All PIUs
Upgradation of Financial Management
1. On-going All IA’s are uploading financial data into IBAS++
System to Multi-User system
Only DNCC organized a Workshop on
2. Submission of Sustainability Plan On-going
Sustainability plan on March 14, 2019
Uploading all post review package
3. On-going
documents in STEP
Adaptation of labor influx monitoring
4. On-going Only DNCC prepared the report
system and report quarterly
DDM
Final Curriculum Approved by Ministry on May 16.
Contract Signing Done: November 19, 2018 2019. Tentative Training July 7, 2019.
Confirmation of the availability of Reviewing ongoing of budget for Comprehensive
Done: November 26, 2018
the key personnel Budget Plan. Approval procedure needs to be
confirmed.
BD-DDM-29946 CS-QBS / Consultancy Contract Effectiveness Done: December 11, 2018
5. Services for Training Exercises and Drills
Submission of Inception Report Done: January 21, 2019 Prior concurrence from Bank to clear line item.
(TED) Program
Submission of Draft Done: May 16, 2019 Flowchart to be prepared as an agreed action to
show the direct flow of authority by June 13, 2019.
Quarterly Budget to be sent to Bank for next phase
Commencement of Training July 7, 2019 by June 30, 2019.
-1-
DRAFT
DNCC
-2-
DRAFT
URP-DNCC/G-1-2 / Procurement of Done: Lot 1: October 17, 2018 For VHF, Frequency Allocation permit is obtained.
Specialized ICT Equipment (VHF and HF Contract Signing But for HF the issue is still pending.
13. Radio Terminals and Related Done: Lot 2: October 22, 2018 A technical meeting will be arranged by DNCC
Installations) for City Corporations (Lot- during the mission with BTRC. After frequency
1: VHF, Lot-2: HF) Delivery of Equipment allocation permit, delivery will commence.
URP-DNCC/G-1-3 / Procurement of Contract Signing Done: August 19, 2018 Mission team will visit DSCC on June 17, 2019 to
Specialized ICT Equipment (UHF Radio discuss with relevant parties to expedite the
14.
Terminals and Related Installations) for Frequency Allocation permit as well as Import
Delivery of Equipment
DSCC Permission and Release of Equipment permit.
Delivery- Lot 01
Delivery- Lot 02
Tender Floating Done: December 20, 2018
URP-DNCC/G-1-5 / Procurement of ICT Completion of Tender Evaluation July 30, 2019 NoA will be issued by July 30, 2019
16. Equipment for Emergency Operation
Center (EOC) at SCC Contract Signing August 30, 2019
-3-
DRAFT
Completion of Tender Evaluation July 15, 2019 NoA will be issued by July 15, 2019
URP-DNCC/G-1-6 / Procurement of ICT
17. Equipment for Command and Control Contract Signing August 30, 2019
Room (CCR) at FSCD, Sylhet
Delivery of Equipment December 31, 2019
-4-
DRAFT
Delivery of Equipment
Tender Floating
Completion of Tender Evaluation June 30, 2019 NoA will be issued by June 30, 2019
URP-DNCC/G-1-11 / Procurement of
22. ICT Equipment for Warehouses for
DNCC and DSCC Contract Signing July 30, 2019
-5-
DRAFT
URP-DNCC/G-2-11 / Procurement of Contract Signing July 30, 2019 NoA will be issued by June 30, 2019
31. Search and Rescue Equipment (Rescue
Boat) Delivery of Equipment March 1, 2020
Technical Specification and detailed
32. Procurement of MCCV July 15, 2019
estimate
-6-
DRAFT
URP-DNCC/S-7 / GIS- Phase 1: Need Contract Signing Done: March 11, 2019
Assessment for Implementation of GIS
33.
Infrastructure in the Urban Resilience
Project Completion September 1, 2019 Trainings already started in DNCC office.
RFP Issuance July 15, 2019 Proposals will be received by August 15, 2019
Evaluation will be completed by September 15,
URP-DNCC/ S-9 / Preparation of GIS Completion of evaluation September 15, 2019
2019
35. Based Maps (Ward level) at DNCC,
DSCC & SCC Contract Signing October 30, 2019
-7-
DRAFT
Approval of Frequency Allocation for Approval for DNCC Status as of No. 13 and 14
41.
ICT equipment
Approval for DSCC Status as of No. 13 and 14
Approval for SCC Status as of No. 13 and 14
Inclusion of all proposed procurement
42. Done
packages in STEP
Bank will reach out to DNCC by May 30, 2019 and
Discussion with NBR on the issue of CD
43 Meeting with NBR July 7, 2019 DNCC will contact NBR. PCMU will help DNCC in
& VAT for ICT Equipment
this issue.
PCMU
-8-
DRAFT
URP/PCMU/S-2 / Internal Audit through Submission of Internal Audit Draft Final Report submitted on May 15, 2019. Will
45 June 30, 2019
a Firm Report be sent to Bank by June 30, 2019
46 Initiation of Restructuring Request June 20, 2019 Will include extension of credit
RAJUK
Confirmation of the availability of
the key personnel
URP/RAJUK/S-4 / Consultancy Services Approval of Inception Report Done: March 27, 2019
for Vulnerability Assessment and
48
Prioritized Investment Plan for Critical Submission of Situation Analysis
Assets in Dhaka for URU Report
Done: June 12, 2019
-9-
DRAFT
- 10 -
DRAFT
URP/RAJUK/G-12 / Procurement of
56
Field and Laboratory Equipment for URU
Completion of Evaluation Done: April 2, 2019
- 11 -
DRAFT
- 12 -