJECT INTEGRATED GAS SURFACE FACILITIES FOR RDG FIELD
DESCRIPTION BEAM,COLUMN,STUB_COLUMN QTY
Page 1 of 9
SIMPLEX ENGG. & FOUNDRY WORKS (P) LTD. UNIT-III
TEDESARA U-3
MATERIAL HISTORY SHEET
REPORT NO SE3/2041/MHS/0037 DATE
PO NO 2041050130 DATE
CLIENT M/s. PETROFAC DRG. NO
PROJECT INTEGRATED GAS SURFACE FACILITIES FOR RDG FIELD
DESCRIPTION BEAM,COLUMN,STUB_COLUMN QTY
5 09TS010CL103P COLUMN 1
Page 2 of 9
SIMPLEX ENGG. & FOUNDRY WORKS (P) LTD. UNIT-III
TEDESARA U-3
MATERIAL HISTORY SHEET
REPORT NO SE3/2041/MHS/0037 DATE
PO NO 2041050130 DATE
CLIENT M/s. PETROFAC DRG. NO
PROJECT INTEGRATED GAS SURFACE FACILITIES FOR RDG FIELD
DESCRIPTION BEAM,COLUMN,STUB_COLUMN QTY
FIRM QC
Page 3 of 9
G. & FOUNDRY WORKS (P) LTD. UNIT-III
TEDESARA U-3
MATERIAL HISTORY SHEET
13.05.2019
22.02.2019
As per Call No: SIM/J2041/0037
10
IS:2062 E250BR
IS:2062 E250BR
IS:2062 E250BR
IS:2062 E250BR
IS:2062 E250BR
IS:2062 E250BR
IS:2062 E250BR
IS:2062 E250BR
IS:2062 E250BR
IS:2062 E250BR
IS:2062 E250BR
IS:2062 E250BR
IS:2062 E250BR
IS:2062 E250BR
IS:2062 E250BR
IS:2062 E250BR
IS:2062 E350BR
IS:2062 E350BR
IS:2062 E350BR
IS:2062 E350BR
IS:2062 E350BR
Page 4 of 9
G. & FOUNDRY WORKS (P) LTD. UNIT-III
TEDESARA U-3
MATERIAL HISTORY SHEET
13.05.2019
22.02.2019
As per Call No: SIM/J2041/0037
10
IS:2062 E350BR
IS:2062 E350BR
IS:2062 E250BR
Page 5 of 9
G. & FOUNDRY WORKS (P) LTD. UNIT-III
TEDESARA U-3
MATERIAL HISTORY SHEET
13.05.2019
22.02.2019
As per Call No: SIM/J2041/0037
10
IS:2062 E250BR
IS:2062 E250BR
IS:2062 E250BR
IS:2062 E250BR
IS:2062 E350BR
IS:2062 E350BR
IS:2062 E350BR
IS:2062 E350BR
IS:2062 E350BR
IS:2062 E250BR
IS:2062 E350BR
TPIA/PETROFAC
Page 6 of 9
SIMPLEX ENGG. & FOUNDRY WORKS (P) LTD. UNIT-III
TEDESARA U-3
FINAL DIMENSION REPORT
Inspection Report SE3/QC/6571/DR/003/0037 Date: 20.05.2019
Client M/S Petrofac Project: Integrated Gas Surface Facility for RDG Field
PO NO 2041050130 Date: 22.02.2019
Item Description Structure steel for pipe racks for integrated facilities for RDG field WO No: 6571
Drawing No As per Call No: SIM/J2041/0037
SL.NO. Member Assembly Mark Drawing No QTY Description Specified Value Observed Value Remarks
Description No (Nos)
Total Length 4990 4991
Section UB406X178X67 UB406X178X67
Hole Dia 22 22
1 BEAM 09TS013BE144P 2041-C-09TS01-S-3BE144-0188 1 hole location 2643/100/2183 2644/100/2182
End pl hole dimn 35/60/60/60/35,35/100/35 35/60/60/60/35,35/100/35
Sweep --- 1 mm Max
Camber --- 2 mm Max
Total Length 4990 4989 to 4991
Section UB406X178X67 UB406X178X67
Hole Dia 22 22
