1 EXACAVATION :-
Earth work in excavation of Foundation of
structures as per drawing and technical
specification, including setting out, construction of
shoring and bracing, removal of stumps and other
deleterious matter, dressing of sides and bottom
and backfilling with approved material.
Total =
FILTER MEDIA
Sr. No. DESCRIPTION OF ITEM UNIT NUMBER LENGTH BREATH DEPTH
1323.89
1323.89 75 3.1 99291.6225
396
12.76
12.76 5041 13.5 64310.5575
239.94
2.89
12.66
142.55
398.04 6129 2439609.0405
396.00
396.00 6800 2692800
M Wt. IN KG
1710.00 4222
1726.65 2729
945.00 1493
968.20 1530
299.20 473
1836.00 1632
3936.00 24879
3196.80 20207
1796.22 1109
1503.43 928
1978.72 1221
1540.06 951
787.51 1244
864.00 5461
1566.56 6044
2056.66 5078
1023.93 1618
1235.78 1098
2280.00 2027
581.53 517
581.53 517
599.33 947
595.85 530
645.93 2492
645.93 574
678.19 603
723.07 643
90767.46
600000.00
M.T 74616 3.1 6772704.4467
16,986,793.20
169.9
ESTIMATE BRIDGE CHOTI NADHI WITHOUT ABUTMENT
BOQ AND ESTIMATE
MORTH
Sr. No. DESCRIPTION OF ITEM UNIT NUMBER LENGTH BREATH DEPTH QUANTITY RATE AMOUNT
ITEM NO.