INSPECTION & TESTING REQUIREMENTS REVISION: 04/18/2011 CODE NUMBER: PAGE:

SAUDI ARAMCO FORM-175 REPLACES: 04/25/2006 IR160100 1 of 1


SCOPE: POWER CIRCUIT BREAKER SWITCHGEAR and DRAWOUT POWER CIRCUIT BREAKERS: Metal-Enclosed, Low Voltage.

TEST AND INSPECTION PER: 16-SAMSS-502and Specifications as Noted Below.

(1) VISUAL INSPECTION WITNESSING BY INSPECTOR (Note 1)


(2) CERTIFICATES / RECORDS TO BE CHECKED BY INSPECTOR
(3) CERTIFICATES / DATA TO BE PROVIDED BY VENDOR / SUPPLIER / MANUFACTURER
0010
0010
*** X
Pre-Fabrication/Production Requirements
Certified design / test report
Specification Details / Notes:

0020
0020
***
X
In process inspection & test requirement
Enclosure (dimensions and painting)
Specification Details / Notes:
As per 16-SAMSS-502.

0030 X Instrument, Control Power Transformers and Meters

0040 X Protective Relays / Tripping Devices Protective relays, external to the circuit breaker, shall meet
requirements of 16-SAMSS-513.

0030
0010
***
X X
Final inspection & test requirements
Routine Production Tests
Specification Details / Notes:
As specified in 16-SAMSS-502.

0020 X Assembly (Visual) Per 16-SAMSS-502. and P.O.

Notes:
(1) May only be waived by the responsible Saudi Aramco, ASC, or AOC Inspection Offices.
(2) See form SA175 000003 for instructions on using this form.

End of IR160100