2 BEAM 09TS013BE145P 2041-C-09TS01-S-3BE145-0189 3 hole location 2683/100/2183 2684/100/2182
End pl hole dimn 35/60/60/60/35.35/100/35 35/60/60/60/35.35/99/35
Sweep --- 1 mm Max
Camber --- 2 mm Max
Total Length 4990 4991
Section UB406X178X67 UB406X178X67
Hole Dia 22 22
3 BEAM 11TS013BE103P 2041-C-11TS01-S-3BE103-0163 1 hole location 2683/100/2183 2682/101/2184
End pl hole dimn 35/60/60/60/35, 35/100/35 35/60/60/60/35, 35/100/35
Sweep --- 1 mm Max
Camber --- 2 mm Max
Page 7 of 9
SIMPLEX ENGG. & FOUNDRY WORKS (P) LTD. UNIT-III
TEDESARA U-3
FINAL DIMENSION REPORT
Inspection Report SE3/QC/6571/DR/003/0037 Date: 20.05.2019
Client M/S Petrofac Project: Integrated Gas Surface Facility for RDG Field
PO NO 2041050130 Date: 22.02.2019
Item Description Structure steel for pipe racks for integrated facilities for RDG field WO No: 6571
Drawing No As per Call No: SIM/J2041/0037
SL.NO. Member Assembly Mark Drawing No QTY Description Specified Value Observed Value Remarks
Description No (Nos)
Total Length 4990 4989 to 4991
Section UB406X178X67 UB406X178X67
Hole Dia 22 22
4 BEAM 11TS013BE105P 2041-C-11TS01-S-3BE105-0165 3 hole location 2683/100/2183 2684/101/2182
End pl hole dimn 35/60/60/60/35, 35/100/35 35/60/60/60/35, 35/100/35
Sweep --- 1 mm Max
Camber --- 2 mm Max
Total Length 7200 7201
Section UB457X191X74 UB457X191X74
Hole Dia 22 22
hole location 4535/80/2560 4534/80/2559
1957/2250/2708/2850/4926/ 1956/2251/2708/2851/4925/5532/5
Rib Dimn 5533/5675/6176/6850/7175 675/6175/6849/7176
Bottom pl hole dimn 160/160/60/60 159/161/60/60
0 +1 0
5 COLUMN 09TS010CL103P 2041-C-09TS01-S-0CL103-0103 1
Water Level ---
0 +1 +1
Plumb ---
-1 -1 0
0 +1 0
Alignment ---
Page 8 of 9
SIMPLEX ENGG. & FOUNDRY WORKS (P) LTD. UNIT-III
TEDESARA U-3
FINAL DIMENSION REPORT
Inspection Report SE3/QC/6571/DR/003/0037 Date: 20.05.2019
Client M/S Petrofac Project: Integrated Gas Surface Facility for RDG Field
PO NO 2041050130 Date: 22.02.2019
Item Description Structure steel for pipe racks for integrated facilities for RDG field WO No: 6571
Drawing No As per Call No: SIM/J2041/0037
SL.NO. Member Assembly Mark Drawing No QTY Description Specified Value Observed Value Remarks
Description No (Nos)
Length 7200 7201
Section UB457X191X74 UB457X191X74
Hole Dia 22 22
4865/5015/5095/5490/5595/572 4866/5014/5096/5491/5596/5724/6
hole location 5/6265/6365/6465/6890/ 264/6366/6464/6891/ 6989/7091
6990/7090
0 +1 +1
Plumb ---
-1 -1 0
0 +1 0
Alignment ---
Notes: 01] As per Drawing orientation & Dimensions checked and found satisfactory.
02] Visual inspection done and found satisfactory.
FIRM QC TPIA/PETROFAC