Beruflich Dokumente
Kultur Dokumente
To,
The Security In-charge (Via Business HR Tata Power, Haldia)
Tata Steel, HMC Division
Haldia: Purba Medinipur
Subject: Issue / Renew of gate pass against the Work Order No for nos.
Of workers for the period from to
Sir/Madam,
Name of Contractor
Address of the Contractor:
Email and Phone Number of Contractor:
Work Order Duration (Valid from and Valid Till):
Trade License Number:
Labour License Number:
PF Code:
ESI Code:
Department Signature Remarks
Reporting/User Department
Safety
Business HR
Security
Enclosure:
Number of gate pass issued till Number of gate pass returned Number of Gate pass to be
date till date applied now
Contractor Declaration – I hereby declare that above specified information is/are true and as per
best of my knowledge.
Signature Signature
Date: Date:
Chembond Water Technologies Limited
(formerly Chembond Solenis Water Technologies Ltd)
EL-71 Mahape MIDC, Navi Mumbai 400710. INDIA
T: +91 22 39213000 - 03 ● F: +91 22 27681294
www.chembondwater.com
CIN: U24110MH1984PLC143564
Chembond Water Technologies
Workmen Details – Part 2
Signature Signature
Date: Date:
Chembond Water Technologies Limited
(formerly Chembond Solenis Water Technologies Ltd)
EL-71 Mahape MIDC, Navi Mumbai 400710. INDIA
T: +91 22 39213000 - 03 ● F: +91 22 27681294
www.chembondwater.com
CIN: U24110MH1984PLC143564