Beruflich Dokumente
Kultur Dokumente
: 15GK0014
CONTRACT NAME : CONSTRUCTION OF MULTI-PURPOSED BUILDIG AT
LOCATION OF THE CONTRACT: MUNICIPALITY OF MURCIA, NEGROS OCCIDENTAL
Prepared By:
DETAILED ESTIMATES
ITEM NO.
1 Excavation & backfilling Work Qty = 166.92 cu.m.
A. Material
Description QTY. UNIT UNIT COST AMOUNT
B. Labor
Description Qty No. of Day Rate/Day Total
Project Engineer 1.0 15.0 600.00 9,000.00
Construction Foreman 1.0 15.0 450.00 6,750.00
Mason/Carpentry 1.0 15.0 300.00 4,500.00
Laborer/Helper 4.0 15.0 200.00 12,000.00
Sub - Total 32,250.00
C. Equipment Rentals ( including Operator, Fuel, Oil , Lub. )
Description Qty No. of Day Rate/Day Total
ITEM NO.
II Concrete & masonry works Qty = 29.82 cu.m
Materials/Labor/Equipment
Description Qty. Unit Unit Cost Total Cost
Concrete & masonry works 29.82 cu.m 5,000.00 149,100.00
Sub-total 149,100.00
ITEM NO.
III CHB & masonry with septic vault Qty = 347.68 sq.m.
Materials/Labor/Equipment
Description Qty. Unit Unit Cost Total Cost
CHB & masonry with septic vault 347.68 sq.m. 755.00 262,498.40
Sub-total 262,498.40
Direct Cost 262,498.40
Indirect Cost
OCM 13,124.92
Profit 26,249.84
Tax 36,224.78
Direct + Indirect Cost 338,097.94
Unit Price 972.44 sq.m.
Total for Item III 338,097.94
ITEM NO.
IV Roofing framing & roofing Qty = 184.76 sq.m
Materials/Labor/Equipment
Description Qty. Unit Unit Cost Total Cost
Roofing framing & roofing 184.76 sq.m 1,800.00 332,568.00
Sub-total 332,568.00
ITEM NO.
V Ceiling work Qty = 184.76 sq.m
a. Materials
Description QTY, UNIT UNIT COST AMOUNT
Ceiling work 184.76 sq.m 1,200.00 221,712.00
Sub - Total 221,712.00
ITEM NO.
VI Doors, windows & steel railing Qty = 33.81 sq.m
a. Materials
Description QTY, UNIT UNIT COST AMOUNT
Provide Project Sign Board 33.81 sq.m 6,500.00 219,765.00
Sub - Total 219,765.00
ITEM NO.
VII Plumbing works Qty = 5.00 fixtures
a. Materials
Description QTY, UNIT UNIT COST AMOUNT
Provide Project Sign Board 5.00 fixtures 7,000.00 35,000.00
Sub - Total 35,000.00
ITEM NO.
VIII Electrical works Qty = 50.00 outlets
a. Materials
Description QTY, UNIT UNIT COST AMOUNT
Provide Project Sign Board 50.00 outlets 1,200.00 60,000.00
Sub - Total 60,000.00
ITEM NO.
IX Painting works Qty = 739.76 sq.m
a. Materials
Description QTY, UNIT UNIT COST AMOUNT
Provide Project Sign Board 739.76 sq.m 250.00 184,940.00
Sub - Total 184,940.00
ITEM NO.
X Tile works Qty = 19.62 sq.m
a. Materials
Description QTY, UNIT UNIT COST AMOUNT
Provide Project Sign Board 19.62 sq.m 1,200.00 23,544.00
Sub - Total 23,544.00
Prepared By:
41,538.04
571,806.90
192,040.80
1,349,115.00
338,097.94
388,439.42
285,565.06
283,057.32
45,080.00
77,280.00
238,202.72
30,324.67
1,528,738.58
1,919,625.97
1,980,000.00
60,374.03
3.05
CONTRACT NO. : 15GK0014
CONTRACT NAME : CONSTRUCTION OF MULTI-PURPOSED BUILDIG AT BRGY. LOPEZ JAENA
LOCATION OF THE CONTRACT: MUNICIPALITY OF MURCIA, NEGROS OCCIDENTAL
DESCRIPTION : CONSTRUCTION SCHEDULE, S-CURVE & PERT/CPM
PERT/CPM
ITEM II = 20 days
ITEM VI & VII= 20 days ITEM V = 15 days
3 5 7
100
I EXCAVATION & BACKFILLING WORKS 41,538.04 2.16
0.72 0.72 0.72
50
VI Doors, windows & steel railing 283,057.32 14.75 3.69 3.69 3.69 3.69
VII PLUMBING WORKS 45,080.00 2.35 1.17 1.17
VIII ELECTRICAL WORKS 77,280.00 4.03 1.01 1.01 1.01 1.01
0
TOTAL 1,919,625.97 100.00 9.67 35.77 74.31 100.00
Prepared By: Checked by: Sumitted by: Recommended for Approval Approved:
SILVERGRACES CONST. AND MELECIO B. PACETE JR. LYDIA D. TUPAS NORMITA A. NOBLE JAIME S.J. JAVELLANA
CONST. SUPPLY Project Engineer Engineer III OIC-Asst. District Engineer District Engineer
0.50 -
0.88
- 1.35
0.99
0.20
- 0.50
11.05 77.15
DPWH, NEG. OCC.1st DISTRICT ENG'G. DISTRICT CONSTRUCTION OF MULTI-PURPOSED BUILDIG AT
MATAB-ANG, TALISAY NEG. OCC. BRGY. LOPEZ JAENA
MUNICIPALITY OF MURCIA, NEGROS OCCIDENTAL
15GK0014
BILL OF QUANTITIES
Item No. Description Unit Quantity Unit Price Amount
(Pesos) (Pesos)
1 Excavation & backfilling Work cu.m. 166.92 248.85 41,538.04
III CHB & masonry with septic vault sq.m. 347.68 972.44 338,097.94
TOTAL 1,919,625.97
67 Days Duration
Item Description
15 30 45
1.0 Project manager 1.0 1.0 1.0
2.0 Project Engineer 1.0 1.0 1.0
3.0 Material Engineer 1.0 1.0 1.0
4.0 General Foreman 1.0 1.0 1.0
5.0 Welder 2.0 2.0 2.0
6.0 Mason/Carpenter 2.0 2.0 2.0
7.0 Steelman 1.0 1.0 1.0
8.0 Plumber 1.0 1.0 1.0
9.0 Electrician 1.0 1.0 1.0
10.0 Laborer/Helper 4.0 4.0 4.0
Total 15.0 15.0 15.0
Prepared By:
DULE
tion
67
1.0
1.0
1.0
1.0
2.0
2.0
1.0
1.0
1.0
4.0
15.0
CONTRACT NO. : 15GK0014
CONTRACT NAME : CONSTRUCTION OF MULTI-PURPOSED BUILDIG AT BRGY. LOPEZ JAENA
LOCATION OF THE CONTRACT: MUNICIPALITY OF MURCIA, NEGROS OCCIDENTAL
67 Days Duration
Item Description 15 30 45
1.0 Welding Machine 1 1 1
2.0 1 Bagger Concrete Mixer 1.0 1.0 1.0
3.0 Concrete Vibrator 1.0 1.0 1.0
4.0 Bar Bender 1.0 1.0 1.0
5.0 Bar Cutter 1.0 1.0 1.0
Total 5.0 5.0 5.0
Prepared By:
ion
67
1
1.0
1.0
1.0
1.0
5.0